ANSWERES MANAGEMENT AN IV CE

1. Calculate the hourly rate for material transporting in the following conditions: - Distance 20 km - Average speed 40 km/h - Load-unload time 0.5 hour - Hourly rate of the transporting mean 10 lei/h Versions: a. 10 lei b. 15 lei c. 20 lei d. 25 lei e. 30 lei 2. The informational roles of a manager are: a. entrepreneur, supervisor, leader b. supervisor, representative figure, entrepreneur c. supervisor, disseminator, spokesman d. disseminator, resource alocator, negociator e. entrepreneur, supervisor, negociator 3. The urbanism certificate has data regarding: a. The construction evaluation, specialty statement, constructions height b. The maximum value of the land occupancy percent, the constructions positioning, the constructions height c. The maximum value of the land occupancy percent, technical expertise, property act d. The resistance project, constructions height, constructions positioning e. The constructions height, construction evaluation, constructions positioning 4. The indirect expenses represent: a. Managers` wages, utilities, non-productive personnels wages b. Productive personnels wages, value of materials, utilities c. Equipment expenses, non-productive personnel wages, utilities d. Raw material expenses, equipment expenses, utilities e. Non-productive personnels wages, utilities, productive personnels wages 5. The type of the traditional contracts are: a. Total price contract, partnership contract, unit price contract b. Total price contract, target-cost contract, unit price contract c. Total price contract, lump sum fee contract, global contract d. Total price contract, work quantities price contract, unit price contract e. Reimbursable cost contract, unit price contract, partnership contract

6. The time spent to perform the finishing works for a 30 mp surface, with 4 workers (NT = 1.2 lei/mp) in 10 ore is: a. 0.5 days b. 0.6 days c. 0.7 days d. 0.8 days e. 0.9 days 7. The minimum term to finish an activity using the Critical Path is calculated by the formula: a. ttm(i) = max [tm(i-1)] b. ttm(i) = min [ttM(i+1)] c. ttm(i) = tm(i) + t(i) d. ttm(i) = tm(i) - t(i) e. ttm(i) = min [tM(i+1)] 8. Establish the time and the activities of the Critical Path for:
Activity A B C D E F Time 1 3 5 7 6 4 Previous START A A B D C,E

a. b. c. d. e.

21 days: A-B-D-E-F 21 days: A-D-E-F 22 days: A-B-D-E-F 23 days: A-C-F 23 days: A-B-D-E-F

9. The simple elementary chains have the following features: a. Unequal sectors, equal work quantities, equal time b. Equal sectors, equal work quantities, different time c. Equal sectors, different work quantities, equal time d. Equal sectors, different work quantities, equal number of teams e. Equal sectors, equal work quantities, equal time 10. The material stock for the site organization is estimated by the formula: a. Qstoc = tstoc x qmax/day b. Qstoc = q
Sstoc normat Snec

c. Qstoc = q x ksc d. Qstoc = Sstoc x qmax/day e. Qstoc = Sstoc x ksc BIBLIOGRAPHY 1. HOSSU, T., s.a., Managementul firmelor de construcii, Editura Casa Crii de tiin, 2001
normat

2. CHIOREANU, T., Preul lucrrilor de construcii, Editura UT Pres, 2004 3. ANASTASIU, L., Note de curs