BEMCO Commitment to Quality

Quality is an obsession in BEMCOS culture. Strict Quality Control Procedures related to Management, Engineering, Procurement, Selection of Vendors/Subcontractors and at the construction site are designed to ensure the highest grade of excellence. Such meticulous procedures for quality produce client satisfaction, repeated business, and avoidance of risk. BEMCO scrutinizes down to the minor details its work to enhance not only the performance of the complete system it installs, but also to ensure that its finished work is pleasant. BEMCO is a pioneer Design, in obtaining and aesthetically

BEMCO was formed in 1965 as a Mechanical & Electrical Contracting Company. Thereafter, BEMCO expanded its experience to become a world-class Contractor in Industrial and Power Projects. Under this expansion, BEMCO has undertaken the largest and most challenging turnkey projects in Saudi Arabia and the Region using various state of the art technologies. Today BEMCO is a leading EPC Turnkey Contractor, comprising full-scale and integrated capabilities in Engineering, Procurement, Construction, Fabrication, and Start-up & Commissioning. BEMCO s Entrepreneurial Leadership restructured the company into three highly organized Business Units (Power, Industrial, Electromechanical and Large Civil Projects) enabling efficient management, providing sufficient flexibility to expand regionally by focusing on client satisfaction, quality and timely completion of projects. BEMCO is also diversifying its operation in project development and project financing under IPP & IWPP scheme to benefit from the Governments privatization initiatives. BEMCO is expanding regionally in the Middle East, Gulf and North Africa to become the leader in Power and Water projects as Developer and Contractor, working in conjunction with renowned international Engineering, Construction and Manufacturing Firms. BEMCO continues to enhance its capabilities to meet the challenges of the 21st century.

implementing the ISO 9001 Certification for Engineering. Management, Procurement and Construction since 1994. The continuous work implementation contributes to of such

quality

BEMCOs

reputation and credentials with all its clients and partners.

Henry M. Sarkissian

CEO

Arabian BEMCO has three distinct business units operating as profit centers. A dedicated Executive Director is responsible for running the day to day activities of each of the units and managing its engineering, procurement and construction activities. These business units coordinate and cooperate with each other in the execution of projects providing scope of their specialties, giving Arabian BEMCO a wealth of professional and specialized resources to integrate large projects and ensure their success.

1- Power Projects
Power Generation Transmission & Distribution

Page 6-11

2- Industrial Projects
Oil & Gas Refrigeration Water

Page 12-17

3- Civil & Electromechanical Projects


Commercial Projects Industrial Projects

Page 18-21

Power Generation Projects


BEMCOs experience and know-how in the power sector is unrivaled for its efficient and timely delivery of Projects. BEMCO has participated in the implementation of numerous, large and prestigious Power Projects, ranging from Simple Cycle to Combined Cycle Technology. BEMCO has undertaken on an EPC basis more than 16,000 MW of Power Generation Projects in the Kingdom of Saudi Arabia and in the Gulf Region. The Riyadh (KSA) Power Plant No.9 Combined Cycle (PP9) project is a typical example of Bemco prowess in the Power Generation sector; the project with a generation capacity of 5,980MW, was built on an area of 3.2 square kilometers.

>

PP9 Combined Cycle 5,980 MW Power Plant - Riyadh

16,000 MW
Combined Cycle Power Plants Simple Cycle Combustion Turbine Power Plants Conventional Steam Power Plants

An Achievement to the Record

680 MW PP9 Extension Fast Track

Letter of Appreciation

680 MW Power plant


Delivered in 5-1/2 months Total Capacity delivered in 7-1/2 months
In early 2004, Saudi Electricity Company (SEC) awarded Arabian Bemco Contracting Company a super rush project for 680MW extension to Power Plant No.9 in Riyadh with an unimaginable and unprecedented schedule of 7-1/2 months. The contract was signed on 1st February 2004 with first power delivered (170MW) by July 15th to meet the high power demand during the summer season. All other power delivery milestones were met culminating with the delivery of full power (680 MW) by mid September 2004.

