Académique Documents
Professionnel Documents
Culture Documents
7/16/2013
Irungattukottai
COIMBATORE
Irungattukottai
Cochin
CHENNAI
COIMBATORE
Emulsion SS 1 Packed
Emulsion RS 1 Packed
Emulsion SS 1 Packed
Emulsion RS 1 Packed
Emulsion - SS 1 - Bulk
Emulsion - RS 1 - Bulk
60/70
80/100
60/70
80/100
60/70
80/100
Diesel
Kerosene
Furnace oil
s3BB0
1
Basic Rate
Convyanc
rate
57590.00
1.69
36281.00
1.69
57590.00
1.69
36206.00
1.69
53648.00
32931.00
39921.00
39121.00
40021.00
39221.00
40886.00
40086.00
54.51
57.95
49.00
1.50
1.50
1.2763
1.2763
0.9924
0.9924
0.9924
0.9924
39715
38915
3
Irungattukottai
Cochin
Date
Emulsion - SS 1
Bulk
Emulsion - RS 1 Bulk
60/70
80/100
1-Jan-2013
52195.00
52345.00
52895.00
52895.00
53880.00
53880.00
52346.00
52596.00
51472.00
51562.00
51843.00
51753.00
53153.00
53648.00
31165.00
31365.00
31415.00
31415.00
31477.00
31477.00
31465.00
31775.00
32000.00
32112.00
32500.00
32388.00
32317.00
32931.00
37138.00
37428.00
37428.00
37428.00
37428.00
37428.00
37570.00
38070.00
38570.00
38750.00
39380.00
39200.00
39200.00
39921.00
36338.00
36628.00
36628.00
36628.00
36628.00
36628.00
36770.00
37270.00
37770.00
37950.00
38580.00
38400.00
38400.00
39121.00
16-Jan-2013
1-Feb-2013
16-Feb-2013
1-Mar-2013
16-Mar-2013
1-Apr-2013
16-Apr-2013
1-May-2013
16-May-2013
1-Jun-2013
16-Jun-2013
1-Jul-2013
16-Jul-2013
1-Aug-2013
16-Aug-2013
55263.00
33032.00
39921.00
39121.00
0
0
Coimbatore
Chennai
14.00%
2.00%
14.00%
2.00%
1.00%
1.00%
5.00%
5.00%
1-Sep-2013
16-Sep-2013
1-Oct-2013
16-Oct-2013
1-Nov-2013
16-Nov-2013
1-Dec-2013
16-Dec-2013
Name of work:
5/12/2012
Description
Basic Price
Detuct drum cost
Sub total
Excise Duty @
Education Cess ON ED @
Higher secondary Education
Cess ON ED @
Billable Price
VAT @
Total invoice value
Tamilnadu Vat @ 5%
Storage Charges on basic price
@
Detuct drum cost
Sub total
5.00%
5.00%
Conveyance
Least rate
Cochin
Cochin
Sub total
Aravakurichi
Distance
Avinashi
Distance
Bhavani
Distance
Dharapuram
Distance
Erode
Distance
60/70
80/100
Kangeyam
Distance
Karur
Distance
Kodumudi
Distance
Krishnarayapuram
Distance
Kulithalai
Distance
Madathukulam
Distance
Mulanoor
Distance
Palladam
Distance
Perundhurai
Distance
Tiruppurnorth
Distance
Tiruppursouth
Distance
Udumalapet
Distance
Vellkovil
Distance
70024.28
35670.29
60/70
80/100
Emulsion SS 1
34696.63
1.10.12
15.11.12
38737.50
37763.68
71095.82
35670.29
34696.63
70024.28
1-Oct-2012
16-Oct-2012
1-Nov-2012
16-Nov-2012
49550.00
52115.00
27815.00
29490.00
53145.00
30790.00
Distance
coefficient
Estimate
rate
Distance
Irungattukottai 77,552.00
428
Irungattukottai 48,570.00
428
COIMBATORE
COIMBATORE
2
2
2
2
2
2
2
2
Irungattukottai
Irungattukottai
Cochin
Cochin
CHENNAI
CHENNAI
COIMBATORE
COIMBATORE
COIMBATORE
10
11
Fuel charges
CHENNAI
60/70
80/100
60/70
80/100
Diesel
Kerosene
38103.00
38393.00
38393.00
38393.00
38393.00
38393.00
38535.00
39035.00
39535.00
39715.00
40345.00
40165.00
40165.00
40886.00
37303.00
37593.00
37593.00
37593.00
37593.00
37593.00
37735.00
38235.00
38735.00
38915.00
39545.00
39365.00
39365.00
40086.00
37238.00
37528.00
37528.00
37528.00
37528.00
37528.00
37670.00
38170.00
38670.00
38850.00
39480.00
39300.00
39300.00
40021.00
36438.00
36728.00
36728.00
36728.00
36728.00
36728.00
36870.00
37370.00
37870.00
38050.00
38680.00
38500.00
38500.00
39221.00
50.54
50.54
51.09
51.64
51.64
51.64
52.11
52.18
52.18
53.28
53.88
53.88
54.51
54.51
55.08
58.37
59.61
57.83
61.92
61.92
61.92
61.92
55.06
55.06
54.83
54.83
57.95
57.95
40886.00
40086.00
40021.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
39221.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
55.12
61.73
7/16/2013
As on
Sub Division
Cochin
Cochin
Irungattukottai
60/70
80/100
39,121.00
0.00
39,121.00
5,476.94
109.54
Coimbatore
Emulsion - Emulsion SS 1
RS 1
Packed
Packed
57,590.00
36,206.00
0.00
0.00
57,590.00
36,206.00
8,062.60
5,068.84
161.25
101.38
14.00%
2.00%
14.00%
2.00%
39,921.00
0.00
39,921.00
5,588.94
111.78
1.00%
1.00%
55.89
54.77
80.63
50.69
45,677.61
913.55
46,591.16
2,329.56
48,920.72
44,762.25
895.25
45,657.50
2,282.88
47,940.38
65,894.48
9,554.70
75,449.18
41,426.91
6,006.90
47,433.81
1,996.05
1,956.05
2,879.50
1,810.30
0.00
50,916.77
0.00
49,896.43
-1,500.00
76,828.68
-1,500.00
47,744.11
2.00%
14.50%
5.00%
5.00%
@ 5%
51223.02
51073.2
Aravakurichi
Karur
Palladam
Dharapuram
Erode
120 Km
x1.2763 x 2
= 306.31
51,223.08
0.92
51,224.00
461 Km
x1.2763 x 2
= 1176.75
51,073.18
0.82
51,074.00
125 Km
x1.69 x 1 =
211.25
77,039.93
0.07
77,040.00
125 Km
x1.69 x 1 =
211.25
47,955.36
0.64
47,956.00
50,916.77
49,896.43
76,828.68
47,744.11
271.00km
271.00km
119.00km
119.00km
271 Km
x1.2763 x 2
= 691.75
51,608.52
0.48
51,609.00
271 Km
x1.2763 x 2
= 691.75
50,588.18
0.82
50,589.00
119 Km
x1.69 x 1 =
201.11
77,029.79
0.21
77,030.00
119 Km
x1.69 x 1 =
201.11
47,945.22
0.78
47,946.00
120.00km
120.00km
125.00km
125.00km
120 Km
x1.2763 x 2
