Vous êtes sur la page 1sur 6

Six_Storied_Industrial_Building

SiteName FacilityID AssessmentNumber AssessmentDate QID Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2201 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2202 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2203 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2204 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2205 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2206 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2207 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2208 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2209 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2210 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2211 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2232 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2233 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2234 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2212 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2213 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2214 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2215 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2216 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2217 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2221 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2222 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2224 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2225 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2226 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2227 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2228 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2229 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2230 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2231 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2235 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2236 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2237 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2238 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2239 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2240 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2241 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2242 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2243 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2244 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2245 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2246 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2247 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2248 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2249 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2250 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2251 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2252 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2253 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2254 Six Storied R.S Industrial DA-01-08102013 Building 01 10/7/2013 2255

AccessTabName Question Choice ValueReturned Hazards Hazard: Blast Blast X Hazards Hazard: CBR Hazards Hazard: Seismic Seismic X Hazards Hazard: Flood Hazards Hazard: Wind Wind X Hazards Hazard: Fire Short fire vulnerabilities X checklist Hazards Resiliency Computations Business / Financial X (Required Question) Pre-Field Questions PF-1: Number 500of - 2000 Occupants c Pre-Field Questions PF-2: Replacement $1M - $5M Value b Pre-Field Questions PF-3: Registered No Historic a Site Pre-Field Questions PF-4: Occupancy Occupancy Use c Group III Pre-Field Questions PF-5.1: Target 0 Density:aZone I (<100 ft) Pre-Field Questions PF-5.2: Target 0 Density:aZone II (100 to 300 ft) Pre-Field Questions PF-5.3: Target 0 Density:aZone III (300 to 1,000 ft) Pre-Field Questions PF-6: Target No Potential: a Facility Pre-Field Questions PF-6: Target No Potential: a Sector Pre-Field Questions PF-7: Seismic Medium Zone b Pre-Field Questions PF-8: Geology Not (Nearby Near Fault a Seismic Faults) Pre-Field Questions PF-9: Floodplain No a Pre-Field Questions PF-10: Maximum Low Previous b Flood Depth Pre-Field Questions PF-14: High Medium Wind Speed b Zone Pre-Field Questions PF-15: Hurricane Rare Events b Pre-Field Questions PF-16: Tornado Rare Eventsbin Region Pre-Field Questions PF-17: Soil Poor Type c Structure Type Structure Type Concrete (Critical Frame X Question) with Unreinforced Masonry In Consequences 1.1 Locality/Density Semi-urban/ Type b Lt. Industrial Consequences 1.2 Operational Moderate Redundancy c Consequences 1.3 Impact of International Physical Loss e Threat 2.1 Site Population High (1/40)d Density (Person Per Square Foot) Threat 2.2 VisibilityModerate / Symbolic c Threat 2.3 Overall Inaccessible Site Accessibility a Site 3.1 Distance 25 to- Potentiall 50 c Threatening Vehicles (feet) Site 3.2 Perimeter Ornamental Boundary dTemporary or Anti-Climb Barriers Site 3.3 Unobstructed 5 - 10 View d (feet) Site 3.4 Unsecured None Underground a Access Site 3.5 StorageLow of Hazardous b Materials Site 3.6 Nearby Small Structures (Underground b or Adjacent) Site 3.7 Topography Flat / Slopes a Site 3.8 Condition Medium of Foundation b Site 3.9 Potential Very Windborne few a Debris/Missiles Site 3.10 Nearby No Water Structures a (Levees, Dams, and Emban Site 3.11 Adequacy Moderate of Emergency b Exits Site 3.12 Retaining None Walls / NA a Site 3.13.1 Location Yes of Critical b Functions/Valuables: Exposure Site 3.13.2 Location No of Critical a Functions/Valuables: Exposure Site 3.14 Potential NAof Soil Liquefaction a Architectural 4.1 Building50-100 Height ft (4-8 c flr) Architectural 4.2 BuildingBox Configuration b Architectural 4.3 Overhang None (feet) a Architectural 4.4 Lobby/Retail Detached Location a (In Relation to Main Building Foo Architectural 4.5 LoadingExterior Dock / Mail to Building bScreening Location

