DMCC ALMAS TOWER (JAP016) JUMEIRAH LAKE TOWERS

TOTAL AMOUNT AMOUNT CERTIFIED OUTSTANDING AMOUNT

DESCRIPTION

PERCENT CERTIFIED

PERCENT OUTSTANDING

REMARKS

EFFECTIVE CONTRACT AMOUNT

261,161,000.00

259,509,675.51

99.37%

1,651,324.49

0.63%

OUTSTANDING CLAIMS WITH ERI

104,323,764.37

60,740,469.59

58.22%

43,583,294.78

41.78%

OUTSTANDING CLAIMS WITHOUT ERI

5,482,732.44

0.00%

5,482,732.44

100.00%

GRAND TOTAL

370,967,496.80

320,250,145.10

86.33%

50,717,351.70

13.67%

DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO. SUB NO. ERI NO. V.O. TO
CLAIM NOTICE LETTER CLAIM ENTITLEMENT APPLICATION DATE
13-May-06 13-May-06

October 15, 2013


REMARKS / COMMENTS

ER / F&G / JV AGREED VALUES COST (AED) 0.00 218,400.00


TIME (Days)
0 0

OUTSTANDING CLAIMS COST (AED)


CLOSED CLOSED

CERTIFIED AS AT CERTIFIED TO-DATE

DESCRIPTION
REFERENCE Additional Telephone Lines
DXB/AMT-01/0500/JLy/429 DXB/AMT-01/0500/JLy/430

November 30, 2008


BALANCE TO-DATE
0.00 59,755.63
to confirm if this is still needed; No need for additional telephone lines F&G evaluation is based on a +12% OH&Pro, and prelims omitted and to be dealt with in EOT's

COST (AED) 0.00 278,155.63

TIME (Days)
0 0

LETTER REF.
JAP016/ALM/TCAC/21287 dated 5-Oct-08 JAP016/ALM/TCAC/05508 dated 29-Nov-06

TIME (Days)
CLOSED CLOSED

13 14

001 001

04 06

JV JV

0.00

14 14 15 16 17

002 004 001R1 001 001

06 06 07 08 09

Site Establishment - Offices (Supply of ETA Temporary Site Office Purchased form Seidco Gen. Cont. Co.) NSC ETA Site Offices (New Offices at Site) JV ETA/F&G Site Offices - Rubbish Removal NSC ETA Site Offices Provision of Power Supply JV JV Provision of Starter Bars to Podium within the Landscape Package Core Wall Thickening

218,400.00

DXB/AMT-01/0600/MIC/____ DXB/AMT-01/0600/DAN/5012 DXB/AMT-01/0500/JLy/431 / DXB/AMT-01/0600/DAN/3648 DXB/AMT-01/0500/JLy/432 DXB/AMT-01/0500/JLy/501

13-Dec-08 26-Oct-08 13-May-06 / 12-Feb-08 13-May-06 26-Jun-06

501,971.39 56,840.00 1,193,235.54 159,171.78 181,391.33

0 0 0

501,971.39 56,840.00

CLOSED 0 CLOSED 765,834.58

501,971.39 56,840.00 427,400.96

ETA cost + 12% OH&P + 3% Attendances JV scope of works; verbally agreed with F&G to be 5050; as at Sep-08 ETA costs + 7% JV OH&P

1,193,235.54

0 ur

128,324.82 107,738.59

JAP016/ALM/TCAC/04893 dated 30-Oct-06 JAP016/ALM/TCAC/08151 dated 09-Apr-07

CLOSED CLOSED

CLOSED ur

128,324.82 107,738.59

30,846.96 73,652.74

Costs agreed by JV under letter ref. DXB/AMT01/0500/Jly/1065 dated 7-Nov-06. ERI No. 09; Internal Preliminary Assessment is equal to 10 days, but works has yet to be carried out to consider the EOT; cost evaluated by F&G accepted thru letter ref. DXB/AMT-01/0500/Jly/1072 dated 8Nov-06 but subject to add'l revisions and prolongat ETA cost of 60,350.00 + 7% JV OH&P

14

003

10

20

001

11

NSC Site Establishment - Offices (Supply and Installation of AC Units within the New Offices being established by Nakheel) JV Supply of Potable Water to DMCC and F&G's Site Offices NSC Cast Resin Bus Bars

DXB/AMT-01/0500/JLy/430

13-May-06

80,097.04

64,574.50

JAP016/ALM/TCAC/06385 dated 21-Jan-07

CLOSED

CLOSED

64,574.50

15,522.54

DXB/AMT-01/0500/JLy/655

16-Jul-06

23,551.60 2,071,622.24

25,076.80 1,049,300.70

28

001R1

12

DXB/AMT-01/0600/EDM/2402, DXB/AMT-01/0600/DAN/3172

24-Jun-07 , 14-Nov-07

ur

JAP016/ALM/TCAC/22075 dated 4-Nov-08, JAP016/ALM/TCAC/23417 dated 6-Jan-08 JAP016/ALM/TCAC/14871 dated 13-Jan-08

CLOSED

CLOSED

10,841.60

12,710.00

Period from June 2006 - September 2007, and October-2007 - November 2008

CLOSED

ur

1,049,300.70

1,022,321.54

ETA Cost + 7%; Time Effect shall be by NSC, if any; potential additional builders works, and attendance in reference to the Time. Confirmed by ETA under their letter ref. DIV.092/AM/TS/1342 dated 31-Jan-08 cost implication sent under JV letter ref.DXB/AMT01/0800/Jly/1175 dated 29-Nov-06 EVSCost Effect is NSC Cost + 7% O&H + 2% Attendance, as this is an additional work; Time Effect shall be by NSC, if any; potential additional builders works. ETA costs + 7% JV OH&P; F&G revised assessment from their letter ref.JAP016/ALM/TCAC/18730 dtd 8Jun-08 JV Cost; Note : the cost for OCP is omitted and will be dealt with separately; F&G revised assessment from their letter ref.JAP016/ALM/TCAC/18730 dtd 8-Jun-08 ETA's cost + 12% OH&P + 3% Attendances

OM-1 32

001 001

13 14

Omit Wall Plaster from Car Parking Areas in all 5 Basement Floors NSC Stainless Steel Members to Diamond Exchange Area JV NSC Provision of DB's in lieu of Isolators in the Offices & Retail Units at 3rd to 49th Floors (MEP Works) JV Provision of DB's in lieu of Isolators in the Offices & Retail Units at 3rd to 49th Floors (Builders Work)

JAP016/ALM/TCAC/05257 DXB/AMT-01/0500/JLy/844

16-Nov-06 11-Sep-06

(383,650.51) 333,540.00 2,072,029.32

0 ur

(383,650.51)
JAP016/ALM/TCAC/05673 dated 11-Dec-06

CLOSED CLOSED

(315,883.28) 317,914.82

(67,767.23) 15,625.18

317,914.82 1,220,076.06

CLOSED

35

001a

15

DXB/AMT-01/0500/JLy/926

03-Oct-06

ur

ur

35

001b

15

DXB/AMT-01/0500/JLy/926

03-Oct-06

102,131.48

ur

55,692.82

ur

JAP016/ALM/TCAC/18730 dated 8-Jun-08 JAP016/ALM/TCAC/22415 dated 18-Nov-08 JAP016/ALM/TCAC/18730 dated 8-Jun-08

CLOSED

CLOSED

1,408,720.27

663,309.05

CLOSED

CLOSED

102,131.44

0.04

217

001

15.1

217

002

15.1

31

001

16

NSC SMDB's in lieu of Isolators at Level 52-63 and Retail Mall and Splitting of Landlord DB's for Ground Floor and First Floor as per DEWA Requirement (MEP Works) JV SMDB's in lieu of Isolators at Level 52-63 and Retail Mall and Splitting of Landlord DB's for Ground Floor and First Floor as per DEWA Requirement (Builders Work) JV Drawing Revisions to the Diamond Exchange Centre; due to revised Openings. JV Interior Design Works (JV Internal Subcontractors)

DXB/AMT-01/0600/EDM/4512

06-Jul-08

538,459.90

ur

538,459.90

ur

538,459.90

DXB/AMT-01/0600/EDM/4512

06-Jul-08

7,538.64

ur

7,538.64

ur

7,538.64

builders works

DXB/AMT-01/0500/JLy/842

11-Sep-06

82,672.78 28,894,792.49

JAP016/GEN/ABS/0010 dated 17-Oct-06

82,672.78

CLOSED

82,672.78

rejected by Nakheel due to relation with coordination issues with MEP requirements; awaiting response from NSC (Eversendai) on the rejection. updated cost and rates approval summary status being sent regularly; cost submitted is the final applied claim updated cost and rates approval summary status being sent regularly.

41

001R1

16/ 39 16/ 39 16/ 39 16/ 39 16 16

DXB/AMT-01/0500/JLy/877

24-Sep-06

see NOC#127

22,785,939.94

agreed values is partial and see NOC#127 deemed to change

CLOSED

28,304,706.24

590,086.25

progressively, as it is based on the agreed rates only (+12%)

41

002R1

NSC Interior Design Works (Other ID Works being done by Bond Interiors) NSC Interior Design Works (MEP Works by ETA)

DXB/AMT-01/0500/JLy/877

24-Sep-06

5,064,844.41

see NOC#127

3,879,153.39

agreed values is partial and see NOC#127 deemed to change

CLOSED

4,062,428.29

1,002,416.12

progressively, as it is based on the agreed rates only (+7%)

41

003R1

DXB/AMT-01/0500/JLy/877

24-Sep-06

8,423,604.53

see NOC#127

8,117,552.86

agreed values is partial and see NOC#127 deemed to change

CLOSED

7,573,568.93

850,035.60

updated cost and rates approval summary status being sent regularly.

progressively, as it is based on the agreed rates only (+7%)

41

004R1

NSC Interior Design Works (Lift Finishes by Kone Middle East) JV JV ID Works Package - Changes to CT-01 & CT-02 Raised Access Flooring System at the Diamond Exchnage Centre to Screeding Works ID Works Package (GL-08)

DXB/AMT-01/0500/JLy/877

24-Sep-06

3,111,331.22

see NOC#127

3,107,564.82

agreed values is partial and see NOC#127 deemed to change

CLOSED

2,774,842.92

336,488.30

updated cost and rates approval summary status being sent regularly.

progressively, as it is based on the agreed rates only (+7%)

69 79

001 001

DXB/AMT-01/0600/EDM/1785 DXB/AMT-01/0500/JLy/2030

14-Mar-07 16-Apr-07

28,616.00 282,635.67

see NOC#127 see NOC#127

28,365.12

JAP016/ALM/TCAC/20228 see NOC#127 dated 12-Aug-08

CLOSED 282,635.67

CLOSED CLOSED

28,616.00 282,635.67

abortive materials only Floor Screeding works; valued under the ERI No. 16 as per the F&G letter ref. JAP016/ALM/TCAC/21388 dated 7-Oct-08 and confirmed under our letter ref. DXB//4963 dtd 16-Oct-08 Mozart Marble cost + 12% OH&P

see NOC#127

132

001

16

JV

DXB/AMT-01/0600/EDM/3065

25-Oct-07

1,774,080.00

(see NOC #127-001) ur ur ur

1,774,080.00

JAP016/TS/GT/0103 dated 18see NOC#127- Oct-2007 JAP016/ALM/TCAC/22521 001 dated 20-Nov-08

CLOSED

CLOSED

1,774,080.00

147 147 169

001 002 001R2

16 16 16

JV JV JV

Internal Water Feature (Aqua-Teknik Scope) Internal Water Feature (Related Builders Work)

DXB/AMT-01/0500/JLy/3209 DXB/AMT-01/0500/JLy/3209 DXB/AMT-01/0600/EDM/3626

21-Nov-07 21-Nov-07 07-Feb-08

626,750.00 4,134.48 541,470.46

626,750.00 4,134.48 541,470.46

ur ur ur

299,096.00

327,654.00 4,134.48 541,470.46

Aqua-Teknik cost + 12% OH&P + 3% Attend Coring Subcon Cost + 12% OH&P + 3% Attendances S/C costs + 12% OH&P + 3% Attendances; to be valued at ERI 16 as per F&g letter ref. JAP016/TS/GT/0254 dtd 29May08 EVS to submit entitlements; EVS cost + 12% OH&P + 3% Attendances

169

002R1

16

169

003

16

170 170

001 002

16 16

Revisions to the ID Works Package For Construction Drawings at the Ground Floor and First Floor (GL-19 & GL-07) JV Revisions to the ID Works Package For Construction Drawings at the Ground Floor and First Floor (Structural Supports to GL-07) NSC Revisions to the ID Works Package For Construction Drawings at the Ground Floor for the termination of GL-07 and other adjacent Finishing Materials (CVI No. 093) JV Potential Claim due to Late Design Changes Stainless Steel Door Frames L49-L64 Inclusive JV Additional Ironmongeries to Timber Door (DT-02) at Levels 49 upwards

DXB/AMT-01/0600/EDM/3626

07-Feb-08

34,314.41

ur

34,314.41

ur

34,314.41

DXB/AMT-01/0600/EDM/4520

07-Jul-08

ur

ur

ur

ur

Bond Interiors to submit entitlements

DXB/AMT-01/1100/WAE/3632 DXB/AMT-01/0500/JLy/3845

09-Feb-07 16-Mar-08

100,121.32 0.00

see NOC#127 see NOC#127

see NOC#127

100,121.32 CLOSED

CLOSED CLOSED

100,121.32 0.00

to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08 under review (haroon & alpha star); to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08; no changes made in the Ironmongeries as there was no formal instruction scope shall be removal, supply and installation of ironmongeries; valued in ERI No. 16 as per Nakheel letter ref. JAP016/TS/GT/0318 dtd 20Aug08 BI to submit entitlements; Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; BI cost + 12% OH&P + 3% Attendances Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Electrical Works by ETA; ETA cost+ 12% OH&P + 3% Attend Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Supply only of light fittings from Lever

0.00

see NOC#127

186

002

16

JV

DMCC Offices - Core Toilets Level 49 & 50 (Revision of Ironmongeries)

DXB/AMT-01/0600/EDM/4671

03-Aug-08

4,137.35 25,112.55

ur

4,137.35

ur

4,137.35

211

001

16

NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (MEP Works by ETA) JV Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (Supply of O2 Light Fixtures from M/s.Lever Electric)

DXB/AMT-01/0600/EDM/4352

05-Jun-08

ur

25,112.55

ur

25,112.55

211

002

16

DXB/AMT-01/0600/MIC/5014

26-Oct-08

247,839.95

ur

247,839.95

ur

247,839.95

211

003

16

DXB/AMT-01/0600/MIC/5040

05-Nov-08

39,243.75

ur

39,243.75

ur

39,243.75

214

001

62 / 16 16.1

122

001

Design Changes due to the Omission of Operable Partition at Level 2 Offices (ERI No. 62) and Stainless Steel Rubbish Bins (ERI No. 16) NSC ID Finishes for the Steel Columns at Ground Floor Entrance Lobby, 1st Floor Food Court and Retail Mall JV NSC DVR Storage Units as per Option III NSC Chilled Water Monitoring and installation (Revised District Cooling Chilled Water Connections Requirements) JV 40' Container for Office Storage NSC Revision of Duties and Capacities of the Ground and First Floor AHU's JV Additional Works to the Extra Piles Driven by the Piling Contractor (CVI No. 007) JV Amendments to Basement 1 Generator Rooms (Architectural Works) NSC Amendments to Basement 1 Generator Rooms (MEP Works by ETA) JV Nibs for the Approach Slabs JV JV JV JV JV JV JV JV Interior Design Package Changes affecting the Main Contract Package Door Details (Door Type for Telephone Room (01-052) at First Floor) DTS referenced AM/015/515 dated 5th August 2006 (Architectural and Structural Works) List of "For Construction" Drawings transmitted by Nakheel Changes in the Lift Pit Depths, and Revisions to the Galvanised Steel Ladder at 64th Level Changes to the Access Floor Heights Various Revisions at the Parking Areas Additional Architectural Works to the Service Floor Areas (1-3)

DXB/AMT-01/0600/EDM/4464

26-Jun-08

(valued in 41-001 & 149001) 72,174.00

ur

(valued in 41-001 & 149-001)

CLOSED

ur

0.00

considered in 41-001 and 149-001

DXB/AMT-01/0600/EDM/2954 /DXB/AMT-01/0600/EDM/3305 DXB/AMT-01/0500/JLy/1891 DXB/AMT-01/0500/JLy/925

01-Oct-07/ 10-Dec-07 27-Mar-07 03-Oct-06

ur

72,174.00

ur

72,174.00

Al Abbar cost + 12% OH&P + 3% Attendances

77 34

001 001

17 18

2,430,700.00 1,566,116.20

ur ur

2,430,700.00

ur ur 642,000.00

2,430,700.00 924,116.20

JCI costs + 7% JV OH&P ETA costs + 7% JV OH&P

678,543.71

JAP016/ALM/TCAC/22578 dated 24-Nov-08

CLOSED

38 37 3 12 12 16 19 21 23 33 33 33 33 33

001 001 002 001 002 002 001 001 001 001 002R1 003 004 005

19 20 21 21 21 21 21 21 21 21 21 21 21 21

DXB/AMT-01/0600/EDM/1011 DXB/AMT-01/0600/EDM/988 DXB/AMT-01/0500/JLy/112 DXB/AMT-01/0500/JLy/362 DXB/AMT-01/0500/JLy/362 DXB/AMT-01/0500/JLy/432 DXB/AMT-01/0500/JLy/623 DXB/AMT-01/0500/JLy/691 DXB/AMT-01/0500/JLy/748 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881

29-Oct-06 22-Oct-06 18-Sep-05 18-Apr-06 18-Apr-06 13-May-06 05-Jul-06 06-Aug-06 12-Aug-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06

32,340.85 262,569.93 1,434.82 19,047.23 1,579,708.41 35,825.47 14,639.13 2,848.23 28,033.99 (not used) 27,175.35 229,129.54 22,371.54 153,565.57

0 ur 0 ur ur 0 0 0 0

32,341.10

JAP/ALM/TCAC/06743 dated 6Feb-07

CLOSED 262,569.93

CLOSED ur CLOSED ur ur CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

32,341.10 84,537.51 1,156.76

(0.25) 178,032.42 278.06 19,047.23 1,579,708.41

actual cost transmitted to F&G based on dayworks rates; agreed with F&G ETA costs + 7% JV OH&P awaiting response from Client. rejected by Nakheel due to notice not served as per the required time period under the Contract. ETA Cost of AED 1,476,363 + 7% JV OH&P awaiting response from Client. Various changes to the ID Package affecting the MC Package; i.e., blockworks Door which is not provided with an opening tag, in reference with Tender Query, Item No.6 dtd 16-May05,pages 9 Various revisions to the drawing under the F&G transmittal sheet ref. F&G/ALMAS/ TAISEI/01356 dtd 01-Aug-06 NOT USED agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G)

0
JAP016/GEN/ABS/1051 dated 8-Aug-06 JAP016/GEN/ABS/1051 dated 8-Aug-06

1,434.82 19,047.23 1,579,708.41 CLOSED CLOSED CLOSED CLOSED CLOSED


JAP016/ALM/TCAC/181187 dated 18-May-08 JAP016/ALM/TCAC/16338 dated 17-Mar-08 JAP016/ALM/TCAC/18352 dated 26-May-08 JAP016/ALM/TCAC/17247 dated 16-Apr-08

25,157.54 14,560.51 2,296.25 21,880.70 (not used)

0 0 0 0 0 0 0 0 0

JAP016/ALM/TCAC/18884 dated 12-Jun-08 JAP016/ALM/TCAC/04947 dated 1-Nov-06 JAP016/ALM/TCAC/05297 dated 19-Nov-06 JAP016/ALM/TCAC/06567 dated 29-Jan-07

25,157.54

10,667.93 14,639.13 2,848.23 28,033.99

0.00

0 0 0 0

26,646.79 23,398.50 18,036.01 123,805.08

CLOSED CLOSED CLOSED CLOSED

25,766.44 23,398.50 18,036.01 123,805.08

1,408.91 205,731.04 4,335.53 29,760.49

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (2).monvabad

2 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
33

October 15, 2013


REMARKS / COMMENTS

SUB NO.
006

ERI NO.
21

V.O. TO
JV

CLAIM NOTICE LETTER

CLAIM ENTITLEMENT APPLICATION DATE COST (AED) 3,223.52 1,894.77 657.99 427.04 425.15 1,150.44 13,820.28 499.04 3,461.71 1,556.34 41,554.32
TIME (Days)
0

ER / F&G / JV AGREED VALUES COST (AED) (1,351.84)


TIME (Days)
0

OUTSTANDING CLAIMS COST (AED)


CLOSED

CERTIFIED AS AT CERTIFIED TO-DATE


(1,351.84)

DESCRIPTION
REFERENCE Missing Spanmark as PB434 (RFI No. 029) Additional Reinforcement due to the Missing Details (RFI No. 042) First Floor Slab Details (RFI No. 072) Second Basement Floor Beam - PB205A (RFI No. 075) Fourth Basement Beam - PB451A (RFI No. 078) Fourth Basement Beam - PB434 (RFI No. 144) Tower Structural Drawings - Additional TB29 Beam (RFI No. 146) Door Opening Height - First Floor (RFI No. 157) Basement 2 Beams (RFI No. 162) Lift F4 - Structural Details (RFI No. 171) Reinforced Concrete Partition Wall @ the Basement 2 (RFI No. 182) Increase in Beam Depths at First Floor - Section N1 (RFI No. 192) Increase in Beam Depths to PB149 and PB150A (RFI No. 223) Additional Outrigger Walls at Service Floor Areas Structural Works Omission of Rebars in Core Walls Additional Mass Concrete at 2nd Level, and Revisions to the Stairs leading to the Vault at 2nd Level Additional Column Posts at 50th to 51st Level and Additional Core Walls, i.e., 400mm and 500mm thick Additional Lifting Beams to the 64th Level Machine Rooms (@Level 288.650m and 285.350m) Changes to Slab Steel Reinforcement to S11 to S12 Additional Steel Reinforcement to Beams Located Around Tower Building and Connected to Precast Slab Additional rebars to basement retaining wall @ staircase and changes of rebar to wall Changes in Shear Wall in Zone 4 Associated in Lift and Vault Wall Additional Rebar in First Basement Slab Additional Top Steel Reinforcement in Ground Floor Slab Additional Bottom Steel Reinforcement in Ground Floor Slab Additional Building Maintenance Units at Diamond Exchange Centre Revisions to Contract Drawings in First Floor Levels
DXB/AMT-01/0500/JLy/881 24-Sep-06

November 30, 2008


BALANCE TO-DATE
4,575.36
agreed with Consultant (F&G)

LETTER REF.
JAP016/GEN/ABS/1011 dtd 19Jun06; JAP016/ALM/TCAC/18884 dtd 12-Jun-08 JAP016/GEN/ABS/1011 dated 19-Jun-06 JAP016/ALM/TCAC/20933 dated 14-Sep-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/17248 dated 16-Apr-08 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/18352 dated 26-May-08 JAP016/ALM/TCAC/18118 dated 18-May-08

TIME (Days)
CLOSED

33 33 33 33 33 33 33 33 33 33

007 008 009 010 011 012 013 014 015 016

21 21 21 21 21 21 21 21 21 21

JV JV JV JV JV JV JV JV JV JV

DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881

24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06

0 0 0 0 0 0 0 0 0 0

1,894.77 CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED 41,554.32

CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED 530.47 343.82 344.60 1,063.46 12,180.62
0.00

1,894.77 127.52 83.22 80.55 86.98 1,639.66 499.04 2,913.10 322.60 41,554.32

awaiting response from Client. agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) rejected F&G assessment in their letter JAP016/ALM/TCAC/18118 dated 18-May-08 thru our letter ref.DXB/./EDM/4262 dtd 22May08;F&G assessment under review by JV agreed with Consultant (F&G) agreed with Consultant (F&G) revised cost impact submitted under ref. DXB/AMT01/0500/Jly/1080 dated 9-Nov-06 based on the approved Methodology; agreed with Consultant (F&G) joint measurement done and agreed; in connection with 33-019 agreed with Consultant (F&G)

530.47 343.82 344.60 1,063.46 12,180.62 0.00 548.61 1,233.74

0 0 0 0 0 0 0 0 0

548.61 1,233.74

33 33 33

017 018 019

21 21 21

JV JV JV

DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881

24-Sep-06 24-Sep-06 24-Sep-06

4,353.86 693.97 956,279.08 (693,815.82) 40,503.44

0 0 ur

3,510.09 337.29 642,006.51 (676,513.69) 171.19

0 0 0

JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/20290 dated 13-August-08

CLOSED CLOSED CLOSED

CLOSED CLOSED CLOSED

3,510.09 337.29 642,006.51

843.77 356.68 314,272.57

OM-2 33

001 020

21 21

JV JV

JAP/ALM/TCAC/11435 DXB/AMT-01/0500/JLy/881

21-Aug-07 24-Sep-06

0 0

0 0

JAP016/ALM/TCAC/20290 dated 13-Aug-08 JAP016/ALM/TCAC/181187 dated 18-May-08

CLOSED CLOSED

CLOSED CLOSED

(693,815.82) 171.19

0.00 40,332.25

33

021

21

JV

DXB/AMT-01/0500/JLy/881

24-Sep-06

43,839.53

33,011.38

JAP016/ALM/TCAC/20933 dated 14-Sep-07

CLOSED

CLOSED

33,011.38

10,828.15

agreed with Consultant (F&G)

33

022

21

JV

DXB/AMT-01/0500/JLy/881

24-Sep-06

5,525.90

4,252.50

JAP016/ALM/TCAC/18884 dated 12-Jun-08

CLOSED

CLOSED

4,252.50

1,273.40

agreed with Consultant (F&G)

33 33

023 024

21 21

JV JV

DXB/AMT-01/0600/EDM/1868 DXB/AMT-01/0600/DAN/1878

26-Mar-07 26-Mar-07

36,827.93 25,336.02

0 0

35,529.29 26,354.14

0 0

JAP016/ALM/TCAC/08133 dated 09-Apr-07 JAP016/ALM/TCAC/17248 dated 16-Apr-08

CLOSED CLOSED

CLOSED CLOSED

35,529.29 26,354.14

1,298.64 (1,018.12)

agreed with Consultant (F&G) agreed with Consultant (F&G)

33 33 33 33 33 33 33 33 33 50

025 026 027R1 028R1 029R1 030 031R1 032 033 001

21 21 21 21 21 21 21 21 21 21

JV JV JV JV JV JV JV JV

DXB/AMT-01/0600/DAN/1883 DXB/AMT-01/0600/DAN/1888 DXB/AMT-01/0600/DAN/1990 DXB/AMT-01/0600/DAN/2020 DXB/AMT-01/0600/DAN/2047 DXB/AMT-01/0600/EDM/2066 DXB/AMT-01/0600/EDM/2160 DXB/AMT-01/0600/EDM/2383 DXB/AMT-01/0600/EDM/2548 DXB/AMT-01/0600/EDM/1301

26-Mar-07 24-Sep-06 10-Apr-07 15-Apr-07 19-Apr-07 24-Apr-07 15-May-07 23-Jun-07 18-Jul-07 21-Dec-06

7,878.22 17,649.58 101,960.65 140,340.33 316,516.91 1,175,875.00 56,950.59 130,015.64 9,356.12 28,025.73

0 0 0 0 0 ur 0 0 0 ur

7,878.22 14,661.14 97,675.24 137,782.64 317,721.58

0 0 0 0 0

JAP016/ALM/TCAC/08287 ated 16-Apr-07 JAP016/ALM/TCAC/08713 ated 7-May-07 JAP016/ALM/TCAC/20933 dated 14-Sep-07 JAP016/ALM/TCAC/10244 ated 9-Jul-07 JAP016/ALM/TCAC/10549 ated 23-Jul-07

CLOSED CLOSED CLOSED CLOSED CLOSED 1,175,875.00

CLOSED CLOSED CLOSED CLOSED CLOSED ur CLOSED CLOSED CLOSED ur

7,878.22 14,661.14 97,675.24 137,782.62 317,721.58

0.00 2,988.44 4,285.41 2,557.71 (1,204.67) 1,175,875.00

agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) under review agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) JV to submit entitlements; note that the DVR's is valued in Claim No. 77; items to be valued under this Claim is only the Lifting Beams await for final drawings. based on the ETA letter request demolition works ETA costs of AED 4,607,254 + 7% OH&P ETA to respond.

50,995.22 55,259.32 7,928.10

0 0 0

JAP016/ALM/TCAC/11392 ated 20-Aug-07 JAP016/ALM/TCAC/14299 ated 12-Dec-07 JAP016/ALM/TCAC/10848 ated 1-Aug-07

CLOSED CLOSED CLOSED 28,025.73

50,995.22 55,259.32 7,928.10

5,955.37 74,756.32 1,428.02 28,025.73

54 59 135 51 55 46 46 56 67 OM-3

001 001 001 001 001 001 002 001 001 001

21 21 21 22 23 24 24 25 26 27

Revisions to Structural Contract Drawings in Second Floor JV Changes in Beam Steel Reinforcement at 29th to 34th Level JV Various Requirements under the F&G Transmittal Ref. F+G/ALMAS/TAISEI/ 01463 dated 12th December 2006 JV Provision of Additional Lift Pit Ladders JV Additional Coring Requirement JV Opening in Block Wall between Offices A & B at Level 29 (CVI No. 067) NSC Revision of Fire Protection System as per JAFZA EHS Fire & Rescue Requirements NSC Category II Drawing Revisions for Office Floors -Air Conditioning NSC Fire Policy Layout (MEP Works) NSC Fire Policy Layout (MEP Works-additional Fireman's Telephone at B1-B5) JV Additional Staff Facilities to Consultants NSC Electrical Connections to Fire Pump Requirements JV Omission of Render from the vertical element of whole three Services Floor (S1, S2, & S3) Plant Rooms Revisions to Office Partitions Revisions to Office Partitions - Masonry Works

DXB/AMT-01/0500/JLy/1358 DXB/AMT-01/0600/EDM/1567 DXB/AMT-01/0600/EDM/3071 DXB/AMT-01/0600/EDM/1312 DXB/AMT-01/0500/JLy/1444 DXB/AMT-01/0600/EDM/1236 DXB/AMT-01/0600/___/____ DXB/AMT-01/0500/JLy/1445 DXB/AMT-01/0600/EDM/1659 JAP016/ALM/TCAC/06046

04-Jan-07 10-Feb-07 27-Oct-07 23-Dec-06 21-Jan-07 11-Dec-06 13-Dec-08 21-Jan-07 25-Feb-07 04-Jan-07

66,895.36 30,965.32 1,484.00 4,929,761.78 ur 24,107.45 17,577.75 51,929.76 2,951,483.26 (277,596.39)

ur ur ur ur ur ur ur 0 ur 0

66,895.36 30,965.32 1,484.00 4,929,761.78 ur

ur ur ur ur ur ur ur CLOSED ur CLOSED (223,000.00) 51,929.76 1,564,665.69

66,895.36 30,965.32 1,484.00 3,365,096.09

5,600.38

JAP016/TS/ABS/22577 dated 24-Nov-08

CLOSED 17,577.75

24,107.45 17,577.75 0.00 2,951,483.26 (54,596.39)

ETA costs + 7%OH&P ETA costs + 12%OH&P + 3% Attendances Time component rejected as per the F&G letter ref. JAP016/TS/ALM/ TCAC/06936 dated 15-Feb-07 ETA costs + 7% JV OH&P IPC NO. 41

51,929.76

JAP016/ALM/TCAC/14753 dated 07-Jan-08

CLOSED 2,951,483.26

(58,985.18)

????

CLOSED

57 OM-4 OM-4 64 65 68 76 78 78

001 001 002 001 001 001 001 001R1 002

28 28 28 29 31 32 34 35 35

JV JV

DXB/AMT-01/0500/JLy/1446 JAP016/ALM/TCAC/19000 JAP016/ALM/TCAC/19000 DXB/AMT-01/0600/EDM/1634 DXB/AMT-01/0600/EDM/1635 DXB/AMT-01/0600/EDM/1660 DXB/AMT-01/0500/JLy/1890 DXB/AMT-01/0600/EDM/2385/ DXB/AMT-01/0600/EDM/3608 DXB/AMT-01/0600/EDM/2385/ DXB/AMT-01/0600/EDM/3608 DXB/AMT-01/0500/JLy/3863 DXB/AMT-01/0500/JLy/3863 DXB/AMT-01/0600/EDM/4339 DXB/AMT-01/0600/MIC/4950 DXB/AMT-01/0500/JLy/1332 DXB/AMT-01/0600/EDM/2310 DXB/AMT-01/0600/EDM/2472 DXB/AMT-01/0600/EDM/2474 DXB/AMT-01/0600/EDM/2554 DXB/AMT-01/0600/EDM/3832 DXB/AMT-01/0600/DAN/4540

21-Jan-07 17-Jun-08 17-Jun-08 20-Feb-07 20-Feb-07 25-Feb-07 25-Mar-07 23-Jun-07/ 4-Feb-08 23-Jun-07/ 4-Feb-08 18-Mar-08 18-Mar-08 03-Jun-08 13-Oct-08

(valued in OM-4) (126,440.24) (69,689.10) 102,143.27 ur 43,688.96 1,402,455.42 2,183,160.00 196,416.80 204,700.00 12,416.32 0.00

0 0 0 ur ur 0 ur see NOC#127 see NOC#127 see NOC#127 see NOC#127 see NOC#127 ur see NOC#127 see NOC#127 0 ur 0 see NOC#127 see NOC#127 see NOC#127 see NOC#127 see NOC#127 ur ur see NOC#127 see NOC#127 see NOC#127 ur

(valued in OM-4) (126,440.24)

0 0
JAP016/ALM/TCAC/19000 dated 17-Jun-08

CLOSED CLOSED (69,689.10) 102,143.27 ur

CLOSED CLOSED 0.00 ur ur CLOSED ur CLOSED CLOSED

0.00

(196,129.34)

69,689.10 (69,689.10)

NSC Revisions to Office Partitions - OCP Works NSC Provision of Foul Water Disposal in case Primary System Failure NSC Revision of Office Partitions - Mechanical & Fire Policy Drawings NSC Trip to Italy for Stone Quarry Inspection NSC Rainwater and Irrigation Waste Water Discharge from Planters JV Function Room / Ball Room Facility (Structural Works) JV Function Room / Ball Room Facility (Fireproofing Works) Modifications to Function Room / Ball Room Facility (Structural Works) JV Modifications to Function Room / Ball Room Facility (Fireproofing Works) JV Ballroom/Function Room (Provision of Scaffolds and Access) NSC Pipe Size Changes @ First Floor (RFI No. 1062) JV Possible Addition of Ballroom JV NSC Function Room / Ball Room Domestic Water Drawings NSC Mechanical Works for the Function Room / Ballroom NSC Security Works for the Function Room / Ballroom JV JV JV Revised Interior Lighting Fixtures Layout at Ballroom GF, Washroom GF, and Ballroom 2L Ballroom / Function Room (Concrete and Masonry Works) Ballroom/Function Room (CW Roofing, Curtain Wall Cladding, Aluminum Panel Bulkheads Work)

16,264.00

85,879.27

see Omission OM-4-001&002 for the JV & NSC works respectively JV scope of works, i.e., omission of blockworks and plaster BondCommunication scope of works + 7% OH&P; AWAITING RESPONSE FROM m/S. Bond Communication ETA costs + 7% JV OH&P ETA to submit entitlements

39,083.00

JAP016/ALM/TCAC/16129 dated 5-Mar-08

CLOSED 1,402,455.42

39,083.00

4,605.96 1,402,455.42

BI costs AED 36,526.17 + 7% JV OH&P ETA costs + 7% JV OH&P; uilders works not yet included to be submitted under 76-002 EVS Cost + 12% OH&P but less works deemed included in the NSC Thermofire Cost AED 170,797.22 + 12% OH&P; confirmed to be valued in ERI 35 under the Nakheel letter ref. JAP016/TS/GT/0244 dtd 27May08 EVS Cost + 12% OH&P + 3% attendances Thermofire Cost + 12% OH&P + 3% attendances Scaffolding to be used by the Nominated Subcontractors; Fit-Out Contractor to work on the MEP Scope ETA claim + 12% OH&P + 3% Attendances supeseded by claim no. 107 Valued in 107-003 ETA to submit entitlements ETA to submit entitlements TO BE VALUED IN CLAIM NO. 107-001 (ERI 35.1)

2,087,955.12 191,292.64

JAP016/ALM/TCAC/18101 see NOC#127 dated 18-May-08 JAP016/ALM/TCAC/22536 see NOC#127 dated 23-Nov-08

CLOSED CLOSED

2,087,955.12 191,292.64

95,204.88 5,124.16

78 78 107 234 52 85 99 100 106 107 107

003 004 005 001 001 001 001 001 001

35 35 35 35 35.1 35.1 35.1 35.1 35.1

see NOC#127 see NOC#127

204,700.00 12,416.32 CLOSED 20,545.90

CLOSED CLOSED CLOSED ur CLOSED CLOSED CLOSED ur CLOSED CLOSED CLOSED

179,424.00

25,276.00 12,416.32

0.00

see NOC#127 see NOC#127 see NOC#127 0

0.00

0.00 20,545.90

27-Dec-06

20,545.90 (valued in Claims No. 78 & 107) 09-Jun-07 (valued in 107-003)


07-Jul-07 07-Jul-07 18-Jul-07

(valued in Claims No. 78 & 107)


(valued in 107-003) (valued in 107-003)

CLOSED CLOSED CLOSED ur

0.00 0.00

(valued in 107-003) ur (valued in 107-001) 785,658.59 284,794.05

(valued in 107-001)

JAP016/ALM/TCAC/10523 dated 22-July-2007

CLOSED CLOSED 284,794.05

0.00

002R2 35.1/ 35.2 004a 35.1/ 35.2 001 35.1/ 35.2/ 35.4 35.1/ 35.2/ 35.4 35.1/ 35.2/ 35.4 35.3 35.4 35.5

15-Mar-08 09-Jul-08

728,934.60

JAP016/ALM/TCAC/19604 see NOC#127 dated 14-July-2008

728,934.60 142,397.03

56,723.99 142,397.02

Subcontractor : JV Internal Al Abbar cost + 12% + 3% attendances

see NOC#127 see NOC#127

107

NSC Ballroom / Function Room (ID Works to the Walls facing the Retail Mall) NSC Ballroom/Function Room (MEP Works)

DXB/AMT-01/0500/JLy/2643

02-Aug-07

ur

ur

CLOSED

Bond Interiors to submit entitlements

107

003

DXB/AMT-01/0600/DAN/3893

25-Mar-08

3,318,315.35

3,318,315.35

JAP016/ALM/TCAC/21289 see NOC#127 dated 5-Oct-08 JAP016/ALM/TCAC/22293 see NOC#127 dated 13-Nov-08

CLOSED

CLOSED

1,926,000.00

1,392,315.35

Subcontractor : ETA; under review by ETA due to the revised scope of works; confirmed by ETA

107

007

NSC Ballroom/Function Room (External Stoneworks)

DXB/AMT-01/0500/JLy/2643

02-Aug-07

357,161.60

310,797.76

CLOSED

CLOSED

(248,638.21)

605,799.81

Al Bayader cost + 12% OH&P

178 107 78

001 008 005

NSC Ballroom/Function Room - Cladding to the Structural Steel Beams JV Ballroom/Function Room (Additional Plaster Works where Electrical Panels are Installed) JV Function Room / Ball Room Facility Parapet (Structural Works) NSC Ballroom/Function Room (Roof Parapet Works - CVI No. 084) JV Ballroom/Function Room (Roof Parapet Works GI Cladding - CVI No. 084) JV Landscaping Works; i.e., provision of Civil/Structural Works as confirmed under Nakheel Letter ref. JAP016/GEN/ABS/1058 dated 14-Aug-06

DXB/AMT-01/0600/EDM/3847 DXB/AMT-01/0600/EDM/4767 DXB/AMT-01/0500/JLy/3964

16-Mar-08 26-Aug-08 08-Apr-08

ur 2,710.59 144,684.43 ur 26,312.00 3,775,777.57

ur 2,710.59 see NOC#127 see NOC#127 see NOC#127 144,684.43

ur ur CLOSED 131,824.00 2,710.59 12,860.43

AA to submit entitlements Plaster works only based on BOQ rates EVS Cost + 12% OH&P + 3% attendances and Scaffolding supplied by JV; to be valued under ERI35.5 as per Nakheel letter ref. JAP016/TS/GT/0255 dtd 29May08 Subcontractor : Al Abbar; shall be valued under ERI 35.5 as per Nakheel Letter JAP016/TS/GT/0255 dtd 29-May-08 additional GI sheets cover to parapet for the preparation of EPDM by AL Abbar Confirmed by Nakheel under the letter as mentioned, and instructed under ERI No. 37

107 107 18

004b 004c 001R1

35.5 35.5 37

DXB/AMT-01/0600/EDM/4032 DXB/AMT-01/0600/DAN/____ DXB/AMT-01/0500/JLy/586

20-Apr-08 12-Jan-09 26-Jun-06

ur 26,312.00
JAP016/ALM/TCAC/90791 dated 19-Jun-08

CLOSED CLOSED CLOSED 2,661,716.46 26,312.00 1,114,061.11

2,661,716.46

CLOSED

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (2).monvabad

3 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
18 86 OM-8

October 15, 2013


REMARKS / COMMENTS

SUB NO.
002 001 001

ERI NO.
37 38 38

V.O. TO
JV JV JV

CLAIM NOTICE LETTER

CLAIM ENTITLEMENT APPLICATION DATE COST (AED) 106,370.21 (valued in OM8-001) (1,988.48)
TIME (Days)
ur ur 0

ER / F&G / JV AGREED VALUES COST (AED) 106,370.21


(valued in OM8-001) TIME (Days)
0 0 0
JAP016/ALM/TCAC/22416 dated 18-ov-08

OUTSTANDING CLAIMS COST (AED)


CLOSED CLOSED CLOSED

CERTIFIED AS AT CERTIFIED TO-DATE


106,370.21 0.00

DESCRIPTION
REFERENCE Landscaping works - Screed for the Planter Boxes Modification to Lift Opening at 36th and 48th Floor Modification of Lift Openings at 36th Floor Low Rise Lift Machine Room and 48th Floor High Rise Lift Machine Rooms (Omission of Concrete Works due to the increase of Lift Opening Sizes) Revised Drawing for Lift Machine Room on 3rd Service Floor Revised Drawing for Interior Design Works Changes of Levels to Room Nos. B1-073 (Corridor) and B1-074 (Mechanical Plant Room) Additional Wall in Security Room at Basement 2
DXB/AMT-01/0600/EDM/3098 DXB/AMT-01/0600/EDM/2311 JAP016/ALM/TCAC/22416 31-Oct-07 09-Jun-07 18-Nov-08

November 30, 2008


BALANCE TO-DATE
0.00
valued under th ERI No. 37 under omission.

LETTER REF.
JAP016/ALM/TCAC/90791 dated 19-Jun-08

TIME (Days)
CLOSED CLOSED CLOSED

(1,988.48)

(1,988.48)

BI to confirm cost by F&G

87 88 81 103 139 70 OM-5 97

001 001 001 001R1 001 001 001 001

41 42 43 44 44.1 45 45 45.1

JV JV JV JV

DXB/AMT-01/0600/EDM/2312 DXB/AMT-01/0600/EDM/2313 DXB/AMT-01/0600/EDM/2111 DXB/AMT-01/0600/EDM/2540 DXB/AMT-01/0600/EDM/3134 DXB/AMT-01/0500/JLy/1781 JAP016/ALM/TCAC/19244 DXB/AMT-01/0600/EDM/2438

09-Jun-07 09-Jun-07 02-May-07 17-Jul-07 08-Nov-07 14-Mar-07 26-Jun-08 30-Jun-07

1,771.88 (valued in Series 41) 7,275.43 26,634.44 172,273.32 (valued in OM-5) (66,453.77) ur

ur 0 0 see NOC#127 ur 0 0 ur

1,587.60
(valued in Series 41)

0 0 0

JAP016/ALM/TCAC/21082 dated 21-Sep-08

CLOSED CLOSED

CLOSED CLOSED CLOSED CLOSED ur CLOSED CLOSED ur

1,587.60
0.00

184.28

Subcon Cost + 12% OH&P considered in Claim Series 41 / ERI No. 16

6,205.97 25,999.57

JAP016/ALM/TCAC/21270 dated 29-Sep-08

CLOSED CLOSED 172,273.32

6,205.97 25,999.57 74,900.00 0.00 (66,453.77)

1,069.46 634.87 97,373.32

Light weight Concrete and chipping works architectural works only. ETA costs + 7% JV OH&P see OM-5 below (omitted works)

JAP016/ALM/TCAC/17848 see NOC#127 dated 8-May-2008

101 146 84

001 001 001

45.2 45 / 45.1 46

NSC Basement 2 Security Room - Revised Drawings for the Ventilation and Lighting Details JV Level 30 Partition Layouts JV Omission of Partition Walls in Level 30 for Single Tenancy Arrangements NSC Various Changes due to the revised MEP "For Construction" Drawings due to Modification at Level 30 NSC Various Revisions to the Electrical Works "For Construction" Drawings NSC Relocation of Cameras at 30th Floor (RFI No. 859) NSC Revision to the Lighting Layout at GF, L1, & L2

(valued in OM-5) (66,453.77)

0 0
JAP016/ALM/TCAC/19244 dated 26-Jun-08

CLOSED CLOSED ur

0.00

JV Scope of Works - Omission of Office Partitions at the Level 30 due to the single tenancy arrangements ETA to submit entitlements

DXB/AMT-01/0600/EDM/2475 DXB/AMT-01/0500/JLy/3207 DXB/AMT-01/0600/EDM/2309

07-Jul-07 20-Nov-07 09-Jun-07

ur ur ur

ur ur ur

ur ur ur

ur ur ur

ETA to submit entitlements JCI to submit entitlements ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No. 105; to be valued under ERI16 ref. JAP016/ALM/TCAC/09512 dtd 12Jun07 ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No.107

102 104 82 89 186

001 001 001 001 001R1

46 47 48 49 49

NSC Lighting Requirements to the Function Room / Ballroom JV Additional 40 Container Storage, Office Chairs, and Computer for F+G Office NSC Telephone IDF/MDF Room Drawings JV JV Modification to the Structural Drawings at Levels 49, 50, and 51 Notification of Entittlements (CVI-089) - Doors to new washrooms at L49 and L50 (Lift Lobby Area) Modification to the Structural Drawings at Levels 49, 50, and 51 Various Revisions due to the revised For Construction Drawings (MEP Works) at Levels 49, 50, & 51 Fire Fighting Systems at Levels 49, 50, & 51 (Abortive Work) Fire Fighting Systems at Levels 49, 50, & 51 (Builders Work and Abortive Work) Revised "For Construction" Security Drawings at Levels 49, 50, & 51 under the DMCC Transmittal Ref. JAP016/TRNS /JV/00044 dated 5th May 2008 (Security Works) Modification of Raised Floor Heights at Server Rooms at Level 49, 50, & 51 Amendment to District Cooling Piping and Control Works (Heat Echangers and Strainers) Changes to Suspended Ceiling (ID Works Package)

DXB/AMT-01/0600/EDM/2499 DXB/AMT-01/0600/EDM/2551 DXB/AMT-01/0600/EDM/2222 DXB/AMT-01/0600/EDM/2315 DXB/AMT-01/1100/WAE/3965

10-Jul-07 18-Jul-07 27-May-07 09-Jun-07 08-Apr-08

ur 40,174.50 34,309.10 (valued in OM9-001) 58,651.66

ur 0 ur 0 ur

ur

ur CLOSED CLOSED CLOSED ur 40,074.53 10,951.45


0.00

40,074.53 13,517.00 (valued in OM9-001)

0 0 0

JAP016/ALM/TCAC/11909 dated 9-Sept-2007 JAP016/ALM/TCAC/21322 dated 5-Oct-08

CLOSED CLOSED CLOSED 58,651.66

99.97 23,357.65

actual cost transmitted to F&G based on dayworks rates; agreed with F&G ETA cost + 7% OH&P valued under the omissions

58,651.66

under review; to be under ERI #49 as per Nakheel letter ref. JAP016/TS/GT/0205 dated 15-Apr-08; SC cost +12%OH&P + 3% Attendances Omission of Office Partitions at Level 49 ETA cost + 12% OH&P + 3% Attendances

OM-9 92

001 001

49 49.2

JV NSC

JAP016/ALM/TCAC/19245 DXB/AMT-01/0600/EDM/2375

26-Jun-08 21-Jun-07

(85,688.89) 218,960.00

0 ur

(85,688.89) 218,960.00

0.00 ur

(85,688.89) 20,544.00

0.00 198,416.00

163 163 163

006a 006b 009

49.3 49.3 49.4

NSC JV NSC

DXB/AMT-01/0600/EDM/4034 DXB/AMT-01/0600/EDM/4034 DXB/AMT-01/0600/EDM/4162

20-Apr-08 20-Apr-08 10-May-08

ur 1,903.78 ur

ur ur ur

ur 1,903.78 ur

ur ur ur

24,824.00 1,903.78

ETA to submit entitlements builders works JCI to submit entitlements

208 109 94 95

001 001 001R2 001

49.5 50 51 52

NSC NSC JV

DXB/AMT-01/0600/EDM/4335 DXB/AMT-01/0600/EDM/2655 DXB/AMT-01/0600/EDM/2432 / DXB/AMT-01/0500/JLy/3369 DXB/AMT-01/0600/EDM/2433

02-Jun-08 05-Aug-07 30-Jun-07 / 22-Dec-07 30-Jun-07

17,250.00 597,081.20 85,383.20 653,624.24

ur ur see NOC#127 0

17,250.00 597,081.20

ur ur CLOSED 393,521.39 85,383.20

17,250.00 203,559.81 0.00

MDS cost + 12% OH&P + 3% Attendances; valued at ERI No. 49.5 as per Nakheel letter ref. JAP016/TS/GT/0271 dtd 9Jun08 ETA to submit entitlements subcon costs plus 12% (revised cost from 182,960.40 due to the meeting between FBI and DMCC) KONE costs + 7% JV OH&P

85,383.20 653,624.24

JAP016/ALM/TCAC/21731 see NOC#127 dated 21-Oct-08

CLOSED

NSC Variation Works due to Lift and Escalator Finishes (Direct Variation to the Nominated S/C Works) NSC Variation Works due to Lift and Escalator Finishes (Adjustment to the Provisional Sums) NSC Changes of Wallpaper in Typical Floor Corridors JV Changes to Mock-up Areas (ID Works) JV JV Change of Pressurization Duct Opening at 51st Floor Lift Lobby Additional Aluminum Flashing

JAP016/ALM/TCAC/17360 dated 20-Apr-08

CLOSED

CLOSED

579,717.22

73,907.03

95

002

52

DXB/AMT-01/0600/EDM/2433

30-Jun-07

544,678.47

544,678.47

JAP016/TS/GT/0083 dated 9Aug-2007

CLOSED

CLOSED

544,678.47

KONE costs + 7% JV OH&P; NOTE : Not considered as a variation by Consultant but adjsutment to the KONE Provisional Sums from AED500K to 1,009,045.30, and agreed amount s the nett costs. BI to submit entitlements

114 93 115 116 112 80 80 134 OM-6 136

001 001 001 001R1 001 001R1 002 001 001 001

53 54 55 57 58 59 59.1 60 60 61

DXB/AMT-01/0600/EDM/2802 DXB/AMT-01/0600/EDM/2400 DXB/AMT-01/0600/EDM/2804 DXB/AMT-01/0600/EDM/2803 DXB/AMT-01/0600/EDM/2763 DXB/AMT-01/0500/JLy/2098 DXB/AMT-01/0600/EDM/3561 DXB/AMT-01/0600/EDM/3069 DXB/AMT-01/0600/MIC/5011 DXB/AMT-01/0600/EDM/3081

01-Sep-07 24-Jun-07 02-Sep-07 01-Sep-07 25-Aug-07 30-Apr-07 28-Jan-08 27-Oct-07 26-Oct-08 29-Oct-07

ur 612,662.92 4,044.20 764,729.70 506,665.14 1,706.32 133,301.39 (valued in OM6-001) (2,856.00) 155,609.44

ur see NOC#127 0 ur ur ur ur 0 0 see NOC#127 see NOC#127 see NOC#127

ur 612,662.92
JAP016/ALM/TCAC/20893 dated 11-Sep-08

ur CLOSED CLOSED ur ur ur ur CLOSED CLOSED CLOSED

(50,825.00) 400,000.00 3,315.73 212,662.92 728.47 764,729.70 506,665.14 1,706.32 17,120.00


0.00

Bond Interiors cost + 12% JV Mark-up + 7% OH&P (Prov. Sums) agreed withConsultants (F&G) Subcon Cost + 12%OH&P + 3% Attendances ETA costs + 12% OH&P + 3% Attendances bulkheads only ETA costs = AED 115,914.25 + 12% JV OH&P + 3% Attendances under review by JV and JCI.

3,315.73

CLOSED 764,729.70 506,665.14 1,706.32 133,301.39

NSC Changes in the LV Schematic Diagram JV False Beam/Bulk Head NSC Drainage Piping in Medium and High Rise Lift Machine Room JV Omission of Proximity Access Card Reader and Access Cards at Basement 1 Boom-Gate JV Omission of Proximity Access Card Reader and Access Cards at Basement 1 Boom-Gate JV Diamond Feature

0.00 116,181.39

(valued in OM6-001)

0
0
JAP016/ALM/TCAC/22410 DATED 18-Nov-08

CLOSED CLOSED CLOSED

(2,822.40) 155,609.44

(2,856.00) 155,609.44 0.00

considered Sultan Hareb rates x no. of slots in Basement 1 + 12% OH&P Excl Acry Costs = AED 138,937 + 12% JV OH&P

JAP016/TS/GT/0227 dated 13see NOC#127- May-2008 001 agreed values is partial and see NOC#127 deemed to change

149

001

62

JV

Revised "For Construction" ID Drawings at the Second Level and Diamond Exchange Centre Cuttings in Corridor Ceiling at Level 2 as required by Bond Communication

DXB/AMT-01/1100/WAE/3232

25-Nov-07

6,574,957.21

3,431,895.90

CLOSED

6,574,957.21

progressively, as it is based on the agreed rates only (+12%)

updated cost and rates approval summary status being sent regularly; cost submitted is the final applied claim FBI shall submit entitlements as per the F&G letter ref. JAP016/ALM/TCAC/21815 dtd 26-Oct-08; BACKCHARGE TO BOND COMMUNICATION DUE NON-COORDINATION BI to submit entitlements

149

007

62

JV

DXB/AMT-01/0600/EDM/____

28-Oct-08

0.00

0.00

CLOSED

CLOSED

0.00

0.00

149

010

62

149 149 149 149 137 126 110 163

002 003a 004 003b 001 001 001R1 001

62.1 62.1 62.2 62.3 63 64 65 66 66.1

NSC Additional Counter at the Security Room level 2 as per the M/s. Nakheel letter ref. JAP016/TS/BW/0366 dated 16-Nov-08 NSC Revisions to Diamond Exchange Centre (MEP and Interior Lighting) NSC Revisions to Diamond Exchange Centre (CCTV and Access Control) NSC Revisions to Diamond Exchange Centre (Fire Policy Layout) NSC Revisions to Diamond Exchange Centre (CCTV and Access Control) NSC Emergency Cables to the Tenant's DB NSC Modification of Male Washroom at 36th Floor - RFI 767 (Rev. 0,1&2) NSC Furniture / Console at Basement 2 Security Room JV Provision of Toilets at upper floors, Levels 49,50,51, and 62 (Civil and Architectural Works, and Abortive Works-Coring at 49, 50, & 51, Plastering at Pantry Wall at L49, and add'l opening at SF3 for Level 49)

DXB/AMT-01/0600/EDM/5104

19-Nov-08

ur

ur

ur

ur

DXB/AMT-01/0600/EDM/3473 DXB/AMT-01/0600/EDM/3473 DXB/AMT-01/0600/EDM/4134 DXB/AMT-01/0600/EDM/4144 DXB/AMT-01/0600/EDM/3091 DXB/AMT-01/0600/EDM/3014 /DXB/AMT-01/0600/EDM/3306 DXB/AMT-01/0600/EDM/2693 DXB/AMT-01/0600/EDM/4113 DXB/AMT-01/0600/EDM/3588

13-Jan-08 13-Jan-08 06-May-08 07-May-08 30-Oct-07 14-Oct-07 /10-Dec-07 12-Aug-07 3-May-08 02-Feb-08

2,679,840.21 617,089.33 ur ur 394,252.82 56,553.22 29,808.00 127,141.12

ur ur ur ur ur ur

2,679,840.21 617,089.33 ur ur 394,252.82 56,553.22

ur ur ur ur ur ur

460,956.00

2,218,884.21 617,089.33

ETA cost + 7% OH&P + 2% Attendances JCI cost AED 566,137.00 + 7%JV OH&P + 2%Attend; based on transmittal ./00017 dtd 1-Nov-07 (drwg. No. 4494/Y/009 Rev.3) ETA to submit entitlements JCI to submit entitlements; based on transmittal ./00043 dtd 4May08 (drwg. No. 4494/Y/009 Rev.4)

322,070.00 12,196.26

72,182.82 44,356.96

ETA costs + 7% JV OH&P; confirmed to be ERI No. 63 as per F&G letter ref. JAP016/ALM/TCAC/18721 dtd 8Jun08 ETA part = AED 50,475.00

0 ur

29,030.40 100,469.43

JAP016/ALM/TCAC/21105 dated 22-Sep-08 JAP016/ALM/TCAC/21426 dated 9-Oct-08

CLOSED CLOSED

CLOSED ur

31,062.53 100,469.43

(1,254.53) 26,671.69

BF claim AED 25,920 + 12% OH&P under review by JV; additional coring works to ERI 66.1 as confirmed by F&G letter ref. JAP016/ALM/TCAC/17867 dtd 8May08; addl plaster at Pantry L49 under 66.1 as per JAp016/ALM/TCAC/18766 dtd9Jun08;ERI 66.1 confirmed by Nakheel to cover coring works by B ETA costs of AED 408,791 + 12%JV OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Al Abbar to submit claim / JV to submit builders works claim; to be valued under the ERI 66.1 refer to F&G letter JAP016/ALM/TCAC/18209 dtd 20May08

163 163 174

002 007 001

66 66.1 66.1

NSC Provision of Toilets at upper floors, Levels 49,50,51, and 62 (MEP Works) NSC Reworks at the New DMCC Washrooms (Levels 49, 50, & 51) for FCU's NSC Design Changes - Additional Dummy Mullions and Back Pans at Levels 49-62 (NSC Works) Design Changes-Additional Aluminum Flashing due to the revised Curtain Wall Cladding JV Provision of Toilets at upper floors, Levels 52,53,54, and 59 (Civil and Architectural Works, and Abortive Works, if any) NSC Provision of Toilets at upper floors, Levels 52,53,54, and 59 (MEP Works) NSC Relocation of FCU to the New Toilet Area at Levels 52,53,54,59, & 62 NSC Missing Purlins at Connecting Corridor Between Tower and Diamond Exchange Center (RFI No. 839) JV JV JV Additional Staff Facilities - Project Manager's Staff (F+G) Modifications to Typical Female Bathroom Ceiling Mirrors

DXB/AMT-01/0600/EDM/3588 DXB/AMT-01/0600/EDM/4048 DXB/AMT-01/0600/EDM/3716

02-Feb-08 22-Apr-08 24-Feb-08

470,109.65 14,283.00 ur 8,452.50 90,502.31

ur ur ur

470,109.65 14,283.00 ur

ur ur ur

119,840.00

350,269.65 14,283.00

174 163

002 003

66.1 67

DXB/AMT-01/0600/EDM/3716 DXB/AMT-01/0600/EDM/3588

24-Feb-08 02-Feb-08

ur ur

8,232.00 63,163.87

JAP016/ALM/TCAC/22576 dated 24-Nov-08 JAP016/ALM/TCAC/22008 dated 2-Nov-08

CLOSED CLOSED

ur ur 63,163.87

8,452.50 27,338.44

Best Steel cost + 12% OH&P; to be valued under the ERI 66.1 refer to F&G letter JAP016/ALM/TCAC/18209 dtd 20May08 agreed withConsultants (F&G)

163 163 131

004 008 001

67 67/ 66 68

DXB/AMT-01/0600/EDM/3588 DXB/AMT-01/0600/EDM/4047 DXB/AMT-01/0600/EDM/3061

02-Feb-08 22-Apr-08 24-Oct-07

334,816.75 ur 16,050.00

ur ur 0

334,816.75 ur

ur ur CLOSED

69,657.00

265,159.75

ETA costs AED291,185 + 12% JV OH&P + 3% Attendance ETA to submit entitlements; Level 52,53,54,59 under ERI67, and Level 62 under ERI66

12,895.64

JAP016/ALM/TCAC/22694 dated 26-Nov-08

CLOSED

12,000.00

4,050.00

EVS cost + 7% OH&P

173 179

001 001

69 70

DXB/AMT-01/0600/EDM/3702 DXB/AMT-01/0600/EDM/3848

20-Feb-08 16-Mar-08

64,706.19 7,855.65

0 (see NOC#127001) see NOC#127

56,015.46 7,650.72

JAP016/AlM/TCAC/21700 dated 20-Oct-08

CLOSED CLOSED

CLOSED CLOSED

56,015.46 7,650.72

8,690.73 204.93

Supply and Labour rates + 12%OH&P BI cost at AED 6,831.00 + 12% JV OH&P

JAP016/ALM/TCAC/17650 (see NOC#127- dated 30-Apr-08 001) JAP016/ALM/TCAC/22470 see NOC#127 dated 20-Nov-08

152

001

71

OM-7

001

71

Additional Works to the Metal Cladding (MT-20) behind Glazed Balustrades caused by the Lowering of Ceiling at Ground Floor Level Due to the MEP Works (Metal Cladding - MT20) NSC Omission of Wall Tiles due to the extension of Metal Cladding Behind Glass Ballustrades caused by the lowering of Ceiling JV

DXB/AMT-01/0600/EDM/3270

03-Dec-07

294,350.71

176,646.32

CLOSED

CLOSED

0.00

294,350.71

using Bond Interiors rates + 7% OH&P

JAP016/ALM/TCAC/22470

20-Nov-08

(132,210.53)

(132,210.53)

0.00

(132,210.53)

BI to confirm cost by F&G

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (2).monvabad

4 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
164 123

October 15, 2013


REMARKS / COMMENTS

SUB NO.
001 001R2

ERI NO.
72 73

V.O. TO
JV JV

CLAIM NOTICE LETTER

CLAIM ENTITLEMENT APPLICATION DATE COST (AED) 40,216.65 12,637.06


TIME (Days)
0 ur

ER / F&G / JV AGREED VALUES COST (AED) 39,167.52


TIME (Days)
0

OUTSTANDING CLAIMS COST (AED)


CLOSED 12,637.06

CERTIFIED AS AT CERTIFIED TO-DATE


39,167.52

DESCRIPTION
REFERENCE BMS Room Furniture Requirements Potential Delay due to Late Issuance of Revised Design Information in Sky Lobby Meeting Room at Level 48 ID Works Package - Lighting Requirements at Level 48 Meeting Room (MEP Works Scope) ID Works Package - Lighting Requirements at L48 Meeting Room (JV Scope - Lever to Supply)
DXB/AMT-01/0600/EDM/3589 DXB/AMT-01/1100/WAE/2955 02-Feb-08 01-Oct-07

November 30, 2008


BALANCE TO-DATE
1,049.13 12,637.06
BF cost AED 34,971.00 + 12% JV OH&P confirmed to be valued under ERI No. 73 according to the Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08

LETTER REF.
JAP016/ALM/TCAC/21106 dated 22-Sep-08

TIME (Days)
CLOSED ur

166

001

73

JV

DXB/AMT-01/0600/EDM/3609

04-Feb-08

11,783.12 2,254.00 73,986.40

ur

11,783.12

ur

11,783.12

ETA cost + 12%OH&P + 3% Attendances; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08 JV to submit entitlements; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08; Lever cost + 12% OH&P + 3% Attendance ETA cost + 12% OH&P + 3% Attendances

166

002

73

JV

DXB/AMT-01/0600/EDM/3609

04-Feb-08

ur

2,254.00

ur

2,254.00

202

001

74

197

001a

74.1

NSC Revised Domestic Water Layout at Ground and First Floor due to the Revised "For Construction" Drawings under the DMCC Transmittal JAP016/TRNS/JV/00042 JV Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope masonry works, abortive works and coring works) Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope ID works) NSC Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (ID Scope of Works) NSC Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (MEP Works) NSC Revised " For Construction" drawings under the DMCC transmittal ref. JAP016/TRNS/JV/00040 dated 16-Apr-08 (Additional Voice/Data Points in GF & 1L) JV NSC ID Tiling Works-Attic Stock (ERI No. 75) JV Doors at DEWA Water Meter Rooms NSC DEWA Water Meter Connection (MEP Works) JV DEWA Water Meter Connection (Builders Work)

DXB/AMT-01/0600/EDM/4137

06-May-08

ur

73,986.40

ur

19,688.00

54,298.40

DXB/AMT-01/0600/EDM/4053

22-Apr-08

18,228.31

ur

14,232.82

JAP016/ALM/TCAC/22447 dated 19-Nov-08

CLOSED

ur

27,042.36

(8,814.05)

Masonry Works, Abortive Works and Coring Works

197

001b

74.1

DXB/AMT-01/0600/EDM/4053

22-Apr-08

57,459.68

ur

57,459.68

ur

57,459.68

Doors and Frames incl Ironmongery, and Ceiling Works

197

002

74.1

DXB/AMT-01/0600/EDM/4053

22-Apr-08

ur

ur

ur

ur

Bond Interiors to submit entitlements

197

003

74.1

DXB/AMT-01/0600/EDM/4127

05-May-08

50,319.40

ur

50,319.40

ur

50,319.40

ETA to submit entitlements

238

001

74.1

DXB/AMT-01/0500/JLy/5009

26-Oct-08

26,919.09

ur

26,919.09

ur

26,919.09

BC Cost + 7% OH&P; BC VO#9; BC time claim = 186 days

201 158 205 205 207 196 196 196

001 001R1 001 002 001 001 002 003a

75 76 76.1 76.1 77 78 78 78

DXB/AMT-01/0600/EDM/4135 DXB/AMT-01/0500/JLy/3401/ DXB/AMT-01/0500/JLy/3416 DXB/AMT-01/0600/EDM/4274 DXB/AMT-01/0600/EDM/4274 DXB/AMT-01/0600/EDM/4323 DXB/AMT-01/0600/EDM/4046 DXB/AMT-01/0600/EDM/4046 DXB/AMT-01/0600/EDM/4046

06-May-08 27 & 31Dec-07 24-May-08 24-May-08 31-May-08 22-Apr-08 22-Apr-08 22-Apr-08

ur 21,502.11 10,637.50 5,263.09 150,193.45 2,070.00 76,094.35 62,002.57

0 ur ur ur ur ur ur ur

ur 21,502.11

CLOSED ur ur ur ur ur ur ur 3,941.91 21,502.11 10,637.50 1,321.18 150,193.45 2,070.00 76,094.35 62,002.57

BI to submit entitlements JV Costs ETA cost + 7% OH&P JV works clsoing of opening and provision of new opening with waterproofing and sealing works Al Abbar cost + 12% OH&P + 3% Attendances valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 ETA cost + 12% OH&P + 3% Attendances; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#03); BC time claim = 147 days BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#05); BC time claim = 233 days BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#11); bc time claim = 201 days BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#01); bc time claim = 275 days BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#02); bc time claim = 273 days valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 JV Internal Works

7,908.70 3,941.91

JAP016/TS/GT/20686 dated 28Aug-08 JAP016/TS/GT/20686 dated 28Aug-08

CLOSED CLOSED 150,193.45 2,070.00 76,094.35 62,002.57

NSC Tower Secondary Roof Clamping Section MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (JV Scope) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (ETA Scope) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeKrone Modules) JV NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeVertical Cable Manager) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeHorizontal Cable Manager) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeCAT 3 Cables Installations) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeOM3 Fibre Optic Cable Installations) JV JV MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Lateral Systems Scope) MDF & IDF Rooms DUs Additional Requirements, i.e., Stand for the UPS & Batteries in MDF Room & UPS Room at Basement 1

196

003b

78

DXB/AMT-01/0600/EDM/4046

22-Apr-08

127,698.42

ur

127,698.42

ur

127,698.42

196

003c

78

DXB/AMT-01/0600/EDM/4046

22-Apr-08

19,821.34

ur

19,821.34

ur

19,821.34

196

003d

78

DXB/AMT-01/0600/EDM/4046

22-Apr-08

336,915.53

ur

336,915.53

ur

336,915.53

196

003e

78

DXB/AMT-01/0600/EDM/4046

22-Apr-08

321,379.43

ur

321,379.43

ur

321,379.43

196 196

004 005

78 78

DXB/AMT-01/0600/EDM/4046 DXB/AMT-01/0600/EDM/4797

22-Apr-08 02-Sep-08

117,875.00 5,689.44

ur ur

117,875.00 5,689.44

ur ur

117,875.00 5,689.44

196

006

78

NSC MDF & IDF Rooms DUs Additional Requirements, i.e., DU's Requirements for the UPS NSC Replacement of FCU at UPS Room Basement 1 NSC Relocation of Isolators in UPS Room as per the DU's Requirements

DXB/AMT-01/0600/MIC/5017

27-Oct-08

93,918.75

ur

93,918.75

ur

93,918.75

ETA cost + 12% OH&P + 3% Attend

196 215

007 001

78 78

DXB/AMT-01/0600/EDM/5146 DXB/AMT-01/0600/EDM/4474

27-Nov-08 29-Jun-08

ur 36,059.40

ur ur

ur 36,059.40

ur ur 36,059.40

ETA to submit entitlements ETA cost + 12% OH&P + 3% Attendances, JV to submit builders work, if any; ERI 78 as confirmed by F&G letter ref. JAP016/ALM/TCAC/19239 dtd 26Jun08 & Nakheel letter ref. JAP016/TS/GT/0304 dtd 8Aug08 ETA cost + 12% OH&P + 3% Attendances (Power & LC, AC & Ventilaltion, Drainage)

204

001

79

NSC Level 1 Food Court A/C Design Revised "For Construction" Drawings under the DMCC transmittal ref. JAP016/TRNS/JV/00046 (MEP Works) JV Doors to Lift Machine Rooms - Summit & Service F1 (Atkins letter ref. RD4532/661/AK/mja/R8-1879)

DXB/AMT-01/0600/EDM/4270

24-May-08

354,891.15

ur

354,891.15

ur

354,891.15

228

001R1

80

DXB/AMT-0//0600/EDM/4667

03-Aug-08

37,185.25

ur

37,185.25

ur

37,185.25

JV's cost from Belgium Aluminum and Best Steel + 12% OH&P + 3% Attendances

203 231

001 001

81 82

NSC Granite Finishing at Level 2 (RFI No. 636 R1) NSC Additional Dummy Mullion at Levels 49-51 NSC Revisions to Landscaping Package in accordance with the M/s. Nakheel letter ref. JAP016/TS/BW/0347 dated 21-Sep-08

DXB/AMT-01/0600/EDM/4249 DXB/AMT-0//0600/EDM/4859

21-May-08 17-Sep-08

33,846.52 ur 66,615.70

ur ur

33,846.52 ur

ur ur

33,846.52

AB cost + 12% OH&P + 3%Attend Al Abbar to submit entitlements; Nakheel letter ref. JAP016/TS/BW/0346 dtd 14Sep08 instruction to install and ERI is forthcoming

233

001

83

DXB/AMT-0//0600/EDM/4939

12-Oct-08

ur

66,615.70

ur

66,615.70

Al Bayader cost + 12% OH&P + 3% Attendances

TOTAL FOR CLAIMED/NOTIFIED VARIATIONS (WITH ERI) 104,323,764.37

59,346,426.72

29,178,400.41

60,740,469.59

43,557,293.78

0 1 2 3 4 5 6 7 8 9

001 001 001 001 001 001 001 001 001 001

JV JV JV JV JV JV JV JV JV JV

Delay in Site Mobilization Design Modification of Pile Caps Excavation to the difference in the Tender Drawings and the Actual Site Conditions Pile Head Levels and Associated Problem Nominated Subcontractor Appointment (ETA) Fuel Price Increases Delay of receipt of the Building Permit and "For Constructon" Drawings Delay in Raft Pour in Zones 1 & 2 Late Notification of Subcontractors Closure of Site and Offices (due to the death of Sheik Maktoom, 5-7 January 2006)

TDB/P3/AM059 TDB/P3/AM/CN-001A TDB/P3/AM/CN-002A DXB/AMT-01/0500/JLy/112 DXB/AMT-01/0500/JLy/068 DXB/AMT-01/0500/JLy/070 DXB/AMT-01/0500/JLy/131 DXB/AMT-01/0500/JLy/134 DXB/AMT-01/0500/JLy/159 DXB/AMT-01/0500/JLy/171

05-Sep-05 05-Sep-05 17-Sep-05 18-Sep-05 03-Oct-05 03-Oct-05 30-Nov-05 04-Dec-05 28-Dec-05 08-Jan-06

0.00 611,739.00 259,943.16 258,088.62 0.00 0.00 0.00 0.00 0.00 0.00

see NOC#127 see NOC#127 see NOC#127 see NOC#127 ur 0 ur see NOC#127 ur 2

0.00

see NOC#127 see NOC#127 see NOC#127 see NOC#127

CLOSED 611,739.00 259,943.16 258,088.62


JAP016/GEN/ABS/1051 dated 8-Aug-06

CLOSED CLOSED CLOSED CLOSED ur CLOSED ur CLOSED ur 2

0.00

0.00 611,739.00 259,943.16 258,088.62 0.00 0.00 0.00 0.00 0.00 0.00

This is due to the late possession of site as detailed in the referred letter. progressed under a separate claim.

progressed under a separate claim.

progressed under a separate claim. rejected by Nakheel due to notice not served as per the required time period under the Contract. rejection letter ref. JAP016/GEN/ABS/1051 dated 8Aug-06 does not detail the reasons for rejection of Claim No. 5. rejected by Nakheel due to notice not served as per the required time period under the Contract. progressed under a separate claim; time related claim. rejected by Nakheel due to dates relating to NSC in the Baseline Programme is not yet accepted. Rejected by Nakheel in accordance to Clause 44.1 of CoC, as 1 day is non working day and 2 days is not sufficient to award an entitlement; our letter ref. DXB/.Jly/5013 dtd 26Oct08 again requested for 2 days EOT ETA to submit entitlements; Permanent Power now in place done by ETA. ETA to submit entitlements; rejected by Nakheel due to notice not served as per the required time period under the Contract.