= 306.31
51,223.08
0.92
51,224.00
120 Km
x1.2763 x 2
= 306.31
50,202.74
0.26
50,203.00
125 Km
x1.69 x 1 =
211.25
77,039.93
0.07
77,040.00
125 Km
x1.69 x 1 =
211.25
47,955.36
0.64
47,956.00
284.00km
284.00km
94.30km
94.30km
284 Km
x1.2763 x 2
= 724.94
51,641.71
0.29
51,642.00
284 Km
x1.2763 x 2
= 724.94
50,621.37
0.63
50,622.00
94.3 Km
x1.69 x 1 =
159.37
76,988.05
0.95
76,989.00
94.3 Km
x1.69 x 1 =
159.37
47,903.48
0.52
47,904.00
249.00km
249.00km
73.90km
73.90km
249 Km
x1.2763 x 2
= 635.60
51,552.37
0.63
51,553.00
249 Km
x1.2763 x 2
= 635.60
50,532.03
0.97
50,533.00
73.9 Km
x1.69 x 1 =
124.89
76,953.57
0.43
76,954.00
73.9 Km
x1.69 x 1 =
124.89
47,869.00
0.00
47,869.00
302.70km
302.70km
100.00km
100.00km
Kangeyam
302.7 Km
x1.2763 x 2
= 772.67
51,689.44
0.56
51,690.00
302.7 Km
x1.2763 x 2
= 772.67
50,669.10
0.90
50,670.00
100 Km
x1.69 x 1 =
169.00
76,997.68
0.32
76,998.00
100 Km
x1.69 x 1 =
169.00
47,913.11
0.89
47,914.00
260.00km
260.00km
51.00km
51.00km
260 Km
x1.2763 x 2
= 663.68
51,580.45
0.55
51,581.00
Karur
Kodumudi
Krishnarayapuram
Kulithalai
260 Km
51 Km x1.69 51 Km x1.69
x1.2763 x 2
x 1 = 86.19 x 1 = 86.19
= 663.68
50,560.11
76,914.87
47,830.30
0.89
0.13
0.70
50,561.00
76,915.00
47,831.00
304.00km
304.00km
118.00km
118.00km
304 Km
x1.2763 x 2
= 775.99
51,692.76
0.24
51,693.00
304 Km
x1.2763 x 2
= 775.99
50,672.42
0.58
50,673.00
118 Km
x1.69 x 1 =
199.42
77,028.10
0.90
77,029.00
118 Km
x1.69 x 1 =
199.42
47,943.53
0.47
47,944.00
284.00km
284.00km
110.00km
110.00km
284 Km
x1.2763 x 2
= 724.94
51,641.71
0.29
51,642.00
284 Km
x1.2763 x 2
= 724.94
50,621.37
0.63
50,622.00
110 Km
x1.69 x 1 =
185.90
77,014.58
0.42
77,015.00
110 Km
x1.69 x 1 =
185.90
47,930.01
0.99
47,931.00
325.00km
325.00km
147.00km
147.00km
325 Km
x1.2763 x 2
= 829.60
51,746.37
0.63
51,747.00
325 Km
x1.2763 x 2
= 829.60
50,726.03
0.97
50,727.00
147 Km
x1.69 x 1 =
248.43
77,077.11
0.89
77,078.00
147 Km
x1.69 x 1 =
248.43
47,992.54
0.46
47,993.00
395.00km
395.00km
182.00km
182.00km
Madathukulam
Mulanoor
Palladam
Perundhurai
395 Km
x1.2763 x 2
= 1008.28
51,925.05
0.95
51,926.00
395 Km
x1.2763 x 2
= 1008.28
50,904.71
0.29
50,905.00
182 Km
x1.69 x 1 =
307.58
77,136.26
0.74
77,137.00
182 Km
x1.69 x 1 =
307.58
48,051.69
0.31
48,052.00
206.00km
206.00km
86.80km
86.80km
206 Km
x1.2763 x 2
= 525.84
51,442.61
0.39
51,443.00
206 Km
x1.2763 x 2
= 525.84
50,422.27
0.74
50,423.00
86.8 Km
x1.69 x 1 =
146.69
76,975.37
0.63
76,976.00
86.8 Km
x1.69 x 1 =
146.69
47,890.80
0.20
47,891.00
246.60km
246.60km
95.20km
95.20km
246.6 Km
x1.2763 x 2
= 629.47
51,546.24
0.76
51,547.00
246.6 Km
x1.2763 x 2
= 629.47
50,525.90
0.10
50,526.00
95.2 Km
x1.69 x 1 =
160.89
76,989.57
0.43
76,990.00
95.2 Km
x1.69 x 1 =
160.89
47,905.00
0.00
47,905.00
215.00km
215.00km
31.30km
31.30km
215 Km
x1.2763 x 2
= 548.81
51,465.58
0.42
51,466.00
215 Km
x1.2763 x 2
= 548.81
50,445.24
0.76
50,446.00
31.3 Km
x1.69 x 1 =
52.90
76,881.58
0.42
76,882.00
31.3 Km
x1.69 x 1 =
52.90
47,797.01
0.99
47,798.00
270.00km
270.00km
73.00km
73.00km
270 Km
x1.2763 x 2
= 689.20
51,605.97
0.03
51,606.00
Tiruppurnorth
229.00km
270 Km
73 Km x1.69 73 Km x1.69
x1.2763 x 2
x 1 = 123.37 x 1 = 123.37
= 689.20
50,585.63
76,952.05
47,867.48
0.38
0.95
0.52
50,586.00
76,953.00
47,868.00
229.00km
42.60km
42.60km
Tiruppursouth
229 Km
x1.2763 x 2
= 584.55
51,501.32
0.68
51,502.00
229 Km
x1.2763 x 2
= 584.55
50,480.98
0.02
50,481.00
42.6 Km
x1.69 x 1 =
71.99
76,900.67
0.33
76,901.00
42.6 Km
x1.69 x 1 =
71.99
47,816.10
0.90
47,817.00
239.00km
239.00km
36.00km
36.00km
239 Km
x1.2763 x 2
= 610.07
51,526.84
0.16
51,527.00
Udumalapet
Vellkovil
Difference
-3067.21
-3067.05
-1071.54
16.11.12
38177.50
37203.83
70782.99
239 Km
36 Km x1.69 36 Km x1.69
x1.2763 x 2
x 1 = 60.84 x 1 = 60.84
= 610.07
50,506.50
76,889.52
47,804.95
0.50
0.48
0.05
50,507.00
76,890.00
47,805.00
195.00km
195.00km
75.70km
75.70km
195 Km
x1.2763 x 2
= 497.76
51,414.53
0.47
51,415.00
195 Km
x1.2763 x 2
= 497.76
50,394.19
0.81
50,395.00
75.7 Km
x1.69 x 1 =
127.93
76,956.61
0.39
76,957.00
75.7 Km
x1.69 x 1 =
127.93
47,872.04
0.96
47,873.00
281.00km
281.00km
80.20km
80.20km
281 Km
x1.2763 x 2
= 717.28
51,634.05
0.95
51,635.00
281 Km
x1.2763 x 2
= 717.28
50,613.71
0.29
50,614.00
80.2 Km
x1.69 x 1 =
135.54
76,964.22
0.78
76,965.00
80.2 Km
x1.69 x 1 =
135.54
47,879.65
0.35
47,880.00
Difference
-560.00
-559.85
-312.83
31828.00
29308.00
29308.00
31368.00
31028.00
28508.00
28508.00
30568.00
77,040.00
125
47,956.00
125
77,766.00
48,231.00
51,224.00
51,074.00
51,260.00
50,259.00
51,253.00
50,252.00
54.51
57.95
49.00
428
428
120
461
461
461
44
44
114.42%
59784
100.00%
52249.61
114.42%
37719
100.00%
32965.39
55414
12
l charges
13
14
Coimbatore
Furnace oil
43.34
46.98
46.80
46.98
47.97
47.97
47.58
47.38
47.39
48.38
46.42
48.59
50.95
49.00
15
16
Irungattukottai
56020.00
56170.00
56720.00
56720.00
57705.00
57705.00
56171.00
56421.33
55414.00