Attn. Arabian Bemco Contracting Co. I received your letter dated 2/6/1425H Reference to the completion of the second extension of phase I of the Riyadh Power Plant No. 9 Rush Project as well as its handing over in record time. I thank you and all those who contributed to this accomplishment and I appreciate your efforts which resulted in such distinguished achievement. Minister of Power & Water Abdullah Bin Abdullrahman Al-Hussain

170 MW

380 kV GIS

380 kV Gas Insulated Bus Duct (GIB)

Transmission & Distribution


Bemco has executed over 30 High voltage substations on EPC Basis up to 400 KV with 10,000 MVA Transformer capacity using Gas insulated switchgear (GIS) and Air insulated switchgear (AIS) technologies. turnkey The scope of such projects has covered Procurement, Erection, Testing and

>10,000MVA
GIS & AIS High Voltage Substations High Tension Transmission Lines

Engineering,

Commissioning including civil works.

Among its many projects, Bemco has executed the 400 KV Substation in Aqaba, Jordan, which forms the first part of the station link interconnecting Egypt, Jordan, Syria, Iraq and Turkey. In addition, Bemco successfully completed two 380 KV substations in Hail & Taif, Saudi Arabia.

2,000,000 BPD Crude Oil Metering Station Riyadh

Oil & Gas


BEMCO executed on EPC basis a large number of Oil & Gas projects related to pumping, transferring, metering and

BEMCO is a General Contractor for construction Process responsibility controls, painting. Among the Oil & Gas projects Compressor Stations Off site Works Utilities works Plants for civil, in Hydrocarbon undertaking electrical, and

Oil & Gas


Bulk Oil Storage Facilities Refinery & Petrochemical Pipelines

mechanical, erection, instrumentation, piping, insulation

storage of hydrocarbon products totaling

>

100 Million Gallons Of Hydrocarbon Storage Facilities

executed for ARAMCO is the 519,000 Barrels Medinah bulk storage facility, the PP9 2,000,000 BPDD crude oil pipeline that ties into the east-west Saudi ARAMCO 48 inch pipeline and a Flare Tank Project for Luberef.

Cooling Water Pumps

Refrigeration
BEMCO executed on EPC basis a large number of central refrigeration and district cooling plants using technologies from centrifugal reciprocating and screw compression technologies to absorption technologies for applications in HVAC, district cooling and Gas Turbines Inlet air Cooling (TIAC) facilities for Power Plants. Among the refrigeration technology projects executed by Bemco is KAAU CUP#2 (Over 18,000 TR), KAAU CUP#2 Extension (Over 4,400 TR), Makkah and Madinah Haram (Over 35,000 TR), the Qatar District Cooling Plant #1 & 2 (Over 65,000 TR) and Gas Turbines Inlet air Cooling (TIAC) Plants in Jouba Hail Power Plants (Over 10,000 TR) and PP9 (over 50,000 TR)

>

400,000 Tones of Refrigeration

Central Refrigeration
Large Chiller Plants District Cooling Turbine Inlet Air Cooling

CentralReciprocatingChillerPlant

Sewage Water Treatment KKIA Riyadh 10,000 m3/day

Boweib Water Treatment Plant 60,000 m3/day

Water
BEMCO executed on EPC basis numerous water treatment plants using Reverse Osmosis technologies for seawater and brackish water desalination as well as industrial and domestic waste water treatment plants. In addition, BEMCO has undertaken large water pumping and transfer stations. Among BEMCOs list of projects are ARAMCOs Waste Water & Spent Caustic Systems & Juaymah Gas Plant (6,000 m3/day), New Doha Intl Airport Domestic Waste Water Treatment Plant (17,000 m3/day), Boweib Water Treatment Plant (60,000 m3/day), Salboukh Water Treatment Plant (60,000 m3/day), Royal Commission sea water intake pumping stations (180,000 m3/day), King Khaled International Airport Waste Water Sewage Treatment Plant (9,600 m3day)

Water & Sewage Treatment Industrial / Domestic Water Treatment Desalination Sea Water / Brackish (R.O) Pumping Stations Pipelines

Cooling Water Pumps

Refrigeration Compressors

Electromechanical
BEMCO has more than 30 years of experience in the Design, Supply, Installation, Testing and Commissioning of Mechanical, Electrical, and low current systems. BEMCO has undertaken a large number of complex projects on design and build basis and executed on a rush schedule to the full satisfaction of the Clients. Among these projects executed are Makkah and Madinah Holly Haram, the Four Seasons Hotel in Amman-Jordan, the Conference Center Palace in Riyadh and 300 villas in Hafr Al-Baten.