0.00 0.00 0.00 0.00 0.00 0.00


see NOC#127 0

CLOSED CLOSED CLOSED CLOSED

0.00 0.00 0.00 0.00

JAP016/GEN/ABS/1051 dated 8-Aug-06 JAP016/GEN/ABS/1051 dated 8-Aug-06

JAP016/TS/BW/0018 dated 31Oct-06 JAP016/GEN/ABS/1014 dated 24-Jun-06, & JAP016/GEN/ ABS/1051 dated 8-Aug-06

CLOSED CLOSED

0.00

10 11

001 001

NSC ETA Site Establishment (Provision of Temporary Power Supply) NSC Revised Contract Drawings by ETA JV Builders Works Drawings NSC DTS referenced AM/015/515 dated 5th August 2006 (MEP Works) NSC DTS referenced AM/015/509 dated 1st August 2006 (MEP Works) NSC DTS referenced AM/015/516 dated 7th August 2006 (MEP Works) NSC LV Schematic Diagram JV Revised Structural Drawings NSC Storage Area for KONE NSC Factory Inspections for Al Abbar

DXB/AMT-01/0500/JLy/353 DXB/AMT-01/0500/JLy/360

17-Apr-06 18-Apr-06

0.00 ur

0 ur

0.00

(not provided) JAP016/GEN/ABS/1051 dated 8-Aug-06

CLOSED ur

CLOSED ur

0.00

0.00

22 23 24 25 26 27 29 30

001 002 001 001 001 001 001 001

DXB/AMT-01/0500/JLy/726 DXB/AMT-01/0500/JLy/748 DXB/AMT-01/0500/JLy/749 DXB/AMT-01/0500/JLy/750 DXB/AMT-01/0500/JLy/759 DXB/AMT-01/0500/JLy/760 DXB/AMT-01/0500/JLy/796 DXB/AMT-01/0500/JLy/802

31,782.05 (valued in 107-003 & 175001) 12-Aug-06 ur


05-Aug-06 12-Aug-06 12-Aug-06 15-Aug-06 15-Aug-06 26-Aug-06 29-Aug-06

0 0 ur ur 0 0 0 0

31,782.05 CLOSED ur ur

CLOSED CLOSED ur ur CLOSED CLOSED CLOSED CLOSED


0.00 0.00 0.00 0.00

31,782.05 0.00

Internal S/C Works + 12% OH&P included in Claim Nos. 107-003 & 175-001 ETA to submit entitlements ETA to submit entitlements included in Claim Nos. 67-001 valued under the Claims Series 33

(valued in 107-003 & 175-001)

ur (valued in 67-001) (valued in 33) 0.00 0.00

(valued in 67-001) (valued in 33) 0.00 0.00

0 0 0 0
JAP016/TS/ABS/0004 dated 12Sep-06 JAP016/GEN/ABS/1070 dated 06-Sep-06

CLOSED CLOSED CLOSED CLOSED

0.00 0.00

KONE to submit entitlements; rejected by Nakheel due to Clause 20.1-Care of Works on the CoC. AA to submit entitlements; rejected by Nakheel due to Tech Specifications H11/20, Clause 871, and Clause 3b of CoC.

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (2).monvabad

5 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
35 35 36

October 15, 2013


REMARKS / COMMENTS

SUB NO.
002a 002b 001

ERI NO.

V.O. TO

CLAIM NOTICE LETTER

CLAIM ENTITLEMENT APPLICATION DATE COST (AED) 38,246.08 120,370.11 ur 0.00 (valued in37-001) 522,748.23 0.00 ur (valued in 127-001) ur ur 0.00 0.00 (valued in 65-001) (valued in 33-030) 0.00 12,494.21 (valued in 35-001) (valued in 64-001) (valued in 76-001) (valued in 116-001) 0.00
TIME (Days)
ur ur ur

ER / F&G / JV AGREED VALUES COST (AED)


TIME (Days)

OUTSTANDING CLAIMS COST (AED)


38,246.08 120,370.11

CERTIFIED AS AT CERTIFIED TO-DATE

DESCRIPTION
REFERENCE
DXB/AMT-01/0500/JLy/926 DXB/AMT-01/0500/JLy/926 DXB/AMT-01/0500/JLy/932 03-Oct-06 03-Oct-06 05-Oct-06

November 30, 2008


BALANCE TO-DATE
38,246.08 120,370.11
ETA Cost + 7% JV OH&P; as per original claim JV Cost ETA to submit entitlements; rejected by Nakheel due to the Consultant's(Atkins)response ref. RD/4532/661/ML/R8-0344.

LETTER REF.

TIME (Days)
ur ur ur

NSC Additional OCP's conduits to the Offices and Retail Units (MEP Works) JV Additional OCP's conduits to the Offices and Retail Unts (Builders Work) NSC Fire Alarm Shop Drawing JV Nomination of Landscaping Subcontractor NSC Revised "For Construction" Drawings for ETA NSC Fire Sprinkler Riser Pipes in Garbage Chute Shaft JV CTU 3rd Party Inspection

JAP016/TS/BW/0021 dated 12Nov-06

ur

39 40 42 43

001 001 001 001

DXB/AMT-01/0500/JLy/1052 DXB/AMT-01/0500/JLy/1054 DXB/AMT-01/0500/015/JLy/235 DXB/AMT-01/0500/JLy/1086

05-Nov-06 06-Nov-06 07-Nov-06 11-Nov-06

ur 0 ur 0

0.00 (valued in37-001)

CLOSED 0 CLOSED 522,748.23

ur CLOSED ur CLOSED
0.00

0.00

time implications. same as Claim No. 37-001, based on the F&G transmittal ref. F+G/ALMAS/TAISEI/01404 dtd 10-1506 based on the response from RFI No. 417 request by WS Atkins and F&G in the Technical Meeting to provide 3rd party safety inspection and issue of certificate prior to CTU; rejected by Nakheel. ETA to submit entitlements; revisions is due to the requirement of a UL/FM specifications

522,748.23 0.00

0.00

JAP016/TS/ABS/0031 dated 28Dec-06

CLOSED

44 45 47 48 49 53 58 60 61 62 63 66 71 72 73

001 001 001 001 001 001 001 001 001 001 001 001 001 001 001

NSC Revised Specifications for the Fire Fighting Equipments JV Provision of Inspectors NSC Revised Architectural Drawings at 31st & 32nd Floor (MEP Works) NSC Revised Architectural and ID Drawings (MEP Works) JV JV Exceptionally Adverse Climatic Conditions RFI No. 480 - Embedded Flush Tank

DXB/AMT-01/0600/EDM/1179 DXB/AMT-01/0500/JLy/1185 DXB/AMT-01/0600/EDM/1237 DXB/AMT-01/0600/EDM/1238 DXB/AMT-01/0500/JLy/1253 DXB/AMT-01/0500/JLy/1338 DXB/AMT-01/0600/EDM/1566 DXB/AMT-01/0500/JLy/1567 DXB/AMT-01/0500/JLy/1593 DXB/AMT-01/0600/EDM/2507 DXB/AMT-01/0500/JLy/1633 DXB/AMT-01/0600/EDM/1655 DXB/AMT-01/0600/EDM/1786 DXB/AMT-01/0500/JLy/1792 DXB/AMT-01/0500/JLy/1836

29-Nov-06 03-Dec-06 11-Dec-06 11-Dec-06 14-Dec-06 28-Dec-06 10-Feb-07 13-Feb-07 14-Feb-07 11-Jul-07 20-Feb-07 25-Feb-07 14-Mar-07 14-Mar-07 19-Mar-07

ur 0 ur ur ur 0 0 0 0 ur 0 0 0 0 0

ur

ur CLOSED ur ur ur CLOSED CLOSED CLOSED CLOSED ur CLOSED CLOSED CLOSED CLOSED CLOSED
0.00 0.00 0.00 0.00 0.00 0.00 0.00

(valued in 127-001)

CLOSED ur ur

0.00

To be included in the Prolongation Claims as this is a preliminaries items ETA to submit entitlements ETA to submit entitlements

0.00 0.00
(valued in 65-001)
0 0 0 0
JAP016/ALM/TCAC/06995 dated 18-Feb-2007 JAP016/TS/ALM/TCAC/06906 dated 14-Feb-07

CLOSED CLOSED CLOSED CLOSED CLOSED 12,494.21

0.00

0.00 0.00

due to inclement weather conditions at site rejected by F&G as it is included specs M13. valued in Claim No. 65-001 not applicable

NSC Revised MEP Drawings JV Provision of BMU JV Sanitary Ware Selection Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms NSC Installation of OCP's to Tenant Rooms NSC MEP Works - Revised External Services Drawings JV NSC MEP Works - Revised Ground Floor Landscape Drawings JV Interfacing Detail between the Cladding and Blockwall JV Disabled Toilets (CVI No. 052 dated 18th March 2007 increase of openings to blockwork walls to 1.00m) JV Shadow Groove to Ceilings JV Disabled Toilet NSC RFI No. 571 - Insulation and Backing Panels to Cladding JV Change of Back of House Doors Colours from White to Gray NSC Revision of ST-10 to ST-15 (ID Works Package Provisional Sum) JV Changes to D-04 & D-30 Hinges (ID Works Package) NSC Secondary Roof for the Towers JV Revised Interior Lighting Fixtures Layout at GF,1L,& 2L JV Provision of Downspouts at Ballroom/Function Room Roof (CVI No. 122) JV Architectural Changes to Level 2 JV Omission of Mirror Mounted Paper Towel Dispenser NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (ETA Scope) NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (Al Abbar Scope) JV Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (JV Scope) JV Changes to the Diamond Exchange Centre

(valued in 33-030) 0.00

0.00

0.00 12,494.21

rejected by F&G as per the response letter Revision 1 - revised due to the changes in the works. not applicable Included in Claim No. 64-001 Included in 76-001 included in Claim No. 116-001

(valued in 35-001) (valued in 64-001) (valued in 76-001) 0.00 0.00

0 0 0 0 0
(not done)

CLOSED CLOSED CLOSED CLOSED CLOSED

0.00

not done

74 75 83 90 91 96 98 105 107 108 111 113

001 001 001 001 001 001 001 001 006 001 001 001

DXB/AMT-01/0500/JLy/1885 DXB/AMT-01/0500/JLy/1886 DXB/AMT-01/0500/JLy/2184 DXB/AMT-01/0500/JLy/2347 DXB/AMT-01/0500/JLy/2350 DXB/AMT-01/0600/EDM/2437 DXB/AMT-01/0600/EDM/2451 DXB/AMT-01/0600/EDM/2553 DXB/AMT-01/0600/EDM/4465 DXB/AMT-01/0100/YOS/2628 DXB/AMT-01/0600/EDM/2731 DXB/AMT-01/0600/EDM/2768

26-Mar-07 26-Mar-07 20-May-07 16-Jun-07 16-Jun-07 30-Jun-07 02-Jul-07 18-Jul-07 26-Jun-08 31-Jul-07 18-Aug-07 26-Aug-07

(valued in 41-001) 0.00 ur 0.00 2,704,866.52 (valued at 41-001) (valued in 220-001) (valued in 41-001) 2,210.46 (valued in 149) 165,993.30 91,147.85

0 0 ur 0 ur 0 ur 0 see NOC#127 0 see NOC#127 ur

(valued in 41-001) 0.00

0 0

(valued in 41-001) (not done)

CLOSED CLOSED ur

CLOSED CLOSED ur CLOSED ur CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED ur

0.00 0.00

valued in Claim No. 41-013 not done AA to submit entitlements no claim from subcontractors

0.00

(not done)

CLOSED 2,704,866.52

0.00

2,704,866.52

BI costs of AED 2,527,912.64 + 7% JV OH&P considered in Claim No. 41-007

(valued at 41-001)
(valued in 220-001) (valued in 41-001)

0 0 0 see NOC#127
JAP016/ALM/TCAC/10523 dated 22-July-2007

CLOSED CLOSED CLOSED 2,210.46 CLOSED 165,993.30 91,147.85

0.00 0.00 0.00


to be valued in Claim N o. 220-001 TO BE VALUED IN CLAIM NO. 41-001 (ERI 16)

2,210.46
0.00

varied works at structural steel works and provision of Roof Drain on-hold area, awaiting details from Client

(valued in 149)

0 see NOC#127

165,993.30 91,147.85

Arte Casa Cost + 12% OH&P + 3% Attendances ETA costs + 12% OH&P + 3% Attendances

113

002

DXB/AMT-01/0600/EDM/2768

26-Aug-07

11,909.40

ur

11,909.40

ur

11,909.40

Al Abbar cost + 12% OH&P + 3% Attendances

113

003

DXB/AMT-01/0600/EDM/2768

26-Aug-07

(valued in 113-001)

(valued in 113-001)

CLOSED

CLOSED

0.00

Included in Claim No. 113-001

117

001

DXB/AMT-01/0500/JLy/2805

02-Sep-07

(valued in 149-001)

see NOC#127001 ur ur 0 ur ur ur 579

(valued in 149-001)

see NOC#127001

CLOSED

CLOSED

0.00

valued in 149-001 under ERI No. 62

118 119 120 121 124 125 127

001 001 001 001 001 001 001

NSC Revised Mechanical and Electrical Drawings at Basement 2 (Security Room) JV Notification of Potential Delay due to the Review of Shop Drawings JV Changes to the Floor Drain Locations JV Engineering and Procurement Activities Late Issuance of Design Information (Specifications of Lighting Fixtures in ID Areas) NSC Level 2 Fire Policy Layouts (Transmittal Ref. JAP016/TRNS/JV/00014) JV Prolongation Costs JV

DXB/AMT-01/0600/EDM/2906 DXB/AMT-01/1100/WAE/2908 DXB/AMT-01/0600/EDM/2933 DXB/AMT-01/0500/JLy/2949 DXB/AMT-01/1100/WAE/2953 DXB/AMT-01/0600/EDM/3009 DXB/AMT-01/0500/JLy/3018 / DXB/AMT-01/0500/JLy/3311 / DXB/AMT-01/0500/JLy/3710 / DXB/AMT-01/0500/JLy/3855 / DXB/AMT-01/0500/JLy/4017

19-Sep-07 19-Sep-07 26-Sep-07 30-Sep-07 01-Oct-07 14-Oct-07 16-Oct-07 / 11-Dec-07 / 21-Feb-08 / 17-Mar-08 / 17-Apr-08

ur 0.00 0.00 (valued in 41-001) 0.00 ur

ur

ur ur CLOSED ur ur ur 579 0.00


0.00

ETA to submit entitlements

0.00 0.00 (valued in 41-001) 0.00


0
(not done)

CLOSED CLOSED CLOSED CLOSED ur 131,765,411.17

0.00 0.00

Potential Time Claim coring works not done. valued in 41-001, time claim submitted separately

0.00
0.00 0.00

0.00

time claim. ETA to submit entitlements EOT of 585 days includes the previous 96 days and 138days claimed; Claim for additional pile works reduced to 132 from 138, thus reducing the overall claim to 579 days

127

002

JV

Additional Payment as a Result of the Escalating Cost of Materials

DXB/AMT-01/0500/JLy/4632

24-Jul-08

see NOC#127001

see NOC#127001

711,983.12

CLOSED

0.00

in connection to the prolongation claim

128

001

129 130 133

001 001 001

138 140 141 142 143 144 145

001 001 001 001 001 001 001

Changes to Level 2 due to the New "For Construction" Drawings under Transmittal JAP016/TRNS/JV/00015 JV Staircase at Levels 49-50 NSC Drainage on Swimming Pool Deck at Level 1 (RFI No. 831) NSC Further Revisions to For Construction Drawings under transmittals ref. JAP016/TRNS/JV/00015 and 00016 JV Notification of Delay to the ID Works Package Signages NSC Modification in Specification of Some ID Lighting Fixtures JV Notification of Delay to the ID Doors Package JV NSC Disruption of Works resulting from Design Conflict in Basement 1 VIP Lounge JV Notice of Disruption of Work at Function Room/Ballroom due to Design Conflict JV Delays due to Design Issues Related to GL-07 JV Notification of a Possible Delay to the Glass Feature Wall (GL-05) under the ID Works Package NSC Internal Water Feature (MEP Scope) NSC Power Supply and Fire Alarm Interface to Smoke Ventilation Window (RFI No. 783) NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (Bond Communication Scope - Additional Voice/Data Points at Level 2) NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (ETA scope of works) JV Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (JV scope of works) NSC Vertical Cable Manager for Diamond Exchange AV System at the Multi Purpose Room in accordance with the F&G letter ref. JAP016/ALM/TCAC/20991 dated 16-Sep-08 JV Break Glass Pedestals at the Diamond Exchange Centre in accordance with the F&G transmittal ref. F+G/ALMAS/TAISEI/01961 NSC Revisions to the Electrical Works at the Diamond Exchange Centre and Level 2 as per the F&G transmittal ref. F+G/ALMAS/TAISEI/01574 and DMCC transmittal ref. JAP016/TRNS/JV/00048 NSC Changes to the Diamond Exchange Centre as per the instructions given via M/s. DMCC letter referenced JAP016/GEN/BW/0177 dated 20-Oct-08 JV Notification of a Potential Delay Determination of Scope of Work at L49, L50, & L51 (DMCC Floors)

DXB/AMT-01/0600/EDM/3035

21-Oct-07

(valued in 149)

(valued in 149)

CLOSED

CLOSED

0.00

not applicable.

DXB/AMT-01/0600/EDM/3051 DXB/AMT-01/0600/EDM/3058 DXB/AMT-01/0600/EDM/3067

23-Oct-07 24-Oct-07 25-Oct-07

0.00 ur ur

0 ur ur

0.00

(not done)

CLOSED ur ur

CLOSED ur ur

0.00

0.00

staircase not done. ETA to submit entitlements ETA & JV to submit entitlements

DXB/AMT-01/1100/WAE/3131 DXB/AMT-01/0600/EDM/3136 DXB/AMT-01/1100/WAE/3137 DXB/AMT-01/0600/EDM/3142 DXB/AMT-01/1100/WAE/3187 DXB/AMT-01/0500/JLy/3192 DXB/AMT-01/0600/EDM/3204

07-Nov-07 08-Nov-07 10-Nov-07 10-Nov-07 18-Nov-07 19-Nov-07 20-Nov-07

(valued in 149-001) ur (valued in 149-001) 25,787.60 0.00 0.00 (valued in 41-001)

ur ur ur ur ur ur ur

(valued in 149-001)

CLOSED ur

ur ur ur ur ur ur ur

0.00

time claim. ETA tnd Lever to submit entitlements time claim.

(valued in 149-001)

CLOSED 25,787.60

0.00

25,787.60
0.00

ETA Cost + 12%OH&P + 3% Attendances time claim. under review; time entitlements under review for time entitlements

0.00 0.00
(valued in 41-001)

CLOSED CLOSED CLOSED

0.00 0.00

0.00

147 148 149

003 001 005a

DXB/AMT-01/0500/JLy/3209 DXB/AMT-01/0600/EDM/3217 DXB/AMT-01/0600/EDM/4741

21-Nov-07 22-Nov-07 18-Aug-08

ur ur 24,628.70

ur ur ur

ur ur 24,628.70

ur ur ur 24,628.70

ETA to submit entitlements ETA to submit entitlements BC cost + 7% OH&P; BC VO#10; BC time claim = 147 days

149

005b

DXB/AMT-01/0600/EDM/4741

18-Aug-08

ur

ur

ur

ur

ETA to submit entitlements

149

005c

DXB/AMT-01/0600/EDM/4741

18-Aug-08

(valued in 149-001)

(valued in 149-001)

CLOSED

CLOSED

0.00

considered in 149-001 (ERI No. 62)

149

006

DXB/AMT-01/0500/JLy/5003

25-Oct-08

11,996.83

ur

11,996.83

ur

11,996.83

BC cost + 7% OH&P; BC VO#14; BC time claim = 119 days

149

008

DXB/AMT-01/0600/EDM/5027

01-Nov-08

9,200.00

ur

9,200.00

ur

9,200.00

Dubai Metals cost + 12% OH&P + 3% Attand

149

009

DXB/AMT-01/0600/EDM/5059

10-Nov-08

222,906.80

ur

222,906.80

ur

222,906.80

ETA cost + 12% OH&P + 3% Attendances

149

011

DXB/AMT-01/0600/EDM/5154

29-Nov-08

44,538.44

ur

44,538.44

ur

44,538.44

BC cost + 7%; BC VO#17; BC time claim = 91 days

150

001

DXB/AMT-01/1100/WAE/3235

25-Jan-08

0.00

ur

0.00

CLOSED

ur

0.00

Time related claim to be submitted separately.

151 153

001 001

NSC Containment (Security Services) JV Provision of Toilets at Levels 53 to 63

DXB/AMT-01/0500/JLy/3252 DXB/AMT-01/0500/JLy/3276

28-Nov-07 03-Dec-07

ur (valued in 163)

ur 0

ur

ur CLOSED
0.00

ETA to submit entitlements valued in another claim

(valued in 163)

CLOSED

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (2).monvabad

6 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
154 155 156 157

October 15, 2013


REMARKS / COMMENTS

SUB NO.
001 001 001 001

ERI NO.

V.O. TO
JV

CLAIM NOTICE LETTER

CLAIM ENTITLEMENT APPLICATION DATE COST (AED) 1,600.56 ur 0.00 (valued in 163)
TIME (Days)
ur ur 0 0

ER / F&G / JV AGREED VALUES COST (AED)


TIME (Days)

OUTSTANDING CLAIMS COST (AED)


1,600.56 ur

CERTIFIED AS AT CERTIFIED TO-DATE

DESCRIPTION
REFERENCE
DXB/AMT-01/0600/EDM/3313 DXB/AMT-01/0600/EDM/3314 DXB/AMT-01/0500/JLy/3359 DXB/AMT-01/0100/YOS/3365 11-Dec-07 11-Dec-07 17-Dec-07 22-Dec-07

November 30, 2008


BALANCE TO-DATE
1,600.56
ETA to submit entitlements rejected by Nakheel as the proposed revisions was not done and was reverted back to original Aedas Specs valued in another claim

LETTER REF.

TIME (Days)
ur ur CLOSED CLOSED

Enclosure to the Irrigation Pipes running through the LV Room 2 (RFI No. 894) NSC Second Floor Revised Lighting and Power Design NSC Lift L4 Mock-Up (Car Interior Finish @ Ground Floor Level) JV Request for Issue of Outstanding Drawings (DMCC Offices at L49-L51 & Add'l Toilets in Office Area at L52-L64) JV Special Holiday on 14th January 2008 Notice of Excessive Rains Additional Architraves to Towel Dispensers Notification of a Possible Variation at Ballroom Electrical Cabinet Doors NSC Further Revisions to the Levels 49, 50, 51, 60 and 61 in accordance with DMCC Transmittal Ref. JAP016/TRNS/JV/ 00032 dated 22nd January 2008 (MEP Works) JV Notification of Disruption of Work due to discrepancy of Design Drawings at Second Floor JV JV JV JV Delays due to Strong Winds

0.00 (valued in 163)

0 0

JAP016/TS/GT/0142 dated 31Jan-08

CLOSED CLOSED

159 160 161 162 163

001 001 001 001 005

DXB/AMT-01/0600/EDM/3482 DXB/AMT-01/0600/EDM/3483 DXB/AMT-01/0600/EDM/3492 DXB/AMT-01/1100/WAE/3542 DXB/AMT-01/0600/EDM/3770

16-Jan-08 16-Jan-08 19-Jan-08 24-Jan-08 03-Mar-08

0.00 0.00 96,768.00 0.00 ur

ur ur 0 ur

0.00 0.00 0.00

JAP016/TS/GT/0259 dated 29May-08

CLOSED CLOSED 96,768.00

CLOSED ur CLOSED ur

0.00 0.00 96,768.00 0.00

to be considered in the EOT claim under review for time entitlements submitted thru3701 dtd 20-Feb-08 under review. ETA to submit entitlements

JAP016/TS/GT/0186 dated 27Mar-08

CLOSED ur

165

001

DXB/AMT-01/1100/WAE/3603

04-Feb-08

(valued in 149-001)

ur

(valued in 149-001)

CLOSED

ur

0.00

time claim.

167 168 171 172 175

001 001 001 001 001

DXB/AMT-01/0500/JLy/3613 DXB/AMT-01/0500/JLy/3623 DXB/AMT-01/0500/JLy/3634 DXB/AMT-01/0600/EDM/3676 DXB/AMT-01/0600/EDM/3771

05-Feb-08 06-Feb-08 09-Feb-08 17-Feb-08 03-Mar-08

0.00 0.00 ur 0.00 ur

0 0 ur 0 ur

0.00 0.00 0.00

0 0 0

JAP016/TS/GT/0152 dated 18Feb-08

CLOSED CLOSED ur

CLOSED CLOSED ur CLOSED ur

0.00
0.00

rejected by Nakheel To be included in the Prolongation Claims EVS to submit entitlements considered Nil due to the increase in the rates for GL07 as per letter ref. ETA to submit entitlements (Builders to be in another submittal)

JV Inspections not done on Timely Basis NSC Sequencing of Spire Erection JV Abortive Cost for GL-07 (ID Works Package) NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00033 dated 5th February 2008 (MEP Works) JV TECOM/DU Comments on Telephone Rooms Raised Access Floor Material Submittal NSC DU Requirements NSC TECOM/DU Comments on Structured Cabling Material Submittal NSC TECOM/DU Comments - " Active " IDF Rooms JV Diamond Exchange Details NSC Increase in Water Tank Size NSC Ducting in MDF Rooms NSC Additional Low Leakage Motorized Smoke Damper NSC Height of Services at Level-49 on Shaft-6 NSC Additional Stone Cladding to Sides of Maintenance Stairs NSC Additional Work to Make-up Levels at Main Entrance JV NSC NSC NSC NSC NSC NSC JV Design Change to External Ramps - Block Stopper Upstand (CVI No. 086) Design Change to External Ramps - Waterproofing (CVI No. 086) Sprinkler Heads in Illuminated Ceiling (RFI No. 967 Rev. 0) Additional Work to the Ball Room Parapet (CVI No. 084) Additional Work to Lightweight Concrete to Pedestrian Path (RFI No. 976) Additional Work to External Wall Finishing at Swimming Pool (RFI No. 920) Additional Work to Concrete Under Maintenance Path Tiles (RFI No. 929) Additional Aluminum Angles at RAF Termination

JAP016/TS/GT/0228 dated 13May-08

CLOSED ur

176 176 176 176 177 180 181 182 183 184 185 187 187 188 189 190 191 192 193 194 194 195 198

001 002 003 004 001 001 001 001 001 001 001 001 002 001 001 001 001 001 001 001 002 001 001

DXB/AMT-01/0500/JLy/3814 DXB/AMT-01/0500/JLy/3568 DXB/AMT-01/1200/JIN/3827 DXB/AMT-01/0600/DAN/3923 DXB/AMT-01/0500/JLy/3844 DXB/AMT-01/1200/RAN/3903 DXB/AMT-01/1200/RAN/3906 DXB/AMT-01/1200/RAN/3915 DXB/AMT-01/1200/RAN/3932 DXB/AMT-01/1100/WAE/3936 DXB/AMT-01/1100/WAE/3937 DXB/AMT-01/1100/WAE/3971 DXB/AMT-01/1100/WAE/3971 DXB/AMT-01/1200/RAN/3974 DXB/AMT-01/1100/WAE/3975 DXB/AMT-01/1100/WAE/3976 DXB/AMT-01/1100/WAE/3979 DXB/AMT-01/1100/WAE/3980 DXB/AMT-01/0600/EDM/4026 DXB/AMT-01/0600/EDM/4041 DXB/AMT-01/0600/EDM/4041 DXB/AMT-01/0600/EDM/4042 DXB/AMT-01/0600/EDM/4079

10-Mar-08 28-Jan-08 13-Mar-08 31-Mar-08 16-Mar-08 27-Mar-08 27-Mar-08 29-Mar-08 02-Apr-08 03-Apr-08 03-Apr-08 09-Apr-08 09-Apr-08 10-Apr-08 10-Apr-08 10-Apr-08 13-Apr-08 13-Apr-08 19-Apr-08 21-Apr-08 21-Apr-08 21-Apr-08 26-Apr-08

(valued in 196) (valued in 196) (valued in 196) (valued in 196) (valued in 149-001) 71,922.15 ur 1,308,459.65 36,435.37 ur ur 108,691.73 86,593.30 ur (valued in 107-007) 0.00 ur ur 0.00 190,661.95 82,800.00 ur ur

ur ur ur ur ur ur ur ur ur ur ur ur ur ur 0 0 ur ur 0 0 0 ur ur

(valued in 196) (valued in 196) (valued in 196) (valued in 196) (valued in 149-001)

0 0 0 0

CLOSED CLOSED CLOSED CLOSED CLOSED 71,922.15 ur 1,308,459.65 36,435.37 ur ur 108,691.73 86,593.30 ur

CLOSED CLOSED CLOSED CLOSED ur ur ur ur ur ur ur ur ur ur CLOSED CLOSED ur ur CLOSED CLOSED CLOSED ur ur 0.00 0.00 190,661.95 82,800.00 0.00 0.00 0.00 108,691.73 86,593.30 1,308,459.65 36,435.37
0.00

Lateral Systems to submit (Builders to be in another submittal) ETA to submit entitlements (Builders to be in another submittal) BC to submit entitlements (Builders Works if any to be in another submittal) ETA to submit entitlements valued in 149-001 under ERI No. 62

71,922.15

ETA Claim = AED 62,541.00, +JV's 12%(OH&P) and 3% (Attend) ETA to submit entitlements ETA Claim = AED 1,137,791.00, + JV's 12% (OH&P) and 3% (Attend) ETA Claim = AED 31,682.93, + JV's 12% (OH&P) and 3% (Attend) Al Bayader to submit entitlements Al Bayader to submit entitlements JV's portion of the works AB cost + 12% OH&P + 3%Attend ETA to submit entitlements Al Bayader to submit entitlements Al Bayader to submit entitlements; claim notice rejected Al Bayader to submit entitlements Al Bayader to submit entitlements under review (done by Dubai Metals); rejected by Nakheel as it is part of MDS scope of works ETA to submit entitlements JV thru Sibca to submit entitlements ETA to submit entitlements (Builders Works if any to be in another submittal) EVS to submit entitlements

(valued in 107-007)

0 0
JAP016/TS/GT/0204 dated 14Apr-08

CLOSED CLOSED ur ur

0.00

0.00

0 0 0

JAP016/TS/GT/0233 dated 15mAY-08

CLOSED 190,661.95 82,800.00 ur ur

NSC Temporary Fire Alarm Systems (Installation) JV Temporary Fire Alarm Systems (Material / Testing and Commissioning) NSC Mechanical Services at Tecom Room in Level 50 NSC Change of Applied Cementitious Fireproofing to Intumescent Paint on Steel Beams at Diamond Exchange Center NSC Design Change of Core Bulk Head at Ground Floor Escalator Lobby - MEP Rectification Works for the ID Works Package (CVI No. 088) NSC Additional Extract Ducts in Basement 1 Male and Female Toilet , and VIP Toilet NSC Carpets at Level 48 NSC Fire Protection Systems at Basement 2 Security Room - Supply of Additional Wall Mounted Dry Powder and CO2 Fire Extinguishers NSC Fire Protection Systems at Basement 2 Security Room - Removal of Existing Fire Fighting Systems and Installation of ETA Supplied Fire Fighting Equipment JV Closure of the Opening in Parapet Wall on Elevation 4 for Spire Connection NSC Back Boxes for Seismic Detectors at Basement 5 and Level 2 Vault Rooms NSC BMS Monitor for the Revolving / Sliding Doors NSC Additional Screed at Road Type 2 and Ramps NSC Additional Requirements for Etisalat Room in Basement 1 (MEP Works) JV Additional Requirements for Etisalat Room in Basement 1 (Door Amendments) JV False Ceiling at Basement 5 Vault Lobby and Services Room (RFI No. 511) NSC Fire Sprinkler above False Ceiling at Basement 5 Vault Lobby & Services Room (RFI No. 511) NSC Vapour Barrier underneath all Parapet Composite Cladding of the 6 Wings and Diamond Exchange Centre JV Modification to Louvers and Additional Aluminum Doors at Various Areas NSC Additional 6" diam. Line from B5 Pump Room to S2 Level Fire Tank JV Temporary Wet Riser Systems (Supply and Delivery of Fire Pumps and Accessories) NSC Temporary Wet Riser Systems (Installation, Testing & Commissioning, and Decomissioning) NSC Paving and Landscaping Works at Ramps (originally under Wade Adams Scope) NSC Planter Area at Level 2 - Change of 500mm thick Sweet Soil to Polysterene JV Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) JV scope of works NSC Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) MEP Scope of Works NSC Extended Warranty due to the Usage of Jet Fans at Basement Levels as per the EHS Improvement Notice NSC Additional Works at Entrance Ramps - Type 3 & 5 JV NSC NSC NSC Signage at the Entrance of VIP Carpark in Basement 1 Entrance Canopy Panel - Down Light (T-39) and Camera Layout (CVI No. 126) Motorized dampers at B2L Security Room (RFI No. 1076 Rev. 0 & 1) Additional Voice/Data Points at Level 48 as per revised "For Construction" drawings under the F&G transmittal ref. F+G/ALMAS/TAISEI/01460 (Sky Lobby Bulding Services Cat II Works) Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00002 dated 10th July 2007 (Additional Voice / Data Points)

199

001

DXB/AMT-01/0600/EDM/4080

27-Apr-08

27,548.25

ur

27,548.25

ur

27,548.25

ETA Claim = AED 23,955.00 + 12%JVOH&P + 3% Attendances

200 206 209

001 001 001

DXB/AMT-01/0600/EDM/4083 DXB/AMT-01/0600/EDM/4318 DXB/AMT-01/0600/EDM/4341

27-Apr-08 31-May-08 03-Jun-08

42,963.29 ur ur

ur ur ur

42,963.29 ur ur

ur ur ur

42,963.29

ETA Cost + 12%OH&P + 3% Attendances Bond Interiors to submit entitlements ETA to submit entitlements; Nakheel letter ref. JAP016/TS/GT/0285 dtd 23Jun08 reject the claim and no ERI's shall be issued JCI to submit entitlements

209

002

DXB/AMT-01/0600/EDM/4341

03-Jun-08

ur

ur

ur

ur

210 212 213 216 218 218 219 219 220

001 001 001 001 001 002 001 002 001

DXB/AMT-01/0600/EDM/4348 DXB/AMT-01/1200/RAN/4391 DXB/AMT-01/0600/MIC/4449 DXB/AMT-01/0600/EDM/4506 DXB/AMT-01/0600/EDM/4525 DXB/AMT-01/0600/EDM/4525 DXB/AMT-01/0600/EDM/4527 DXB/AMT-01/0600/EDM/4527 DXB/AMT-01/0600/EDM/4556

04-Jun-08 12-Jun-08 22-Jun-08 05-Jul-08 08-Jul-08 08-Jul-08 08-Jul-08 08-Jul-08 12-Jul-08

11,682.47 ur 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 ur ur

ur ur ur ur ur ur ur ur ur

11,682.47 ur 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 ur ur

ur ur ur ur ur ur ur ur ur

11,682.47

Intherpro Cost + 12% OH&P + 3% attendances ETA to submit entitlements

99,660.15 37,147.81 41,743.85 1,286.00 37,895.22

ETA cost + 12% OH&P + 3% Attendances Al Bayader cost + 12% OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Belgium Alkuminum cost + 12% OH&P +3 % Attend FBI + EVS cost + 12% OH&P + 3% Attend ETA to submit entitlements Al Abbar to submit entitlements

221 222 223 223 224 225 226

001R1 001 001 002 001 001 001

DXB/AMT-01/0600/EDM/4558 DXB/AMT-01/0600/MIC/4577 DXB/AMT-01/0600/DAN/4592 DXB/AMT-01/0600/DAN/4592 DXB/AMT-01/0600/EDM/4598 DXB/AMT-0//0600/EDM/4627 DXB/AMT-0//0600/EDM/4633

12-Jul-08 15-Jul-08 17-Jul-08 17-Jul-08 20-Jul-08 23-Jul-08 24-Jul-08

32,364.90 404,090.45 447,120.00 1,625,886.10 305,837.13 25,300.00 35,000.25

ur ur ur ur ur ur ur

32,364.90 404,090.45

ur ur CLOSED CLOSED ur ur ur

32,364.90 404,090.45 447,120.00 1,625,886.10 305,837.13 25,300.00 35,000.25

cost from domestic subcons + 12%OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Naffco Costs +12% OH&P + 3% Attendances; not a new regulation as per the review of Jly ETA Cost + 12% OH&P + 3% Attendances; not a new regulation as per the review of Jly Al Bayader cost + 12% OH&P + 3% Attendances AB cost + 12% OH&P + 3%Attend JV Internal Works

0.00 0.00

0 0

JAP016/TS/GT/0324 dated 28Aug-08 JAP016/TS/GT/0324 dated 28Aug-08

CLOSED CLOSED 305,837.13 25,300.00 35,000.25

226

002

DXB/AMT-0//0600/EDM/4633

24-Jul-08

110,641.50

ur

110,641.50

ur

110,641.50

ETA cost + 12% OH&P + 3% Attendances

227

001

DXB/AMT-0//0600/EDM/4659

29-Jul-08

0.00

0.00

JAP016/TS/BW/0352 dated 15Oct-08

CLOSED

CLOSED

0.00

0.00

this cost to be by JV as per the Gen. Specs Section A, Item 1.03.d & 1.05

229 230 232 235 236

001 001 001 001 001

DXB/AMT-0//0600/EDM/4678 DXB/AMT-0//0600/EDM/4735 DXB/AMT-0//0600/EDM/4864 DXB/AMT-01/0600/EDM/4966 DXB/AMT-01/0500/JLy/5000

05-Aug-08 17-Aug-08 21-Sep-08 16-Oct-08 25-Oct-08

16,654.95 7,797.46 0.00 0.00 18,364.91

ur ur 0 0 ur

16,654.95 7,797.46

ur ur CLOSED CLOSED ur 0.00 0.00

16,654.95 7,797.46 0.00 0.00 18,364.91

Al Bayader cost + 12% OH&P + 3% Attendances under ID Works Al Abbar to submit entitlements; rejected by Nakheel as the works is deemed included in Al Abbar scope ETA to submit full entitlements; rejected by M/s. Nakheel BC Cost + 7% OH&P; BC VO#6; BC time claim = 165 days

0.00 0.00

0 0

JAP016/TS/BW/0350 dated 14Oct-08 JAP016/TS/BW/0354 dated 9Nov-08

CLOSED CLOSED 18,364.91

237

001

NSC

DXB/AMT-01/0500/JLy/5010

26-Oct-08

34,599.52

ur

34,599.52

ur

34,599.52

BC Cost + 7% OH&P; BC VO#7; BC time claim = 201 days

239

001

NSC Additional Power Supply Lines for External Water Features, Irrigation Pumps, and Swimming Pool NSC Trimming of Cantilever Beams at the Diamond Exchange Center as per the RFI No. 1085 NSC Modification of Soffit Cladding for the Swimming Pool to Conceal Service Pipings as per the RFI No. 1054

DXB/AMT-0/0600/MIC/5081

15-Nov-08

141,276.06

ur

141,276.06

ur

141,276.06

ETA cost + 12% OH&P + 3% Attendances

240 241

001 001

DXB/AMT-01/0600/EDM/5130 DXB/AMT-01/0600/EDM/5131

24-Nov-08 24-Nov-08

ur ur

ur ur

ur ur

ur ur

note that the structural works was based on the structural drawings provided to EVS; EVS to submit entitlements AA to submit entitlements

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (2).monvabad

7 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
242 243 244

October 15, 2013


REMARKS / COMMENTS

SUB NO.
001 001 001

ERI NO.

V.O. TO

CLAIM NOTICE LETTER

CLAIM ENTITLEMENT APPLICATION DATE COST (AED) 340,314.96 13,460.75 1,732.06


TIME (Days)
ur ur ur

ER / F&G / JV AGREED VALUES COST (AED)


TIME (Days)

OUTSTANDING CLAIMS COST (AED)


340,314.96 13,460.75 1,732.06

CERTIFIED AS AT CERTIFIED TO-DATE

DESCRIPTION
REFERENCE
DXB/AMT-01/0600/MIC/5158 DXB/AMT-01/0600/EDM/5189 DXB/AMT-01/0500/Jly/5252 01-Dec-08 13-Dec-08 24-Dec-08

November 30, 2008


BALANCE TO-DATE
340,314.96 13,460.75 1,732.06
ETA cost + 12% OH&P + 3% Att ETA cost + 12% OH&P + 3% Attendances Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22-Dec-08 as per the email request of Mr. Clarence Pinto of DMCC dated 4Jan-09 as per the EHS requirements adjustment to the Contract Sums due to the PC Materials final rates

LETTER REF.

TIME (Days)
ur ur ur

NSC Structural Steel Support for Fans at Air Shaft NSC HVAC Systems at Basement 1 Control Room and Lobby as per RFI No. 1087 JV Additional Door Closer and Selector at Basement 1 Management Office JV JV JV Coring for the Tenant Fit-Out Contractors Additional Access Ladder at Penstock Chamber in Basement 4 PC Supply Rates

245 246 OM-10

001 001 001

DXB/AMT-01/0500/Jly/5278 DXB/AMT-01/0600/MIC/5287 DXB/AMT-01/0600/DAN/5092

04-Jan-09 05-Jan-09 16-Nov-08

ur ur (21,806.96)

ur ur 0

ur ur (21,806.96)

ur ur 0.00

10,993,091.15 TOTAL FOR CLAIMED/NOTIFIED VARIATIONS (WITHOUT ERI)


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0.00

10,993,091.15
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ` 0.00 0.00 0.00 0.00 0.00 0.00 0.00

00-Jan-00

0.00 0.00 0.00 0.00

00-Jan-00

0.00 0.00 0.00 0.00

00-Jan-00

0.00 0.00 0.00 0.00 0.00

0 0

0 0

0 0

0 0

0 0

00-Jan-00

0.00 0.00 0.00

00-Jan-00

GRAND TOTAL
NOTE :

115,316,855.52

581

118,692,853.45

199,754,280.16

581

60,740,469.59

54,550,384.93

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (2).monvabad

8 - 53

DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO. SUB NO. ERI NO. V.O. TO
CLAIM NOTICE LETTER CLAIM ENTITLEMENT APPLICATION DATE
13-May-06 13-May-06

October 15, 2013


REMARKS / COMMENTS

ER / F&G / JV AGREED VALUES COST (AED) 0.00 218,400.00


TIME (Days)
0 0

OUTSTANDING CLAIMS COST (AED)


CLOSED CLOSED

CERTIFIED AS AT CERTIFIED TO-DATE

DESCRIPTION
REFERENCE Additional Telephone Lines
DXB/AMT-01/0500/JLy/429 DXB/AMT-01/0500/JLy/430

November 30, 2008


BALANCE TO-DATE
0.00 59,755.63
to confirm if this is still needed; No need for additional telephone lines F&G evaluation is based on a +12% OH&Pro, and prelims omitted and to be dealt with in EOT's

COST (AED) 0.00 278,155.63

TIME (Days)
0 0

LETTER REF.
JAP016/ALM/TCAC/21287 dated 5-Oct-08 JAP016/ALM/TCAC/05508 dated 29-Nov-06

TIME (Days)
CLOSED CLOSED

13 14

001 001

04 06

JV JV

0.00

14 14 15 16 17

002 004 001R1 001 001

06 06 07 08 09

Site Establishment - Offices (Supply of ETA Temporary Site Office Purchased form Seidco Gen. Cont. Co.) NSC ETA Site Offices (New Offices at Site) JV ETA/F&G Site Offices - Rubbish Removal NSC ETA Site Offices Provision of Power Supply JV JV Provision of Starter Bars to Podium within the Landscape Package Core Wall Thickening

218,400.00

DXB/AMT-01/0600/MIC/____ DXB/AMT-01/0600/DAN/5012 DXB/AMT-01/0500/JLy/431 / DXB/AMT-01/0600/DAN/3648 DXB/AMT-01/0500/JLy/432 DXB/AMT-01/0500/JLy/501

13-Dec-08 26-Oct-08 13-May-06 / 12-Feb-08 13-May-06 26-Jun-06

501,971.39 56,840.00 1,193,235.54 159,171.78 181,391.33

0 0 0

501,971.39 56,840.00

CLOSED 0 CLOSED 765,834.58

501,971.39 56,840.00 427,400.96

ETA cost + 12% OH&P + 3% Attendances JV scope of works; verbally agreed with F&G to be 5050; as at Sep-08 ETA costs + 7% JV OH&P

1,193,235.54

0 ur

128,324.82 107,738.59

JAP016/ALM/TCAC/04893 dated 30-Oct-06 JAP016/ALM/TCAC/08151 dated 09-Apr-07

CLOSED CLOSED

CLOSED ur

128,324.82 107,738.59

30,846.96 73,652.74

Costs agreed by JV under letter ref. DXB/AMT01/0500/Jly/1065 dated 7-Nov-06. ERI No. 09; Internal Preliminary Assessment is equal to 10 days, but works has yet to be carried out to consider the EOT; cost evaluated by F&G accepted thru letter ref. DXB/AMT-01/0500/Jly/1072 dated 8Nov-06 but subject to add'l revisions and prolongat ETA cost of 60,350.00 + 7% JV OH&P

14

003

10

20

001

11

NSC Site Establishment - Offices (Supply and Installation of AC Units within the New Offices being established by Nakheel) JV Supply of Potable Water to DMCC and F&G's Site Offices NSC Cast Resin Bus Bars

DXB/AMT-01/0500/JLy/430

13-May-06

80,097.04

64,574.50

JAP016/ALM/TCAC/06385 dated 21-Jan-07

CLOSED

CLOSED

64,574.50

15,522.54

DXB/AMT-01/0500/JLy/655

16-Jul-06

23,551.60 2,071,622.24

25,076.80 1,049,300.70

28

001R1

12

DXB/AMT-01/0600/EDM/2402, DXB/AMT-01/0600/DAN/3172

24-Jun-07 , 14-Nov-07

ur

JAP016/ALM/TCAC/22075 dated 4-Nov-08, JAP016/ALM/TCAC/23417 dated 6-Jan-08 JAP016/ALM/TCAC/14871 dated 13-Jan-08

CLOSED

CLOSED

10,841.60

12,710.00

Period from June 2006 - September 2007, and October-2007 - November 2008

CLOSED

ur

1,049,300.70

1,022,321.54

ETA Cost + 7%; Time Effect shall be by NSC, if any; potential additional builders works, and attendance in reference to the Time. Confirmed by ETA under their letter ref. DIV.092/AM/TS/1342 dated 31-Jan-08 cost implication sent under JV letter ref.DXB/AMT01/0800/Jly/1175 dated 29-Nov-06 EVSCost Effect is NSC Cost + 7% O&H + 2% Attendance, as this is an additional work; Time Effect shall be by NSC, if any; potential additional builders works. ETA costs + 7% JV OH&P; F&G revised assessment from their letter ref.JAP016/ALM/TCAC/18730 dtd 8Jun-08 JV Cost; Note : the cost for OCP is omitted and will be dealt with separately; F&G revised assessment from their letter ref.JAP016/ALM/TCAC/18730 dtd 8-Jun-08 ETA's cost + 12% OH&P + 3% Attendances

OM-1 32

001 001

13 14

Omit Wall Plaster from Car Parking Areas in all 5 Basement Floors NSC Stainless Steel Members to Diamond Exchange Area JV NSC Provision of DB's in lieu of Isolators in the Offices & Retail Units at 3rd to 49th Floors (MEP Works) JV Provision of DB's in lieu of Isolators in the Offices & Retail Units at 3rd to 49th Floors (Builders Work)

JAP016/ALM/TCAC/05257 DXB/AMT-01/0500/JLy/844

16-Nov-06 11-Sep-06

(383,650.51) 333,540.00 2,072,029.32

0 ur

(383,650.51)
JAP016/ALM/TCAC/05673 dated 11-Dec-06

CLOSED CLOSED

(315,883.28) 317,914.82

(67,767.23) 15,625.18

317,914.82 1,220,076.06

CLOSED

35

001a

15

DXB/AMT-01/0500/JLy/926

03-Oct-06

ur

ur

35

001b

15

DXB/AMT-01/0500/JLy/926

03-Oct-06

102,131.48

ur

55,692.82

ur

JAP016/ALM/TCAC/18730 dated 8-Jun-08 JAP016/ALM/TCAC/22415 dated 18-Nov-08 JAP016/ALM/TCAC/18730 dated 8-Jun-08

CLOSED

CLOSED

1,408,720.27

663,309.05

CLOSED

CLOSED

102,131.44

0.04

217

001

15.1

217

002

15.1

31

001

16

NSC SMDB's in lieu of Isolators at Level 52-63 and Retail Mall and Splitting of Landlord DB's for Ground Floor and First Floor as per DEWA Requirement (MEP Works) JV SMDB's in lieu of Isolators at Level 52-63 and Retail Mall and Splitting of Landlord DB's for Ground Floor and First Floor as per DEWA Requirement (Builders Work) JV Drawing Revisions to the Diamond Exchange Centre; due to revised Openings. JV Interior Design Works (JV Internal Subcontractors)

DXB/AMT-01/0600/EDM/4512

06-Jul-08

538,459.90

ur

538,459.90

ur

538,459.90

DXB/AMT-01/0600/EDM/4512

06-Jul-08

7,538.64

ur

7,538.64

ur

7,538.64

builders works

DXB/AMT-01/0500/JLy/842

11-Sep-06

82,672.78 28,894,792.49

JAP016/GEN/ABS/0010 dated 17-Oct-06

82,672.78

CLOSED

82,672.78

rejected by Nakheel due to relation with coordination issues with MEP requirements; awaiting response from NSC (Eversendai) on the rejection. updated cost and rates approval summary status being sent regularly; cost submitted is the final applied claim updated cost and rates approval summary status being sent regularly.

41

001R1

16/ 39 16/ 39 16/ 39 16/ 39 16 16

DXB/AMT-01/0500/JLy/877

24-Sep-06

see NOC#127

22,785,939.94

agreed values is partial and see NOC#127 deemed to change

CLOSED

28,304,706.24

590,086.25

progressively, as it is based on the agreed rates only (+12%)

41

002R1

NSC Interior Design Works (Other ID Works being done by Bond Interiors) NSC Interior Design Works (MEP Works by ETA)

DXB/AMT-01/0500/JLy/877

24-Sep-06

5,064,844.41

see NOC#127

3,879,153.39

agreed values is partial and see NOC#127 deemed to change

CLOSED

4,062,428.29

1,002,416.12

progressively, as it is based on the agreed rates only (+7%)

41

003R1

DXB/AMT-01/0500/JLy/877

24-Sep-06

8,423,604.53

see NOC#127

8,117,552.86

agreed values is partial and see NOC#127 deemed to change

CLOSED

7,573,568.93

850,035.60

updated cost and rates approval summary status being sent regularly.

progressively, as it is based on the agreed rates only (+7%)

41

004R1

NSC Interior Design Works (Lift Finishes by Kone Middle East) JV JV ID Works Package - Changes to CT-01 & CT-02 Raised Access Flooring System at the Diamond Exchnage Centre to Screeding Works ID Works Package (GL-08)

DXB/AMT-01/0500/JLy/877

24-Sep-06

3,111,331.22

see NOC#127

3,107,564.82

agreed values is partial and see NOC#127 deemed to change

CLOSED

2,774,842.92

336,488.30

updated cost and rates approval summary status being sent regularly.

progressively, as it is based on the agreed rates only (+7%)

69 79

001 001

DXB/AMT-01/0600/EDM/1785 DXB/AMT-01/0500/JLy/2030

14-Mar-07 16-Apr-07

28,616.00 282,635.67

see NOC#127 see NOC#127

28,365.12

JAP016/ALM/TCAC/20228 see NOC#127 dated 12-Aug-08

CLOSED 282,635.67

CLOSED CLOSED

28,616.00 282,635.67

abortive materials only Floor Screeding works; valued under the ERI No. 16 as per the F&G letter ref. JAP016/ALM/TCAC/21388 dated 7-Oct-08 and confirmed under our letter ref. DXB//4963 dtd 16-Oct-08 Mozart Marble cost + 12% OH&P

see NOC#127

132

001

16

JV

DXB/AMT-01/0600/EDM/3065

25-Oct-07

1,774,080.00

(see NOC #127-001) ur ur ur

1,774,080.00

JAP016/TS/GT/0103 dated 18see NOC#127- Oct-2007 JAP016/ALM/TCAC/22521 001 dated 20-Nov-08

CLOSED

CLOSED

1,774,080.00

147 147 169

001 002 001R2

16 16 16

JV JV JV

Internal Water Feature (Aqua-Teknik Scope) Internal Water Feature (Related Builders Work)

DXB/AMT-01/0500/JLy/3209 DXB/AMT-01/0500/JLy/3209 DXB/AMT-01/0600/EDM/3626

21-Nov-07 21-Nov-07 07-Feb-08

626,750.00 4,134.48 541,470.46

626,750.00 4,134.48 541,470.46

ur ur ur

299,096.00

327,654.00 4,134.48 541,470.46

Aqua-Teknik cost + 12% OH&P + 3% Attend Coring Subcon Cost + 12% OH&P + 3% Attendances S/C costs + 12% OH&P + 3% Attendances; to be valued at ERI 16 as per F&g letter ref. JAP016/TS/GT/0254 dtd 29May08 EVS to submit entitlements; EVS cost + 12% OH&P + 3% Attendances

169

002R1

16

169

003

16

170 170

001 002

16 16

Revisions to the ID Works Package For Construction Drawings at the Ground Floor and First Floor (GL-19 & GL-07) JV Revisions to the ID Works Package For Construction Drawings at the Ground Floor and First Floor (Structural Supports to GL-07) NSC Revisions to the ID Works Package For Construction Drawings at the Ground Floor for the termination of GL-07 and other adjacent Finishing Materials (CVI No. 093) JV Potential Claim due to Late Design Changes Stainless Steel Door Frames L49-L64 Inclusive JV Additional Ironmongeries to Timber Door (DT-02) at Levels 49 upwards

DXB/AMT-01/0600/EDM/3626

07-Feb-08

34,314.41

ur

34,314.41

ur

34,314.41

DXB/AMT-01/0600/EDM/4520

07-Jul-08

ur

ur

ur

ur

Bond Interiors to submit entitlements

DXB/AMT-01/1100/WAE/3632 DXB/AMT-01/0500/JLy/3845

09-Feb-07 16-Mar-08

100,121.32 0.00

see NOC#127 see NOC#127

see NOC#127

100,121.32 CLOSED

CLOSED CLOSED

100,121.32 0.00

to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08 under review (haroon & alpha star); to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08; no changes made in the Ironmongeries as there was no formal instruction scope shall be removal, supply and installation of ironmongeries; valued in ERI No. 16 as per Nakheel letter ref. JAP016/TS/GT/0318 dtd 20Aug08 BI to submit entitlements; Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; BI cost + 12% OH&P + 3% Attendances Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Electrical Works by ETA; ETA cost+ 12% OH&P + 3% Attend Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Supply only of light fittings from Lever

0.00

see NOC#127

186

002

16

JV

DMCC Offices - Core Toilets Level 49 & 50 (Revision of Ironmongeries)

DXB/AMT-01/0600/EDM/4671

03-Aug-08

4,137.35 25,112.55

ur

4,137.35

ur

4,137.35

211

001

16

NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (MEP Works by ETA) JV Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (Supply of O2 Light Fixtures from M/s.Lever Electric)

DXB/AMT-01/0600/EDM/4352

05-Jun-08

ur

25,112.55

ur

25,112.55

211

002

16

DXB/AMT-01/0600/MIC/5014

26-Oct-08

247,839.95

ur

247,839.95

ur

247,839.95

211

003

16

DXB/AMT-01/0600/MIC/5040

05-Nov-08

39,243.75

ur

39,243.75

ur

39,243.75

214

001

62 / 16 16.1

122

001

Design Changes due to the Omission of Operable Partition at Level 2 Offices (ERI No. 62) and Stainless Steel Rubbish Bins (ERI No. 16) NSC ID Finishes for the Steel Columns at Ground Floor Entrance Lobby, 1st Floor Food Court and Retail Mall JV NSC DVR Storage Units as per Option III NSC Chilled Water Monitoring and installation (Revised District Cooling Chilled Water Connections Requirements) JV 40' Container for Office Storage NSC Revision of Duties and Capacities of the Ground and First Floor AHU's JV Additional Works to the Extra Piles Driven by the Piling Contractor (CVI No. 007) JV Amendments to Basement 1 Generator Rooms (Architectural Works) NSC Amendments to Basement 1 Generator Rooms (MEP Works by ETA) JV Nibs for the Approach Slabs JV JV JV JV JV JV JV JV Interior Design Package Changes affecting the Main Contract Package Door Details (Door Type for Telephone Room (01-052) at First Floor) DTS referenced AM/015/515 dated 5th August 2006 (Architectural and Structural Works) List of "For Construction" Drawings transmitted by Nakheel Changes in the Lift Pit Depths, and Revisions to the Galvanised Steel Ladder at 64th Level Changes to the Access Floor Heights Various Revisions at the Parking Areas Additional Architectural Works to the Service Floor Areas (1-3)

DXB/AMT-01/0600/EDM/4464

26-Jun-08

(valued in 41-001 & 149001) 72,174.00

ur

(valued in 41-001 & 149-001)

CLOSED

ur

0.00

considered in 41-001 and 149-001

DXB/AMT-01/0600/EDM/2954 /DXB/AMT-01/0600/EDM/3305 DXB/AMT-01/0500/JLy/1891 DXB/AMT-01/0500/JLy/925

01-Oct-07/ 10-Dec-07 27-Mar-07 03-Oct-06

ur

72,174.00

ur

72,174.00

Al Abbar cost + 12% OH&P + 3% Attendances

77 34

001 001

17 18

2,430,700.00 1,566,116.20

ur ur

2,430,700.00

ur ur 642,000.00

2,430,700.00 924,116.20

JCI costs + 7% JV OH&P ETA costs + 7% JV OH&P

678,543.71

JAP016/ALM/TCAC/22578 dated 24-Nov-08

CLOSED

38 37 3 12 12 16 19 21 23 33 33 33 33 33

001 001 002 001 002 002 001 001 001 001 002R1 003 004 005

19 20 21 21 21 21 21 21 21 21 21 21 21 21

DXB/AMT-01/0600/EDM/1011 DXB/AMT-01/0600/EDM/988 DXB/AMT-01/0500/JLy/112 DXB/AMT-01/0500/JLy/362 DXB/AMT-01/0500/JLy/362 DXB/AMT-01/0500/JLy/432 DXB/AMT-01/0500/JLy/623 DXB/AMT-01/0500/JLy/691 DXB/AMT-01/0500/JLy/748 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881

29-Oct-06 22-Oct-06 18-Sep-05 18-Apr-06 18-Apr-06 13-May-06 05-Jul-06 06-Aug-06 12-Aug-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06

32,340.85 262,569.93 1,434.82 19,047.23 1,579,708.41 35,825.47 14,639.13 2,848.23 28,033.99 (not used) 27,175.35 229,129.54 22,371.54 153,565.57

0 ur 0 ur ur 0 0 0 0

32,341.10

JAP/ALM/TCAC/06743 dated 6Feb-07

CLOSED 262,569.93

CLOSED ur CLOSED ur ur CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

32,341.10 84,537.51 1,156.76

(0.25) 178,032.42 278.06 19,047.23 1,579,708.41

actual cost transmitted to F&G based on dayworks rates; agreed with F&G ETA costs + 7% JV OH&P awaiting response from Client. rejected by Nakheel due to notice not served as per the required time period under the Contract. ETA Cost of AED 1,476,363 + 7% JV OH&P awaiting response from Client. Various changes to the ID Package affecting the MC Package; i.e., blockworks Door which is not provided with an opening tag, in reference with Tender Query, Item No.6 dtd 16-May05,pages 9 Various revisions to the drawing under the F&G transmittal sheet ref. F&G/ALMAS/ TAISEI/01356 dtd 01-Aug-06 NOT USED agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G)

0
JAP016/GEN/ABS/1051 dated 8-Aug-06 JAP016/GEN/ABS/1051 dated 8-Aug-06

1,434.82 19,047.23 1,579,708.41 CLOSED CLOSED CLOSED CLOSED CLOSED


JAP016/ALM/TCAC/181187 dated 18-May-08 JAP016/ALM/TCAC/16338 dated 17-Mar-08 JAP016/ALM/TCAC/18352 dated 26-May-08 JAP016/ALM/TCAC/17247 dated 16-Apr-08

25,157.54 14,560.51 2,296.25 21,880.70 (not used)

0 0 0 0 0 0 0 0 0

JAP016/ALM/TCAC/18884 dated 12-Jun-08 JAP016/ALM/TCAC/04947 dated 1-Nov-06 JAP016/ALM/TCAC/05297 dated 19-Nov-06 JAP016/ALM/TCAC/06567 dated 29-Jan-07

25,157.54

10,667.93 14,639.13 2,848.23 28,033.99

0.00

0 0 0 0

26,646.79 23,398.50 18,036.01 123,805.08

CLOSED CLOSED CLOSED CLOSED

25,766.44 23,398.50 18,036.01 123,805.08

1,408.91 205,731.04 4,335.53 29,760.49

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List.monvabad

9 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
33

October 15, 2013


REMARKS / COMMENTS

SUB NO.
006

ERI NO.
21

V.O. TO
JV

CLAIM NOTICE LETTER

CLAIM ENTITLEMENT APPLICATION DATE COST (AED) 3,223.52 1,894.77 657.99 427.04 425.15 1,150.44 13,820.28 499.04 3,461.71 1,556.34 41,554.32
TIME (Days)
0

ER / F&G / JV AGREED VALUES COST (AED) (1,351.84)


TIME (Days)
0

OUTSTANDING CLAIMS COST (AED)


CLOSED

CERTIFIED AS AT CERTIFIED TO-DATE


(1,351.84)

DESCRIPTION
REFERENCE Missing Spanmark as PB434 (RFI No. 029) Additional Reinforcement due to the Missing Details (RFI No. 042) First Floor Slab Details (RFI No. 072) Second Basement Floor Beam - PB205A (RFI No. 075) Fourth Basement Beam - PB451A (RFI No. 078) Fourth Basement Beam - PB434 (RFI No. 144) Tower Structural Drawings - Additional TB29 Beam (RFI No. 146) Door Opening Height - First Floor (RFI No. 157) Basement 2 Beams (RFI No. 162) Lift F4 - Structural Details (RFI No. 171) Reinforced Concrete Partition Wall @ the Basement 2 (RFI No. 182) Increase in Beam Depths at First Floor - Section N1 (RFI No. 192) Increase in Beam Depths to PB149 and PB150A (RFI No. 223) Additional Outrigger Walls at Service Floor Areas Structural Works Omission of Rebars in Core Walls Additional Mass Concrete at 2nd Level, and Revisions to the Stairs leading to the Vault at 2nd Level Additional Column Posts at 50th to 51st Level and Additional Core Walls, i.e., 400mm and 500mm thick Additional Lifting Beams to the 64th Level Machine Rooms (@Level 288.650m and 285.350m) Changes to Slab Steel Reinforcement to S11 to S12 Additional Steel Reinforcement to Beams Located Around Tower Building and Connected to Precast Slab Additional rebars to basement retaining wall @ staircase and changes of rebar to wall Changes in Shear Wall in Zone 4 Associated in Lift and Vault Wall Additional Rebar in First Basement Slab Additional Top Steel Reinforcement in Ground Floor Slab Additional Bottom Steel Reinforcement in Ground Floor Slab Additional Building Maintenance Units at Diamond Exchange Centre Revisions to Contract Drawings in First Floor Levels
DXB/AMT-01/0500/JLy/881 24-Sep-06

November 30, 2008


BALANCE TO-DATE
4,575.36
agreed with Consultant (F&G)

LETTER REF.
JAP016/GEN/ABS/1011 dtd 19Jun06; JAP016/ALM/TCAC/18884 dtd 12-Jun-08 JAP016/GEN/ABS/1011 dated 19-Jun-06 JAP016/ALM/TCAC/20933 dated 14-Sep-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/17248 dated 16-Apr-08 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/18352 dated 26-May-08 JAP016/ALM/TCAC/18118 dated 18-May-08

TIME (Days)
CLOSED

33 33 33 33 33 33 33 33 33 33

007 008 009 010 011 012 013 014 015 016

21 21 21 21 21 21 21 21 21 21

JV JV JV JV JV JV JV JV JV JV

DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881

24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06

0 0 0 0 0 0 0 0 0 0

1,894.77 CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED 41,554.32

CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED 530.47 343.82 344.60 1,063.46 12,180.62
0.00

1,894.77 127.52 83.22 80.55 86.98 1,639.66 499.04 2,913.10 322.60 41,554.32

awaiting response from Client. agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) rejected F&G assessment in their letter JAP016/ALM/TCAC/18118 dated 18-May-08 thru our letter ref.DXB/./EDM/4262 dtd 22May08;F&G assessment under review by JV agreed with Consultant (F&G) agreed with Consultant (F&G) revised cost impact submitted under ref. DXB/AMT01/0500/Jly/1080 dated 9-Nov-06 based on the approved Methodology; agreed with Consultant (F&G) joint measurement done and agreed; in connection with 33-019 agreed with Consultant (F&G)

530.47 343.82 344.60 1,063.46 12,180.62 0.00 548.61 1,233.74

0 0 0 0 0 0 0 0 0

548.61 1,233.74

33 33 33

017 018 019

21 21 21

JV JV JV

DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881

24-Sep-06 24-Sep-06 24-Sep-06

4,353.86 693.97 956,279.08 (693,815.82) 40,503.44

0 0 ur

3,510.09 337.29 642,006.51 (676,513.69) 171.19

0 0 0

JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/20290 dated 13-August-08

CLOSED CLOSED CLOSED

CLOSED CLOSED CLOSED

3,510.09 337.29 642,006.51

843.77 356.68 314,272.57

OM-2 33

001 020

21 21

JV JV

JAP/ALM/TCAC/11435 DXB/AMT-01/0500/JLy/881

21-Aug-07 24-Sep-06

0 0

0 0

JAP016/ALM/TCAC/20290 dated 13-Aug-08 JAP016/ALM/TCAC/181187 dated 18-May-08

CLOSED CLOSED

CLOSED CLOSED

(693,815.82) 171.19

0.00 40,332.25

33

021

21

JV

DXB/AMT-01/0500/JLy/881

24-Sep-06

43,839.53

33,011.38

JAP016/ALM/TCAC/20933 dated 14-Sep-07

CLOSED

CLOSED

33,011.38

10,828.15

agreed with Consultant (F&G)

33

022

21

JV

DXB/AMT-01/0500/JLy/881

24-Sep-06

5,525.90

4,252.50

JAP016/ALM/TCAC/18884 dated 12-Jun-08

CLOSED

CLOSED

4,252.50

1,273.40

agreed with Consultant (F&G)

33 33

023 024

21 21

JV JV

DXB/AMT-01/0600/EDM/1868 DXB/AMT-01/0600/DAN/1878

26-Mar-07 26-Mar-07

36,827.93 25,336.02

0 0

35,529.29 26,354.14

0 0

JAP016/ALM/TCAC/08133 dated 09-Apr-07 JAP016/ALM/TCAC/17248 dated 16-Apr-08

CLOSED CLOSED

CLOSED CLOSED

35,529.29 26,354.14

1,298.64 (1,018.12)

agreed with Consultant (F&G) agreed with Consultant (F&G)

33 33 33 33 33 33 33 33 33 50

025 026 027R1 028R1 029R1 030 031R1 032 033 001

21 21 21 21 21 21 21 21 21 21

JV JV JV JV JV JV JV JV

DXB/AMT-01/0600/DAN/1883 DXB/AMT-01/0600/DAN/1888 DXB/AMT-01/0600/DAN/1990 DXB/AMT-01/0600/DAN/2020 DXB/AMT-01/0600/DAN/2047 DXB/AMT-01/0600/EDM/2066 DXB/AMT-01/0600/EDM/2160 DXB/AMT-01/0600/EDM/2383 DXB/AMT-01/0600/EDM/2548 DXB/AMT-01/0600/EDM/1301

26-Mar-07 24-Sep-06 10-Apr-07 15-Apr-07 19-Apr-07 24-Apr-07 15-May-07 23-Jun-07 18-Jul-07 21-Dec-06

7,878.22 17,649.58 101,960.65 140,340.33 316,516.91 1,175,875.00 56,950.59 130,015.64 9,356.12 28,025.73

0 0 0 0 0 ur 0 0 0 ur

7,878.22 14,661.14 97,675.24 137,782.64 317,721.58

0 0 0 0 0

JAP016/ALM/TCAC/08287 ated 16-Apr-07 JAP016/ALM/TCAC/08713 ated 7-May-07 JAP016/ALM/TCAC/20933 dated 14-Sep-07 JAP016/ALM/TCAC/10244 ated 9-Jul-07 JAP016/ALM/TCAC/10549 ated 23-Jul-07

CLOSED CLOSED CLOSED CLOSED CLOSED 1,175,875.00

CLOSED CLOSED CLOSED CLOSED CLOSED ur CLOSED CLOSED CLOSED ur

7,878.22 14,661.14 97,675.24 137,782.62 317,721.58

0.00 2,988.44 4,285.41 2,557.71 (1,204.67) 1,175,875.00

agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) under review agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) JV to submit entitlements; note that the DVR's is valued in Claim No. 77; items to be valued under this Claim is only the Lifting Beams await for final drawings. based on the ETA letter request demolition works ETA costs of AED 4,607,254 + 7% OH&P ETA to respond.

50,995.22 55,259.32 7,928.10

0 0 0

JAP016/ALM/TCAC/11392 ated 20-Aug-07 JAP016/ALM/TCAC/14299 ated 12-Dec-07 JAP016/ALM/TCAC/10848 ated 1-Aug-07

CLOSED CLOSED CLOSED 28,025.73

50,995.22 55,259.32 7,928.10

5,955.37 74,756.32 1,428.02 28,025.73

54 59 135 51 55 46 46 56 67 OM-3

001 001 001 001 001 001 002 001 001 001

21 21 21 22 23 24 24 25 26 27

Revisions to Structural Contract Drawings in Second Floor JV Changes in Beam Steel Reinforcement at 29th to 34th Level JV Various Requirements under the F&G Transmittal Ref. F+G/ALMAS/TAISEI/ 01463 dated 12th December 2006 JV Provision of Additional Lift Pit Ladders JV Additional Coring Requirement JV Opening in Block Wall between Offices A & B at Level 29 (CVI No. 067) NSC Revision of Fire Protection System as per JAFZA EHS Fire & Rescue Requirements NSC Category II Drawing Revisions for Office Floors -Air Conditioning NSC Fire Policy Layout (MEP Works) NSC Fire Policy Layout (MEP Works-additional Fireman's Telephone at B1-B5) JV Additional Staff Facilities to Consultants NSC Electrical Connections to Fire Pump Requirements JV Omission of Render from the vertical element of whole three Services Floor (S1, S2, & S3) Plant Rooms Revisions to Office Partitions Revisions to Office Partitions - Masonry Works

DXB/AMT-01/0500/JLy/1358 DXB/AMT-01/0600/EDM/1567 DXB/AMT-01/0600/EDM/3071 DXB/AMT-01/0600/EDM/1312 DXB/AMT-01/0500/JLy/1444 DXB/AMT-01/0600/EDM/1236 DXB/AMT-01/0600/___/____ DXB/AMT-01/0500/JLy/1445 DXB/AMT-01/0600/EDM/1659 JAP016/ALM/TCAC/06046

04-Jan-07 10-Feb-07 27-Oct-07 23-Dec-06 21-Jan-07 11-Dec-06 13-Dec-08 21-Jan-07 25-Feb-07 04-Jan-07

66,895.36 30,965.32 1,484.00 4,929,761.78 ur 24,107.45 17,577.75 51,929.76 2,951,483.26 (277,596.39)

ur ur ur ur ur ur ur 0 ur 0

66,895.36 30,965.32 1,484.00 4,929,761.78 ur

ur ur ur ur ur ur ur CLOSED ur CLOSED (223,000.00) 51,929.76 1,564,665.69

66,895.36 30,965.32 1,484.00 3,365,096.09

5,600.38

JAP016/TS/ABS/22577 dated 24-Nov-08

CLOSED 17,577.75

24,107.45 17,577.75 0.00 2,951,483.26 (54,596.39)

ETA costs + 7%OH&P ETA costs + 12%OH&P + 3% Attendances Time component rejected as per the F&G letter ref. JAP016/TS/ALM/ TCAC/06936 dated 15-Feb-07 ETA costs + 7% JV OH&P IPC NO. 41

51,929.76

JAP016/ALM/TCAC/14753 dated 07-Jan-08

CLOSED 2,951,483.26

(58,985.18)

????

