Vous êtes sur la page 1sur 24

REVISIONS Rev.

Date Description

3G New Site Integration Drive Test Report

SITE SHJ2208
DRIVE TEST ENGINEER NAME SITE ON AIR DATE DRIVE TEST DATE REPORT PREPARED BY Haroon Waheed
17/01/2011 06/03 /2011

Azer Butt

Approved

Received

.. Huawei RF Manager

.. RF Planning Manager

New BTS Site Integration Drive Test Report Template

Table of Contents
1 INTRODUCTION.........................................................................................................................................2 2 RADIO DESIGN PERFORMANCE CHECK...........................................................................................6 3 BASIC FUNCTIONALITY TEST.............................................................................................................16 4 OPTIMIZATION COMMENTS................................................................................................................23 5 ACCEPTANCE............................................................................................................................................24

1 Introduction
1.1 Area and site overview

A drive test was performed to verify and validate the new site integration for SHJ2208.

2013-10-09

Confidential

Page2, Total24

New BTS Site Integration Drive Test Report Template

2013-10-09

Confidential

Page3, Total24

New BTS Site Integration Drive Test Report Template

1.2

Site information data


RNC
130

Site ID
SHJ2208

Longitude
55.49295

Latitude
25.33472

Area Class
Urban

Site Type
Green Field

Infra type
30m Monopole

1.3

Cell information data


Elements Sector 1 SHJ22087 29.7 HBX-6516DS-VTM 4/0 60 Macro UMTS 2100 22087 1301/3 65 2 33 dBm Dynamic 384/384 10 1 2 Sector 2 SHJ22088 29.7 HBX-6516DS-VTM 4/0 180 Macro UMTS 2100 22088 1301/3 66 2 33 dBm Dynamic 384/384 10 1 2 11 22 Mbps Sector 3 SHJ22089 29.7 HBX-6516DS-VTM 4/0 300 Macro UMTS 2100 22089 1301/3 67 2 33 dBm Dynamic 384/384 10 1 2

Cell Name Antenna Ht Antenna type Tilting (2100-E/M) Azimuth BTS Type Frequency Service area code LAC / RAC Scrambling Code Number of Carrier CPICH Power HSDPA Power CE Elements (UL / DL) Max HS-PDSCH Codes Min HS-PDSCH Codes HS-SCCH Codes E1 number IP RX Band width

2013-10-09

Confidential

Page4, Total24

New BTS Site Integration Drive Test Report Template

1.4

Test procedures
TEST CASES DRIVE TEST METHODOLOGY Drive Test to be done using two UEs and a Scanner. (MS1-in idle Mode and; MS2 in Dedicated Mode). Both UEs are Locked to 3G Only. 1. Coverage performance of each sector (Best Server RSCP) 2. Quality performance of each sector(Best Server EcNo) Short calls: Static test on each sector. Call duration is 20 seconds and 10 seconds idle. Long Calls: Drive around within the coverage objective of each sector. Handover performance to be verified by driving in clock wise and anti clock wise around the Site, for all three sectors. Then perform handover test towards its surrounding neighbors (at least 3 neighbors) R99 & HSPA test for the following: 1. PDP context activation (5 attempts) 2. Throughput test (based on 2MB downloaded file from the FTP server. 3 SMS/MMS per cell at different locations with 10 sec break after each SMS/MMS

Radio Design Performance Check Coverage and quality performance check Call Performance Check.