Page 1

Six_Storied_Industrial_Building

Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six

Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01

10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013

2256 2257 2258 2259 2260 2261 2262 2263 2264 2265 2266 2267 2268 2269 2270 2271 2272 2273 2274 2275 2276 2277 2278 2279 2280 2281 2282 2283 2284 2285 2287 2288 2289 2294 2295 2297 2298 2299 2300 2301 2302 2303 2304 2305 2306 2307 2308 2309 2310 2311 2368 2369

Architectural 4.6 Vehicular No Penetration a of Exterior Enclosure Architectural 4.7 Garage Adjacent Location Exterior c & Above Ground Architectural 4.8 Partitions Not braced,c6-9 ft high Architectural 4.9 Appendages NA (Chimneys, a Parapets, or Ornaments) Architectural 4.10 Anchoring 60%of - 90% Non-structural b Components (Suspende Architectural 4.11 Horizontal None Irregularity a Architectural 4.12 Vertical None Irregularity a Architectural 4.13 Soft Story None a Architectural 4.14 Elevated None Tanks, Bins, a Vessels, or Trussed Towers Building Enclosure 5.1 WindowGlass Support & Metal Type c Framing Building Enclosure 5.2 Total Percentage 10% - 30% of b Window Area Building Enclosure 5.3 Glass Type Annealed Glass e Building Enclosure 5.4 Wall Type Lt. Frame or e Slender Unreinf. Masonry Building Enclosure 5.5 Windborne Debris Impact Protection Building Enclosure 5.6 Glazing-frame: NA In-plane a Seismic Clearance Building Enclosure 5.7 Veneer NA Condition a Building Enclosure 5.8 Enclosure Excellent - Structure a Connections Building Enclosure 5.9 Geometry Regular of Enclosure a Building Enclosure 5.10 Shutter NA Availability a Building Enclosure 5.11 Roof Construction Solid a Building Enclosure 5.12 Roof Configuration Flat b / Pitch Structural 6.1 Number>of 5 Bays in Short a Building Direction Structural 6.2 Column15 Spacing - 25 ft (Feet) b Structural 6.3 Unbraced < 12ft Column Height a (Feet) Structural 6.4 PubliclyYes: Accessible Massive c Column Structural 6.5 Transfer None Girder Conditions a Structural 6.6 Structural None Enhancements c & Weaknesses Structural 6.7 Number>4 of lateral systems a (Redundancy) Structural 6.8 Short Columns Several or in Walls several e floors Structural 6.9 SeismicYes Design/Retrofit a Structural 6.10 Span of <=20 Roof ft a Structural 6.11 Missing Yes Topping Slabs b Structural 6.12 Pounding No adjacent of Adjacent abuildings Structures: Buildings Separatio MEP 7.4 Critical Utilities Yes: Hardened Located b Close to High Risk Areas MEP 7.5 MEP Systems 60% - 90% Anchoring b MEP 7.7 Elevation Above of Utility ground Lines b MEP 7.8 Above Ground Moderate Utility, c Communication, and Lifeline An MEP 7.9 MEP Support Well supported by Structural c - 30%-60% System MEP 7.10 Soil Spread NA Potential a (Underground Systems) MEP 7.11 Clearances Poor for Pipe d Penetrations Fire - 1 8.1a Upgraded Yes to Meeta Current Code/Governing Standard Fire - 1 8.2a Backup Yes Power for a Life Safety Equipment Fire - 1 8.3a Fire Command No Center c Fire - 1 8.4a Automatic No Detection b System Fire - 1 8.5a Activation No of the System: c Automatically Shut Down H Fire - 1 8.6a Automatic No Sprinkler b System Fire - 1 8.7a Standpipe No Systemc Fire - 1 8.8a Fire Department Yes Drill a Fire - 1 8.9a Fire Safety Yes Training a for Occupants/Tenants Fire - 1 8.10a Emergency Yes Evacuation a Plan and Shelter-in-place Security 9.1.1 Internal >3Threat, Systemsa Intrusion: Number of Security System Security 9.1.2 Internal Moderate Threat, Intrusion: c Overall Security Effectiven

Page 2

Six_Storied_Industrial_Building

Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six Six

Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01 Storied R.S Industrial DA-01-08102013 Building 01