CLOSED

57 OM-4 OM-4 64 65 68 76 78 78

001 001 002 001 001 001 001 001R1 002

28 28 28 29 31 32 34 35 35

JV JV

DXB/AMT-01/0500/JLy/1446 JAP016/ALM/TCAC/19000 JAP016/ALM/TCAC/19000 DXB/AMT-01/0600/EDM/1634 DXB/AMT-01/0600/EDM/1635 DXB/AMT-01/0600/EDM/1660 DXB/AMT-01/0500/JLy/1890 DXB/AMT-01/0600/EDM/2385/ DXB/AMT-01/0600/EDM/3608 DXB/AMT-01/0600/EDM/2385/ DXB/AMT-01/0600/EDM/3608 DXB/AMT-01/0500/JLy/3863 DXB/AMT-01/0500/JLy/3863 DXB/AMT-01/0600/EDM/4339 DXB/AMT-01/0600/MIC/4950 DXB/AMT-01/0500/JLy/1332 DXB/AMT-01/0600/EDM/2310 DXB/AMT-01/0600/EDM/2472 DXB/AMT-01/0600/EDM/2474 DXB/AMT-01/0600/EDM/2554 DXB/AMT-01/0600/EDM/3832 DXB/AMT-01/0600/DAN/4540

21-Jan-07 17-Jun-08 17-Jun-08 20-Feb-07 20-Feb-07 25-Feb-07 25-Mar-07 23-Jun-07/ 4-Feb-08 23-Jun-07/ 4-Feb-08 18-Mar-08 18-Mar-08 03-Jun-08 13-Oct-08

(valued in OM-4) (126,440.24) (69,689.10) 102,143.27 ur 43,688.96 1,402,455.42 2,183,160.00 196,416.80 204,700.00 12,416.32 0.00

0 0 0 ur ur 0 ur see NOC#127 see NOC#127 see NOC#127 see NOC#127 see NOC#127 ur see NOC#127 see NOC#127 0 ur 0 see NOC#127 see NOC#127 see NOC#127 see NOC#127 see NOC#127 ur ur see NOC#127 see NOC#127 see NOC#127 ur

(valued in OM-4) (126,440.24)

0 0
JAP016/ALM/TCAC/19000 dated 17-Jun-08

CLOSED CLOSED (69,689.10) 102,143.27 ur

CLOSED CLOSED 0.00 ur ur CLOSED ur CLOSED CLOSED

0.00

(196,129.34)

69,689.10 (69,689.10)

NSC Revisions to Office Partitions - OCP Works NSC Provision of Foul Water Disposal in case Primary System Failure NSC Revision of Office Partitions - Mechanical & Fire Policy Drawings NSC Trip to Italy for Stone Quarry Inspection NSC Rainwater and Irrigation Waste Water Discharge from Planters JV Function Room / Ball Room Facility (Structural Works) JV Function Room / Ball Room Facility (Fireproofing Works) Modifications to Function Room / Ball Room Facility (Structural Works) JV Modifications to Function Room / Ball Room Facility (Fireproofing Works) JV Ballroom/Function Room (Provision of Scaffolds and Access) NSC Pipe Size Changes @ First Floor (RFI No. 1062) JV Possible Addition of Ballroom JV NSC Function Room / Ball Room Domestic Water Drawings NSC Mechanical Works for the Function Room / Ballroom NSC Security Works for the Function Room / Ballroom JV JV JV Revised Interior Lighting Fixtures Layout at Ballroom GF, Washroom GF, and Ballroom 2L Ballroom / Function Room (Concrete and Masonry Works) Ballroom/Function Room (CW Roofing, Curtain Wall Cladding, Aluminum Panel Bulkheads Work)

16,264.00

85,879.27

see Omission OM-4-001&002 for the JV & NSC works respectively JV scope of works, i.e., omission of blockworks and plaster BondCommunication scope of works + 7% OH&P; AWAITING RESPONSE FROM m/S. Bond Communication ETA costs + 7% JV OH&P ETA to submit entitlements

39,083.00

JAP016/ALM/TCAC/16129 dated 5-Mar-08

CLOSED 1,402,455.42

39,083.00

4,605.96 1,402,455.42

BI costs AED 36,526.17 + 7% JV OH&P ETA costs + 7% JV OH&P; uilders works not yet included to be submitted under 76-002 EVS Cost + 12% OH&P but less works deemed included in the NSC Thermofire Cost AED 170,797.22 + 12% OH&P; confirmed to be valued in ERI 35 under the Nakheel letter ref. JAP016/TS/GT/0244 dtd 27May08 EVS Cost + 12% OH&P + 3% attendances Thermofire Cost + 12% OH&P + 3% attendances Scaffolding to be used by the Nominated Subcontractors; Fit-Out Contractor to work on the MEP Scope ETA claim + 12% OH&P + 3% Attendances supeseded by claim no. 107 Valued in 107-003 ETA to submit entitlements ETA to submit entitlements TO BE VALUED IN CLAIM NO. 107-001 (ERI 35.1)

2,087,955.12 191,292.64

JAP016/ALM/TCAC/18101 see NOC#127 dated 18-May-08 JAP016/ALM/TCAC/22536 see NOC#127 dated 23-Nov-08

CLOSED CLOSED

2,087,955.12 191,292.64

95,204.88 5,124.16

78 78 107 234 52 85 99 100 106 107 107

003 004 005 001 001 001 001 001 001

35 35 35 35 35.1 35.1 35.1 35.1 35.1

see NOC#127 see NOC#127

204,700.00 12,416.32 CLOSED 20,545.90

CLOSED CLOSED CLOSED ur CLOSED CLOSED CLOSED ur CLOSED CLOSED CLOSED

179,424.00

25,276.00 12,416.32

0.00

see NOC#127 see NOC#127 see NOC#127 0

0.00

0.00 20,545.90

27-Dec-06

20,545.90 (valued in Claims No. 78 & 107) 09-Jun-07 (valued in 107-003)


07-Jul-07 07-Jul-07 18-Jul-07

(valued in Claims No. 78 & 107)


(valued in 107-003) (valued in 107-003)

CLOSED CLOSED CLOSED ur

0.00 0.00

(valued in 107-003) ur (valued in 107-001) 785,658.59 284,794.05

(valued in 107-001)

JAP016/ALM/TCAC/10523 dated 22-July-2007

CLOSED CLOSED 284,794.05

0.00

002R2 35.1/ 35.2 004a 35.1/ 35.2 001 35.1/ 35.2/ 35.4 35.1/ 35.2/ 35.4 35.1/ 35.2/ 35.4 35.3 35.4 35.5

15-Mar-08 09-Jul-08

728,934.60

JAP016/ALM/TCAC/19604 see NOC#127 dated 14-July-2008

728,934.60 142,397.03

56,723.99 142,397.02

Subcontractor : JV Internal Al Abbar cost + 12% + 3% attendances

see NOC#127 see NOC#127

107

NSC Ballroom / Function Room (ID Works to the Walls facing the Retail Mall) NSC Ballroom/Function Room (MEP Works)

DXB/AMT-01/0500/JLy/2643

02-Aug-07

ur

ur

CLOSED

Bond Interiors to submit entitlements

107

003

DXB/AMT-01/0600/DAN/3893

25-Mar-08

3,318,315.35

3,318,315.35

JAP016/ALM/TCAC/21289 see NOC#127 dated 5-Oct-08 JAP016/ALM/TCAC/22293 see NOC#127 dated 13-Nov-08

CLOSED

CLOSED

1,926,000.00

1,392,315.35

Subcontractor : ETA; under review by ETA due to the revised scope of works; confirmed by ETA

107

007

NSC Ballroom/Function Room (External Stoneworks)

DXB/AMT-01/0500/JLy/2643

02-Aug-07

357,161.60

310,797.76

CLOSED

CLOSED

(248,638.21)

605,799.81

Al Bayader cost + 12% OH&P

178 107 78

001 008 005

NSC Ballroom/Function Room - Cladding to the Structural Steel Beams JV Ballroom/Function Room (Additional Plaster Works where Electrical Panels are Installed) JV Function Room / Ball Room Facility Parapet (Structural Works) NSC Ballroom/Function Room (Roof Parapet Works - CVI No. 084) JV Ballroom/Function Room (Roof Parapet Works GI Cladding - CVI No. 084) JV Landscaping Works; i.e., provision of Civil/Structural Works as confirmed under Nakheel Letter ref. JAP016/GEN/ABS/1058 dated 14-Aug-06

DXB/AMT-01/0600/EDM/3847 DXB/AMT-01/0600/EDM/4767 DXB/AMT-01/0500/JLy/3964

16-Mar-08 26-Aug-08 08-Apr-08

ur 2,710.59 144,684.43 ur 26,312.00 3,775,777.57

ur 2,710.59 see NOC#127 see NOC#127 see NOC#127 144,684.43

ur ur CLOSED 131,824.00 2,710.59 12,860.43

AA to submit entitlements Plaster works only based on BOQ rates EVS Cost + 12% OH&P + 3% attendances and Scaffolding supplied by JV; to be valued under ERI35.5 as per Nakheel letter ref. JAP016/TS/GT/0255 dtd 29May08 Subcontractor : Al Abbar; shall be valued under ERI 35.5 as per Nakheel Letter JAP016/TS/GT/0255 dtd 29-May-08 additional GI sheets cover to parapet for the preparation of EPDM by AL Abbar Confirmed by Nakheel under the letter as mentioned, and instructed under ERI No. 37

107 107 18

004b 004c 001R1

35.5 35.5 37

DXB/AMT-01/0600/EDM/4032 DXB/AMT-01/0600/DAN/____ DXB/AMT-01/0500/JLy/586

20-Apr-08 12-Jan-09 26-Jun-06

ur 26,312.00
JAP016/ALM/TCAC/90791 dated 19-Jun-08

CLOSED CLOSED CLOSED 2,661,716.46 26,312.00 1,114,061.11

2,661,716.46

CLOSED

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List.monvabad

10 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
18 86 OM-8

October 15, 2013


REMARKS / COMMENTS

SUB NO.
002 001 001

ERI NO.
37 38 38

V.O. TO
JV JV JV

CLAIM NOTICE LETTER

CLAIM ENTITLEMENT APPLICATION DATE COST (AED) 106,370.21 (valued in OM8-001) (1,988.48)
TIME (Days)
ur ur 0

ER / F&G / JV AGREED VALUES COST (AED) 106,370.21


(valued in OM8-001) TIME (Days)
0 0 0
JAP016/ALM/TCAC/22416 dated 18-ov-08

OUTSTANDING CLAIMS COST (AED)


CLOSED CLOSED CLOSED

CERTIFIED AS AT CERTIFIED TO-DATE


106,370.21 0.00

DESCRIPTION
REFERENCE Landscaping works - Screed for the Planter Boxes Modification to Lift Opening at 36th and 48th Floor Modification of Lift Openings at 36th Floor Low Rise Lift Machine Room and 48th Floor High Rise Lift Machine Rooms (Omission of Concrete Works due to the increase of Lift Opening Sizes) Revised Drawing for Lift Machine Room on 3rd Service Floor Revised Drawing for Interior Design Works Changes of Levels to Room Nos. B1-073 (Corridor) and B1-074 (Mechanical Plant Room) Additional Wall in Security Room at Basement 2
DXB/AMT-01/0600/EDM/3098 DXB/AMT-01/0600/EDM/2311 JAP016/ALM/TCAC/22416 31-Oct-07 09-Jun-07 18-Nov-08

November 30, 2008


BALANCE TO-DATE
0.00
valued under th ERI No. 37 under omission.

LETTER REF.
JAP016/ALM/TCAC/90791 dated 19-Jun-08

TIME (Days)
CLOSED CLOSED CLOSED

(1,988.48)

(1,988.48)

BI to confirm cost by F&G

87 88 81 103 139 70 OM-5 97

001 001 001 001R1 001 001 001 001

41 42 43 44 44.1 45 45 45.1

JV JV JV JV

DXB/AMT-01/0600/EDM/2312 DXB/AMT-01/0600/EDM/2313 DXB/AMT-01/0600/EDM/2111 DXB/AMT-01/0600/EDM/2540 DXB/AMT-01/0600/EDM/3134 DXB/AMT-01/0500/JLy/1781 JAP016/ALM/TCAC/19244 DXB/AMT-01/0600/EDM/2438

09-Jun-07 09-Jun-07 02-May-07 17-Jul-07 08-Nov-07 14-Mar-07 26-Jun-08 30-Jun-07

1,771.88 (valued in Series 41) 7,275.43 26,634.44 172,273.32 (valued in OM-5) (66,453.77) ur

ur 0 0 see NOC#127 ur 0 0 ur

1,587.60
(valued in Series 41)

0 0 0

JAP016/ALM/TCAC/21082 dated 21-Sep-08

CLOSED CLOSED

CLOSED CLOSED CLOSED CLOSED ur CLOSED CLOSED ur

1,587.60
0.00

184.28

Subcon Cost + 12% OH&P considered in Claim Series 41 / ERI No. 16

6,205.97 25,999.57

JAP016/ALM/TCAC/21270 dated 29-Sep-08

CLOSED CLOSED 172,273.32

6,205.97 25,999.57 74,900.00 0.00 (66,453.77)

1,069.46 634.87 97,373.32

Light weight Concrete and chipping works architectural works only. ETA costs + 7% JV OH&P see OM-5 below (omitted works)

JAP016/ALM/TCAC/17848 see NOC#127 dated 8-May-2008

101 146 84

001 001 001

45.2 45 / 45.1 46

NSC Basement 2 Security Room - Revised Drawings for the Ventilation and Lighting Details JV Level 30 Partition Layouts JV Omission of Partition Walls in Level 30 for Single Tenancy Arrangements NSC Various Changes due to the revised MEP "For Construction" Drawings due to Modification at Level 30 NSC Various Revisions to the Electrical Works "For Construction" Drawings NSC Relocation of Cameras at 30th Floor (RFI No. 859) NSC Revision to the Lighting Layout at GF, L1, & L2

(valued in OM-5) (66,453.77)

0 0
JAP016/ALM/TCAC/19244 dated 26-Jun-08

CLOSED CLOSED ur

0.00

JV Scope of Works - Omission of Office Partitions at the Level 30 due to the single tenancy arrangements ETA to submit entitlements

DXB/AMT-01/0600/EDM/2475 DXB/AMT-01/0500/JLy/3207 DXB/AMT-01/0600/EDM/2309

07-Jul-07 20-Nov-07 09-Jun-07

ur ur ur

ur ur ur

ur ur ur

ur ur ur

ETA to submit entitlements JCI to submit entitlements ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No. 105; to be valued under ERI16 ref. JAP016/ALM/TCAC/09512 dtd 12Jun07 ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No.107

102 104 82 89 186

001 001 001 001 001R1

46 47 48 49 49

NSC Lighting Requirements to the Function Room / Ballroom JV Additional 40 Container Storage, Office Chairs, and Computer for F+G Office NSC Telephone IDF/MDF Room Drawings JV JV Modification to the Structural Drawings at Levels 49, 50, and 51 Notification of Entittlements (CVI-089) - Doors to new washrooms at L49 and L50 (Lift Lobby Area) Modification to the Structural Drawings at Levels 49, 50, and 51 Various Revisions due to the revised For Construction Drawings (MEP Works) at Levels 49, 50, & 51 Fire Fighting Systems at Levels 49, 50, & 51 (Abortive Work) Fire Fighting Systems at Levels 49, 50, & 51 (Builders Work and Abortive Work) Revised "For Construction" Security Drawings at Levels 49, 50, & 51 under the DMCC Transmittal Ref. JAP016/TRNS /JV/00044 dated 5th May 2008 (Security Works) Modification of Raised Floor Heights at Server Rooms at Level 49, 50, & 51 Amendment to District Cooling Piping and Control Works (Heat Echangers and Strainers) Changes to Suspended Ceiling (ID Works Package)

DXB/AMT-01/0600/EDM/2499 DXB/AMT-01/0600/EDM/2551 DXB/AMT-01/0600/EDM/2222 DXB/AMT-01/0600/EDM/2315 DXB/AMT-01/1100/WAE/3965

10-Jul-07 18-Jul-07 27-May-07 09-Jun-07 08-Apr-08

ur 40,174.50 34,309.10 (valued in OM9-001) 58,651.66

ur 0 ur 0 ur

ur

ur CLOSED CLOSED CLOSED ur 40,074.53 10,951.45


0.00

40,074.53 13,517.00 (valued in OM9-001)

0 0 0

JAP016/ALM/TCAC/11909 dated 9-Sept-2007 JAP016/ALM/TCAC/21322 dated 5-Oct-08

CLOSED CLOSED CLOSED 58,651.66

99.97 23,357.65

actual cost transmitted to F&G based on dayworks rates; agreed with F&G ETA cost + 7% OH&P valued under the omissions

58,651.66

under review; to be under ERI #49 as per Nakheel letter ref. JAP016/TS/GT/0205 dated 15-Apr-08; SC cost +12%OH&P + 3% Attendances Omission of Office Partitions at Level 49 ETA cost + 12% OH&P + 3% Attendances

OM-9 92

001 001

49 49.2

JV NSC

JAP016/ALM/TCAC/19245 DXB/AMT-01/0600/EDM/2375

26-Jun-08 21-Jun-07

(85,688.89) 218,960.00

0 ur

(85,688.89) 218,960.00

0.00 ur

(85,688.89) 20,544.00

0.00 198,416.00

163 163 163

006a 006b 009

49.3 49.3 49.4

NSC JV NSC

DXB/AMT-01/0600/EDM/4034 DXB/AMT-01/0600/EDM/4034 DXB/AMT-01/0600/EDM/4162

20-Apr-08 20-Apr-08 10-May-08

ur 1,903.78 ur

ur ur ur

ur 1,903.78 ur

ur ur ur

24,824.00 1,903.78

ETA to submit entitlements builders works JCI to submit entitlements

208 109 94 95

001 001 001R2 001

49.5 50 51 52

NSC NSC JV

DXB/AMT-01/0600/EDM/4335 DXB/AMT-01/0600/EDM/2655 DXB/AMT-01/0600/EDM/2432 / DXB/AMT-01/0500/JLy/3369 DXB/AMT-01/0600/EDM/2433

02-Jun-08 05-Aug-07 30-Jun-07 / 22-Dec-07 30-Jun-07

17,250.00 597,081.20 85,383.20 653,624.24

ur ur see NOC#127 0

17,250.00 597,081.20

ur ur CLOSED 393,521.39 85,383.20

17,250.00 203,559.81 0.00

MDS cost + 12% OH&P + 3% Attendances; valued at ERI No. 49.5 as per Nakheel letter ref. JAP016/TS/GT/0271 dtd 9Jun08 ETA to submit entitlements subcon costs plus 12% (revised cost from 182,960.40 due to the meeting between FBI and DMCC) KONE costs + 7% JV OH&P

85,383.20 653,624.24

JAP016/ALM/TCAC/21731 see NOC#127 dated 21-Oct-08

CLOSED

NSC Variation Works due to Lift and Escalator Finishes (Direct Variation to the Nominated S/C Works) NSC Variation Works due to Lift and Escalator Finishes (Adjustment to the Provisional Sums) NSC Changes of Wallpaper in Typical Floor Corridors JV Changes to Mock-up Areas (ID Works) JV JV Change of Pressurization Duct Opening at 51st Floor Lift Lobby Additional Aluminum Flashing

JAP016/ALM/TCAC/17360 dated 20-Apr-08

CLOSED

CLOSED

579,717.22

73,907.03

95

002

52

DXB/AMT-01/0600/EDM/2433

30-Jun-07

544,678.47

544,678.47

JAP016/TS/GT/0083 dated 9Aug-2007

CLOSED

CLOSED

544,678.47

KONE costs + 7% JV OH&P; NOTE : Not considered as a variation by Consultant but adjsutment to the KONE Provisional Sums from AED500K to 1,009,045.30, and agreed amount s the nett costs. BI to submit entitlements

114 93 115 116 112 80 80 134 OM-6 136

001 001 001 001R1 001 001R1 002 001 001 001

53 54 55 57 58 59 59.1 60 60 61

DXB/AMT-01/0600/EDM/2802 DXB/AMT-01/0600/EDM/2400 DXB/AMT-01/0600/EDM/2804 DXB/AMT-01/0600/EDM/2803 DXB/AMT-01/0600/EDM/2763 DXB/AMT-01/0500/JLy/2098 DXB/AMT-01/0600/EDM/3561 DXB/AMT-01/0600/EDM/3069 DXB/AMT-01/0600/MIC/5011 DXB/AMT-01/0600/EDM/3081

01-Sep-07 24-Jun-07 02-Sep-07 01-Sep-07 25-Aug-07 30-Apr-07 28-Jan-08 27-Oct-07 26-Oct-08 29-Oct-07

ur 612,662.92 4,044.20 764,729.70 506,665.14 1,706.32 133,301.39 (valued in OM6-001) (2,856.00) 155,609.44

ur see NOC#127 0 ur ur ur ur 0 0 see NOC#127 see NOC#127 see NOC#127

ur 612,662.92
JAP016/ALM/TCAC/20893 dated 11-Sep-08

ur CLOSED CLOSED ur ur ur ur CLOSED CLOSED CLOSED

(50,825.00) 400,000.00 3,315.73 212,662.92 728.47 764,729.70 506,665.14 1,706.32 17,120.00


0.00

Bond Interiors cost + 12% JV Mark-up + 7% OH&P (Prov. Sums) agreed withConsultants (F&G) Subcon Cost + 12%OH&P + 3% Attendances ETA costs + 12% OH&P + 3% Attendances bulkheads only ETA costs = AED 115,914.25 + 12% JV OH&P + 3% Attendances under review by JV and JCI.

3,315.73

CLOSED 764,729.70 506,665.14 1,706.32 133,301.39

NSC Changes in the LV Schematic Diagram JV False Beam/Bulk Head NSC Drainage Piping in Medium and High Rise Lift Machine Room JV Omission of Proximity Access Card Reader and Access Cards at Basement 1 Boom-Gate JV Omission of Proximity Access Card Reader and Access Cards at Basement 1 Boom-Gate JV Diamond Feature

0.00 116,181.39

(valued in OM6-001)

0
0
JAP016/ALM/TCAC/22410 DATED 18-Nov-08

CLOSED CLOSED CLOSED

(2,822.40) 155,609.44

(2,856.00) 155,609.44 0.00

considered Sultan Hareb rates x no. of slots in Basement 1 + 12% OH&P Excl Acry Costs = AED 138,937 + 12% JV OH&P

JAP016/TS/GT/0227 dated 13see NOC#127- May-2008 001 agreed values is partial and see NOC#127 deemed to change

149

001

62

JV

Revised "For Construction" ID Drawings at the Second Level and Diamond Exchange Centre Cuttings in Corridor Ceiling at Level 2 as required by Bond Communication

DXB/AMT-01/1100/WAE/3232

25-Nov-07

6,574,957.21

3,431,895.90

CLOSED

6,574,957.21

progressively, as it is based on the agreed rates only (+12%)

updated cost and rates approval summary status being sent regularly; cost submitted is the final applied claim FBI shall submit entitlements as per the F&G letter ref. JAP016/ALM/TCAC/21815 dtd 26-Oct-08; BACKCHARGE TO BOND COMMUNICATION DUE NON-COORDINATION BI to submit entitlements

149

007

62

JV

DXB/AMT-01/0600/EDM/____

28-Oct-08

0.00

0.00

CLOSED

CLOSED

0.00

0.00

149

010

62

149 149 149 149 137 126 110 163

002 003a 004 003b 001 001 001R1 001

62.1 62.1 62.2 62.3 63 64 65 66 66.1

NSC Additional Counter at the Security Room level 2 as per the M/s. Nakheel letter ref. JAP016/TS/BW/0366 dated 16-Nov-08 NSC Revisions to Diamond Exchange Centre (MEP and Interior Lighting) NSC Revisions to Diamond Exchange Centre (CCTV and Access Control) NSC Revisions to Diamond Exchange Centre (Fire Policy Layout) NSC Revisions to Diamond Exchange Centre (CCTV and Access Control) NSC Emergency Cables to the Tenant's DB NSC Modification of Male Washroom at 36th Floor - RFI 767 (Rev. 0,1&2) NSC Furniture / Console at Basement 2 Security Room JV Provision of Toilets at upper floors, Levels 49,50,51, and 62 (Civil and Architectural Works, and Abortive Works-Coring at 49, 50, & 51, Plastering at Pantry Wall at L49, and add'l opening at SF3 for Level 49)

DXB/AMT-01/0600/EDM/5104

19-Nov-08

ur

ur

ur

ur

DXB/AMT-01/0600/EDM/3473 DXB/AMT-01/0600/EDM/3473 DXB/AMT-01/0600/EDM/4134 DXB/AMT-01/0600/EDM/4144 DXB/AMT-01/0600/EDM/3091 DXB/AMT-01/0600/EDM/3014 /DXB/AMT-01/0600/EDM/3306 DXB/AMT-01/0600/EDM/2693 DXB/AMT-01/0600/EDM/4113 DXB/AMT-01/0600/EDM/3588

13-Jan-08 13-Jan-08 06-May-08 07-May-08 30-Oct-07 14-Oct-07 /10-Dec-07 12-Aug-07 3-May-08 02-Feb-08

2,679,840.21 617,089.33 ur ur 394,252.82 56,553.22 29,808.00 127,141.12

ur ur ur ur ur ur

2,679,840.21 617,089.33 ur ur 394,252.82 56,553.22

ur ur ur ur ur ur

460,956.00

2,218,884.21 617,089.33

ETA cost + 7% OH&P + 2% Attendances JCI cost AED 566,137.00 + 7%JV OH&P + 2%Attend; based on transmittal ./00017 dtd 1-Nov-07 (drwg. No. 4494/Y/009 Rev.3) ETA to submit entitlements JCI to submit entitlements; based on transmittal ./00043 dtd 4May08 (drwg. No. 4494/Y/009 Rev.4)

322,070.00 12,196.26

72,182.82 44,356.96

ETA costs + 7% JV OH&P; confirmed to be ERI No. 63 as per F&G letter ref. JAP016/ALM/TCAC/18721 dtd 8Jun08 ETA part = AED 50,475.00

0 ur

29,030.40 100,469.43

JAP016/ALM/TCAC/21105 dated 22-Sep-08 JAP016/ALM/TCAC/21426 dated 9-Oct-08

CLOSED CLOSED

CLOSED ur

31,062.53 100,469.43

(1,254.53) 26,671.69

BF claim AED 25,920 + 12% OH&P under review by JV; additional coring works to ERI 66.1 as confirmed by F&G letter ref. JAP016/ALM/TCAC/17867 dtd 8May08; addl plaster at Pantry L49 under 66.1 as per JAp016/ALM/TCAC/18766 dtd9Jun08;ERI 66.1 confirmed by Nakheel to cover coring works by B ETA costs of AED 408,791 + 12%JV OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Al Abbar to submit claim / JV to submit builders works claim; to be valued under the ERI 66.1 refer to F&G letter JAP016/ALM/TCAC/18209 dtd 20May08

163 163 174

002 007 001

66 66.1 66.1

NSC Provision of Toilets at upper floors, Levels 49,50,51, and 62 (MEP Works) NSC Reworks at the New DMCC Washrooms (Levels 49, 50, & 51) for FCU's NSC Design Changes - Additional Dummy Mullions and Back Pans at Levels 49-62 (NSC Works) Design Changes-Additional Aluminum Flashing due to the revised Curtain Wall Cladding JV Provision of Toilets at upper floors, Levels 52,53,54, and 59 (Civil and Architectural Works, and Abortive Works, if any) NSC Provision of Toilets at upper floors, Levels 52,53,54, and 59 (MEP Works) NSC Relocation of FCU to the New Toilet Area at Levels 52,53,54,59, & 62 NSC Missing Purlins at Connecting Corridor Between Tower and Diamond Exchange Center (RFI No. 839) JV JV JV Additional Staff Facilities - Project Manager's Staff (F+G) Modifications to Typical Female Bathroom Ceiling Mirrors

DXB/AMT-01/0600/EDM/3588 DXB/AMT-01/0600/EDM/4048 DXB/AMT-01/0600/EDM/3716

02-Feb-08 22-Apr-08 24-Feb-08

470,109.65 14,283.00 ur 8,452.50 90,502.31

ur ur ur

470,109.65 14,283.00 ur

ur ur ur

119,840.00

350,269.65 14,283.00

174 163

002 003

66.1 67

DXB/AMT-01/0600/EDM/3716 DXB/AMT-01/0600/EDM/3588

24-Feb-08 02-Feb-08

ur ur

8,232.00 63,163.87

JAP016/ALM/TCAC/22576 dated 24-Nov-08 JAP016/ALM/TCAC/22008 dated 2-Nov-08

CLOSED CLOSED

ur ur 63,163.87

8,452.50 27,338.44

Best Steel cost + 12% OH&P; to be valued under the ERI 66.1 refer to F&G letter JAP016/ALM/TCAC/18209 dtd 20May08 agreed withConsultants (F&G)

163 163 131

004 008 001

67 67/ 66 68

DXB/AMT-01/0600/EDM/3588 DXB/AMT-01/0600/EDM/4047 DXB/AMT-01/0600/EDM/3061

02-Feb-08 22-Apr-08 24-Oct-07

334,816.75 ur 16,050.00

ur ur 0

334,816.75 ur

ur ur CLOSED

69,657.00

265,159.75

ETA costs AED291,185 + 12% JV OH&P + 3% Attendance ETA to submit entitlements; Level 52,53,54,59 under ERI67, and Level 62 under ERI66

12,895.64

JAP016/ALM/TCAC/22694 dated 26-Nov-08

CLOSED

12,000.00

4,050.00

EVS cost + 7% OH&P

173 179

001 001

69 70

DXB/AMT-01/0600/EDM/3702 DXB/AMT-01/0600/EDM/3848

20-Feb-08 16-Mar-08

64,706.19 7,855.65

0 (see NOC#127001) see NOC#127

56,015.46 7,650.72

JAP016/AlM/TCAC/21700 dated 20-Oct-08

CLOSED CLOSED

CLOSED CLOSED

56,015.46 7,650.72

8,690.73 204.93

Supply and Labour rates + 12%OH&P BI cost at AED 6,831.00 + 12% JV OH&P

JAP016/ALM/TCAC/17650 (see NOC#127- dated 30-Apr-08 001) JAP016/ALM/TCAC/22470 see NOC#127 dated 20-Nov-08

152

001

71

OM-7

001

71

Additional Works to the Metal Cladding (MT-20) behind Glazed Balustrades caused by the Lowering of Ceiling at Ground Floor Level Due to the MEP Works (Metal Cladding - MT20) NSC Omission of Wall Tiles due to the extension of Metal Cladding Behind Glass Ballustrades caused by the lowering of Ceiling JV

DXB/AMT-01/0600/EDM/3270

03-Dec-07

294,350.71

176,646.32

CLOSED

CLOSED

0.00

294,350.71

using Bond Interiors rates + 7% OH&P

JAP016/ALM/TCAC/22470

20-Nov-08

(132,210.53)

(132,210.53)

0.00

(132,210.53)

BI to confirm cost by F&G

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List.monvabad

11 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
164 123

October 15, 2013


REMARKS / COMMENTS

SUB NO.
001 001R2

ERI NO.
72 73

V.O. TO
JV JV

CLAIM NOTICE LETTER

CLAIM ENTITLEMENT APPLICATION DATE COST (AED) 40,216.65 12,637.06


TIME (Days)
0 ur

ER / F&G / JV AGREED VALUES COST (AED) 39,167.52


TIME (Days)
0

OUTSTANDING CLAIMS COST (AED)


CLOSED 12,637.06

CERTIFIED AS AT CERTIFIED TO-DATE


39,167.52

DESCRIPTION
REFERENCE BMS Room Furniture Requirements Potential Delay due to Late Issuance of Revised Design Information in Sky Lobby Meeting Room at Level 48 ID Works Package - Lighting Requirements at Level 48 Meeting Room (MEP Works Scope) ID Works Package - Lighting Requirements at L48 Meeting Room (JV Scope - Lever to Supply)
DXB/AMT-01/0600/EDM/3589 DXB/AMT-01/1100/WAE/2955 02-Feb-08 01-Oct-07

November 30, 2008


BALANCE TO-DATE
1,049.13 12,637.06
BF cost AED 34,971.00 + 12% JV OH&P confirmed to be valued under ERI No. 73 according to the Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08

LETTER REF.
JAP016/ALM/TCAC/21106 dated 22-Sep-08

TIME (Days)
CLOSED ur

166

001

73

JV

DXB/AMT-01/0600/EDM/3609

04-Feb-08

11,783.12 2,254.00 73,986.40

ur

11,783.12

ur

11,783.12

ETA cost + 12%OH&P + 3% Attendances; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08 JV to submit entitlements; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08; Lever cost + 12% OH&P + 3% Attendance ETA cost + 12% OH&P + 3% Attendances

166

002

73

JV

DXB/AMT-01/0600/EDM/3609

04-Feb-08

ur

2,254.00

ur

2,254.00

202

001

74

197

001a

74.1

NSC Revised Domestic Water Layout at Ground and First Floor due to the Revised "For Construction" Drawings under the DMCC Transmittal JAP016/TRNS/JV/00042 JV Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope masonry works, abortive works and coring works) Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope ID works) NSC Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (ID Scope of Works) NSC Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (MEP Works) NSC Revised " For Construction" drawings under the DMCC transmittal ref. JAP016/TRNS/JV/00040 dated 16-Apr-08 (Additional Voice/Data Points in GF & 1L) JV NSC ID Tiling Works-Attic Stock (ERI No. 75) JV Doors at DEWA Water Meter Rooms NSC DEWA Water Meter Connection (MEP Works) JV DEWA Water Meter Connection (Builders Work)

DXB/AMT-01/0600/EDM/4137

06-May-08

ur

73,986.40

ur

19,688.00

54,298.40

DXB/AMT-01/0600/EDM/4053

22-Apr-08

18,228.31

ur

14,232.82

JAP016/ALM/TCAC/22447 dated 19-Nov-08

CLOSED

ur

27,042.36

(8,814.05)

Masonry Works, Abortive Works and Coring Works

197

001b

74.1

DXB/AMT-01/0600/EDM/4053

22-Apr-08

57,459.68

ur

57,459.68

ur

57,459.68

Doors and Frames incl Ironmongery, and Ceiling Works

197

002

74.1

DXB/AMT-01/0600/EDM/4053

22-Apr-08

ur

ur

ur

ur

Bond Interiors to submit entitlements

197

003

74.1

DXB/AMT-01/0600/EDM/4127

05-May-08

50,319.40

ur

50,319.40

ur

50,319.40

ETA to submit entitlements

238

001

74.1

DXB/AMT-01/0500/JLy/5009

26-Oct-08

26,919.09

ur

26,919.09

ur

26,919.09

BC Cost + 7% OH&P; BC VO#9; BC time claim = 186 days

201 158 205 205 207 196 196 196

001 001R1 001 002 001 001 002 003a

75 76 76.1 76.1 77 78 78 78

DXB/AMT-01/0600/EDM/4135 DXB/AMT-01/0500/JLy/3401/ DXB/AMT-01/0500/JLy/3416 DXB/AMT-01/0600/EDM/4274 DXB/AMT-01/0600/EDM/4274 DXB/AMT-01/0600/EDM/4323 DXB/AMT-01/0600/EDM/4046 DXB/AMT-01/0600/EDM/4046 DXB/AMT-01/0600/EDM/4046

06-May-08 27 & 31Dec-07 24-May-08 24-May-08 31-May-08 22-Apr-08 22-Apr-08 22-Apr-08

ur 21,502.11 10,637.50 5,263.09 150,193.45 2,070.00 76,094.35 62,002.57

0 ur ur ur ur ur ur ur

ur 21,502.11

CLOSED ur ur ur ur ur ur ur 3,941.91 21,502.11 10,637.50 1,321.18 150,193.45 2,070.00 76,094.35 62,002.57

BI to submit entitlements JV Costs ETA cost + 7% OH&P JV works clsoing of opening and provision of new opening with waterproofing and sealing works Al Abbar cost + 12% OH&P + 3% Attendances valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 ETA cost + 12% OH&P + 3% Attendances; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#03); BC time claim = 147 days BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#05); BC time claim = 233 days BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#11); bc time claim = 201 days BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#01); bc time claim = 275 days BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#02); bc time claim = 273 days valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 JV Internal Works

7,908.70 3,941.91

JAP016/TS/GT/20686 dated 28Aug-08 JAP016/TS/GT/20686 dated 28Aug-08

CLOSED CLOSED 150,193.45 2,070.00 76,094.35 62,002.57

NSC Tower Secondary Roof Clamping Section MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (JV Scope) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (ETA Scope) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeKrone Modules) JV NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeVertical Cable Manager) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeHorizontal Cable Manager) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeCAT 3 Cables Installations) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeOM3 Fibre Optic Cable Installations) JV JV MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Lateral Systems Scope) MDF & IDF Rooms DUs Additional Requirements, i.e., Stand for the UPS & Batteries in MDF Room & UPS Room at Basement 1

196

003b

78

DXB/AMT-01/0600/EDM/4046

22-Apr-08

127,698.42

ur

127,698.42

ur

127,698.42

196

003c

78

DXB/AMT-01/0600/EDM/4046

22-Apr-08

19,821.34

ur

19,821.34

ur

19,821.34

196

003d

78

DXB/AMT-01/0600/EDM/4046

22-Apr-08

336,915.53

ur

336,915.53

ur

336,915.53

196

003e

78

DXB/AMT-01/0600/EDM/4046

22-Apr-08

321,379.43

ur

321,379.43

ur

321,379.43

196 196

004 005

78 78

DXB/AMT-01/0600/EDM/4046 DXB/AMT-01/0600/EDM/4797

22-Apr-08 02-Sep-08

117,875.00 5,689.44

ur ur

117,875.00 5,689.44

ur ur

117,875.00 5,689.44

196

006

78

NSC MDF & IDF Rooms DUs Additional Requirements, i.e., DU's Requirements for the UPS NSC Replacement of FCU at UPS Room Basement 1 NSC Relocation of Isolators in UPS Room as per the DU's Requirements

DXB/AMT-01/0600/MIC/5017

27-Oct-08

93,918.75

ur

93,918.75

ur

93,918.75

ETA cost + 12% OH&P + 3% Attend

196 215

007 001

78 78

DXB/AMT-01/0600/EDM/5146 DXB/AMT-01/0600/EDM/4474

27-Nov-08 29-Jun-08

ur 36,059.40

ur ur

ur 36,059.40

ur ur 36,059.40

ETA to submit entitlements ETA cost + 12% OH&P + 3% Attendances, JV to submit builders work, if any; ERI 78 as confirmed by F&G letter ref. JAP016/ALM/TCAC/19239 dtd 26Jun08 & Nakheel letter ref. JAP016/TS/GT/0304 dtd 8Aug08 ETA cost + 12% OH&P + 3% Attendances (Power & LC, AC & Ventilaltion, Drainage)

204

001

79

NSC Level 1 Food Court A/C Design Revised "For Construction" Drawings under the DMCC transmittal ref. JAP016/TRNS/JV/00046 (MEP Works) JV Doors to Lift Machine Rooms - Summit & Service F1 (Atkins letter ref. RD4532/661/AK/mja/R8-1879)

DXB/AMT-01/0600/EDM/4270

24-May-08

354,891.15

ur

354,891.15

ur

354,891.15

228

001R1

80

DXB/AMT-0//0600/EDM/4667

03-Aug-08

37,185.25

ur

37,185.25

ur

37,185.25

JV's cost from Belgium Aluminum and Best Steel + 12% OH&P + 3% Attendances

203 231

001 001

81 82

NSC Granite Finishing at Level 2 (RFI No. 636 R1) NSC Additional Dummy Mullion at Levels 49-51 NSC Revisions to Landscaping Package in accordance with the M/s. Nakheel letter ref. JAP016/TS/BW/0347 dated 21-Sep-08

DXB/AMT-01/0600/EDM/4249 DXB/AMT-0//0600/EDM/4859

21-May-08 17-Sep-08

33,846.52 ur 66,615.70

ur ur

33,846.52 ur

ur ur

33,846.52

AB cost + 12% OH&P + 3%Attend Al Abbar to submit entitlements; Nakheel letter ref. JAP016/TS/BW/0346 dtd 14Sep08 instruction to install and ERI is forthcoming

233

001

83

DXB/AMT-0//0600/EDM/4939

12-Oct-08

ur

66,615.70

ur

66,615.70

Al Bayader cost + 12% OH&P + 3% Attendances

TOTAL FOR CLAIMED/NOTIFIED VARIATIONS (WITH ERI) 104,323,764.37

59,346,426.72

29,178,400.41

60,740,469.59

43,557,293.78

0 1 2 3 4 5 6 7 8 9

001 001 001 001 001 001 001 001 001 001

JV JV JV JV JV JV JV JV JV JV

Delay in Site Mobilization Design Modification of Pile Caps Excavation to the difference in the Tender Drawings and the Actual Site Conditions Pile Head Levels and Associated Problem Nominated Subcontractor Appointment (ETA) Fuel Price Increases Delay of receipt of the Building Permit and "For Constructon" Drawings Delay in Raft Pour in Zones 1 & 2 Late Notification of Subcontractors Closure of Site and Offices (due to the death of Sheik Maktoom, 5-7 January 2006)

TDB/P3/AM059 TDB/P3/AM/CN-001A TDB/P3/AM/CN-002A DXB/AMT-01/0500/JLy/112 DXB/AMT-01/0500/JLy/068 DXB/AMT-01/0500/JLy/070 DXB/AMT-01/0500/JLy/131 DXB/AMT-01/0500/JLy/134 DXB/AMT-01/0500/JLy/159 DXB/AMT-01/0500/JLy/171

05-Sep-05 05-Sep-05 17-Sep-05 18-Sep-05 03-Oct-05 03-Oct-05 30-Nov-05 04-Dec-05 28-Dec-05 08-Jan-06

0.00 611,739.00 259,943.16 258,088.62 0.00 0.00 0.00 0.00 0.00 0.00

see NOC#127 see NOC#127 see NOC#127 see NOC#127 ur 0 ur see NOC#127 ur 2

0.00

see NOC#127 see NOC#127 see NOC#127 see NOC#127

CLOSED 611,739.00 259,943.16 258,088.62


JAP016/GEN/ABS/1051 dated 8-Aug-06

CLOSED CLOSED CLOSED CLOSED ur CLOSED ur CLOSED ur 2

0.00

0.00 611,739.00 259,943.16 258,088.62 0.00 0.00 0.00 0.00 0.00 0.00

This is due to the late possession of site as detailed in the referred letter. progressed under a separate claim.

progressed under a separate claim.

progressed under a separate claim. rejected by Nakheel due to notice not served as per the required time period under the Contract. rejection letter ref. JAP016/GEN/ABS/1051 dated 8Aug-06 does not detail the reasons for rejection of Claim No. 5. rejected by Nakheel due to notice not served as per the required time period under the Contract. progressed under a separate claim; time related claim. rejected by Nakheel due to dates relating to NSC in the Baseline Programme is not yet accepted. Rejected by Nakheel in accordance to Clause 44.1 of CoC, as 1 day is non working day and 2 days is not sufficient to award an entitlement; our letter ref. DXB/.Jly/5013 dtd 26Oct08 again requested for 2 days EOT ETA to submit entitlements; Permanent Power now in place done by ETA. ETA to submit entitlements; rejected by Nakheel due to notice not served as per the required time period under the Contract. Internal S/C Works + 12% OH&P included in Claim Nos. 107-003 & 175-001 ETA to submit entitlements ETA to submit entitlements included in Claim Nos. 67-001 valued under the Claims Series 33 KONE to submit entitlements; rejected by Nakheel due to Clause 20.1-Care of Works on the CoC. AA to submit entitlements; rejected by Nakheel due to Tech Specifications H11/20, Clause 871, and Clause 3b of CoC.

0.00 0.00 0.00 0.00 0.00 0.00


see NOC#127 0

CLOSED CLOSED CLOSED CLOSED

0.00 0.00 0.00 0.00

JAP016/GEN/ABS/1051 dated 8-Aug-06 JAP016/GEN/ABS/1051 dated 8-Aug-06

JAP016/TS/BW/0018 dated 31Oct-06 JAP016/GEN/ABS/1014 dated 24-Jun-06, & JAP016/GEN/ ABS/1051 dated 8-Aug-06

CLOSED CLOSED

0.00

10 11

001 001

NSC ETA Site Establishment (Provision of Temporary Power Supply) NSC Revised Contract Drawings by ETA JV Builders Works Drawings NSC DTS referenced AM/015/515 dated 5th August 2006 (MEP Works) NSC DTS referenced AM/015/509 dated 1st August 2006 (MEP Works) NSC DTS referenced AM/015/516 dated 7th August 2006 (MEP Works) NSC LV Schematic Diagram JV Revised Structural Drawings NSC Storage Area for KONE NSC Factory Inspections for Al Abbar

DXB/AMT-01/0500/JLy/353 DXB/AMT-01/0500/JLy/360

17-Apr-06 18-Apr-06

0.00 ur

0 ur

0.00

(not provided) JAP016/GEN/ABS/1051 dated 8-Aug-06

CLOSED ur

CLOSED ur

0.00

0.00 0.00

22 23 24 25 26 27 29 30

001 002 001 001 001 001 001 001

DXB/AMT-01/0500/JLy/726 DXB/AMT-01/0500/JLy/748 DXB/AMT-01/0500/JLy/749 DXB/AMT-01/0500/JLy/750 DXB/AMT-01/0500/JLy/759 DXB/AMT-01/0500/JLy/760 DXB/AMT-01/0500/JLy/796 DXB/AMT-01/0500/JLy/802

31,782.05 (valued in 107-003 & 175001) 12-Aug-06 ur


05-Aug-06 12-Aug-06 12-Aug-06 15-Aug-06 15-Aug-06 26-Aug-06 29-Aug-06

0 0 ur ur 0 0 0 0

31,782.05 CLOSED ur ur

CLOSED CLOSED ur ur CLOSED CLOSED CLOSED CLOSED


0.00 0.00 0.00 0.00

31,782.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

(valued in 107-003 & 175-001)

ur (valued in 67-001) (valued in 33) 0.00 0.00

(valued in 67-001) (valued in 33) 0.00 0.00

0 0 0 0
JAP016/TS/ABS/0004 dated 12Sep-06 JAP016/GEN/ABS/1070 dated 06-Sep-06

CLOSED CLOSED CLOSED CLOSED

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List.monvabad

12 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
35 35 36

October 15, 2013


REMARKS / COMMENTS

SUB NO.
002a 002b 001

ERI NO.

V.O. TO

CLAIM NOTICE LETTER

CLAIM ENTITLEMENT APPLICATION DATE COST (AED) 38,246.08 120,370.11 ur 0.00 (valued in37-001) 522,748.23 0.00 ur (valued in 127-001) ur ur 0.00 0.00 (valued in 65-001) (valued in 33-030) 0.00 12,494.21 (valued in 35-001) (valued in 64-001) (valued in 76-001) (valued in 116-001) 0.00
TIME (Days)
ur ur ur

ER / F&G / JV AGREED VALUES COST (AED)


TIME (Days)

OUTSTANDING CLAIMS COST (AED)


38,246.08 120,370.11

CERTIFIED AS AT CERTIFIED TO-DATE

DESCRIPTION
REFERENCE
DXB/AMT-01/0500/JLy/926 DXB/AMT-01/0500/JLy/926 DXB/AMT-01/0500/JLy/932 03-Oct-06 03-Oct-06 05-Oct-06

November 30, 2008


BALANCE TO-DATE
38,246.08 120,370.11 0.00
ETA Cost + 7% JV OH&P; as per original claim JV Cost ETA to submit entitlements; rejected by Nakheel due to the Consultant's(Atkins)response ref. RD/4532/661/ML/R8-0344. time implications. same as Claim No. 37-001, based on the F&G transmittal ref. F+G/ALMAS/TAISEI/01404 dtd 10-1506 based on the response from RFI No. 417 request by WS Atkins and F&G in the Technical Meeting to provide 3rd party safety inspection and issue of certificate prior to CTU; rejected by Nakheel. ETA to submit entitlements; revisions is due to the requirement of a UL/FM specifications To be included in the Prolongation Claims as this is a preliminaries items ETA to submit entitlements ETA to submit entitlements due to inclement weather conditions at site rejected by F&G as it is included specs M13. valued in Claim No. 65-001 not applicable rejected by F&G as per the response letter Revision 1 - revised due to the changes in the works. not applicable Included in Claim No. 64-001 Included in 76-001 included in Claim No. 116-001 not done

LETTER REF.

TIME (Days)
ur ur ur

NSC Additional OCP's conduits to the Offices and Retail Units (MEP Works) JV Additional OCP's conduits to the Offices and Retail Unts (Builders Work) NSC Fire Alarm Shop Drawing JV Nomination of Landscaping Subcontractor NSC Revised "For Construction" Drawings for ETA NSC Fire Sprinkler Riser Pipes in Garbage Chute Shaft JV CTU 3rd Party Inspection

JAP016/TS/BW/0021 dated 12Nov-06

ur

39 40 42 43

001 001 001 001

DXB/AMT-01/0500/JLy/1052 DXB/AMT-01/0500/JLy/1054 DXB/AMT-01/0500/015/JLy/235 DXB/AMT-01/0500/JLy/1086

05-Nov-06 06-Nov-06 07-Nov-06 11-Nov-06

ur 0 ur 0

0.00 (valued in37-001)

CLOSED 0 CLOSED 522,748.23

ur CLOSED ur CLOSED
0.00

0.00 0.00 522,748.23 0.00

0.00

JAP016/TS/ABS/0031 dated 28Dec-06

CLOSED

44 45 47 48 49 53 58 60 61 62 63 66 71 72 73

001 001 001 001 001 001 001 001 001 001 001 001 001 001 001

NSC Revised Specifications for the Fire Fighting Equipments JV Provision of Inspectors NSC Revised Architectural Drawings at 31st & 32nd Floor (MEP Works) NSC Revised Architectural and ID Drawings (MEP Works) JV JV Exceptionally Adverse Climatic Conditions RFI No. 480 - Embedded Flush Tank

DXB/AMT-01/0600/EDM/1179 DXB/AMT-01/0500/JLy/1185 DXB/AMT-01/0600/EDM/1237 DXB/AMT-01/0600/EDM/1238 DXB/AMT-01/0500/JLy/1253 DXB/AMT-01/0500/JLy/1338 DXB/AMT-01/0600/EDM/1566 DXB/AMT-01/0500/JLy/1567 DXB/AMT-01/0500/JLy/1593 DXB/AMT-01/0600/EDM/2507 DXB/AMT-01/0500/JLy/1633 DXB/AMT-01/0600/EDM/1655 DXB/AMT-01/0600/EDM/1786 DXB/AMT-01/0500/JLy/1792 DXB/AMT-01/0500/JLy/1836

29-Nov-06 03-Dec-06 11-Dec-06 11-Dec-06 14-Dec-06 28-Dec-06 10-Feb-07 13-Feb-07 14-Feb-07 11-Jul-07 20-Feb-07 25-Feb-07 14-Mar-07 14-Mar-07 19-Mar-07

ur 0 ur ur ur 0 0 0 0 ur 0 0 0 0 0

ur

ur CLOSED ur ur ur CLOSED CLOSED CLOSED CLOSED ur CLOSED CLOSED CLOSED CLOSED CLOSED
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12,494.21 0.00 0.00 0.00 0.00 0.00

(valued in 127-001)

CLOSED ur ur

0.00

0.00 0.00
(valued in 65-001)
0 0 0 0
JAP016/ALM/TCAC/06995 dated 18-Feb-2007 JAP016/TS/ALM/TCAC/06906 dated 14-Feb-07

CLOSED CLOSED CLOSED CLOSED CLOSED 12,494.21

NSC Revised MEP Drawings JV Provision of BMU JV Sanitary Ware Selection Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms NSC Installation of OCP's to Tenant Rooms NSC MEP Works - Revised External Services Drawings JV NSC MEP Works - Revised Ground Floor Landscape Drawings JV Interfacing Detail between the Cladding and Blockwall JV Disabled Toilets (CVI No. 052 dated 18th March 2007 increase of openings to blockwork walls to 1.00m) JV Shadow Groove to Ceilings JV Disabled Toilet NSC RFI No. 571 - Insulation and Backing Panels to Cladding JV Change of Back of House Doors Colours from White to Gray NSC Revision of ST-10 to ST-15 (ID Works Package Provisional Sum) JV Changes to D-04 & D-30 Hinges (ID Works Package) NSC Secondary Roof for the Towers JV Revised Interior Lighting Fixtures Layout at GF,1L,& 2L JV Provision of Downspouts at Ballroom/Function Room Roof (CVI No. 122) JV Architectural Changes to Level 2 JV Omission of Mirror Mounted Paper Towel Dispenser NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (ETA Scope) NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (Al Abbar Scope) JV Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (JV Scope) JV Changes to the Diamond Exchange Centre

(valued in 33-030) 0.00

0.00

(valued in 35-001) (valued in 64-001) (valued in 76-001) 0.00 0.00

0 0 0 0 0
(not done)

CLOSED CLOSED CLOSED CLOSED CLOSED

74 75 83 90 91 96 98 105 107 108 111 113

001 001 001 001 001 001 001 001 006 001 001 001

DXB/AMT-01/0500/JLy/1885 DXB/AMT-01/0500/JLy/1886 DXB/AMT-01/0500/JLy/2184 DXB/AMT-01/0500/JLy/2347 DXB/AMT-01/0500/JLy/2350 DXB/AMT-01/0600/EDM/2437 DXB/AMT-01/0600/EDM/2451 DXB/AMT-01/0600/EDM/2553 DXB/AMT-01/0600/EDM/4465 DXB/AMT-01/0100/YOS/2628 DXB/AMT-01/0600/EDM/2731 DXB/AMT-01/0600/EDM/2768

26-Mar-07 26-Mar-07 20-May-07 16-Jun-07 16-Jun-07 30-Jun-07 02-Jul-07 18-Jul-07 26-Jun-08 31-Jul-07 18-Aug-07 26-Aug-07

(valued in 41-001) 0.00 ur 0.00 2,704,866.52 (valued at 41-001) (valued in 220-001) (valued in 41-001) 2,210.46 (valued in 149) 165,993.30 91,147.85

0 0 ur 0 ur 0 ur 0 see NOC#127 0 see NOC#127 ur

(valued in 41-001) 0.00

0 0

(valued in 41-001) (not done)

CLOSED CLOSED ur

CLOSED CLOSED ur CLOSED ur CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED ur

0.00 0.00

0.00 0.00 0.00

valued in Claim No. 41-013 not done AA to submit entitlements no claim from subcontractors BI costs of AED 2,527,912.64 + 7% JV OH&P considered in Claim No. 41-007 to be valued in Claim N o. 220-001 TO BE VALUED IN CLAIM NO. 41-001 (ERI 16) varied works at structural steel works and provision of Roof Drain on-hold area, awaiting details from Client Arte Casa Cost + 12% OH&P + 3% Attendances ETA costs + 12% OH&P + 3% Attendances

0.00

(not done)

CLOSED 2,704,866.52

0.00

0.00 2,704,866.52 0.00 0.00 0.00 2,210.46

(valued at 41-001)
(valued in 220-001) (valued in 41-001)

0 0 0 see NOC#127
JAP016/ALM/TCAC/10523 dated 22-July-2007

CLOSED CLOSED CLOSED 2,210.46 CLOSED 165,993.30 91,147.85

0.00 0.00 0.00

(valued in 149)

0 see NOC#127

0.00

0.00 165,993.30 91,147.85

113

002

DXB/AMT-01/0600/EDM/2768

26-Aug-07

11,909.40

ur

11,909.40

ur

11,909.40

Al Abbar cost + 12% OH&P + 3% Attendances

113

003

DXB/AMT-01/0600/EDM/2768

26-Aug-07

(valued in 113-001)

(valued in 113-001)

CLOSED

CLOSED

0.00

0.00

Included in Claim No. 113-001

117

001

DXB/AMT-01/0500/JLy/2805

02-Sep-07

(valued in 149-001)

see NOC#127001 ur ur 0 ur ur ur 579

(valued in 149-001)

see NOC#127001

CLOSED

CLOSED

0.00

0.00

valued in 149-001 under ERI No. 62

118 119 120 121 124 125 127

001 001 001 001 001 001 001

NSC Revised Mechanical and Electrical Drawings at Basement 2 (Security Room) JV Notification of Potential Delay due to the Review of Shop Drawings JV Changes to the Floor Drain Locations JV Engineering and Procurement Activities Late Issuance of Design Information (Specifications of Lighting Fixtures in ID Areas) NSC Level 2 Fire Policy Layouts (Transmittal Ref. JAP016/TRNS/JV/00014) JV Prolongation Costs JV

DXB/AMT-01/0600/EDM/2906 DXB/AMT-01/1100/WAE/2908 DXB/AMT-01/0600/EDM/2933 DXB/AMT-01/0500/JLy/2949 DXB/AMT-01/1100/WAE/2953 DXB/AMT-01/0600/EDM/3009 DXB/AMT-01/0500/JLy/3018 / DXB/AMT-01/0500/JLy/3311 / DXB/AMT-01/0500/JLy/3710 / DXB/AMT-01/0500/JLy/3855 / DXB/AMT-01/0500/JLy/4017

19-Sep-07 19-Sep-07 26-Sep-07 30-Sep-07 01-Oct-07 14-Oct-07 16-Oct-07 / 11-Dec-07 / 21-Feb-08 / 17-Mar-08 / 17-Apr-08

ur 0.00 0.00 (valued in 41-001) 0.00 ur 131,765,411.17

ur

ur ur CLOSED ur ur ur 579
0.00

0.00 0.00 0.00 0.00 0.00 0.00 131,765,411.17

ETA to submit entitlements Potential Time Claim coring works not done. valued in 41-001, time claim submitted separately time claim. ETA to submit entitlements EOT of 585 days includes the previous 96 days and 138days claimed; Claim for additional pile works reduced to 132 from 138, thus reducing the overall claim to 579 days

0.00 0.00 (valued in 41-001) 0.00


0
(not done)

CLOSED CLOSED CLOSED CLOSED ur 131,765,411.17

0.00
0.00 0.00

127

002

JV

Additional Payment as a Result of the Escalating Cost of Materials

DXB/AMT-01/0500/JLy/4632

24-Jul-08

711,983.12

see NOC#127001 0

see NOC#127001

711,983.12

CLOSED

711,983.12

in connection to the prolongation claim

128

001

129 130 133

001 001 001

138 140 141 142 143 144 145

001 001 001 001 001 001 001

Changes to Level 2 due to the New "For Construction" Drawings under Transmittal JAP016/TRNS/JV/00015 JV Staircase at Levels 49-50 NSC Drainage on Swimming Pool Deck at Level 1 (RFI No. 831) NSC Further Revisions to For Construction Drawings under transmittals ref. JAP016/TRNS/JV/00015 and 00016 JV Notification of Delay to the ID Works Package Signages NSC Modification in Specification of Some ID Lighting Fixtures JV Notification of Delay to the ID Doors Package JV NSC Disruption of Works resulting from Design Conflict in Basement 1 VIP Lounge JV Notice of Disruption of Work at Function Room/Ballroom due to Design Conflict JV Delays due to Design Issues Related to GL-07 JV Notification of a Possible Delay to the Glass Feature Wall (GL-05) under the ID Works Package NSC Internal Water Feature (MEP Scope) NSC Power Supply and Fire Alarm Interface to Smoke Ventilation Window (RFI No. 783) NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (Bond Communication Scope - Additional Voice/Data Points at Level 2) NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (ETA scope of works) JV Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (JV scope of works) NSC Vertical Cable Manager for Diamond Exchange AV System at the Multi Purpose Room in accordance with the F&G letter ref. JAP016/ALM/TCAC/20991 dated 16-Sep-08 JV Break Glass Pedestals at the Diamond Exchange Centre in accordance with the F&G transmittal ref. F+G/ALMAS/TAISEI/01961 NSC Revisions to the Electrical Works at the Diamond Exchange Centre and Level 2 as per the F&G transmittal ref. F+G/ALMAS/TAISEI/01574 and DMCC transmittal ref. JAP016/TRNS/JV/00048 NSC Changes to the Diamond Exchange Centre as per the instructions given via M/s. DMCC letter referenced JAP016/GEN/BW/0177 dated 20-Oct-08 JV Notification of a Potential Delay Determination of Scope of Work at L49, L50, & L51 (DMCC Floors)

DXB/AMT-01/0600/EDM/3035

21-Oct-07

(valued in 149)

(valued in 149)

CLOSED

CLOSED

0.00

0.00

not applicable.

DXB/AMT-01/0600/EDM/3051 DXB/AMT-01/0600/EDM/3058 DXB/AMT-01/0600/EDM/3067

23-Oct-07 24-Oct-07 25-Oct-07

0.00 ur ur

0 ur ur

0.00

(not done)

CLOSED ur ur

CLOSED ur ur

0.00

0.00 0.00 0.00

staircase not done. ETA to submit entitlements ETA & JV to submit entitlements

DXB/AMT-01/1100/WAE/3131 DXB/AMT-01/0600/EDM/3136 DXB/AMT-01/1100/WAE/3137 DXB/AMT-01/0600/EDM/3142 DXB/AMT-01/1100/WAE/3187 DXB/AMT-01/0500/JLy/3192 DXB/AMT-01/0600/EDM/3204

07-Nov-07 08-Nov-07 10-Nov-07 10-Nov-07 18-Nov-07 19-Nov-07 20-Nov-07

(valued in 149-001) ur (valued in 149-001) 25,787.60 0.00 0.00 (valued in 41-001)

ur ur ur ur ur ur ur

(valued in 149-001)

CLOSED ur

ur ur ur ur ur ur ur

0.00

0.00 0.00

time claim. ETA tnd Lever to submit entitlements time claim. ETA Cost + 12%OH&P + 3% Attendances time claim. under review; time entitlements under review for time entitlements

(valued in 149-001)

CLOSED 25,787.60

0.00

0.00 25,787.60

0.00 0.00
(valued in 41-001)

CLOSED CLOSED CLOSED

0.00

0.00 0.00

0.00

0.00

147 148 149

003 001 005a

DXB/AMT-01/0500/JLy/3209 DXB/AMT-01/0600/EDM/3217 DXB/AMT-01/0600/EDM/4741

21-Nov-07 22-Nov-07 18-Aug-08

ur ur 24,628.70

ur ur ur

ur ur 24,628.70

ur ur ur

0.00 0.00 24,628.70

ETA to submit entitlements ETA to submit entitlements BC cost + 7% OH&P; BC VO#10; BC time claim = 147 days

149

005b

DXB/AMT-01/0600/EDM/4741

18-Aug-08

ur

ur

ur

ur

0.00

ETA to submit entitlements

149

005c

DXB/AMT-01/0600/EDM/4741

18-Aug-08

(valued in 149-001)

(valued in 149-001)

CLOSED

CLOSED

0.00

0.00

considered in 149-001 (ERI No. 62)

149

006

DXB/AMT-01/0500/JLy/5003

25-Oct-08

11,996.83

ur

11,996.83

ur

11,996.83

BC cost + 7% OH&P; BC VO#14; BC time claim = 119 days

149

008

DXB/AMT-01/0600/EDM/5027

01-Nov-08

9,200.00

ur

9,200.00

ur

9,200.00

Dubai Metals cost + 12% OH&P + 3% Attand

149

009

DXB/AMT-01/0600/EDM/5059

10-Nov-08

222,906.80

ur

222,906.80

ur

222,906.80

ETA cost + 12% OH&P + 3% Attendances

149

011

DXB/AMT-01/0600/EDM/5154

29-Nov-08

44,538.44

ur

44,538.44

ur

44,538.44

BC cost + 7%; BC VO#17; BC time claim = 91 days

150

001

DXB/AMT-01/1100/WAE/3235

25-Jan-08

0.00

ur

0.00

CLOSED

ur

0.00

Time related claim to be submitted separately.

151 153

001 001

NSC Containment (Security Services) JV Provision of Toilets at Levels 53 to 63

DXB/AMT-01/0500/JLy/3252 DXB/AMT-01/0500/JLy/3276

28-Nov-07 03-Dec-07

ur (valued in 163)

ur 0

ur

ur CLOSED
0.00

0.00 0.00

ETA to submit entitlements valued in another claim

(valued in 163)

CLOSED

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List.monvabad

13 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
154 155 156 157

October 15, 2013


REMARKS / COMMENTS

SUB NO.
001 001 001 001

ERI NO.

V.O. TO
JV

CLAIM NOTICE LETTER

CLAIM ENTITLEMENT APPLICATION DATE COST (AED) 1,600.56 ur 0.00 (valued in 163)
TIME (Days)
ur ur 0 0

ER / F&G / JV AGREED VALUES COST (AED)


TIME (Days)

OUTSTANDING CLAIMS COST (AED)


1,600.56 ur

CERTIFIED AS AT CERTIFIED TO-DATE

DESCRIPTION
REFERENCE
DXB/AMT-01/0600/EDM/3313 DXB/AMT-01/0600/EDM/3314 DXB/AMT-01/0500/JLy/3359 DXB/AMT-01/0100/YOS/3365 11-Dec-07 11-Dec-07 17-Dec-07 22-Dec-07

November 30, 2008


BALANCE TO-DATE
1,600.56 0.00 0.00 0.00
ETA to submit entitlements rejected by Nakheel as the proposed revisions was not done and was reverted back to original Aedas Specs valued in another claim

LETTER REF.

TIME (Days)
ur ur CLOSED CLOSED

Enclosure to the Irrigation Pipes running through the LV Room 2 (RFI No. 894) NSC Second Floor Revised Lighting and Power Design NSC Lift L4 Mock-Up (Car Interior Finish @ Ground Floor Level) JV Request for Issue of Outstanding Drawings (DMCC Offices at L49-L51 & Add'l Toilets in Office Area at L52-L64) JV Special Holiday on 14th January 2008 Notice of Excessive Rains Additional Architraves to Towel Dispensers Notification of a Possible Variation at Ballroom Electrical Cabinet Doors NSC Further Revisions to the Levels 49, 50, 51, 60 and 61 in accordance with DMCC Transmittal Ref. JAP016/TRNS/JV/ 00032 dated 22nd January 2008 (MEP Works) JV Notification of Disruption of Work due to discrepancy of Design Drawings at Second Floor JV JV JV JV Delays due to Strong Winds

0.00 (valued in 163)

0 0

JAP016/TS/GT/0142 dated 31Jan-08

CLOSED CLOSED

159 160 161 162 163

001 001 001 001 005

DXB/AMT-01/0600/EDM/3482 DXB/AMT-01/0600/EDM/3483 DXB/AMT-01/0600/EDM/3492 DXB/AMT-01/1100/WAE/3542 DXB/AMT-01/0600/EDM/3770

16-Jan-08 16-Jan-08 19-Jan-08 24-Jan-08 03-Mar-08

0.00 0.00 96,768.00 0.00 ur

ur ur 0 ur

0.00 0.00 0.00

JAP016/TS/GT/0259 dated 29May-08

CLOSED CLOSED 96,768.00

CLOSED ur CLOSED ur

0.00 0.00 96,768.00 0.00 0.00

to be considered in the EOT claim under review for time entitlements submitted thru3701 dtd 20-Feb-08 under review. ETA to submit entitlements

JAP016/TS/GT/0186 dated 27Mar-08

CLOSED ur

165

001

DXB/AMT-01/1100/WAE/3603

04-Feb-08

(valued in 149-001)

ur

(valued in 149-001)

CLOSED

ur

0.00

0.00

time claim.