Large Commercial & Residential Complexes Holly Haram of Makkah and Madinah

Building Services Works

Royal Palaces, Luxury Hotels and High Rise Buildings

Industrial Electromechanical Works


Power Plants Industrial Plants

Medium Voltage Switchgear

Civil Projects
BEMCOs Civil Business Unit executes Civil Works for BEMCOs turnkey projects in the Power & Industrial Sector related to large Power Plants, Oil & Gas Facilities, Refrigeration and Water Projects. BEMCO also Executes the construction of large complexes as a general contractor for projects such as Housing and Commercial Buildings in PP9 and Shoaiba Power Plants.

Community Housing Projects

Commercial / Residential
High rise Buildings Industrial Buildings

Industrial
Power Plants Industrial Plants

Typical BOT Project Development Structure

Project Developer BEMCO Concessionaire Concessionaire

Financial & Technical Advisors

Equity25-30% Pension Funds Private Investors Off-taker

Debt-70-75%
Financial Institutions

PROJECT COMPANY

Multilateral, Bilateral Agencies

(Fuel or Feedstock Agreement)

O&M Contract

Off-taker Agreement

EPC Contract

Project Structured Financing and Projects Development


BEMCO has offered and implemented in some of its projects longterm Project Structured Financing as well as deferred payment options with tenures between 5-10 years. As the power sector evolves, BEMCO continues to pioneer this concept at the forefront of the movement.

PartialListofProjectDevelopmentStudiesandProposals
1,200 MW Shoaiba CC Power Plant 1991 Study and presentation conducted by GE, BECHTEL and BEMCO for SCECO West. 1,750 MW Shoaiba Steam Power Plant 1997, Official tender for BOO concept for SCECO West, Joint Venture BEMCO-ENRON. 1,050 MW Shoaiba Steam Power Plant 1998, Official Tender for Structured Project Financing for SCECO West, Joint Venture BEMCO-ENRON. 25,000m3/day STP -2000/2001, Official tender for BOT Concept for Jeddah Industrial City (JIC), Upgrading and Expansion of existing STP. 150MW CC Power Plant 2001, Tender for BOO Concept for Hadeed Iron and Steel Company. 480MW PP-9 Power Plant -2004, Implementation of Deferred Payment Project Financing. 350MW Marib-2 Power Plant 2005, Proposal for Long-term financing for the Ministry of Electricity in Yemen. 36,000 m3/day Desalination Plant 2006, Official tender for BOT concept for the General Authority of Civil Aviation (GACA) Joint Venture BEMCO - GE

BEMCO has initiated several concepts for the implementation of Independent Power Projects (IPP) in the Kingdom of Saudi Arabia. In this process, BEMCO has worked with International Developers in the Integration of the project development.

BEMCO has evolved to become a world class Power, Industrial and Civil Contractor with capabilities to Develop, Engineer, up and Procure, Commission Construct, Test, StartProjects on a turnkey basis. BEMCOs resources large permit implementation and vast the of

BEMCO utilizes a modern and systematic approach in the implementation of projects from its preaward phase of development, conceptual design, pricing, proposal preparation, bid submittal and negotiation; through the engineering, procurement and construction phase. BEMCOs vast resources of Manpower, Plant & Equipment, and Fabrication facilities in construction, coupled with its single point responsibility Project Management approach ensures customer satisfaction and success in the execution of its projects. BEMCOs IT infrastructure is a key ingredient to manage and track the progress of our projects. BEMCO has a centralized database with information being shared between its head office, branches and sites. We take pride in using state of the art ERP software such as J.D. Edwards and Primavera.

Large resources with over 18,000 direct employees, extensive fleet of construction equipment, vehicles and facilities, quick and swift mobilization. Over 2,200 Engineers in all disciplines including Civil, Electrical, mechanical, Instrumentation and Control. Highly qualified Engineering and Design group comprising over 400 Engineers, Designers and CAD Operators. Highly qualified technicians for specialized work; such as welding, high voltage cabling, others. Global procurement capabilities Large fabrication workshop with state of the art Equipments. Competitive standards pricing with international bidding

Testing & Commissioning Services and O&M


Project Management Planning and Scheduling Quality Control Cost Control Reporting

complex

projects in record time.