55504.00
55785.00
55695.00
57095.00
57590.00
38665.00
34615.00
34665.00
34665.00
34727.00
34727.00
34715.00
36526.62
35350.00
35462.00
35850.00
35738.00
35667.00
36206.00
56020.00
56170.00
56720.00
56720.00
57705.00
57705.00
56171.00
56171.00
55414.00
55504.00
55785.00
55695.00
57095.00
57590.00
38665.00
34615.00
34665.00
34665.00
34727.00
34727.00
34715.00
34715.00
35350.00
35462.00
35850.00
35738.00
35667.00
36281.00
17
Chennai
60/70
48.54
59204.99
36307.67
59204.99
36382.00
Division Tiruppur
Sub Division Avinashi
Coimbatore
Chennai
Irungattukottai
Emulsion - Emulsion SS 1
RS 1
Packed
Packed
57,590.00
36,281.00
0.00
0.00
57,590.00
36,281.00
8,062.60
5,079.34
161.25
101.59
60/70
80/100
60/70
80/100
40,886.00
0.00
40,886.00
5,724.04
114.48
40,086.00
0.00
40,086.00
5,612.04
112.24
40,021.00
0.00
40,021.00
5,602.94
112.06
39,221.00
0.00
39,221.00
5,490.94
109.82
57.24
56.12
56.03
54.91
80.63
50.79
46,781.76
2,339.09
49,120.85
45,866.40
2,293.32
48,159.72
45,792.03
2,289.60
48,081.63
44,876.67
2,243.83
47,120.50
65,894.48
9,554.70
75,449.18
41,512.72
6,019.34
47,532.06
2,044.30
2,004.30
2,001.05
1,961.05
2,879.50
1,814.05
0.00
51,165.15
0.00
50,164.02
0.00
50,082.68
0.00
49,081.55
-1,500.00
76,828.68
-1,500.00
47,846.11
44 Km
x0.9924 x 2
= 87.33
51,252.48
0.52
51,253.00
428 Km
x1.69 x 1 =
723.32
77,552.00
0.00
77,552.00
428 Km
x1.69 x 1 =
723.32
48,569.43
0.57
48,570.00
51,165.15
50,164.02
50,082.68
49,081.55
76,828.68
47,846.11
125.00km
125.00km
410.00km
410.00km
398.00km
398.00km
398 Km
x1.69 x 1 =
672.62
77,501.30
0.70
77,502.00
398 Km
x1.69 x 1 =
672.62
48,518.73
0.27
48,519.00
461.00km
428.00km
428.00km
428 Km
x1.69 x 1 =
723.32
77,552.00
0.00
77,552.00
428 Km
x1.69 x 1 =
723.32
48,569.43
0.57
48,570.00
402.00km
372.00km
372.00km
372 Km
x1.69 x 1 =
628.68
77,457.36
0.64
77,458.00
372 Km
x1.69 x 1 =
628.68
48,474.79
0.21
48,475.00
456.00km
444.00km
444.00km
444 Km
x1.69 x 1 =
750.36
77,579.04
0.96
77,580.00
444 Km
x1.69 x 1 =
750.36
48,596.47
0.53
48,597.00
380.00km
380.00km
125 Km
x0.9924 x 2
= 248.10
51,413.25
0.75
51,414.00
44.00km
44 Km
x0.9924 x 2
= 87.33
51,252.48
0.52
51,253.00
107.00km
107 Km
x0.9924 x 2
= 212.37
51,377.52
0.48
51,378.00
80.50km
80.5 Km
x0.9924 x 2
= 159.78
51,324.93
0.07
51,325.00
100.00km
44.00km
107.00km
80.50km
100.00km
461.00km
402.00km
456.00km
400.00km
400.00km
100 Km
x0.9924 x 2
= 198.48
51,363.63
0.37
51,364.00
70.00km
70 Km
x0.9924 x 2
= 138.94
51,304.09
0.91
51,305.00
129.00km
129 Km
x0.9924 x 2
= 256.04
51,421.19
0.81
51,422.00
107.00km
107 Km
x0.9924 x 2
= 212.37
51,377.52
0.48
51,378.00
154.00km
154 Km
x0.9924 x 2
= 305.66
51,470.81
0.19
51,471.00
170.00km
380 Km
x1.69 x 1 =
642.20
77,470.88
0.12
77,471.00
380 Km
x1.69 x 1 =
642.20
48,488.31
0.69
48,489.00
444.00km
446.00km
446.00km
446 Km
x1.69 x 1 =
753.74
77,582.42
0.58
77,583.00
446 Km
x1.69 x 1 =
753.74
48,599.85
0.15
48,600.00
383.00km
371.00km
371.00km
371 Km
x1.69 x 1 =
626.99
77,455.67
0.33
77,456.00
371 Km
x1.69 x 1 =
626.99
48,473.10
0.90
48,474.00
411.00km
427.00km
427.00km
427 Km
x1.69 x 1 =
721.63
77,550.31
0.69
77,551.00
427 Km
x1.69 x 1 =
721.63
48,567.74
0.26
48,568.00
358.00km
345.00km
345.00km
345 Km
x1.69 x 1 =
583.05
77,411.73
0.27
77,412.00
345 Km
x1.69 x 1 =
583.05
48,429.16
0.84
48,430.00
332.00km
332.00km
70.00km
129.00km
107.00km
154.00km
170.00km
444.00km
383.00km
411.00km
358.00km
365.00km
365.00km
170 Km
x0.9924 x 2
= 337.42
51,502.57
0.43
51,503.00
81.00km
81 Km
x0.9924 x 2
= 160.77
51,325.92
0.08
51,326.00
102.00km
102 Km
x0.9924 x 2
= 202.45
51,367.60
0.40
51,368.00
38.30km
38.3 Km
x0.9924 x 2
= 76.02
51,241.17
0.83
51,242.00
82.30km
82.3 Km
x0.9924 x 2
= 163.35
51,328.50
0.50
51,329.00
52.30km
332 Km
x1.69 x 1 =
561.08
77,389.76
0.24
77,390.00
332 Km
x1.69 x 1 =
561.08
48,407.19
0.81
48,408.00
510.00km
498.00km
498.00km
498 Km
x1.69 x 1 =
841.62
77,670.30
0.70
77,671.00
498 Km
x1.69 x 1 =
841.62
48,687.73
0.27
48,688.00
435.00km
423.00km
423.00km
423 Km
x1.69 x 1 =
714.87
77,543.55
0.45
77,544.00
423 Km
x1.69 x 1 =
714.87
48,560.98
0.02
48,561.00
477.00km
467.00km
467.00km
467 Km
x1.69 x 1 =
789.23
77,617.91
0.09
77,618.00
467 Km
x1.69 x 1 =
789.23
48,635.34
0.66
48,636.00
423.00km
414.00km
414.00km
414 Km
x1.69 x 1 =
699.66
77,528.34
0.66
77,529.00
414 Km
x1.69 x 1 =
699.66
48,545.77
0.23
48,546.00
450.00km
450.00km
81.00km
102.00km
38.30km
82.30km
52.30km
510.00km
435.00km
477.00km
423.00km
460.00km
460.00km
52.3 Km
x0.9924 x 2
= 103.81
51,268.96
0.04
51,269.00
52.30km
52.3 Km
x0.9924 x 2
= 103.81
51,268.96
0.04
51,269.00
70.00km
70 Km
x0.9924 x 2
= 138.94
51,304.09
0.91
51,305.00
86.80km
86.8 Km
x0.9924 x 2
= 172.28
51,337.43
0.57
51,338.00
450 Km
x1.69 x 1 =
760.50
77,589.18
0.82
77,590.00
450 Km
x1.69 x 1 =
760.50
48,606.61
0.39
48,607.00
460.00km
450.00km
450.00km
450 Km
x1.69 x 1 =
760.50
77,589.18
0.82
77,590.00
450 Km
x1.69 x 1 =
760.50