167 168 171 172 175

001 001 001 001 001

DXB/AMT-01/0500/JLy/3613 DXB/AMT-01/0500/JLy/3623 DXB/AMT-01/0500/JLy/3634 DXB/AMT-01/0600/EDM/3676 DXB/AMT-01/0600/EDM/3771

05-Feb-08 06-Feb-08 09-Feb-08 17-Feb-08 03-Mar-08

0.00 0.00 ur 0.00 ur

0 0 ur 0 ur

0.00 0.00 0.00

0 0 0

JAP016/TS/GT/0152 dated 18Feb-08

CLOSED CLOSED ur

CLOSED CLOSED ur CLOSED ur

0.00
0.00

0.00 0.00 0.00 0.00 0.00

rejected by Nakheel To be included in the Prolongation Claims EVS to submit entitlements considered Nil due to the increase in the rates for GL07 as per letter ref. ETA to submit entitlements (Builders to be in another submittal)

JV Inspections not done on Timely Basis NSC Sequencing of Spire Erection JV Abortive Cost for GL-07 (ID Works Package) NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00033 dated 5th February 2008 (MEP Works) JV TECOM/DU Comments on Telephone Rooms Raised Access Floor Material Submittal NSC DU Requirements NSC TECOM/DU Comments on Structured Cabling Material Submittal NSC TECOM/DU Comments - " Active " IDF Rooms JV Diamond Exchange Details NSC Increase in Water Tank Size NSC Ducting in MDF Rooms NSC Additional Low Leakage Motorized Smoke Damper NSC Height of Services at Level-49 on Shaft-6 NSC Additional Stone Cladding to Sides of Maintenance Stairs NSC Additional Work to Make-up Levels at Main Entrance JV NSC NSC NSC NSC NSC NSC JV Design Change to External Ramps - Block Stopper Upstand (CVI No. 086) Design Change to External Ramps - Waterproofing (CVI No. 086) Sprinkler Heads in Illuminated Ceiling (RFI No. 967 Rev. 0) Additional Work to the Ball Room Parapet (CVI No. 084) Additional Work to Lightweight Concrete to Pedestrian Path (RFI No. 976) Additional Work to External Wall Finishing at Swimming Pool (RFI No. 920) Additional Work to Concrete Under Maintenance Path Tiles (RFI No. 929) Additional Aluminum Angles at RAF Termination

JAP016/TS/GT/0228 dated 13May-08

CLOSED ur

176 176 176 176 177 180 181 182 183 184 185 187 187 188 189 190 191 192 193 194 194 195 198

001 002 003 004 001 001 001 001 001 001 001 001 002 001 001 001 001 001 001 001 002 001 001

DXB/AMT-01/0500/JLy/3814 DXB/AMT-01/0500/JLy/3568 DXB/AMT-01/1200/JIN/3827 DXB/AMT-01/0600/DAN/3923 DXB/AMT-01/0500/JLy/3844 DXB/AMT-01/1200/RAN/3903 DXB/AMT-01/1200/RAN/3906 DXB/AMT-01/1200/RAN/3915 DXB/AMT-01/1200/RAN/3932 DXB/AMT-01/1100/WAE/3936 DXB/AMT-01/1100/WAE/3937 DXB/AMT-01/1100/WAE/3971 DXB/AMT-01/1100/WAE/3971 DXB/AMT-01/1200/RAN/3974 DXB/AMT-01/1100/WAE/3975 DXB/AMT-01/1100/WAE/3976 DXB/AMT-01/1100/WAE/3979 DXB/AMT-01/1100/WAE/3980 DXB/AMT-01/0600/EDM/4026 DXB/AMT-01/0600/EDM/4041 DXB/AMT-01/0600/EDM/4041 DXB/AMT-01/0600/EDM/4042 DXB/AMT-01/0600/EDM/4079

10-Mar-08 28-Jan-08 13-Mar-08 31-Mar-08 16-Mar-08 27-Mar-08 27-Mar-08 29-Mar-08 02-Apr-08 03-Apr-08 03-Apr-08 09-Apr-08 09-Apr-08 10-Apr-08 10-Apr-08 10-Apr-08 13-Apr-08 13-Apr-08 19-Apr-08 21-Apr-08 21-Apr-08 21-Apr-08 26-Apr-08

(valued in 196) (valued in 196) (valued in 196) (valued in 196) (valued in 149-001) 71,922.15 ur 1,308,459.65 36,435.37 ur ur 108,691.73 86,593.30 ur (valued in 107-007) 0.00 ur ur 0.00 190,661.95 82,800.00 ur ur

ur ur ur ur ur ur ur ur ur ur ur ur ur ur 0 0 ur ur 0 0 0 ur ur

(valued in 196) (valued in 196) (valued in 196) (valued in 196) (valued in 149-001)

0 0 0 0

CLOSED CLOSED CLOSED CLOSED CLOSED 71,922.15 ur 1,308,459.65 36,435.37 ur ur 108,691.73 86,593.30 ur

CLOSED CLOSED CLOSED CLOSED ur ur ur ur ur ur ur ur ur ur CLOSED CLOSED ur ur CLOSED CLOSED CLOSED ur ur 0.00 0.00 0.00
0.00

0.00 0.00 0.00 0.00 0.00 71,922.15 0.00 1,308,459.65 36,435.37 0.00 0.00 108,691.73 86,593.30 0.00 0.00 0.00 0.00 0.00 0.00 190,661.95 82,800.00 0.00 0.00

Lateral Systems to submit (Builders to be in another submittal) ETA to submit entitlements (Builders to be in another submittal) BC to submit entitlements (Builders Works if any to be in another submittal) ETA to submit entitlements valued in 149-001 under ERI No. 62 ETA Claim = AED 62,541.00, +JV's 12%(OH&P) and 3% (Attend) ETA to submit entitlements ETA Claim = AED 1,137,791.00, + JV's 12% (OH&P) and 3% (Attend) ETA Claim = AED 31,682.93, + JV's 12% (OH&P) and 3% (Attend) Al Bayader to submit entitlements Al Bayader to submit entitlements JV's portion of the works AB cost + 12% OH&P + 3%Attend ETA to submit entitlements Al Bayader to submit entitlements Al Bayader to submit entitlements; claim notice rejected Al Bayader to submit entitlements Al Bayader to submit entitlements under review (done by Dubai Metals); rejected by Nakheel as it is part of MDS scope of works ETA to submit entitlements JV thru Sibca to submit entitlements ETA to submit entitlements (Builders Works if any to be in another submittal) EVS to submit entitlements

(valued in 107-007)

0 0
JAP016/TS/GT/0204 dated 14Apr-08

CLOSED CLOSED ur ur

0.00

0.00

0 0 0

JAP016/TS/GT/0233 dated 15mAY-08

CLOSED 190,661.95 82,800.00 ur ur

NSC Temporary Fire Alarm Systems (Installation) JV Temporary Fire Alarm Systems (Material / Testing and Commissioning) NSC Mechanical Services at Tecom Room in Level 50 NSC Change of Applied Cementitious Fireproofing to Intumescent Paint on Steel Beams at Diamond Exchange Center NSC Design Change of Core Bulk Head at Ground Floor Escalator Lobby - MEP Rectification Works for the ID Works Package (CVI No. 088) NSC Additional Extract Ducts in Basement 1 Male and Female Toilet , and VIP Toilet NSC Carpets at Level 48 NSC Fire Protection Systems at Basement 2 Security Room - Supply of Additional Wall Mounted Dry Powder and CO2 Fire Extinguishers NSC Fire Protection Systems at Basement 2 Security Room - Removal of Existing Fire Fighting Systems and Installation of ETA Supplied Fire Fighting Equipment JV Closure of the Opening in Parapet Wall on Elevation 4 for Spire Connection NSC Back Boxes for Seismic Detectors at Basement 5 and Level 2 Vault Rooms NSC BMS Monitor for the Revolving / Sliding Doors NSC Additional Screed at Road Type 2 and Ramps NSC Additional Requirements for Etisalat Room in Basement 1 (MEP Works) JV Additional Requirements for Etisalat Room in Basement 1 (Door Amendments) JV False Ceiling at Basement 5 Vault Lobby and Services Room (RFI No. 511) NSC Fire Sprinkler above False Ceiling at Basement 5 Vault Lobby & Services Room (RFI No. 511) NSC Vapour Barrier underneath all Parapet Composite Cladding of the 6 Wings and Diamond Exchange Centre JV Modification to Louvers and Additional Aluminum Doors at Various Areas NSC Additional 6" diam. Line from B5 Pump Room to S2 Level Fire Tank JV Temporary Wet Riser Systems (Supply and Delivery of Fire Pumps and Accessories) NSC Temporary Wet Riser Systems (Installation, Testing & Commissioning, and Decomissioning) NSC Paving and Landscaping Works at Ramps (originally under Wade Adams Scope) NSC Planter Area at Level 2 - Change of 500mm thick Sweet Soil to Polysterene JV Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) JV scope of works NSC Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) MEP Scope of Works NSC Extended Warranty due to the Usage of Jet Fans at Basement Levels as per the EHS Improvement Notice NSC Additional Works at Entrance Ramps - Type 3 & 5 JV NSC NSC NSC Signage at the Entrance of VIP Carpark in Basement 1 Entrance Canopy Panel - Down Light (T-39) and Camera Layout (CVI No. 126) Motorized dampers at B2L Security Room (RFI No. 1076 Rev. 0 & 1) Additional Voice/Data Points at Level 48 as per revised "For Construction" drawings under the F&G transmittal ref. F+G/ALMAS/TAISEI/01460 (Sky Lobby Bulding Services Cat II Works) Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00002 dated 10th July 2007 (Additional Voice / Data Points)

199

001

DXB/AMT-01/0600/EDM/4080

27-Apr-08

27,548.25

ur

27,548.25

ur

27,548.25

ETA Claim = AED 23,955.00 + 12%JVOH&P + 3% Attendances

200 206 209

001 001 001

DXB/AMT-01/0600/EDM/4083 DXB/AMT-01/0600/EDM/4318 DXB/AMT-01/0600/EDM/4341

27-Apr-08 31-May-08 03-Jun-08

42,963.29 ur ur

ur ur ur

42,963.29 ur ur

ur ur ur

42,963.29 0.00 0.00

ETA Cost + 12%OH&P + 3% Attendances Bond Interiors to submit entitlements ETA to submit entitlements; Nakheel letter ref. JAP016/TS/GT/0285 dtd 23Jun08 reject the claim and no ERI's shall be issued JCI to submit entitlements

209

002

DXB/AMT-01/0600/EDM/4341

03-Jun-08

ur

ur

ur

ur

0.00

210 212 213 216 218 218 219 219 220

001 001 001 001 001 002 001 002 001

DXB/AMT-01/0600/EDM/4348 DXB/AMT-01/1200/RAN/4391 DXB/AMT-01/0600/MIC/4449 DXB/AMT-01/0600/EDM/4506 DXB/AMT-01/0600/EDM/4525 DXB/AMT-01/0600/EDM/4525 DXB/AMT-01/0600/EDM/4527 DXB/AMT-01/0600/EDM/4527 DXB/AMT-01/0600/EDM/4556

04-Jun-08 12-Jun-08 22-Jun-08 05-Jul-08 08-Jul-08 08-Jul-08 08-Jul-08 08-Jul-08 12-Jul-08

11,682.47 ur 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 ur ur

ur ur ur ur ur ur ur ur ur

11,682.47 ur 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 ur ur

ur ur ur ur ur ur ur ur ur

11,682.47 0.00 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 0.00 0.00

Intherpro Cost + 12% OH&P + 3% attendances ETA to submit entitlements ETA cost + 12% OH&P + 3% Attendances Al Bayader cost + 12% OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Belgium Alkuminum cost + 12% OH&P +3 % Attend FBI + EVS cost + 12% OH&P + 3% Attend ETA to submit entitlements Al Abbar to submit entitlements

221 222 223 223 224 225 226

001R1 001 001 002 001 001 001

DXB/AMT-01/0600/EDM/4558 DXB/AMT-01/0600/MIC/4577 DXB/AMT-01/0600/DAN/4592 DXB/AMT-01/0600/DAN/4592 DXB/AMT-01/0600/EDM/4598 DXB/AMT-0//0600/EDM/4627 DXB/AMT-0//0600/EDM/4633

12-Jul-08 15-Jul-08 17-Jul-08 17-Jul-08 20-Jul-08 23-Jul-08 24-Jul-08

32,364.90 404,090.45 447,120.00 1,625,886.10 305,837.13 25,300.00 35,000.25

ur ur ur ur ur ur ur

32,364.90 404,090.45

ur ur CLOSED CLOSED ur ur ur

32,364.90 404,090.45 0.00 0.00 305,837.13 25,300.00 35,000.25

cost from domestic subcons + 12%OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Naffco Costs +12% OH&P + 3% Attendances; not a new regulation as per the review of Jly ETA Cost + 12% OH&P + 3% Attendances; not a new regulation as per the review of Jly Al Bayader cost + 12% OH&P + 3% Attendances AB cost + 12% OH&P + 3%Attend JV Internal Works

0.00 0.00

0 0

JAP016/TS/GT/0324 dated 28Aug-08 JAP016/TS/GT/0324 dated 28Aug-08

CLOSED CLOSED 305,837.13 25,300.00 35,000.25

226

002

DXB/AMT-0//0600/EDM/4633

24-Jul-08

110,641.50

ur

110,641.50

ur

110,641.50

ETA cost + 12% OH&P + 3% Attendances

227

001

DXB/AMT-0//0600/EDM/4659

29-Jul-08

0.00

0.00

JAP016/TS/BW/0352 dated 15Oct-08

CLOSED

CLOSED

0.00

0.00

this cost to be by JV as per the Gen. Specs Section A, Item 1.03.d & 1.05

229 230 232 235 236

001 001 001 001 001

DXB/AMT-0//0600/EDM/4678 DXB/AMT-0//0600/EDM/4735 DXB/AMT-0//0600/EDM/4864 DXB/AMT-01/0600/EDM/4966 DXB/AMT-01/0500/JLy/5000

05-Aug-08 17-Aug-08 21-Sep-08 16-Oct-08 25-Oct-08

16,654.95 7,797.46 0.00 0.00 18,364.91

ur ur 0 0 ur

16,654.95 7,797.46

ur ur CLOSED CLOSED ur 0.00 0.00

16,654.95 7,797.46 0.00 0.00 18,364.91

Al Bayader cost + 12% OH&P + 3% Attendances under ID Works Al Abbar to submit entitlements; rejected by Nakheel as the works is deemed included in Al Abbar scope ETA to submit full entitlements; rejected by M/s. Nakheel BC Cost + 7% OH&P; BC VO#6; BC time claim = 165 days

0.00 0.00

0 0

JAP016/TS/BW/0350 dated 14Oct-08 JAP016/TS/BW/0354 dated 9Nov-08

CLOSED CLOSED 18,364.91

237

001

NSC

DXB/AMT-01/0500/JLy/5010

26-Oct-08

34,599.52

ur

34,599.52

ur

34,599.52

BC Cost + 7% OH&P; BC VO#7; BC time claim = 201 days

239

001

NSC Additional Power Supply Lines for External Water Features, Irrigation Pumps, and Swimming Pool NSC Trimming of Cantilever Beams at the Diamond Exchange Center as per the RFI No. 1085 NSC Modification of Soffit Cladding for the Swimming Pool to Conceal Service Pipings as per the RFI No. 1054

DXB/AMT-0/0600/MIC/5081

15-Nov-08

141,276.06

ur

141,276.06

ur

141,276.06

ETA cost + 12% OH&P + 3% Attendances

240 241

001 001

DXB/AMT-01/0600/EDM/5130 DXB/AMT-01/0600/EDM/5131

24-Nov-08 24-Nov-08

ur ur

ur ur

ur ur

ur ur

0.00 0.00

note that the structural works was based on the structural drawings provided to EVS; EVS to submit entitlements AA to submit entitlements

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List.monvabad

14 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
242 243 244

October 15, 2013


REMARKS / COMMENTS

SUB NO.
001 001 001

ERI NO.

V.O. TO

CLAIM NOTICE LETTER

CLAIM ENTITLEMENT APPLICATION DATE COST (AED) 340,314.96 13,460.75 1,732.06


TIME (Days)
ur ur ur

ER / F&G / JV AGREED VALUES COST (AED)


TIME (Days)

OUTSTANDING CLAIMS COST (AED)


340,314.96 13,460.75 1,732.06

CERTIFIED AS AT CERTIFIED TO-DATE

DESCRIPTION
REFERENCE
DXB/AMT-01/0600/MIC/5158 DXB/AMT-01/0600/EDM/5189 DXB/AMT-01/0500/Jly/5252 01-Dec-08 13-Dec-08 24-Dec-08

November 30, 2008


BALANCE TO-DATE
340,314.96 13,460.75 1,732.06
ETA cost + 12% OH&P + 3% Att ETA cost + 12% OH&P + 3% Attendances Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22-Dec-08 as per the email request of Mr. Clarence Pinto of DMCC dated 4Jan-09 as per the EHS requirements adjustment to the Contract Sums due to the PC Materials final rates

LETTER REF.

TIME (Days)
ur ur ur

NSC Structural Steel Support for Fans at Air Shaft NSC HVAC Systems at Basement 1 Control Room and Lobby as per RFI No. 1087 JV Additional Door Closer and Selector at Basement 1 Management Office JV JV JV Coring for the Tenant Fit-Out Contractors Additional Access Ladder at Penstock Chamber in Basement 4 PC Supply Rates

245 246 OM-10

001 001 001

DXB/AMT-01/0500/Jly/5278 DXB/AMT-01/0600/MIC/5287 DXB/AMT-01/0600/DAN/5092

04-Jan-09 05-Jan-09 16-Nov-08

ur ur (21,806.96)

ur ur 0

ur ur (21,806.96)

ur ur 0.00

0.00 0.00

143,470,485.44 TOTAL FOR CLAIMED/NOTIFIED VARIATIONS (WITHOUT ERI)


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0.00

141,419,286.30
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ` 0.00 0.00 0.00 0.00 0.00 0.00 0.00

00-Jan-00

0.00 0.00 0.00 0.00

00-Jan-00

0.00 0.00 0.00 0.00

00-Jan-00

0.00 0.00 0.00 0.00 0.00

0 0

0 0

0 0

0 0

0 0

00-Jan-00

0.00 0.00 0.00

00-Jan-00

GRAND TOTAL
NOTE :

247,794,249.81

581

118,692,853.45

199,754,280.16

581

60,740,469.59

184,976,580.08

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List.monvabad

15 - 53

DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO. SUB NO. ERI NO. V.O. TO
CLAIM NOTICE LETTER

October 15, 2013


REMARKS / COMMENTS

DESCRIPTION
REFERENCE Potential Claim due to Late Design Changes Stainless Steel Door Frames L49-L64 Inclusive Additional Ironmongeries to Timber Door (DT-02) at Levels 49 upwards
DXB/AMT-01/1100/WAE/3632 DXB/AMT-01/0500/JLy/3845

DATE
09-Feb-07 16-Mar-08

CLAIM ENTITLEMENT APPLICATION COST TIME (Days) (AED) 100,121.32 0.00


see NOC#127 see NOC#127

ER / F&G / JV AGREED VALUES COST (AED)


TIME (Days)
see NOC#127

OUTSTANDING CLAIMS COST (AED)


100,121.32 CLOSED

LETTER REF.

TIME (Days)
CLOSED CLOSED

%
100% 0%

WORK DONE TO-DATE VALUE (AED)


100,121.32 0.00

BALANCE OF WORK TO-DATE VALUE % (AED)


0% 0% 0.00 0.00

CERTIFIED AS AT CERTIFIED TO-DATE

November 30, 2008


BALANCE TO-DATE
100,121.32 0.00
to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08 under review (haroon & alpha star); to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08; no changes made in the Ironmongeries as there was no formal instruction Al Abbar cost + 12% OH&P + 3% Attendances

170 170

001 002

16 16

JV JV

0.00

see NOC#127

122

001

16.1

77 76 78 78

001 001 001R1 002

17 34 35 35

NSC ID Finishes for the Steel Columns at Ground Floor Entrance Lobby, 1st Floor Food Court and Retail Mall NSC DVR Storage Units as per Option III NSC Rainwater and Irrigation Waste Water Discharge from Planters JV Function Room / Ball Room Facility (Structural Works) JV Function Room / Ball Room Facility (Fireproofing Works) Modifications to Function Room / Ball Room Facility (Structural Works) JV Modifications to Function Room / Ball Room Facility (Fireproofing Works) NSC Function Room / Ball Room Domestic Water Drawings NSC Mechanical Works for the Function Room / Ballroom JV NSC Security Works for the Function Room / Ballroom Revised Interior Lighting Fixtures Layout at Ballroom GF, Washroom GF, and Ballroom 2L NSC Ballroom/Function Room - Cladding to the Structural Steel Beams JV Modification to Lift Opening at 36th and 48th Floor JV JV JV JV JV Revised Drawing for Lift Machine Room on 3rd Service Floor Revised Drawing for Interior Design Works Changes of Levels to Room Nos. B1-073 (Corridor) and B1-074 (Mechanical Plant Room) Additional Wall in Security Room at Basement 2

DXB/AMT-01/0600/EDM/2954 /DXB/AMT-01/0600/EDM/3305 DXB/AMT-01/0500/JLy/1891 DXB/AMT-01/0500/JLy/1890 DXB/AMT-01/0600/EDM/2385/ DXB/AMT-01/0600/EDM/3608 DXB/AMT-01/0600/EDM/2385/ DXB/AMT-01/0600/EDM/3608 DXB/AMT-01/0500/JLy/3863 DXB/AMT-01/0500/JLy/3863 DXB/AMT-01/0600/EDM/2310 DXB/AMT-01/0600/EDM/2472 DXB/AMT-01/0600/EDM/2474 DXB/AMT-01/0600/EDM/2554 DXB/AMT-01/0600/EDM/3847 DXB/AMT-01/0600/EDM/2311 DXB/AMT-01/0600/EDM/2312 DXB/AMT-01/0600/EDM/2313 DXB/AMT-01/0600/EDM/2111 DXB/AMT-01/0600/EDM/2540 DXB/AMT-01/0600/EDM/3134 DXB/AMT-01/0600/EDM/2438

01-Oct-07/ 10-Dec-07 27-Mar-07 25-Mar-07 23-Jun-07/ 4-Feb-08 23-Jun-07/ 4-Feb-08 18-Mar-08 18-Mar-08 09-Jun-07 07-Jul-07 07-Jul-07 18-Jul-07 16-Mar-08 09-Jun-07 09-Jun-07 09-Jun-07 02-May-07 17-Jul-07 08-Nov-07 30-Jun-07

72,174.00

ur

72,174.00

ur

0.00

100%

72,174.00

72,174.00

2,430,700.00 1,402,455.42 2,183,160.00 196,416.80 204,700.00 12,416.32 (valued in 107-003) (valued in 107-003) ur (valued in 107-001) ur (valued in OM8-001) 1,771.88 (valued in Series 41) 7,275.43 26,634.44 172,273.32 ur

ur ur see NOC#127 see NOC#127 see NOC#127 see NOC#127 see NOC#127 0 ur 0 ur ur ur 0 0 see NOC#127 ur ur

2,430,700.00 1,402,455.42

ur ur CLOSED CLOSED

100% 0% 100% 100%

2,430,700.00 0.00 2,087,955.12 191,292.64

0% 100% 0% 0%

0.00 1,402,455.42 0.00 0.00 2,087,955.12 191,292.64

2,430,700.00 1,402,455.42 0.00 0.00

JCI costs + 7% JV OH&P ETA costs + 7% JV OH&P; uilders works not yet included to be submitted under 76-002 EVS Cost + 12% OH&P but less works deemed included in the NSC Thermofire Cost AED 170,797.22 + 12% OH&P; confirmed to be valued in ERI 35 under the Nakheel letter ref. JAP016/TS/GT/0244 dtd 27May08 EVS Cost + 12% OH&P + 3% attendances Thermofire Cost + 12% OH&P + 3% attendances Valued in 107-003 ETA to submit entitlements ETA to submit entitlements TO BE VALUED IN CLAIM NO. 107-001 (ERI 35.1) AA to submit entitlements under omission. Subcon Cost + 12% OH&P considered in Claim Series 41 / ERI No. 16 Light weight Concrete and chipping works architectural works only. ETA costs + 7% JV OH&P ETA to submit entitlements

2,087,955.12 191,292.64

JAP016/ALM/TCAC/18101 see NOC#127 dated 18-May-08 JAP016/ALM/TCAC/22536 see NOC#127 dated 23-Nov-08

CLOSED CLOSED

78 78 85 99 100 106 178 86 87 88 81 103 139 97

003 004 001 001 001 001 001 001 001 001 001 001R1 001 001

35 35 35.1 35.1 35.1 35.1 35.3 38 41 42 43 44 44.1 45.1

see NOC#127 see NOC#127

204,700.00 12,416.32 CLOSED CLOSED ur

CLOSED CLOSED CLOSED CLOSED ur CLOSED ur CLOSED CLOSED CLOSED CLOSED CLOSED ur ur

100%

204,700.00 0.00

0% 100% 0% 0% ur 0% ur 0% 0% 0% 0% 0% 57% ur

0.00 12,416.32 0.00 0.00 ur 0.00 ur 0.00 0.00 0.00 0.00 0.00 97,373.32 ur

179,424.00

25,276.00 12,416.32

(valued in 107-003) (valued in 107-003)

see NOC#127 0

0% 0%

0.00 0.00 ur

0.00 0.00

0.00 0.00 0.00

(valued in 107-001)

JAP016/ALM/TCAC/10523 dated 22-July-2007

CLOSED ur

0%

0.00 ur

0.00

0.00 0.00

(valued in OM8-001)

0 0 0 0
JAP016/ALM/TCAC/21270 dated 29-Sep-08 JAP016/ALM/TCAC/21082 dated 21-Sep-08

CLOSED CLOSED CLOSED CLOSED CLOSED 172,273.32 ur

0% 100% 0% 100% 100% 43%

0.00 1,587.60 0.00 6,205.97 25,999.57 74,900.00 ur

0.00 1,587.60
0.00

0.00 0.00 0.00 0.00 0.00 97,373.32 0.00

1,587.60
(valued in Series 41)

6,205.97 25,999.57

6,205.97 25,999.57 74,900.00

JAP016/ALM/TCAC/17848 see NOC#127 dated 8-May-2008

84

001

46

NSC Basement 2 Security Room - Revised Drawings for the Ventilation and Lighting Details NSC Various Changes due to the revised MEP "For Construction" Drawings due to Modification at Level 30 NSC Revision to the Lighting Layout at GF, L1, & L2

DXB/AMT-01/0600/EDM/2309

09-Jun-07

ur

ur

ur

ur

ur

ur

ur

0.00

ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No. 105; to be valued under ERI16 ref. JAP016/ALM/TCAC/09512 dtd 12Jun07 ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No.107 actual cost transmitted to F&G based on dayworks rates; agreed with F&G ETA cost + 7% OH&P valued under the omissions under review; to be under ERI #49 as per Nakheel letter ref. JAP016/TS/GT/0205 dated 15-Apr-08; SC cost +12%OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances

102 104 82 89 186

001 001 001 001 001R1

46 47 48 49 49

NSC Lighting Requirements to the Function Room / Ballroom JV Additional 40 Container Storage, Office Chairs, and Computer for F+G Office NSC Telephone IDF/MDF Room Drawings JV JV Modification to the Structural Drawings at Levels 49, 50, and 51 Notification of Entittlements (CVI-089) - Doors to new washrooms at L49 and L50 (Lift Lobby Area)

DXB/AMT-01/0600/EDM/2499 DXB/AMT-01/0600/EDM/2551 DXB/AMT-01/0600/EDM/2222 DXB/AMT-01/0600/EDM/2315 DXB/AMT-01/1100/WAE/3965

10-Jul-07 18-Jul-07 27-May-07 09-Jun-07 08-Apr-08

ur 40,174.50 34,309.10 (valued in OM9-001) 58,651.66

ur 0 ur 0 ur

ur

ur CLOSED CLOSED CLOSED ur 100% 100% 0% 100%

ur 40,074.53 13,517.00 0.00 58,651.66

ur 0% 0% 0% 0%

ur 0.00 0.00 0.00 0.00 40,074.53 10,951.45


0.00

0.00 0.00 2,565.55 0.00 58,651.66

40,074.53 13,517.00 (valued in OM9-001)

0 0 0

JAP016/ALM/TCAC/11909 dated 9-Sept-2007 JAP016/ALM/TCAC/21322 dated 5-Oct-08

CLOSED CLOSED CLOSED 58,651.66

92

001

49.2

109 94 95

001 001R2 001

50 51 52

NSC Various Revisions due to the revised For Construction Drawings (MEP Works) at Levels 49, 50, & 51 NSC Amendment to District Cooling Piping and Control Works (Heat Echangers and Strainers) JV Changes to Suspended Ceiling (ID Works Package) NSC Variation Works due to Lift and Escalator Finishes (Direct Variation to the Nominated S/C Works) NSC Variation Works due to Lift and Escalator Finishes (Adjustment to the Provisional Sums) NSC Changes of Wallpaper in Typical Floor Corridors JV Changes to Mock-up Areas (ID Works) JV JV Change of Pressurization Duct Opening at 51st Floor Lift Lobby Additional Aluminum Flashing

DXB/AMT-01/0600/EDM/2375

21-Jun-07

218,960.00

ur

218,960.00

ur

100%

218,960.00

0%

0.00

20,544.00

198,416.00

DXB/AMT-01/0600/EDM/2655 DXB/AMT-01/0600/EDM/2432 / DXB/AMT-01/0500/JLy/3369 DXB/AMT-01/0600/EDM/2433

05-Aug-07 30-Jun-07 / 22-Dec-07 30-Jun-07

597,081.20 85,383.20 653,624.24

ur see NOC#127 0

597,081.20

ur CLOSED CLOSED

66% 100% 89%

393,521.39 85,383.20 579,717.22

34% 0% 11%

203,559.81 0.00 73,907.02

393,521.39 85,383.20 579,717.22

203,559.81 0.00 73,907.02

ETA to submit entitlements subcon costs plus 12% (revised cost from 182,960.40 due to the meeting between FBI and DMCC) KONE costs + 7% JV OH&P

85,383.20 653,624.24

JAP016/ALM/TCAC/21731 see NOC#127 dated 21-Oct-08

CLOSED CLOSED

JAP016/ALM/TCAC/17360 dated 20-Apr-08

95

002

52

DXB/AMT-01/0600/EDM/2433

30-Jun-07

544,678.47

544,678.47

JAP016/TS/GT/0083 dated 9Aug-2007

CLOSED

CLOSED

70%

381,274.93

30%

163,403.54

381,274.93

163,403.54

KONE costs + 7% JV OH&P; NOTE : Not considered as a variation by Consultant but adjsutment to the KONE Provisional Sums from AED500K to 1,009,045.30, and agreed amount s the nett costs. BI to submit entitlements Bond Interiors cost + 12% JV Mark-up + 7% OH&P (Prov. Sums) agreed withConsultants (F&G) Subcon Cost + 12%OH&P + 3% Attendances ETA costs + 12% OH&P + 3% Attendances bulkheads only under review by JV and JCI. Excl Acry Costs = AED 138,937 + 12% JV OH&P

114 93 115 116 112 80 134 136

001 001 001 001R1 001 001R1 001 001

53 54 55 57 58 59 60 61

DXB/AMT-01/0600/EDM/2802 DXB/AMT-01/0600/EDM/2400 DXB/AMT-01/0600/EDM/2804 DXB/AMT-01/0600/EDM/2803 DXB/AMT-01/0600/EDM/2763 DXB/AMT-01/0500/JLy/2098 DXB/AMT-01/0600/EDM/3069 DXB/AMT-01/0600/EDM/3081

01-Sep-07 24-Jun-07 02-Sep-07 01-Sep-07 25-Aug-07 30-Apr-07 27-Oct-07 29-Oct-07

ur 612,662.92 4,044.20 764,729.70 506,665.14 1,706.32 (valued in OM6-001) 155,609.44

ur see NOC#127 0 ur ur ur 0 see NOC#127 see NOC#127 see NOC#127

ur 612,662.92
JAP016/ALM/TCAC/20893 dated 11-Sep-08

ur CLOSED CLOSED ur ur ur CLOSED CLOSED 0% 100% 100% 100% 60% 0%

ur 612,662.92 3,315.73 458,837.82 0.00 0.00 0.00 155,609.44

ur 0% 0% 40% 100% 100% 0% 0%

ur 0.00 0.00 305,891.88 506,665.14 1,706.32 0.00 0.00

(50,825.00) 400,000.00 3,315.73

0.00 212,662.92 0.00 764,729.70 506,665.14

3,315.73

CLOSED 764,729.70 506,665.14 1,706.32

NSC Changes in the LV Schematic Diagram JV False Beam/Bulk Head JV Omission of Proximity Access Card Reader and Access Cards at Basement 1 Boom-Gate JV Diamond Feature

1,706.32
0.00

0.00 0.00 0.00

(valued in OM6-001)

0
JAP016/TS/GT/0227 dated 13see NOC#127- May-2008 001 agreed values is partial and see NOC#127 deemed to change

CLOSED CLOSED

155,609.44

155,609.44

149

001

62

JV

Revised "For Construction" ID Drawings at the Second Level and Diamond Exchange Centre

DXB/AMT-01/1100/WAE/3232

25-Nov-07

6,574,957.21

3,431,895.90

CLOSED

0.00

100%

6,574,957.21

0.00

progressively, as it is based on the agreed rates only (+12%)

updated cost and rates approval summary status being sent regularly; cost submitted is the final applied claim ETA cost + 7% OH&P + 2% Attendances JCI cost AED 566,137.00 + 7%JV OH&P + 2%Attend; based on transmittal ./00017 dtd 1-Nov-07 (drwg. No. 4494/Y/009 Rev.3) ETA part = AED 50,475.00

149 149 126 110 163 163

002 003a 001 001R1 002 003

62.1 62.1 64 65 66 67

NSC Revisions to Diamond Exchange Centre (MEP and Interior Lighting) NSC Revisions to Diamond Exchange Centre (CCTV and Access Control) NSC Modification of Male Washroom at 36th Floor - RFI 767 (Rev. 0,1&2) NSC Furniture / Console at Basement 2 Security Room NSC Provision of Toilets at upper floors, Levels 49,50,51, and 62 (MEP Works) JV Provision of Toilets at upper floors, Levels 52,53,54, and 59 (Civil and Architectural Works, and Abortive Works, if any) NSC Provision of Toilets at upper floors, Levels 52,53,54, and 59 (MEP Works) NSC Missing Purlins at Connecting Corridor Between Tower and Diamond Exchange Center (RFI No. 839) JV JV Additional Staff Facilities - Project Manager's Staff (F+G) Modifications to Typical Female Bathroom Ceiling Mirrors Additional Telephone Lines

DXB/AMT-01/0600/EDM/3473 DXB/AMT-01/0600/EDM/3473 DXB/AMT-01/0600/EDM/3014 /DXB/AMT-01/0600/EDM/3306 DXB/AMT-01/0600/EDM/2693 DXB/AMT-01/0600/EDM/4113 DXB/AMT-01/0600/EDM/3588 DXB/AMT-01/0600/EDM/3588

13-Jan-08 13-Jan-08 14-Oct-07 /10-Dec-07 12-Aug-07 3-May-08 02-Feb-08 02-Feb-08

2,679,840.21 617,089.33 56,553.22 29,808.00 470,109.65 90,502.31

ur ur ur

2,679,840.21 617,089.33 56,553.22

ur ur ur 23%

0.00 0.00 12,896.26

100% 100% 77%

2,679,840.21 617,089.33 43,656.96

460,956.00

2,218,884.21 617,089.33

12,896.26

43,656.96

0 ur ur

29,030.40

JAP016/ALM/TCAC/21105 dated 22-Sep-08

CLOSED 470,109.65

CLOSED ur ur

100% 25% 100%

29,030.40 119,840.00 63,163.87

0% 75% 0%

0.00 350,269.65 0.00

31,062.53 119,840.00 63,163.87

(2,032.13) 350,269.65 0.00

BF claim AED 25,920 + 12% OH&P ETA costs of AED 408,791 + 12%JV OH&P + 3% Attendances agreed withConsultants (F&G)

63,163.87

JAP016/ALM/TCAC/22008 dated 2-Nov-08

CLOSED

163 131

004 001

67 68

DXB/AMT-01/0600/EDM/3588 DXB/AMT-01/0600/EDM/3061

02-Feb-08 24-Oct-07

334,816.75 16,050.00

ur 0

334,816.75

ur CLOSED

21% 100%

69,657.00 12,895.64

79% 0%

265,159.75 0.00

69,657.00 12,000.00

265,159.75 895.64

ETA costs AED291,185 + 12% JV OH&P + 3% Attendance EVS cost + 7% OH&P

12,895.64

JAP016/ALM/TCAC/22694 dated 26-Nov-08

CLOSED

173 179

001 001

69 70

DXB/AMT-01/0600/EDM/3702 DXB/AMT-01/0600/EDM/3848

20-Feb-08 16-Mar-08

64,706.19 7,855.65

0 (see NOC#127001) 0 0

56,015.46 7,650.72

JAP016/AlM/TCAC/21700 dated 20-Oct-08

CLOSED CLOSED

CLOSED CLOSED

100% 100%

56,015.46 7,650.72

0% 0%

0.00 0.00

56,015.46 7,650.72

0.00 0.00

Supply and Labour rates + 12%OH&P BI cost at AED 6,831.00 + 12% JV OH&P

JAP016/ALM/TCAC/17650 (see NOC#127- dated 30-Apr-08 001)

13 14

001 001

04 06

JV JV

DXB/AMT-01/0500/JLy/429 DXB/AMT-01/0500/JLy/430

13-May-06 13-May-06

0.00 278,155.63 501,971.39 56,840.00 1,193,235.54 159,171.78 181,391.33

0.00 218,400.00

0 0

14 14 15 16 17

002 004 001R1 001 001

06 06 07 08 09

Site Establishment - Offices (Supply of ETA Temporary Site Office Purchased form Seidco Gen. Cont. Co.) NSC ETA Site Offices (New Offices at Site) JV ETA/F&G Site Offices - Rubbish Removal NSC ETA Site Offices Provision of Power Supply JV JV Provision of Starter Bars to Podium within the Landscape Package Core Wall Thickening

JAP016/ALM/TCAC/21287 dated 5-Oct-08 JAP016/ALM/TCAC/05508 dated 29-Nov-06

CLOSED CLOSED

CLOSED CLOSED

0% 100%

0.00 218,400.00

0% 0%

0.00 0.00

0.00

0.00 0.00

218,400.00

to confirm if this is still needed; No need for additional telephone lines F&G evaluation is based on a +12% OH&Pro, and prelims omitted and to be dealt with in EOT's

DXB/AMT-01/0600/MIC/____ DXB/AMT-01/0600/DAN/5012 DXB/AMT-01/0500/JLy/431 / DXB/AMT-01/0600/DAN/3648 DXB/AMT-01/0500/JLy/432 DXB/AMT-01/0500/JLy/501

13-Dec-08 26-Oct-08 13-May-06 / 12-Feb-08 13-May-06 26-Jun-06

0 0 0

501,971.39 56,840.00

CLOSED 0 CLOSED 60%

0.00 0.00 715,733.25

100% 100% 40%

501,971.39 56,840.00 477,502.29 715,733.25

501,971.39 56,840.00 477,502.29

ETA cost + 12% OH&P + 3% Attendances JV scope of works; verbally agreed with F&G to be 5050; as at Sep-08 ETA costs + 7% JV OH&P

1,193,235.54

0 ur

128,324.82 107,738.59

JAP016/ALM/TCAC/04893 dated 30-Oct-06 JAP016/ALM/TCAC/08151 dated 09-Apr-07

CLOSED CLOSED

CLOSED ur

100% 100%

128,324.82 107,738.59

0% 0%

0.00 0.00

128,324.82 107,738.59

0.00 0.00

Costs agreed by JV under letter ref. DXB/AMT01/0500/Jly/1065 dated 7-Nov-06. ERI No. 09; Internal Preliminary Assessment is equal to 10 days, but works has yet to be carried out to consider the EOT; cost evaluated by F&G accepted thru letter ref. DXB/AMT-01/0500/Jly/1072 dated 8-Nov06 but subject to add'l revisions and prolongat ETA cost of 60,350.00 + 7% JV OH&P

14

003

10

20

001

11

NSC Site Establishment - Offices (Supply and Installation of AC Units within the New Offices being established by Nakheel) JV Supply of Potable Water to DMCC and F&G's Site Offices NSC Cast Resin Bus Bars

DXB/AMT-01/0500/JLy/430

13-May-06

80,097.04

64,574.50

JAP016/ALM/TCAC/06385 dated 21-Jan-07

CLOSED

CLOSED

100%

64,574.50

0%

0.00

60,350.00

4,224.50

DXB/AMT-01/0500/JLy/655

16-Jul-06

23,551.60 2,071,622.24

25,076.80 1,049,300.70

28

001R1

12

DXB/AMT-01/0600/EDM/2402, DXB/AMT-01/0600/DAN/3172

24-Jun-07 , 14-Nov-07

ur

JAP016/ALM/TCAC/22075 dated 4-Nov-08, JAP016/ALM/TCAC/23417 dated 6-Jan-08 JAP016/ALM/TCAC/14871 dated 13-Jan-08

CLOSED

CLOSED

100%

25,076.80

0%

0.00

10,841.60

14,235.20

Period from June 2006 - September 2007, and October-2007 - November 2008 ETA Cost + 7%; Time Effect shall be by NSC, if any; potential additional builders works, and attendance in reference to the Time. Confirmed by ETA under their letter ref. DIV.092/AM/TS/1342 dated 31-Jan-08 EVSCost Effect is NSC Cost + 7% O&H + 2% Attendance, as this is an additional work; Time Effect shall be by NSC, if any; potential additional builders works. ETA costs + 7% JV OH&P; F&G revised assessment from their letter ref.JAP016/ALM/TCAC/18730 dtd 8Jun-08 JV Cost; Note : the cost for OCP is omitted and will be dealt with separately; F&G revised assessment from their letter ref.JAP016/ALM/TCAC/18730 dtd 8-Jun-08 ETA's cost + 12% OH&P + 3% Attendances

CLOSED

ur

100%

1,049,300.70

0%

0.00

980,654.86

68,645.84

32

001

14 15

NSC Stainless Steel Members to Diamond Exchange Area NSC Provision of DB's in lieu of Isolators in the Offices & Retail Units at 3rd to 49th Floors (MEP Works) JV Provision of DB's in lieu of Isolators in the Offices & Retail Units at 3rd to 49th Floors (Builders Work)

DXB/AMT-01/0500/JLy/844

11-Sep-06

333,540.00 1,571,815.50

ur

317,914.82 1,220,076.06

JAP016/ALM/TCAC/05673 dated 11-Dec-06 JAP016/ALM/TCAC/18730 dated 8-Jun-08 JAP016/ALM/TCAC/22415 dated 18-Nov-08 JAP016/ALM/TCAC/18730 dated 8-Jun-08

CLOSED

CLOSED

100%

317,914.82

0%

0.00

317,914.82

0.00

35

001a

DXB/AMT-01/0500/JLy/926

03-Oct-06

ur

ur

CLOSED

CLOSED

115%

1,408,720.27

-15%

(188,644.21)

1,408,720.27

(188,644.21)

35

001b

15

DXB/AMT-01/0500/JLy/926

03-Oct-06

214,962.95

ur

55,692.82

ur

CLOSED

CLOSED

115%

64,303.86

-15%

(8,611.04)

102,131.44

(46,438.62)

217

001

15.1

217

002

15.1

31

001

16 16 16

NSC SMDB's in lieu of Isolators at Level 52-63 and Retail Mall and Splitting of Landlord DB's for Ground Floor and First Floor as per DEWA Requirement (MEP Works) JV SMDB's in lieu of Isolators at Level 52-63 and Retail Mall and Splitting of Landlord DB's for Ground Floor and First Floor as per DEWA Requirement (Builders Work) JV Drawing Revisions to the Diamond Exchange Centre; due to revised Openings. JV JV ID Works Package - Changes to CT-01 & CT-02 Raised Access Flooring System at the Diamond Exchnage Centre to Screeding Works ID Works Package (GL-08)

DXB/AMT-01/0600/EDM/4512

06-Jul-08

538,459.90

ur

538,459.90

ur

0.00

100%

538,459.90

538,459.90

DXB/AMT-01/0600/EDM/4512

06-Jul-08

7,538.64

ur

7,538.64

ur

0.00

100%

7,538.64

7,538.64

builders works

DXB/AMT-01/0500/JLy/842

11-Sep-06

82,672.78 28,616.00 282,635.67

JAP016/GEN/ABS/0010 dated 17-Oct-06

82,672.78

CLOSED

100%

82,672.78

0%

0.00

82,672.78

rejected by Nakheel due to relation with coordination issues with MEP requirements; awaiting response from NSC (Eversendai) on the rejection. abortive materials only Floor Screeding works; valued under the ERI No. 16 as per the F&G letter ref. JAP016/ALM/TCAC/21388 dated 7-Oct-08 and confirmed under our letter ref. DXB//4963 dtd 16-Oct-08 Mozart Marble cost + 12% OH&P

69 79

001 001

DXB/AMT-01/0600/EDM/1785 DXB/AMT-01/0500/JLy/2030

14-Mar-07 16-Apr-07

see NOC#127 see NOC#127

28,365.12

JAP016/ALM/TCAC/20228 see NOC#127 dated 12-Aug-08

CLOSED 282,635.67

CLOSED CLOSED

100% 100%

28,365.12 282,635.67

0% 0%

0.00 0.00

28,365.12 282,635.67

see NOC#127

132

001

16

JV

DXB/AMT-01/0600/EDM/3065

25-Oct-07

1,774,080.00

(see NOC #127-001) ur

1,774,080.00

JAP016/TS/GT/0103 dated 18see NOC#127- Oct-2007 JAP016/ALM/TCAC/22521 001 dated 20-Nov-08

CLOSED

CLOSED

100%

1,774,080.00

0%

0.00

1,774,080.00

147

001

16

JV

Internal Water Feature (Aqua-Teknik Scope)

DXB/AMT-01/0500/JLy/3209

21-Nov-07

626,750.00

626,750.00

ur

0.00

100%

626,750.00

299,096.00

327,654.00

Aqua-Teknik cost + 12% OH&P + 3% Attend

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (3).monvabad

16 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
147 169

October 15, 2013


REMARKS / COMMENTS

SUB NO.
002 001R2

ERI NO.
16 16

V.O. TO
JV JV

CLAIM NOTICE LETTER

DESCRIPTION
REFERENCE Internal Water Feature (Related Builders Work)
DXB/AMT-01/0500/JLy/3209 DXB/AMT-01/0600/EDM/3626

DATE
21-Nov-07 07-Feb-08

CLAIM ENTITLEMENT APPLICATION COST TIME (Days) (AED) 4,134.48 541,470.46


ur ur

ER / F&G / JV AGREED VALUES COST (AED)


TIME (Days)

OUTSTANDING CLAIMS COST (AED)


4,134.48 541,470.46

LETTER REF.

TIME (Days)
ur ur

WORK DONE TO-DATE VALUE (AED)


0.00 487,323.41

BALANCE OF WORK TO-DATE VALUE % (AED)


100% 10% 4,134.48 54,147.05

CERTIFIED AS AT CERTIFIED TO-DATE

November 30, 2008


BALANCE TO-DATE
4,134.48 541,470.46
Coring Subcon Cost + 12% OH&P + 3% Attendances S/C costs + 12% OH&P + 3% Attendances; to be valued at ERI 16 as per F&g letter ref. JAP016/TS/GT/0254 dtd 29May08 EVS to submit entitlements; EVS cost + 12% OH&P + 3% Attendances

169

002R1

16

169

003

16

186

002

16

Revisions to the ID Works Package For Construction Drawings at the Ground Floor and First Floor (GL-19 & GL-07) JV Revisions to the ID Works Package For Construction Drawings at the Ground Floor and First Floor (Structural Supports to GL-07) NSC Revisions to the ID Works Package For Construction Drawings at the Ground Floor for the termination of GL-07 and other adjacent Finishing Materials (CVI No. 093) JV DMCC Offices - Core Toilets Level 49 & 50 (Revision of Ironmongeries) NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (MEP Works by ETA) JV Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (Supply of O2 Light Fixtures from M/s.Lever Electric) Interior Design Works (JV Internal Subcontractors)

90%

DXB/AMT-01/0600/EDM/3626

07-Feb-08

34,314.41

ur

34,314.41

ur

100%

34,314.41

0%

0.00

34,314.41

DXB/AMT-01/0600/EDM/4520

07-Jul-08

ur

ur

ur

ur

100%

ur

ur

ur

0.00

Bond Interiors to submit entitlements

DXB/AMT-01/0600/EDM/4671

03-Aug-08

4,137.35 25,112.55

ur

4,137.35

ur

100%

4,137.35

0%

0.00

4,137.35

scope shall be removal, supply and installation of ironmongeries; valued in ERI No. 16 as per Nakheel letter ref. JAP016/TS/GT/0318 dtd 20Aug08 BI to submit entitlements; Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; BI cost + 12% OH&P + 3% Attendances Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Electrical Works by ETA; ETA cost+ 12% OH&P + 3% Attend Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Supply only of light fittings from Lever

211

001

16

DXB/AMT-01/0600/EDM/4352

05-Jun-08

ur

25,112.55

ur

0.00

100%

25,112.55

25,112.55

211

002

16

DXB/AMT-01/0600/MIC/5014

26-Oct-08

247,839.95

ur

247,839.95

ur

0.00

100%

247,839.95

247,839.95

211

003

16

DXB/AMT-01/0600/MIC/5040

05-Nov-08

39,243.75

ur

39,243.75

ur

0.00

100%

39,243.75

39,243.75

41

001R1

16/ 39 16/ 39 16/ 39 16/ 39 18

JV

DXB/AMT-01/0500/JLy/877

24-Sep-06

28,894,792.49

see NOC#127

22,785,939.94

agreed values is partial and see NOC#127 deemed to change

CLOSED

98%

28,304,706.24

2%

590,086.25

28,304,706.24

(28,304,706.24)

progressively, as it is based on the agreed rates only (+12%)

updated cost and rates approval summary status being sent regularly; cost submitted is the final applied claim updated cost and rates approval summary status being sent regularly.

41

002R1

NSC Interior Design Works (Other ID Works being done by Bond Interiors) NSC Interior Design Works (MEP Works by ETA)

DXB/AMT-01/0500/JLy/877

24-Sep-06

5,064,844.41

see NOC#127

3,879,153.39

agreed values is partial and see NOC#127 deemed to change

CLOSED

80%

4,062,428.29

20%

1,002,416.12

4,062,428.29

(4,062,428.29)

progressively, as it is based on the agreed rates only (+7%)

41

003R1

DXB/AMT-01/0500/JLy/877

24-Sep-06

8,423,604.53

see NOC#127

8,117,552.86

agreed values is partial and see NOC#127 deemed to change

CLOSED

90%

7,573,568.93

10%

850,035.60

7,573,568.93

(7,573,568.93)

updated cost and rates approval summary status being sent regularly.

progressively, as it is based on the agreed rates only (+7%)

41

004R1

NSC Interior Design Works (Lift Finishes by Kone Middle East) NSC Chilled Water Monitoring and installation (Revised District Cooling Chilled Water Connections Requirements) JV 40' Container for Office Storage NSC Revision of Duties and Capacities of the Ground and First Floor AHU's JV Additional Works to the Extra Piles Driven by the Piling Contractor (CVI No. 007) JV Amendments to Basement 1 Generator Rooms (Architectural Works) NSC Amendments to Basement 1 Generator Rooms (MEP Works by ETA) JV Nibs for the Approach Slabs JV JV JV JV JV JV JV JV JV Interior Design Package Changes affecting the Main Contract Package Door Details (Door Type for Telephone Room (01052) at First Floor) DTS referenced AM/015/515 dated 5th August 2006 (Architectural and Structural Works) List of "For Construction" Drawings transmitted by Nakheel Changes in the Lift Pit Depths, and Revisions to the Galvanised Steel Ladder at 64th Level Changes to the Access Floor Heights Various Revisions at the Parking Areas Additional Architectural Works to the Service Floor Areas (1-3) Missing Spanmark as PB434 (RFI No. 029) Additional Reinforcement due to the Missing Details (RFI No. 042) First Floor Slab Details (RFI No. 072) Second Basement Floor Beam - PB205A (RFI No. 075) Fourth Basement Beam - PB451A (RFI No. 078) Fourth Basement Beam - PB434 (RFI No. 144) Tower Structural Drawings - Additional TB29 Beam (RFI No. 146) Door Opening Height - First Floor (RFI No. 157) Basement 2 Beams (RFI No. 162) Lift F4 - Structural Details (RFI No. 171) Reinforced Concrete Partition Wall @ the Basement 2 (RFI No. 182) Increase in Beam Depths at First Floor - Section N1 (RFI No. 192) Increase in Beam Depths to PB149 and PB150A (RFI No. 223) Additional Outrigger Walls at Service Floor Areas Structural Works Additional Mass Concrete at 2nd Level, and Revisions to the Stairs leading to the Vault at 2nd Level Additional Column Posts at 50th to 51st Level and Additional Core Walls, i.e., 400mm and 500mm thick Additional Lifting Beams to the 64th Level Machine Rooms (@Level 288.650m and 285.350m) Changes to Slab Steel Reinforcement to S11 to S12 Additional Steel Reinforcement to Beams Located Around Tower Building and Connected to Precast Slab Additional rebars to basement retaining wall @ staircase and changes of rebar to wall Changes in Shear Wall in Zone 4 Associated in Lift and Vault Wall Additional Rebar in First Basement Slab Additional Top Steel Reinforcement in Ground Floor Slab Additional Bottom Steel Reinforcement in Ground Floor Slab Additional Building Maintenance Units at Diamond Exchange Centre Revisions to Contract Drawings in First Floor Levels

DXB/AMT-01/0500/JLy/877

24-Sep-06

3,111,331.22

see NOC#127

3,107,564.82

agreed values is partial and see NOC#127 deemed to change

CLOSED

89%

2,774,842.92

11%

336,488.30

2,774,842.92

(2,774,842.92)

updated cost and rates approval summary status being sent regularly.

progressively, as it is based on the agreed rates only (+7%) JAP016/ALM/TCAC/22578 dated 24-Nov-08

34

001

DXB/AMT-01/0500/JLy/925

03-Oct-06

1,566,116.20

ur

678,543.71

CLOSED

ur

95%

642,000.00

5%

36,543.71

642,000.00

36,543.71

ETA costs + 7% JV OH&P

38 37 3 12 12 16 19 21 23 33 33 33 33 33 33

001 001 002 001 002 002 001 001 001 001 002R1 003 004 005 006

19 20 21 21 21 21 21 21 21 21 21 21 21 21 21

DXB/AMT-01/0600/EDM/1011 DXB/AMT-01/0600/EDM/988 DXB/AMT-01/0500/JLy/112 DXB/AMT-01/0500/JLy/362 DXB/AMT-01/0500/JLy/362 DXB/AMT-01/0500/JLy/432 DXB/AMT-01/0500/JLy/623 DXB/AMT-01/0500/JLy/691 DXB/AMT-01/0500/JLy/748 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881

29-Oct-06 22-Oct-06 18-Sep-05 18-Apr-06 18-Apr-06 13-May-06 05-Jul-06 06-Aug-06 12-Aug-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06

32,340.85 262,569.93 1,434.82 19,047.23 1,579,708.41 35,825.47 14,639.13 2,848.23 28,033.99 (not used) 27,175.35 229,129.54 22,371.54 153,565.57 3,223.52 1,894.77 657.99 427.04 425.15 1,150.44 13,820.28 499.04 3,461.71 1,556.34 41,554.32

0 ur 0 ur ur 0 0 0 0

32,341.10

JAP/ALM/TCAC/06743 dated 6Feb-07

CLOSED 262,569.93

CLOSED ur CLOSED ur ur CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

100% 32% 100% 100% 100% 100% 100% 100% 100% 0% 100% 100% 100% 100% 100%

32,341.10 84,537.51 1,434.82 19,047.23 1,579,708.41 25,157.54 14,560.51 2,296.25 21,880.70 0.00 26,646.79 23,398.50 18,036.01 123,805.08 (1,351.84)

0% 68% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0.00 178,032.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

32,341.10 84,537.51 1,156.76

0.00 178,032.42 278.06 19,047.23 1,579,708.41

actual cost transmitted to F&G based on dayworks rates; agreed with F&G ETA costs + 7% JV OH&P awaiting response from Client. rejected by Nakheel due to notice not served as per the required time period under the Contract. ETA Cost of AED 1,476,363 + 7% JV OH&P awaiting response from Client. Various changes to the ID Package affecting the MC Package; i.e., blockworks Door which is not provided with an opening tag, in reference with Tender Query, Item No.6 dtd 16-May05,pages 9 Various revisions to the drawing under the F&G transmittal sheet ref. F&G/ALMAS/ TAISEI/01356 dtd 01-Aug-06 NOT USED agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G)

0
JAP016/GEN/ABS/1051 dated 8-Aug-06 JAP016/GEN/ABS/1051 dated 8-Aug-06

1,434.82 19,047.23 1,579,708.41 CLOSED CLOSED CLOSED CLOSED CLOSED


JAP016/ALM/TCAC/181187 dated 18-May-08 JAP016/ALM/TCAC/16338 dated 17-Mar-08 JAP016/ALM/TCAC/18352 dated 26-May-08 JAP016/ALM/TCAC/17247 dated 16-Apr-08 JAP016/GEN/ABS/1011 dtd 19Jun06; JAP016/ALM/TCAC/18884 dtd 12-Jun-08 JAP016/GEN/ABS/1011 dated 19-Jun-06 JAP016/ALM/TCAC/20933 dated 14-Sep-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/17248 dated 16-Apr-08 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/18352 dated 26-May-08 JAP016/ALM/TCAC/18118 dated 18-May-08

25,157.54 14,560.51 2,296.25 21,880.70 (not used)

0 0 0 0 0 0 0 0 0 0

JAP016/ALM/TCAC/18884 dated 12-Jun-08 JAP016/ALM/TCAC/04947 dated 1-Nov-06 JAP016/ALM/TCAC/05297 dated 19-Nov-06 JAP016/ALM/TCAC/06567 dated 29-Jan-07

25,157.54

0.00 14,560.51 2,296.25 21,880.70 0.00 880.35 0.00 0.00 0.00 0.00

0.00

0 0 0 0 0

26,646.79 23,398.50 18,036.01 123,805.08 (1,351.84)

CLOSED CLOSED CLOSED CLOSED CLOSED

25,766.44 23,398.50 18,036.01 123,805.08 (1,351.84)

33 33 33 33 33 33 33 33 33 33

007 008 009 010 011 012 013 014 015 016

21 21 21 21 21 21 21 21 21 21

JV JV JV JV JV JV JV JV JV JV

DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881

24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06 24-Sep-06

0 0 0 0 0 0 0 0 0 0

1,894.77 CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED 41,554.32

CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

1,894.77 530.47 343.82 344.60 1,063.46 12,180.62 0.00 548.61 1,233.74 41,554.32

0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 530.47 343.82 344.60 1,063.46 12,180.62
0.00

1,894.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41,554.32

awaiting response from Client. agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) rejected F&G assessment in their letter JAP016/ALM/TCAC/18118 dated 18-May-08 thru our letter ref.DXB/./EDM/4262 dtd 22May08;F&G assessment under review by JV agreed with Consultant (F&G) agreed with Consultant (F&G) revised cost impact submitted under ref. DXB/AMT01/0500/Jly/1080 dated 9-Nov-06 based on the approved Methodology; agreed with Consultant (F&G) agreed with Consultant (F&G)

530.47 343.82 344.60 1,063.46 12,180.62 0.00 548.61 1,233.74

0 0 0 0 0 0 0 0 0

548.61 1,233.74

33 33 33

017 018 019

21 21 21

JV JV JV

DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881 DXB/AMT-01/0500/JLy/881

24-Sep-06 24-Sep-06 24-Sep-06

4,353.86 693.97 956,279.08 40,503.44

0 0 ur

3,510.09 337.29 642,006.51 171.19

0 0 0

JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/20290 dated 13-August-08 JAP016/ALM/TCAC/181187 dated 18-May-08

CLOSED CLOSED CLOSED

CLOSED CLOSED CLOSED

100% 100% 100%

3,510.09 337.29 642,006.51

0% 0% 0%

0.00 0.00 0.00

3,510.09 337.29 642,006.51

0.00 0.00 0.00

33

020

21

JV

DXB/AMT-01/0500/JLy/881

24-Sep-06

CLOSED

CLOSED

100%

171.19

0%

0.00

171.19

0.00

33

021

21

JV

DXB/AMT-01/0500/JLy/881

24-Sep-06

43,839.53

33,011.38

JAP016/ALM/TCAC/20933 dated 14-Sep-07

CLOSED

CLOSED

100%

33,011.38

0%

0.00

33,011.38

0.00

agreed with Consultant (F&G)

33

022

21

JV

DXB/AMT-01/0500/JLy/881

24-Sep-06

5,525.90

4,252.50

JAP016/ALM/TCAC/18884 dated 12-Jun-08

CLOSED

CLOSED

100%

4,252.50

0%

0.00

4,252.50

0.00

agreed with Consultant (F&G)

33 33

023 024

21 21

JV JV

DXB/AMT-01/0600/EDM/1868 DXB/AMT-01/0600/DAN/1878

26-Mar-07 26-Mar-07

36,827.93 25,336.02

0 0

35,529.29 26,354.14

0 0

JAP016/ALM/TCAC/08133 dated 09-Apr-07 JAP016/ALM/TCAC/17248 dated 16-Apr-08

CLOSED CLOSED

CLOSED CLOSED

100% 100%

35,529.29 26,354.14

0% 0%

0.00 0.00

35,529.29 26,354.14

0.00 0.00

agreed with Consultant (F&G) agreed with Consultant (F&G)

33 33 33 33 33 33 33 33 33 50

025 026 027R1 028R1 029R1 030 031R1 032 033 001

21 21 21 21 21 21 21 21 21 21

JV JV JV JV JV JV JV JV

DXB/AMT-01/0600/DAN/1883 DXB/AMT-01/0600/DAN/1888 DXB/AMT-01/0600/DAN/1990 DXB/AMT-01/0600/DAN/2020 DXB/AMT-01/0600/DAN/2047 DXB/AMT-01/0600/EDM/2066 DXB/AMT-01/0600/EDM/2160 DXB/AMT-01/0600/EDM/2383 DXB/AMT-01/0600/EDM/2548 DXB/AMT-01/0600/EDM/1301

26-Mar-07 24-Sep-06 10-Apr-07 15-Apr-07 19-Apr-07 24-Apr-07 15-May-07 23-Jun-07 18-Jul-07 21-Dec-06

7,878.22 17,649.58 101,960.65 140,340.33 316,516.91 1,175,875.00 56,950.59 130,015.64 9,356.12 28,025.73

0 0 0 0 0 ur 0 0 0 ur

7,878.22 14,661.14 97,675.24 137,782.64 317,721.58

0 0 0 0 0

JAP016/ALM/TCAC/08287 ated 16-Apr-07 JAP016/ALM/TCAC/08713 ated 7-May-07 JAP016/ALM/TCAC/20933 dated 14-Sep-07 JAP016/ALM/TCAC/10244 ated 9-Jul-07 JAP016/ALM/TCAC/10549 ated 23-Jul-07

CLOSED CLOSED CLOSED CLOSED CLOSED 1,175,875.00

CLOSED CLOSED CLOSED CLOSED CLOSED ur CLOSED CLOSED CLOSED ur

100% 100% 100% 100% 100% 100% 100% 100% 100%

7,878.22 14,661.14 97,675.24 137,782.64 317,721.58 1,175,875.00 50,995.22 55,259.32 7,928.10 0.00

0% 0% 0% 0% 0% 0% 0% 0% 0% 100%

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28,025.73

7,878.22 14,661.14 97,675.24 137,782.62 317,721.58

0.00 0.00 0.00 0.02 0.00 1,175,875.00

agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) under review agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) JV to submit entitlements; note that the DVR's is valued in Claim No. 77; items to be valued under this Claim is only the Lifting Beams await for final drawings. based on the ETA letter request demolition works ETA costs of AED 4,607,254 + 7% OH&P ETA to respond. ETA costs + 7%OH&P ETA costs + 12%OH&P + 3% Attendances Time component rejected as per the F&G letter ref. JAP016/TS/ALM/ TCAC/06936 dated 15-Feb-07 ETA costs + 7% JV OH&P see Omission OM-4-001&002 for the JV & NSC works respectively ETA costs + 7% JV OH&P ETA to submit entitlements BI costs AED 36,526.17 + 7% JV OH&P Scaffolding to be used by the Nominated Subcontractors; Fit-Out Contractor to work on the MEP Scope ETA claim + 12% OH&P + 3% Attendances supeseded by claim no. 107 Subcontractor : JV Internal Al Abbar cost + 12% + 3% attendances

50,995.22 55,259.32 7,928.10

0 0 0

JAP016/ALM/TCAC/11392 ated 20-Aug-07 JAP016/ALM/TCAC/14299 ated 12-Dec-07 JAP016/ALM/TCAC/10848 ated 1-Aug-07

CLOSED CLOSED CLOSED 28,025.73

50,995.22 55,259.32 7,928.10

0.00 0.00 0.00 28,025.73

54 59 135 51 55 46 46 56 67 57 64 65 68 107 234 52 107 107

001 001 001 001 001 001 002 001 001 001 001 001 001 005 001 001

21 21 21 22 23 24 24 25 26 28 29 31 32 35 35 35.1

Revisions to Structural Contract Drawings in Second Floor JV Changes in Beam Steel Reinforcement at 29th to 34th Level JV Various Requirements under the F&G Transmittal Ref. F+G/ALMAS/TAISEI/ 01463 dated 12th December 2006 JV Provision of Additional Lift Pit Ladders JV Additional Coring Requirement JV Opening in Block Wall between Offices A & B at Level 29 (CVI No. 067) NSC Revision of Fire Protection System as per JAFZA EHS Fire & Rescue Requirements NSC Category II Drawing Revisions for Office Floors -Air Conditioning NSC Fire Policy Layout (MEP Works) NSC Fire Policy Layout (MEP Works-additional Fireman's Telephone at B1-B5) JV Additional Staff Facilities to Consultants NSC Electrical Connections to Fire Pump Requirements JV Revisions to Office Partitions

DXB/AMT-01/0500/JLy/1358 DXB/AMT-01/0600/EDM/1567 DXB/AMT-01/0600/EDM/3071 DXB/AMT-01/0600/EDM/1312 DXB/AMT-01/0500/JLy/1444 DXB/AMT-01/0600/EDM/1236 DXB/AMT-01/0600/___/____ DXB/AMT-01/0500/JLy/1445 DXB/AMT-01/0600/EDM/1659 DXB/AMT-01/0500/JLy/1446 DXB/AMT-01/0600/EDM/1634 DXB/AMT-01/0600/EDM/1635 DXB/AMT-01/0600/EDM/1660 DXB/AMT-01/0600/EDM/4339 DXB/AMT-01/0600/MIC/4950 DXB/AMT-01/0500/JLy/1332 DXB/AMT-01/0600/EDM/3832 DXB/AMT-01/0600/DAN/4540

04-Jan-07 10-Feb-07 27-Oct-07 23-Dec-06 21-Jan-07 11-Dec-06 13-Dec-08 21-Jan-07 25-Feb-07 21-Jan-07 20-Feb-07 20-Feb-07 25-Feb-07 03-Jun-08 13-Oct-08

66,895.36 30,965.32 1,484.00 4,929,761.78 ur 24,107.45 17,577.75 51,929.76 2,951,483.26 (valued in OM-4) 102,143.27 ur 43,688.96 0.00

ur ur ur ur ur ur ur 0 ur 0 ur ur 0 see NOC#127 ur see NOC#127 see NOC#127 see NOC#127 see NOC#127 see NOC#127 see NOC#127 ur

66,895.36 30,965.32 1,484.00 4,929,761.78 ur

ur ur ur ur ur ur ur CLOSED ur CLOSED ur ur CLOSED CLOSED ur CLOSED CLOSED CLOSED

100% 100% 100% 100%

66,895.36 30,965.32 1,484.00 4,929,761.78 ur

0% 0% 0% 0% ur 0% 100% 0% 47%

0.00 0.00 0.00 0.00 ur 0.00 17,577.75 0.00 1,386,817.57 51,929.76 1,564,665.69
0.00

66,895.36 30,965.32 1,484.00 4,929,761.78 0.00 5,600.38 17,577.75 0.00 1,386,817.57

5,600.38

JAP016/TS/ABS/22577 dated 24-Nov-08

CLOSED 17,577.75

100%

5,600.38 0.00

51,929.76

JAP016/ALM/TCAC/14753 dated 07-Jan-08

CLOSED 2,951,483.26

100% 53%

51,929.76 1,564,665.69

(valued in OM-4)

CLOSED 102,143.27 ur

NSC Provision of Foul Water Disposal in case Primary System Failure NSC Revision of Office Partitions - Mechanical & Fire Policy Drawings NSC Trip to Italy for Stone Quarry Inspection Ballroom/Function Room (Provision of Scaffolds and Access) NSC Pipe Size Changes @ First Floor (RFI No. 1062) JV Possible Addition of Ballroom JV JV JV Ballroom / Function Room (Concrete and Masonry Works) Ballroom/Function Room (CW Roofing, Curtain Wall Cladding, Aluminum Panel Bulkheads Work)

16%

16,264.00 ur

84% ur 0% 0% 100% 0% 0% 50%

85,879.27 ur 0.00 0.00 20,545.90 0.00 0.00 142,397.02

16,264.00

85,879.27 0.00

39,083.00 0.00

0 see NOC#127 see NOC#127

JAP016/ALM/TCAC/16129 dated 5-Mar-08

CLOSED CLOSED 20,545.90

100% 0%

39,083.00 0.00 0.00

39,083.00
0.00

(0.00) 0.00 20,545.90 0.00

27-Dec-06

002R2 35.1/ 35.2 004a 35.1/ 35.2 001

20,545.90 (valued in Claims No. 78 & 107) 15-Mar-08 785,658.59


09-Jul-08

(valued in Claims No. 78 & 107) 728,934.60

CLOSED CLOSED 284,794.05

0% 100% 50%

0.00 728,934.60 142,397.03

JAP016/ALM/TCAC/19604 see NOC#127 dated 14-July-2008

728,934.60 142,397.03

0.00 142,397.02

284,794.05

see NOC#127 see NOC#127

107

107

003

107

007

107

008

35.1/ NSC Ballroom / Function Room (ID Works to the Walls 35.2/ facing the Retail Mall) 35.4 35.1/ NSC Ballroom/Function Room (MEP Works) 35.2/ 35.4 35.1/ NSC Ballroom/Function Room (External Stoneworks) 35.2/ 35.4 35.4 JV Ballroom/Function Room (Additional Plaster Works where Electrical Panels are Installed)

DXB/AMT-01/0500/JLy/2643

02-Aug-07

ur

ur

CLOSED

ur

ur

ur

0.00

Bond Interiors to submit entitlements

DXB/AMT-01/0600/DAN/3893

25-Mar-08

3,318,315.35

3,318,315.35

JAP016/ALM/TCAC/21289 see NOC#127 dated 5-Oct-08 JAP016/ALM/TCAC/22293 see NOC#127 dated 13-Nov-08

CLOSED

CLOSED

58%

1,926,000.00

42%

1,392,315.35

1,926,000.00

1,392,315.35

Subcontractor : ETA; under review by ETA due to the revised scope of works; confirmed by ETA

DXB/AMT-01/0500/JLy/2643

02-Aug-07

357,161.60

310,797.76

CLOSED

CLOSED

0.00

100%

310,797.76

(248,638.21)

559,435.97

Al Bayader cost + 12% OH&P

DXB/AMT-01/0600/EDM/4767

26-Aug-08

2,710.59

2,710.59

ur

0.00

100%

2,710.59

2,710.59

Plaster works only based on BOQ rates

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (3).monvabad

17 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
78

October 15, 2013


REMARKS / COMMENTS

SUB NO.
005

ERI NO.
35.5

V.O. TO
JV

CLAIM NOTICE LETTER

DESCRIPTION
REFERENCE Function Room / Ball Room Facility Parapet (Structural Works)
DXB/AMT-01/0500/JLy/3964

DATE
08-Apr-08

CLAIM ENTITLEMENT APPLICATION COST TIME (Days) (AED) 144,684.43 ur 26,312.00 3,775,777.57
see NOC#127 see NOC#127 see NOC#127 ur

ER / F&G / JV AGREED VALUES COST (AED)


TIME (Days)
see NOC#127 see NOC#127 see NOC#127

OUTSTANDING CLAIMS COST (AED)


144,684.43

LETTER REF.