Handover Performance Check

Data Performance Check

Supplementary Services Check

2013-10-09

Confidential

Page5, Total24

New BTS Site Integration Drive Test Report Template

2 Radio design performance check


2.1 Drive Test Route

* Airport Area

*Open Areas

2013-10-09

Confidential

Page6, Total24

New BTS Site Integration Drive Test Report Template

The drive to be performed considering that the Scrambling code of the desired Wcell is the primary server for most of the time. 2.2 General observation on coverage and quality
Coverage observation Sector 1 Sector 2 Sector 3 The average coverage within 1KM is about -71 dbm. No obstruction observed The average coverage within 1KM is about -71 dbm. No obstruction observed The average coverage within 1KM is about -73 dbm. No obstruction observed The average Ec/No is less than -6 The average Ec/No is less than -5 Quality observation The average Ec/No is less than -5

2013-10-09

Confidential

Page7, Total24

New BTS Site Integration Drive Test Report Template

2.3

Coverage performance Scanner mode

Chart- Serving CPICH RSCP (Scanner mode)

2013-10-09

Confidential

Page8, Total24

New BTS Site Integration Drive Test Report Template

2013-10-09

Confidential

Page9, Total24

New BTS Site Integration Drive Test Report Template

2.4

Quality performance Scanner Mode (Ec/No)

Chart- Serving CPICH EcNo (Scanner mode)

2013-10-09

Confidential

Page10, Total24

New BTS Site Integration Drive Test Report Template

2.5

Coverage performance Dedicated Mode (CPICH RSCP)

Chart- AS CPICH RSCP (Dedicated mode)

2013-10-09

Confidential

Page11, Total24

New BTS Site Integration Drive Test Report Template

2.6

Quality performance Dedicated Mode (Ec/No)

Chart- AS CPICH EcNo

2013-10-09

Confidential

Page12, Total24

New BTS Site Integration Drive Test Report Template

2.7

Active Set Size Plot

2013-10-09

Confidential

Page13, Total24

New BTS Site Integration Drive Test Report Template

Best Server Plot

*SHJ2648 sector 1 being shadowed by building at this location.

2013-10-09

Confidential

Page14, Total24

New BTS Site Integration Drive Test Report Template

Scanner Best Server Plot

2013-10-09

Confidential

Page15, Total24

New BTS Site Integration Drive Test Report Template

3 Basic Functionality Test


3.1 Accessibility

Sector -1 Voice Attempts Success Block Call Drop Call CSSR (%) Success Criteria 10 10 0 0 100% >=90% PS(R99 ) 5 5 0 0 100% >=80% HSDPA 5 5 0 0 100% >=80% HSUP A 5 5 0 0 100% >=80% SMS 3 3 0 0 100% 100% MMS 3 3 0 0 100% 100%

Sector -2 Voice Attempts Success Block Call Drop Call CSSR (%) Success Criteria Sector -3 Voice Attempts
2013-10-09

PS(R99 ) 5 5 0 0 100% >=80%

HSDPA 5 5 0 0 100% >=80%

HSUP A 5 5 0 0 100% >=80%

SMS 3 3 0 0 100% 100%

MMS 3 3 0 0 100% 100%

10 10 0 0 100% >=90%

PS(R99 ) 5

HSDPA 5

HSUP A 5

SMS 3

MMS 3
Page16, Total24

10

Confidential

New BTS Site Integration Drive Test Report Template

Success Block Call Drop Call CSSR (%) Success 3.2

10 0 0 100% >=90%

5 0 0 100% >=80%

5 0 0 100% >=80%

5 0 0 100% >=80%

3 0 0 100% 100%

3 0 0 100% 100%

Handover Test

Handover tests will be performed to demonstrate the mobility feature supported by the network. The test will also include Neighbor checks which shall be performed by driving around the site in clockwise and anti-clockwise direction for cells in the same site; and inter cell handover with the closest surrounding sites. 3.3 Handover detection

Soft & Soft-Softer Handover Sector 1 & 2 in Sector 2 & 3 in Sector 3 & 1 in AS AS AS Clockwise Yes Yes Yes Anti-Clockwise Yes Yes Yes

3.4

Handover detection between sectors of other /neighbor site

Soft & Soft-Softer Handover Sector 1 Neigh 1 143 Neigh 2 332 Neigh 3 050

Sector 2 142 143 332 446 131 332

Sector 3

Acceptance Criteria: The SHO between the sectors of same site should be successful The SHO between the sites should be successful.