48,606.61
0.39
48,607.00
496.00km
483.00km
483.00km
483 Km
x1.69 x 1 =
816.27
77,644.95
0.05
77,645.00
483 Km
x1.69 x 1 =
816.27
48,662.38
0.62
48,663.00
425.00km
413.00km
413.00km
413 Km
x1.69 x 1 =
697.97
77,526.65
0.35
77,527.00
413 Km
x1.69 x 1 =
697.97
48,544.08
0.92
48,545.00
52.30km
70.00km
86.80km
460.00km
496.00km
425.00km
Diesel
Month
Tiruppur
Chennai
Excise Duty
@
Education
Cess ON
ED @
66026
60.46
60.46
60.96
1-Jan-13
50.54
50.13
14.0%
2%
18-Jan-13
51.09
50.68
14.0%
2%
15-Feb-13
51.64
51.23
14.0%
2%
22-Mar-13
52.19
51.78
14.0%
2%
1-Apr-13
52.11
51.78
14.0%
2%
15-Apr-13
52.18
51.82
14.0%
2%
10-May-13
53.28
52.92
14.0%
2%
31-May-13
53.88
52.92
14.0%
2%
1-Jun-13
53.88
53.93
14.0%
2%
14.0%
14.0%
14.0%
2%
2%
2%
14.0%
2%
14.0%
2%
61917.88
58.71
14.0%
14.0%
2%
2%
14.0%
2%
14.0%
2%
14.0%
2%
14.0%
2%
14.0%
2%
14.0%
2%
14.0%
2%
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
2%
2%
2%
2%
2%
2%
2%
2%
2%
2%
2%
Irungattukottai
Emulsion SS 1 Bulk
Emulsion RS 1 Bulk
53,648.00
0.00
53,648.00
7,510.72
150.21
32,931.00
0.00
32,931.00
4,610.34
92.21
75.11
46.10
61,384.04
8,900.69
70,284.73
3,514.24
37,679.65
5,463.55
43,143.20
2,157.16
2,682.40
1,646.55
0.00
76,481.37
0.00
46,946.91
3,942.00
788.4
0.00
46,946.91
398.00km
398.00km
428.00km
372.00km
444.00km
380.00km
1500
1,500.00
446.00km
371.00km
427.00km
345.00km
332.00km
47,942.91
0.09
47,943.00
498.00km
498.00km
423.00km
467.00km
414.00km
450.00km
450.00km
483.00km
413.00km
Higher
secondary
Education
Cess ON
ED @
Emulsion
VAT @
Bitumen
VAT @
Bitumen
Central VAT
@
Storage
Charges on
basic price
@
Date
1%
14.5%
5%
2%
5%
1-Jan-2012
1%
14.5%
5%
2%
5%
16-Jan-2012
1%
14.5%
5%
2%
5%
1-Feb-2012
1%
14.5%
5%
2%
5%
16-Feb-2012
1%
14.5%
5%
2%
5%
1-Mar-2012
1%
14.5%
5%
2%
5%
16-Mar-2012
1%
14.5%
5%
2%
5%
1-Apr-2012
1%
14.5%
5%
2%
5%
16-Apr-2012
1%
14.5%
5%
2%
5%
1-May-2012
1%
1%
1%
14.5%
14.5%
14.5%
5%
5%
5%
2%
2%
2%
5%
5%
5%
16-May-2012
1-Jun-2012
16-Jun-2012
1%
14.5%
5%
2%
5%
1-Jul-2012
1%
14.5%
5%
2%
5%
16-Jul-2012
1%
1%
14.5%
14.5%
5%
5%
2%
2%
5%
5%
1-Aug-2012
16-Aug-2012
1%
14.5%
5%
2%
5%
1-Sep-2012
1%
14.5%
5%
2%
5%
16-Sep-2012
1%
14.5%
5%
2%
5%
1-Oct-2012
1%
14.5%
5%
2%
5%
16-Oct-2012
1%
14.5%
5%
2%
5%
1-Nov-2012
1%
14.5%
5%
2%
5%
16-Nov-2012
1%
14.5%
5%
2%
5%
1-Dec-2012
1%
1%
1%
1%
1%
1%
1%
1%
1%
1%
1%
14.5%
14.5%
14.5%
14.5%
14.5%
14.5%
14.5%
14.5%
14.5%
14.5%
14.5%
5%
5%
5%
5%
5%
5%
5%
5%
5%
5%
5%
2%
2%
2%
2%
2%
2%
2%
2%
2%
2%
2%
5%
5%
5%
5%
5%
5%
5%
5%
5%
5%
5%
16-Dec-2012
53.53 Most Recent price change date: Saturday, June 01, 2013
52.92
51.78 Historical Diesel price change date: Saturday, May 11, 2013
3/23/2013
51.78
2/16/2013
51.23 Historical Diesel price change date: Monday, April 01, 2013
1/18/2013
50.68
1/1/2013
10/27/2013
9/14/2012
8/1/2012
6/25/2012
7/1/2011
6/25/2011
11/2/2011
50.13 Historical Diesel price change date: Saturday, March 23, 2013
50.16
49.98 Historical Diesel price change date: Saturday, February 16, 2013
44.76
43.83 Historical Diesel price change date: Friday, January 18, 2013
43.95
43.8 Historical Diesel price change date: Tuesday, January 01, 2013
40.16
3 Rs/Ltr
2 Rs/Ltr
8 Rs/Ltr
8 Rs/Ltr
3 Rs/Ltr
8 Rs/Ltr
3 Rs/Ltr
6 Rs/Ltr
6 Rs/Ltr
8 Rs/Ltr
6 Rs/Ltr
3 Rs/Ltr
5 Rs/Ltr
Sub Division:Avinashi
Date:
7/16/2013
Division: Tiruppur
COIMBAT
Emulsion ORE
SS 1 Packed
Packed
Earth
Gravel
Metal
Sand
Quarry
1 Km
3 Km
12 Km
80 Km
CMP
1 Km
3 Km
3 Km
49 Km
125.00 Km
77,039.81
71,265.00
-5,774.81
Avinashi
Sub Division
Name of work:
Reach
Cochin
60/70
120.00 Km
51,223.02
39,510.02
-11,713.00
Cochin
80/100
461.00 Km
51,073.20
38,470.00
-12,603.20 Aravakurichi
Avinashi
Bhavani
Dharapuram
Erode
Irungattukottai 1.50/RTKM
Hincol invoice
dated:01.08.2011
Kangeyam
Karur
Kodumudi
Krishnarayapuram
Cochin
1.28/RTKM
CHENNAI
0.9924
COIMBATORE
0.9924
COIMBATORE
Least rate
1.69
Hincol invoice
dated:01.08.2011
Kulithalai
Cochin
60/70
51,223.02
Madathukulam
Cochin
80/100
51,073.20
Mulanoor
COIMBAT
Emulsion ORE
SS 1 Packed
Packed
125
77,039.81
Palladam
Perundhurai
7/16/2013
Irungattu
Emulsion kottai
SS 1 Packed
Packed
Irungattu
Emulsion kottai
SS 1 Bulk
Bulk
COIMBAT
Emulsion ORE
RS 1 Packed
Packed
Irungattu
Emulsion kottai
RS 1 Packed
Packed
Irungattu
Emulsion kottai
RS 1 Bulk
Bulk
CHENNAI
60/70
Distance
Tiruppurnorth
a
Tiruppursouth
428.00 Km
77,552.00
Udumalapet
428.00 Km
77,766.00
Vellkovil
125.00 Km
47,956.00
428.00 Km
48,570.00
428.00 Km
48,231.00
461.00 Km
51,260.00
50,259.00
51,223.02
51,073.20
51,253.00
80/100
461.00 Km
Cochin
60/70
120.00 Km
Cochin
80/100
461.00 Km
COIMBATORE 60/70
44.00 Km
CHENNAI
Estimate rate
COIMBATORE80/100
Diesel
Kerosene
Furnace oil
44.00 Km
50,252.00
Diesel
Kerosene
Furnace
oil
54.51
Emulsion SS 1 Bulk
Emulsion RS 1 Packed
Least rate
57.95
49.00
51,073.20 c
47,956.00
#N/A
HINDUSTAN
COLAS
LIMITED. A-9,
SIPCOTand
Industrial
Kancheepuram
Data
for Bitumenious
concrete
SDBCPark,IRUNGATTUKOTTAI,Dist.