TIME (Days)
CLOSED

%
100%

WORK DONE TO-DATE VALUE (AED)


144,684.43

BALANCE OF WORK TO-DATE VALUE % (AED)


0% 0.00

CERTIFIED AS AT CERTIFIED TO-DATE


123,200.00

November 30, 2008


BALANCE TO-DATE
21,484.43
EVS Cost + 12% OH&P + 3% attendances and Scaffolding supplied by JV; to be valued under ERI35.5 as per Nakheel letter ref. JAP016/TS/GT/0255 dtd 29May08 Subcontractor : Al Abbar; shall be valued under ERI 35.5 as per Nakheel Letter JAP016/TS/GT/0255 dtd 29May-08 additional GI sheets cover to parapet for the preparation of EPDM by AL Abbar Confirmed by Nakheel under the letter as mentioned, and instructed under ERI No. 37

107 107 18

004b 004c 001R1

35.5 35.5 37

NSC Ballroom/Function Room (Roof Parapet Works - CVI No. 084) JV Ballroom/Function Room (Roof Parapet Works GI Cladding - CVI No. 084) JV Landscaping Works; i.e., provision of Civil/Structural Works as confirmed under Nakheel Letter ref. JAP016/GEN/ABS/1058 dated 14-Aug-06 JV Landscaping works - Screed for the Planter Boxes

DXB/AMT-01/0600/EDM/4032 DXB/AMT-01/0600/DAN/____ DXB/AMT-01/0500/JLy/586

20-Apr-08 12-Jan-09 26-Jun-06

ur 26,312.00
JAP016/ALM/TCAC/90791 dated 19-Jun-08

CLOSED CLOSED CLOSED 100%

ur 0.00 2,661,716.46

ur 100% 0%

ur 26,312.00 0.00 2,661,716.46

0.00 26,312.00 0.00

2,661,716.46

CLOSED

18 70 146 101 163 163 163

002 001 001 001 006a 006b 009

37 45 45 / 45.1 45.2 49.3 49.3 49.4

DXB/AMT-01/0600/EDM/3098 DXB/AMT-01/0500/JLy/1781 DXB/AMT-01/0500/JLy/3207 DXB/AMT-01/0600/EDM/2475 DXB/AMT-01/0600/EDM/4034 DXB/AMT-01/0600/EDM/4034 DXB/AMT-01/0600/EDM/4162

31-Oct-07 14-Mar-07 20-Nov-07 07-Jul-07 20-Apr-08 20-Apr-08 10-May-08

106,370.21 (valued in OM-5) ur ur ur 1,903.78 ur

ur 0 ur ur ur ur ur

106,370.21 (valued in OM-5)

0 0

JAP016/ALM/TCAC/90791 dated 19-Jun-08

CLOSED CLOSED ur ur ur 1,903.78 ur

CLOSED CLOSED ur ur ur ur ur

100% 0%

106,370.21 0.00 ur ur ur

0% 0% ur ur ur 0% ur

0.00 0.00 ur ur ur 0.00 ur

106,370.21
0.00

0.00 0.00 0.00 0.00

valued under th ERI No. 37 see OM-5 below (omitted works) JCI to submit entitlements ETA to submit entitlements ETA to submit entitlements builders works JCI to submit entitlements

JV Level 30 Partition Layouts NSC Relocation of Cameras at 30th Floor (RFI No. 859) NSC Various Revisions to the Electrical Works "For Construction" Drawings NSC Fire Fighting Systems at Levels 49, 50, & 51 (Abortive Work) JV Fire Fighting Systems at Levels 49, 50, & 51 (Builders Work and Abortive Work) NSC Revised "For Construction" Security Drawings at Levels 49, 50, & 51 under the DMCC Transmittal Ref. JAP016/TRNS /JV/00044 dated 5th May 2008 (Security Works) NSC Modification of Raised Floor Heights at Server Rooms at Level 49, 50, & 51 NSC Drainage Piping in Medium and High Rise Lift Machine Room JV Cuttings in Corridor Ceiling at Level 2 as required by Bond Communication NSC Additional Counter at the Security Room level 2 as per the M/s. Nakheel letter ref. JAP016/TS/BW/0366 dated 16-Nov-08 JV Design Changes due to the Omission of Operable Partition at Level 2 Offices (ERI No. 62) and Stainless Steel Rubbish Bins (ERI No. 16) NSC Revisions to Diamond Exchange Centre (Fire Policy Layout) NSC Revisions to Diamond Exchange Centre (CCTV and Access Control) NSC Emergency Cables to the Tenant's DB JV Provision of Toilets at upper floors, Levels 49,50,51, and 62 (Civil and Architectural Works, and Abortive Works-Coring at 49, 50, & 51, Plastering at Pantry Wall at L49, and add'l opening at SF3 for Level 49)

24,824.00

0.00 1,903.78 0.00

100%

1,903.78 ur

208 80 149

001 002 007

49.5 59.1 62

DXB/AMT-01/0600/EDM/4335 DXB/AMT-01/0600/EDM/3561 DXB/AMT-01/0600/EDM/____

02-Jun-08 28-Jan-08 28-Oct-08

17,250.00 133,301.39 0.00

ur ur 0

17,250.00 133,301.39

ur ur CLOSED

100% 100% 0%

17,250.00 133,301.39 0.00

0% 0% 0%

0.00 0.00 0.00 17,120.00


0.00

17,250.00 116,181.39 0.00

MDS cost + 12% OH&P + 3% Attendances; valued at ERI No. 49.5 as per Nakheel letter ref. JAP016/TS/GT/0271 dtd 9Jun08 ETA costs = AED 115,914.25 + 12% JV OH&P + 3% Attendances FBI shall submit entitlements as per the F&G letter ref. JAP016/ALM/TCAC/21815 dtd 26-Oct-08; BACKCHARGE TO BOND COMMUNICATION DUE NON-COORDINATION BI to submit entitlements

0.00

CLOSED

149

010

62

DXB/AMT-01/0600/EDM/5104

19-Nov-08

ur

ur

ur

ur

ur

ur

ur

0.00

214

001

62 / 16 62.2 62.3 63 66 66.1

DXB/AMT-01/0600/EDM/4464

26-Jun-08

(valued in 41-001 & 149001) ur ur 394,252.82 127,141.12

ur

(valued in 41-001 & 149-001)

CLOSED

ur

0%

0.00

0%

0.00

0.00

0.00

considered in 41-001 and 149-001

149 149 137 163

004 003b 001 001

DXB/AMT-01/0600/EDM/4134 DXB/AMT-01/0600/EDM/4144 DXB/AMT-01/0600/EDM/3091 DXB/AMT-01/0600/EDM/3588

06-May-08 07-May-08 30-Oct-07 02-Feb-08

ur ur ur ur

ur ur 394,252.82

ur ur ur ur 82% 100%

ur ur 322,070.00 100,469.43

ur ur 18% 0%

ur ur 72,182.82 0.00 322,070.00 100,469.43

0.00 0.00 72,182.82 0.00

ETA to submit entitlements JCI to submit entitlements; based on transmittal ./00043 dtd 4May08 (drwg. No. 4494/Y/009 Rev.4) ETA costs + 7% JV OH&P; confirmed to be ERI No. 63 as per F&G letter ref. JAP016/ALM/TCAC/18721 dtd 8Jun08 under review by JV; additional coring works to ERI 66.1 as confirmed by F&G letter ref. JAP016/ALM/TCAC/17867 dtd 8May08; addl plaster at Pantry L49 under 66.1 as per JAp016/ALM/TCAC/18766 dtd9Jun08;ERI 66.1 confirmed by Nakheel to cover coring works by B ETA cost + 12% OH&P + 3% Attendances Al Abbar to submit claim / JV to submit builders works claim; to be valued under the ERI 66.1 refer to F&G letter JAP016/ALM/TCAC/18209 dtd 20May08 Best Steel cost + 12% OH&P; to be valued under the ERI 66.1 refer to F&G letter JAP016/ALM/TCAC/18209 dtd 20May08 ETA to submit entitlements; Level 52,53,54,59 under ERI67, and Level 62 under ERI66 using Bond Interiors rates + 7% OH&P

100,469.43

JAP016/ALM/TCAC/21426 dated 9-Oct-08

CLOSED

163 174

007 001

66.1 66.1

NSC Reworks at the New DMCC Washrooms (Levels 49, 50, & 51) for FCU's NSC Design Changes - Additional Dummy Mullions and Back Pans at Levels 49-62 (NSC Works) JV Design Changes-Additional Aluminum Flashing due to the revised Curtain Wall Cladding NSC Relocation of FCU to the New Toilet Area at Levels 52,53,54,59, & 62 JV Additional Works to the Metal Cladding (MT-20) behind Glazed Balustrades caused by the Lowering of Ceiling at Ground Floor Level Due to the MEP Works (Metal Cladding - MT20) JV BMS Room Furniture Requirements JV Potential Delay due to Late Issuance of Revised Design Information in Sky Lobby Meeting Room at Level 48 ID Works Package - Lighting Requirements at Level 48 Meeting Room (MEP Works Scope) ID Works Package - Lighting Requirements at L48 Meeting Room (JV Scope - Lever to Supply)

DXB/AMT-01/0600/EDM/4048 DXB/AMT-01/0600/EDM/3716

22-Apr-08 24-Feb-08

14,283.00 ur 8,452.50 ur 294,350.71

ur ur

14,283.00 ur

ur ur

100%

14,283.00 ur

0% ur

0.00 ur

14,283.00 0.00

174 163 152

002 008 001

66.1 67/ 66 71

DXB/AMT-01/0600/EDM/3716 DXB/AMT-01/0600/EDM/4047 DXB/AMT-01/0600/EDM/3270

24-Feb-08 22-Apr-08 03-Dec-07

ur ur see NOC#127

8,232.00

JAP016/ALM/TCAC/22576 dated 24-Nov-08

CLOSED ur

ur ur CLOSED 0%

0.00 ur 0.00

100% ur 0%

8,232.00 ur 0.00

8,232.00 0.00 0.00

176,646.32

JAP016/ALM/TCAC/22470 see NOC#127 dated 20-Nov-08

CLOSED

0.00

164 123

001 001R2

72 73

DXB/AMT-01/0600/EDM/3589 DXB/AMT-01/1100/WAE/2955

02-Feb-08 01-Oct-07

40,216.65 12,637.06

0 ur

39,167.52

JAP016/ALM/TCAC/21106 dated 22-Sep-08

CLOSED 12,637.06

CLOSED ur

100% 100%

39,167.52 12,637.06

0% 0%

0.00 0.00

39,167.52

0.00 12,637.06

BF cost AED 34,971.00 + 12% JV OH&P confirmed to be valued under ERI No. 73 according to the Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08

166

001

73

JV

DXB/AMT-01/0600/EDM/3609

04-Feb-08

11,783.12 2,254.00 73,986.40

ur

11,783.12

ur

100%

11,783.12

0%

0.00

11,783.12

ETA cost + 12%OH&P + 3% Attendances; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08 JV to submit entitlements; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08; Lever cost + 12% OH&P + 3% Attendance ETA cost + 12% OH&P + 3% Attendances

166

002

73

JV

DXB/AMT-01/0600/EDM/3609

04-Feb-08

ur

2,254.00

ur

100%

2,254.00

0%

0.00

2,254.00

202

001

74

197

001a

74.1

NSC Revised Domestic Water Layout at Ground and First Floor due to the Revised "For Construction" Drawings under the DMCC Transmittal JAP016/TRNS/JV/00042 JV Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope masonry works, abortive works and coring works) Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope ID works) NSC Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (ID Scope of Works) NSC Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (MEP Works) NSC Revised " For Construction" drawings under the DMCC transmittal ref. JAP016/TRNS/JV/00040 dated 16-Apr-08 (Additional Voice/Data Points in GF & 1L) JV NSC ID Tiling Works-Attic Stock (ERI No. 75) JV Doors at DEWA Water Meter Rooms

DXB/AMT-01/0600/EDM/4137

06-May-08

ur

73,986.40

ur

0.00

100%

73,986.40

19,688.00

54,298.40

DXB/AMT-01/0600/EDM/4053

22-Apr-08

18,228.31

ur

14,232.82

JAP016/ALM/TCAC/22447 dated 19-Nov-08

CLOSED

ur

0.00

100%

14,232.82

27,042.36

(12,809.54)

Masonry Works, Abortive Works and Coring Works

197

001b

74.1

DXB/AMT-01/0600/EDM/4053

22-Apr-08

57,459.68

ur

57,459.68

ur

0.00

100%

57,459.68

57,459.68

Doors and Frames incl Ironmongery, and Ceiling Works

197

002

74.1

DXB/AMT-01/0600/EDM/4053

22-Apr-08

ur

ur

ur

ur

ur

ur

ur

0.00

Bond Interiors to submit entitlements

197

003

74.1

DXB/AMT-01/0600/EDM/4127

05-May-08

50,319.40

ur

50,319.40

ur

0.00

100%

50,319.40

50,319.40

ETA to submit entitlements

238

001

74.1

DXB/AMT-01/0500/JLy/5009

26-Oct-08

26,919.09

ur

26,919.09

ur

0.00

100%

26,919.09

26,919.09

BC Cost + 7% OH&P; BC VO#9; BC time claim = 186 days

201 158 205 205 207 196 196 196

001 001R1 001 002 001 001 002 003a

75 76 76.1 76.1 77 78 78 78

DXB/AMT-01/0600/EDM/4135 DXB/AMT-01/0500/JLy/3401/ DXB/AMT-01/0500/JLy/3416 DXB/AMT-01/0600/EDM/4274 DXB/AMT-01/0600/EDM/4274 DXB/AMT-01/0600/EDM/4323 DXB/AMT-01/0600/EDM/4046 DXB/AMT-01/0600/EDM/4046 DXB/AMT-01/0600/EDM/4046

06-May-08 27 & 31Dec-07 24-May-08 24-May-08 31-May-08 22-Apr-08 22-Apr-08 22-Apr-08

ur 21,502.11 10,637.50 5,263.09 150,193.45 2,070.00 76,094.35 62,002.57

0 ur ur ur ur ur ur ur

ur 21,502.11

CLOSED ur ur ur ur ur ur ur 100% 100% 100%

ur 21,502.11 7,908.70 3,941.91 0.00 0.00 0.00 0.00

ur 0% 0% 0% 100% 100% 100% 100%

ur 0.00 0.00 0.00 150,193.45 2,070.00 76,094.35 62,002.57 3,941.91

0.00 21,502.11 7,908.70 0.00 150,193.45 2,070.00 76,094.35 62,002.57

BI to submit entitlements JV Costs ETA cost + 7% OH&P JV works clsoing of opening and provision of new opening with waterproofing and sealing works Al Abbar cost + 12% OH&P + 3% Attendances valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 ETA cost + 12% OH&P + 3% Attendances; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#03); BC time claim = 147 days BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#05); BC time claim = 233 days BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#11); bc time claim = 201 days BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#01); bc time claim = 275 days BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#02); bc time claim = 273 days valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 JV Internal Works

NSC DEWA Water Meter Connection (MEP Works) JV DEWA Water Meter Connection (Builders Work)

7,908.70 3,941.91

JAP016/TS/GT/20686 dated 28Aug-08 JAP016/TS/GT/20686 dated 28Aug-08

CLOSED CLOSED 150,193.45 2,070.00 76,094.35 62,002.57

NSC Tower Secondary Roof Clamping Section MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (JV Scope) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (ETA Scope) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeKrone Modules) JV NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeVertical Cable Manager) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeHorizontal Cable Manager) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeCAT 3 Cables Installations) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeOM3 Fibre Optic Cable Installations) JV JV MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Lateral Systems Scope) MDF & IDF Rooms DUs Additional Requirements, i.e., Stand for the UPS & Batteries in MDF Room & UPS Room at Basement 1

196

003b

78

DXB/AMT-01/0600/EDM/4046

22-Apr-08

127,698.42

ur

127,698.42

ur

0.00

100%

127,698.42

127,698.42

196

003c

78

DXB/AMT-01/0600/EDM/4046

22-Apr-08

19,821.34

ur

19,821.34

ur

0.00

100%

19,821.34

19,821.34

196

003d

78

DXB/AMT-01/0600/EDM/4046

22-Apr-08

336,915.53

ur

336,915.53

ur

0.00

100%

336,915.53

336,915.53

196

003e

78

DXB/AMT-01/0600/EDM/4046

22-Apr-08

321,379.43

ur

321,379.43

ur

0.00

100%

321,379.43

321,379.43

196 196

004 005

78 78

DXB/AMT-01/0600/EDM/4046 DXB/AMT-01/0600/EDM/4797

22-Apr-08 02-Sep-08

117,875.00 5,689.44

ur ur

117,875.00 5,689.44

ur ur

100%

117,875.00 0.00

0% 100%

0.00 5,689.44

117,875.00 5,689.44

196

006

78

NSC MDF & IDF Rooms DUs Additional Requirements, i.e., DU's Requirements for the UPS NSC Replacement of FCU at UPS Room Basement 1 NSC Relocation of Isolators in UPS Room as per the DU's Requirements

DXB/AMT-01/0600/MIC/5017

27-Oct-08

93,918.75

ur

93,918.75

ur

0.00

100%

93,918.75

93,918.75

ETA cost + 12% OH&P + 3% Attend

196 215

007 001

78 78

DXB/AMT-01/0600/EDM/5146 DXB/AMT-01/0600/EDM/4474

27-Nov-08 29-Jun-08

ur 36,059.40

ur ur

ur 36,059.40

ur ur

ur 0.00

ur 100%

ur 36,059.40

0.00 36,059.40

ETA to submit entitlements ETA cost + 12% OH&P + 3% Attendances, JV to submit builders work, if any; ERI 78 as confirmed by F&G letter ref. JAP016/ALM/TCAC/19239 dtd 26Jun08 & Nakheel letter ref. JAP016/TS/GT/0304 dtd 8Aug08 ETA cost + 12% OH&P + 3% Attendances (Power & LC, AC & Ventilaltion, Drainage)

204

001

79

NSC Level 1 Food Court A/C Design Revised "For Construction" Drawings under the DMCC transmittal ref. JAP016/TRNS/JV/00046 (MEP Works) JV Doors to Lift Machine Rooms - Summit & Service F1 (Atkins letter ref. RD4532/661/AK/mja/R8-1879)

DXB/AMT-01/0600/EDM/4270

24-May-08

354,891.15

ur

354,891.15

ur

0.00

100%

354,891.15

354,891.15

228

001R1

80

DXB/AMT-0//0600/EDM/4667

03-Aug-08

37,185.25

ur

37,185.25

ur

0.00

100%

37,185.25

37,185.25

JV's cost from Belgium Aluminum and Best Steel + 12% OH&P + 3% Attendances

203 231

001 001

81 82

NSC Granite Finishing at Level 2 (RFI No. 636 R1) NSC Additional Dummy Mullion at Levels 49-51 NSC Revisions to Landscaping Package in accordance with the M/s. Nakheel letter ref. JAP016/TS/BW/0347 dated 21-Sep-08 JV Omit Wall Plaster from Car Parking Areas in all 5 Basement Floors JV Omission of Rebars in Core Walls JV Omission of Render from the vertical element of whole three Services Floor (S1, S2, & S3) Plant Rooms Revisions to Office Partitions - Masonry Works

DXB/AMT-01/0600/EDM/4249 DXB/AMT-0//0600/EDM/4859

21-May-08 17-Sep-08

33,846.52 ur 66,615.70

ur ur

33,846.52 ur

ur ur

0.00 ur

100% ur

33,846.52 ur

33,846.52 0.00

AB cost + 12% OH&P + 3%Attend Al Abbar to submit entitlements; Nakheel letter ref. JAP016/TS/BW/0346 dtd 14Sep08 instruction to install and ERI is forthcoming Al Bayader cost + 12% OH&P + 3% Attendances

233

001

83

DXB/AMT-0//0600/EDM/4939

12-Oct-08

ur

66,615.70

ur

0.00

100%

66,615.70

66,615.70

OM-1 OM-2 OM-3

001 001 001

13 21 27

JAP016/ALM/TCAC/05257 JAP/ALM/TCAC/11435 JAP016/ALM/TCAC/06046

16-Nov-06 21-Aug-07 04-Jan-07

(383,650.51) (693,815.82) (277,596.39)

0 0 0

(383,650.51)
JAP016/ALM/TCAC/20290 dated 13-Aug-08 ????

CLOSED CLOSED CLOSED

100% 100% 100%

(383,650.51) (676,513.69) (58,985.18)

0% 0% 0%

0.00

(315,883.28) (693,815.82)

(67,767.23) 17,302.13 164,014.82

cost implication sent under JV letter ref.DXB/AMT01/0800/Jly/1175 dated 29-Nov-06 joint measurement done and agreed; in connection with 33-019 IPC NO. 41

(676,513.69) (58,985.18)

0 0

CLOSED CLOSED

0.00

(223,000.00)

OM-4 OM-4 OM-5 OM-6 OM-7

001 002 001 001 001

28 28 45 60 71

JV

JAP016/ALM/TCAC/19000 JAP016/ALM/TCAC/19000 JAP016/ALM/TCAC/19244 DXB/AMT-01/0600/MIC/5011 JAP016/ALM/TCAC/22470

17-Jun-08 17-Jun-08 26-Jun-08 26-Oct-08 20-Nov-08

(126,440.24) (69,689.10) (66,453.77) (2,856.00) (132,210.53)

0 0 0 0 0

(126,440.24)

JAP016/ALM/TCAC/19000 dated 17-Jun-08

CLOSED (69,689.10)

CLOSED 0.00 CLOSED CLOSED 0.00

100%

(126,440.24) 0.00

0% 100% 0% 0% 100%

0.00 (69,689.10) 0.00 0.00 (132,210.53)

(196,129.34)

69,689.10 (69,689.10)

NSC Revisions to Office Partitions - OCP Works Omission of Partition Walls in Level 30 for Single Tenancy Arrangements Omission of Proximity Access Card Reader and Access Cards at Basement 1 Boom-Gate NSC Omission of Wall Tiles due to the extension of Metal Cladding Behind Glass Ballustrades caused by the lowering of Ceiling JV JV

(66,453.77) (2,822.40)

0 0

JAP016/ALM/TCAC/19244 dated 26-Jun-08 JAP016/ALM/TCAC/22410 DATED 18-Nov-08

CLOSED CLOSED (132,210.53)

100% 100%

(66,453.77) (2,822.40) 0.00

(66,453.77)

0.00 (2,822.40) (132,210.53)

JV scope of works, i.e., omission of blockworks and plaster BondCommunication scope of works + 7% OH&P; AWAITING RESPONSE FROM m/S. Bond Communication JV Scope of Works - Omission of Office Partitions at the Level 30 due to the single tenancy arrangements considered Sultan Hareb rates x no. of slots in Basement 1 + 12% OH&P BI to confirm cost by F&G

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (3).monvabad

18 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
OM-8

October 15, 2013


REMARKS / COMMENTS

SUB NO.
001

ERI NO.
38

V.O. TO
JV

CLAIM NOTICE LETTER

DESCRIPTION
REFERENCE Modification of Lift Openings at 36th Floor Low Rise Lift Machine Room and 48th Floor High Rise Lift Machine Rooms (Omission of Concrete Works due to the increase of Lift Opening Sizes) Modification to the Structural Drawings at Levels 49, 50, and 51
JAP016/ALM/TCAC/22416

DATE
18-Nov-08

CLAIM ENTITLEMENT APPLICATION COST TIME (Days) (AED) (1,988.48)


0

ER / F&G / JV AGREED VALUES COST (AED) (1,988.48)


TIME (Days)
0

OUTSTANDING CLAIMS COST (AED)


CLOSED

LETTER REF.
JAP016/ALM/TCAC/22416 dated 18-ov-08

TIME (Days)
CLOSED

%
100%

WORK DONE TO-DATE VALUE (AED)


(1,988.48)

BALANCE OF WORK TO-DATE VALUE % (AED)


0% 0.00

CERTIFIED AS AT CERTIFIED TO-DATE

November 30, 2008


BALANCE TO-DATE
(1,988.48)
BI to confirm cost by F&G

OM-9

001

49

JV

JAP016/ALM/TCAC/19245

26-Jun-08

(85,688.89)

(85,688.89)

0.00

1.00

(85,688.89)

0.00

0.00

(85,688.89)

0.00

Omission of Office Partitions at Level 49

0 1 2 3 4 5 6 7 8 9

001 001 001 001 001 001 001 001 001 001

JV JV JV JV JV JV JV JV JV JV

Delay in Site Mobilization Design Modification of Pile Caps Excavation to the difference in the Tender Drawings and the Actual Site Conditions Pile Head Levels and Associated Problem Nominated Subcontractor Appointment (ETA) Fuel Price Increases Delay of receipt of the Building Permit and "For Constructon" Drawings Delay in Raft Pour in Zones 1 & 2 Late Notification of Subcontractors Closure of Site and Offices (due to the death of Sheik Maktoom, 5-7 January 2006)

TDB/P3/AM059 TDB/P3/AM/CN-001A TDB/P3/AM/CN-002A DXB/AMT-01/0500/JLy/112 DXB/AMT-01/0500/JLy/068 DXB/AMT-01/0500/JLy/070 DXB/AMT-01/0500/JLy/131 DXB/AMT-01/0500/JLy/134 DXB/AMT-01/0500/JLy/159 DXB/AMT-01/0500/JLy/171

05-Sep-05 05-Sep-05 17-Sep-05 18-Sep-05 03-Oct-05 03-Oct-05 30-Nov-05 04-Dec-05 28-Dec-05 08-Jan-06

0.00 611,739.00 259,943.16 258,088.62 0.00 0.00 0.00 0.00 0.00 0.00

see NOC#127 see NOC#127 see NOC#127 see NOC#127 ur 0 ur see NOC#127 ur 2

0.00

see NOC#127 see NOC#127 see NOC#127 see NOC#127

CLOSED 611,739.00 259,943.16 258,088.62


JAP016/GEN/ABS/1051 dated 8-Aug-06

CLOSED CLOSED CLOSED CLOSED ur CLOSED ur CLOSED ur 2

0% 100% 100% 100% 0% 0% 0% 0% 0% 0%

0.00 611,739.00 259,943.16 258,088.62 0.00 0.00 0.00 0.00 0.00 0.00

0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00 611,739.00 259,943.16 258,088.62 0.00 0.00 0.00 0.00 0.00 0.00

This is due to the late possession of site as detailed in the referred letter. progressed under a separate claim.

progressed under a separate claim.

progressed under a separate claim. rejected by Nakheel due to notice not served as per the required time period under the Contract. rejection letter ref. JAP016/GEN/ABS/1051 dated 8Aug-06 does not detail the reasons for rejection of Claim No. 5. rejected by Nakheel due to notice not served as per the required time period under the Contract. progressed under a separate claim; time related claim. rejected by Nakheel due to dates relating to NSC in the Baseline Programme is not yet accepted. Rejected by Nakheel in accordance to Clause 44.1 of CoC, as 1 day is non working day and 2 days is not sufficient to award an entitlement; our letter ref. DXB/.Jly/5013 dtd 26Oct08 again requested for 2 days EOT ETA to submit entitlements; Permanent Power now in place done by ETA. ETA to submit entitlements; rejected by Nakheel due to notice not served as per the required time period under the Contract. Internal S/C Works + 12% OH&P included in Claim Nos. 107-003 & 175-001 ETA to submit entitlements ETA to submit entitlements included in Claim Nos. 67-001 valued under the Claims Series 33 KONE to submit entitlements; rejected by Nakheel due to Clause 20.1-Care of Works on the CoC. AA to submit entitlements; rejected by Nakheel due to Tech Specifications H11/20, Clause 871, and Clause 3b of CoC. ETA Cost + 7% JV OH&P; as per original claim JV Cost ETA to submit entitlements; rejected by Nakheel due to the Consultant's(Atkins)response ref. RD/4532/661/ML/R8-0344. time implications. same as Claim No. 37-001, based on the F&G transmittal ref. F+G/ALMAS/TAISEI/01404 dtd 10-1506 based on the response from RFI No. 417 request by WS Atkins and F&G in the Technical Meeting to provide 3rd party safety inspection and issue of certificate prior to CTU; rejected by Nakheel. ETA to submit entitlements; revisions is due to the requirement of a UL/FM specifications To be included in the Prolongation Claims as this is a preliminaries items ETA to submit entitlements ETA to submit entitlements due to inclement weather conditions at site rejected by F&G as it is included specs M13. valued in Claim No. 65-001 not applicable rejected by F&G as per the response letter Revision 1 - revised due to the changes in the works. not applicable Included in Claim No. 64-001 Included in 76-001 included in Claim No. 116-001 not done

0.00 0.00 0.00 0.00 0.00 0.00


see NOC#127 0

CLOSED CLOSED CLOSED CLOSED

0.00 0.00 0.00 0.00

JAP016/GEN/ABS/1051 dated 8-Aug-06 JAP016/GEN/ABS/1051 dated 8-Aug-06

JAP016/TS/BW/0018 dated 31Oct-06 JAP016/GEN/ABS/1014 dated 24-Jun-06, & JAP016/GEN/ ABS/1051 dated 8-Aug-06

CLOSED CLOSED

0.00

10 11

001 001

NSC ETA Site Establishment (Provision of Temporary Power Supply) NSC Revised Contract Drawings by ETA JV Builders Works Drawings NSC DTS referenced AM/015/515 dated 5th August 2006 (MEP Works) NSC DTS referenced AM/015/509 dated 1st August 2006 (MEP Works) NSC DTS referenced AM/015/516 dated 7th August 2006 (MEP Works) NSC LV Schematic Diagram JV Revised Structural Drawings NSC Storage Area for KONE NSC Factory Inspections for Al Abbar NSC Additional OCP's conduits to the Offices and Retail Units (MEP Works) JV Additional OCP's conduits to the Offices and Retail Unts (Builders Work) NSC Fire Alarm Shop Drawing JV Nomination of Landscaping Subcontractor NSC Revised "For Construction" Drawings for ETA NSC Fire Sprinkler Riser Pipes in Garbage Chute Shaft JV CTU 3rd Party Inspection

DXB/AMT-01/0500/JLy/353 DXB/AMT-01/0500/JLy/360

17-Apr-06 18-Apr-06

0.00 ur

0 ur

0.00

(not provided) JAP016/GEN/ABS/1051 dated 8-Aug-06

CLOSED ur

CLOSED ur

0%

0.00 ur

0% ur

0.00 ur

0.00

0.00 0.00

22 23 24 25 26 27 29 30

001 002 001 001 001 001 001 001

DXB/AMT-01/0500/JLy/726 DXB/AMT-01/0500/JLy/748 DXB/AMT-01/0500/JLy/749 DXB/AMT-01/0500/JLy/750 DXB/AMT-01/0500/JLy/759 DXB/AMT-01/0500/JLy/760 DXB/AMT-01/0500/JLy/796 DXB/AMT-01/0500/JLy/802

31,782.05 (valued in 107-003 & 175001) 12-Aug-06 ur


05-Aug-06 12-Aug-06 12-Aug-06 15-Aug-06 15-Aug-06 26-Aug-06 29-Aug-06

0 0 ur ur 0 0 0 0

31,782.05 CLOSED ur ur

CLOSED CLOSED ur ur CLOSED CLOSED CLOSED CLOSED

100% 0%

31,782.05 0.00 ur ur

0% 0% ur ur 0% 0% 0% 0%

0.00 0.00 ur ur 0.00 0.00 0.00 0.00


0.00 0.00 0.00

31,782.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00

(valued in 107-003 & 175-001)

ur (valued in 67-001) (valued in 33) 0.00 0.00 38,246.08 120,370.11 ur 0.00 (valued in37-001) 522,748.23 0.00 ur (valued in 127-001) ur ur 0.00 0.00 (valued in 65-001) (valued in 33-030) 0.00 12,494.21 (valued in 35-001) (valued in 64-001) (valued in 76-001) (valued in 116-001) 0.00

(valued in 67-001) (valued in 33) 0.00 0.00

0 0 0 0
JAP016/TS/ABS/0004 dated 12Sep-06 JAP016/GEN/ABS/1070 dated 06-Sep-06

CLOSED CLOSED CLOSED CLOSED

0% 0% 0% 0%

0.00 0.00 0.00 0.00

0.00 0.00

35 35 36

002a 002b 001

DXB/AMT-01/0500/JLy/926 DXB/AMT-01/0500/JLy/926 DXB/AMT-01/0500/JLy/932

03-Oct-06 03-Oct-06 05-Oct-06

ur ur ur
JAP016/TS/BW/0021 dated 12Nov-06

38,246.08 120,370.11 ur

ur ur ur

100% 100%

38,246.08 120,370.11 ur

0% 0% ur

0.00 0.00 ur

38,246.08 120,370.11 0.00

39 40 42 43

001 001 001 001

DXB/AMT-01/0500/JLy/1052 DXB/AMT-01/0500/JLy/1054 DXB/AMT-01/0500/015/JLy/235 DXB/AMT-01/0500/JLy/1086

05-Nov-06 06-Nov-06 07-Nov-06 11-Nov-06

ur 0 ur 0

0.00 (valued in37-001)

CLOSED 0 CLOSED 522,748.23

ur CLOSED ur CLOSED

0% 0% 100% 0%

0.00 0.00 522,748.23 0.00

0% 0% 0% 0%

0.00 0.00 0.00 0.00


0.00

0.00 0.00 522,748.23 0.00

0.00

JAP016/TS/ABS/0031 dated 28Dec-06

CLOSED

44 45 47 48 49 53 58 60 61 62 63 66 71 72 73

001 001 001 001 001 001 001 001 001 001 001 001 001 001 001

NSC Revised Specifications for the Fire Fighting Equipments JV Provision of Inspectors NSC Revised Architectural Drawings at 31st & 32nd Floor (MEP Works) NSC Revised Architectural and ID Drawings (MEP Works) JV JV Exceptionally Adverse Climatic Conditions RFI No. 480 - Embedded Flush Tank

DXB/AMT-01/0600/EDM/1179 DXB/AMT-01/0500/JLy/1185 DXB/AMT-01/0600/EDM/1237 DXB/AMT-01/0600/EDM/1238 DXB/AMT-01/0500/JLy/1253 DXB/AMT-01/0500/JLy/1338 DXB/AMT-01/0600/EDM/1566 DXB/AMT-01/0500/JLy/1567 DXB/AMT-01/0500/JLy/1593 DXB/AMT-01/0600/EDM/2507 DXB/AMT-01/0500/JLy/1633 DXB/AMT-01/0600/EDM/1655 DXB/AMT-01/0600/EDM/1786 DXB/AMT-01/0500/JLy/1792 DXB/AMT-01/0500/JLy/1836

29-Nov-06 03-Dec-06 11-Dec-06 11-Dec-06 14-Dec-06 28-Dec-06 10-Feb-07 13-Feb-07 14-Feb-07 11-Jul-07 20-Feb-07 25-Feb-07 14-Mar-07 14-Mar-07 19-Mar-07

ur 0 ur ur ur 0 0 0 0 ur 0 0 0 0 0

ur

ur CLOSED ur ur ur CLOSED CLOSED CLOSED CLOSED ur CLOSED CLOSED CLOSED CLOSED CLOSED 0% 0% 0% 0% 0% 100% 0% 0% 0% 0% 0% 0%

ur 0.00 ur ur 0.00 0.00 0.00 0.00 0.00 12,494.21 0.00 0.00 0.00 0.00 0.00

ur 0% ur ur 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

ur 0.00 ur ur 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00

(valued in 127-001)

CLOSED ur ur

0.00

0.00 0.00
(valued in 65-001)
0 0 0 0
JAP016/ALM/TCAC/06995 dated 18-Feb-2007 JAP016/TS/ALM/TCAC/06906 dated 14-Feb-07

CLOSED CLOSED CLOSED CLOSED CLOSED 12,494.21

NSC Revised MEP Drawings JV Provision of BMU JV JV Sanitary Ware Selection

0.00 0.00 0.00 12,494.21 0.00 0.00 0.00 0.00 0.00

(valued in 33-030) 0.00

Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms NSC Installation of OCP's to Tenant Rooms NSC MEP Works - Revised External Services Drawings NSC MEP Works - Revised Ground Floor Landscape Drawings JV Interfacing Detail between the Cladding and Blockwall JV Disabled Toilets (CVI No. 052 dated 18th March 2007 increase of openings to blockwork walls to 1.00m) JV Shadow Groove to Ceilings JV Disabled Toilet NSC RFI No. 571 - Insulation and Backing Panels to Cladding JV Change of Back of House Doors Colours from White to Gray NSC Revision of ST-10 to ST-15 (ID Works Package Provisional Sum) JV Changes to D-04 & D-30 Hinges (ID Works Package) NSC Secondary Roof for the Towers JV JV JV JV Revised Interior Lighting Fixtures Layout at GF,1L,& 2L Provision of Downspouts at Ballroom/Function Room Roof (CVI No. 122) Architectural Changes to Level 2 Omission of Mirror Mounted Paper Towel Dispenser

(valued in 35-001) (valued in 64-001) (valued in 76-001) 0.00 0.00

0 0 0 0 0
(not done)

CLOSED CLOSED CLOSED CLOSED CLOSED

0.00 0.00

74 75 83 90 91 96 98 105 107 108 111 113

001 001 001 001 001 001 001 001 006 001 001 001

DXB/AMT-01/0500/JLy/1885 DXB/AMT-01/0500/JLy/1886 DXB/AMT-01/0500/JLy/2184 DXB/AMT-01/0500/JLy/2347 DXB/AMT-01/0500/JLy/2350 DXB/AMT-01/0600/EDM/2437 DXB/AMT-01/0600/EDM/2451 DXB/AMT-01/0600/EDM/2553 DXB/AMT-01/0600/EDM/4465 DXB/AMT-01/0100/YOS/2628 DXB/AMT-01/0600/EDM/2731 DXB/AMT-01/0600/EDM/2768

26-Mar-07 26-Mar-07 20-May-07 16-Jun-07 16-Jun-07 30-Jun-07 02-Jul-07 18-Jul-07 26-Jun-08 31-Jul-07 18-Aug-07 26-Aug-07

(valued in 41-001) 0.00 ur 0.00 2,704,866.52 (valued at 41-001) (valued in 220-001) (valued in 41-001) 2,210.46 (valued in 149) 165,993.30 91,147.85

0 0 ur 0 ur 0 ur 0 see NOC#127 0 see NOC#127 ur

(valued in 41-001) 0.00

0 0

(valued in 41-001) (not done)

CLOSED CLOSED ur

CLOSED CLOSED ur CLOSED ur CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED ur

0% 0%

0.00 0.00 ur

0% 0% ur 0% 0% 0% 0% 0% 100% 0% 0% 100%

0.00 0.00 ur 0.00 0.00 0.00 0.00 0.00 2,210.46 0.00 0.00 91,147.85

0.00 0.00

0.00 0.00 0.00

valued in Claim No. 41-013 not done AA to submit entitlements no claim from subcontractors BI costs of AED 2,527,912.64 + 7% JV OH&P considered in Claim No. 41-007 to be valued in Claim N o. 220-001 TO BE VALUED IN CLAIM NO. 41-001 (ERI 16) varied works at structural steel works and provision of Roof Drain on-hold area, awaiting details from Client Arte Casa Cost + 12% OH&P + 3% Attendances ETA costs + 12% OH&P + 3% Attendances

0.00

(not done)

CLOSED 2,704,866.52

100% 100% 0% 0% 0%

0.00 2,704,866.52 0.00 0.00 0.00 0.00

0.00

0.00 2,704,866.52

(valued at 41-001)
(valued in 220-001) (valued in 41-001)

0 0 0 see NOC#127
JAP016/ALM/TCAC/10523 dated 22-July-2007

CLOSED CLOSED CLOSED 2,210.46 CLOSED 165,993.30 91,147.85

0.00 0.00 0.00

0.00 0.00 0.00 2,210.46

(valued in 149)

0 see NOC#127

0% 100% 0%

0.00 165,993.30 0.00

0.00

0.00 165,993.30 91,147.85

113

002

113

003

117

001

NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (ETA Scope) NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (Al Abbar Scope) JV Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (JV Scope) JV Changes to the Diamond Exchange Centre

DXB/AMT-01/0600/EDM/2768

26-Aug-07

11,909.40

ur

11,909.40

ur

0%

0.00

100%

11,909.40

11,909.40

Al Abbar cost + 12% OH&P + 3% Attendances

DXB/AMT-01/0600/EDM/2768

26-Aug-07

(valued in 113-001)

(valued in 113-001)

CLOSED

CLOSED

0%

0.00

0%

0.00

0.00

0.00

Included in Claim No. 113-001

DXB/AMT-01/0500/JLy/2805

02-Sep-07

(valued in 149-001)

see NOC#127001 ur ur 0 ur ur ur 579

(valued in 149-001)

see NOC#127001

CLOSED

CLOSED

0%

0.00

0%

0.00

0.00

0.00

valued in 149-001 under ERI No. 62

118 119 120 121 124 125 127

001 001 001 001 001 001 001

NSC Revised Mechanical and Electrical Drawings at Basement 2 (Security Room) JV Notification of Potential Delay due to the Review of Shop Drawings JV Changes to the Floor Drain Locations JV JV Engineering and Procurement Activities

DXB/AMT-01/0600/EDM/2906 DXB/AMT-01/1100/WAE/2908 DXB/AMT-01/0600/EDM/2933 DXB/AMT-01/0500/JLy/2949 DXB/AMT-01/1100/WAE/2953 DXB/AMT-01/0600/EDM/3009 DXB/AMT-01/0500/JLy/3018 / DXB/AMT-01/0500/JLy/3311 / DXB/AMT-01/0500/JLy/3710 / DXB/AMT-01/0500/JLy/3855 / DXB/AMT-01/0500/JLy/4017

19-Sep-07 19-Sep-07 26-Sep-07 30-Sep-07 01-Oct-07 14-Oct-07 16-Oct-07 / 11-Dec-07 / 21-Feb-08 / 17-Mar-08 / 17-Apr-08

ur 0.00 0.00 (valued in 41-001) 0.00 ur 131,765,411.17

ur

ur ur CLOSED ur ur ur 579 55% 0% 0% 0% 0%

ur 0.00 0.00 0.00 0.00 ur 72,105,982.91

ur 0% 0% 0% 0% ur 45%

ur 0.00 0.00 0.00 0.00 ur 59,659,428.26


0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 131,765,411.17

ETA to submit entitlements Potential Time Claim coring works not done. valued in 41-001, time claim submitted separately time claim. ETA to submit entitlements EOT of 585 days includes the previous 96 days and 138days claimed; Claim for additional pile works reduced to 132 from 138, thus reducing the overall claim to 579 days

0.00 0.00 (valued in 41-001) 0.00


0
(not done)

CLOSED CLOSED CLOSED CLOSED ur 131,765,411.17

Late Issuance of Design Information (Specifications of Lighting Fixtures in ID Areas) NSC Level 2 Fire Policy Layouts (Transmittal Ref. JAP016/TRNS/JV/00014) JV Prolongation Costs

0.00

127

002

JV

Additional Payment as a Result of the Escalating Cost of Materials

DXB/AMT-01/0500/JLy/4632

24-Jul-08

711,983.12

see NOC#127001 0

see NOC#127001

711,983.12

CLOSED

55%

389,618.51

45%

322,364.61

711,983.12

in connection to the prolongation claim

128

001

129 130 133

001 001 001

138 140 141 142 143 144 145

001 001 001 001 001 001 001

Changes to Level 2 due to the New "For Construction" Drawings under Transmittal JAP016/TRNS/JV/00015 JV Staircase at Levels 49-50 NSC Drainage on Swimming Pool Deck at Level 1 (RFI No. 831) NSC Further Revisions to For Construction Drawings under transmittals ref. JAP016/TRNS/JV/00015 and 00016 JV Notification of Delay to the ID Works Package Signages NSC Modification in Specification of Some ID Lighting Fixtures JV Notification of Delay to the ID Doors Package JV NSC Disruption of Works resulting from Design Conflict in Basement 1 VIP Lounge JV Notice of Disruption of Work at Function Room/Ballroom due to Design Conflict JV Delays due to Design Issues Related to GL-07 JV Notification of a Possible Delay to the Glass Feature Wall (GL-05) under the ID Works Package NSC Internal Water Feature (MEP Scope) NSC Power Supply and Fire Alarm Interface to Smoke Ventilation Window (RFI No. 783) NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (Bond Communication Scope - Additional Voice/Data Points at Level 2)

DXB/AMT-01/0600/EDM/3035

21-Oct-07

(valued in 149)

(valued in 149)

CLOSED

CLOSED

0%

0.00

0%

0.00

0.00

0.00

not applicable.

DXB/AMT-01/0600/EDM/3051 DXB/AMT-01/0600/EDM/3058 DXB/AMT-01/0600/EDM/3067

23-Oct-07 24-Oct-07 25-Oct-07

0.00 ur ur

0 ur ur

0.00

(not done)

CLOSED ur ur

CLOSED ur ur

0%

0.00 ur ur

0% ur ur

0.00 ur ur

0.00

0.00 0.00 0.00

staircase not done. ETA to submit entitlements ETA & JV to submit entitlements

DXB/AMT-01/1100/WAE/3131 DXB/AMT-01/0600/EDM/3136 DXB/AMT-01/1100/WAE/3137 DXB/AMT-01/0600/EDM/3142 DXB/AMT-01/1100/WAE/3187 DXB/AMT-01/0500/JLy/3192 DXB/AMT-01/0600/EDM/3204

07-Nov-07 08-Nov-07 10-Nov-07 10-Nov-07 18-Nov-07 19-Nov-07 20-Nov-07

(valued in 149-001) ur (valued in 149-001) 25,787.60 0.00 0.00 (valued in 41-001)

ur ur ur ur ur ur ur

(valued in 149-001)

CLOSED ur

ur ur ur ur ur ur ur

0%

0.00 ur

0% ur 0% 100% 0% 0% 0%

0.00 ur 0.00 25,787.60 0.00 0.00 0.00

0.00

0.00 0.00

time claim. ETA tnd Lever to submit entitlements time claim. ETA Cost + 12%OH&P + 3% Attendances time claim. under review; time entitlements under review for time entitlements

(valued in 149-001)

CLOSED 25,787.60

0% 0% 0% 0% 0%

0.00 0.00 0.00 0.00 0.00

0.00

0.00 25,787.60

0.00 0.00
(valued in 41-001)

CLOSED CLOSED CLOSED

0.00

0.00 0.00

0.00

0.00

147 148 149

003 001 005a

DXB/AMT-01/0500/JLy/3209 DXB/AMT-01/0600/EDM/3217 DXB/AMT-01/0600/EDM/4741

21-Nov-07 22-Nov-07 18-Aug-08

ur ur 24,628.70

ur ur ur

ur ur 24,628.70

ur ur ur

ur ur 0.00

ur ur 100%

ur ur 24,628.70

0.00 0.00 24,628.70

ETA to submit entitlements ETA to submit entitlements BC cost + 7% OH&P; BC VO#10; BC time claim = 147 days

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (3).monvabad

19 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
149

October 15, 2013


REMARKS / COMMENTS

SUB NO.
005b

ERI NO.

V.O. TO

CLAIM NOTICE LETTER

DESCRIPTION
REFERENCE
DXB/AMT-01/0600/EDM/4741

DATE
18-Aug-08

CLAIM ENTITLEMENT APPLICATION COST TIME (Days) (AED) ur


ur

ER / F&G / JV AGREED VALUES COST (AED)


TIME (Days)

OUTSTANDING CLAIMS COST (AED)


ur

LETTER REF.

TIME (Days)
ur

WORK DONE TO-DATE VALUE (AED)


ur

BALANCE OF WORK TO-DATE VALUE % (AED)


ur ur

CERTIFIED AS AT CERTIFIED TO-DATE

November 30, 2008


BALANCE TO-DATE
0.00
ETA to submit entitlements

149

005c

149

006

149

008

149

009

NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (ETA scope of works) JV Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (JV scope of works) NSC Vertical Cable Manager for Diamond Exchange AV System at the Multi Purpose Room in accordance with the F&G letter ref. JAP016/ALM/TCAC/20991 dated 16-Sep-08 JV Break Glass Pedestals at the Diamond Exchange Centre in accordance with the F&G transmittal ref. F+G/ALMAS/TAISEI/01961 NSC Revisions to the Electrical Works at the Diamond Exchange Centre and Level 2 as per the F&G transmittal ref. F+G/ALMAS/TAISEI/01574 and DMCC transmittal ref. JAP016/TRNS/JV/00048 NSC Changes to the Diamond Exchange Centre as per the instructions given via M/s. DMCC letter referenced JAP016/GEN/BW/0177 dated 20-Oct-08 JV Notification of a Potential Delay Determination of Scope of Work at L49, L50, & L51 (DMCC Floors)

DXB/AMT-01/0600/EDM/4741

18-Aug-08

(valued in 149-001)

(valued in 149-001)

CLOSED

CLOSED

0%

0.00

0%

0.00

0.00

0.00

considered in 149-001 (ERI No. 62)

DXB/AMT-01/0500/JLy/5003

25-Oct-08

11,996.83

ur

11,996.83

ur

0.00

100%

11,996.83

11,996.83

BC cost + 7% OH&P; BC VO#14; BC time claim = 119 days

DXB/AMT-01/0600/EDM/5027

01-Nov-08

9,200.00

ur

9,200.00

ur

0.00

100%

9,200.00

9,200.00

Dubai Metals cost + 12% OH&P + 3% Attand

DXB/AMT-01/0600/EDM/5059

10-Nov-08

222,906.80

ur

222,906.80

ur

0.00

100%

222,906.80

222,906.80

ETA cost + 12% OH&P + 3% Attendances

149

011

DXB/AMT-01/0600/EDM/5154

29-Nov-08

44,538.44

ur

44,538.44

ur

0.00

100%

44,538.44

44,538.44

BC cost + 7%; BC VO#17; BC time claim = 91 days

150

001

DXB/AMT-01/1100/WAE/3235

25-Jan-08

0.00

ur

0.00

CLOSED

ur

0.00

0%

0.00

0.00

Time related claim to be submitted separately.

151 153 154 155 156 157

001 001 001 001 001 001

NSC Containment (Security Services) JV Provision of Toilets at Levels 53 to 63 JV Enclosure to the Irrigation Pipes running through the LV Room 2 (RFI No. 894) NSC Second Floor Revised Lighting and Power Design NSC Lift L4 Mock-Up (Car Interior Finish @ Ground Floor Level) JV Request for Issue of Outstanding Drawings (DMCC Offices at L49-L51 & Add'l Toilets in Office Area at L52-L64) JV Special Holiday on 14th January 2008 Notice of Excessive Rains Additional Architraves to Towel Dispensers Notification of a Possible Variation at Ballroom Electrical Cabinet Doors NSC Further Revisions to the Levels 49, 50, 51, 60 and 61 in accordance with DMCC Transmittal Ref. JAP016/TRNS/JV/ 00032 dated 22nd January 2008 (MEP Works) JV Notification of Disruption of Work due to discrepancy of Design Drawings at Second Floor JV Delays due to Strong Winds JV JV JV JV Inspections not done on Timely Basis NSC Sequencing of Spire Erection JV Abortive Cost for GL-07 (ID Works Package) NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00033 dated 5th February 2008 (MEP Works) JV TECOM/DU Comments on Telephone Rooms Raised Access Floor Material Submittal NSC DU Requirements NSC TECOM/DU Comments on Structured Cabling Material Submittal NSC TECOM/DU Comments - " Active " IDF Rooms JV Diamond Exchange Details NSC Increase in Water Tank Size NSC Ducting in MDF Rooms NSC Additional Low Leakage Motorized Smoke Damper NSC Height of Services at Level-49 on Shaft-6 NSC Additional Stone Cladding to Sides of Maintenance Stairs NSC Additional Work to Make-up Levels at Main Entrance JV NSC NSC NSC NSC NSC NSC JV Design Change to External Ramps - Block Stopper Upstand (CVI No. 086) Design Change to External Ramps - Waterproofing (CVI No. 086) Sprinkler Heads in Illuminated Ceiling (RFI No. 967 Rev. 0) Additional Work to the Ball Room Parapet (CVI No. 084) Additional Work to Lightweight Concrete to Pedestrian Path (RFI No. 976) Additional Work to External Wall Finishing at Swimming Pool (RFI No. 920) Additional Work to Concrete Under Maintenance Path Tiles (RFI No. 929) Additional Aluminum Angles at RAF Termination

DXB/AMT-01/0500/JLy/3252 DXB/AMT-01/0500/JLy/3276 DXB/AMT-01/0600/EDM/3313 DXB/AMT-01/0600/EDM/3314 DXB/AMT-01/0500/JLy/3359 DXB/AMT-01/0100/YOS/3365

28-Nov-07 03-Dec-07 11-Dec-07 11-Dec-07 17-Dec-07 22-Dec-07

ur (valued in 163) 1,600.56 ur 0.00 (valued in 163)

ur 0 ur ur 0 0

ur

ur CLOSED ur ur CLOSED CLOSED 0% 0% 100%

ur 0.00 1,600.56 ur 0.00 0.00

ur 0% 0% ur 0% 0%

ur 0.00 0.00 ur 0.00 0.00


0.00

0.00 0.00 1,600.56 0.00 0.00 0.00

ETA to submit entitlements valued in another claim

(valued in 163)

CLOSED 1,600.56 ur

ETA to submit entitlements rejected by Nakheel as the proposed revisions was not done and was reverted back to original Aedas Specs valued in another claim

0.00 (valued in 163)

0 0

JAP016/TS/GT/0142 dated 31Jan-08

CLOSED CLOSED

159 160 161 162 163

001 001 001 001 005

DXB/AMT-01/0600/EDM/3482 DXB/AMT-01/0600/EDM/3483 DXB/AMT-01/0600/EDM/3492 DXB/AMT-01/1100/WAE/3542 DXB/AMT-01/0600/EDM/3770

16-Jan-08 16-Jan-08 19-Jan-08 24-Jan-08 03-Mar-08

0.00 0.00 96,768.00 0.00 ur

ur ur 0 ur

0.00 0.00 0.00

JAP016/TS/GT/0259 dated 29May-08

CLOSED CLOSED 96,768.00

CLOSED ur CLOSED ur

0% 0% 100% 0%

0.00 0.00 96,768.00 0.00 ur

0% 0% 0% 0% ur

0.00 0.00 0.00 0.00 ur

0.00 0.00 96,768.00 0.00 0.00

to be considered in the EOT claim under review for time entitlements submitted thru3701 dtd 20-Feb-08 under review. ETA to submit entitlements

JAP016/TS/GT/0186 dated 27Mar-08

CLOSED ur

165 167 168 171 172 175

001 001 001 001 001 001

DXB/AMT-01/1100/WAE/3603 DXB/AMT-01/0500/JLy/3613 DXB/AMT-01/0500/JLy/3623 DXB/AMT-01/0500/JLy/3634 DXB/AMT-01/0600/EDM/3676 DXB/AMT-01/0600/EDM/3771

04-Feb-08 05-Feb-08 06-Feb-08 09-Feb-08 17-Feb-08 03-Mar-08

(valued in 149-001) 0.00 0.00 ur 0.00 ur

ur 0 0 ur 0 ur

(valued in 149-001) 0.00 0.00 0.00


0 0 0
JAP016/TS/GT/0228 dated 13May-08 JAP016/TS/GT/0152 dated 18Feb-08

CLOSED CLOSED CLOSED ur CLOSED ur

ur CLOSED CLOSED ur CLOSED ur

0% 0% 0% 0%

0.00 0.00 0.00 ur 0.00 ur

0% 0% 0% ur 0% ur

0.00 0.00 0.00 ur 0.00 ur

0.00

0.00 0.00 0.00 0.00 0.00 0.00

time claim.

0.00
0.00

rejected by Nakheel To be included in the Prolongation Claims EVS to submit entitlements considered Nil due to the increase in the rates for GL07 as per letter ref. ETA to submit entitlements (Builders to be in another submittal)

176 176 176 176 177 180 181 182 183 184 185 187 187 188 189 190 191 192 193 194 194 195 198

001 002 003 004 001 001 001 001 001 001 001 001 002 001 001 001 001 001 001 001 002 001 001

DXB/AMT-01/0500/JLy/3814 DXB/AMT-01/0500/JLy/3568 DXB/AMT-01/1200/JIN/3827 DXB/AMT-01/0600/DAN/3923 DXB/AMT-01/0500/JLy/3844 DXB/AMT-01/1200/RAN/3903 DXB/AMT-01/1200/RAN/3906 DXB/AMT-01/1200/RAN/3915 DXB/AMT-01/1200/RAN/3932 DXB/AMT-01/1100/WAE/3936 DXB/AMT-01/1100/WAE/3937 DXB/AMT-01/1100/WAE/3971 DXB/AMT-01/1100/WAE/3971 DXB/AMT-01/1200/RAN/3974 DXB/AMT-01/1100/WAE/3975 DXB/AMT-01/1100/WAE/3976 DXB/AMT-01/1100/WAE/3979 DXB/AMT-01/1100/WAE/3980 DXB/AMT-01/0600/EDM/4026 DXB/AMT-01/0600/EDM/4041 DXB/AMT-01/0600/EDM/4041 DXB/AMT-01/0600/EDM/4042 DXB/AMT-01/0600/EDM/4079

10-Mar-08 28-Jan-08 13-Mar-08 31-Mar-08 16-Mar-08 27-Mar-08 27-Mar-08 29-Mar-08 02-Apr-08 03-Apr-08 03-Apr-08 09-Apr-08 09-Apr-08 10-Apr-08 10-Apr-08 10-Apr-08 13-Apr-08 13-Apr-08 19-Apr-08 21-Apr-08 21-Apr-08 21-Apr-08 26-Apr-08

(valued in 196) (valued in 196) (valued in 196) (valued in 196) (valued in 149-001) 71,922.15 ur 1,308,459.65 36,435.37 ur ur 108,691.73 86,593.30 ur (valued in 107-007) 0.00 ur ur 0.00 190,661.95 82,800.00 ur ur

ur ur ur ur ur ur ur ur ur ur ur ur ur ur 0 0 ur ur 0 0 0 ur ur

(valued in 196) (valued in 196) (valued in 196) (valued in 196) (valued in 149-001)

0 0 0 0

CLOSED CLOSED CLOSED CLOSED CLOSED 71,922.15 ur 1,308,459.65 36,435.37 ur ur 108,691.73 86,593.30 ur

CLOSED CLOSED CLOSED CLOSED ur ur ur ur ur ur ur ur ur ur CLOSED CLOSED ur ur CLOSED CLOSED CLOSED ur ur

0% 0% 0% 0% 0%

0.00 0.00 0.00 0.00 0.00 0.00 ur 0.00 0.00 ur ur

0% 0% 0% 0% 0% 100% ur 100% 100% ur ur 0% 100% ur 0% 0% ur ur 0% 0% 0% ur ur

0.00 0.00 0.00 0.00 0.00 71,922.15 ur 1,308,459.65 36,435.37 ur ur 0.00 86,593.30 ur 0.00 0.00 ur ur 0.00 0.00 0.00 ur ur
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 71,922.15 0.00 1,308,459.65 36,435.37 0.00 0.00 108,691.73 86,593.30 0.00 0.00 0.00 0.00 0.00 0.00 190,661.95 82,800.00 0.00 0.00

Lateral Systems to submit (Builders to be in another submittal) ETA to submit entitlements (Builders to be in another submittal) BC to submit entitlements (Builders Works if any to be in another submittal) ETA to submit entitlements valued in 149-001 under ERI No. 62 ETA Claim = AED 62,541.00, +JV's 12%(OH&P) and 3% (Attend) ETA to submit entitlements ETA Claim = AED 1,137,791.00, + JV's 12% (OH&P) and 3% (Attend) ETA Claim = AED 31,682.93, + JV's 12% (OH&P) and 3% (Attend) Al Bayader to submit entitlements Al Bayader to submit entitlements JV's portion of the works AB cost + 12% OH&P + 3%Attend ETA to submit entitlements Al Bayader to submit entitlements Al Bayader to submit entitlements; claim notice rejected Al Bayader to submit entitlements Al Bayader to submit entitlements under review (done by Dubai Metals); rejected by Nakheel as it is part of MDS scope of works ETA to submit entitlements JV thru Sibca to submit entitlements ETA to submit entitlements (Builders Works if any to be in another submittal) EVS to submit entitlements

100%

108,691.73 0.00 ur

(valued in 107-007)

0 0
JAP016/TS/GT/0204 dated 14Apr-08

CLOSED CLOSED ur ur

0% 0%

0.00 0.00 ur ur

0.00

0.00

0 0 0

JAP016/TS/GT/0233 dated 15mAY-08

CLOSED 190,661.95 82,800.00 ur ur

0% 100% 100%

0.00 190,661.95 82,800.00 ur ur

NSC Temporary Fire Alarm Systems (Installation) JV Temporary Fire Alarm Systems (Material / Testing and Commissioning) NSC Mechanical Services at Tecom Room in Level 50 NSC Change of Applied Cementitious Fireproofing to Intumescent Paint on Steel Beams at Diamond Exchange Center NSC Design Change of Core Bulk Head at Ground Floor Escalator Lobby - MEP Rectification Works for the ID Works Package (CVI No. 088) NSC Additional Extract Ducts in Basement 1 Male and Female Toilet , and VIP Toilet NSC Carpets at Level 48 NSC Fire Protection Systems at Basement 2 Security Room - Supply of Additional Wall Mounted Dry Powder and CO2 Fire Extinguishers NSC Fire Protection Systems at Basement 2 Security Room - Removal of Existing Fire Fighting Systems and Installation of ETA Supplied Fire Fighting Equipment JV Closure of the Opening in Parapet Wall on Elevation 4 for Spire Connection NSC Back Boxes for Seismic Detectors at Basement 5 and Level 2 Vault Rooms NSC BMS Monitor for the Revolving / Sliding Doors NSC Additional Screed at Road Type 2 and Ramps NSC Additional Requirements for Etisalat Room in Basement 1 (MEP Works) JV Additional Requirements for Etisalat Room in Basement 1 (Door Amendments) JV False Ceiling at Basement 5 Vault Lobby and Services Room (RFI No. 511) NSC Fire Sprinkler above False Ceiling at Basement 5 Vault Lobby & Services Room (RFI No. 511) NSC Vapour Barrier underneath all Parapet Composite Cladding of the 6 Wings and Diamond Exchange Centre JV Modification to Louvers and Additional Aluminum Doors at Various Areas NSC Additional 6" diam. Line from B5 Pump Room to S2 Level Fire Tank JV Temporary Wet Riser Systems (Supply and Delivery of Fire Pumps and Accessories) NSC Temporary Wet Riser Systems (Installation, Testing & Commissioning, and Decomissioning) NSC Paving and Landscaping Works at Ramps (originally under Wade Adams Scope) NSC Planter Area at Level 2 - Change of 500mm thick Sweet Soil to Polysterene JV Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) JV scope of works NSC Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) MEP Scope of Works NSC Extended Warranty due to the Usage of Jet Fans at Basement Levels as per the EHS Improvement Notice NSC Additional Works at Entrance Ramps - Type 3 & 5 JV NSC NSC NSC Signage at the Entrance of VIP Carpark in Basement 1 Entrance Canopy Panel - Down Light (T-39) and Camera Layout (CVI No. 126) Motorized dampers at B2L Security Room (RFI No. 1076 Rev. 0 & 1) Additional Voice/Data Points at Level 48 as per revised "For Construction" drawings under the F&G transmittal ref. F+G/ALMAS/TAISEI/01460 (Sky Lobby Bulding Services Cat II Works) Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00002 dated 10th July 2007 (Additional Voice / Data Points)

199

001

DXB/AMT-01/0600/EDM/4080

27-Apr-08

27,548.25

ur

27,548.25

ur

100%

27,548.25

0%

0.00

27,548.25

ETA Claim = AED 23,955.00 + 12%JVOH&P + 3% Attendances

200 206 209

001 001 001

DXB/AMT-01/0600/EDM/4083 DXB/AMT-01/0600/EDM/4318 DXB/AMT-01/0600/EDM/4341

27-Apr-08 31-May-08 03-Jun-08

42,963.29 ur ur

ur ur ur

42,963.29 ur ur

ur ur ur

100%

42,963.29 ur ur

0% ur ur

0.00 ur ur

42,963.29 0.00 0.00

ETA Cost + 12%OH&P + 3% Attendances Bond Interiors to submit entitlements ETA to submit entitlements; Nakheel letter ref. JAP016/TS/GT/0285 dtd 23Jun08 reject the claim and no ERI's shall be issued JCI to submit entitlements

209

002

DXB/AMT-01/0600/EDM/4341

03-Jun-08

ur

ur

ur

ur

ur

ur

ur

0.00

210 212 213 216 218 218 219 219 220

001 001 001 001 001 002 001 002 001

DXB/AMT-01/0600/EDM/4348 DXB/AMT-01/1200/RAN/4391 DXB/AMT-01/0600/MIC/4449 DXB/AMT-01/0600/EDM/4506 DXB/AMT-01/0600/EDM/4525 DXB/AMT-01/0600/EDM/4525 DXB/AMT-01/0600/EDM/4527 DXB/AMT-01/0600/EDM/4527 DXB/AMT-01/0600/EDM/4556

04-Jun-08 12-Jun-08 22-Jun-08 05-Jul-08 08-Jul-08 08-Jul-08 08-Jul-08 08-Jul-08 12-Jul-08

11,682.47 ur 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 ur ur

ur ur ur ur ur ur ur ur ur

11,682.47 ur 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 ur ur

ur ur ur ur ur ur ur ur ur

0.00 ur 0.00 0.00 0.00 0.00 0.00 ur ur

100% ur 100% 100% 100% 100% 100% ur ur

11,682.47 ur 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 ur ur

11,682.47 0.00 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 0.00 0.00

Intherpro Cost + 12% OH&P + 3% attendances ETA to submit entitlements ETA cost + 12% OH&P + 3% Attendances Al Bayader cost + 12% OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Belgium Alkuminum cost + 12% OH&P +3 % Attend FBI + EVS cost + 12% OH&P + 3% Attend ETA to submit entitlements Al Abbar to submit entitlements

221 222 223 223 224 225 226

001R1 001 001 002 001 001 001

DXB/AMT-01/0600/EDM/4558 DXB/AMT-01/0600/MIC/4577 DXB/AMT-01/0600/DAN/4592 DXB/AMT-01/0600/DAN/4592 DXB/AMT-01/0600/EDM/4598 DXB/AMT-0//0600/EDM/4627 DXB/AMT-0//0600/EDM/4633

12-Jul-08 15-Jul-08 17-Jul-08 17-Jul-08 20-Jul-08 23-Jul-08 24-Jul-08

32,364.90 404,090.45 447,120.00 1,625,886.10 305,837.13 25,300.00 35,000.25

ur ur ur ur ur ur ur

32,364.90 404,090.45

ur ur CLOSED CLOSED ur ur ur

100%

32,364.90 0.00

0% 100% 0% 0% 100% 100% 100%

0.00 404,090.45 0.00 0.00 305,837.13 25,300.00 35,000.25

32,364.90 404,090.45 0.00 0.00 305,837.13 25,300.00 35,000.25

cost from domestic subcons + 12%OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Naffco Costs +12% OH&P + 3% Attendances; not a new regulation as per the review of Jly ETA Cost + 12% OH&P + 3% Attendances; not a new regulation as per the review of Jly Al Bayader cost + 12% OH&P + 3% Attendances AB cost + 12% OH&P + 3%Attend JV Internal Works

0.00 0.00

0 0

JAP016/TS/GT/0324 dated 28Aug-08 JAP016/TS/GT/0324 dated 28Aug-08

CLOSED CLOSED 305,837.13 25,300.00 35,000.25

0% 0%

0.00 0.00 0.00 0.00 0.00

226

002

DXB/AMT-0//0600/EDM/4633

24-Jul-08

110,641.50

ur

110,641.50

ur

0.00

100%

110,641.50

110,641.50

ETA cost + 12% OH&P + 3% Attendances

227

001

DXB/AMT-0//0600/EDM/4659

29-Jul-08

0.00

0.00

JAP016/TS/BW/0352 dated 15Oct-08

CLOSED

CLOSED

0%

0.00

0%

0.00

0.00

0.00

this cost to be by JV as per the Gen. Specs Section A, Item 1.03.d & 1.05

229 230 232 235 236

001 001 001 001 001

DXB/AMT-0//0600/EDM/4678 DXB/AMT-0//0600/EDM/4735 DXB/AMT-0//0600/EDM/4864 DXB/AMT-01/0600/EDM/4966 DXB/AMT-01/0500/JLy/5000

05-Aug-08 17-Aug-08 21-Sep-08 16-Oct-08 25-Oct-08

16,654.95 7,797.46 0.00 0.00 18,364.91

ur ur 0 0 ur

16,654.95 7,797.46

ur ur CLOSED CLOSED ur 0% 0%

0.00 0.00 0.00 0.00 0.00

100% 100% 0% 0% 100%

16,654.95 7,797.46 0.00 0.00 18,364.91


0.00 0.00

16,654.95 7,797.46 0.00 0.00 18,364.91

Al Bayader cost + 12% OH&P + 3% Attendances under ID Works Al Abbar to submit entitlements; rejected by Nakheel as the works is deemed included in Al Abbar scope ETA to submit full entitlements; rejected by M/s. Nakheel BC Cost + 7% OH&P; BC VO#6; BC time claim = 165 days

0.00 0.00

0 0

JAP016/TS/BW/0350 dated 14Oct-08 JAP016/TS/BW/0354 dated 9Nov-08

CLOSED CLOSED 18,364.91

237

001

NSC

DXB/AMT-01/0500/JLy/5010

26-Oct-08

34,599.52

ur

34,599.52

ur

0.00

100%

34,599.52

34,599.52

BC Cost + 7% OH&P; BC VO#7; BC time claim = 201 days

239

001

NSC Additional Power Supply Lines for External Water Features, Irrigation Pumps, and Swimming Pool NSC Trimming of Cantilever Beams at the Diamond Exchange Center as per the RFI No. 1085 NSC Modification of Soffit Cladding for the Swimming Pool to Conceal Service Pipings as per the RFI No. 1054 NSC Structural Steel Support for Fans at Air Shaft NSC HVAC Systems at Basement 1 Control Room and Lobby as per RFI No. 1087

DXB/AMT-0/0600/MIC/5081

15-Nov-08

141,276.06

ur

141,276.06

ur

0.00

100%

141,276.06

141,276.06

ETA cost + 12% OH&P + 3% Attendances

240 241

001 001

DXB/AMT-01/0600/EDM/5130 DXB/AMT-01/0600/EDM/5131

24-Nov-08 24-Nov-08

ur ur

ur ur

ur ur

ur ur

ur ur

ur ur

ur ur

0.00 0.00

note that the structural works was based on the structural drawings provided to EVS; EVS to submit entitlements AA to submit entitlements

242 243

001 001

DXB/AMT-01/0600/MIC/5158 DXB/AMT-01/0600/EDM/5189

01-Dec-08 13-Dec-08

340,314.96 13,460.75

ur ur

340,314.96 13,460.75

ur ur

0.00 0.00

100% 100%

340,314.96 13,460.75

340,314.96 13,460.75

ETA cost + 12% OH&P + 3% Att ETA cost + 12% OH&P + 3% Attendances

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (3).monvabad

20 - 53

VARIATION CLAIMS STATUS TO-DATE


as at
NOC NO.
244

October 15, 2013


REMARKS / COMMENTS

SUB NO.
001

ERI NO.

V.O. TO
JV

CLAIM NOTICE LETTER

DESCRIPTION
REFERENCE Additional Door Closer and Selector at Basement 1 Management Office Coring for the Tenant Fit-Out Contractors Additional Access Ladder at Penstock Chamber in Basement 4 PC Supply Rates
DXB/AMT-01/0500/Jly/5252

DATE
24-Dec-08

CLAIM ENTITLEMENT APPLICATION COST TIME (Days) (AED) 1,732.06


ur

ER / F&G / JV AGREED VALUES COST (AED)


TIME (Days)

OUTSTANDING CLAIMS COST (AED)


1,732.06

LETTER REF.

TIME (Days)
ur

WORK DONE TO-DATE VALUE (AED)


0.00

BALANCE OF WORK TO-DATE VALUE % (AED)


100% 1,732.06

CERTIFIED AS AT CERTIFIED TO-DATE

November 30, 2008


BALANCE TO-DATE
1,732.06
Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22-Dec-08 as per the email request of Mr. Clarence Pinto of DMCC dated 4Jan-09 as per the EHS requirements adjustment to the Contract Sums due to the PC Materials final rates

245 246 OM-10

001 001 001

JV JV JV

DXB/AMT-01/0500/Jly/5278 DXB/AMT-01/0600/MIC/5287 DXB/AMT-01/0600/DAN/5092

04-Jan-09 05-Jan-09 16-Nov-08

ur ur (21,806.96)

ur ur 0

ur ur (21,806.96) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ur ur 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ur ur

ur ur

ur ur

0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

00-Jan-00

0.00 0.00 0.00 0.00

00-Jan-00

0.00 0.00 0.00 0.00

00-Jan-00

0.00 0.00 0.00 0.00 0.00

0 0 0

0 0

0 0

0 0

0 0 0

00-Jan-00

0.00 0.00 0.00 0.00

00-Jan-00 00-Jan-00

CLAIM STATUS (ADDITION) 380 216 164 317 63 177 203 101 278 203 177
Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos.
57% 43% 83% 17% 47% 53% 27% 73% 53% 47%

NO. OF CLAIMS TO-DATE NO. OF CLAIMS WITH ERI NO. OF CLAIMS WITHOUT ERI NO. OF CLAIMS APPLIED NO. OF CLAIMS OUTSTANDING NO. OF AGREED CLAIMS NO. OF UNAGREED CLAIMS NO. OF CERTIFIED ON-ACCOUNT NO. OF UNCERTIFIED APPLICATIONS NO. OF CLAIMS TO JV NO. OF CLAIMS TO NSC
0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL FOR CLAIMED/NOTIFIED VARIATIONS

247,406,867.46

581

59,346,426.72

170,575,879.75

581

152,915,269.25

87,599,620.81

60,998,772.87

127,420,586.33

OMISSIONS TO-DATE:OM-1 OM-2 OM-3 001 001 001 13 21 27 JV JV JV Omit Wall Plaster from Car Parking Areas in all 5 Basement Floors Omission of Rebars in Core Walls Omission of Render from the vertical element of whole three Services Floor (S1, S2, & S3) Plant Rooms Revisions to Office Partitions - Masonry Works
JAP016/ALM/TCAC/05257 JAP/ALM/TCAC/11435 JAP016/ALM/TCAC/06046 16-Nov-06 21-Aug-07 04-Jan-07

(383,650.51) (693,815.82) (277,596.39)

0 0 0

(383,650.51)
JAP016/ALM/TCAC/20290 dated 13-Aug-08 ????

CLOSED CLOSED CLOSED

100% 100% 100%

(383,650.51) (676,513.69) (58,985.18)

0% 0% 0%

0.00

(315,883.28) (693,815.82)

(67,767.23) 17,302.13 164,014.82

cost implication sent under JV letter ref.DXB/AMT01/0800/Jly/1175 dated 29-Nov-06 joint measurement done and agreed; in connection with 33-019 IPC NO. 41

(676,513.69) (58,985.18)

0 0

CLOSED CLOSED

0.00

(223,000.00)

OM-4 OM-4 OM-5 OM-6 OM-7

001 002 001 001 001

28 28 45 60 71

JV

JAP016/ALM/TCAC/19000 JAP016/ALM/TCAC/19000 JAP016/ALM/TCAC/19244 DXB/AMT-01/0600/MIC/5011 JAP016/ALM/TCAC/22470

17-Jun-08 17-Jun-08 26-Jun-08 26-Oct-08 20-Nov-08

(126,440.24) (69,689.10) (66,453.77) (2,856.00) (132,210.53)

0 0 0 0 0

(126,440.24)

JAP016/ALM/TCAC/19000 dated 17-Jun-08

CLOSED (69,689.10)

CLOSED 0.00 CLOSED CLOSED 0.00

100%

(126,440.24) 0.00

0% 100% 0% 0% 100%

0.00 (69,689.10) 0.00 0.00 (132,210.53)

(196,129.34)

69,689.10 (69,689.10)

NSC Revisions to Office Partitions - OCP Works Omission of Partition Walls in Level 30 for Single Tenancy Arrangements Omission of Proximity Access Card Reader and Access Cards at Basement 1 Boom-Gate NSC Omission of Wall Tiles due to the extension of Metal Cladding Behind Glass Ballustrades caused by the lowering of Ceiling JV Modification of Lift Openings at 36th Floor Low Rise Lift Machine Room and 48th Floor High Rise Lift Machine Rooms (Omission of Concrete Works due to the increase of Lift Opening Sizes) JV Modification to the Structural Drawings at Levels 49, 50, and 51 JV PC Supply Rates JV JV

(66,453.77) (2,822.40)

0 0

JAP016/ALM/TCAC/19244 dated 26-Jun-08 JAP016/ALM/TCAC/22410 DATED 18-Nov-08

CLOSED CLOSED (132,210.53)

100% 100%

(66,453.77) (2,822.40) 0.00

(66,453.77)

0.00 (2,822.40) (132,210.53)

JV scope of works, i.e., omission of blockworks and plaster BondCommunication scope of works + 7% OH&P; AWAITING RESPONSE FROM m/S. Bond Communication JV Scope of Works - Omission of Office Partitions at the Level 30 due to the single tenancy arrangements considered Sultan Hareb rates x no. of slots in Basement 1 + 12% OH&P BI to confirm cost by F&G

OM-8

001

38

JAP016/ALM/TCAC/22416

18-Nov-08

(1,988.48)

(1,988.48)

JAP016/ALM/TCAC/22416 dated 18-ov-08

CLOSED

CLOSED

100%

(1,988.48)

0%

0.00

(1,988.48)

BI to confirm cost by F&G

OM-9 OM-10

001 001

49

JAP016/ALM/TCAC/19245 DXB/AMT-01/0600/DAN/5092

26-Jun-08 16-Nov-08

(85,688.89) (21,806.96)

0 0

(85,688.89) (21,806.96)

0.00 0.00

1.00

(85,688.89)

0.00

0.00

(85,688.89)

0.00

Omission of Office Partitions at Level 49 adjustment to the Contract Sums due to the PC Materials final rates

0.00

0%

0.00

0.00 0.00 0.00 0.00 0.00

CLAIM STATUS (OMISSION) 11 10 1 11 0 6 5 6 4 9 2


Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos.
91% 0% 100% 0% 55% 45% 55% 36% 82% 18%

NO. OF CLAIMS TO-DATE NO. OF CLAIMS WITH ERI NO. OF CLAIMS WITHOUT ERI NO. OF CLAIMS APPLIED NO. OF CLAIMS OUTSTANDING NO. OF AGREED CLAIMS NO. OF UNAGREED CLAIMS NO. OF CERTIFIED ON-ACCOUNT NO. OF UNCERTIFIED APPLICATIONS NO. OF CLAIMS TO JV NO. OF CLAIMS TO NSC NOTE :
The values under the Claim Entitlement Application is for OM-1 to 5 from the Consultant (F&G) under their letter with reference as shown in the Claim Notice Letter

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL FOR OMISSIONS TO-DATE

(1,862,196.69)

(933,203.76)

(693,045.99)

0.00

(1,402,543.16)

(201,899.63)

(1,580,971.10)

(23,471.69)

SUMMARY
TOTAL FOR CLAIMED/NOTIFIED VARIATIONS TOTAL FOR OMISSIONS TO-DATE CLAIM STATUS 391 226 165 328 63 183 208 107 282 212 179
Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos.
58% 42% 84% 16% 47% 53% 27% 72% 54% 46%

247,406,867.46 (1,862,196.69)

581

59,346,426.72 (933,203.76)

170,575,879.75 (693,045.99)

581 0

67%

152,915,269.25 (1,402,543.16)

33%

87,599,620.81 (201,899.63)

60,998,772.87 (1,580,971.10)

127,420,586.33 (23,471.69)

86%

14%

NO. OF CLAIMS TO-DATE NO. OF CLAIMS WITH ERI NO. OF CLAIMS WITHOUT ERI NO. OF CLAIMS APPLIED NO. OF CLAIMS OUTSTANDING NO. OF AGREED CLAIMS NO. OF UNAGREED CLAIMS NO. OF CERTIFIED ON-ACCOUNT NO. OF UNCERTIFIED APPLICATIONS NO. OF CLAIMS TO JV NO. OF CLAIMS TO NSC

GRAND TOTAL

245,544,670.77

581

58,413,222.96

169,882,833.76

581

66%

151,512,726.09

34%

87,397,721.18

59,417,801.77

127,397,114.64

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (3).monvabad

21 - 53

DMCC ALMAS TOWER (JAP016) JUMEIRAH LAKE TOWERS


TOTAL AMOUNT AMOUNT CERTIFIED OUTSTANDING AMOUNT

DESCRIPTION

PERCENT CERTIFIED

PERCENT OUTSTANDING

REMARKS

EFFECTIVE CONTRACT AMOUNT

261,161,000.00

259,509,675.51

99.37%

1,651,324.49

0.63%

OUTSTANDING CLAIMS WITH ERI

107,761,116.98

60,740,469.59

56.37%

47,020,647.39

43.63%

OUTSTANDING CLAIMS WITHOUT ERI

5,482,732.44

0.00%

5,482,732.44

100.00%

GRAND TOTAL

374,404,849.42

320,250,145.10

85.54%

54,154,704.32

14.46%

DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO. SUB NO. ERI NO. V.O. TO

DESCRIPTION

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) JV COST (AED)

ER / F&G / JV AGREED VALUES


NSC COST (AED) LETTER REFERENCE

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED)

REMARKS / COMMENTS

ERI NO. 4
13 001 04 JV Additional Telephone Lines 0.00 0.00
JAP016/ALM/TCAC/21287 dated 5-Oct-08

CLOSED

to confirm if this is still needed; No need for additional telephone lines

SUB-TOTAL ERI NO. 6


14 001 06 Site Establishment - Offices (Supply of ETA Temporary Site Office Purchased form Seidco Gen. Cont. Co.) NSC ETA Site Offices (New Offices at Site) JV JV ETA/F&G Site Offices - Rubbish Removal

0.00
278,155.63

0.00

0.00
218,400.00

0.00
JAP016/ALM/TCAC/05508 dated 29-Nov-06

0.00
CLOSED

0.00
F&G evaluation is based on a +12% OH&Pro, and prelims omitted and to be dealt with in EOT's

14 14

002 004

06 06

501,971.39 56,840.00

#REF! #REF!

