5S Audit - Weekly Confirmation Audit
Zone
5S PRODUCTION Can the description criteria be met - Yes? Record 1
Audited by
ZONES CHECKLIST
Date
Can the description criteria be met - No? Record 0
1 All equipment and tooling in regular use. 2/ All tools re on counterbalance/chained to location Audit Result
There are no unnecessary stock items at Is there no more than 1 shift of any part number next to the build process
Separate.
2
work areas.
Is scrap, special material etc. clearly Specific area and all parts clearly marked & within reject & scrap area?
3
marked and segregated.
No cables, wiring, airlines lying or All should be secured in place.
4 hanging loose.
Is there only 1 part number type in a box, check there are no mixed
0 5 Parts separation. condition boxes.
If 5S score for Separate is less than 5 then Red Tag should take place in that zone
Are all stations and parts above line clearly identified with a standard
6 Are all areas clearly identified. label?
Straighten.
Are all parts stored in packaging specification and removed only before
7 Supplier parts. use? Special attention to light coloured parts & airb ags.
8 Storage areas and work stations are 1/ Are boxes under the stacking height limits?
designed for ease of use. 2/ Are boxes lineside only 1 high (tri-wall size)
Is there a place marked out for everything
9 All stock is stored in a fixed place.
Scrub.
Are small parts in supplier labelled containers & the floor free from all
13 The audit area is always clean and free small parts?
small parts.
Is the area clear of personal belongings?
14 Personal belongings.
Standardise.
Check 4S Instruction, is it displayed?
17 Monthly 4S Work Instruction
18 Signage or ODS standard 1) Ensure all signs are BOS ODS/Containments or manufactured
signs?
2) Doesthere
Ensure everyismachine/area haveequipment,
no poor standard a standardtaped
sign?cardboard etc
19 Is all equipment standard
Have all team members for the zone Are training matrices upto date, check 2 operators to matrix.
21 compeleted JCMS 5S training in the last
12 months
Systemise.
Is the 5S audit result displayed on a standard presentation?
22 Display of 5S Standards.
23 Improvement in 5S Has 5S audit stayed the same or improved since last audit
24 Are repeat 5S problems solved using Is there root cause or 5 why analysis for at least 3 of the repeat failures?
JCMS tools
0 25 Are countermeasures on a timing plan Is there a on time timing plan for at least 3 of the root cause failures
% Score
50%
Row 38 Row 41
40%
0 30%
20%
10%
0%
M 5-
Ju 4-
M 9-
Ju 0-
A 1-
S 8-
Ju 2-
Ju -
M -
7-
4-
26
1
1
1
g u
p e
n
y a
l
y a
y a
g u
p e
l
Row 39 Row 40