NED UNIVERSITY OF ENGINEERING AND TECHNOLOGY M.

Engineering (Civil) Fall Semester 2009 FINAL EXAMINATION 2009 CE568 AIRPORT PLANNING AND DESIGN Time 3 Hours INSTRUCTIONS Attempt any Five questions Assume necessary data wherever needed Q. No 1 Workout the space requirements for an airport terminal. Your design must present all necessary space requirements considering the following data Annual Passenger in design year 0.5 Million Peak Hour Passenger 2000 14 Arrivals 60% Unbalance Flow 80% A/C Mix in peak hour Type A B C D E F G Q.No 2a Q. No 2b No of Aircraft 5 10 3 2 1 2 1 Seat Range 0.6 1.0 1.4 1.9 2.4 3.5 4.6 Max. Marks 70

Enlist airline activities for Terminal Building. Describe passenger amenities at an airport. 04 The weight characteristic of a commercial aircraft are as under? (i) Maximum Structural take off load 220 000 lbs 10 (ii) Maximum structural landing weight 198 000 lbs (iii) Zero Fuel Weight 182 000 lbs (iv) Operating Empty Weight 125 000 lbs (v) Maximum Structural Pay load 60 000 lbs (vi) Fuel capacity 78 000 lbs Reserved fuel 1.25 hours Consumption 20 lbs /Kn Average Speed 520 Kn /Hour Draw Pay Load Vs Range Diagram me How many passengers can be loaded when aircraft has 13500 lbs cargo?

Q. No 3

An airport has three parallel runways ,two of them can be considered as CLOSE ,one of them is reserved for arrival and the other for departure. Third run way is 3200 ft from the middle one and on this runway both the Operation ie landing and takeoff can be performed. The airport has 10% T & G operations. Determine the hourly capacity for under mentioned Operations Airport has 55 % arrivals. 14 CLASS A B C D NO OF OPERATIONS 22 21 30 08

What will be the impact of introducing instrumental flight rules Q. No 4 Design Flexible pavement for a runway, which has the following Forecast traffic? Aircraft 727-100 727-200 707-320b DC 9 CV 880 737-200 L 1011 747-100 Gear Configuration DW DW DT DW DT DW DT DDT Annual Departure 3760 9080 3050 5800 400 2650 1710 85 14

MSTOW (lbs) 160 000 190 000 327 000 108 000 184 500 115 000 450 000 700 000

Take sub base thickness as 24 inch CBR value as 10 Q. No 5 At an airport there are 08 gates reserved for Four different air lines. Gate Allocation and operations are as under 14 Airline Gate allotted A B C D G1, G5 G2 ,G6 G3 ,G7 G4 ,G8 Wide Body Gate Time Operations Minutes 2 1 1 0 55 50 50 0 Non Wide Body Operations 7 3 5 4 Gate Time Minutes 45 40 45 35

Determine the Hourly Capacity of Terminal gate complex

Q.No 6

What are the constituents of Air Port Planning Process. Differentiate between System planning, Master planning and Project planning of an airport. By means of Chart Describe the components of airport system Plan 14 An airport is to be built near an industrial city in Pakistan As an airport planner what factors you will consider for selecting site for air port 07 To determine weather an object is obstruction to air navigation several Imaginary surfaces are established. Describe them in detail Describe the function ,design and construction of a helipad By means of sketch describe runway marking and their function 07 07 07

Q.No7a

Q.No 7b Q.No 8a Q.No 8b