#REF! #REF!

#REF! #REF!

501,971.39 56,840.00

ETA cost + 12% OH&P + 3% Attendances JV scope of works; verbally agreed with F&G to be 5050; as at Sep-08

SUB-TOTAL ERI NO. 7


15 001R1 07 NSC ETA Site Offices Provision of Power Supply

334,995.63

501,971.39
1,193,235.54

#REF!
#REF!

#REF!
#REF!
#REF!

56,840.00

501,971.39
1,193,235.54
ETA costs + 7% JV OH&P

SUB-TOTAL ERI NO. 8


16 001 08 JV Provision of Starter Bars to Podium within the Landscape Package

0.00
159,171.78

1,193,235.54

#REF!
128,324.82

#REF!
JAP016/ALM/TCAC/04893 dated 30-Oct-06

0.00
CLOSED

1,193,235.54
Costs agreed by JV under letter ref. DXB/AMT01/0500/Jly/1065 dated 7-Nov-06.

SUB-TOTAL ERI NO. 9


17 001 09 JV Core Wall Thickening

159,171.78
181,391.33

0.00

128,324.82
107,738.59

0.00
JAP016/ALM/TCAC/08151 dated 09-Apr-07

0.00
CLOSED

0.00
ERI No. 09; Internal Preliminary Assessment is equal to 10 days, but works has yet to be carried out to consider the EOT; cost evaluated by F&G accepted thru letter ref. DXB/AMT-01/0500/Jly/1072 dated 8-Nov-06 but subject to add'l revisions and prolongat

SUB-TOTAL ERI NO. 10


14 003 10 NSC Site Establishment - Offices (Supply and Installation of AC Units within the New Offices being established by Nakheel)

181,391.33

0.00
80,097.04

107,738.59

0.00
64,574.50
JAP016/ALM/TCAC/06385 dated 21-Jan-07

0.00

0.00
CLOSED
ETA cost of 60,350.00 + 7% JV OH&P

SUB-TOTAL ERI NO. 11


20 001 11 JV Supply of Potable Water to DMCC and F&G's Site Offices

0.00
23,551.60

80,097.04

0.00
25,076.80

64,574.50
JAP016/ALM/TCAC/22075 dated 4-Nov-08, JAP016/ALM/TCAC/23417 dated 6-Jan-08

0.00
CLOSED

0.00
Period from June 2006 - September 2007, and October2007 - November 2008

SUB-TOTAL ERI NO. 12


28 001R1 12 NSC Cast Resin Bus Bars

23,551.60

0.00
2,071,622.24

25,076.80

0.00
1,049,300.70

0.00

0.00
CLOSED
ETA Cost + 7%; Time Effect shall be by NSC, if any; potential additional builders works, and attendance in reference to the Time. Confirmed by ETA under their letter ref. DIV.092/AM/TS/1342 dated 31-Jan-08

JAP016/ALM/TCAC/14871 dated 13-Jan-08

SUB-TOTAL ERI NO. 13


OM-1 001 13 JV Omit Wall Plaster from Car Parking Areas in all 5 Basement Floors

0.00
(383,650.51)

2,071,622.24

0.00
#REF!

1,049,300.70
#REF!

0.00
(383,650.51)

0.00
cost implication sent under JV letter ref.DXB/AMT01/0800/Jly/1175 dated 29-Nov-06

SUB-TOTAL ERI NO. 14


32 001 14 NSC Stainless Steel Members to Diamond Exchange Area

(383,650.51)

0.00
333,540.00

#REF!

0.00
317,914.82
JAP016/ALM/TCAC/05673 dated 11-Dec-06

(383,650.51)

0.00
CLOSED
EVSCost Effect is NSC Cost + 7% O&H + 2% Attendance, as this is an additional work; Time Effect shall be by NSC, if any; potential additional builders works.

SUB-TOTAL ERI NO. 15 / 15.1


35 001a 15 NSC Provision of DB's in lieu of Isolators in the Offices & Retail Units at 3rd to 49th Floors (MEP Works) JV Provision of DB's in lieu of Isolators in the Offices & Retail Units at 3rd to 49th Floors (Builders Work)

0.00

333,540.00
2,072,029.32

0.00

317,914.82
1,220,076.06
JAP016/ALM/TCAC/18730 dated 8-Jun-08 JAP016/ALM/TCAC/22415 dated 18-Nov-08 JAP016/ALM/TCAC/18730 dated 8-Jun-08

0.00

0.00
CLOSED

ETA costs + 7% JV OH&P; F&G revised assessment from their letter ref.JAP016/ALM/TCAC/18730 dtd 8-Jun08 JV Cost; Note : the cost for OCP is omitted and will be dealt with separately; F&G revised assessment from their letter ref.JAP016/ALM/TCAC/18730 dtd 8-Jun-08

35

001b

15

102,131.48

55,692.82

CLOSED

217

001

15.1

217

002

15.1

NSC SMDB's in lieu of Isolators at Level 52-63 and Retail Mall and Splitting of Landlord DB's for Ground Floor and First Floor as per DEWA Requirement (MEP Works) JV SMDB's in lieu of Isolators at Level 52-63 and Retail Mall and Splitting of Landlord DB's for Ground Floor and First Floor as per DEWA Requirement (Builders Work)

538,459.90

#REF!

#REF!

#REF!

538,459.90

ETA's cost + 12% OH&P + 3% Attendances

7,538.64

#REF!

#REF!

#REF!

7,538.64

builders works

SUB-TOTAL ERI NO. 16 / 16.1


31 001 16 JV Drawing Revisions to the Diamond Exchange Centre; due to revised Openings. Interior Design Works (JV Internal Subcontractors)

109,670.12
82,672.78 28,894,792.49

2,610,489.22

#REF!
#REF! 22,785,939.94

#REF!
JAP016/GEN/ABS/0010 dated 17-Oct-06

7,538.64
82,672.78 #REF!

538,459.90
rejected by Nakheel due to relation with coordination issues with MEP requirements; awaiting response from NSC (Eversendai) on the rejection. updated cost and rates approval summary status being sent regularly; cost submitted is the final applied claim

41

001R1

16/ 39 16/ 39 16/ 39 16/ 39

JV

agreed values is partial and deemed to change progressively, as it is based on the agreed rates only (+12%)

41

002R1

NSC Interior Design Works (Other ID Works being done by Bond Interiors) NSC Interior Design Works (MEP Works by ETA)

5,064,844.41

3,879,153.39

agreed values is partial and deemed to change progressively, as it is based on the agreed rates only (+7%) agreed values is partial and deemed to change progressively, as it is based on the agreed rates only (+7%) agreed values is partial and deemed to change progressively, as it is based on the agreed rates only (+7%) #REF! JAP016/ALM/TCAC/20228 dated 12-Aug-08 (valued in 41-001)

#REF!

updated cost and rates approval summary status being sent regularly.

41

003R1

8,423,604.53

8,117,552.86

#REF!

updated cost and rates approval summary status being sent regularly.

41

004R1

NSC Interior Design Works (Lift Finishes by Kone Middle East)

3,111,331.22

3,107,564.82

#REF!

updated cost and rates approval summary status being sent regularly.

48 69 74 79

001 001 001 001

#### NSC Revised Architectural and ID Drawings (MEP Works) 16 #### 16 JV JV JV ID Works Package - Changes to CT-01 & CT-02 Shadow Groove to Ceilings Raised Access Flooring System at the Diamond Exchnage Centre to Screeding Works 28,616.00 (valued in 41-001) 282,635.67

ur

#REF! 28,365.12 (valued in 41-001) #REF!

#REF!

ur CLOSED CLOSED 282,635.67

ETA to submit entitlements abortive materials only valued in Claim No. 41-013 Floor Screeding works; valued under the ERI No. 16 as per the F&G letter ref. JAP016/ALM/TCAC/21388 dated 7-Oct-08 and confirmed under our letter ref. DXB//4963 dtd 16-Oct-08

#REF!

#REF!

91 96 105 111 121 122

001 001 001 001 001 001

#### NSC Revision of ST-10 to ST-15 (ID Works Package Provisional Sum) #### JV Changes to D-04 & D-30 Hinges (ID Works Package) #### JV Revised Interior Lighting Fixtures Layout at GF,1L,& 2L #### JV Omission of Mirror Mounted Paper Towel Dispenser #### 16.1 JV Engineering and Procurement Activities

2,704,866.52 (valued at 41-001) (valued in 41-001) 165,993.30 (valued in 41-001) 72,174.00

#REF! #REF! (valued in 41-001) #REF! #REF! #REF!

#REF! #REF!

#REF! #REF! JAP016/ALM/TCAC/10523 dated 22-July-2007

2,704,866.52 CLOSED CLOSED 165,993.30 CLOSED 72,174.00

BI costs of AED 2,527,912.64 + 7% JV OH&P considered in Claim No. 41-007 TO BE VALUED IN CLAIM NO. 41-001 (ERI 16) Arte Casa Cost + 12% OH&P + 3% Attendances valued in 41-001, time claim submitted separately Al Abbar cost + 12% OH&P + 3% Attendances

#REF! #REF! #REF!

#REF! #REF! #REF!

NSC ID Finishes for the Steel Columns at Ground Floor Entrance Lobby, 1st Floor Food Court and Retail Mall

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (ERI).monvabad

23 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
124 132

SUB NO.
001 001

ERI NO.
#### 16

V.O. TO
JV JV

DESCRIPTION
Late Issuance of Design Information (Specifications of Lighting Fixtures in ID Areas) ID Works Package (GL-08)

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) 0.00 1,774,080.00 (valued in 149-001) ur (valued in 149-001) 25,787.60 0.00 (valued in 41-001) 626,750.00 4,134.48 ur 0.00 96,768.00 541,470.46 #REF! #REF! NSC COST (AED) JV COST (AED) #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! LETTER REFERENCE
#REF! JAP016/TS/GT/0103 dated 18Oct-2007 JAP016/ALM/TCAC/22521 dated 20-Nov-08 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! JAP016/TS/GT/0142 dated 31Jan-08 #REF! #REF!

OUTSTANDING CLAIMS
JV COST (AED) CLOSED CLOSED CLOSED ur CLOSED 25,787.60 CLOSED CLOSED 626,750.00 4,134.48 ur CLOSED 96,768.00 541,470.46 NSC COST (AED)

REMARKS / COMMENTS
time claim. Mozart Marble cost + 12% OH&P

1,774,080.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF! #REF!

138 140 141 142 144 145 147 147 147 156 161 169

001 001 001 001 001 001 001 002 003 001 001 001R2

Notification of Delay to the ID Works Package Signages #### NSC Modification in Specification of Some ID Lighting Fixtures #### JV Notification of Delay to the ID Doors Package #### JV #### NSC Disruption of Works resulting from Design Conflict in Basement 1 VIP Lounge #### JV Delays due to Design Issues Related to GL-07 #### JV Notification of a Possible Delay to the Glass Feature Wall (GL-05) under the ID Works Package 16 JV Internal Water Feature (Aqua-Teknik Scope) 16 JV Internal Water Feature (Related Builders Work)

time claim. ETA tnd Lever to submit entitlements time claim. ETA Cost + 12%OH&P + 3% Attendances under review; time entitlements under review for time entitlements Aqua-Teknik cost + 12% OH&P + 3% Attend Coring Subcon Cost + 12% OH&P + 3% Attendances ETA to submit entitlements rejected by Nakheel as the proposed revisions was not done and was reverted back to original Aedas Specs submitted thru3701 dtd 20-Feb-08 S/C costs + 12% OH&P + 3% Attendances; to be valued at ERI 16 as per F&g letter ref. JAP016/TS/GT/0254 dtd 29May08 EVS to submit entitlements; EVS cost + 12% OH&P + 3% Attendances

#### NSC Internal Water Feature (MEP Scope) #### NSC Lift L4 Mock-Up (Car Interior Finish @ Ground Floor Level) #### JV Additional Architraves to Towel Dispensers 16 Revisions to the ID Works Package For Construction Drawings at the Ground Floor and First Floor (GL-19 & GL-07) JV Revisions to the ID Works Package For Construction Drawings at the Ground Floor and First Floor (Structural Supports to GL-07) NSC Revisions to the ID Works Package For Construction Drawings at the Ground Floor for the termination of GL-07 and other adjacent Finishing Materials (CVI No. 093) JV Potential Claim due to Late Design Changes Stainless Steel Door Frames L49-L64 Inclusive JV Additional Ironmongeries to Timber Door (DT-02) at Levels 49 upwards JV JV DMCC Offices - Core Toilets Level 49 & 50 (Revision of Ironmongeries)

169

002R1

16

34,314.41

#REF!

#REF!

#REF!

34,314.41

169

003

16

ur

#REF!

#REF!

#REF!

ur

Bond Interiors to submit entitlements

170 170

001 002

16 16

100,121.32 0.00

#REF! #REF!

#REF! #REF!

#REF!

100,121.32 CLOSED

to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08 under review (haroon & alpha star); to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08; no changes made in the Ironmongeries as there was no formal instruction scope shall be removal, supply and installation of ironmongeries; valued in ERI No. 16 as per Nakheel letter ref. JAP016/TS/GT/0318 dtd 20Aug08

#REF!

186

002

16

4,137.35 ur 27,548.25

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF!

4,137.35 ur 27,548.25

188 199

001 001

200 206 211

001 001 001

#### NSC Sprinkler Heads in Illuminated Ceiling (RFI No. 967 Rev. 0) #### NSC Design Change of Core Bulk Head at Ground Floor Escalator Lobby - MEP Rectification Works for the ID Works Package (CVI No. 088) #### NSC Additional Extract Ducts in Basement 1 Male and Female Toilet , and VIP Toilet #### NSC Carpets at Level 48 16 NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (MEP Works by ETA) JV Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (Supply of O2 Light Fixtures from M/s.Lever Electric) JV

#REF! #REF!

ETA to submit entitlements ETA Claim = AED 23,955.00 + 12%JVOH&P + 3% Attendances

42,963.29 ur 25,112.55

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

42,963.29 ur 25,112.55

ETA Cost + 12%OH&P + 3% Attendances Bond Interiors to submit entitlements BI to submit entitlements; Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; BI cost + 12% OH&P + 3% Attendances Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Electrical Works by ETA; ETA cost+ 12% OH&P + 3% Attend Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Supply only of light fittings from Lever

211

002

16

247,839.95

#REF!

#REF!

#REF!

247,839.95

211

003

16

39,243.75

#REF!

#REF!

#REF!

39,243.75

230 236

001 001

Signage at the Entrance of VIP Carpark in Basement 1 #### NSC Additional Voice/Data Points at Level 48 as per revised "For Construction" drawings under the F&G transmittal ref. F+G/ALMAS/TAISEI/01460 (Sky Lobby Bulding Services Cat II Works) ####

7,797.46 18,364.91

#REF! #REF!

#REF! #REF!

#REF! #REF!

7,797.46 18,364.91

under ID Works BC Cost + 7% OH&P; BC VO#6; BC time claim = 165 days

SUB-TOTAL ERI NO. 17


77 001 17 NSC DVR Storage Units as per Option III

32,683,527.48

19,764,437.23
2,430,700.00

#REF!
#REF!

#REF!
#REF!
#REF!

#REF!

#REF!
2,430,700.00
JCI costs + 7% JV OH&P

SUB-TOTAL ERI NO. 18


34 001 18 NSC Chilled Water Monitoring and installation (Revised District Cooling Chilled Water Connections Requirements)

0.00

2,430,700.00
1,566,116.20

#REF!

#REF!
678,543.71
JAP016/ALM/TCAC/22578 dated 24-Nov-08

0.00

2,430,700.00
CLOSED
ETA costs + 7% JV OH&P

SUB-TOTAL ERI NO. 19


38 001 19 JV 40' Container for Office Storage

0.00
32,340.85

1,566,116.20

0.00
32,341.10

678,543.71
JAP/ALM/TCAC/06743 dated 6Feb-07

0.00
CLOSED

0.00
actual cost transmitted to F&G based on dayworks rates; agreed with F&G

SUB-TOTAL ERI NO. 20


37 40 001 001 NSC Revision of Duties and Capacities of the Ground and First Floor AHU's #### NSC Revised "For Construction" Drawings for ETA 20

32,340.85

0.00
262,569.93 (valued in37-001)

32,341.10
#REF! #REF!

0.00
#REF! #REF!
#REF! #REF!

0.00

0.00
262,569.93 CLOSED
ETA costs + 7% JV OH&P same as Claim No. 37-001, based on the F&G transmittal ref. F+G/ALMAS/TAISEI/01404 dtd 10-15-06

SUB-TOTAL ERI NO. 21


3 11 002 001 Additional Works to the Extra Piles Driven by the Piling Contractor (CVI No. 007) #### NSC Revised Contract Drawings by ETA 21 JV Amendments to Basement 1 Generator Rooms (Architectural Works) NSC Amendments to Basement 1 Generator Rooms (MEP Works by ETA) JV Nibs for the Approach Slabs JV JV JV JV Interior Design Package Changes affecting the Main Contract Package Door Details (Door Type for Telephone Room (01052) at First Floor) Builders Works Drawings

0.00
1,434.82

262,569.93

#REF!
#REF!

#REF!
#REF! #REF!
#REF!

0.00
1,434.82

262,569.93
awaiting response from Client.

ur 19,047.23 1,579,708.41 35,825.47 14,639.13 2,848.23 31,782.05 28,033.99 ur ur (valued in 67-001) (valued in 33) (not used) 27,175.35 229,129.54 22,371.54 25,157.54 14,560.51 2,296.25 #REF! 21,880.70 #REF! #REF! #REF! #REF! #REF! 26,646.79 23,398.50 18,036.01 #REF!

JAP016/GEN/ABS/1051 dated 8Aug-06

ur 19,047.23 1,579,708.41 CLOSED CLOSED CLOSED 31,782.05 CLOSED ur ur CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

ETA to submit entitlements; rejected by Nakheel due to notice not served as per the required time period under the Contract. rejected by Nakheel due to notice not served as per the required time period under the Contract. ETA Cost of AED 1,476,363 + 7% JV OH&P awaiting response from Client. Various changes to the ID Package affecting the MC Package; i.e., blockworks Door which is not provided with an opening tag, in reference with Tender Query, Item No.6 dtd 16-May05,pages 9 Internal S/C Works + 12% OH&P Various revisions to the drawing under the F&G transmittal sheet ref. F&G/ALMAS/ TAISEI/01356 dtd 01Aug-06 ETA to submit entitlements ETA to submit entitlements included in Claim Nos. 67-001 valued under the Claims Series 33 NOT USED agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G)

12 12 16 19 21 22 23 24 25 26 27 33 33 33 33

001 002 002 001 001 001 001 001 001 001 001 001 002R1 003 004

21 21 21 21 21 #### 21

JAP016/GEN/ABS/1051 dated 8Aug-06

#REF!

JAP016/GEN/ABS/1051 dated 8Aug-06 JAP016/ALM/TCAC/18884 dated 12-Jun-08 JAP016/ALM/TCAC/04947 dated 1-Nov-06 JAP016/ALM/TCAC/05297 dated 19-Nov-06

#REF!

#REF! JAP016/ALM/TCAC/06567 dated 29-Jan-07

JV DTS referenced AM/015/515 dated 5th August 2006 (Architectural and Structural Works) #### NSC DTS referenced AM/015/509 dated 1st August 2006 (MEP Works) #### NSC DTS referenced AM/015/516 dated 7th August 2006 (MEP Works) #### NSC LV Schematic Diagram #### 21 21 21 21 JV JV JV JV JV Revised Structural Drawings List of "For Construction" Drawings transmitted by Nakheel Changes in the Lift Pit Depths, and Revisions to the Galvanised Steel Ladder at 64th Level Changes to the Access Floor Heights Various Revisions at the Parking Areas

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! JAP016/ALM/TCAC/181187 dated 18-May-08 JAP016/ALM/TCAC/16338 dated 17-Mar-08 JAP016/ALM/TCAC/18352 dated 26-May-08

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (ERI).monvabad

24 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
33 33

SUB NO.
005 006

ERI NO.
21 21

V.O. TO
JV JV

DESCRIPTION
Additional Architectural Works to the Service Floor Areas (1-3) Missing Spanmark as PB434 (RFI No. 029) Additional Reinforcement due to the Missing Details (RFI No. 042) First Floor Slab Details (RFI No. 072) Second Basement Floor Beam - PB205A (RFI No. 075) Fourth Basement Beam - PB451A (RFI No. 078) Fourth Basement Beam - PB434 (RFI No. 144) Tower Structural Drawings - Additional TB29 Beam (RFI No. 146) Door Opening Height - First Floor (RFI No. 157) Basement 2 Beams (RFI No. 162) Lift F4 - Structural Details (RFI No. 171) Reinforced Concrete Partition Wall @ the Basement 2 (RFI No. 182) Increase in Beam Depths at First Floor - Section N1 (RFI No. 192) Increase in Beam Depths to PB149 and PB150A (RFI No. 223) Additional Outrigger Walls at Service Floor Areas Structural Works Additional Mass Concrete at 2nd Level, and Revisions to the Stairs leading to the Vault at 2nd Level Additional Column Posts at 50th to 51st Level and Additional Core Walls, i.e., 400mm and 500mm thick Additional Lifting Beams to the 64th Level Machine Rooms (@Level 288.650m and 285.350m) Changes to Slab Steel Reinforcement to S11 to S12 Additional Steel Reinforcement to Beams Located Around Tower Building and Connected to Precast Slab Additional rebars to basement retaining wall @ staircase and changes of rebar to wall Changes in Shear Wall in Zone 4 Associated in Lift and Vault Wall Additional Rebar in First Basement Slab Additional Top Steel Reinforcement in Ground Floor Slab Additional Bottom Steel Reinforcement in Ground Floor Slab Additional Building Maintenance Units at Diamond Exchange Centre Revisions to Contract Drawings in First Floor Levels Revisions to Structural Contract Drawings in Second Floor Changes in Beam Steel Reinforcement at 29th to 34th Level Various Requirements under the F&G Transmittal Ref. F+G/ALMAS/TAISEI/ 01463 dated 12th December 2006 Provision of Additional Lift Pit Ladders Additional Coring Requirement Provision of BMU Opening in Block Wall between Offices A & B at Level 29 (CVI No. 067) Omission of Rebars in Core Walls

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) 153,565.57 3,223.52 1,894.77 657.99 427.04 425.15 1,150.44 13,820.28 499.04 3,461.71 1,556.34 41,554.32 NSC COST (AED) JV COST (AED) 123,805.08 (1,351.84) #REF! 530.47 343.82 344.60 1,063.46 12,180.62 0.00 548.61 1,233.74 #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) LETTER REFERENCE
JAP016/ALM/TCAC/17247 dated 16-Apr-08 JAP016/GEN/ABS/1011 dtd 19Jun06; JAP016/ALM/TCAC/18884 dtd 12Jun-08 JAP016/GEN/ABS/1011 dated 19Jun-06 JAP016/ALM/TCAC/20933 dated 14-Sep-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/17248 dated 16-Apr-08 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/18352 dated 26-May-08 JAP016/ALM/TCAC/18118 dated 18-May-08

OUTSTANDING CLAIMS
JV COST (AED) CLOSED CLOSED 1,894.77 CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED 41,554.32 NSC COST (AED)

REMARKS / COMMENTS
agreed with Consultant (F&G) agreed with Consultant (F&G)

33 33 33 33 33 33 33 33 33 33

007 008 009 010 011 012 013 014 015 016

21 21 21 21 21 21 21 21 21 21

JV JV JV JV JV JV JV JV JV JV

awaiting response from Client. agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) rejected F&G assessment in their letter JAP016/ALM/TCAC/18118 dated 18-May-08 thru our letter ref.DXB/./EDM/4262 dtd 22May08;F&G assessment under review by JV agreed with Consultant (F&G) agreed with Consultant (F&G) revised cost impact submitted under ref. DXB/AMT01/0500/Jly/1080 dated 9-Nov-06 based on the approved Methodology; agreed with Consultant (F&G) agreed with Consultant (F&G)

33 33 33

017 018 019

21 21 21

JV JV JV

4,353.86 693.97 956,279.08 40,503.44

3,510.09 337.29 642,006.51 171.19

JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/20290 dated 13-August-08

CLOSED CLOSED CLOSED CLOSED

33

020

21

JV

JAP016/ALM/TCAC/181187 dated 18-May-08

33

021

21

JV

43,839.53

33,011.38

JAP016/ALM/TCAC/20933 dated 14-Sep-07

CLOSED

agreed with Consultant (F&G)

33

022

21

JV

5,525.90

4,252.50

JAP016/ALM/TCAC/18884 dated 12-Jun-08

CLOSED

agreed with Consultant (F&G)

33 33

023 024

21 21

JV JV

36,827.93 25,336.02

35,529.29 26,354.14

JAP016/ALM/TCAC/08133 dated 09-Apr-07 JAP016/ALM/TCAC/17248 dated 16-Apr-08

CLOSED CLOSED

agreed with Consultant (F&G) agreed with Consultant (F&G)

33 33 33 33 33 33 33 33 33 50

025 026 027R1 028R1 029R1 030 031R1 032 033 001

21 21 21 21 21 21 21 21 21 21

JV JV JV JV JV JV JV JV JV JV

7,878.22 17,649.58 101,960.65 140,340.33 316,516.91 1,175,875.00 56,950.59 130,015.64 9,356.12 28,025.73

7,878.22 14,661.14 97,675.24 137,782.64 317,721.58 #REF! 50,995.22 55,259.32 7,928.10 #REF! #REF! #REF!

JAP016/ALM/TCAC/08287 ated 16-Apr-07 JAP016/ALM/TCAC/08713 ated 7May-07 JAP016/ALM/TCAC/20933 dated 14-Sep-07 JAP016/ALM/TCAC/10244 ated 9Jul-07 JAP016/ALM/TCAC/10549 ated 23-Jul-07 #REF! JAP016/ALM/TCAC/11392 ated 20-Aug-07 JAP016/ALM/TCAC/14299 ated 12-Dec-07 JAP016/ALM/TCAC/10848 ated 1Aug-07 #REF!

CLOSED CLOSED CLOSED CLOSED CLOSED 1,175,875.00 CLOSED CLOSED CLOSED 28,025.73

agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G)

agreed with Consultant (F&G)

under review agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) JV to submit entitlements; note that the DVR's is valued in Claim No. 77; items to be valued under this Claim is only the Lifting Beams await for final drawings. based on the ETA letter request not applicable demolition works joint measurement done and agreed; in connection with 33-019

54 59 60 135 OM-2

001 001 001 001 001

21 21 #### 21 21

JV JV JV JV JV

66,895.36 30,965.32 (valued in 33-030) 1,484.00 (693,815.82)

#REF! #REF! #REF! #REF! (676,513.69)

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! JAP016/ALM/TCAC/20290 dated 13-Aug-08

66,895.36 30,965.32 CLOSED 1,484.00 CLOSED

SUB-TOTAL ERI NO. 22


51 001 22 NSC Revision of Fire Protection System as per JAFZA EHS Fire & Rescue Requirements

3,137,980.87

1,579,708.41
4,929,761.78

#REF!
#REF!

#REF!
#REF!
#REF!

1,398,958.60

1,579,708.41
4,929,761.78
ETA costs of AED 4,607,254 + 7% OH&P

SUB-TOTAL ERI NO. 23


55 001 23 NSC Category II Drawing Revisions for Office Floors -Air Conditioning

0.00

4,929,761.78
ur

#REF!
#REF!

#REF!
#REF!
#REF!

0.00

4,929,761.78
ur
ETA to respond.

SUB-TOTAL ERI NO. 24


46 46 001 002 24 24 NSC Fire Policy Layout (MEP Works) NSC Fire Policy Layout (MEP Works-additional Fireman's Telephone at B1-B5)

0.00

0.00
24,107.45 17,577.75

#REF!

#REF!
5,600.38
JAP016/TS/ABS/22577 dated 24Nov-08 #REF!

0.00

0.00
CLOSED 17,577.75
ETA costs + 7%OH&P ETA costs + 12%OH&P + 3% Attendances

#REF!

#REF!

SUB-TOTAL ERI NO. 25


56 001 25 JV Additional Staff Facilities to Consultants

0.00
51,929.76

41,685.20

#REF!
51,929.76

#REF!
JAP016/ALM/TCAC/14753 dated 07-Jan-08

0.00
CLOSED

17,577.75
Time component rejected as per the F&G letter ref. JAP016/TS/ALM/ TCAC/06936 dated 15-Feb-07

SUB-TOTAL ERI NO. 26


67 001 26 NSC Electrical Connections to Fire Pump Requirements

51,929.76

0.00
2,951,483.26

51,929.76
#REF!

0.00
#REF!
#REF!

0.00

0.00
2,951,483.26
ETA costs + 7% JV OH&P

SUB-TOTAL ERI NO. 27


OM-3 001 27 JV Omission of Render from the vertical element of whole three Services Floor (S1, S2, & S3) Plant Rooms

0.00
(277,596.39)

2,951,483.26

#REF!
(58,985.18)

#REF!
????

0.00
CLOSED

2,951,483.26
IPC NO. 41

SUB-TOTAL ERI NO. 28


57 OM-4 OM-4 001 001 002 28 28 28 JV JV Revisions to Office Partitions Revisions to Office Partitions - Masonry Works

(277,596.39)
(valued in OM-4) (126,440.24)

0.00

(58,985.18)
#REF! (126,440.24)

0.00
#REF!
#REF! JAP016/ALM/TCAC/19000 dated 17-Jun-08 #REF!

0.00
CLOSED CLOSED

0.00
see Omission OM-4-001&002 for the JV & NSC works respectively JV scope of works, i.e., omission of blockworks and plaster BondCommunication scope of works + 7% OH&P; AWAITING RESPONSE FROM m/S. Bond Communication

NSC Revisions to Office Partitions - OCP Works

(69,689.10)

#REF!

(69,689.10)

SUB-TOTAL ERI NO. 29


64 66 001 001 NSC Provision of Foul Water Disposal in case Primary System Failure #### NSC MEP Works - Revised External Services Drawings 29

(126,440.24)

(69,689.10)
102,143.27 (valued in 64-001)

#REF!
#REF! #REF!

#REF!
#REF! #REF!
#REF! #REF!

0.00

(69,689.10)
102,143.27 CLOSED

ETA costs + 7% JV OH&P Included in Claim No. 64-001

SUB-TOTAL ERI NO. 31

0.00

102,143.27

#REF!

#REF!

0.00

102,143.27

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (ERI).monvabad

25 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
65 58

SUB NO.
001 001

ERI NO.
31

V.O. TO

DESCRIPTION

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) ur (valued in 65-001) JV COST (AED) #REF! #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! #REF! LETTER REFERENCE
#REF! #REF!

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED) ur CLOSED

REMARKS / COMMENTS
ETA to submit entitlements valued in Claim No. 65-001

NSC Revision of Office Partitions - Mechanical & Fire Policy Drawings #### NSC Revised MEP Drawings

SUB-TOTAL ERI NO. 32


68 001 32 NSC Trip to Italy for Stone Quarry Inspection

0.00

0.00
43,688.96

#REF!

#REF!
39,083.00
JAP016/ALM/TCAC/16129 dated 5-Mar-08

0.00

0.00
CLOSED
BI costs AED 36,526.17 + 7% JV OH&P

SUB-TOTAL ERI NO. 34


71 76 001 001 #### NSC MEP Works - Revised Ground Floor Landscape Drawings 34 NSC Rainwater and Irrigation Waste Water Discharge from Planters

0.00

43,688.96
(valued in 76-001) 1,402,455.42

0.00
#REF! #REF!

39,083.00
#REF! #REF!
#REF! #REF!

0.00

0.00
CLOSED 1,402,455.42
Included in 76-001 ETA costs + 7% JV OH&P; uilders works not yet included to be submitted under 76-002

SUB-TOTAL ERI NO. 35 / 35.2 / 35.1 / 35.3 / 35.4 / 35.5


23 52 78 78 002 001 001R1 002 #### NSC DTS referenced AM/015/515 dated 5th August 2006 (MEP Works) 35.1 JV Possible Addition of Ballroom 35 35 JV JV Function Room / Ball Room Facility (Structural Works) Function Room / Ball Room Facility (Fireproofing Works) Modifications to Function Room / Ball Room Facility (Structural Works) Modifications to Function Room / Ball Room Facility (Fireproofing Works) Function Room / Ball Room Facility Parapet (Structural Works)

0.00

1,402,455.42
(valued in 107-003 & 175001)

#REF!
#REF! #REF! 2,087,955.12 191,292.64 #REF! #REF! #REF!

#REF!
#REF! #REF!
#REF! #REF! JAP016/ALM/TCAC/18101 dated 18-May-08 JAP016/ALM/TCAC/22536 dated 23-Nov-08

0.00

1,402,455.42
CLOSED
included in Claim Nos. 107-003 & 175-001 supeseded by claim no. 107 EVS Cost + 12% OH&P but less works deemed included in the NSC Thermofire Cost AED 170,797.22 + 12% OH&P; confirmed to be valued in ERI 35 under the Nakheel letter ref. JAP016/TS/GT/0244 dtd 27May08 EVS Cost + 12% OH&P + 3% attendances Thermofire Cost + 12% OH&P + 3% attendances EVS Cost + 12% OH&P + 3% attendances and Scaffolding supplied by JV; to be valued under ERI35.5 as per Nakheel letter ref. JAP016/TS/GT/0255 dtd 29May08 Valued in 107-003

(valued in Claims No. 78 & 107) 2,183,160.00 196,416.80 204,700.00 12,416.32 144,684.43 (valued in 107-003) (valued in 107-003) ur (valued in 107-001) ur

CLOSED CLOSED CLOSED 204,700.00 12,416.32 144,684.43 CLOSED CLOSED ur CLOSED ur

78 78 78

003 004 005

35 35 35.5

JV JV JV

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF!

85 99 100 106 107

001 001 001 001

35.1 35.1 35.1 35.1

NSC Function Room / Ball Room Domestic Water Drawings NSC Mechanical Works for the Function Room / Ballroom

#REF! #REF! #REF! (valued in 107-001) #REF!

#REF!

#REF! #REF! JAP016/ALM/TCAC/10523 dated 22-July-2007

ETA to submit entitlements ETA to submit entitlements TO BE VALUED IN CLAIM NO. 107-001 (ERI 35.1) Bond Interiors to submit entitlements

107 107

107 107 107 107 107 107

107 178 189 234

NSC Security Works for the Function Room / Ballroom JV Revised Interior Lighting Fixtures Layout at Ballroom GF, Washroom GF, and Ballroom 2L 001 35.1/ NSC Ballroom / Function Room (ID Works to the Walls 35.2/ facing the Retail Mall) 35.4 002R2 35.1/ JV Ballroom / Function Room (Concrete and Masonry 35.2 Works) 003 35.1/ NSC Ballroom/Function Room (MEP Works) 35.2/ 35.4 004a 35.1/ JV Ballroom/Function Room (CW Roofing, Curtain Wall 35.2 Cladding, Aluminum Panel Bulkheads Work) 004b 35.5 NSC Ballroom/Function Room (Roof Parapet Works - CVI No. 084) 004c 35.5 JV Ballroom/Function Room (Roof Parapet Works GI Cladding - CVI No. 084) 35 005 JV Ballroom/Function Room (Provision of Scaffolds and Access) 006 #### JV Provision of Downspouts at Ballroom/Function Room Roof (CVI No. 122) 007 35.1/ NSC Ballroom/Function Room (External Stoneworks) 35.2/ 35.4 35.4 008 JV Ballroom/Function Room (Additional Plaster Works where Electrical Panels are Installed) 35.3 NSC Ballroom/Function Room - Cladding to the 001 Structural Steel Beams 001 #### NSC Additional Work to the Ball Room Parapet (CVI No. 084) 35 001 NSC Pipe Size Changes @ First Floor (RFI No. 1062)

#REF!

#REF!

785,658.59 3,318,315.35

728,934.60 3,318,315.35

JAP016/ALM/TCAC/19604 dated 14-July-2008 JAP016/ALM/TCAC/21289 dated 5-Oct-08

CLOSED CLOSED

Subcontractor : JV Internal Subcontractor : ETA; under review by ETA due to the revised scope of works; confirmed by ETA

284,794.05 ur 26,312.00 0.00 2,210.46 357,161.60

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! 310,797.76

#REF! #REF!

284,794.05 ur 26,312.00 CLOSED 2,210.46 CLOSED

Al Abbar cost + 12% + 3% attendances Subcontractor : Al Abbar; shall be valued under ERI 35.5 as per Nakheel Letter JAP016/TS/GT/0255 dtd 29-May08 additional GI sheets cover to parapet for the preparation of EPDM by AL Abbar Scaffolding to be used by the Nominated Subcontractors; Fit-Out Contractor to work on the MEP Scope varied works at structural steel works and provision of Roof Drain Al Bayader cost + 12% OH&P

#REF! #REF!

#REF! JAP016/ALM/TCAC/22293 dated 13-Nov-08

2,710.59 ur (valued in 107-007) 20,545.90

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF!

2,710.59 ur CLOSED 20,545.90

Plaster works only based on BOQ rates AA to submit entitlements Al Bayader to submit entitlements

#REF!

ETA claim + 12% OH&P + 3% Attendances

SUB-TOTAL ERI NO. 37


18 001R1 37 JV Landscaping Works; i.e., provision of Civil/Structural Works as confirmed under Nakheel Letter ref. JAP016/GEN/ABS/1058 dated 14-Aug-06 Landscaping works - Screed for the Planter Boxes

3,843,063.24
3,775,777.57

3,696,022.85

#REF!
2,661,716.46

#REF!
JAP016/ALM/TCAC/90791 dated 19-Jun-08

677,827.85
CLOSED

20,545.90
Confirmed by Nakheel under the letter as mentioned, and instructed under ERI No. 37

18

002

37

JV

106,370.21

106,370.21

JAP016/ALM/TCAC/90791 dated 19-Jun-08

CLOSED

valued under th ERI No. 37

SUB-TOTAL ERI NO. 38


86 OM-8 001 001 38 38 JV JV Modification to Lift Opening at 36th and 48th Floor Modification of Lift Openings at 36th Floor Low Rise Lift Machine Room and 48th Floor High Rise Lift Machine Rooms (Omission of Concrete Works due to the increase of Lift Opening Sizes)

3,882,147.78
(valued in OM8-001) (1,988.48)

0.00

2,768,086.67
#REF! (1,988.48)

0.00
#REF!
#REF! JAP016/ALM/TCAC/22416 dated 18-ov-08

0.00
CLOSED CLOSED

0.00
under omission. BI to confirm cost by F&G

SUB-TOTAL ERI NO. 41

(1,988.48)
1,771.88

0.00

#REF!
1,587.60

#REF!
JAP016/ALM/TCAC/21082 dated 21-Sep-08

0.00
CLOSED

0.00
Subcon Cost + 12% OH&P

87

001

41

JV

Revised Drawing for Lift Machine Room on 3rd Service Floor

SUB-TOTAL ERI NO. 42


88 001 42 JV Revised Drawing for Interior Design Works

1,771.88
(valued in Series 41)

0.00

1,587.60
#REF!

0.00
#REF!
#REF!

0.00
CLOSED

0.00
considered in Claim Series 41 / ERI No. 16

SUB-TOTAL ERI NO. 43


81 001 43 JV Changes of Levels to Room Nos. B1-073 (Corridor) and B1-074 (Mechanical Plant Room)

0.00
7,275.43

0.00

#REF!
6,205.97

#REF!
JAP016/ALM/TCAC/21270 dated 29-Sep-08

0.00
CLOSED

0.00
Light weight Concrete and chipping works

SUB-TOTAL ERI NO. 44 / 44.1


103 139 001R1 001 44 44.1 JV Additional Wall in Security Room at Basement 2

7,275.43
26,634.44

0.00

6,205.97
25,999.57

0.00
JAP016/ALM/TCAC/17848 dated 8-May-2008

0.00
CLOSED

0.00
architectural works only.

NSC Basement 2 Security Room - Revised Drawings for the Ventilation and Lighting Details

172,273.32

#REF!

#REF!

#REF!

172,273.32

ETA costs + 7% JV OH&P

SUB-TOTAL ERI NO. 45 / 45.1


70 97 001 001 45 45.1 JV Level 30 Partition Layouts NSC Various Changes due to the revised MEP "For Construction" Drawings due to Modification at Level 30 NSC Various Revisions to the Electrical Works "For Construction" Drawings NSC Relocation of Cameras at 30th Floor (RFI No. 859) JV Omission of Partition Walls in Level 30 for Single Tenancy Arrangements

26,634.44
(valued in OM-5)

172,273.32

#REF!
#REF! #REF!

#REF!
#REF! #REF!
#REF! #REF!

0.00
CLOSED

172,273.32
see OM-5 below (omitted works)

ur

ur

ETA to submit entitlements

101 146 OM-5

001 001 001

45.2 45 / 45.1 45

ur ur (66,453.77)

#REF! #REF! (66,453.77)

#REF! #REF!

#REF! #REF! JAP016/ALM/TCAC/19244 dated 26-Jun-08

ur ur CLOSED

ETA to submit entitlements JCI to submit entitlements JV Scope of Works - Omission of Office Partitions at the Level 30 due to the single tenancy arrangements

SUB-TOTAL ERI NO. 46

(66,453.77)

0.00

#REF!

#REF!

0.00

0.00

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (ERI).monvabad

26 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
84

SUB NO.
001

ERI NO.
46

V.O. TO

DESCRIPTION

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) ur JV COST (AED) #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! LETTER REFERENCE
#REF!

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED) ur

REMARKS / COMMENTS
ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No. 105; to be valued under ERI16 ref. JAP016/ALM/TCAC/09512 dtd 12Jun07 ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No.107

NSC Revision to the Lighting Layout at GF, L1, & L2

102

001

46

NSC Lighting Requirements to the Function Room / Ballroom

ur

#REF!

#REF!

#REF!

ur

SUB-TOTAL ERI NO. 47


104 001 47 JV Additional 40 Container Storage, Office Chairs, and Computer for F+G Office

0.00
40,174.50

0.00

#REF!
40,074.53

#REF!
JAP016/ALM/TCAC/11909 dated 9-Sept-2007

0.00
CLOSED

0.00
actual cost transmitted to F&G based on dayworks rates; agreed with F&G

SUB-TOTAL ERI NO. 48


82 001 48 NSC Telephone IDF/MDF Room Drawings

40,174.50

0.00
34,309.10

40,074.53

0.00
13,517.00
JAP016/ALM/TCAC/21322 dated 5-Oct-08

0.00

0.00
CLOSED
ETA cost + 7% OH&P

SUB-TOTAL ERI NO. 49 / 49.2 / 49.3 / 49.4 / 49.5


89 92 Modification to the Structural Drawings at Levels 49, 50, and 51 49.2 NSC Various Revisions due to the revised For 001 Construction Drawings (MEP Works) at Levels 49, 50, & 51 001 #### JV Provision of Toilets at Levels 53 to 63 001 #### JV Request for Issue of Outstanding Drawings (DMCC Offices at L49-L51 & Add'l Toilets in Office Area at L52-L64) 006a 49.3 NSC Fire Fighting Systems at Levels 49, 50, & 51 (Abortive Work) 006b 49.3 JV Fire Fighting Systems at Levels 49, 50, & 51 (Builders Work and Abortive Work) 49.4 NSC Revised "For Construction" Security Drawings at 009 Levels 49, 50, & 51 under the DMCC Transmittal Ref. JAP016/TRNS /JV/00044 dated 5th May 2008 (Security Works) 001R1 49 JV Notification of Entittlements (CVI-089) - Doors to new washrooms at L49 and L50 (Lift Lobby Area) 001 49 JV 001 001 49.5 49 NSC Modification of Raised Floor Heights at Server Rooms at Level 49, 50, & 51 JV Modification to the Structural Drawings at Levels 49, 50, and 51

0.00
(valued in OM9-001)

34,309.10

0.00
#REF!

13,517.00
#REF! #REF!
#REF! #REF!

0.00
CLOSED

0.00
valued under the omissions

218,960.00

#REF!

218,960.00

ETA cost + 12% OH&P + 3% Attendances

153 157

(valued in 163) (valued in 163)

#REF! #REF!

#REF! #REF!

#REF! #REF!

CLOSED CLOSED

valued in another claim valued in another claim

163 163 163

ur 1,903.78 ur

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

ur 1,903.78 ur

ETA to submit entitlements builders works JCI to submit entitlements

186

58,651.66

#REF!

#REF!

#REF!

58,651.66

under review; to be under ERI #49 as per Nakheel letter ref. JAP016/TS/GT/0205 dated 15-Apr-08; SC cost +12%OH&P + 3% Attendances

208 OM-9

17,250.00 (85,688.89)

#REF! #REF!

#REF!

#REF!

17,250.00 (85,688.89)

#REF!

MDS cost + 12% OH&P + 3% Attendances; valued at ERI No. 49.5 as per Nakheel letter ref. JAP016/TS/GT/0271 dtd 9Jun08 Omission of Office Partitions at Level 49

SUB-TOTAL ERI NO. 50


109 001 50 NSC Amendment to District Cooling Piping and Control Works (Heat Echangers and Strainers)

(25,133.45)

236,210.00
597,081.20

#REF!
#REF!

#REF!
#REF!
#REF!

(25,133.45)

236,210.00
597,081.20
ETA to submit entitlements

SUB-TOTAL ERI NO. 51


94 001R2 51 JV Changes to Suspended Ceiling (ID Works Package)

0.00
85,383.20

597,081.20

#REF!
85,383.20

#REF!
JAP016/ALM/TCAC/21731 dated 21-Oct-08

0.00
CLOSED

597,081.20
subcon costs plus 12% (revised cost from 182,960.40 due to the meeting between FBI and DMCC)

SUB-TOTAL ERI NO. 52


95 95 001 002 52 52 NSC Variation Works due to Lift and Escalator Finishes (Direct Variation to the Nominated S/C Works) NSC Variation Works due to Lift and Escalator Finishes (Adjustment to the Provisional Sums)

85,383.20

0.00
653,624.24 544,678.47

85,383.20

0.00
653,624.24 544,678.47
JAP016/ALM/TCAC/17360 dated 20-Apr-08 JAP016/TS/GT/0083 dated 9-Aug2007

0.00

0.00
CLOSED CLOSED
KONE costs + 7% JV OH&P KONE costs + 7% JV OH&P; NOTE : Not considered as a variation by Consultant but adjsutment to the KONE Provisional Sums from AED500K to 1,009,045.30, and agreed amount s the nett costs.

SUB-TOTAL ERI NO. 53


114 001 53 NSC Changes of Wallpaper in Typical Floor Corridors

0.00

1,198,302.72
ur

0.00
#REF!

1,198,302.71
#REF!
#REF!

0.00

0.00
ur
BI to submit entitlements

SUB-TOTAL ERI NO. 54


93 001 54 JV Changes to Mock-up Areas (ID Works)

0.00
612,662.92

0.00

#REF!
#REF!

#REF!
#REF!
#REF!

0.00
612,662.92

0.00
Bond Interiors cost + 12% JV Mark-up + 7% OH&P (Prov. Sums)

SUB-TOTAL ERI NO. 55


115 001 55 JV Change of Pressurization Duct Opening at 51st Floor Lift Lobby

612,662.92
4,044.20

0.00

#REF!
3,315.73

#REF!
JAP016/ALM/TCAC/20893 dated 11-Sep-08

612,662.92
CLOSED

0.00
agreed withConsultants (F&G)

SUB-TOTAL ERI NO. 57


116 72 001R1 001 57 #### JV JV Additional Aluminum Flashing Interfacing Detail between the Cladding and Blockwall

4,044.20
764,729.70 (valued in 116-001)

0.00

3,315.73
#REF! #REF!

0.00
#REF! #REF!
#REF! #REF!

0.00
764,729.70 CLOSED

0.00
Subcon Cost + 12%OH&P + 3% Attendances included in Claim No. 116-001

SUB-TOTAL ERI NO. 58


112 001 58 NSC Changes in the LV Schematic Diagram

764,729.70

0.00
506,665.14

#REF!
#REF!

#REF!
#REF!
#REF!

764,729.70

0.00
506,665.14
ETA costs + 12% OH&P + 3% Attendances

SUB-TOTAL ERI NO. 59 / 59.1


80 80 001R1 59 59.1 002 JV False Beam/Bulk Head NSC Drainage Piping in Medium and High Rise Lift Machine Room

0.00
1,706.32

506,665.14

#REF!
#REF! #REF!

#REF!
#REF! #REF!
#REF! #REF!

0.00
1,706.32

506,665.14
bulkheads only

133,301.39

133,301.39

ETA costs = AED 115,914.25 + 12% JV OH&P + 3% Attendances

SUB-TOTAL ERI NO. 60


134 OM-6 001 001 60 60 JV JV Omission of Proximity Access Card Reader and Access Cards at Basement 1 Boom-Gate Omission of Proximity Access Card Reader and Access Cards at Basement 1 Boom-Gate

1,706.32
(valued in OM6-001) (2,856.00)

133,301.39

#REF!
#REF! (2,822.40)

#REF!
#REF!
#REF! JAP016/ALM/TCAC/22410 DATED 18-Nov-08

1,706.32
CLOSED CLOSED

133,301.39
under review by JV and JCI. considered Sultan Hareb rates x no. of slots in Basement 1 + 12% OH&P

SUB-TOTAL ERI NO. 61


136 001 61 JV Diamond Feature

(2,856.00)
155,609.44

0.00

#REF!
155,609.44

#REF!
JAP016/TS/GT/0227 dated 13May-2008

0.00
CLOSED

0.00
Excl Acry Costs = AED 138,937 + 12% JV OH&P

SUB-TOTAL ERI NO. 62 / 62.1 / 62.2 / 62.3


108 117 128 001 001 001 #### #### #### JV JV JV Architectural Changes to Level 2 Changes to the Diamond Exchange Centre Changes to Level 2 due to the New "For Construction" Drawings under Transmittal JAP016/TRNS/JV/00015 Revised "For Construction" ID Drawings at the Second Level and Diamond Exchange Centre

155,609.44
(valued in 149) (valued in 149-001) (valued in 149)

0.00

155,609.44
#REF! #REF! #REF!

0.00
#REF! #REF! #REF!
#REF! #REF! #REF!

0.00
CLOSED CLOSED CLOSED

0.00
on-hold area, awaiting details from Client valued in 149-001 under ERI No. 62 not applicable.

149

001

62

JV

6,574,957.21

3,431,895.90

agreed values is partial and deemed to change progressively, as it is based on the agreed rates only (+12%)

#REF!

updated cost and rates approval summary status being sent regularly; cost submitted is the final applied claim

149 149

002 003a

62.1 62.1

NSC Revisions to Diamond Exchange Centre (MEP and Interior Lighting) NSC Revisions to Diamond Exchange Centre (CCTV and Access Control)

2,679,840.21 617,089.33

#REF! #REF!

#REF! #REF!

#REF! #REF!

2,679,840.21 617,089.33

ETA cost + 7% OH&P + 2% Attendances JCI cost AED 566,137.00 + 7%JV OH&P + 2%Attend; based on transmittal ./00017 dtd 1-Nov-07 (drwg. No. 4494/Y/009 Rev.3)

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (ERI).monvabad

27 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
149 149 149

SUB NO.
003b 004 005a

ERI NO.
62.3 62.2 ####

V.O. TO

DESCRIPTION

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) ur ur 24,628.70 JV COST (AED) #REF! #REF! #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! #REF! #REF! LETTER REFERENCE
#REF!

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED) ur ur 24,628.70

REMARKS / COMMENTS
JCI to submit entitlements; based on transmittal ./00043 dtd 4May08 (drwg. No. 4494/Y/009 Rev.4) ETA to submit entitlements BC cost + 7% OH&P; BC VO#10; BC time claim = 147 days

149

005b

####

149

005c

####

149

006

####

149

007

62

NSC Revisions to Diamond Exchange Centre (CCTV and Access Control) NSC Revisions to Diamond Exchange Centre (Fire Policy Layout) NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (Bond Communication Scope - Additional Voice/Data Points at Level 2) NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (ETA scope of works) JV Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (JV scope of works) NSC Vertical Cable Manager for Diamond Exchange AV System at the Multi Purpose Room in accordance with the F&G letter ref. JAP016/ALM/TCAC/20991 dated 16-Sep-08 JV Cuttings in Corridor Ceiling at Level 2 as required by Bond Communication JV

#REF! #REF!

ur

#REF!

#REF!

#REF!

ur

ETA to submit entitlements

(valued in 149-001)

#REF!

#REF!

#REF!

CLOSED

considered in 149-001 (ERI No. 62)

11,996.83

#REF!

#REF!

#REF!

11,996.83

BC cost + 7% OH&P; BC VO#14; BC time claim = 119 days

0.00

#REF!

#REF!

#REF!

CLOSED

FBI shall submit entitlements as per the F&G letter ref. JAP016/ALM/TCAC/21815 dtd 26-Oct-08; BACKCHARGE TO BOND COMMUNICATION DUE NON-COORDINATION Dubai Metals cost + 12% OH&P + 3% Attand

149

008

149

009

Break Glass Pedestals at the Diamond Exchange Centre in accordance with the F&G transmittal ref. F+G/ALMAS/TAISEI/01961 #### NSC Revisions to the Electrical Works at the Diamond Exchange Centre and Level 2 as per the F&G transmittal ref. F+G/ALMAS/TAISEI/01574 and DMCC transmittal ref. JAP016/TRNS/JV/00048 #### NSC Additional Counter at the Security Room level 2 as per the M/s. Nakheel letter ref. JAP016/TS/BW/0366 dated 16-Nov-08 #### NSC Changes to the Diamond Exchange Centre as per the instructions given via M/s. DMCC letter referenced JAP016/GEN/BW/0177 dated 20-Oct-08 62 #### #### 62 / 16 JV JV JV Notification of Disruption of Work due to discrepancy of Design Drawings at Second Floor Diamond Exchange Details Design Changes due to the Omission of Operable Partition at Level 2 Offices (ERI No. 62) and Stainless Steel Rubbish Bins (ERI No. 16)

9,200.00

#REF!

#REF!

#REF!

9,200.00

222,906.80

#REF!

#REF!

#REF!

222,906.80

ETA cost + 12% OH&P + 3% Attendances

149

010

ur

#REF!

#REF!

#REF!

ur

BI to submit entitlements

149

011

44,538.44

#REF!

#REF!

#REF!

44,538.44

BC cost + 7%; BC VO#17; BC time claim = 91 days

165 177 214

001 001 001

(valued in 149-001) (valued in 149-001) (valued in 41-001 & 149001)

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF!

CLOSED CLOSED CLOSED

time claim.

#REF! #REF!

valued in 149-001 under ERI No. 62 considered in 41-001 and 149-001

SUB-TOTAL ERI NO. 63


137 001 63 NSC Emergency Cables to the Tenant's DB

6,584,157.21

3,601,000.31
394,252.82

#REF!
#REF!

#REF!
#REF!
#REF!

#REF!

3,601,000.31
394,252.82
ETA costs + 7% JV OH&P; confirmed to be ERI No. 63 as per F&G letter ref. JAP016/ALM/TCAC/18721 dtd 8Jun08

SUB-TOTAL ERI NO. 64


126 001 64 NSC Modification of Male Washroom at 36th Floor - RFI 767 (Rev. 0,1&2)

0.00

394,252.82
56,553.22

#REF!
#REF!

#REF!
#REF!
#REF!

0.00

394,252.82
56,553.22

ETA part = AED 50,475.00

SUB-TOTAL ERI NO. 65


110 001R1 65 NSC Furniture / Console at Basement 2 Security Room

0.00

56,553.22
29,808.00

#REF!

#REF!
29,030.40
JAP016/ALM/TCAC/21105 dated 22-Sep-08

0.00

56,553.22
CLOSED
BF claim AED 25,920 + 12% OH&P

SUB-TOTAL ERI NO. 66 / 66.1


163 001 66 66.1 JV Provision of Toilets at upper floors, Levels 49,50,51, and 62 (Civil and Architectural Works, and Abortive Works-Coring at 49, 50, & 51, Plastering at Pantry Wall at L49, and add'l opening at SF3 for Level 49)

0.00
127,141.12

29,808.00

0.00
100,469.43

29,030.40
JAP016/ALM/TCAC/21426 dated 9-Oct-08

0.00
CLOSED

0.00
under review by JV; additional coring works to ERI 66.1 as confirmed by F&G letter ref. JAP016/ALM/TCAC/17867 dtd 8May08; addl plaster at Pantry L49 under 66.1 as per JAp016/ALM/TCAC/18766 dtd9Jun08;ERI 66.1 confirmed by Nakheel to cover coring works by B

163 163

002 005

163 163 174

007 008 001

NSC Provision of Toilets at upper floors, Levels 49,50,51, and 62 (MEP Works) #### NSC Further Revisions to the Levels 49, 50, 51, 60 and 61 in accordance with DMCC Transmittal Ref. JAP016/TRNS/JV/ 00032 dated 22nd January 2008 (MEP Works) 66.1 NSC Reworks at the New DMCC Washrooms (Levels 49, 50, & 51) for FCU's 67/ NSC Relocation of FCU to the New Toilet Area at Levels 66 52,53,54,59, & 62 66.1 NSC Design Changes - Additional Dummy Mullions and Back Pans at Levels 49-62 (NSC Works) 66 66.1 JV Design Changes-Additional Aluminum Flashing due to the revised Curtain Wall Cladding 8,452.50

470,109.65 ur

#REF! #REF!

#REF! #REF!

#REF! #REF!

470,109.65 ur

ETA costs of AED 408,791 + 12%JV OH&P + 3% Attendances ETA to submit entitlements

14,283.00 ur ur

#REF! #REF! #REF! 8,232.00

#REF! #REF! #REF!

#REF! #REF!

14,283.00 ur ur CLOSED

ETA cost + 12% OH&P + 3% Attendances ETA to submit entitlements; Level 52,53,54,59 under ERI67, and Level 62 under ERI66 Al Abbar to submit claim / JV to submit builders works claim; to be valued under the ERI 66.1 refer to F&G letter JAP016/ALM/TCAC/18209 dtd 20May08 Best Steel cost + 12% OH&P; to be valued under the ERI 66.1 refer to F&G letter JAP016/ALM/TCAC/18209 dtd 20May08

#REF!

174

002

JAP016/ALM/TCAC/22576 dated 24-Nov-08

SUB-TOTAL ERI NO. 67


163 003 67 Provision of Toilets at upper floors, Levels 52,53,54, and 59 (Civil and Architectural Works, and Abortive Works, if any) NSC Provision of Toilets at upper floors, Levels 52,53,54, and 59 (MEP Works) JV

135,593.62
90,502.31

484,392.65

#REF!
63,163.87

#REF!
JAP016/ALM/TCAC/22008 dated 2-Nov-08

0.00
CLOSED

484,392.65
agreed withConsultants (F&G)

163

004

67

334,816.75

#REF!

#REF!

#REF!

334,816.75

ETA costs AED291,185 + 12% JV OH&P + 3% Attendance

SUB-TOTAL ERI NO. 68


131 001 68 NSC Missing Purlins at Connecting Corridor Between Tower and Diamond Exchange Center (RFI No. 839)

90,502.31

334,816.75
16,050.00

#REF!

#REF!
12,895.64
JAP016/ALM/TCAC/22694 dated 26-Nov-08

0.00

334,816.75
CLOSED
EVS cost + 7% OH&P

SUB-TOTAL ERI NO. 69


173 001 69 JV Additional Staff Facilities - Project Manager's Staff (F+G)

0.00
64,706.19

16,050.00

0.00
56,015.46

12,895.64
JAP016/AlM/TCAC/21700 dated 20-Oct-08

0.00
CLOSED

0.00
Supply and Labour rates + 12%OH&P

SUB-TOTAL ERI NO. 70


179 001 70 JV Modifications to Typical Female Bathroom Ceiling Mirrors

64,706.19
7,855.65

0.00

56,015.46
7,650.72

0.00
JAP016/ALM/TCAC/17650 dated 30-Apr-08

0.00
CLOSED

0.00
BI cost at AED 6,831.00 + 12% JV OH&P

SUB-TOTAL ERI NO. 71


152 001 71 Additional Works to the Metal Cladding (MT-20) behind Glazed Balustrades caused by the Lowering of Ceiling at Ground Floor Level Due to the MEP Works (Metal Cladding - MT20) NSC Omission of Wall Tiles due to the extension of Metal Cladding Behind Glass Ballustrades caused by the lowering of Ceiling JV

7,855.65
294,350.71

0.00

7,650.72
176,646.32

0.00
JAP016/ALM/TCAC/22470 dated 20-Nov-08

0.00
CLOSED

0.00
using Bond Interiors rates + 7% OH&P

OM-7

001

71

(132,210.53)

#REF!

#REF!

(132,210.53)

BI to confirm cost by F&G

SUB-TOTAL ERI NO. 72


164 001 72 JV BMS Room Furniture Requirements

294,350.71
40,216.65

(132,210.53)

176,646.32
39,167.52

#REF!
JAP016/ALM/TCAC/21106 dated 22-Sep-08

0.00
CLOSED

(132,210.53)
BF cost AED 34,971.00 + 12% JV OH&P

SUB-TOTAL

40,216.65

0.00

39,167.52

0.00

0.00

0.00

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (ERI).monvabad

28 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO. SUB NO. ERI NO. V.O. TO

DESCRIPTION ERI NO. 73

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) 12,637.06 NSC COST (AED) JV COST (AED) #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! LETTER REFERENCE
#REF!

OUTSTANDING CLAIMS
JV COST (AED) 12,637.06 NSC COST (AED)

REMARKS / COMMENTS

123

001R2

73

JV

166

001

73

JV

Potential Delay due to Late Issuance of Revised Design Information in Sky Lobby Meeting Room at Level 48 ID Works Package - Lighting Requirements at Level 48 Meeting Room (MEP Works Scope) ID Works Package - Lighting Requirements at L48 Meeting Room (JV Scope - Lever to Supply)

confirmed to be valued under ERI No. 73 according to the Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08

11,783.12 2,254.00

#REF! #REF!

#REF! #REF!

#REF!

11,783.12 2,254.00

ETA cost + 12%OH&P + 3% Attendances; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08 JV to submit entitlements; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08; Lever cost + 12% OH&P + 3% Attendance

166

002

73

JV

#REF!

SUB-TOTAL ERI NO. 74 / 74.1


197 001a 74.1 JV Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope - masonry works, abortive works and coring works) Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope - ID works) Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (ID Scope of Works) Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (MEP Works) Revised Domestic Water Layout at Ground and First Floor due to the Revised "For Construction" Drawings under the DMCC Transmittal JAP016/TRNS/JV/00042 Revised " For Construction" drawings under the DMCC transmittal ref. JAP016/TRNS/JV/00040 dated 16-Apr-08 (Additional Voice/Data Points in GF & 1L)

26,674.18
18,228.31

0.00

#REF!
14,232.82

#REF!
JAP016/ALM/TCAC/22447 dated 19-Nov-08

26,674.18
CLOSED

0.00

Masonry Works, Abortive Works and Coring Works

197

001b

74.1

JV

57,459.68

#REF!

#REF!

#REF!

57,459.68

Doors and Frames incl Ironmongery, and Ceiling Works

197

002

74.1

NSC

ur

#REF!

#REF!

#REF!

ur

Bond Interiors to submit entitlements

197

003

74.1

NSC

50,319.40

#REF!

#REF!

#REF!

50,319.40

ETA to submit entitlements

202

001

74

NSC

73,986.40

#REF!

#REF!

#REF!

73,986.40

ETA cost + 12% OH&P + 3% Attendances

238

001

74.1

NSC

26,919.09

#REF!

#REF!

#REF!

26,919.09

BC Cost + 7% OH&P; BC VO#9; BC time claim = 186 days

SUB-TOTAL ERI NO. 75


201 001 75 NSC ID Tiling Works-Attic Stock (ERI No. 75)

75,687.99

151,224.89
ur

#REF!
#REF!

#REF!
#REF!
#REF!

57,459.68

151,224.89
ur
BI to submit entitlements

SUB-TOTAL ERI NO. 76 / 76.1


158 205 205 001R1 001 002 76 76.1 76.1 JV Doors at DEWA Water Meter Rooms

0.00
21,502.11

0.00

#REF!
#REF!

#REF!
#REF! 7,908.70
#REF! JAP016/TS/GT/20686 dated 28Aug-08 JAP016/TS/GT/20686 dated 28Aug-08

0.00
21,502.11

0.00
JV Costs

NSC DEWA Water Meter Connection (MEP Works) JV DEWA Water Meter Connection (Builders Work) 5,263.09

10,637.50 3,941.91

CLOSED CLOSED

ETA cost + 7% OH&P JV works clsoing of opening and provision of new opening with waterproofing and sealing works

SUB-TOTAL ERI NO. 77


207 001 77 NSC Tower Secondary Roof Clamping Section

26,765.20

10,637.50
150,193.45

#REF!
#REF!

#REF!
#REF!
#REF!

21,502.11

0.00
150,193.45
Al Abbar cost + 12% OH&P + 3% Attendances

SUB-TOTAL ERI NO. 78


176 176 176 176 196 196 196 001 002 003 004 001 002 003a TECOM/DU Comments on Telephone Rooms Raised Access Floor Material Submittal #### NSC DU Requirements #### JV #### NSC TECOM/DU Comments on Structured Cabling Material Submittal #### NSC TECOM/DU Comments - " Active " IDF Rooms 78 JV MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (JV Scope) 78 NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (ETA Scope) 78 NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeKrone Modules) 78 NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeVertical Cable Manager) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeHorizontal Cable Manager) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeCAT 3 Cables Installations) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeOM3 Fibre Optic Cable Installations) JV JV MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Lateral Systems Scope)

0.00
(valued in 196)

150,193.45

#REF!
#REF!

#REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

0.00
CLOSED

150,193.45
Lateral Systems to submit (Builders to be in another submittal)

(valued in 196) (valued in 196) (valued in 196) 2,070.00 76,094.35 62,002.57

#REF! #REF! #REF! #REF! #REF! #REF!

CLOSED CLOSED CLOSED 2,070.00 76,094.35 62,002.57

ETA to submit entitlements (Builders to be in another submittal) BC to submit entitlements (Builders Works if any to be in another submittal) ETA to submit entitlements valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 ETA cost + 12% OH&P + 3% Attendances; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#03); BC time claim = 147 days

#REF!

196

003b

127,698.42

#REF!

#REF!

#REF!

127,698.42

BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#05); BC time claim = 233 days

196

003c

78

19,821.34

#REF!

#REF!

#REF!

19,821.34

BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#11); bc time claim = 201 days

196

003d

78

336,915.53

#REF!

#REF!

#REF!

336,915.53

BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#01); bc time claim = 275 days

196

003e

78

321,379.43

#REF!

#REF!

#REF!

321,379.43

BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#02); bc time claim = 273 days

196 196

004 005

78 78

117,875.00 5,689.44 93,918.75 ur 36,059.40

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF!

117,875.00 5,689.44 93,918.75 ur 36,059.40

valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 JV Internal Works

196

006

78

MDF & IDF Rooms DUs Additional Requirements, i.e., Stand for the UPS & Batteries in MDF Room & UPS Room at Basement 1 NSC MDF & IDF Rooms DUs Additional Requirements, i.e., DU's Requirements for the UPS NSC Replacement of FCU at UPS Room Basement 1 NSC Relocation of Isolators in UPS Room as per the DU's Requirements

#REF!

#REF!

ETA cost + 12% OH&P + 3% Attend

196 215

007 001

78 78

#REF! #REF!

ETA to submit entitlements ETA cost + 12% OH&P + 3% Attendances, JV to submit builders work, if any; ERI 78 as confirmed by F&G letter ref. JAP016/ALM/TCAC/19239 dtd 26Jun08 & Nakheel letter ref. JAP016/TS/GT/0304 dtd 8Aug08

SUB-TOTAL ERI NO. 79


204 001 79 NSC Level 1 Food Court A/C Design Revised "For Construction" Drawings under the DMCC transmittal ref. JAP016/TRNS/JV/00046 (MEP Works)

125,634.44

1,073,889.80
354,891.15

#REF!
#REF!

#REF!
#REF!
#REF!

125,634.44

1,073,889.80
354,891.15
ETA cost + 12% OH&P + 3% Attendances (Power & LC, AC & Ventilaltion, Drainage)

SUB-TOTAL ERI NO. 80


228 001R1 80 JV Doors to Lift Machine Rooms - Summit & Service F1 (Atkins letter ref. RD4532/661/AK/mja/R8-1879)

0.00
37,185.25

354,891.15

#REF!
#REF!

#REF!
#REF!
#REF!

0.00
37,185.25

354,891.15
JV's cost from Belgium Aluminum and Best Steel + 12% OH&P + 3% Attendances

SUB-TOTAL ERI NO. 81


203 001 81 NSC Granite Finishing at Level 2 (RFI No. 636 R1)

37,185.25

0.00
33,846.52

#REF!
#REF!

#REF!
#REF!
#REF!

37,185.25

0.00
33,846.52
AB cost + 12% OH&P + 3%Attend

SUB-TOTAL ERI NO. 82


231 001 82 NSC Additional Dummy Mullion at Levels 49-51

0.00

33,846.52
ur

#REF!
#REF!

#REF!
#REF!
#REF!

0.00

33,846.52
ur
Al Abbar to submit entitlements; Nakheel letter ref. JAP016/TS/BW/0346 dtd 14Sep08 instruction to install and ERI is forthcoming

SUB-TOTAL

0.00

0.00

#REF!

#REF!

0.00

0.00

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (ERI).monvabad

29 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO. SUB NO. ERI NO. V.O. TO

DESCRIPTION

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) JV COST (AED)

ER / F&G / JV AGREED VALUES


NSC COST (AED) LETTER REFERENCE

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED)

REMARKS / COMMENTS

ERI NO. 83
233 001 83 NSC Revisions to Landscaping Package in accordance with the M/s. Nakheel letter ref. JAP016/TS/BW/0347 dated 21-Sep-08 66,615.70 #REF! #REF!
#REF!

66,615.70

Al Bayader cost + 12% OH&P + 3% Attendances

SUB-TOTAL OUTSTANDING CLAIMS WITHOUT ERI


1 001 #### JV Design Modification of Pile Caps Excavation to the difference in the Tender Drawings and the Actual Site Conditions Pile Head Levels and Associated Problem

0.00
611,739.00 259,943.16 258,088.62

66,615.70

#REF!
#REF! #REF! #REF!

#REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!

0.00
611,739.00 259,943.16 258,088.62

66,615.70
progressed under a separate claim.