Additional Comments:

2013-10-09

Confidential

Page17, Total24

New BTS Site Integration Drive Test Report Template

3.5

PS Data Performance Tests

The tests are required to verify the performance of the data calls. The data collected from the static calls and also from long calls will be used to generate the required data. The results will be interpreted and compared with the acceptance criteria. Sector -1 PS(R99 ) PDP Context Request PDP Accept Context UL 398 UL 383 DL 394 DL 390 5 5 HSPA 5 5
4.7 Mbps 4.4 Mbps 7.9 Mbps 7 Mbps

Sector- 2 PS(R9 9) 5 5
394 kbps 381 kbps 394 kbps 388 kbps

Sector-3 PS(R99 ) 5 5
394 kbps 372 kbps 394 kbps 389 kbps

HSPA 5 5
4.3 Mbps 3.3 Mbps 8.1 Mbps 7.1 Mbps

HSPA 5 5
4.8 Mbps 4 Mbps 8.7 Mbps 8.6 Mbps

Throughput (max) Throughput (Avg) Throughput (max) Throughput (Avg)

kbps kbps kbps kbps

Acceptance Criteria The acceptance criteria of data calls are based on RAB defined to cater to the packet traffic. Note: SIM with 8 Mbps DL 8 Mbps UL capabilities was used for throughput
2013-10-09 Confidential Page18, Total24

New BTS Site Integration Drive Test Report Template

testing of this site. Target Uplink Data Throughput: R99 utilizes 384 kbps RAB and the HSUPA can cater for 1.94 mbps. The target UL Peak throughput is expected to deliver 80% of the maximum RAB rate and; the average throughput should be >50% of the maximum RAB rate considering the complete drive test data. HSUPA is expected to achieve 50% of peak throughput rate and; the average throughput should be 20% of the maximum throughput, considering the complete drive test data. Target Downlink Data Throughput: R99 utilizes 384 kbps RAB and the HSDPA can cater for 7.2 mbps. For R99 PS service, the average DL throughput target is expected achieve 50% of the RAB rate and the peak DL throughput target is set to achieve 80% of the RAB rate on any one instance. HSDPA is expected to achieve 50% of peak throughput rate and; the average throughput should be 20% of the maximum throughput, considering the complete drive test data. Test method: The UL & DL of data transfer will be from a test FTP server. The file format should be a txt or data file.

2013-10-09

Confidential

Page19, Total24

New BTS Site Integration Drive Test Report Template

3.6

Throughput performance Present the graphs including the UL & DL showing the target throughputs

3.6.1 R99 Uplink & HSUPA Throughput performance sector 1

3.6.2 R99 Downlink & HSUPA Throughput performance sector 1

2013-10-09

Confidential

Page20, Total24

New BTS Site Integration Drive Test Report Template

3.6.3 R99 Uplink & HSUPA Throughput Performance Sector 2

3.6.4 R99 Downlink & HSUPA Throughput performance sector 2

2013-10-09

Confidential

Page21, Total24

New BTS Site Integration Drive Test Report Template

3.6.5 R99 Uplink & HSUPA Throughput performance Sector -3

3.6.6

R99 Downlink & HSUPA Throughput performance Sector 3

2013-10-09

Confidential

Page22, Total24

New BTS Site Integration Drive Test Report Template

4 Optimization Comments
4.1
Sr. 1. 2.

Initial tuning summary sheet


Cell Name Problems Action Taken Responsibility Status

2013-10-09

Confidential

Page23, Total24

New BTS Site Integration Drive Test Report Template

5 Acceptance
Acceptance Remarks Signed by (Huawei) Signed by (du) Date of acceptance ACCEPTED / NOT ACCEPTED

2013-10-09

Confidential

Page24, Total24

Vous aimerez peut-être aussi