40 are to be revised with reference
to the IRC-111-2009 Specificati
Manali Refinery, Manali Chennai (Madras) - 600068
Hindustan Colas Limited AA-9,SIPCOT Industrial Park, Irungattukottai - 602105.
SDBC
To
Cochin
Cochin Coimbator
Irungattuk
Coimbator
Chennai
Bitumen Bitumen
eottai
e Bitumen
Bitumen
60/70
80/100 Emulsion
Emulsion
271
410
119
125
398
410
120
461
125
44
428
461
284
402
94.3
107
372
402
249
456
73.9
80.5
444
456
302.7
276.5
100
100
380
400
Metal
Quarry
Metal
CMP
gravel
Quarry
gravel
CMP
15
12
12
5
22
12
3
3
7
12
4
3
3
3
3
5
3
3
3
3
260
250
51
70
446
444
10
10
304
284
325
302
411
358
118
110
147
129
107
154
371
427
345
383
411
358
12
12
12
2
3
3
3
3
3
3
3
3
395
365
182
170
332
365
39
10
206
510
86.8
81
498
510
24
246.6
263.2
95.2
102
423
435
215
477
31.3
38.3
467
477
12
270
275
73
82.3
414
423
12
229
460
42.6
52.3
450
460
239
239
36
52.3
450
460
14
12
195
496
75.7
70
483
496
12
281
278.2
80.2
86.8
413
425
12
on Designs ,Highways,Chennai data book and CEs Circulars.Engineers are requested to verify and up date the data frequently if any
ceived from higher authorities.
wing distances are approximate distances.Taken from google map.Engineers are requesed to calculate actual
with reference to the hard copy
Division
Karur
Tiruppur
Erode
Dharapuram
Erode
Tiruppur
Karur
Erode
Karur
Karur
Dharapuram
Dharapuram
Sub
Sugested route
Division
Aravakuri
chi
Tiruppur
Tiruppur
Dharapuram
Avinashi
3.
Dharapuram
Kangeyam
Karur
296.2
89
70.6
40
71.2
0.6
20
296.2
4.8
lai, Dharapuram,Mulanur
ia) Trissur,Vadakancherry,Pollachi,Dharapuram
lai, Dharapuram
ia) Trissur,Vadakancherry, Palakad,Coimbatore,Avinashi, Perundurai
) Trissur,Vadakancherry, Palakad,Coimbatore,Palladam, Kangyam
SH 21 (via) Trissur,Vadakancherry,Pollachi,Palladam,Tiruppur,Perundurai
) Trissur,Vadakancherry, Palakad,Coimbatore,Palladam
SH 21 (via) Trissur,Vadakancherry,Pollachi,Palladam
SH 21 (via) Trissur,Vadakancherry, Pollachi,Dharapuram,Mulanur,Aravakuraichi
NH 81 (via) Trissur,Vadakancherry, Palakad,Coimbatore,Palladam,Kangeyam, Vellaokoil
SH 21 (via) Trissur,Pollachi,Dharapuram,Mulanur
) Trissur,Pallakadu,Malumichampatty,Sulur,Palladam,Koduvai Dharapuram
i,Dharapuram
) Trissur,Pallakadu,Malumichampatty,Sulur
SH 19 (via) Trissur,Vadakancherry, Pollachi
ia) Trissur,Pallakadu,Malumichampatty,Avinashi,Perundhurai
) Trissur,Vadakancherry,Pollachi,Palladam,Tiruppur,Perundhurai
) Trissur,Pallakadu,Malumichampatty,Sulur,Karanampettai, Samalapuram,Avinashi
SH 19 (via) Trissur,Vadakancherry,Pollachi,Palladam
Udumalai,Palladam
) Trissur,Pallakadu,Malumichampatty,Sulur,Karanampettai, Samalapuram,Avinashi
SH 19 (via) Trissur,Vadakancherry,Pollachi,Palladam
Udumalai,Palladam
) Trissur,Vadakancherry,Pollachi
) Trissur,Vadakancherry,Pollachi,Palladam,Dharapuram
NH 81 (via) Trissur,Pallakadu,Malumichampatty,Sulur,Palladam,Kangeyam
Udumalai,Dharapuram,Vellakoil
neries) Km 0/0-89/0
68/4-239/0 (Up to Vadakkanchery)
- Muthalamada - Gopalapuram km 0/0 - 40/0 (Kerala SH 58)
via) Meenkarai km 99/6-28/4
Date:
7/16/2013
13 Km
12 Km
Gravel
3 Km
Sand
94 Km
Lime Powder
25 Km
Bitumen - CMP
220 Km
Emulsion - site
45 Km
420 Km
225 Km
0.99924
1.2763
1.69
COST OF MATERIALS
Diesel
54.51
Oil
49.00
Kerosine
57.95
Head Mazdoor
266.00
Mazdoor I
258.00
Mazdoor II
231.00
57590.00
36206.00
39121.00
39921.00
0.00
Furnace Oil
49.00
GSB Lead
23
Granular 53 -- 22.40 Gr
13
780.67
98.10
878.77
13
473.60
98.10
571.70
Granular 4.75 Gr
13
440.00
98.10
538.10
Quarry fines
13
92.40
67.95
160.35
WMM 45-22.4
13
810.60
98.10
908.70
WMM 22.4-2.36
13
662.86
98.10
760.96
12
440.00
91.40
531.40
12
773.00
91.40
864.40 CMP
12
731.00
91.40
822.40 CMP
12
731.00
91.40
822.40 CMP
12
1061.00
91.40
1152.40 CMP
13.20 mm IRC
12
983.00
91.40
1074.40 CMP
12
668.00
91.40
759.40 CMP
6.70 mm IRC
12
496.00
91.40
587.40 CMP
6.00 mm IRC
12
496.00
91.40
587.40 CMP
5.60 mm IRC
12
496.00
91.40
587.40 CMP
4.75 mm IRC
13
440.00
98.10
538.10 CMP
13
440.00
98.10
538.10 CMP
Quarry fines
94
92.40
363.90
456.30 CMP
13
983.00
98.10
1081.10
45 mm IRC Metal
13
757.00
98.10
855.10
94
110.00
524.00
634.00
Quarry Rubbish
72.60
16.20
88.80
Gravel
111.00
23.40
134.40
25
110.00
174.50
284.50
80 / 100
Basic price
39121.00 39921.00
ED @ 14 %
EDN CESS @ 3 % ON ED
SUB TOTAL
5476.94
5588.94
164.31
167.67
44762.25 45677.61
VAT 5 %
2238.11
Total
Conveyance at Rs.1.2763 /RTKM 2 x
60 / 70
CMP
tc
220.00km 225.00km
Storage charges 5%
Total
Cost of bulk bitumen 30/40 at CMP site
2283.88
47000.36 47961.49
574.34
561.57
1956.05
1996.05
49530.75 50519.11
30 / 40
Basic price
0.00
ED @ 14 %
0.00
EDN CESS @ 3 % ON ED
0.00
SUB TOTAL
0.00
VAT 5 %
0.00
Total
0.00
420.00km
839.36
0.60
Total
839.96
Basic price
Eecise Duty @ 14.42%
8304.48
Billable Price
65894.48
VAT 14.5 %
9554.70
75449.18
-1500.00
73949.18