001

####

JV

#REF!

progressed under a separate claim.

001

####

JV

#REF!

progressed under a separate claim.

35 35 42 44 47 62 63 36

002a 002b 001 001 001 001 001 001

#### NSC Additional OCP's conduits to the Offices and Retail Units (MEP Works) #### JV Additional OCP's conduits to the Offices and Retail Unts (Builders Work) #### NSC Fire Sprinkler Riser Pipes in Garbage Chute Shaft #### NSC Revised Specifications for the Fire Fighting Equipments #### NSC Revised Architectural Drawings at 31st & 32nd Floor (MEP Works) #### JV Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms #### NSC Installation of OCP's to Tenant Rooms #### NSC Fire Alarm Shop Drawing #### NSC RFI No. 571 - Insulation and Backing Panels to Cladding #### NSC Secondary Roof for the Towers #### NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (ETA Scope) #### NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (Al Abbar Scope) #### JV Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (JV Scope) #### NSC Revised Mechanical and Electrical Drawings at Basement 2 (Security Room) #### NSC Level 2 Fire Policy Layouts (Transmittal Ref. JAP016/TRNS/JV/00014) #### NSC Drainage on Swimming Pool Deck at Level 1 (RFI No. 831) #### NSC Further Revisions to For Construction Drawings under transmittals ref. JAP016/TRNS/JV/00015 and 00016 #### NSC Power Supply and Fire Alarm Interface to Smoke Ventilation Window (RFI No. 783) #### NSC Containment (Security Services) #### JV Enclosure to the Irrigation Pipes running through the LV Room 2 (RFI No. 894) #### NSC Second Floor Revised Lighting and Power Design #### NSC Sequencing of Spire Erection #### NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00033 dated 5th February 2008 (MEP Works) #### NSC Increase in Water Tank Size #### NSC Ducting in MDF Rooms #### NSC Additional Low Leakage Motorized Smoke Damper #### NSC Height of Services at Level-49 on Shaft-6 #### NSC Additional Stone Cladding to Sides of Maintenance Stairs #### NSC Additional Work to Make-up Levels at Main Entrance #### JV Design Change to External Ramps - Block Stopper Upstand (CVI No. 086) Design Change to External Ramps - Waterproofing (CVI No. 086) Additional Work to External Wall Finishing at Swimming Pool (RFI No. 920) Additional Work to Concrete Under Maintenance Path Tiles (RFI No. 929) Temporary Fire Alarm Systems (Installation) Temporary Fire Alarm Systems (Material / Testing and Commissioning) Mechanical Services at Tecom Room in Level 50

38,246.08 120,370.11 522,748.23 ur ur 12,494.21 (valued in 35-001) ur ur (valued in 220-001) 91,147.85

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

38,246.08 120,370.11 522,748.23 ur ur 12,494.21 CLOSED ur ur CLOSED 91,147.85

ETA Cost + 7% JV OH&P; as per original claim JV Cost based on the response from RFI No. 417 ETA to submit entitlements; revisions is due to the requirement of a UL/FM specifications ETA to submit entitlements Revision 1 - revised due to the changes in the works. not applicable ETA to submit entitlements; rejected by Nakheel due to the Consultant's(Atkins)response ref. RD/4532/661/ML/R8-0344. AA to submit entitlements to be valued in Claim N o. 220-001 ETA costs + 12% OH&P + 3% Attendances

#REF! #REF! #REF! JAP016/TS/BW/0021 dated 12Nov-06

83 98 113

001 001 001

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

113

002

11,909.40

#REF!

#REF!

#REF!

11,909.40

Al Abbar cost + 12% OH&P + 3% Attendances

113

003

(valued in 113-001)

#REF!

#REF!

#REF!

CLOSED

Included in Claim No. 113-001

118 125 130 133

001 001 001 001

ur ur ur ur

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

ur ur ur ur

ETA to submit entitlements ETA to submit entitlements ETA to submit entitlements ETA & JV to submit entitlements

148 151 154 155 171 175

001 001 001 001 001 001

ur ur 1,600.56 ur ur ur

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

ur ur 1,600.56 ur ur ur

ETA to submit entitlements ETA to submit entitlements #REF! ETA to submit entitlements EVS to submit entitlements ETA to submit entitlements (Builders to be in another submittal)

180 181 182 183 184 185 187 187 191 192 194 194 195 198

001 001 001 001 001 001 001 002 001 001 001 002 001 001

71,922.15 ur 1,308,459.65 36,435.37 ur ur 108,691.73 86,593.30 ur ur 190,661.95 82,800.00 ur ur

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

71,922.15 ur 1,308,459.65 36,435.37 ur ur 108,691.73 86,593.30 ur ur 190,661.95 82,800.00 ur ur

ETA Claim = AED 62,541.00, +JV's 12%(OH&P) and 3% (Attend) ETA to submit entitlements ETA Claim = AED 1,137,791.00, + JV's 12% (OH&P) and 3% (Attend) ETA Claim = AED 31,682.93, + JV's 12% (OH&P) and 3% (Attend) Al Bayader to submit entitlements Al Bayader to submit entitlements JV's portion of the works AB cost + 12% OH&P + 3%Attend Al Bayader to submit entitlements Al Bayader to submit entitlements ETA to submit entitlements JV thru Sibca to submit entitlements ETA to submit entitlements (Builders Works if any to be in another submittal) EVS to submit entitlements

#### NSC #### NSC #### NSC #### NSC #### JV #### NSC

209

001

209

002

210 212 213 216 218 218 219 219 220

001 001 001 001 001

#### NSC Change of Applied Cementitious Fireproofing to Intumescent Paint on Steel Beams at Diamond Exchange Center #### NSC Fire Protection Systems at Basement 2 Security Room - Supply of Additional Wall Mounted Dry Powder and CO2 Fire Extinguishers #### NSC Fire Protection Systems at Basement 2 Security Room - Removal of Existing Fire Fighting Systems and Installation of ETA Supplied Fire Fighting Equipment #### JV Closure of the Opening in Parapet Wall on Elevation 4 for Spire Connection #### NSC Back Boxes for Seismic Detectors at Basement 5 and Level 2 Vault Rooms #### NSC BMS Monitor for the Revolving / Sliding Doors #### NSC Additional Screed at Road Type 2 and Ramps

ur

#REF!

#REF!

#REF!

ur

ETA to submit entitlements; Nakheel letter ref. JAP016/TS/GT/0285 dtd 23Jun08 reject the claim and no ERI's shall be issued JCI to submit entitlements

ur

#REF!

#REF!

#REF!

ur

11,682.47 ur 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 ur ur

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

11,682.47 ur 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 ur ur

Intherpro Cost + 12% OH&P + 3% attendances ETA to submit entitlements ETA cost + 12% OH&P + 3% Attendances Al Bayader cost + 12% OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Belgium Alkuminum cost + 12% OH&P +3 % Attend FBI + EVS cost + 12% OH&P + 3% Attend ETA to submit entitlements Al Abbar to submit entitlements

221 222 224 225 226

#### NSC Additional Requirements for Etisalat Room in Basement 1 (MEP Works) 002 #### JV Additional Requirements for Etisalat Room in Basement 1 (Door Amendments) 001 #### JV False Ceiling at Basement 5 Vault Lobby and Services Room (RFI No. 511) 002 #### NSC Fire Sprinkler above False Ceiling at Basement 5 Vault Lobby & Services Room (RFI No. 511) 001 #### NSC Vapour Barrier underneath all Parapet Composite Cladding of the 6 Wings and Diamond Exchange Centre 001R1 #### JV Modification to Louvers and Additional Aluminum Doors at Various Areas 001 #### NSC Additional 6" diam. Line from B5 Pump Room to S2 Level Fire Tank 001 #### NSC Paving and Landscaping Works at Ramps (originally under Wade Adams Scope) 001 #### NSC Planter Area at Level 2 - Change of 500mm thick Sweet Soil to Polysterene 001 #### JV Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) JV scope of works

32,364.90 404,090.45 305,837.13 25,300.00 35,000.25

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

32,364.90 404,090.45 305,837.13 25,300.00 35,000.25

cost from domestic subcons + 12%OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Al Bayader cost + 12% OH&P + 3% Attendances AB cost + 12% OH&P + 3%Attend JV Internal Works

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (ERI).monvabad

30 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
226

SUB NO.
002

ERI NO.

V.O. TO

DESCRIPTION

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) 110,641.50 JV COST (AED) #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! LETTER REFERENCE
#REF!

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED) 110,641.50

REMARKS / COMMENTS
ETA cost + 12% OH&P + 3% Attendances

229 237

001 001

#### NSC Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) MEP Scope of Works #### NSC Additional Works at Entrance Ramps - Type 3 & 5 #### NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00002 dated 10th July 2007 (Additional Voice / Data Points) #### NSC Additional Power Supply Lines for External Water Features, Irrigation Pumps, and Swimming Pool #### NSC Trimming of Cantilever Beams at the Diamond Exchange Center as per the RFI No. 1085 #### NSC Modification of Soffit Cladding for the Swimming Pool to Conceal Service Pipings as per the RFI No. 1054 #### NSC Structural Steel Support for Fans at Air Shaft #### NSC HVAC Systems at Basement 1 Control Room and Lobby as per RFI No. 1087 #### JV Additional Door Closer and Selector at Basement 1 Management Office #### #### #### JV JV JV Coring for the Tenant Fit-Out Contractors Additional Access Ladder at Penstock Chamber in Basement PC Supply4 Rates

16,654.95 34,599.52

#REF! #REF!

#REF! #REF!

#REF! #REF!

16,654.95 34,599.52

Al Bayader cost + 12% OH&P + 3% Attendances BC Cost + 7% OH&P; BC VO#7; BC time claim = 201 days

239

001

141,276.06

#REF!

#REF!

#REF!

141,276.06

ETA cost + 12% OH&P + 3% Attendances

240 241

001 001

ur ur

#REF! #REF!

#REF! #REF!

#REF!

ur ur

#REF!

note that the structural works was based on the structural drawings provided to EVS; EVS to submit entitlements AA to submit entitlements

242 243 244

001 001 001

340,314.96 13,460.75 1,732.06

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

340,314.96 13,460.75 1,732.06

ETA cost + 12% OH&P + 3% Att ETA cost + 12% OH&P + 3% Attendances Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22Dec-08 as per the email request of Mr. Clarence Pinto of DMCC dated 4Jan-09 as per the EHS requirements adjustment to the Contract Sums due to the PC Materials final rates

245 246 OM-10

001 001 001

ur ur (21,806.96)

#REF! #REF!

#REF! #REF!

#REF! #REF!

ur ur (21,806.96)

SUB-TOTAL TIME RELATED/ESCALATION CLAIMS


0 001 #### JV Delay in Site Mobilization Nominated Subcontractor Appointment (ETA) Delay of receipt of the Building Permit and "For Constructon" Drawings Delay in Raft Pour in Zones 1 & 2 Late Notification of Subcontractors Closure of Site and Offices (due to the death of Sheik Maktoom, 5-7 January 2006)

1,553,881.33
0.00 0.00 0.00 0.00 0.00 0.00

3,928,851.11

#REF!
#REF! 0.00 0.00 #REF! 0.00 0.00

#REF!
#REF!
#REF!

1,553,881.33
CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

3,928,851.11
This is due to the late possession of site as detailed in the referred letter.

4 6 7 8 9

001 001 001 001 001

#### #### #### #### ####

JV JV JV JV JV

JAP016/GEN/ABS/1051 dated 8Aug-06 JAP016/GEN/ABS/1051 dated 8Aug-06

rejected by Nakheel due to notice not served as per the required time period under the Contract. rejected by Nakheel due to notice not served as per the required time period under the Contract. progressed under a separate claim; time related claim. rejected by Nakheel due to dates relating to NSC in the Baseline Programme is not yet accepted. Rejected by Nakheel in accordance to Clause 44.1 of CoC, as 1 day is non working day and 2 days is not sufficient to award an entitlement; our letter ref. DXB/.Jly/5013 dtd 26Oct08 again requested for 2 days EOT time implications. To be included in the Prolongation Claims as this is a preliminaries items due to inclement weather conditions at site Potential Time Claim EOT of 585 days includes the previous 96 days and 138days claimed; Claim for additional pile works reduced to 132 from 138, thus reducing the overall claim to 579 days

#REF!

#REF! JAP016/TS/BW/0018 dated 31Oct-06 JAP016/GEN/ABS/1014 dated 24Jun-06, & JAP016/GEN/ ABS/1051 dated 8-Aug-06

39 45 49 119 127

001 001 001 001 001

#### #### #### #### ####

JV JV JV JV JV

Nomination of Landscaping Subcontractor Provision of Inspectors Exceptionally Adverse Climatic Conditions Notification of Potential Delay due to the Review of Shop Drawings Prolongation Costs

0.00 (valued in 127-001) 0.00 0.00 131,765,411.17

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

CLOSED CLOSED CLOSED CLOSED 131,765,411.17

127

002

####

JV

Additional Payment as a Result of the Escalating Cost of Materials Notice of Disruption of Work at Function Room/Ballroom due to Design Conflict Notification of a Potential Delay Determination of Scope of Work at L49, L50, & L51 (DMCC Floors) Special Holiday on 14th January 2008 Notice of Excessive Rains Delays due to Strong Winds Inspections not done on Timely Basis

711,983.12

#REF!

#REF!

#REF!

711,983.12

in connection to the prolongation claim

143 150 159 160 167 168

001 001 001 001 001 001

#### #### #### #### #### ####

JV JV JV JV JV JV

0.00 0.00 0.00 0.00 0.00 0.00

#REF! #REF! 0.00 #REF! 0.00 #REF!

#REF! #REF!

#REF! #REF!

CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

time claim. Time related claim to be submitted separately.

#REF!

JAP016/TS/GT/0259 dated 29May-08 #REF! JAP016/TS/GT/0152 dated 18Feb-08 #REF!

to be considered in the EOT claim under review for time entitlements rejected by Nakheel To be included in the Prolongation Claims

#REF!

SUB-TOTAL CLOSED CLAIMS WITHOUT ERI


5 10 29 30 43 001 001 001 001 001 #### JV Fuel Price Increases

132,477,394.29
0.00

0.00

#REF!
0.00

#REF!
JAP016/GEN/ABS/1051 dated 8Aug-06

132,477,394.29
CLOSED

0.00
rejection letter ref. JAP016/GEN/ABS/1051 dated 8-Aug06 does not detail the reasons for rejection of Claim No. 5. ETA to submit entitlements; Permanent Power now in place done by ETA. KONE to submit entitlements; rejected by Nakheel due to Clause 20.1-Care of Works on the CoC. AA to submit entitlements; rejected by Nakheel due to Tech Specifications H11/20, Clause 871, and Clause 3b of CoC. request by WS Atkins and F&G in the Technical Meeting to provide 3rd party safety inspection and issue of certificate prior to CTU; rejected by Nakheel. rejected by F&G as it is included specs M13. rejected by F&G as per the response letter not done

#### NSC ETA Site Establishment (Provision of Temporary Power Supply) #### NSC Storage Area for KONE #### NSC Factory Inspections for Al Abbar #### JV CTU 3rd Party Inspection RFI No. 480 - Embedded Flush Tank Sanitary Ware Selection Disabled Toilets (CVI No. 052 dated 18th March 2007 increase of openings to blockwork walls to 1.00m) Disabled Toilet Change of Back of House Doors Colours from White to Gray Changes to the Floor Drain Locations Staircase at Levels 49-50 Notification of a Possible Variation at Ballroom Electrical Cabinet Doors Abortive Cost for GL-07 (ID Works Package) 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00

(not provided) JAP016/TS/ABS/0004 dated 12Sep-06 JAP016/GEN/ABS/1070 dated 06-Sep-06 JAP016/TS/ABS/0031 dated 28Dec-06

CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

53 61 73

001 001 001

#### #### ####

JV JV JV

JAP016/TS/ALM/TCAC/06906 dated 14-Feb-07 JAP016/ALM/TCAC/06995 dated 18-Feb-2007 (not done)

75 90 120 129 162 172 190 193 223 223 227

001 001 001 001 001 001 001 001 001 002 001

#### #### #### #### #### ####

JV JV JV JV JV JV

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 447,120.00 1,625,886.10 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

(not done) (not done) (not done) (not done) JAP016/TS/GT/0186 dated 27Mar-08 JAP016/TS/GT/0228 dated 13May-08 JAP016/TS/GT/0204 dated 14Apr-08 JAP016/TS/GT/0233 dated 15mAY-08 JAP016/TS/GT/0324 dated 28Aug-08 JAP016/TS/GT/0324 dated 28Aug-08 JAP016/TS/BW/0352 dated 15Oct-08

CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

not done no claim from subcontractors coring works not done. staircase not done. under review. considered Nil due to the increase in the rates for GL-07 as per letter ref. Al Bayader to submit entitlements; claim notice rejected under review (done by Dubai Metals); rejected by Nakheel as it is part of MDS scope of works Naffco Costs +12% OH&P + 3% Attendances; not a new regulation as per the review of Jly ETA Cost + 12% OH&P + 3% Attendances; not a new regulation as per the review of Jly this cost to be by JV as per the Gen. Specs Section A, Item 1.03.d & 1.05

#### NSC Additional Work to Lightweight Concrete to Pedestrian Path (RFI No. 976) #### JV Additional Aluminum Angles at RAF Termination #### JV Temporary Wet Riser Systems (Supply and Delivery of Fire Pumps and Accessories) Temporary Wet Riser Systems (Installation, Testing & Commissioning, and Decomissioning) Extended Warranty due to the Usage of Jet Fans at Basement Levels as per the EHS Improvement Notice Entrance Canopy Panel - Down Light (T-39) and Camera Layout (CVI No. 126) Motorized dampers at B2L Security Room (RFI No. 1076 Rev. 0 & 1)

#### NSC #### NSC

232 235

001 001

#### NSC #### NSC

0.00 0.00

0.00 0.00

JAP016/TS/BW/0350 dated 14Oct-08 JAP016/TS/BW/0354 dated 9Nov-08

CLOSED CLOSED

Al Abbar to submit entitlements; rejected by Nakheel as the works is deemed included in Al Abbar scope ETA to submit full entitlements; rejected by M/s. Nakheel

SUB-TOTAL
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

447,120.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1,625,886.10
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (ERI).monvabad

31 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! #REF! #REF! #REF! 0 #REF! 0

SUB NO.
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! #REF! #REF! #REF! 0 #REF! 0

ERI NO.
#### #### #### 0 #### #### #### 0 #### #### #### 0 #### #### #### #### 0 #### 0

V.O. TO
#### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### ####

DESCRIPTION
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! #REF! #REF! #REF! 0 #REF! 0

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! NSC COST (AED) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! JV COST (AED) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! LETTER REFERENCE
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

OUTSTANDING CLAIMS
JV COST (AED) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! NSC COST (AED) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

REMARKS / COMMENTS
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

CLAIM STATUS #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos.
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

NO. OF CLAIMS TO-DATE NO. OF CLAIMS WITH ERI NO. OF CLAIMS WITHOUT ERI NO. OF CLAIMS APPLIED NO. OF CLAIMS OUTSTANDING NO. OF AGREED CLAIMS NO. OF UNAGREED CLAIMS NO. OF CLAIMS TO JV NO. OF CLAIMS TO NSC

187,243,368.65

60,550,881.16

#REF! #REF!

#REF!

#REF! #REF!

#REF!

GRAND TOTAL

247,794,249.81

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (ERI).monvabad

32 - 53

DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO. SUB NO. ERI NO. V.O. TO
CLAIM LETTER

DESCRIPTION
LETTER REF. DATE

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) JV COST (AED)

ER / F&G / JV AGREED VALUES


NSC COST (AED) LETTER REFERENCE

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED) REMARKS / COMMENTS

OUTSTANDING CLAIMS WITHOUT ERI


1 001 #### JV Design Modification of Pile Caps Excavation to the difference in the Tender Drawings and the Actual Site Conditions Pile Head Levels and Associated Problem
TDB/P3/AM/CN-001A 17-Sep-05

611,739.00 259,943.16 258,088.62 38,246.08 120,370.11 522,748.23 ur ur

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! (valued in 35-001) ur ur (valued in 220-001) #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF!

611,739.00 259,943.16 258,088.62 38,246.08 120,370.11 522,748.23 ur ur 12,494.21 CLOSED ur ur CLOSED 91,147.85

progressed under a separate claim.

001

####

JV

TDB/P3/AM/CN-002A

18-Sep-05

#REF!

progressed under a separate claim.

001

####

JV

DXB/AMT-01/0500/Jly/112

13-Nov-05

#REF!

progressed under a separate claim.

35 35 42 44 47 62 63 36

002a 002b 001 001 001 001 001 001

#### NSC Additional OCP's conduits to the Offices and Retail Units (MEP Works) #### JV Additional OCP's conduits to the Offices and Retail Unts (Builders Work) #### NSC Fire Sprinkler Riser Pipes in Garbage Chute Shaft #### NSC Revised Specifications for the Fire Fighting Equipments #### NSC Revised Architectural Drawings at 31st & 32nd Floor (MEP Works) #### JV Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms #### NSC Installation of OCP's to Tenant Rooms #### NSC Fire Alarm Shop Drawing #### NSC RFI No. 571 - Insulation and Backing Panels to Cladding #### NSC Secondary Roof for the Towers #### NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (ETA Scope) #### NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (Al Abbar Scope) #### JV Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (JV Scope) #### NSC Revised Mechanical and Electrical Drawings at Basement 2 (Security Room) #### NSC Level 2 Fire Policy Layouts (Transmittal Ref. JAP016/TRNS/JV/00014) #### NSC Drainage on Swimming Pool Deck at Level 1 (RFI No. 831) #### NSC Further Revisions to For Construction Drawings under transmittals ref. JAP016/TRNS/JV/00015 and 00016 #### NSC Power Supply and Fire Alarm Interface to Smoke Ventilation Window (RFI No. 783) #### NSC Containment (Security Services) #### JV Enclosure to the Irrigation Pipes running through the LV Room 2 (RFI No. 894) #### NSC Second Floor Revised Lighting and Power Design #### NSC Sequencing of Spire Erection #### NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00033 dated 5th February 2008 (MEP Works) #### NSC Increase in Water Tank Size #### NSC Ducting in MDF Rooms #### NSC Additional Low Leakage Motorized Smoke Damper #### NSC Height of Services at Level-49 on Shaft-6 #### NSC Additional Stone Cladding to Sides of Maintenance Stairs #### NSC Additional Work to Make-up Levels at Main Entrance Design Change to External Ramps - Block Stopper Upstand (CVI No. 086) #### NSC Design Change to External Ramps - Waterproofing (CVI No. 086) #### NSC Additional Work to External Wall Finishing at Swimming Pool (RFI No. 920) #### JV

DXB/AMT-01/0600/DAN/3032 DXB/AMT-01/0600/DAN/3032 DXB/AMT-01/0600/DAN/3768

18-Oct-07 18-Oct-07 03-Mar-08

#REF! #REF! #REF! #REF!

ETA Cost + 7% JV OH&P; as per original claim JV Cost based on the response from RFI No. 417 ETA to submit entitlements; revisions is due to the requirement of a UL/FM specifications ETA to submit entitlements Revision 1 - revised due to the changes in the works. not applicable ETA to submit entitlements; rejected by Nakheel due to the Consultant's(Atkins)response ref. RD/4532/661/ML/R8-0344. AA to submit entitlements to be valued in Claim N o. 220-001 ETA costs + 12% OH&P + 3% Attendances

#REF! #REF! #REF! JAP016/TS/BW/0021 dated 12Nov-06 #REF! #REF! #REF!

DXB/AMT-01/0600/EDM/2508

11-Jul-07

12,494.21

83 98 113

001 001 001

DXB/AMT-01/0600/MIC/4491

02-Jul-08

91,147.85

113

002

DXB/AMT-01/0600/MIC/4559

13-Jul-08

11,909.40

#REF!

#REF!

#REF!

11,909.40

Al Abbar cost + 12% OH&P + 3% Attendances

113

003

(valued in 113-001)

#REF!

#REF!

#REF!

CLOSED

Included in Claim No. 113-001

118 125 130 133

001 001 001 001

ur ur ur ur

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

ur ur ur ur

ETA to submit entitlements ETA to submit entitlements ETA to submit entitlements ETA & JV to submit entitlements

148 151 154 155 171 175

001 001 001 001 001 001

ur ur
DXB/AMT-01/0600/PMG/4679 05-Aug-08

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

ur ur 1,600.56 ur ur ur

ETA to submit entitlements ETA to submit entitlements #REF! ETA to submit entitlements EVS to submit entitlements ETA to submit entitlements (Builders to be in another submittal)

1,600.56 ur ur ur

180 181 182 183 184 185 187 187 191

001 001 001 001 001 001 001 002 001

DXB/AMT-01/0600/DAN/3916

30-Mar-08

71,922.15 ur 1,308,459.65 36,435.37 ur ur

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

71,922.15 ur 1,308,459.65 36,435.37 ur ur 108,691.73 86,593.30 ur

ETA Claim = AED 62,541.00, +JV's 12%(OH&P) and 3% (Attend) ETA to submit entitlements ETA Claim = AED 1,137,791.00, + JV's 12% (OH&P) and 3% (Attend) ETA Claim = AED 31,682.93, + JV's 12% (OH&P) and 3% (Attend) Al Bayader to submit entitlements Al Bayader to submit entitlements JV's portion of the works AB cost + 12% OH&P + 3%Attend Al Bayader to submit entitlements

DXB/AMT-01/0600/EDM/3983 DXB/AMT-01/0600/DAN/3967

13-Apr-08 08-Apr-08

DXB/AMT-01/0600/PMG/4691 DXB/AMT-01/0600/MIC/5049

09-Aug-08 06-Nov-08

108,691.73 86,593.30 ur

#REF! #REF!

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (ERI) (2).monvabad

33 - 52

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
192 194 194 195 198

SUB NO.
001 001 002 001 001

ERI NO.

V.O. TO

CLAIM LETTER

DESCRIPTION
LETTER REF. DATE

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) ur 190,661.95 82,800.00 ur ur JV COST (AED) #REF! #REF! #REF! #REF! #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! #REF! #REF! #REF! #REF! LETTER REFERENCE
#REF! #REF! #REF! #REF! #REF!

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED) ur 190,661.95 82,800.00 ur ur REMARKS / COMMENTS
Al Bayader to submit entitlements ETA to submit entitlements JV thru Sibca to submit entitlements ETA to submit entitlements (Builders Works if any to be in another submittal) EVS to submit entitlements

#### NSC Additional Work to Concrete Under Maintenance Path Tiles (RFI No. 929) #### NSC Temporary Fire Alarm Systems (Installation) #### JV Temporary Fire Alarm Systems (Material / Testing and Commissioning) #### NSC Mechanical Services at Tecom Room in Level 50 #### NSC Change of Applied Cementitious Fireproofing to Intumescent Paint on Steel Beams at Diamond Exchange Center #### NSC Fire Protection Systems at Basement 2 Security Room - Supply of Additional Wall Mounted Dry Powder and CO2 Fire Extinguishers #### NSC Fire Protection Systems at Basement 2 Security Room - Removal of Existing Fire Fighting Systems and Installation of ETA Supplied Fire Fighting Equipment #### JV Closure of the Opening in Parapet Wall on Elevation 4 for Spire Connection #### NSC Back Boxes for Seismic Detectors at Basement 5 and Level 2 Vault Rooms #### NSC BMS Monitor for the Revolving / Sliding Doors #### NSC Additional Screed at Road Type 2 and Ramps

DXB/AMT-01/0600/EDM/4041 DXB/AMT-01/0600/EDM/4041

21-Apr-08 21-Apr-08

209

001

ur

#REF!

#REF!

#REF!

ur

ETA to submit entitlements; Nakheel letter ref. JAP016/TS/GT/0285 dtd 23Jun08 reject the claim and no ERI's shall be issued JCI to submit entitlements

209

002

ur

#REF!

#REF!

#REF!

ur

210 212 213 216 218 218 219 219 220

001 001 001 001 001

DXB/AMT-01/0600/MIC/5089

16-Nov-08

11,682.47 ur

#REF! #REF! #REF! #REF! #REF! #REF! #REF! ur ur #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

11,682.47 ur 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 ur ur

Intherpro Cost + 12% OH&P + 3% attendances ETA to submit entitlements ETA cost + 12% OH&P + 3% Attendances Al Bayader cost + 12% OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Belgium Alkuminum cost + 12% OH&P +3 % Attend FBI + EVS cost + 12% OH&P + 3% Attend ETA to submit entitlements Al Abbar to submit entitlements

DXB/AMT-01/0600/MIC/4449 DXB/AMT-01/0600/MIC/5046 DXB/AMT-01/0600/MIC/4672 DXB/AMT-01/0600/MIC/5039 DXB/AMT-01/0600/MIC/5051

23-Jun-08 06-Nov-08 03-Aug-08 05-Nov-08 08-Nov-08

99,660.15 37,147.81 41,743.85 1,286.00 37,895.22

221 222 224 225 226

226

229 237

#### NSC Additional Requirements for Etisalat Room in Basement 1 (MEP Works) 002 #### JV Additional Requirements for Etisalat Room in Basement 1 (Door Amendments) 001 #### JV False Ceiling at Basement 5 Vault Lobby and Services Room (RFI No. 511) 002 #### NSC Fire Sprinkler above False Ceiling at Basement 5 Vault Lobby & Services Room (RFI No. 511) 001 #### NSC Vapour Barrier underneath all Parapet Composite Cladding of the 6 Wings and Diamond Exchange Centre 001R1 #### JV Modification to Louvers and Additional Aluminum Doors at Various Areas 001 #### NSC Additional 6" diam. Line from B5 Pump Room to S2 Level Fire Tank 001 #### NSC Paving and Landscaping Works at Ramps (originally under Wade Adams Scope) 001 #### NSC Planter Area at Level 2 - Change of 500mm thick Sweet Soil to Polysterene 001 #### JV Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) JV scope of works 002 #### NSC Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) MEP Scope of Works 001 #### NSC Additional Works at Entrance Ramps - Type 3 & 5 001 #### NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00002 dated 10th July 2007 (Additional Voice / Data Points) #### NSC Additional Power Supply Lines for External Water Features, Irrigation Pumps, and Swimming Pool #### NSC Trimming of Cantilever Beams at the Diamond Exchange Center as per the RFI No. 1085 #### NSC Modification of Soffit Cladding for the Swimming Pool to Conceal Service Pipings as per the RFI No. 1054 #### NSC Structural Steel Support for Fans at Air Shaft #### NSC HVAC Systems at Basement 1 Control Room and Lobby as per RFI No. 1087 #### JV Additional Door Closer and Selector at Basement 1 Management Office #### #### #### JV JV JV Coring for the Tenant Fit-Out Contractors Additional Access Ladder at Penstock Chamber in Basement PC Supply 4 Rates

DXB/AMT-01/0600/MIC/4874 DXB/AMT-01/0600/MIC/4577 DXB/AMT-01/0600/MIC/5045 DXB/AMT-01/0600/MIC/5117 DXB/AMT-01/0600/MIC/5196

22-Sep-08 15-Jul-08 06-Nov-08 23-Nov-08 14-Dec-08

32,364.90 404,090.45 305,837.13 25,300.00 35,000.25

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

32,364.90 404,090.45 305,837.13 25,300.00 35,000.25

cost from domestic subcons + 12%OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Al Bayader cost + 12% OH&P + 3% Attendances AB cost + 12% OH&P + 3%Attend JV Internal Works

DXB/AMT-01/0600/MIC/5197

14-Dec-08

110,641.50

#REF!

#REF!

#REF!

110,641.50

ETA cost + 12% OH&P + 3% Attendances

DXB/AMT-01/0600/MIC/5041 DXB/AMT-01/0500/JLy/5010

05-Nov-08 26-Oct-08

16,654.95 34,599.52

#REF! #REF!

#REF! #REF!

#REF! #REF!

16,654.95 34,599.52

Al Bayader cost + 12% OH&P + 3% Attendances BC Cost + 7% OH&P; BC VO#7; BC time claim = 201 days

239

001

DXB/AMT-01/0600/MIC/5081

15-Nov-08

141,276.06

#REF!

#REF!

#REF!

141,276.06

ETA cost + 12% OH&P + 3% Attendances

240 241

001 001

ur ur

#REF! #REF!

#REF! #REF!

#REF!

ur ur

#REF!

note that the structural works was based on the structural drawings provided to EVS; EVS to submit entitlements AA to submit entitlements

242 243 244

001 001 001

DXB/AMT-01/0600/MIC/5158 DXB/AMT-01/0600/MIC/5282 DXB/AMT-01/0600/DAN/5315

01-Dec-08 05-Jan-09 13-Jan-09

340,314.96 13,460.75 1,732.06

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

340,314.96 13,460.75 1,732.06

ETA cost + 12% OH&P + 3% Att ETA cost + 12% OH&P + 3% Attendances Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22-Dec-08 as per the email request of Mr. Clarence Pinto of DMCC dated 4Jan-09 as per the EHS requirements adjustment to the Contract Sums due to the PC Materials final rates

245 246 OM-10

001 001 001

ur
DXB/AMT-01/0600/DAN/5092 16-Nov-08

#REF! #REF!

#REF! #REF!

#REF! #REF!

ur ur (21,806.96)

ur (21,806.96)

SUB-TOTAL

1,553,881.33

3,928,851.11

#REF!

#REF!

1,553,881.33

3,928,851.11

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (ERI) (2).monvabad

34 - 52

DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO. SUB NO. ERI NO. V.O. TO
CLAIM LETTER

DESCRIPTION
LETTER REF. DATE

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) REMARKS / COMMENTS

OUTSTANDING CLAIMS WITHOUT ERI


1 001 #### JV Design Modification of Pile Caps Excavation to the difference in the Tender Drawings and the Actual Site Conditions Pile Head Levels and Associated Problem
TDB/P3/AM/CN-001A 17-Sep-05

611,739.00 259,943.16 258,088.62 38,246.08 120,370.11 522,748.23 12,494.21 91,147.85

progressed under a separate claim.

001

####

JV

TDB/P3/AM/CN-002A

18-Sep-05

progressed under a separate claim.

001

####

JV

DXB/AMT-01/0500/Jly/112

13-Nov-05

progressed under a separate claim.

35 35 42 62 113

002a 002b 001 001 001

113

002

154 180 182 183 187 187 194 194 210 213 216 218 218 219 221 222 224 225 226

001 001 001 001 001 002 001 002 001 001 001 001

#### NSC Additional OCP's conduits to the Offices and Retail Units (MEP Works) #### JV Additional OCP's conduits to the Offices and Retail Unts (Builders Work) #### NSC Fire Sprinkler Riser Pipes in Garbage Chute Shaft #### JV Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms #### NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (ETA Scope) #### NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (Al Abbar Scope) #### JV Enclosure to the Irrigation Pipes running through the LV Room 2 (RFI No. 894) #### NSC Increase in Water Tank Size #### NSC Additional Low Leakage Motorized Smoke Damper #### NSC Height of Services at Level-49 on Shaft-6 #### JV Design Change to External Ramps - Block Stopper Upstand (CVI No. 086) Design Change to External Ramps - Waterproofing (CVI No. 086) Temporary Fire Alarm Systems (Installation) Temporary Fire Alarm Systems (Material / Testing and Commissioning) Closure of the Opening in Parapet Wall on Elevation 4 for Spire Connection BMS Monitor for the Revolving / Sliding Doors Additional Screed at Road Type 2 and Ramps

DXB/AMT-01/0600/DAN/3032 DXB/AMT-01/0600/DAN/3032 DXB/AMT-01/0600/DAN/3768 DXB/AMT-01/0600/EDM/2508 DXB/AMT-01/0600/MIC/4491

18-Oct-07 18-Oct-07 03-Mar-08 11-Jul-07 02-Jul-08

ETA Cost + 7% JV OH&P; as per original claim JV Cost based on the response from RFI No. 417 Revision 1 - revised due to the changes in the works. ETA costs + 12% OH&P + 3% Attendances

DXB/AMT-01/0600/MIC/4559

13-Jul-08

11,909.40

Al Abbar cost + 12% OH&P + 3% Attendances

DXB/AMT-01/0600/PMG/4679 DXB/AMT-01/0600/DAN/3916 DXB/AMT-01/0600/EDM/3983 DXB/AMT-01/0600/DAN/3967 DXB/AMT-01/0600/PMG/4691 DXB/AMT-01/0600/MIC/5049 DXB/AMT-01/0600/EDM/4041 DXB/AMT-01/0600/EDM/4041 DXB/AMT-01/0600/MIC/5089 DXB/AMT-01/0600/MIC/4449 DXB/AMT-01/0600/MIC/5046 DXB/AMT-01/0600/MIC/4672 DXB/AMT-01/0600/MIC/5039 DXB/AMT-01/0600/MIC/5051 DXB/AMT-01/0600/MIC/4874 DXB/AMT-01/0600/MIC/4577 DXB/AMT-01/0600/MIC/5045 DXB/AMT-01/0600/MIC/5117 DXB/AMT-01/0600/MIC/5196

05-Aug-08 30-Mar-08 13-Apr-08 08-Apr-08 09-Aug-08 06-Nov-08 21-Apr-08 21-Apr-08 16-Nov-08 23-Jun-08 06-Nov-08 03-Aug-08 05-Nov-08 08-Nov-08 22-Sep-08 15-Jul-08 06-Nov-08 23-Nov-08 14-Dec-08

1,600.56 71,922.15 1,308,459.65 36,435.37 108,691.73 86,593.30 190,661.95 82,800.00 11,682.47 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 32,364.90 404,090.45 305,837.13 25,300.00 35,000.25

#REF! ETA Claim = AED 62,541.00, +JV's 12%(OH&P) and 3% (Attend) ETA Claim = AED 1,137,791.00, + JV's 12% (OH&P) and 3% (Attend) ETA Claim = AED 31,682.93, + JV's 12% (OH&P) and 3% (Attend) JV's portion of the works AB cost + 12% OH&P + 3%Attend ETA to submit entitlements JV thru Sibca to submit entitlements Intherpro Cost + 12% OH&P + 3% attendances ETA cost + 12% OH&P + 3% Attendances Al Bayader cost + 12% OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Belgium Alkuminum cost + 12% OH&P +3 % Attend FBI + EVS cost + 12% OH&P + 3% Attend cost from domestic subcons + 12%OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Al Bayader cost + 12% OH&P + 3% Attendances AB cost + 12% OH&P + 3%Attend JV Internal Works

#### NSC #### NSC #### JV #### JV

#### NSC #### NSC

226

229 237

#### NSC Additional Requirements for Etisalat Room in Basement 1 (MEP Works) 002 #### JV Additional Requirements for Etisalat Room in Basement 1 (Door Amendments) 001 #### JV False Ceiling at Basement 5 Vault Lobby and Services Room (RFI No. 511) 001R1 #### JV Modification to Louvers and Additional Aluminum Doors at Various Areas 001 #### NSC Additional 6" diam. Line from B5 Pump Room to S2 Level Fire Tank 001 #### NSC Paving and Landscaping Works at Ramps (originally under Wade Adams Scope) 001 #### NSC Planter Area at Level 2 - Change of 500mm thick Sweet Soil to Polysterene 001 #### JV Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) JV scope of works 002 #### NSC Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) MEP Scope of Works 001 #### NSC Additional Works at Entrance Ramps - Type 3 & 5 001 #### NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00002 dated 10th July 2007 (Additional Voice / Data Points) #### NSC Additional Power Supply Lines for External Water Features, Irrigation Pumps, and Swimming Pool #### NSC Structural Steel Support for Fans at Air Shaft #### NSC HVAC Systems at Basement 1 Control Room and Lobby as per RFI No. 1087 #### JV Additional Door Closer and Selector at Basement 1 Management Office #### JV PC Supply Rates

DXB/AMT-01/0600/MIC/5197

14-Dec-08

110,641.50

ETA cost + 12% OH&P + 3% Attendances

DXB/AMT-01/0600/MIC/5041 DXB/AMT-01/0500/JLy/5010

05-Nov-08 26-Oct-08

16,654.95 34,599.52

Al Bayader cost + 12% OH&P + 3% Attendances BC Cost + 7% OH&P; BC VO#7; BC time claim = 201 days

239

001

DXB/AMT-01/0600/MIC/5081

15-Nov-08

141,276.06

ETA cost + 12% OH&P + 3% Attendances

242 243 244

001 001 001

DXB/AMT-01/0600/MIC/5158 DXB/AMT-01/0600/MIC/5282 DXB/AMT-01/0600/DAN/5315

01-Dec-08 05-Jan-09 13-Jan-09

340,314.96 13,460.75 1,732.06

ETA cost + 12% OH&P + 3% Att ETA cost + 12% OH&P + 3% Attendances Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22-Dec-08 adjustment to the Contract Sums due to the PC Materials final rates

OM-10

001

DXB/AMT-01/0600/DAN/5092

16-Nov-08

(21,806.96)

SUB-TOTAL

1,553,881.33

3,928,851.11

TOTAL

5,482,732.44

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Outstanding.monvabad

35 - 53

DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO. SUB NO. ERI NO. V.O. TO
CLAIM LETTER

DESCRIPTION
LETTER REF. DATE

CLAIM ENTITLEMENT APPLICATION


JV COST (AED)

REMARKS / COMMENTS

OUTSTANDING CLAIMS WITHOUT ERI


1 001 #### JV Design Modification of Pile Caps Excavation to the difference in the Tender Drawings and the Actual Site Conditions Pile Head Levels and Associated Problem Additional OCP's conduits to the Offices and Retail Unts (Builders Work) Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms Enclosure to the Irrigation Pipes running through the LV Room 2 (RFI No. 894) Design Change to External Ramps - Block Stopper Upstand (CVI No. 086) Temporary Fire Alarm Systems (Material / Testing and Commissioning) Closure of the Opening in Parapet Wall on Elevation 4 for Spire Connection Additional Requirements for Etisalat Room in Basement 1 (Door Amendments) False Ceiling at Basement 5 Vault Lobby and Services Room (RFI No. 511) Modification to Louvers and Additional Aluminum Doors at Various Areas Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) JV scope of works Additional Door Closer and Selector at Basement 1 Management Office PC Supply Rates
TDB/P3/AM/CN-001A 17-Sep-05

611,739.00 259,943.16 258,088.62 120,370.11 12,494.21 1,600.56 108,691.73 82,800.00 11,682.47 1,286.00 37,895.22 32,364.90 35,000.25

progressed under a separate claim.

001

####

JV

TDB/P3/AM/CN-002A

18-Sep-05

progressed under a separate claim.

001

####

JV

DXB/AMT-01/0500/Jly/112

13-Nov-05

progressed under a separate claim.

35 62 154 187 194 210 218 219 221 226

002b 001 001 001 002 001 002 001

#### #### #### #### #### #### #### ####

JV JV JV JV JV JV JV JV JV JV

DXB/AMT-01/0600/DAN/3032 DXB/AMT-01/0600/EDM/2508 DXB/AMT-01/0600/PMG/4679 DXB/AMT-01/0600/PMG/4691 DXB/AMT-01/0600/EDM/4041 DXB/AMT-01/0600/MIC/5089 DXB/AMT-01/0600/MIC/5039 DXB/AMT-01/0600/MIC/5051 DXB/AMT-01/0600/MIC/4874 DXB/AMT-01/0600/MIC/5196

18-Oct-07 11-Jul-07 05-Aug-08 09-Aug-08 21-Apr-08 16-Nov-08 05-Nov-08 08-Nov-08 22-Sep-08 14-Dec-08

JV Cost Revision 1 - revised due to the changes in the works. #REF! JV's portion of the works JV thru Sibca to submit entitlements Intherpro Cost + 12% OH&P + 3% attendances Belgium Alkuminum cost + 12% OH&P +3 % Attend FBI + EVS cost + 12% OH&P + 3% Attend cost from domestic subcons + 12%OH&P + 3% Attendances JV Internal Works

001R1 #### 001 ####

244

001

####

JV

DXB/AMT-01/0600/DAN/5315

13-Jan-09

1,732.06

Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22Dec-08 adjustment to the Contract Sums due to the PC Materials final rates

OM-10

001

####

JV

DXB/AMT-01/0600/DAN/5092

16-Nov-08

(21,806.96)

TOTAL

1,553,881.33

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Outstanding (JV).monvabad

36 - 53

DMCC ALMAS TOWER (JAP016) JUMEIRAH LAKE TOWERS


TOTAL AMOUNT AMOUNT CERTIFIED OUTSTANDING AMOUNT

DESCRIPTION

PERCENT CERTIFIED

PERCENT OUTSTANDING

REMARKS

EFFECTIVE CONTRACT AMOUNT

261,161,000.00

259,509,675.51

99.37%

1,651,324.49

0.63%

OUTSTANDING CLAIMS WITH ERI

52,764,973.04

50,744,847.95

96.17%

2,020,125.09

3.83%

OUTSTANDING CLAIMS WITHOUT ERI

1,553,881.33

0.00%

1,553,881.33

100.00%

GRAND TOTAL

315,479,854.36

310,254,523.46

98.34%

5,225,330.90

1.66%

DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO. SUB NO. ERI NO. V.O. TO

DESCRIPTION

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) JV COST (AED)

ER / F&G / JV AGREED VALUES


NSC COST (AED) LETTER REFERENCE

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED)

REMARKS / COMMENTS

ERI NO. 4
13 001 04 JV Additional Telephone Lines 0.00 0.00
JAP016/ALM/TCAC/21287 dated 5-Oct-08

CLOSED

to confirm if this is still needed; No need for additional telephone lines

SUB-TOTAL ERI NO. 6


14 001 06 Site Establishment - Offices (Supply of ETA Temporary Site Office Purchased form Seidco Gen. Cont. Co.) NSC ETA Site Offices (New Offices at Site) JV JV ETA/F&G Site Offices - Rubbish Removal

0.00
278,155.63

0.00

0.00
218,400.00

0.00
JAP016/ALM/TCAC/05508 dated 29-Nov-06

0.00
CLOSED

0.00
F&G evaluation is based on a +12% OH&Pro, and prelims omitted and to be dealt with in EOT's

14 14

002 004

06 06

501,971.39 56,840.00

#REF! #REF!

#REF! #REF!

#REF! #REF!

501,971.39 56,840.00

ETA cost + 12% OH&P + 3% Attendances JV scope of works; verbally agreed with F&G to be 5050; as at Sep-08

SUB-TOTAL ERI NO. 7


15 001R1 07 NSC ETA Site Offices Provision of Power Supply

334,995.63

501,971.39
1,193,235.54

#REF!
#REF!

#REF!
#REF!
#REF!

56,840.00

501,971.39
1,193,235.54
ETA costs + 7% JV OH&P

SUB-TOTAL ERI NO. 8


16 001 08 JV Provision of Starter Bars to Podium within the Landscape Package

0.00
159,171.78

1,193,235.54

#REF!
128,324.82

#REF!
JAP016/ALM/TCAC/04893 dated 30-Oct-06

0.00
CLOSED

1,193,235.54
Costs agreed by JV under letter ref. DXB/AMT01/0500/Jly/1065 dated 7-Nov-06.

SUB-TOTAL ERI NO. 9


17 001 09 JV Core Wall Thickening

159,171.78
181,391.33

0.00

128,324.82
107,738.59

0.00
JAP016/ALM/TCAC/08151 dated 09-Apr-07

0.00
CLOSED

0.00
ERI No. 09; Internal Preliminary Assessment is equal to 10 days, but works has yet to be carried out to consider the EOT; cost evaluated by F&G accepted thru letter ref. DXB/AMT-01/0500/Jly/1072 dated 8-Nov-06 but subject to add'l revisions and prolongat

SUB-TOTAL ERI NO. 10


14 003 10 NSC Site Establishment - Offices (Supply and Installation of AC Units within the New Offices being established by Nakheel)

181,391.33

0.00
80,097.04

107,738.59

0.00
64,574.50
JAP016/ALM/TCAC/06385 dated 21-Jan-07

0.00

0.00
CLOSED
ETA cost of 60,350.00 + 7% JV OH&P

SUB-TOTAL ERI NO. 11


20 001 11 JV Supply of Potable Water to DMCC and F&G's Site Offices

0.00
23,551.60

80,097.04

0.00
25,076.80

64,574.50
JAP016/ALM/TCAC/22075 dated 4-Nov-08, JAP016/ALM/TCAC/23417 dated 6-Jan-08

0.00
CLOSED

0.00
Period from June 2006 - September 2007, and October2007 - November 2008

SUB-TOTAL ERI NO. 12


28 001R1 12 NSC Cast Resin Bus Bars

23,551.60

0.00
2,071,622.24

25,076.80

0.00
1,049,300.70

0.00

0.00
CLOSED
ETA Cost + 7%; Time Effect shall be by NSC, if any; potential additional builders works, and attendance in reference to the Time. Confirmed by ETA under their letter ref. DIV.092/AM/TS/1342 dated 31-Jan-08

JAP016/ALM/TCAC/14871 dated 13-Jan-08

SUB-TOTAL ERI NO. 13


OM-1 001 13 JV Omit Wall Plaster from Car Parking Areas in all 5 Basement Floors

0.00
(383,650.51)

2,071,622.24

0.00
#REF!

1,049,300.70
#REF!

0.00
(383,650.51)

0.00
cost implication sent under JV letter ref.DXB/AMT01/0800/Jly/1175 dated 29-Nov-06

SUB-TOTAL ERI NO. 14


32 001 14 NSC Stainless Steel Members to Diamond Exchange Area

(383,650.51)

0.00
333,540.00

#REF!

0.00
317,914.82
JAP016/ALM/TCAC/05673 dated 11-Dec-06

(383,650.51)

0.00
CLOSED
EVSCost Effect is NSC Cost + 7% O&H + 2% Attendance, as this is an additional work; Time Effect shall be by NSC, if any; potential additional builders works.

SUB-TOTAL ERI NO. 15 / 15.1


35 001a 15 NSC Provision of DB's in lieu of Isolators in the Offices & Retail Units at 3rd to 49th Floors (MEP Works) JV Provision of DB's in lieu of Isolators in the Offices & Retail Units at 3rd to 49th Floors (Builders Work)

0.00

333,540.00
2,072,029.32

0.00

317,914.82
1,220,076.06
JAP016/ALM/TCAC/18730 dated 8-Jun-08 JAP016/ALM/TCAC/22415 dated 18-Nov-08 JAP016/ALM/TCAC/18730 dated 8-Jun-08

0.00

0.00
CLOSED

ETA costs + 7% JV OH&P; F&G revised assessment from their letter ref.JAP016/ALM/TCAC/18730 dtd 8-Jun08 JV Cost; Note : the cost for OCP is omitted and will be dealt with separately; F&G revised assessment from their letter ref.JAP016/ALM/TCAC/18730 dtd 8-Jun-08

35

001b

15

102,131.48

55,692.82

CLOSED

217

001

15.1

217

002

15.1

NSC SMDB's in lieu of Isolators at Level 52-63 and Retail Mall and Splitting of Landlord DB's for Ground Floor and First Floor as per DEWA Requirement (MEP Works) JV SMDB's in lieu of Isolators at Level 52-63 and Retail Mall and Splitting of Landlord DB's for Ground Floor and First Floor as per DEWA Requirement (Builders Work)

538,459.90

#REF!

#REF!

#REF!

538,459.90

ETA's cost + 12% OH&P + 3% Attendances

7,538.64

#REF!

#REF!

#REF!

7,538.64

builders works

SUB-TOTAL ERI NO. 16 / 16.1


31 001 16 JV Drawing Revisions to the Diamond Exchange Centre; due to revised Openings. Interior Design Works (JV Internal Subcontractors)

109,670.12
82,672.78 28,894,792.49

2,610,489.22

#REF!
#REF! 22,785,939.94

#REF!
JAP016/GEN/ABS/0010 dated 17-Oct-06

7,538.64
82,672.78 #REF!

538,459.90
rejected by Nakheel due to relation with coordination issues with MEP requirements; awaiting response from NSC (Eversendai) on the rejection. updated cost and rates approval summary status being sent regularly; cost submitted is the final applied claim

41

001R1

16/ 39 16/ 39 16/ 39 16/ 39

JV

agreed values is partial and deemed to change progressively, as it is based on the agreed rates only (+12%)

41

002R1

NSC Interior Design Works (Other ID Works being done by Bond Interiors) NSC Interior Design Works (MEP Works by ETA)

5,064,844.41

3,879,153.39

agreed values is partial and deemed to change progressively, as it is based on the agreed rates only (+7%) agreed values is partial and deemed to change progressively, as it is based on the agreed rates only (+7%) agreed values is partial and deemed to change progressively, as it is based on the agreed rates only (+7%) #REF! JAP016/ALM/TCAC/20228 dated 12-Aug-08 (valued in 41-001)

#REF!

updated cost and rates approval summary status being sent regularly.

41

003R1

8,423,604.53

8,117,552.86

#REF!

updated cost and rates approval summary status being sent regularly.

41

004R1

NSC Interior Design Works (Lift Finishes by Kone Middle East)

3,111,331.22

3,107,564.82

#REF!

updated cost and rates approval summary status being sent regularly.

48 69 74 79

001 001 001 001

#### NSC Revised Architectural and ID Drawings (MEP Works) 16 #### 16 JV JV JV ID Works Package - Changes to CT-01 & CT-02 Shadow Groove to Ceilings Raised Access Flooring System at the Diamond Exchnage Centre to Screeding Works 28,616.00 (valued in 41-001) 282,635.67

ur

#REF! 28,365.12 (valued in 41-001) #REF!

#REF!

ur CLOSED CLOSED 282,635.67

ETA to submit entitlements abortive materials only valued in Claim No. 41-013 Floor Screeding works; valued under the ERI No. 16 as per the F&G letter ref. JAP016/ALM/TCAC/21388 dated 7-Oct-08 and confirmed under our letter ref. DXB//4963 dtd 16-Oct-08

#REF!

#REF!

91 96 105 111 121 122

001 001 001 001 001 001

#### NSC Revision of ST-10 to ST-15 (ID Works Package Provisional Sum) #### JV Changes to D-04 & D-30 Hinges (ID Works Package) #### JV Revised Interior Lighting Fixtures Layout at GF,1L,& 2L #### JV Omission of Mirror Mounted Paper Towel Dispenser #### 16.1 JV Engineering and Procurement Activities

2,704,866.52 (valued at 41-001) (valued in 41-001) 165,993.30 (valued in 41-001) 72,174.00

#REF! #REF! (valued in 41-001) #REF! #REF! #REF!

#REF! #REF!

#REF! #REF! JAP016/ALM/TCAC/10523 dated 22-July-2007

2,704,866.52 CLOSED CLOSED 165,993.30 CLOSED 72,174.00

BI costs of AED 2,527,912.64 + 7% JV OH&P considered in Claim No. 41-007 TO BE VALUED IN CLAIM NO. 41-001 (ERI 16) Arte Casa Cost + 12% OH&P + 3% Attendances valued in 41-001, time claim submitted separately Al Abbar cost + 12% OH&P + 3% Attendances

#REF! #REF! #REF!

#REF! #REF! #REF!

NSC ID Finishes for the Steel Columns at Ground Floor Entrance Lobby, 1st Floor Food Court and Retail Mall

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--CLAIMS.monvabad

38 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
124 132

SUB NO.
001 001

ERI NO.
#### 16

V.O. TO
JV JV

DESCRIPTION
Late Issuance of Design Information (Specifications of Lighting Fixtures in ID Areas) ID Works Package (GL-08)

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) 0.00 1,774,080.00 (valued in 149-001) ur (valued in 149-001) 25,787.60 0.00 (valued in 41-001) 626,750.00 4,134.48 ur 0.00 96,768.00 541,470.46 #REF! #REF! NSC COST (AED) JV COST (AED) #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! LETTER REFERENCE
#REF! JAP016/TS/GT/0103 dated 18Oct-2007 JAP016/ALM/TCAC/22521 dated 20-Nov-08 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! JAP016/TS/GT/0142 dated 31Jan-08 #REF! #REF!

OUTSTANDING CLAIMS
JV COST (AED) CLOSED CLOSED CLOSED ur CLOSED 25,787.60 CLOSED CLOSED 626,750.00 4,134.48 ur CLOSED 96,768.00 541,470.46 NSC COST (AED)

REMARKS / COMMENTS
time claim. Mozart Marble cost + 12% OH&P

1,774,080.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF! #REF!

138 140 141 142 144 145 147 147 147 156 161 169

001 001 001 001 001 001 001 002 003 001 001 001R2

Notification of Delay to the ID Works Package Signages #### NSC Modification in Specification of Some ID Lighting Fixtures #### JV Notification of Delay to the ID Doors Package #### JV #### NSC Disruption of Works resulting from Design Conflict in Basement 1 VIP Lounge #### JV Delays due to Design Issues Related to GL-07 #### JV Notification of a Possible Delay to the Glass Feature Wall (GL-05) under the ID Works Package 16 JV Internal Water Feature (Aqua-Teknik Scope) 16 JV Internal Water Feature (Related Builders Work)

time claim. ETA tnd Lever to submit entitlements time claim. ETA Cost + 12%OH&P + 3% Attendances under review; time entitlements under review for time entitlements Aqua-Teknik cost + 12% OH&P + 3% Attend Coring Subcon Cost + 12% OH&P + 3% Attendances ETA to submit entitlements rejected by Nakheel as the proposed revisions was not done and was reverted back to original Aedas Specs submitted thru3701 dtd 20-Feb-08 S/C costs + 12% OH&P + 3% Attendances; to be valued at ERI 16 as per F&g letter ref. JAP016/TS/GT/0254 dtd 29May08 EVS to submit entitlements; EVS cost + 12% OH&P + 3% Attendances

#### NSC Internal Water Feature (MEP Scope) #### NSC Lift L4 Mock-Up (Car Interior Finish @ Ground Floor Level) #### JV Additional Architraves to Towel Dispensers 16 Revisions to the ID Works Package For Construction Drawings at the Ground Floor and First Floor (GL-19 & GL-07) JV Revisions to the ID Works Package For Construction Drawings at the Ground Floor and First Floor (Structural Supports to GL-07) NSC Revisions to the ID Works Package For Construction Drawings at the Ground Floor for the termination of GL-07 and other adjacent Finishing Materials (CVI No. 093) JV Potential Claim due to Late Design Changes Stainless Steel Door Frames L49-L64 Inclusive JV Additional Ironmongeries to Timber Door (DT-02) at Levels 49 upwards JV JV DMCC Offices - Core Toilets Level 49 & 50 (Revision of Ironmongeries)

169

002R1

16

34,314.41

#REF!

#REF!

#REF!

34,314.41

169

003

16

ur

#REF!

#REF!

#REF!

ur

Bond Interiors to submit entitlements

170 170

001 002

16 16

100,121.32 0.00

#REF! #REF!

#REF! #REF!

#REF!

100,121.32 CLOSED

to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08 under review (haroon & alpha star); to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08; no changes made in the Ironmongeries as there was no formal instruction scope shall be removal, supply and installation of ironmongeries; valued in ERI No. 16 as per Nakheel letter ref. JAP016/TS/GT/0318 dtd 20Aug08

#REF!

186

002

16

4,137.35 ur 27,548.25

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF!

4,137.35 ur 27,548.25

188 199

001 001

200 206 211

001 001 001

#### NSC Sprinkler Heads in Illuminated Ceiling (RFI No. 967 Rev. 0) #### NSC Design Change of Core Bulk Head at Ground Floor Escalator Lobby - MEP Rectification Works for the ID Works Package (CVI No. 088) #### NSC Additional Extract Ducts in Basement 1 Male and Female Toilet , and VIP Toilet #### NSC Carpets at Level 48 16 NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (MEP Works by ETA) JV Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (Supply of O2 Light Fixtures from M/s.Lever Electric) JV

#REF! #REF!

ETA to submit entitlements ETA Claim = AED 23,955.00 + 12%JVOH&P + 3% Attendances

42,963.29 ur 25,112.55

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

42,963.29 ur 25,112.55

ETA Cost + 12%OH&P + 3% Attendances Bond Interiors to submit entitlements BI to submit entitlements; Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; BI cost + 12% OH&P + 3% Attendances Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Electrical Works by ETA; ETA cost+ 12% OH&P + 3% Attend Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Supply only of light fittings from Lever

211

002

16

247,839.95

#REF!

#REF!

#REF!

247,839.95

211

003

16

39,243.75

#REF!

#REF!

#REF!

39,243.75

230 236

001 001

Signage at the Entrance of VIP Carpark in Basement 1 #### NSC Additional Voice/Data Points at Level 48 as per revised "For Construction" drawings under the F&G transmittal ref. F+G/ALMAS/TAISEI/01460 (Sky Lobby Bulding Services Cat II Works) ####

7,797.46 18,364.91

#REF! #REF!

#REF! #REF!

#REF! #REF!

7,797.46 18,364.91

under ID Works BC Cost + 7% OH&P; BC VO#6; BC time claim = 165 days

SUB-TOTAL ERI NO. 17


77 001 17 NSC DVR Storage Units as per Option III

32,683,527.48

19,764,437.23
2,430,700.00

#REF!
#REF!

#REF!
#REF!
#REF!

#REF!

#REF!
2,430,700.00
JCI costs + 7% JV OH&P

SUB-TOTAL ERI NO. 18


34 001 18 NSC Chilled Water Monitoring and installation (Revised District Cooling Chilled Water Connections Requirements)

0.00

2,430,700.00
1,566,116.20

#REF!

#REF!
678,543.71
JAP016/ALM/TCAC/22578 dated 24-Nov-08

0.00

2,430,700.00
CLOSED
ETA costs + 7% JV OH&P

SUB-TOTAL ERI NO. 19


38 001 19 JV 40' Container for Office Storage

0.00
32,340.85

1,566,116.20

0.00
32,341.10

678,543.71
JAP/ALM/TCAC/06743 dated 6Feb-07

0.00
CLOSED

0.00
actual cost transmitted to F&G based on dayworks rates; agreed with F&G

SUB-TOTAL ERI NO. 20


37 40 001 001 NSC Revision of Duties and Capacities of the Ground and First Floor AHU's #### NSC Revised "For Construction" Drawings for ETA 20

32,340.85

0.00
262,569.93 (valued in37-001)

32,341.10
#REF! #REF!

0.00
#REF! #REF!
#REF! #REF!

0.00

0.00
262,569.93 CLOSED
ETA costs + 7% JV OH&P same as Claim No. 37-001, based on the F&G transmittal ref. F+G/ALMAS/TAISEI/01404 dtd 10-15-06

SUB-TOTAL ERI NO. 21


3 11 002 001 Additional Works to the Extra Piles Driven by the Piling Contractor (CVI No. 007) #### NSC Revised Contract Drawings by ETA 21 JV Amendments to Basement 1 Generator Rooms (Architectural Works) NSC Amendments to Basement 1 Generator Rooms (MEP Works by ETA) JV Nibs for the Approach Slabs JV JV JV JV Interior Design Package Changes affecting the Main Contract Package Door Details (Door Type for Telephone Room (01052) at First Floor) Builders Works Drawings

0.00
1,434.82

262,569.93

#REF!
#REF!

#REF!
#REF! #REF!
#REF!

0.00
1,434.82

262,569.93
awaiting response from Client.

ur 19,047.23 1,579,708.41 35,825.47 14,639.13 2,848.23 31,782.05 28,033.99 ur ur (valued in 67-001) (valued in 33) (not used) 27,175.35 229,129.54 22,371.54 25,157.54 14,560.51 2,296.25 #REF! 21,880.70 #REF! #REF! #REF! #REF! #REF! 26,646.79 23,398.50 18,036.01 #REF!

JAP016/GEN/ABS/1051 dated 8Aug-06

ur 19,047.23 1,579,708.41 CLOSED CLOSED CLOSED 31,782.05 CLOSED ur ur CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

ETA to submit entitlements; rejected by Nakheel due to notice not served as per the required time period under the Contract. rejected by Nakheel due to notice not served as per the required time period under the Contract. ETA Cost of AED 1,476,363 + 7% JV OH&P awaiting response from Client. Various changes to the ID Package affecting the MC Package; i.e., blockworks Door which is not provided with an opening tag, in reference with Tender Query, Item No.6 dtd 16-May05,pages 9 Internal S/C Works + 12% OH&P Various revisions to the drawing under the F&G transmittal sheet ref. F&G/ALMAS/ TAISEI/01356 dtd 01Aug-06 ETA to submit entitlements ETA to submit entitlements included in Claim Nos. 67-001 valued under the Claims Series 33 NOT USED agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G)

12 12 16 19 21 22 23 24 25 26 27 33 33 33 33

001 002 002 001 001 001 001 001 001 001 001 001 002R1 003 004

21 21 21 21 21 #### 21

JAP016/GEN/ABS/1051 dated 8Aug-06

#REF!

JAP016/GEN/ABS/1051 dated 8Aug-06 JAP016/ALM/TCAC/18884 dated 12-Jun-08 JAP016/ALM/TCAC/04947 dated 1-Nov-06 JAP016/ALM/TCAC/05297 dated 19-Nov-06

#REF!

#REF! JAP016/ALM/TCAC/06567 dated 29-Jan-07

JV DTS referenced AM/015/515 dated 5th August 2006 (Architectural and Structural Works) #### NSC DTS referenced AM/015/509 dated 1st August 2006 (MEP Works) #### NSC DTS referenced AM/015/516 dated 7th August 2006 (MEP Works) #### NSC LV Schematic Diagram #### 21 21 21 21 JV JV JV JV JV Revised Structural Drawings List of "For Construction" Drawings transmitted by Nakheel Changes in the Lift Pit Depths, and Revisions to the Galvanised Steel Ladder at 64th Level Changes to the Access Floor Heights Various Revisions at the Parking Areas

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! JAP016/ALM/TCAC/181187 dated 18-May-08 JAP016/ALM/TCAC/16338 dated 17-Mar-08 JAP016/ALM/TCAC/18352 dated 26-May-08

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--CLAIMS.monvabad

39 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
33 33

SUB NO.
005 006

ERI NO.
21 21

V.O. TO
JV JV

DESCRIPTION
Additional Architectural Works to the Service Floor Areas (1-3) Missing Spanmark as PB434 (RFI No. 029) Additional Reinforcement due to the Missing Details (RFI No. 042) First Floor Slab Details (RFI No. 072) Second Basement Floor Beam - PB205A (RFI No. 075) Fourth Basement Beam - PB451A (RFI No. 078) Fourth Basement Beam - PB434 (RFI No. 144) Tower Structural Drawings - Additional TB29 Beam (RFI No. 146) Door Opening Height - First Floor (RFI No. 157) Basement 2 Beams (RFI No. 162) Lift F4 - Structural Details (RFI No. 171) Reinforced Concrete Partition Wall @ the Basement 2 (RFI No. 182) Increase in Beam Depths at First Floor - Section N1 (RFI No. 192) Increase in Beam Depths to PB149 and PB150A (RFI No. 223) Additional Outrigger Walls at Service Floor Areas Structural Works Additional Mass Concrete at 2nd Level, and Revisions to the Stairs leading to the Vault at 2nd Level Additional Column Posts at 50th to 51st Level and Additional Core Walls, i.e., 400mm and 500mm thick Additional Lifting Beams to the 64th Level Machine Rooms (@Level 288.650m and 285.350m) Changes to Slab Steel Reinforcement to S11 to S12 Additional Steel Reinforcement to Beams Located Around Tower Building and Connected to Precast Slab Additional rebars to basement retaining wall @ staircase and changes of rebar to wall Changes in Shear Wall in Zone 4 Associated in Lift and Vault Wall Additional Rebar in First Basement Slab Additional Top Steel Reinforcement in Ground Floor Slab Additional Bottom Steel Reinforcement in Ground Floor Slab Additional Building Maintenance Units at Diamond Exchange Centre Revisions to Contract Drawings in First Floor Levels Revisions to Structural Contract Drawings in Second Floor Changes in Beam Steel Reinforcement at 29th to 34th Level Various Requirements under the F&G Transmittal Ref. F+G/ALMAS/TAISEI/ 01463 dated 12th December 2006 Provision of Additional Lift Pit Ladders Additional Coring Requirement Provision of BMU Opening in Block Wall between Offices A & B at Level 29 (CVI No. 067) Omission of Rebars in Core Walls

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) 153,565.57 3,223.52 1,894.77 657.99 427.04 425.15 1,150.44 13,820.28 499.04 3,461.71 1,556.34 41,554.32 NSC COST (AED) JV COST (AED) 123,805.08 (1,351.84) #REF! 530.47 343.82 344.60 1,063.46 12,180.62 0.00 548.61 1,233.74 #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) LETTER REFERENCE
JAP016/ALM/TCAC/17247 dated 16-Apr-08 JAP016/GEN/ABS/1011 dtd 19Jun06; JAP016/ALM/TCAC/18884 dtd 12Jun-08 JAP016/GEN/ABS/1011 dated 19Jun-06 JAP016/ALM/TCAC/20933 dated 14-Sep-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/17248 dated 16-Apr-08 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/18352 dated 26-May-08 JAP016/ALM/TCAC/18118 dated 18-May-08

OUTSTANDING CLAIMS
JV COST (AED) CLOSED CLOSED 1,894.77 CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED 41,554.32 NSC COST (AED)

REMARKS / COMMENTS
agreed with Consultant (F&G) agreed with Consultant (F&G)

33 33 33 33 33 33 33 33 33 33

007 008 009 010 011 012 013 014 015 016

21 21 21 21 21 21 21 21 21 21

JV JV JV JV JV JV JV JV JV JV

awaiting response from Client. agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) rejected F&G assessment in their letter JAP016/ALM/TCAC/18118 dated 18-May-08 thru our letter ref.DXB/./EDM/4262 dtd 22May08;F&G assessment under review by JV agreed with Consultant (F&G) agreed with Consultant (F&G) revised cost impact submitted under ref. DXB/AMT01/0500/Jly/1080 dated 9-Nov-06 based on the approved Methodology; agreed with Consultant (F&G) agreed with Consultant (F&G)

33 33 33

017 018 019

21 21 21

JV JV JV

4,353.86 693.97 956,279.08 40,503.44

3,510.09 337.29 642,006.51 171.19

JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/20290 dated 13-August-08

CLOSED CLOSED CLOSED CLOSED

33

020

21

JV

JAP016/ALM/TCAC/181187 dated 18-May-08

33

021

21

JV

43,839.53

33,011.38

JAP016/ALM/TCAC/20933 dated 14-Sep-07

CLOSED

agreed with Consultant (F&G)

33

022

21

JV

5,525.90

4,252.50

JAP016/ALM/TCAC/18884 dated 12-Jun-08

CLOSED

agreed with Consultant (F&G)

33 33

023 024

21 21

JV JV

36,827.93 25,336.02

35,529.29 26,354.14

JAP016/ALM/TCAC/08133 dated 09-Apr-07 JAP016/ALM/TCAC/17248 dated 16-Apr-08

CLOSED CLOSED

agreed with Consultant (F&G) agreed with Consultant (F&G)

33 33 33 33 33 33 33 33 33 50

025 026 027R1 028R1 029R1 030 031R1 032 033 001

21 21 21 21 21 21 21 21 21 21

JV JV JV JV JV JV JV JV JV JV

7,878.22 17,649.58 101,960.65 140,340.33 316,516.91 1,175,875.00 56,950.59 130,015.64 9,356.12 28,025.73

7,878.22 14,661.14 97,675.24 137,782.64 317,721.58 #REF! 50,995.22 55,259.32 7,928.10 #REF! #REF! #REF!

JAP016/ALM/TCAC/08287 ated 16-Apr-07 JAP016/ALM/TCAC/08713 ated 7May-07 JAP016/ALM/TCAC/20933 dated 14-Sep-07 JAP016/ALM/TCAC/10244 ated 9Jul-07 JAP016/ALM/TCAC/10549 ated 23-Jul-07 #REF! JAP016/ALM/TCAC/11392 ated 20-Aug-07 JAP016/ALM/TCAC/14299 ated 12-Dec-07 JAP016/ALM/TCAC/10848 ated 1Aug-07 #REF!

CLOSED CLOSED CLOSED CLOSED CLOSED 1,175,875.00 CLOSED CLOSED CLOSED 28,025.73

agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G)

agreed with Consultant (F&G)

under review agreed with Consultant (F&G) agreed with Consultant (F&G) agreed with Consultant (F&G) JV to submit entitlements; note that the DVR's is valued in Claim No. 77; items to be valued under this Claim is only the Lifting Beams await for final drawings. based on the ETA letter request not applicable demolition works joint measurement done and agreed; in connection with 33-019

54 59 60 135 OM-2

001 001 001 001 001

21 21 #### 21 21

JV JV JV JV JV

66,895.36 30,965.32 (valued in 33-030) 1,484.00 (693,815.82)

#REF! #REF! #REF! #REF! (676,513.69)

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! JAP016/ALM/TCAC/20290 dated 13-Aug-08

66,895.36 30,965.32 CLOSED 1,484.00 CLOSED

SUB-TOTAL ERI NO. 22


51 001 22 NSC Revision of Fire Protection System as per JAFZA EHS Fire & Rescue Requirements

3,137,980.87

1,579,708.41
4,929,761.78

#REF!
#REF!

#REF!
#REF!
#REF!

1,398,958.60

1,579,708.41
4,929,761.78
ETA costs of AED 4,607,254 + 7% OH&P

SUB-TOTAL ERI NO. 23


55 001 23 NSC Category II Drawing Revisions for Office Floors -Air Conditioning

0.00

4,929,761.78
ur

#REF!
#REF!

#REF!
#REF!
#REF!

0.00

4,929,761.78
ur
ETA to respond.