Procurement Sourcing Purchasing & Logistics

Start-up & Commissioning Operation & Maintenance Power plants & Substation, Protection & Control, Firefighting systems, HVAC

Project Evolution

Engineering Basic & Detailed Engineering

Fabrication Steel Structure Pipe pre-fabrication Skids Ducting

Erection Mechanical Erection, Electrical & Instrumentation Works

Award

Project Management
BEMCOs Project Management objective is to identify, monitor and correct any deviations from the original project scope of work quality, cost and schedule. To achieve the above objective, the following functions are monitored during project execution: Planning and Scheduling: Planning is performed to address as a minimum the following: Scope of work, assumptions and risks, execution strategy, specific contract requirements, engineering design, procurement, tasks and work break down, resources, construction requirements, inspection and test requirements, tooling and equipments supplies. Quality & Safety Control: Designed to ensure that all quality and safety requirements are implemented through all the stages of a project. Cash Flow Control: Designed to know the status of Billing and Collection during any stage of a project execution. Budget/Cost Control: Designed to check expenses on a project as they are incurred. It is intended to keep track of each cost element or cost center, to identify reasons for cost variance against budget of the item throughout the various stages of project. Contract Administration: Designed to secure legal and contractual rights for the company in an efficient and timely manner. This function is to be carried out jointly by the Project Manager and Contract Administration Section .

Management Philosophy
Each business line is led by a senior vice-president who is responsible for the projects in a vertical structure and responsible for business development, proposals

preparation, project execution and hand over.

GasTurbineElevationDesign

500MVATransformer,weight400tonsincludingtrailer,transportedtositeviaspecialtrailerequippedwith320wheels

Engineering
Engineering and Procurement Groups work closely with each other to ensure early sourcing of major and long-lead equipment and to ensure compliance with the technical requirements and customer specifications.
Quality Engineering in Turnkey EPC Industrial and Power projects is the essence of success. BEMCOs Professional group of engineers, designers and draftsmen provide conceptual designs from the proposal stage of a project all the way to detailed construction drawings and as-built drawings at the construction stage. The group utilizes computer aided design (CAD) systems for all its two and three dimensional designs, as well as state of the art engineering software for piping, electrical and structural designs and calculations. The Group is supported by its offices in Lebanon,

Procurement
Procurement for all projects is carried out in compliance with strict company policies and ISO certified procedures. The Procurement Business Process is stream-lined into the following basic phases, to ensure quality and timely delivery of materials to site. Vendor selection Ensuring specification compliance Expediting material production and delivery Achieving quality requirement, by arranging the quality tests Tracking shipments and site delivery To achieve a successful procurement performance, BEMCO utilizes J.D. Edwards and ERP system, to map and to allow recording of procurement data at all phases of the Business Process yielding detailed reports on each phase and for greater procurement control.

Egypt, India, and USA.

CNC Plasma and Gas Cutting Machine

CNC Beam Drilling and Saw Cutting Machine


BEMCO modern fabrication deliver quality expedited and and owns and a large, to high an automated erect on

Fabrication
Todays demanding construction market requires from qualified and successful contractors

Partial list of Fabrication:


Pressure tanks and vessels Pipe and electrical steel supports Pipe fabrication and welding 2 diameter and above Platforms, Ladders and Stairs Pumps and compressor skids complete with piping, tubing and electrical Steel Structures Pipe Spool

workshop

products

continuous

basis. This workshop facility consists of 80,000 sq.m. of fabrication floor space with resources, technicians, equipment engineers and and and It over 2,600 highly qualified management personnel. has basic ASME

extensive in house fabrication of various mechanical, structural

and electrical components for its turnkey projects.

detailed for

engineering capabilities and is certified pressure vessels.

BEMCO has its own Start-up & Commissioning, Operation & Maintenance service group (BEMCO Services Co.) professional engineers and This Group is a formidable team of specialized in Maintaining, technicians

SteamTurbine ShoaibaStage2,PhaseI Highest Quality Erection & Construction constitutes an essential part of a successful turnkey project. BEMCOs competences are demonstrated by the successful completion of major

Operating, Testing and Commissioning of Electrical and Mechanical systems for Industrial, Power and Commercial Projects. To support this well trained team, BMECO has assembled a large inventory of precision instruments and tools for the testing, commissioning and start-up of the projects.

industrial, power, electromechanical & civil projects. The significant in resources Engineering, and years of experience Procurement,

Partial list of System Testing Capabilities:


Hi-pot Testing of Cables LV, MV and HV Switchgears Protection and Intertip Relays Pilots Differential Protection Distance Relays Power Transformers MV Circuit Breakers Chilled Water Plants AHUs and FCUs CCMS Variable Frequencies Drivers PLC & DDC Controlled Systems

Construction, Mechanical Erection, Electrical and Instrumentation activities, along with a fully owned large modern and highly and quality efficient erect and fabrication construct the workshop highest

construction equipment enables BEMCO to projects.