37.00km
0.00
Storage charges 5%
2879.50
Total
76828.68
RS1
36206.00
5220.91
41426.91
6006.90
47433.81
-1500.00
45933.81
0.00
1810.30
47744.11
Basic price
Eecise Duty @ 14.42%
Billable Price
VAT 14.5 %
Total Invoice Value
Deduct for Drums Cost
Conveyance at Rs.1.69 /RTKM 1 x
Storage charges 5%
37.00km
Total
49.00
ED @ 14 %
6.86
EDN CESS @ 3 % ON ED
0.21
SUB TOTAL
56.07
VAT 5%
2.80
Total
58.87
Total
Per Liter
58.87
0.06
1112.00
26 Litres/day
2529.26
1417.26
1000 cum
2529.26 /1000
2.53 (A)
POWER ROLLER:
Hire charges excluding fuel charges per day
Fuel charges per day at the rate of 2.50 Lr.per hour
720.00
20 Litres/day
1810.20
1090.20
425 cum
1810.20 /425
4.26 (B)
6.79
LABOUR CHARGES:
Labour charges for 100 cum
Mazdoors I class
Rate for 1 cum
Total hire charges and labour charges for one cum
2 Nos
258.00
516.00 /100
each
516.00
5.16
11.95
HIRECHARGES AND LABOUR CHARGES FOR GRANULAR SUB BASE WITH COARSE GRADED MATERIALS
(Table400-2)
5428.00/day
20 liters/day
5428.00
54.51
1090.20
6518.20
814.78
855.00/day
855.00
25 liters/day
54.51
1362.75
2217.75
277.22
1205.00/day
1205.00
80 liters/day
54.51
4360.80
5565.80
695.73
Hire and fuel charges for machineries for 300 cum of Granular
1. Wet Mix Plant 75 tonne capacity
6 hours
1116.63
hour
6699.78
6 hours
647.38
hour
3884.28
4.5 hours
277.22
hour
1247.49
6 hours
695.73
hour
4174.38
3.00
Day
31050.00
450 Km
For 23 Kms
3105.00
6 hours
1691.63
hour
10149.78
6 hours
814.78
hour
4888.68
65199.39
0.40 No.
266.00
each
106.40
Mazdoors I class
2.00 Nos
258.00
each
516.00
Mazdoor II class
8.00 Nos
231.00
each
1848.00
2470.40
1112.00
26 Litres/day
2529.26
1417.26
25.29 (A)
POWER ROLLER:
Hire charges excluding fuel charges per day
Fuel charges per day at the rate of 2.50 Lr.per hour
720.00
20 Litres/day
1810.20
1090.20
95 cum
1810.20 /95
19.05 (B)
44.34
LABOUR CHARGES:
For mixing
Labour charges for 950 sqm
Mazdoors I class
6 Nos
258.00
each
1548.00
Mazdoor II class
24 Nos
231.00
each
5544.00
7092.00
7092.00 /95
74.65
For spreading
Labour charges for 100 cum
Mazdoors I class
4 Nos
258.00
each
1032.00
1032.00
1032.00 /100
10.32 (D)
84.97
(A+B+C+D)
129.31
HIRECHARGES AND LABOUR CHARGES FOR WBM Grade II and III 75 mm thick
WATER SPRINKLER:
Hire charges excluding fuel charges per day
Fuel charges per day at the rate of 3.50 Lr.per hour
1112.00
28 Litres/day
1526.28
2638.28
450 sqm
2638.28 /450
58.63 (A)
POWER ROLLER:
Hire charges excluding fuel charges per day
Fuel charges per day at the rate of 2.50 Lr.per hour
720.00
20 Litres/day
1090.20
1810.20
450 sqm
1810.20 x10 /450
40.23 (B)
98.86 (C)
LABOUR CHARGES:
1.Spreading 10 sqm of 75 mm thick
a)Mazdoor I class
258.00
each
52.25
b)Mazdoor II class
231.00
each
62.37
c)Mazdoor II class
231.00
each
83.16
1.25
1.25
4) Watering and keeping the surface moist for 15days as per SI. No. 71
1.25
5) Rent for tools including baskets,sharpening pick axes etc., as per SI NO. 72
1.25
0.97
203.75 (D)
(C+D)
302.61
HIRECHARGES AND LABOUR CHARGES FOR WET MIX MACADAM 300 mm thick
Machineries
1.Loader 5 cum capacity
Hire and running charges per day
Fuel charges 80 litres per day
Total hire charges including fuel per day
Total hire charges including fuel per hour
2.Tipper
Hire and running charges per day
Fuel charges 3.25 litres per hour
Total hire charges including fuel per day
Total hire charges including fuel per hour
3.Water tanker
Hire and running charges per day
Fuel charges 25 litres per day
Total hire charges including fuel per day
Total hire charges including fuel per hour
4.Vibratory Power Roller 8 -- 10 tonne
Hire and running charges per day
Fuel charges 3.00 litres per hour
Total hire charges including fuel per day
Total hire charges including fuel per hour
5.Motor grader including fuel /hour
80 litres/day
26 litres/day
25 litres/day
24 litres/day
hours
hours
hours
hours
54.51 per/ltr
54.51 per/ltr
54.51 per/ltr
54.51 per/ltr
1205.00
4360.80
5565.80
695.73
1094.00
1417.26
2511.26
313.91
855.00
1362.75
2217.75
277.22
5428.00
1308.24
6736.24
842.03
1691.63
834.88
695.73
834.88
313.91
277.22
1691.63
842.03
35189.48 /100
Head Mazdoor
0.50 Nos
266.00 each
Mazdoors I
8.63 Nos
258.00 each
Mazdoors II
2.00 Nos
231.00 each
Total labour charges for 100 cum of WMM
Total labour charges for 1 cum of WMM
2821.54 /100
Total Hire charges and labour charges 10 sqm of 100 mm thic or 1 cum
(A+B)
4174.38
5009.28
7533.84
6653.28
6766.52
5052.18
35189.48
351.89 (A)
133.00
2226.54
462.00
2821.54
28.22 (B)
380.11
10 Nos
258.00
each
2580.00
Mazdoors II
16 Nos
231.00
each
3696.00
7 Nos
231.00
each
1617.00
7893.00
157.86
25 Ltrs
202.00
57.95
Hire charges for Bitumen boiler 750 litres capacity including fuel per day
Hire charges for Bitumen boiler 750 litres capacity including fuel per houry
Hourly out turn of bitumen boiler