10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013 10/7/2013

2370 2371 2374 2375 2378 2379 2380 2381 2382 2383 2490 2491 2492 2493 2494 2495 2496 2497 2498 2499 2500 2501 2502 2503 2504 2505 2506 2507 2508 2509 2510

Security 9.2.1 Internal None Threat, Explosion: d Number of Security Syste Security 9.2.2 Internal No Threat, Securitye Explosion: Overall Security Effective Security 9.4.1 External Zone I Threat, Explosion: Number of Secu Security 9.4.2 External Zone I Threat, Explosion: Overall Security E Cyber 10.1 Effectiveness Low of Cyber c Security Plan Cyber 10.2 Effectiveness Mediumof Cyber b Training Program Cyber 10.3 Security Medium of Communication Security b and Power Systems Cyber 10.4 Redundancy Yes of Communication a Systems Cyber 10.5 Security Medium of Power Security bSupply Cyber 10.6 Effectiveness Medium of (within Mass b Jurisdiction) Comnunication, Wireless, Ra Continuity - 11.1 Business Emergency PartialOperations b Center and Incident Comma Continuity - 11.2 Business Plans, No Policies, and c Procedures for Disaster Recover Continuity - 11.3 Business Risk Assessement No c and Business Impact Analysis Continuity - 11.4 Business MutualNo Aid Agreements c Continuity - Water Business Supply/Storages Does Not d Continuity - Power Business Supplies Does Not d Continuity - Heating Business / Cooling NA a Continuity - Generator/Backup Business Partially Power c Continuity - Wastewater Business Does Systems Not d Continuity - Supplies/Inventories Business Fully b Continuity - Deliveries/Loading Business Fully Dock b Continuity - Elevators Business NA a Continuity - Data/Telecome Business FullyDistribution b Systems Continuity - IT/ Business Computers Partially (Data Centers/Servers) c Continuity - Utility Business Control Partially Center (Building c Automation System) Continuity - Emergency Business Partially Operationsc Continuity - Janitorial Business/ Housekeeping Fully b Continuity - Archives/Vital Business Partially Records c Continuity - Special Business Collections/Valuables NA a Continuity - Other Business Critical NA Functions a Continuity - Short-term Business Shelter-in-place NA a

Page 3

Six_Storied_Industrial_Building

Comments Unknown FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE a. Excellent. FALSE No signs of distress (e.g., cracks, settlement, tilt) b. Medium. Minor cracks that do not affect the stability of the stru FALSE FALSE a. Excellent FALSE Multiple exits sufficient for the size of the building and number of occupants logically located to efficiently evacua FALSE Typical areas FALSE where critical functions and valuables are exposed to wind are: building interior near windows Roof FALSE Soil conditions FALSE do not indicate poten- tial for liquefaction FALSE FALSE FALSE FALSE FALSE

Page 4

Six_Storied_Industrial_Building

FALSE FALSE FALSE Not applicable. FALSE No appendages (chimneys, parapets, ornaments, and similar items)that require bracing FALSE FALSE FALSE FALSE FALSE FALSE FALSE W eakest type FALSE of glass Creates shards when broken FALSE s Impact Protection FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE c. None. No structural FALSE enhancements or weaknesses described in the other attribute options (most common) FALSE FALSE The building has FALSE or has not been designed or retrofit for seismic events, which can be determined by talking to the building eng FALSE FALSE FALSE b. Exposure to FALSE potential threat, hardened. Critical utilities are within50 feet of high-risk areas and are separated by a hardened FALSE FALSE FALSE FALSE FALSE Poor. Pipes have FALSE no clearance or have non-flexible interface to fill voids FALSE life safety equipment FALSE is automatically connected to a backup (redundant or secondary) power supply if the primary power supply Fire command FALSE centers generally include: a fire alarm system control panel with a digital annunciator, status indicating lights, an FALSE FALSE FALSE FALSE FALSE FALSE FALSE Intrusion refers FALSE to entering or breaking into a building by a person or persons with the intent of attacking or causing harm to the FALSE

Page 5

Six_Storied_Industrial_Building

FALSE FALSE Threat, Explosion: Number FALSE of Security Systems Threat, Explosion: Overall FALSE Security Effectiveness FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE

Page 6

Vous aimerez peut-être aussi