ARABIAN BEMCO PROJECT & CONSTRUCTION MANAGEMENT

BEMCO INTERNATIONAL PROJECT & CONSTRUCTION MANAGEMENT (Lebanon)

Projects
BEMCO STEEL FABRICATIONS TRUBA ARABIA CO. ERECTION TEAM TECHMASTER INC. ILLINOIS, USA

Partial list of international companies with whom BEMCO has worked in the past and present:
Siemens Germany General Electric USA ABB Switzerland Alstom France AREVA - France Mitsui Japan Marubeni - Japan Mitsubishi Heavy Industries Japan Doosan Heavy Industries Korea Hitachi Japan Toshiba Japan Nuovo Pignone Italy YIT Finland Spie-Batignolles France Bechtel USA Lurgi Germany PB Power - UK Belleli Italy Foster Wheeler - Italy Shaw Group Inc. USA CBI USA Mot MacDonald - UK Black & Veatch USA TermoMeccanica Italy Korea Power Engineering Company (KOPEC) Korea Hyundai Heavy Industries Korea Ishikawajima-Harima Heavy Industries Co. (IHI) Japan Hitachi Zosen Japan International Power UK WATERLEAU Belgium APINA Spain CADAGUA Spain IBERINCO Spain Weir UK Enpropie France EFACEC Portugal DURO Felgueraca - Spain

BEMCO SERVICES
START-UP & COMMI. OPERATION & MAINTENANCE

TECHMASTER ENGG EGYPT & INDIA

GEDAC ELECTRIC
MANUFACTURING OF POWER, LIGHT. & ELEC. SYSTEMS

REGIONAL OFFICES
Bemco has formed strategic affiliated companies working as Profit Centers providing highly competitive and quality services.
BEMCO International (Offshore) in Lebanon takes responsibility on assigned projects, proposals, engineering, procurement and project management. TRUBA ARABIA is specialized in heavy Mechanical Erection works for Utility Boilers, large Steam & Gas Turbines, Petrochemical, Cement and Refinery Complexes. GEDAC has been at the forefront in the Middle East since 1978 manufacturing and assembling electrical switchgears and control panels in the medium and low voltage range. BEMCO Steel Industries (BSI) is specialized in manufacturing of structural and sheet steel, pre-fab pipes, skids ducts, vessels and tanks. BEMCO Services is specialized in Operation, Maintenance, Testing & Commissioning systems for Power, Industrial and Building Services. Impregilo Arabia is specialized in Engineering and Construction of infrastructure, high rise buildings, and marine works.

Partial List of Power Projects POWER GENERATION PROJECTS Qassim Power Plant Extension #2 Riyadh Power Plant No. 10 PP10 Construction of Qurayyah Open Cycle Power Plant PP9 A&B, Grass Root Combined Cycle Power Plant PP9, Blocks C&D PP9, Block F PP9, Grass Root Block E Al Fujairah IWPP Combined Cycle, U.A.E Aweer Power Plant, Dubai, U.A.E. Maarib power Plant, Yemen Sadaf Al-Jubail Co-Generation Tabouk Power Plant PP7 Extension Power Plant Asir Extension Power Plant Jizan extension Power Plant Najran Power Plant Tihama Power Plant Duba Power Plant Madina Extension Power Plant Hail Power Plant Extension New Doha International Airport (NDIA) - Qatar TRANSMISSION & DISTRIBUTION PROJETS Aqaba Substation Jordan Taif Substation Hail Substation Abha North Substation Sakaka & Al Jouf Reinforcement Idwa & Kilabiyah Substations Tufaih Substation Saudia City Substation Haram III Substation Al Aous Substation Nuzha Substation Safa Substation Sawamlah & Al Leith Substations Khayber Substation PP9 Gas Insulated Bus Duct Makkah Haram II Substation Madinah Haram II Substation Jeddah Ind. City II Substation Nuzlah Yamaniyah Substation Jeddah Rawdah Substation Jeddah Nahda Substation Nagah, Marwah, Bayah Substation Dubah & Joubah Substation Bayouniah & Al Khobar Al Sahiliah Substations Five (5) Substations at New Doha International Airport (NDIA) Qatar