Hire charges of bitumen boiler using 7 kg per 10 sqm
Total Hire and labour charges for 10 sqm
1448.75
1650.75
206.34
125 kg
206.34 x 7 /125
11.56
169.42
8 Nos
258.00
each
2064.00
5 Nos
258.00
each
1290.00
3354.00
3354.00 /500/10
67.08
25 ltrs kerosin
202.00
25
57.95
litre
1448.75
1650.75
206.34
125 kg
206.34 x 5 /125
8.25
75.33
10 Nos
258.00
each
2580.00
Mazdoor II
16 Nos
231.00
each
3696.00
10 Nos
258.00
each
2580.00
8856.00
8856.00 /500/10
177.12
25 ltrs kerosin
202.00
25
57.95
litre
1448.75
1650.75
206.34
125 kg
206.34 x 10 /125
16.51
193.63
1054.00
30 Litres
1635.30
25 Litres
1225.00
170 Litres
8330.00
12244.30
90 sqm
1360.48 (A)
678.50
2.5 Litres
136.28
814.78
Out turn of Power roller per hour for 75 mm thick BM 250 sqm
Hire charges of power roller for 10 sqm
32.59 (B)
3 Paver finisher
Hire charges excluding fuel charges per day
2447.00
305.88
6 Litres
327.06
632.94
90 sqm
70.33
4. Tipper Trucks
Hire charge excluding fuel per day
1094.00
136.75
3.25 Litres
313.91
6 Nos
90 sqm
6x
209.27 (D)
1672.67 (E)
OR
Mazdoor I
Mazdoor II
Mazdoor I
809.06
33 Nos
258.00 each
8514
25 Nos
231.00 each
5775
10 Nos
258.00 each
2580
177.16
16869
16869.00 x10 /1000
(E+F)
168.69 (F)
1841.36
1212.00
30 Litres
1635.30
25 Litres
1225.00
170 Litres
8330.00
12402.30
135 sqm
918.69 (A)
678.50
2.5 Litres
136.28
814.78
Out turn of power roller per hour for 50 mm thick BM 350 sqm
Hire charges of power roller for 10 sqm
23.28 (B)
3 Paver finisher
Hire charges excluding fuel charges per day
2447.00
305.88
6 Litres
327.06
632.94
135 sqm
46.88
4. Tipper Trucks
Hire charge excluding fuel per day
1094.00
136.75
3.25 Litres
177.16
313.91
6 Nos
135 sqm
6x
139.52 (D)
1128.37 (E)
Mazdoor I
Mazdoor II
Mazdoor I
33 Nos
258.00 each
8514
25 Nos
231.00 each
5775
10 Nos
258.00 each
2580
16869
16869.00 x10 /1200
(E+F)
140.58 (F)
1268.95
1212.00
30 Litres
1635.30
25 Litres
1225.00
170 Litres
8330.00
12402.30
90 sqm
1378.03 (A)
2. Vibratory Roller
Hire charges including fuel charges per hour
Cost of fuel diesel
5428 Day
2.5 Litres
678.50
136.28
814.78
220 sqm
37.04 (B)
3 Paver finisher
Hire charges excluding fuel charges per day
2447.00
305.88
6 Litres
327.06
632.94
90 sqm
70.33
4. Tipper Trucks
Hire charge excluding fuel per day
1094.00
136.75
3.25 Litres
177.16
313.91
6 Nos
90 sqm
6x
209.27 (D)
1694.67 (E)
Mazdoor I
Mazdoor II
Mazdoor I
33 Nos
258.00 each
8514.00
25 Nos
231.00 each
5775
10 Nos
258.00 each
2580
16869
16869.00 x10 /1200
Total rate Hire and labour charges for 10 sqm of DBM 75 mm thick (E+F)
168.69 (F)
1863.36
1212.00
30 Litres
1635.30
25 Litres
1225.00
170 Litres
8330.00
12402.30
135 sqm
918.69 (A)
2.Vibratory Roller
Hire charges including fuel charges per hour
Cost of fuel diesel
5428 Day
2.5 Litres
678.50
136.28
814.78
320 sqm
25.46 (B)
3 Paver finisher
Hire charges excluding fuel charges per day
2447.00
305.88
6 Litres
327.06
632.94
135 sqm
46.88
4. Tipper Trucks
Hire charge excluding fuel per day
1094.00
136.75
3.25 Litres
177.16
313.91
6 Nos
135 sqm
6x
139.52 (D)
1130.55 (E)
Mazdoor I
Mazdoor II
33 Nos
258.00 each
8514
25 Nos
231.00 each
5775
10 Nos
258.00 each
2580
16869
16869.00 x10 /1200
Total rate Hire and labour charges for 10 sqm of DBM 50 mm thick
(E+F)
140.58 (F)
1271.13
1212.00
30 Litres
1635.30
25 Litres
1225.00
170 Litres
8330.00
12402.30
170 sqm
729.55 (A)
2. Vibratory Roller
Hire charges including fuel charges per hour
Cost of fuel diesel
5428 Day
2.5 Litres
678.50
136.28
814.78
400 sqm
20.37 (B)
3 Paver finisher
Hire charges excluding fuel charges per day
2447.00
305.88
6 Litres
327.06
632.94
170 sqm
37.23
4. Tipper Trucks
Hire charge excluding fuel per day
1094.00
136.75
3.25 Litres
177.16
313.91
6 Nos
170 sqm
6x
110.79 (D)
897.94 (E)
Mazdoor I
Mazdoor II
Mazdoor I
33 Nos
258.00 each
8514
25 Nos
231.00 each
5775
10 Nos
258.00 each
2580
16869
16869.00 x10 /1200
(E+F)
140.58 (F)
1038.52
1212.00
30 Litres
1635.30
25 Litres
1225.00
170 Litres
8330.00
12402.30
170 sqm
729.55 (A)
2. Vibratory Roller
Hire charges including fuel charges per hour
Cost of fuel diesel
5428 Day
2.5 Litres
678.50
136.28
814.78
400 sqm
20.37 (B)
3 Paver finisher
Hire charges excluding fuel charges per day
2447.00
305.88
6 Litres
327.06
632.94
170 sqm
37.23
4. Tipper Trucks
Hire charge excluding fuel per day
1094.00
136.75
3.25 Litres
177.16
313.91
6 Nos
170 sqm
6x
110.79 (D)
897.94 (E)
Mazdoor I
Mazdoor II
Mazdoor I
33 Nos
258.00 each
8514
25 Nos
231.00 each
5775
10 Nos
258.00 each
2580
16869
16869.00 x10 /1200
(E+F)
140.58 (F)
1038.52
DBM 50 mm thick with CMP and Paver finishing (Pneumatic Tyred Roller)
HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour
1212.00
30 Litres
1635.30
25 Litres
1225.00
170 Litres
8330.00
12402.30
135 sqm
918.69 (A)
1243 Day
2.5 Litres
1243.00
0.00 per Ltr.
