Académique Documents
Professionnel Documents
Culture Documents
• Not all participants in the task force agreed with DLI’s approach
on the issue. Although some members agree with the content of
the report, a number of members were not in support.
New Crane Operator Bill
• On Mar 7, 2005 S.F. 1485 was introduced.
• On Apr 18, 2005 H.F. 759 was posted.
Industry supporters of the new crane bill:
Local 49 International Union of Operating Engineers
Associated General Contractors of Minnesota
AFSCME Minnesota Council 5
Laborers District Council Minnesota and North Dakota
Local 455 St. Paul Steamfitters,Pipefitters
• On May 15, passed Senate & 18, 2005 passed the House.
An Overview
According to the new law, no individual
may operate a crane with lifting capacity
of five tons or more, on a construction
site unless that person has a valid crane
operator certificate.
PHYSICAL EVALUATION
Candidates must submit one of the following:
•CCO Physical Examination Form
•A current DOT (Department of Transportation) Medical Examiner’s
Certificate
Certified crane operators must continue to meet ASME B30.5 physical
requirements throughout their certification period. The CCO certification
card is valid only with a current medical certificate that meets the
requirements of ASME B30.5.
CCO WRITTEN EXAMINATIONS
The written examination program consists of a Core
examination in crane operation, as well as four crane Specialty
examinations. All Specialty examinations consist of 26 multiple
choice questions.
No
Wire
Rope
HDT 80
HD 40A CAPACITY
CAPACITY OVER 5
UNDER 5 TONS TONS
(3,968 lbs) (13,228 lbs)
1926.20(b)(4)
The employer shall permit only those employees qualified by training or experience to operate equipment and machinery.
ANSI - A 10.31 Digger Derricks
Exceptions;
A person who is
employed by or
performing work for
a public utility, rural
electric cooperative,
municipality,
telephone company.
http://www.doli.state.mn.us/mnosha.html?
What's new
Crane operator certification
information
•ANY QUESTIONS