SCHEDULE OF QUANTITIES -[HVAC SYSTEM FOR OTTERS CLUB @ MUMBAI]

C LOW SIDE AIR CONDITIONING WORK Supply, Installation ,testing & commissioning of AIR DISTRTIBUTION SYSTEM with all necessary supports, fastners, nuts, bolts, washers, jointing & reinrforcement system, etc. as specified in the tender

C.1.6

Supply, installation, testing and commissioning of GI duct type Volume Controller Damper

MT2

C.2

Supply, installation, testing and commissioning of Extruded aluminium powder coated grilles of required airflow angles with & with out VCD as per drawing specific as per approval of Interior Designer Supply, installation, testing and commissioning of Extruded aluminium powder coated Two directional slot diffuser with damper as per approval of Interior Designer Supply, installation, testing and commissioning of Extruded GI powder coated Plenum box with insulation for two way sloted diffuser, sizes as per drawing G.I. opposed blade duct dampers Supply, installation, testing and commissioning of Aluminium extruded rectanglur diffusers with VCD as per approval of Interior Designer Supply, installation, testing and commissioning of Aluminium extruded powder coated Square diffusers with VCD as per approval of Interior Designer 200x200 Supply diffuser x 10 nos 150x150 Return diffuser x 85 nos Supply, installation, testing and commissioning of Aluminium extruded powder coated Round diffusers with VCD as per approval of Interior Designer 400 mm outer size 225 next size Aluminium extruded rectanglur diffusers without VCD Supply, installation, testing and commissioning of Fusible link (Specially design assembly with brass end)operated UL listed fire damper design to withstand recommended temperature 70C Aluminum extruded opposed blade Collar Dampers Supply, installation, testing and commissioning of GI make Duct flow controller including all all necessary supports, fastners, nuts, bolts, washers, jointing etc 20CFM 50CFM 60CFM 100CFM 150CFM SUB-TOTAL C LOW SIDE AIR CONDITIONING WORKS

27

MT2

C.2.1

MT2

C.2.2

20

MT2

C.2.3

RO

MT2

C.2.4

MT2

C.2.5 a b

MT2

MT2

C.2.6 a C.2.7

Nos 18 RO MT2

C.3

MT2

C.4

QRO

MT2

C.7

NOS

a b c d e C

25 10 RO RO RO

BOQ FOR HVAC WORK OFOTTERS CLUB @ MUMBAI

SCHEDULE OF QUANTITIES -[HVAC SYSTEM FOR OTTERS CLUB @ MUMBAI]


C C.1 LOW SIDE AIR CONDITIONING WORK Supply, Installation ,testing & commissioning of AIR DISTRTIBUTION SYSTEM with all necessary supports, fastners, nuts, bolts, washers, jointing & reinrforcement system, etc. as specified in the tender GI duct type Volume Controller Damper Extruded aluminium powder coated grilles of required airflow angles with & with out VCD as per drawing specific as per approval of Interior Designer Extruded aluminium powder coated Two directional slot diffuser with damper as per approval of Interior Designer Extruded GI powder coated Plenum box with insulation for two way sloted diffuser, sizes as per drawing G.I. opposed blade duct dampers Aluminium extruded rectanglur diffusers with approval of Interior Designer VCD as per 2 MT2 MT2

C.1.3

C.3

33

C.3.1 C.3.2 C.3.3 C.3.4 C.3.5 a b C.3.6

RO RO 3 RO 1

MT2 MT2 MT2 MT2 MT2 MT2

Aluminium extruded powder coated Square diffusers with VCD as per approval of Interior Designer 200x200 Supply diffuser x 10 nos 150x150 Return diffuser x 85 nos Aluminium extruded rectanglur diffusers without VCD Supply, Installation ,testing & commissioning of Fusible link (Specially design assembly with brass end)operated UL listed fire damper design to withstand recommended temperature 70C Supply, Installation ,testing & commissioning of Aluminum extruded opposed blade Collar Dampers Supply, Installation ,testing & commissioning of GI make Duct flow controller including all all necessary supports, fastners, nuts, bolts, washers, jointing etc 20CFM 50CFM 60CFM 100CFM 150CFM SUB-TOTAL C LOW SIDE AIR CONDITIONING WORKS

MT2

C.4

MT2

C.5

2.5

MT2

C.7 a b c d e

NOS 10 10 RO RO RO

BOQ FOR HVAC WORK OFOTTERS CLUB @ MUMBAI

SCHEDULE OF QUANTITIES -[HVAC SYSTEM FOR OTTERS CLUB @ MUMBAI]

BOQ FOR HVAC WORK OFOTTERS CLUB @ MUMBAI

SCHEDULE OF QUANTITIES -[HVAC SYSTEM FOR OTTERS CLUB @ MUMBAI]


B C C.1 C.1.3 Supply,Installation ,Erection, testing and Commissioning of LOW SIDE WORK LOW SIDE AIR CONDITIONING WORK AIR DISTRTIBUTION SYSTEM Supply, installation, testing and commissioning of GI duct type Volume Controller Damper Supply, installation, testing and commissioning of Extruded aluminium powder coated grilles of required airflow angles with & with out VCD as per drawing specific as per approval of Interior Designer Supply, installation, testing and commissioning of Extruded aluminium powder coated Two directional slot diffuser with damper as per approval of Interior Designer Supply, installation, testing and commissioning of Extruded GI powder coated Plenum box with insulation for two way sloted diffuser, sizes as per drawing G.I. opposed blade duct dampers Supply, installation, testing and commissioning of Aluminium extruded rectanglur diffusers with VCD as per approval of Interior Designer Supply, installation, testing and commissioning of Aluminium extruded powder coated Square diffusers with VCD as per approval of Interior Designer 200x200 Supply diffuser x 10 nos 150x150 Return diffuser x 85 nos Aluminium extruded rectanglur diffusers without VCD Supply, installation, testing and commissioning of Fusible link (Specially design assembly with brass end)operated UL listed fire damper design to withstand recommended temperature 70C Aluminum extruded opposed blade Collar Dampers Supply, installation, testing and commissioning of GI make Duct flow controller including all all necessary supports, fastners, nuts, bolts, washers, jointing etc 20CFM ( for 1 way cassettes in cabins) 50CFM (for Gym) 60CFM (for Gym) 100CFM (for ladies change room) 150CFM (for Gents change room) SUB-TOTAL C LOW SIDE AIR CONDITIONING WORKS

MT2

C.3

11

MT3 MT2

C.3.1

10

MT

C.3.2

30

MT2 MT2

C.3.3

RO

C.3.4

C.3.5 a b C.3.6

MT2 MT2

RO

MT2

C.4

MT2

C.5

QRO

MT2

C.9 a b c d e

NOS 5 5 4 4 2

BOQ FOR HVAC WORK OFOTTERS CLUB @ MUMBAI

SUMMARY OF COST
SR. NO. 1 2 3 DESCRIPTION OF WORKS GROUND FLOOR FIRST FLOOR SECOND FLOOR TOTAL COST OF TENDER FOR VRV WORKS REBATE _______ % NET TOTAL COST OF TENDER In Words: Rs.

TOTAL AMOUNT FOR MATERIAL & LABOUR (IN RS.) -

BOQ FOR HVAC WORK OFOTTERS CLUB @ MUMBAI