SUB-TOTAL ERI NO. 24


46 46 001 002 24 24 NSC Fire Policy Layout (MEP Works) NSC Fire Policy Layout (MEP Works-additional Fireman's Telephone at B1-B5)

0.00

0.00
24,107.45 17,577.75

#REF!

#REF!
5,600.38
JAP016/TS/ABS/22577 dated 24Nov-08 #REF!

0.00

0.00
CLOSED 17,577.75
ETA costs + 7%OH&P ETA costs + 12%OH&P + 3% Attendances

#REF!

#REF!

SUB-TOTAL ERI NO. 25


56 001 25 JV Additional Staff Facilities to Consultants

0.00
51,929.76

41,685.20

#REF!
51,929.76

#REF!
JAP016/ALM/TCAC/14753 dated 07-Jan-08

0.00
CLOSED

17,577.75
Time component rejected as per the F&G letter ref. JAP016/TS/ALM/ TCAC/06936 dated 15-Feb-07

SUB-TOTAL ERI NO. 26


67 001 26 NSC Electrical Connections to Fire Pump Requirements

51,929.76

0.00
2,951,483.26

51,929.76
#REF!

0.00
#REF!
#REF!

0.00

0.00
2,951,483.26
ETA costs + 7% JV OH&P

SUB-TOTAL ERI NO. 27


OM-3 001 27 JV Omission of Render from the vertical element of whole three Services Floor (S1, S2, & S3) Plant Rooms

0.00
(277,596.39)

2,951,483.26

#REF!
(58,985.18)

#REF!
????

0.00
CLOSED

2,951,483.26
IPC NO. 41

SUB-TOTAL ERI NO. 28


57 OM-4 OM-4 001 001 002 28 28 28 JV JV Revisions to Office Partitions Revisions to Office Partitions - Masonry Works

(277,596.39)
(valued in OM-4) (126,440.24)

0.00

(58,985.18)
#REF! (126,440.24)

0.00
#REF!
#REF! JAP016/ALM/TCAC/19000 dated 17-Jun-08 #REF!

0.00
CLOSED CLOSED

0.00
see Omission OM-4-001&002 for the JV & NSC works respectively JV scope of works, i.e., omission of blockworks and plaster BondCommunication scope of works + 7% OH&P; AWAITING RESPONSE FROM m/S. Bond Communication

NSC Revisions to Office Partitions - OCP Works

(69,689.10)

#REF!

(69,689.10)

SUB-TOTAL ERI NO. 29


64 66 001 001 NSC Provision of Foul Water Disposal in case Primary System Failure #### NSC MEP Works - Revised External Services Drawings 29

(126,440.24)

(69,689.10)
102,143.27 (valued in 64-001)

#REF!
#REF! #REF!

#REF!
#REF! #REF!
#REF! #REF!

0.00

(69,689.10)
102,143.27 CLOSED

ETA costs + 7% JV OH&P Included in Claim No. 64-001

SUB-TOTAL ERI NO. 31

0.00

102,143.27

#REF!

#REF!

0.00

102,143.27

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--CLAIMS.monvabad

40 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
65 58

SUB NO.
001 001

ERI NO.
31

V.O. TO

DESCRIPTION

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) ur (valued in 65-001) JV COST (AED) #REF! #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! #REF! LETTER REFERENCE
#REF! #REF!

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED) ur CLOSED

REMARKS / COMMENTS
ETA to submit entitlements valued in Claim No. 65-001

NSC Revision of Office Partitions - Mechanical & Fire Policy Drawings #### NSC Revised MEP Drawings

SUB-TOTAL ERI NO. 32


68 001 32 NSC Trip to Italy for Stone Quarry Inspection

0.00

0.00
43,688.96

#REF!

#REF!
39,083.00
JAP016/ALM/TCAC/16129 dated 5-Mar-08

0.00

0.00
CLOSED
BI costs AED 36,526.17 + 7% JV OH&P

SUB-TOTAL ERI NO. 34


71 76 001 001 #### NSC MEP Works - Revised Ground Floor Landscape Drawings 34 NSC Rainwater and Irrigation Waste Water Discharge from Planters

0.00

43,688.96
(valued in 76-001) 1,402,455.42

0.00
#REF! #REF!

39,083.00
#REF! #REF!
#REF! #REF!

0.00

0.00
CLOSED 1,402,455.42
Included in 76-001 ETA costs + 7% JV OH&P; uilders works not yet included to be submitted under 76-002

SUB-TOTAL ERI NO. 35 / 35.2 / 35.1 / 35.3 / 35.4 / 35.5


23 52 78 78 002 001 001R1 002 #### NSC DTS referenced AM/015/515 dated 5th August 2006 (MEP Works) 35.1 JV Possible Addition of Ballroom 35 35 JV JV Function Room / Ball Room Facility (Structural Works) Function Room / Ball Room Facility (Fireproofing Works) Modifications to Function Room / Ball Room Facility (Structural Works) Modifications to Function Room / Ball Room Facility (Fireproofing Works) Function Room / Ball Room Facility Parapet (Structural Works)

0.00

1,402,455.42
(valued in 107-003 & 175001)

#REF!
#REF! #REF! 2,087,955.12 191,292.64 #REF! #REF! #REF!

#REF!
#REF! #REF!
#REF! #REF! JAP016/ALM/TCAC/18101 dated 18-May-08 JAP016/ALM/TCAC/22536 dated 23-Nov-08

0.00

1,402,455.42
CLOSED
included in Claim Nos. 107-003 & 175-001 supeseded by claim no. 107 EVS Cost + 12% OH&P but less works deemed included in the NSC Thermofire Cost AED 170,797.22 + 12% OH&P; confirmed to be valued in ERI 35 under the Nakheel letter ref. JAP016/TS/GT/0244 dtd 27May08 EVS Cost + 12% OH&P + 3% attendances Thermofire Cost + 12% OH&P + 3% attendances EVS Cost + 12% OH&P + 3% attendances and Scaffolding supplied by JV; to be valued under ERI35.5 as per Nakheel letter ref. JAP016/TS/GT/0255 dtd 29May08 Valued in 107-003

(valued in Claims No. 78 & 107) 2,183,160.00 196,416.80 204,700.00 12,416.32 144,684.43 (valued in 107-003) (valued in 107-003) ur (valued in 107-001) ur

CLOSED CLOSED CLOSED 204,700.00 12,416.32 144,684.43 CLOSED CLOSED ur CLOSED ur

78 78 78

003 004 005

35 35 35.5

JV JV JV

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF!

85 99 100 106 107

001 001 001 001

35.1 35.1 35.1 35.1

NSC Function Room / Ball Room Domestic Water Drawings NSC Mechanical Works for the Function Room / Ballroom

#REF! #REF! #REF! (valued in 107-001) #REF!

#REF!

#REF! #REF! JAP016/ALM/TCAC/10523 dated 22-July-2007

ETA to submit entitlements ETA to submit entitlements TO BE VALUED IN CLAIM NO. 107-001 (ERI 35.1) Bond Interiors to submit entitlements

107 107

107 107 107 107 107 107

107 178 189 234

NSC Security Works for the Function Room / Ballroom JV Revised Interior Lighting Fixtures Layout at Ballroom GF, Washroom GF, and Ballroom 2L 001 35.1/ NSC Ballroom / Function Room (ID Works to the Walls 35.2/ facing the Retail Mall) 35.4 002R2 35.1/ JV Ballroom / Function Room (Concrete and Masonry 35.2 Works) 003 35.1/ NSC Ballroom/Function Room (MEP Works) 35.2/ 35.4 004a 35.1/ JV Ballroom/Function Room (CW Roofing, Curtain Wall 35.2 Cladding, Aluminum Panel Bulkheads Work) 004b 35.5 NSC Ballroom/Function Room (Roof Parapet Works - CVI No. 084) 004c 35.5 JV Ballroom/Function Room (Roof Parapet Works GI Cladding - CVI No. 084) 35 005 JV Ballroom/Function Room (Provision of Scaffolds and Access) 006 #### JV Provision of Downspouts at Ballroom/Function Room Roof (CVI No. 122) 007 35.1/ NSC Ballroom/Function Room (External Stoneworks) 35.2/ 35.4 35.4 008 JV Ballroom/Function Room (Additional Plaster Works where Electrical Panels are Installed) 35.3 NSC Ballroom/Function Room - Cladding to the 001 Structural Steel Beams 001 #### NSC Additional Work to the Ball Room Parapet (CVI No. 084) 35 001 NSC Pipe Size Changes @ First Floor (RFI No. 1062)

#REF!

#REF!

785,658.59 3,318,315.35

728,934.60 3,318,315.35

JAP016/ALM/TCAC/19604 dated 14-July-2008 JAP016/ALM/TCAC/21289 dated 5-Oct-08

CLOSED CLOSED

Subcontractor : JV Internal Subcontractor : ETA; under review by ETA due to the revised scope of works; confirmed by ETA

284,794.05 ur 26,312.00 0.00 2,210.46 357,161.60

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! 310,797.76

#REF! #REF!

284,794.05 ur 26,312.00 CLOSED 2,210.46 CLOSED

Al Abbar cost + 12% + 3% attendances Subcontractor : Al Abbar; shall be valued under ERI 35.5 as per Nakheel Letter JAP016/TS/GT/0255 dtd 29-May08 additional GI sheets cover to parapet for the preparation of EPDM by AL Abbar Scaffolding to be used by the Nominated Subcontractors; Fit-Out Contractor to work on the MEP Scope varied works at structural steel works and provision of Roof Drain Al Bayader cost + 12% OH&P

#REF! #REF!

#REF! JAP016/ALM/TCAC/22293 dated 13-Nov-08

2,710.59 ur (valued in 107-007) 20,545.90

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF!

2,710.59 ur CLOSED 20,545.90

Plaster works only based on BOQ rates AA to submit entitlements Al Bayader to submit entitlements

#REF!

ETA claim + 12% OH&P + 3% Attendances

SUB-TOTAL ERI NO. 37


18 001R1 37 JV Landscaping Works; i.e., provision of Civil/Structural Works as confirmed under Nakheel Letter ref. JAP016/GEN/ABS/1058 dated 14-Aug-06 Landscaping works - Screed for the Planter Boxes

3,843,063.24
3,775,777.57

3,696,022.85

#REF!
2,661,716.46

#REF!
JAP016/ALM/TCAC/90791 dated 19-Jun-08

677,827.85
CLOSED

20,545.90
Confirmed by Nakheel under the letter as mentioned, and instructed under ERI No. 37

18

002

37

JV

106,370.21

106,370.21

JAP016/ALM/TCAC/90791 dated 19-Jun-08

CLOSED

valued under th ERI No. 37

SUB-TOTAL ERI NO. 38


86 OM-8 001 001 38 38 JV JV Modification to Lift Opening at 36th and 48th Floor Modification of Lift Openings at 36th Floor Low Rise Lift Machine Room and 48th Floor High Rise Lift Machine Rooms (Omission of Concrete Works due to the increase of Lift Opening Sizes)

3,882,147.78
(valued in OM8-001) (1,988.48)

0.00

2,768,086.67
#REF! (1,988.48)

0.00
#REF!
#REF! JAP016/ALM/TCAC/22416 dated 18-ov-08

0.00
CLOSED CLOSED

0.00
under omission. BI to confirm cost by F&G

SUB-TOTAL ERI NO. 41

(1,988.48)
1,771.88

0.00

#REF!
1,587.60

#REF!
JAP016/ALM/TCAC/21082 dated 21-Sep-08

0.00
CLOSED

0.00
Subcon Cost + 12% OH&P

87

001

41

JV

Revised Drawing for Lift Machine Room on 3rd Service Floor

SUB-TOTAL ERI NO. 42


88 001 42 JV Revised Drawing for Interior Design Works

1,771.88
(valued in Series 41)

0.00

1,587.60
#REF!

0.00
#REF!
#REF!

0.00
CLOSED

0.00
considered in Claim Series 41 / ERI No. 16

SUB-TOTAL ERI NO. 43


81 001 43 JV Changes of Levels to Room Nos. B1-073 (Corridor) and B1-074 (Mechanical Plant Room)

0.00
7,275.43

0.00

#REF!
6,205.97

#REF!
JAP016/ALM/TCAC/21270 dated 29-Sep-08

0.00
CLOSED

0.00
Light weight Concrete and chipping works

SUB-TOTAL ERI NO. 44 / 44.1


103 139 001R1 001 44 44.1 JV Additional Wall in Security Room at Basement 2

7,275.43
26,634.44

0.00

6,205.97
25,999.57

0.00
JAP016/ALM/TCAC/17848 dated 8-May-2008

0.00
CLOSED

0.00
architectural works only.

NSC Basement 2 Security Room - Revised Drawings for the Ventilation and Lighting Details

172,273.32

#REF!

#REF!

#REF!

172,273.32

ETA costs + 7% JV OH&P

SUB-TOTAL ERI NO. 45 / 45.1


70 97 001 001 45 45.1 JV Level 30 Partition Layouts NSC Various Changes due to the revised MEP "For Construction" Drawings due to Modification at Level 30 NSC Various Revisions to the Electrical Works "For Construction" Drawings NSC Relocation of Cameras at 30th Floor (RFI No. 859) JV Omission of Partition Walls in Level 30 for Single Tenancy Arrangements

26,634.44
(valued in OM-5)

172,273.32

#REF!
#REF! #REF!

#REF!
#REF! #REF!
#REF! #REF!

0.00
CLOSED

172,273.32
see OM-5 below (omitted works)

ur

ur

ETA to submit entitlements

101 146 OM-5

001 001 001

45.2 45 / 45.1 45

ur ur (66,453.77)

#REF! #REF! (66,453.77)

#REF! #REF!

#REF! #REF! JAP016/ALM/TCAC/19244 dated 26-Jun-08

ur ur CLOSED

ETA to submit entitlements JCI to submit entitlements JV Scope of Works - Omission of Office Partitions at the Level 30 due to the single tenancy arrangements

SUB-TOTAL ERI NO. 46

(66,453.77)

0.00

#REF!

#REF!

0.00

0.00

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--CLAIMS.monvabad

41 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
84

SUB NO.
001

ERI NO.
46

V.O. TO

DESCRIPTION

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) ur JV COST (AED) #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! LETTER REFERENCE
#REF!

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED) ur

REMARKS / COMMENTS
ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No. 105; to be valued under ERI16 ref. JAP016/ALM/TCAC/09512 dtd 12Jun07 ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No.107

NSC Revision to the Lighting Layout at GF, L1, & L2

102

001

46

NSC Lighting Requirements to the Function Room / Ballroom

ur

#REF!

#REF!

#REF!

ur

SUB-TOTAL ERI NO. 47


104 001 47 JV Additional 40 Container Storage, Office Chairs, and Computer for F+G Office

0.00
40,174.50

0.00

#REF!
40,074.53

#REF!
JAP016/ALM/TCAC/11909 dated 9-Sept-2007

0.00
CLOSED

0.00
actual cost transmitted to F&G based on dayworks rates; agreed with F&G

SUB-TOTAL ERI NO. 48


82 001 48 NSC Telephone IDF/MDF Room Drawings

40,174.50

0.00
34,309.10

40,074.53

0.00
13,517.00
JAP016/ALM/TCAC/21322 dated 5-Oct-08

0.00

0.00
CLOSED
ETA cost + 7% OH&P

SUB-TOTAL ERI NO. 49 / 49.2 / 49.3 / 49.4 / 49.5


89 92 Modification to the Structural Drawings at Levels 49, 50, and 51 49.2 NSC Various Revisions due to the revised For 001 Construction Drawings (MEP Works) at Levels 49, 50, & 51 001 #### JV Provision of Toilets at Levels 53 to 63 001 #### JV Request for Issue of Outstanding Drawings (DMCC Offices at L49-L51 & Add'l Toilets in Office Area at L52-L64) 006a 49.3 NSC Fire Fighting Systems at Levels 49, 50, & 51 (Abortive Work) 006b 49.3 JV Fire Fighting Systems at Levels 49, 50, & 51 (Builders Work and Abortive Work) 49.4 NSC Revised "For Construction" Security Drawings at 009 Levels 49, 50, & 51 under the DMCC Transmittal Ref. JAP016/TRNS /JV/00044 dated 5th May 2008 (Security Works) 001R1 49 JV Notification of Entittlements (CVI-089) - Doors to new washrooms at L49 and L50 (Lift Lobby Area) 001 49 JV 001 001 49.5 49 NSC Modification of Raised Floor Heights at Server Rooms at Level 49, 50, & 51 JV Modification to the Structural Drawings at Levels 49, 50, and 51

0.00
(valued in OM9-001)

34,309.10

0.00
#REF!

13,517.00
#REF! #REF!
#REF! #REF!

0.00
CLOSED

0.00
valued under the omissions

218,960.00

#REF!

218,960.00

ETA cost + 12% OH&P + 3% Attendances

153 157

(valued in 163) (valued in 163)

#REF! #REF!

#REF! #REF!

#REF! #REF!

CLOSED CLOSED

valued in another claim valued in another claim

163 163 163

ur 1,903.78 ur

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

ur 1,903.78 ur

ETA to submit entitlements builders works JCI to submit entitlements

186

58,651.66

#REF!

#REF!

#REF!

58,651.66

under review; to be under ERI #49 as per Nakheel letter ref. JAP016/TS/GT/0205 dated 15-Apr-08; SC cost +12%OH&P + 3% Attendances

208 OM-9

17,250.00 (85,688.89)

#REF! #REF!

#REF!

#REF!

17,250.00 (85,688.89)

#REF!

MDS cost + 12% OH&P + 3% Attendances; valued at ERI No. 49.5 as per Nakheel letter ref. JAP016/TS/GT/0271 dtd 9Jun08 Omission of Office Partitions at Level 49

SUB-TOTAL ERI NO. 50


109 001 50 NSC Amendment to District Cooling Piping and Control Works (Heat Echangers and Strainers)

(25,133.45)

236,210.00
597,081.20

#REF!
#REF!

#REF!
#REF!
#REF!

(25,133.45)

236,210.00
597,081.20
ETA to submit entitlements

SUB-TOTAL ERI NO. 51


94 001R2 51 JV Changes to Suspended Ceiling (ID Works Package)

0.00
85,383.20

597,081.20

#REF!
85,383.20

#REF!
JAP016/ALM/TCAC/21731 dated 21-Oct-08

0.00
CLOSED

597,081.20
subcon costs plus 12% (revised cost from 182,960.40 due to the meeting between FBI and DMCC)

SUB-TOTAL ERI NO. 52


95 95 001 002 52 52 NSC Variation Works due to Lift and Escalator Finishes (Direct Variation to the Nominated S/C Works) NSC Variation Works due to Lift and Escalator Finishes (Adjustment to the Provisional Sums)

85,383.20

0.00
653,624.24 544,678.47

85,383.20

0.00
653,624.24 544,678.47
JAP016/ALM/TCAC/17360 dated 20-Apr-08 JAP016/TS/GT/0083 dated 9-Aug2007

0.00

0.00
CLOSED CLOSED
KONE costs + 7% JV OH&P KONE costs + 7% JV OH&P; NOTE : Not considered as a variation by Consultant but adjsutment to the KONE Provisional Sums from AED500K to 1,009,045.30, and agreed amount s the nett costs.

SUB-TOTAL ERI NO. 53


114 001 53 NSC Changes of Wallpaper in Typical Floor Corridors

0.00

1,198,302.72
ur

0.00
#REF!

1,198,302.71
#REF!
#REF!

0.00

0.00
ur
BI to submit entitlements

SUB-TOTAL ERI NO. 54


93 001 54 JV Changes to Mock-up Areas (ID Works)

0.00
612,662.92

0.00

#REF!
#REF!

#REF!
#REF!
#REF!

0.00
612,662.92

0.00
Bond Interiors cost + 12% JV Mark-up + 7% OH&P (Prov. Sums)

SUB-TOTAL ERI NO. 55


115 001 55 JV Change of Pressurization Duct Opening at 51st Floor Lift Lobby

612,662.92
4,044.20

0.00

#REF!
3,315.73

#REF!
JAP016/ALM/TCAC/20893 dated 11-Sep-08

612,662.92
CLOSED

0.00
agreed withConsultants (F&G)

SUB-TOTAL ERI NO. 57


116 72 001R1 001 57 #### JV JV Additional Aluminum Flashing Interfacing Detail between the Cladding and Blockwall

4,044.20
764,729.70 (valued in 116-001)

0.00

3,315.73
#REF! #REF!

0.00
#REF! #REF!
#REF! #REF!

0.00
764,729.70 CLOSED

0.00
Subcon Cost + 12%OH&P + 3% Attendances included in Claim No. 116-001

SUB-TOTAL ERI NO. 58


112 001 58 NSC Changes in the LV Schematic Diagram

764,729.70

0.00
506,665.14

#REF!
#REF!

#REF!
#REF!
#REF!

764,729.70

0.00
506,665.14
ETA costs + 12% OH&P + 3% Attendances

SUB-TOTAL ERI NO. 59 / 59.1


80 80 001R1 59 59.1 002 JV False Beam/Bulk Head NSC Drainage Piping in Medium and High Rise Lift Machine Room

0.00
1,706.32

506,665.14

#REF!
#REF! #REF!

#REF!
#REF! #REF!
#REF! #REF!

0.00
1,706.32

506,665.14
bulkheads only

133,301.39

133,301.39

ETA costs = AED 115,914.25 + 12% JV OH&P + 3% Attendances

SUB-TOTAL ERI NO. 60


134 OM-6 001 001 60 60 JV JV Omission of Proximity Access Card Reader and Access Cards at Basement 1 Boom-Gate Omission of Proximity Access Card Reader and Access Cards at Basement 1 Boom-Gate

1,706.32
(valued in OM6-001) (2,856.00)

133,301.39

#REF!
#REF! (2,822.40)

#REF!
#REF!
#REF! JAP016/ALM/TCAC/22410 DATED 18-Nov-08

1,706.32
CLOSED CLOSED

133,301.39
under review by JV and JCI. considered Sultan Hareb rates x no. of slots in Basement 1 + 12% OH&P

SUB-TOTAL ERI NO. 61


136 001 61 JV Diamond Feature

(2,856.00)
155,609.44

0.00

#REF!
155,609.44

#REF!
JAP016/TS/GT/0227 dated 13May-2008

0.00
CLOSED

0.00
Excl Acry Costs = AED 138,937 + 12% JV OH&P

SUB-TOTAL ERI NO. 62 / 62.1 / 62.2 / 62.3


108 117 128 001 001 001 #### #### #### JV JV JV Architectural Changes to Level 2 Changes to the Diamond Exchange Centre Changes to Level 2 due to the New "For Construction" Drawings under Transmittal JAP016/TRNS/JV/00015 Revised "For Construction" ID Drawings at the Second Level and Diamond Exchange Centre

155,609.44
(valued in 149) (valued in 149-001) (valued in 149)

0.00

155,609.44
#REF! #REF! #REF!

0.00
#REF! #REF! #REF!
#REF! #REF! #REF!

0.00
CLOSED CLOSED CLOSED

0.00
on-hold area, awaiting details from Client valued in 149-001 under ERI No. 62 not applicable.

149

001

62

JV

6,574,957.21

3,431,895.90

agreed values is partial and deemed to change progressively, as it is based on the agreed rates only (+12%)

#REF!

updated cost and rates approval summary status being sent regularly; cost submitted is the final applied claim

149 149

002 003a

62.1 62.1

NSC Revisions to Diamond Exchange Centre (MEP and Interior Lighting) NSC Revisions to Diamond Exchange Centre (CCTV and Access Control)

2,679,840.21 617,089.33

#REF! #REF!

#REF! #REF!

#REF! #REF!

2,679,840.21 617,089.33

ETA cost + 7% OH&P + 2% Attendances JCI cost AED 566,137.00 + 7%JV OH&P + 2%Attend; based on transmittal ./00017 dtd 1-Nov-07 (drwg. No. 4494/Y/009 Rev.3)

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--CLAIMS.monvabad

42 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
149 149 149

SUB NO.
003b 004 005a

ERI NO.
62.3 62.2 ####

V.O. TO

DESCRIPTION

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) ur ur 24,628.70 JV COST (AED) #REF! #REF! #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! #REF! #REF! LETTER REFERENCE
#REF!

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED) ur ur 24,628.70

REMARKS / COMMENTS
JCI to submit entitlements; based on transmittal ./00043 dtd 4May08 (drwg. No. 4494/Y/009 Rev.4) ETA to submit entitlements BC cost + 7% OH&P; BC VO#10; BC time claim = 147 days

149

005b

####

149

005c

####

149

006

####

149

007

62

NSC Revisions to Diamond Exchange Centre (CCTV and Access Control) NSC Revisions to Diamond Exchange Centre (Fire Policy Layout) NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (Bond Communication Scope - Additional Voice/Data Points at Level 2) NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (ETA scope of works) JV Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (JV scope of works) NSC Vertical Cable Manager for Diamond Exchange AV System at the Multi Purpose Room in accordance with the F&G letter ref. JAP016/ALM/TCAC/20991 dated 16-Sep-08 JV Cuttings in Corridor Ceiling at Level 2 as required by Bond Communication JV

#REF! #REF!

ur

#REF!

#REF!

#REF!

ur

ETA to submit entitlements

(valued in 149-001)

#REF!

#REF!

#REF!

CLOSED

considered in 149-001 (ERI No. 62)

11,996.83

#REF!

#REF!

#REF!

11,996.83

BC cost + 7% OH&P; BC VO#14; BC time claim = 119 days

0.00

#REF!

#REF!

#REF!

CLOSED

FBI shall submit entitlements as per the F&G letter ref. JAP016/ALM/TCAC/21815 dtd 26-Oct-08; BACKCHARGE TO BOND COMMUNICATION DUE NON-COORDINATION Dubai Metals cost + 12% OH&P + 3% Attand

149

008

149

009

Break Glass Pedestals at the Diamond Exchange Centre in accordance with the F&G transmittal ref. F+G/ALMAS/TAISEI/01961 #### NSC Revisions to the Electrical Works at the Diamond Exchange Centre and Level 2 as per the F&G transmittal ref. F+G/ALMAS/TAISEI/01574 and DMCC transmittal ref. JAP016/TRNS/JV/00048 #### NSC Additional Counter at the Security Room level 2 as per the M/s. Nakheel letter ref. JAP016/TS/BW/0366 dated 16-Nov-08 #### NSC Changes to the Diamond Exchange Centre as per the instructions given via M/s. DMCC letter referenced JAP016/GEN/BW/0177 dated 20-Oct-08 62 #### #### 62 / 16 JV JV JV Notification of Disruption of Work due to discrepancy of Design Drawings at Second Floor Diamond Exchange Details Design Changes due to the Omission of Operable Partition at Level 2 Offices (ERI No. 62) and Stainless Steel Rubbish Bins (ERI No. 16)

9,200.00

#REF!

#REF!

#REF!

9,200.00

222,906.80

#REF!

#REF!

#REF!

222,906.80

ETA cost + 12% OH&P + 3% Attendances

149

010

ur

#REF!

#REF!

#REF!

ur

BI to submit entitlements

149

011

44,538.44

#REF!

#REF!

#REF!

44,538.44

BC cost + 7%; BC VO#17; BC time claim = 91 days

165 177 214

001 001 001

(valued in 149-001) (valued in 149-001) (valued in 41-001 & 149001)

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF!

CLOSED CLOSED CLOSED

time claim.

#REF! #REF!

valued in 149-001 under ERI No. 62 considered in 41-001 and 149-001

SUB-TOTAL ERI NO. 63


137 001 63 NSC Emergency Cables to the Tenant's DB

6,584,157.21

3,601,000.31
394,252.82

#REF!
#REF!

#REF!
#REF!
#REF!

#REF!

3,601,000.31
394,252.82
ETA costs + 7% JV OH&P; confirmed to be ERI No. 63 as per F&G letter ref. JAP016/ALM/TCAC/18721 dtd 8Jun08

SUB-TOTAL ERI NO. 64


126 001 64 NSC Modification of Male Washroom at 36th Floor - RFI 767 (Rev. 0,1&2)

0.00

394,252.82
56,553.22

#REF!
#REF!

#REF!
#REF!
#REF!

0.00

394,252.82
56,553.22

ETA part = AED 50,475.00

SUB-TOTAL ERI NO. 65


110 001R1 65 NSC Furniture / Console at Basement 2 Security Room

0.00

56,553.22
29,808.00

#REF!

#REF!
29,030.40
JAP016/ALM/TCAC/21105 dated 22-Sep-08

0.00

56,553.22
CLOSED
BF claim AED 25,920 + 12% OH&P

SUB-TOTAL ERI NO. 66 / 66.1


163 001 66 66.1 JV Provision of Toilets at upper floors, Levels 49,50,51, and 62 (Civil and Architectural Works, and Abortive Works-Coring at 49, 50, & 51, Plastering at Pantry Wall at L49, and add'l opening at SF3 for Level 49)

0.00
127,141.12

29,808.00

0.00
100,469.43

29,030.40
JAP016/ALM/TCAC/21426 dated 9-Oct-08

0.00
CLOSED

0.00
under review by JV; additional coring works to ERI 66.1 as confirmed by F&G letter ref. JAP016/ALM/TCAC/17867 dtd 8May08; addl plaster at Pantry L49 under 66.1 as per JAp016/ALM/TCAC/18766 dtd9Jun08;ERI 66.1 confirmed by Nakheel to cover coring works by B

163 163

002 005

163 163 174

007 008 001

NSC Provision of Toilets at upper floors, Levels 49,50,51, and 62 (MEP Works) #### NSC Further Revisions to the Levels 49, 50, 51, 60 and 61 in accordance with DMCC Transmittal Ref. JAP016/TRNS/JV/ 00032 dated 22nd January 2008 (MEP Works) 66.1 NSC Reworks at the New DMCC Washrooms (Levels 49, 50, & 51) for FCU's 67/ NSC Relocation of FCU to the New Toilet Area at Levels 66 52,53,54,59, & 62 66.1 NSC Design Changes - Additional Dummy Mullions and Back Pans at Levels 49-62 (NSC Works) 66 66.1 JV Design Changes-Additional Aluminum Flashing due to the revised Curtain Wall Cladding 8,452.50

470,109.65 ur

#REF! #REF!

#REF! #REF!

#REF! #REF!

470,109.65 ur

ETA costs of AED 408,791 + 12%JV OH&P + 3% Attendances ETA to submit entitlements

14,283.00 ur ur

#REF! #REF! #REF! 8,232.00

#REF! #REF! #REF!

#REF! #REF!

14,283.00 ur ur CLOSED

ETA cost + 12% OH&P + 3% Attendances ETA to submit entitlements; Level 52,53,54,59 under ERI67, and Level 62 under ERI66 Al Abbar to submit claim / JV to submit builders works claim; to be valued under the ERI 66.1 refer to F&G letter JAP016/ALM/TCAC/18209 dtd 20May08 Best Steel cost + 12% OH&P; to be valued under the ERI 66.1 refer to F&G letter JAP016/ALM/TCAC/18209 dtd 20May08

#REF!

174

002

JAP016/ALM/TCAC/22576 dated 24-Nov-08

SUB-TOTAL ERI NO. 67


163 003 67 Provision of Toilets at upper floors, Levels 52,53,54, and 59 (Civil and Architectural Works, and Abortive Works, if any) NSC Provision of Toilets at upper floors, Levels 52,53,54, and 59 (MEP Works) JV

135,593.62
90,502.31

484,392.65

#REF!
63,163.87

#REF!
JAP016/ALM/TCAC/22008 dated 2-Nov-08

0.00
CLOSED

484,392.65
agreed withConsultants (F&G)

163

004

67

334,816.75

#REF!

#REF!

#REF!

334,816.75

ETA costs AED291,185 + 12% JV OH&P + 3% Attendance

SUB-TOTAL ERI NO. 68


131 001 68 NSC Missing Purlins at Connecting Corridor Between Tower and Diamond Exchange Center (RFI No. 839)

90,502.31

334,816.75
16,050.00

#REF!

#REF!
12,895.64
JAP016/ALM/TCAC/22694 dated 26-Nov-08

0.00

334,816.75
CLOSED
EVS cost + 7% OH&P

SUB-TOTAL ERI NO. 69


173 001 69 JV Additional Staff Facilities - Project Manager's Staff (F+G)

0.00
64,706.19

16,050.00

0.00
56,015.46

12,895.64
JAP016/AlM/TCAC/21700 dated 20-Oct-08

0.00
CLOSED

0.00
Supply and Labour rates + 12%OH&P

SUB-TOTAL ERI NO. 70


179 001 70 JV Modifications to Typical Female Bathroom Ceiling Mirrors

64,706.19
7,855.65

0.00

56,015.46
7,650.72

0.00
JAP016/ALM/TCAC/17650 dated 30-Apr-08

0.00
CLOSED

0.00
BI cost at AED 6,831.00 + 12% JV OH&P

SUB-TOTAL ERI NO. 71


152 001 71 Additional Works to the Metal Cladding (MT-20) behind Glazed Balustrades caused by the Lowering of Ceiling at Ground Floor Level Due to the MEP Works (Metal Cladding - MT20) NSC Omission of Wall Tiles due to the extension of Metal Cladding Behind Glass Ballustrades caused by the lowering of Ceiling JV

7,855.65
294,350.71

0.00

7,650.72
176,646.32

0.00
JAP016/ALM/TCAC/22470 dated 20-Nov-08

0.00
CLOSED

0.00
using Bond Interiors rates + 7% OH&P

OM-7

001

71

(132,210.53)

#REF!

#REF!

(132,210.53)

BI to confirm cost by F&G

SUB-TOTAL ERI NO. 72


164 001 72 JV BMS Room Furniture Requirements

294,350.71
40,216.65

(132,210.53)

176,646.32
39,167.52

#REF!
JAP016/ALM/TCAC/21106 dated 22-Sep-08

0.00
CLOSED

(132,210.53)
BF cost AED 34,971.00 + 12% JV OH&P

SUB-TOTAL

40,216.65

0.00

39,167.52

0.00

0.00

0.00

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--CLAIMS.monvabad

43 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO. SUB NO. ERI NO. V.O. TO

DESCRIPTION ERI NO. 73

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) 12,637.06 NSC COST (AED) JV COST (AED) #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! LETTER REFERENCE
#REF!

OUTSTANDING CLAIMS
JV COST (AED) 12,637.06 NSC COST (AED)

REMARKS / COMMENTS

123

001R2

73

JV

166

001

73

JV

Potential Delay due to Late Issuance of Revised Design Information in Sky Lobby Meeting Room at Level 48 ID Works Package - Lighting Requirements at Level 48 Meeting Room (MEP Works Scope) ID Works Package - Lighting Requirements at L48 Meeting Room (JV Scope - Lever to Supply)

confirmed to be valued under ERI No. 73 according to the Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08

11,783.12 2,254.00

#REF! #REF!

#REF! #REF!

#REF!

11,783.12 2,254.00

ETA cost + 12%OH&P + 3% Attendances; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08 JV to submit entitlements; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08; Lever cost + 12% OH&P + 3% Attendance

166

002

73

JV

#REF!

SUB-TOTAL ERI NO. 74 / 74.1


197 001a 74.1 JV Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope - masonry works, abortive works and coring works) Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope - ID works) Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (ID Scope of Works) Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (MEP Works) Revised Domestic Water Layout at Ground and First Floor due to the Revised "For Construction" Drawings under the DMCC Transmittal JAP016/TRNS/JV/00042 Revised " For Construction" drawings under the DMCC transmittal ref. JAP016/TRNS/JV/00040 dated 16-Apr-08 (Additional Voice/Data Points in GF & 1L)

26,674.18
18,228.31

0.00

#REF!
14,232.82

#REF!
JAP016/ALM/TCAC/22447 dated 19-Nov-08

26,674.18
CLOSED

0.00

Masonry Works, Abortive Works and Coring Works

197

001b

74.1

JV

57,459.68

#REF!

#REF!

#REF!

57,459.68

Doors and Frames incl Ironmongery, and Ceiling Works

197

002

74.1

NSC

ur

#REF!

#REF!

#REF!

ur

Bond Interiors to submit entitlements

197

003

74.1

NSC

50,319.40

#REF!

#REF!

#REF!

50,319.40

ETA to submit entitlements

202

001

74

NSC

73,986.40

#REF!

#REF!

#REF!

73,986.40

ETA cost + 12% OH&P + 3% Attendances

238

001

74.1

NSC

26,919.09

#REF!

#REF!

#REF!

26,919.09

BC Cost + 7% OH&P; BC VO#9; BC time claim = 186 days

SUB-TOTAL ERI NO. 75


201 001 75 NSC ID Tiling Works-Attic Stock (ERI No. 75)

75,687.99

151,224.89
ur

#REF!
#REF!

#REF!
#REF!
#REF!

57,459.68

151,224.89
ur
BI to submit entitlements

SUB-TOTAL ERI NO. 76 / 76.1


158 205 205 001R1 001 002 76 76.1 76.1 JV Doors at DEWA Water Meter Rooms

0.00
21,502.11

0.00

#REF!
#REF!

#REF!
#REF! 7,908.70
#REF! JAP016/TS/GT/20686 dated 28Aug-08 JAP016/TS/GT/20686 dated 28Aug-08

0.00
21,502.11

0.00
JV Costs

NSC DEWA Water Meter Connection (MEP Works) JV DEWA Water Meter Connection (Builders Work) 5,263.09

10,637.50 3,941.91

CLOSED CLOSED

ETA cost + 7% OH&P JV works clsoing of opening and provision of new opening with waterproofing and sealing works

SUB-TOTAL ERI NO. 77


207 001 77 NSC Tower Secondary Roof Clamping Section

26,765.20

10,637.50
150,193.45

#REF!
#REF!

#REF!
#REF!
#REF!

21,502.11

0.00
150,193.45
Al Abbar cost + 12% OH&P + 3% Attendances

SUB-TOTAL ERI NO. 78


176 176 176 176 196 196 196 001 002 003 004 001 002 003a TECOM/DU Comments on Telephone Rooms Raised Access Floor Material Submittal #### NSC DU Requirements #### JV #### NSC TECOM/DU Comments on Structured Cabling Material Submittal #### NSC TECOM/DU Comments - " Active " IDF Rooms 78 JV MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (JV Scope) 78 NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (ETA Scope) 78 NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeKrone Modules) 78 NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeVertical Cable Manager) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeHorizontal Cable Manager) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeCAT 3 Cables Installations) NSC MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Bond Communication ScopeOM3 Fibre Optic Cable Installations) JV JV MDF & IDF Rooms DUs Requirements as per the Mock-up Snag List (Lateral Systems Scope)

0.00
(valued in 196)

150,193.45

#REF!
#REF!

#REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

0.00
CLOSED

150,193.45
Lateral Systems to submit (Builders to be in another submittal)

(valued in 196) (valued in 196) (valued in 196) 2,070.00 76,094.35 62,002.57

#REF! #REF! #REF! #REF! #REF! #REF!

CLOSED CLOSED CLOSED 2,070.00 76,094.35 62,002.57

ETA to submit entitlements (Builders to be in another submittal) BC to submit entitlements (Builders Works if any to be in another submittal) ETA to submit entitlements valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 ETA cost + 12% OH&P + 3% Attendances; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#03); BC time claim = 147 days

#REF!

196

003b

127,698.42

#REF!

#REF!

#REF!

127,698.42

BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#05); BC time claim = 233 days

196

003c

78

19,821.34

#REF!

#REF!

#REF!

19,821.34

BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#11); bc time claim = 201 days

196

003d

78

336,915.53

#REF!

#REF!

#REF!

336,915.53

BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#01); bc time claim = 275 days

196

003e

78

321,379.43

#REF!

#REF!

#REF!

321,379.43

BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#02); bc time claim = 273 days

196 196

004 005

78 78

117,875.00 5,689.44 93,918.75 ur 36,059.40

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF!

117,875.00 5,689.44 93,918.75 ur 36,059.40

valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08 JV Internal Works

196

006

78

MDF & IDF Rooms DUs Additional Requirements, i.e., Stand for the UPS & Batteries in MDF Room & UPS Room at Basement 1 NSC MDF & IDF Rooms DUs Additional Requirements, i.e., DU's Requirements for the UPS NSC Replacement of FCU at UPS Room Basement 1 NSC Relocation of Isolators in UPS Room as per the DU's Requirements

#REF!

#REF!

ETA cost + 12% OH&P + 3% Attend

196 215

007 001

78 78

#REF! #REF!

ETA to submit entitlements ETA cost + 12% OH&P + 3% Attendances, JV to submit builders work, if any; ERI 78 as confirmed by F&G letter ref. JAP016/ALM/TCAC/19239 dtd 26Jun08 & Nakheel letter ref. JAP016/TS/GT/0304 dtd 8Aug08

SUB-TOTAL ERI NO. 79


204 001 79 NSC Level 1 Food Court A/C Design Revised "For Construction" Drawings under the DMCC transmittal ref. JAP016/TRNS/JV/00046 (MEP Works)

125,634.44

1,073,889.80
354,891.15

#REF!
#REF!

#REF!
#REF!
#REF!

125,634.44

1,073,889.80
354,891.15
ETA cost + 12% OH&P + 3% Attendances (Power & LC, AC & Ventilaltion, Drainage)

SUB-TOTAL ERI NO. 80


228 001R1 80 JV Doors to Lift Machine Rooms - Summit & Service F1 (Atkins letter ref. RD4532/661/AK/mja/R8-1879)

0.00
37,185.25

354,891.15

#REF!
#REF!

#REF!
#REF!
#REF!

0.00
37,185.25

354,891.15
JV's cost from Belgium Aluminum and Best Steel + 12% OH&P + 3% Attendances

SUB-TOTAL ERI NO. 81


203 001 81 NSC Granite Finishing at Level 2 (RFI No. 636 R1)

37,185.25

0.00
33,846.52

#REF!
#REF!

#REF!
#REF!
#REF!

37,185.25

0.00
33,846.52
AB cost + 12% OH&P + 3%Attend

SUB-TOTAL ERI NO. 82


231 001 82 NSC Additional Dummy Mullion at Levels 49-51

0.00

33,846.52
ur

#REF!
#REF!

#REF!
#REF!
#REF!

0.00

33,846.52
ur
Al Abbar to submit entitlements; Nakheel letter ref. JAP016/TS/BW/0346 dtd 14Sep08 instruction to install and ERI is forthcoming

SUB-TOTAL

0.00

0.00

#REF!

#REF!

0.00

0.00

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--CLAIMS.monvabad

44 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO. SUB NO. ERI NO. V.O. TO

DESCRIPTION

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) JV COST (AED)

ER / F&G / JV AGREED VALUES


NSC COST (AED) LETTER REFERENCE

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED)

REMARKS / COMMENTS

ERI NO. 83
233 001 83 NSC Revisions to Landscaping Package in accordance with the M/s. Nakheel letter ref. JAP016/TS/BW/0347 dated 21-Sep-08 66,615.70 #REF! #REF!
#REF!

66,615.70

Al Bayader cost + 12% OH&P + 3% Attendances

SUB-TOTAL OUTSTANDING CLAIMS WITHOUT ERI


1 001 #### JV Design Modification of Pile Caps Excavation to the difference in the Tender Drawings and the Actual Site Conditions Pile Head Levels and Associated Problem

0.00
611,739.00 259,943.16 258,088.62

66,615.70

#REF!
#REF! #REF! #REF!

#REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!

0.00
611,739.00 259,943.16 258,088.62

66,615.70
progressed under a separate claim.

001

####

JV

#REF!

progressed under a separate claim.

001

####

JV

#REF!

progressed under a separate claim.

35 35 42 44 47 62 63 36

002a 002b 001 001 001 001 001 001

#### NSC Additional OCP's conduits to the Offices and Retail Units (MEP Works) #### JV Additional OCP's conduits to the Offices and Retail Unts (Builders Work) #### NSC Fire Sprinkler Riser Pipes in Garbage Chute Shaft #### NSC Revised Specifications for the Fire Fighting Equipments #### NSC Revised Architectural Drawings at 31st & 32nd Floor (MEP Works) #### JV Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms #### NSC Installation of OCP's to Tenant Rooms #### NSC Fire Alarm Shop Drawing #### NSC RFI No. 571 - Insulation and Backing Panels to Cladding #### NSC Secondary Roof for the Towers #### NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (ETA Scope) #### NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (Al Abbar Scope) #### JV Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (JV Scope) #### NSC Revised Mechanical and Electrical Drawings at Basement 2 (Security Room) #### NSC Level 2 Fire Policy Layouts (Transmittal Ref. JAP016/TRNS/JV/00014) #### NSC Drainage on Swimming Pool Deck at Level 1 (RFI No. 831) #### NSC Further Revisions to For Construction Drawings under transmittals ref. JAP016/TRNS/JV/00015 and 00016 #### NSC Power Supply and Fire Alarm Interface to Smoke Ventilation Window (RFI No. 783) #### NSC Containment (Security Services) #### JV Enclosure to the Irrigation Pipes running through the LV Room 2 (RFI No. 894) #### NSC Second Floor Revised Lighting and Power Design #### NSC Sequencing of Spire Erection #### NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00033 dated 5th February 2008 (MEP Works) #### NSC Increase in Water Tank Size #### NSC Ducting in MDF Rooms #### NSC Additional Low Leakage Motorized Smoke Damper #### NSC Height of Services at Level-49 on Shaft-6 #### NSC Additional Stone Cladding to Sides of Maintenance Stairs #### NSC Additional Work to Make-up Levels at Main Entrance #### JV Design Change to External Ramps - Block Stopper Upstand (CVI No. 086) Design Change to External Ramps - Waterproofing (CVI No. 086) Additional Work to External Wall Finishing at Swimming Pool (RFI No. 920) Additional Work to Concrete Under Maintenance Path Tiles (RFI No. 929) Temporary Fire Alarm Systems (Installation) Temporary Fire Alarm Systems (Material / Testing and Commissioning) Mechanical Services at Tecom Room in Level 50

38,246.08 120,370.11 522,748.23 ur ur 12,494.21 (valued in 35-001) ur ur (valued in 220-001) 91,147.85

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

38,246.08 120,370.11 522,748.23 ur ur 12,494.21 CLOSED ur ur CLOSED 91,147.85

ETA Cost + 7% JV OH&P; as per original claim JV Cost based on the response from RFI No. 417 ETA to submit entitlements; revisions is due to the requirement of a UL/FM specifications ETA to submit entitlements Revision 1 - revised due to the changes in the works. not applicable ETA to submit entitlements; rejected by Nakheel due to the Consultant's(Atkins)response ref. RD/4532/661/ML/R8-0344. AA to submit entitlements to be valued in Claim N o. 220-001 ETA costs + 12% OH&P + 3% Attendances

#REF! #REF! #REF! JAP016/TS/BW/0021 dated 12Nov-06

83 98 113

001 001 001

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

113

002

11,909.40

#REF!

#REF!

#REF!

11,909.40

Al Abbar cost + 12% OH&P + 3% Attendances

113

003

(valued in 113-001)

#REF!

#REF!

#REF!

CLOSED

Included in Claim No. 113-001

118 125 130 133

001 001 001 001

ur ur ur ur

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

ur ur ur ur

ETA to submit entitlements ETA to submit entitlements ETA to submit entitlements ETA & JV to submit entitlements

148 151 154 155 171 175

001 001 001 001 001 001

ur ur 1,600.56 ur ur ur

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

ur ur 1,600.56 ur ur ur

ETA to submit entitlements ETA to submit entitlements #REF! ETA to submit entitlements EVS to submit entitlements ETA to submit entitlements (Builders to be in another submittal)

180 181 182 183 184 185 187 187 191 192 194 194 195 198

001 001 001 001 001 001 001 002 001 001 001 002 001 001

71,922.15 ur 1,308,459.65 36,435.37 ur ur 108,691.73 86,593.30 ur ur 190,661.95 82,800.00 ur ur

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

71,922.15 ur 1,308,459.65 36,435.37 ur ur 108,691.73 86,593.30 ur ur 190,661.95 82,800.00 ur ur

ETA Claim = AED 62,541.00, +JV's 12%(OH&P) and 3% (Attend) ETA to submit entitlements ETA Claim = AED 1,137,791.00, + JV's 12% (OH&P) and 3% (Attend) ETA Claim = AED 31,682.93, + JV's 12% (OH&P) and 3% (Attend) Al Bayader to submit entitlements Al Bayader to submit entitlements JV's portion of the works AB cost + 12% OH&P + 3%Attend Al Bayader to submit entitlements Al Bayader to submit entitlements ETA to submit entitlements JV thru Sibca to submit entitlements ETA to submit entitlements (Builders Works if any to be in another submittal) EVS to submit entitlements

#### NSC #### NSC #### NSC #### NSC #### JV #### NSC

209

001

209

002

210 212 213 216 218 218 219 219 220

001 001 001 001 001

#### NSC Change of Applied Cementitious Fireproofing to Intumescent Paint on Steel Beams at Diamond Exchange Center #### NSC Fire Protection Systems at Basement 2 Security Room - Supply of Additional Wall Mounted Dry Powder and CO2 Fire Extinguishers #### NSC Fire Protection Systems at Basement 2 Security Room - Removal of Existing Fire Fighting Systems and Installation of ETA Supplied Fire Fighting Equipment #### JV Closure of the Opening in Parapet Wall on Elevation 4 for Spire Connection #### NSC Back Boxes for Seismic Detectors at Basement 5 and Level 2 Vault Rooms #### NSC BMS Monitor for the Revolving / Sliding Doors #### NSC Additional Screed at Road Type 2 and Ramps

ur

#REF!

#REF!

#REF!

ur

ETA to submit entitlements; Nakheel letter ref. JAP016/TS/GT/0285 dtd 23Jun08 reject the claim and no ERI's shall be issued JCI to submit entitlements

ur

#REF!

#REF!

#REF!

ur

11,682.47 ur 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 ur ur

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

11,682.47 ur 99,660.15 37,147.81 41,743.85 1,286.00 37,895.22 ur ur

Intherpro Cost + 12% OH&P + 3% attendances ETA to submit entitlements ETA cost + 12% OH&P + 3% Attendances Al Bayader cost + 12% OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Belgium Alkuminum cost + 12% OH&P +3 % Attend FBI + EVS cost + 12% OH&P + 3% Attend ETA to submit entitlements Al Abbar to submit entitlements

221 222 224 225 226

#### NSC Additional Requirements for Etisalat Room in Basement 1 (MEP Works) 002 #### JV Additional Requirements for Etisalat Room in Basement 1 (Door Amendments) 001 #### JV False Ceiling at Basement 5 Vault Lobby and Services Room (RFI No. 511) 002 #### NSC Fire Sprinkler above False Ceiling at Basement 5 Vault Lobby & Services Room (RFI No. 511) 001 #### NSC Vapour Barrier underneath all Parapet Composite Cladding of the 6 Wings and Diamond Exchange Centre 001R1 #### JV Modification to Louvers and Additional Aluminum Doors at Various Areas 001 #### NSC Additional 6" diam. Line from B5 Pump Room to S2 Level Fire Tank 001 #### NSC Paving and Landscaping Works at Ramps (originally under Wade Adams Scope) 001 #### NSC Planter Area at Level 2 - Change of 500mm thick Sweet Soil to Polysterene 001 #### JV Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) JV scope of works

32,364.90 404,090.45 305,837.13 25,300.00 35,000.25

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

32,364.90 404,090.45 305,837.13 25,300.00 35,000.25

cost from domestic subcons + 12%OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances Al Bayader cost + 12% OH&P + 3% Attendances AB cost + 12% OH&P + 3%Attend JV Internal Works

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--CLAIMS.monvabad

45 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
226

SUB NO.
002

ERI NO.

V.O. TO

DESCRIPTION

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) 110,641.50 JV COST (AED) #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! LETTER REFERENCE
#REF!

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED) 110,641.50

REMARKS / COMMENTS
ETA cost + 12% OH&P + 3% Attendances

229 237

001 001

#### NSC Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) MEP Scope of Works #### NSC Additional Works at Entrance Ramps - Type 3 & 5 #### NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00002 dated 10th July 2007 (Additional Voice / Data Points) #### NSC Additional Power Supply Lines for External Water Features, Irrigation Pumps, and Swimming Pool #### NSC Trimming of Cantilever Beams at the Diamond Exchange Center as per the RFI No. 1085 #### NSC Modification of Soffit Cladding for the Swimming Pool to Conceal Service Pipings as per the RFI No. 1054 #### NSC Structural Steel Support for Fans at Air Shaft #### NSC HVAC Systems at Basement 1 Control Room and Lobby as per RFI No. 1087 #### JV Additional Door Closer and Selector at Basement 1 Management Office #### #### #### JV JV JV Coring for the Tenant Fit-Out Contractors Additional Access Ladder at Penstock Chamber in Basement PC Supply4 Rates

16,654.95 34,599.52

#REF! #REF!

#REF! #REF!

#REF! #REF!

16,654.95 34,599.52

Al Bayader cost + 12% OH&P + 3% Attendances BC Cost + 7% OH&P; BC VO#7; BC time claim = 201 days

239

001

141,276.06

#REF!

#REF!

#REF!

141,276.06

ETA cost + 12% OH&P + 3% Attendances

240 241

001 001

ur ur

#REF! #REF!

#REF! #REF!

#REF!

ur ur

#REF!

note that the structural works was based on the structural drawings provided to EVS; EVS to submit entitlements AA to submit entitlements

242 243 244

001 001 001

340,314.96 13,460.75 1,732.06

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

340,314.96 13,460.75 1,732.06

ETA cost + 12% OH&P + 3% Att ETA cost + 12% OH&P + 3% Attendances Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22Dec-08 as per the email request of Mr. Clarence Pinto of DMCC dated 4Jan-09 as per the EHS requirements adjustment to the Contract Sums due to the PC Materials final rates

245 246 OM-10

001 001 001

ur ur (21,806.96)

#REF! #REF!

#REF! #REF!

#REF! #REF!

ur ur (21,806.96)

SUB-TOTAL TIME RELATED/ESCALATION CLAIMS


0 001 #### JV Delay in Site Mobilization Nominated Subcontractor Appointment (ETA) Delay of receipt of the Building Permit and "For Constructon" Drawings Delay in Raft Pour in Zones 1 & 2 Late Notification of Subcontractors Closure of Site and Offices (due to the death of Sheik Maktoom, 5-7 January 2006) 0.00 0.00 0.00 0.00 0.00 0.00

#REF!
#REF! 0.00 0.00 #REF! 0.00 0.00

#REF!
#REF!
#REF!

1,553,881.33
CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

3,928,851.11
This is due to the late possession of site as detailed in the referred letter.

4 6 7 8 9

001 001 001 001 001

#### #### #### #### ####

JV JV JV JV JV

JAP016/GEN/ABS/1051 dated 8Aug-06 JAP016/GEN/ABS/1051 dated 8Aug-06

rejected by Nakheel due to notice not served as per the required time period under the Contract. rejected by Nakheel due to notice not served as per the required time period under the Contract. progressed under a separate claim; time related claim. rejected by Nakheel due to dates relating to NSC in the Baseline Programme is not yet accepted. Rejected by Nakheel in accordance to Clause 44.1 of CoC, as 1 day is non working day and 2 days is not sufficient to award an entitlement; our letter ref. DXB/.Jly/5013 dtd 26Oct08 again requested for 2 days EOT time implications. To be included in the Prolongation Claims as this is a preliminaries items due to inclement weather conditions at site Potential Time Claim EOT of 585 days includes the previous 96 days and 138days claimed; Claim for additional pile works reduced to 132 from 138, thus reducing the overall claim to 579 days

#REF!

#REF! JAP016/TS/BW/0018 dated 31Oct-06 JAP016/GEN/ABS/1014 dated 24Jun-06, & JAP016/GEN/ ABS/1051 dated 8-Aug-06

39 45 49 119 127

001 001 001 001 001

#### #### #### #### ####

JV JV JV JV JV

Nomination of Landscaping Subcontractor Provision of Inspectors Exceptionally Adverse Climatic Conditions Notification of Potential Delay due to the Review of Shop Drawings Prolongation Costs

0.00 (valued in 127-001) 0.00 0.00 131,765,411.17

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

CLOSED CLOSED CLOSED CLOSED 131,765,411.17

127

002

####

JV

Additional Payment as a Result of the Escalating Cost of Materials Notice of Disruption of Work at Function Room/Ballroom due to Design Conflict Notification of a Potential Delay Determination of Scope of Work at L49, L50, & L51 (DMCC Floors) Special Holiday on 14th January 2008 Notice of Excessive Rains Delays due to Strong Winds Inspections not done on Timely Basis

711,983.12

#REF!

#REF!

#REF!

711,983.12

in connection to the prolongation claim

143 150 159 160 167 168

001 001 001 001 001 001

#### #### #### #### #### ####

JV JV JV JV JV JV

0.00 0.00 0.00 0.00 0.00 0.00

#REF! #REF! 0.00 #REF! 0.00 #REF!

#REF! #REF!

#REF! #REF!

CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

time claim. Time related claim to be submitted separately.

#REF!

JAP016/TS/GT/0259 dated 29May-08 #REF! JAP016/TS/GT/0152 dated 18Feb-08 #REF!

to be considered in the EOT claim under review for time entitlements rejected by Nakheel To be included in the Prolongation Claims

#REF!

SUB-TOTAL CLOSED CLAIMS WITHOUT ERI


5 10 29 30 43 001 001 001 001 001 #### JV Fuel Price Increases 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#REF!
0.00

#REF!
JAP016/GEN/ABS/1051 dated 8Aug-06

132,477,394.29
CLOSED

0.00
rejection letter ref. JAP016/GEN/ABS/1051 dated 8-Aug06 does not detail the reasons for rejection of Claim No. 5. ETA to submit entitlements; Permanent Power now in place done by ETA. KONE to submit entitlements; rejected by Nakheel due to Clause 20.1-Care of Works on the CoC. AA to submit entitlements; rejected by Nakheel due to Tech Specifications H11/20, Clause 871, and Clause 3b of CoC. request by WS Atkins and F&G in the Technical Meeting to provide 3rd party safety inspection and issue of certificate prior to CTU; rejected by Nakheel. rejected by F&G as it is included specs M13. rejected by F&G as per the response letter not done

#### NSC ETA Site Establishment (Provision of Temporary Power Supply) #### NSC Storage Area for KONE #### NSC Factory Inspections for Al Abbar #### JV CTU 3rd Party Inspection RFI No. 480 - Embedded Flush Tank Sanitary Ware Selection Disabled Toilets (CVI No. 052 dated 18th March 2007 increase of openings to blockwork walls to 1.00m) Disabled Toilet Change of Back of House Doors Colours from White to Gray Changes to the Floor Drain Locations Staircase at Levels 49-50 Notification of a Possible Variation at Ballroom Electrical Cabinet Doors Abortive Cost for GL-07 (ID Works Package)

0.00 0.00 0.00 0.00 0.00 0.00 0.00

(not provided) JAP016/TS/ABS/0004 dated 12Sep-06 JAP016/GEN/ABS/1070 dated 06-Sep-06 JAP016/TS/ABS/0031 dated 28Dec-06

CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

53 61 73

001 001 001

#### #### ####

JV JV JV

JAP016/TS/ALM/TCAC/06906 dated 14-Feb-07 JAP016/ALM/TCAC/06995 dated 18-Feb-2007 (not done)

75 90 120 129 162 172 190 193 223 223 227

001 001 001 001 001 001 001 001 001 002 001

#### #### #### #### #### ####

JV JV JV JV JV JV

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 447,120.00 1,625,886.10 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

(not done) (not done) (not done) (not done) JAP016/TS/GT/0186 dated 27Mar-08 JAP016/TS/GT/0228 dated 13May-08 JAP016/TS/GT/0204 dated 14Apr-08 JAP016/TS/GT/0233 dated 15mAY-08 JAP016/TS/GT/0324 dated 28Aug-08 JAP016/TS/GT/0324 dated 28Aug-08 JAP016/TS/BW/0352 dated 15Oct-08

CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

not done no claim from subcontractors coring works not done. staircase not done. under review. considered Nil due to the increase in the rates for GL-07 as per letter ref. Al Bayader to submit entitlements; claim notice rejected under review (done by Dubai Metals); rejected by Nakheel as it is part of MDS scope of works Naffco Costs +12% OH&P + 3% Attendances; not a new regulation as per the review of Jly ETA Cost + 12% OH&P + 3% Attendances; not a new regulation as per the review of Jly this cost to be by JV as per the Gen. Specs Section A, Item 1.03.d & 1.05

#### NSC Additional Work to Lightweight Concrete to Pedestrian Path (RFI No. 976) #### JV Additional Aluminum Angles at RAF Termination #### JV Temporary Wet Riser Systems (Supply and Delivery of Fire Pumps and Accessories) Temporary Wet Riser Systems (Installation, Testing & Commissioning, and Decomissioning) Extended Warranty due to the Usage of Jet Fans at Basement Levels as per the EHS Improvement Notice Entrance Canopy Panel - Down Light (T-39) and Camera Layout (CVI No. 126) Motorized dampers at B2L Security Room (RFI No. 1076 Rev. 0 & 1)

#### NSC #### NSC

232 235

001 001

#### NSC #### NSC

0.00 0.00

0.00 0.00

JAP016/TS/BW/0350 dated 14Oct-08 JAP016/TS/BW/0354 dated 9Nov-08

CLOSED CLOSED

Al Abbar to submit entitlements; rejected by Nakheel as the works is deemed included in Al Abbar scope ETA to submit full entitlements; rejected by M/s. Nakheel

SUB-TOTAL
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--CLAIMS.monvabad

46 - 53

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO.
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! #REF! #REF! #REF! 0 #REF! 0

SUB NO.
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! #REF! #REF! #REF! 0 #REF! 0

ERI NO.
#### #### #### 0 #### #### #### 0 #### #### #### 0 #### #### #### #### 0 #### 0

V.O. TO
#### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### ####

DESCRIPTION
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! #REF! #REF! #REF! 0 #REF! 0

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! NSC COST (AED) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! JV COST (AED) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

ER / F&G / JV AGREED VALUES


NSC COST (AED) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! LETTER REFERENCE
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

OUTSTANDING CLAIMS
JV COST (AED) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! NSC COST (AED) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

REMARKS / COMMENTS
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

52,764,973.04

54,996,143.95
107,761,116.98

CLAIM STATUS #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos.
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

NO. OF CLAIMS TO-DATE NO. OF CLAIMS WITH ERI NO. OF CLAIMS WITHOUT ERI NO. OF CLAIMS APPLIED NO. OF CLAIMS OUTSTANDING NO. OF AGREED CLAIMS NO. OF UNAGREED CLAIMS NO. OF CLAIMS TO JV NO. OF CLAIMS TO NSC

52,764,973.04

54,996,143.95

#REF! #REF!

#REF!

#REF! #REF!

#REF!

GRAND TOTAL

107,761,116.98

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--CLAIMS.monvabad

47 - 53

DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS

VARIATION CLAIMS STATUS TO-DATE


October 15, 2013
NOC NO. SUB NO. ERI NO. V.O. TO

DESCRIPTION

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) NSC COST (AED) JV COST (AED)

ER / F&G / JV AGREED VALUES


NSC COST (AED) LETTER REFERENCE

OUTSTANDING CLAIMS
JV COST (AED) NSC COST (AED)

REMARKS / COMMENTS

SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL

0.00 334,995.63 0.00 159,171.78 181,391.33 0.00 23,551.60 0.00 (383,650.51) 0.00 109,670.12 32,683,527.48 0.00 0.00 32,340.85 0.00 3,137,980.87 0.00 0.00 0.00 51,929.76 0.00 (277,596.39) (126,440.24) 0.00 0.00 0.00 0.00 3,843,063.24 3,882,147.78 (1,988.48) 1,771.88 0.00 7,275.43 26,634.44 (66,453.77) 0.00 40,174.50 0.00 (25,133.45) 0.00 85,383.20 0.00 0.00 612,662.92 4,044.20 764,729.70 0.00 1,706.32 (2,856.00) 155,609.44 6,584,157.21 0.00 0.00 0.00 135,593.62 90,502.31 0.00 64,706.19 7,855.65 294,350.71 40,216.65 26,674.18 75,687.99 0.00 26,765.20 0.00 125,634.44 0.00 37,185.25 0.00 0.00 0.00 1,553,881.33 132,477,394.29 447,120.00

0.00 501,971.39 1,193,235.54 0.00 0.00 80,097.04 0.00 2,071,622.24 0.00 333,540.00 2,610,489.22 19,764,437.23 2,430,700.00 1,566,116.20 0.00 262,569.93 1,579,708.41 4,929,761.78 0.00 41,685.20 0.00 2,951,483.26 0.00 (69,689.10) 102,143.27 0.00 43,688.96 1,402,455.42 3,696,022.85 0.00 0.00 0.00 0.00 0.00 172,273.32 0.00 0.00 0.00 34,309.10 236,210.00 597,081.20 0.00 1,198,302.72 0.00 0.00 0.00 0.00 506,665.14 133,301.39 0.00 0.00 3,601,000.31 394,252.82 56,553.22 29,808.00 484,392.65 334,816.75 16,050.00 0.00 0.00 (132,210.53) 0.00 0.00 151,224.89 0.00 10,637.50 150,193.45 1,073,889.80 354,891.15 0.00 33,846.52 0.00 66,615.70 3,928,851.11 0.00 1,625,886.10

0.00 #REF! #REF! 128,324.82 107,738.59 0.00 25,076.80 0.00 #REF! 0.00 #REF! #REF! #REF! 0.00 32,341.10 #REF! #REF! #REF! #REF! #REF! 51,929.76 #REF! (58,985.18) #REF! #REF! #REF! 0.00 #REF! #REF! 2,768,086.67 #REF! 1,587.60 #REF! 6,205.97 #REF! #REF! #REF! 40,074.53 0.00 #REF! #REF! 85,383.20 0.00 #REF! #REF! 3,315.73 #REF! #REF! #REF! #REF! 155,609.44 #REF! #REF! #REF! 0.00 #REF! #REF! 0.00 56,015.46 7,650.72 176,646.32 39,167.52 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00

0.00 #REF! #REF! 0.00 0.00 64,574.50 0.00 1,049,300.70 0.00 317,914.82 #REF! #REF! #REF! 678,543.71 0.00 #REF! #REF! #REF! #REF! #REF! 0.00 #REF! 0.00 #REF! #REF! #REF! 39,083.00 #REF! #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! #REF! #REF! 0.00 13,517.00 #REF! #REF! 0.00 1,198,302.71 #REF! #REF! 0.00 #REF! #REF! #REF! #REF! 0.00 #REF! #REF! #REF! 29,030.40 #REF! #REF! 12,895.64 0.00 0.00 #REF! 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00

0.00 56,840.00 0.00 0.00 0.00 0.00 0.00 0.00 (383,650.51) 0.00 7,538.64 #REF! 0.00 0.00 0.00 0.00 1,398,958.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 677,827.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 (25,133.45) 0.00 0.00 0.00 0.00 612,662.92 0.00 764,729.70 0.00 1,706.32 0.00 0.00 #REF! 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26,674.18 57,459.68 0.00 21,502.11 0.00 125,634.44 0.00 37,185.25 0.00 0.00 0.00 1,553,881.33 132,477,394.29 0.00

0.00 501,971.39 1,193,235.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 538,459.90 #REF! 2,430,700.00 0.00 0.00 262,569.93 1,579,708.41 4,929,761.78 0.00 17,577.75 0.00 2,951,483.26 0.00 (69,689.10) 102,143.27 0.00 0.00 1,402,455.42 20,545.90 0.00 0.00 0.00 0.00 0.00 172,273.32 0.00 0.00 0.00 0.00 236,210.00 597,081.20 0.00 0.00 0.00 0.00 0.00 0.00 506,665.14 133,301.39 0.00 0.00 3,601,000.31 394,252.82 56,553.22 0.00 484,392.65 334,816.75 0.00 0.00 0.00 (132,210.53) 0.00 0.00 151,224.89 0.00 0.00 150,193.45 1,073,889.80 354,891.15 0.00 33,846.52 0.00 66,615.70 3,928,851.11 0.00 0.00

CLAIM STATUS #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos. #REF! Nos.
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

NO. OF CLAIMS TO-DATE NO. OF CLAIMS WITH ERI NO. OF CLAIMS WITHOUT ERI NO. OF CLAIMS APPLIED NO. OF CLAIMS OUTSTANDING NO. OF AGREED CLAIMS NO. OF UNAGREED CLAIMS NO. OF CLAIMS TO JV NO. OF CLAIMS TO NSC

187,243,368.65

60,550,881.16

#REF! #REF!

#REF!

#REF! #REF!

#REF!

GRAND TOTAL

247,794,249.81

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--CLAIMS (2).monvabad

48 - 53

DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS

VARIATION CLAIMS STATUS TO-DATE


NOC NO. SUB NO. ERI NO. V.O. TO
CLAIM LETTER F&G/NAKHEEL's RESPONSE DATE LETTER REF. DATE

DESCRIPTION
LETTER REF.

CLAIM ENTITLEMENT APPLICATION


JV COST (AED)

OUTSTANDING CLAIMS WITHOUT ERI


TDB/P3/AM/CN-001A 17-Sep-05 16-May-06 JAP016/GEN/MF/873 JAP016/GEN/ABS/1006 11-Mar-06 11-Jun-06

001

####

JV

Design Modification of Pile Caps

DXB/AMT-01/0600/EDM/446

611,739.00

TDB/P3/AM/CN-002A

18-Sep-05 16-May-06

JAP016/GEN/MF/873 JAP016/GEN/ABS/1006

11-Mar-06 11-Jun-06

001

####

JV

Excavation to the difference in the Tender Drawings and the Actual Site Conditions

DXB/AMT-01/0600/EDM/446

259,943.16

DXB/AMT-01/0500/Jly/112

13-Nov-05 16-May-06

JAP016/GEN/MF/873 JAP016/GEN/ABS/1006

11-Mar-06 11-Jun-06

001

####

JV

Pile Head Levels and Associated Problem Additional OCP's conduits to the Offices and Retail Unts (Builders Work) Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms Enclosure to the Irrigation Pipes running through the LV Room 2 (RFI No. 894) Design Change to External Ramps - Block Stopper Upstand (CVI No. 086) Temporary Fire Alarm Systems (Material / Testing and Commissioning) Closure of the Opening in Parapet Wall on Elevation 4 for Spire Connection Additional Requirements for Etisalat Room in Basement 1 (Door Amendments)

DXB/AMT-01/0600/EDM/446

258,088.62

35 62 154 187 194 210 218

002b 001 001 001 002 001 002

#### #### #### #### #### #### ####

JV JV JV JV JV JV JV

DXB/AMT-01/0600/DAN/3032 DXB/AMT-01/0600/EDM/2507

18-Oct-07 11-Jul-07 JAP016/TS/GT/0078 26-Jul-07

120,370.11 12,494.21 1,600.56 108,691.73 82,800.00 11,682.47 1,286.00


JAP016/TS/BW/0370 18-Nov-08

DXB/AMT-01/0600/PMG/4679 DXB/AMT-01/0600/PMG/4691 DXB/AMT-01/0600/EDM/4041 DXB/AMT-01/0600/MIC/5089 DXB/AMT-01/0600/MIC/5039 DXB/AMT-01/0600/MIC/5051

05-Aug-08 09-Aug-08 21-Apr-08 16-Nov-08 05-Nov-08 08-Nov-08

219

001

####

JV

False Ceiling at Basement 5 Vault Lobby and Services Room (RFI No. 511)

DXB/AMT-01/0500/JLy/5137

25-Nov-08

JAP016/TS/BW/0388

21-Dec-08

37,895.22

DXB/AMT-01/0500/JLy/5270

30-Dec-08 22-Sep-08

221 226

001R1 #### 001 ####

JV JV

Modification to Louvers and Additional Aluminum Doors at Various Areas Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) JV scope of works

DXB/AMT-01/0600/MIC/4874

32,364.90 35,000.25

DXB/AMT-01/0600/MIC/5196

14-Dec-08

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Outstanding (JV) (2).monvabad

49 - 53

VARIATION CLAIMS STATUS TO-DATE


NOC NO. SUB NO. ERI NO. V.O. TO
CLAIM LETTER F&G/NAKHEEL's RESPONSE DATE LETTER REF. DATE

DESCRIPTION
LETTER REF. Additional Door Closer and Selector at Basement 1 Management Office PC Supply Rates

CLAIM ENTITLEMENT APPLICATION


JV COST (AED) 1,732.06 (21,806.96)

244 OM-10

001 001

#### ####

JV JV

DXB/AMT-01/0600/DAN/5315

13-Jan-09

DXB/AMT-01/0600/DAN/5092

16-Nov-08

TOTAL

1,553,881.33

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Outstanding (JV) (2).monvabad

50 - 53

CC- AL MAS TOWER PROJECT

JUMEIRAH LAKE TOWERS

CKAGE NO. 3 - MAIN BUILDING WORKS

CLAIMS STATUS TO-DATE


October 15, 2013
REMARKS / COMMENTS

progressed under a separate claim.

progressed under a separate claim.

progressed under a separate claim.

JV Cost

Revision 1 - revised due to the changes in the works.

#REF! JV's portion of the works JV thru Sibca to submit entitlements Intherpro Cost + 12% OH&P + 3% attendances Belgium Alkuminum cost + 12% OH&P +3 % Attend

FBI + EVS cost + 12% OH&P + 3% Attend

cost from domestic subcons + 12%OH&P + 3% Attendances

JV Internal Works

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Outstanding (JV) (2).monvabad

51 - 53

CLAIMS STATUS TO-DATE


October 15, 2013
REMARKS / COMMENTS

Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22Dec-08 adjustment to the Contract Sums due to the PC Materials final rates

\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Outstanding (JV) (2).monvabad

52 - 53

Vous aimerez peut-être aussi