How to Start a New Hospital


Many of us began our lives in one, and most of us have visited one under both happy and unpleasant circumstances. No doubt, hospitals are an indispensable part of peoples lives everywhere. This makes the healthcare industry a lucrative area to step into. In India, healthcare is the second-fastest growing sector right now, after retail. Many corporate houses are considering or have already diversified into this sector by setting up their own hospitals. Since the process of setting up a hospital involves so many processes, subprocesses and finance, it is imperative to prepare a detailed feasibility study report before you get started. Most people misunderstand the FSR as a tool for obtaining finance from institutions. On the contrary, it is a tool that would clearly answer the five questions that form the basis of every good hospital: Why am I doing it? Is it for the good of the people and the nation, or for my own financial interests? When should I start out? Timing is important; make sure you start out at a time thats most appropriate for bringing up a hospital. Where should I set it up? Proper location is also extremely important. If there are existing hospitals in a particular area, its best not to start another one there. Also, the area you select should be easily approachable and have transportation facilities. What kind of hospital will it be? Do you want to start a speciality or general hospital? Equipment and products need to be procured accordingly. How will I go about it? Broadly outline the steps for building the hospital and having all the services in place. If you are toying with this idea yourself, it is important to first ask yourself a few basic questions. Setting up a hospital is a complex mix that includes proper

building design, permissions, finance, advisors and consultants. PERMITS Land and construction The first thing to figure out is land. Keeping the approachability and transportability in mind, one should ideally look for non-agricultural land and it should be designated for hospitals. You can obtain this information from the land records of the local authorities or municipal corporations. In case the land is not designated for hospitals, you will have to notify the local authorities about the change of users. To start construction, you will need certain documents, such as the land title deed, corporate or company details, permission from the local authority to use land space for construction, building permit, tax identification card and the architects plan. The architects plan must be approved by the local authorities before construction can commence. A certificate of no objection also needs to be procured from the local authorities. On obtaining electricity supply and setting the tiles, you can get a completion certificate from the authorities after the premises has been inspected. An occupation certificate is issued after all clearances are obtained. Electricity A hospitals load requirement is calculated based on the lighting, air-cooling and medical equipment usage. These can be assessed with the help of the architect or hospital consultant. The permission is to be obtained from the local electric supply board. Water The water requirement for a hospital can vary vastly from project to project, depending on whether it is a primary, secondary, tertiary or special care hospital.

However, for a ballpark figure, your hospital will require approximately 100 liters of water per bed per day. This includes everything from a patients water requirements to hospital maintenance. Permission has to be obtained from the local authorities. Sewerage and sanitation For the installation of tanks, pipelines and the likes, you need to obtain permission from the local authorities. Bio-medical waste Large hospitals need to have incinerators installed for disposing bio-medical waste, such as body parts or tissues. As incinerators usually take up between 500 to 1,000 square feet of space, smaller hospitals cannot afford to have them installed. Therefore, they need to register themselves with municipal corporations for waste disposal. Fire department approval This is necessary for large hospitals. Health certification In most cities, the local authority will certify a healthcare facility only after all beds and equipment has been installed. This involves a nominal fee. FINANCE Obtaining finance for setting up a hospital or healthcare center is not difficult, as success rates in this industry is usually quite high. Banks are relatively easy targets for this sector. ADVISORS & CONSULTANTS

In the process of setting up a hospital, you will need to enlist the services of these professionals: Architects Hospital design consultants Structural engineers Electricity consultants Water and sanitation consultants Fire prevention consultants DEPARTMENT-WISE PLANNING Choosing medical equipment vendors: Equipment planning, department-wise Budgeting Vendor identification Vendor selection Purchase Installation Signing annual maintenance contracts Human resource functions: Making a requirement matrix, department-wise Making HR available Interview and selection Assessing financial implication Types of doctors or consultants: Resident medical officers Full-time consultants Part-time consultants Visiting consultants Nursing staff Automation and engineering services: Air-conditioner

Air handling unit Plumbing Electricity maintenance Medical gas pipelines Civil works Computerization: Hardware Software (Hospital Management Information System) Systems and protocols: Nursing protocol Admissions protocol` Infection control protocol, etc. You would also need to plan for: Stores and pharmacy Hi-tech equipment selection, installation and training Setting up super-speciality departments