224MW 3,000MW 2,565MW 1,800MW 1,700MW 1,000MW 680MW 255MW 490MW 490MW 250MW 170MW 500MW 225MW 225MW 350MW 170MW 80MW 170MW 85MW 40MW 400/132 KV GIS 480MVA 380/110 KV GIS 1,000 MVA 380/132 KV AIS/GIS 800MVA 132/33/13.8 KV AIS 386MVA 132/13.8 KV GIS 240 MVA 115 KV AIS 80MVA 115 KV AIS 80MVA 110 KV GIS 120 MVA 110 KV GIS 120 MVA 110 KV GIS 120 MVA 115KV 13.8 KV GIS 120 MVA 110 KV GIS 120 MVA 110/33/13.8 KV AIS 160 MVA 110/33/13.8 KV AIS 160 MVA 30 Km, 380 KV 110 KV GIS 160MVA 110 KV GIS 120MVA 110 KV GIS 120MVA 110 KV GIS 120MVA 110 KV GIS 120MVA 110 KV GIS 120MVA 110 KV GIS 120KVA 110/13.8 KV 120MVA 69/13.8 KV GIS 160MVA 66/11kV GIS 560 MVA

REFRIGERATION PROJECTS West Bay District Cooling Plant II 30,000 Tons - Qatar New Doha International Airport (NDIA) Chiller Plant 12,000 tons - Qatar Turbine Inlet Air Cooling System for Block C at PP9 (for 10 GTG Units) Turbine Inlet Air Cooling System for Block D at PP9 (for 10 GTG Units) Turbine Inlet Air Cooling System for Block E at PP9 (for 8 GTG Units) Turbine Inlet Air Cooling System for Block F at PP9 (for 12 GTG Units) Juba Turbine Inlet Air-cooling Project (for 9 GTG Units) Hail Turbine Inlet Air-cooling Project (for 5 GTG Units) KAAU Chiller, Seven Chiller Units (22,400 TR) with four Ice Storage Tanks (84,000 T/Hr) West Bay District Cooling Qatar, Refrigeration Capacity of 30,000 tons King Abdul Aziz University Piping, Installation of main chilled water pipes which links two chillers With other University facilities King Khalid National Guard Hospital A/C Plant, 4 Centrifugal Chillers King Fahd International Airport (I&II) Capacity of 15,000 tons King Abdul Aziz International Airport Jeddah, Replacement of evaporator and condenser Vessels Two chiller plants, and two ice Tanks Ajyad Central Chiller Plant, Capacity 60,000 tons central ARAMCOs Rastanura Refinery Upgrade, Laboratory & Refinery Operations Building Amino Plant, Capacity 3,000 tons/year Prophet Mosque Extension Chiller Plant, Capacity 21,000 tons WATER PROJECTS ARAMCOs Waste Water & Spent Caustic Systems at Juaymah Gas Plant 6,000 m3/day King Khalid International Airport Wastewater Treatment Capacity 10,000 m3/day Boweib Water Treatment Plants Capacity 60,000 m3/day Salboukh Water Treatment Plants Capacity 60,000 m3/day Seawater Pump House Upgrade Phase I, Capacity 60,000 m3/hr Seawater Pump House Upgrade Phase II, Capacity 60,000 m3/hr Qatar (NDIA) Waste Water Treatment Plant 17,000 m3/day Partial List of Civil Projects Maarib Power Plant Housing Complex - Yemen Shoaiba Power Plant Housing Complex Jeddah Power Plant 9 & Family Housing Complex Riyadh School Complex for Royal Commission - Yanbu Lab Bldg. ARAMCO, Ras Tanura New Doha International Airport (NDIA) Qatar Partial List of Electromechanical Projects New Doha International Airport (NDIA) Utility Systems - Qatar Al Habtour Grand Hotel Beirut Makkah Intercontinental Hotel Madinah Hotels Plot 131, 136, 141 Four Seasons Hotel Jordan Residential and Commercial Center - Makkah Ras Tanura Laboratory Saudi ARAMCO 300 Villas Hafr Al Batin Beirut Government Hospital (500 Bed) Beirut Conference Center Palace Riyadh King Fahad International Airport - Air Cargo Terminal - Dammam

Partial List of Industrial Projects OIL & GAS PROJECTS ARAMCOs Utility Upgrade at Juaymah Gas Plant ARAMCOs North West Bulk Plants (Traif, Al Jouf, Tabouk and Duba) ARAMCOs South West Bulk Plants (Najran, Abha and Jizan) ARAMCOs Madinah Bulk Plant Project 510,000 Barrels of product storage ARAMCOs Two Grade Gasoline Hydrocarbon Storage Facilities Luberef Flare & Tank Project