0.00
1243.00
320 sqm
38.84 (B)
2674.00
2674.00
6 Litres
0.00
2674.00
135 sqm
198.07
4. Tipper Trucks
Hire charge excluding fuel per day
1094.00
136.75
3.25 Litres
177.16
313.91
6 Nos
135 sqm
6x
139.52 (D)
1295.12 (E)
Mazdoor I
Mazdoor II
33 Nos
258.00 each
8514
25 Nos
231.00 each
5775
10 Nos
258.00 each
2580
16869
16869.00 x10 /1200
Total rate Hire and labour charges for 10 sqm of DBM 50 mm thick
(E+F)
140.58 (F)
1435.70
DBM 100 mm thick with CMP and Paver finishing (Pneumatic Tyred Roller)
HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour
1212.00
30 Litres
1635.30
25 Litres
1225.00
170 Litres
8330.00
12402.30
90 sqm
1378.03 (A)
1243 Day
2.5 Litres
1243.00
0.00 per Ltr.
0.00
1243.00
220 sqm
56.50 (B)
2674.00
2674.00
6 Litres
0.00
2674.00
90 sqm
297.11
4. Tipper Trucks
Hire charge excluding fuel per day
1094.00
136.75
3.25 Litres
177.16
313.91
6 Nos
90 sqm
6x
209.27 (D)
1940.91 (E)
Mazdoor I
Mazdoor II
33 Nos
258.00 each
8514
25 Nos
231.00 each
5775
10 Nos
258.00 each
2580
16869
16869.00 x10 /1000
Total rate Hire and labour charges for 10 sqm of DBM 50 mm thick
(E+F)
168.69 (F)
2109.60
Bituminous Concrete 40 mm thick with CMP and Paver finishing (Pneumatic Tyred Roller)
HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour
1212.00
30 Litres
1635.30
25 Litres
1225.00
170 Litres
8330.00
12402.30
170 sqm
729.55 (A)
1243 Day
1243.00
1243.00
400 sqm
31.08 (B)
2674.00
2674.00
2674.00
170 sqm
157.29
4. Tipper Trucks
Hire charge excluding fuel per day
1094.00
136.75
3.25 Litres
177.16
313.91
6 Nos
170 sqm
6x
110.79 (D)
1028.71 (E)
Mazdoor I
Mazdoor II
Mazdoor I
33 Nos
258.00 each
8514
25 Nos
231.00 each
5775
10 Nos
258.00 each
2580
16869
16869.00 x10 /1200
(E+F)
140.58 (F)
1169.29
1212.00
30 Litres
1635.30
25 Litres
1225.00
170 Litres
8330.00
12402.30
270 sqm
459.34 (A)
828.00
20 Litres
1090.20
1918.20
400 sqm
47.96 (B)
3 Paver finisher
Hire charges excluding fuel charges per day
2447.00
305.88
6 Litres
327.06
632.94
270 sqm
23.44
4. Tipper Trucks
Hire charge excluding fuel per day
1094.00
136.75
3.25 Litres
177.16
313.91
6 Nos
270 sqm
6x
69.76 (D)
600.50 (E)
Mazdoor I
Mazdoor II
Mazdoor I
33 Nos
258.00 each
8514.00
25 Nos
231.00 each
5775.00
10 Nos
258.00 each
2580.00
16869.00
16869.00 x10 /2000
(E+F)
84.35 (F)
684.85
Semi Dense Bituminous Concrete 25 mm thick with CMP and Paver finishing
HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour
1212.00
30 Litres
1635.30
25 Litres
1225.00
170 Litres
8330.00
12402.30
270 sqm
459.34 (A)
678.50
2.5 Litres
136.28
814.78
500 sqm
16.30 (B)
3 Paver finisher
Hire charges excluding fuel charges per day
2447.00
305.88
6 Litres
327.06
632.94
270 sqm
23.44
4. Tipper Trucks
Hire charge excluding fuel per day
1094.00
136.75
3.25 Litres
177.16
313.91
6 Nos
270 sqm
6x
69.76 (D)
568.84 (E)
Mazdoor I
Mazdoor II
Mazdoor I
33 Nos
258.00 each
8514.00
25 Nos
231.00 each
5775.00
10 Nos
258.00 each
2580.00
16869.00
16869.00 x10 /2000
Total rate Hire and labour charges for 10 sqm SDBC 25 mm thick
(E+F)
84.35 (F)
653.19
1212.00
30 Litres
1635.30
25 Litres
1225.00
170 Litres
8330.00
12402.30
325 sqm
381.61 (A)
2. Vibratory Roller
Hire charges including fuel charges per hour
Cost of fuel diesel
678.50
2.5 Litres
136.28
814.78
1000 sqm
8.15 (B)
500 sqm
16.30 (C)
3 Paver finisher
Hire charges excluding fuel charges per day
2447.00
305.88
6 Litres
327.06
632.94
325 sqm
19.48 (D)
4. Tipper Trucks
Hire charge excluding fuel per day
1094.00
136.75
3.25 Litres
177.16
313.91
6 Nos
325 sqm
6x
57.95 (E)
483.49 (F)
Mazdoor I
Mazdoor II
Mazdoor I
33 Nos
258.00 each
8514
25 Nos
231.00 each
5775
10 Nos
258.00 each
2580
16869
16869.00 x10 /2000
Total rate Hire and labour charges for 10 sqm PC with Seal coat
(F+G)
84.35 (G)
567.84
Premix Carpet with seal coat with Mini Hot Mix Plant
HIRE CHARGES FOR MACHINERY
1.Mini Hot Mix Plant
Hire charges excluding fuel charges per hour
209.25
15 Litres
817.65
45 Litres
2205.00
3231.90
180 sqm
3231.90 x10 /180
179.55 (A)
828.00
20 Litres
1090.20
1918.20
500 sqm
38.36 (B)
1000 sqm
19.18 (C)
3 Bitumen boiler
Hire charges excluding fuel charges per day
Fuel charges kerosine
202.00
25 Litres
57.95 Litre
1448.75
1650.75
1650.75 /8
206.34
125 kg
206.34 /125
14.6 kg
14.6 kg
9.8 kg
9.8 kg
1.65
1.65 kg
24.09 (D)
1.65 kg
16.17 (E)
277.35 (F)
Mazdoor I
Mazdoor II
0.75 No
258.00 each
193.50
0.25 No
231.00 each
57.75
251.25 (G)
(F+G)
528.60
828.00
20 Litres
1090.20
1918.20
225 sqm
85.25 (A)
2 Bitumen boiler
Hire charges excluding fuel charges per day
Fuel charges kerosine
202.00
25 Litres
57.95 Litre
1448.75
1650.75
1650.75 /8
206.34
125 kg
206.34 /125
30 kg
30 kg
1.65 kg
1.65
49.50 (B)
3.Mechanical sprayer
Hire charges for mechanical sprayer per 10 sqm
12.00
146.75
1 Nos
266.00 each
266
Mazdoor I
25 Nos
258.00 each
6450
6716
6716.00 x10 /110
610.55
10 Nos
258.00
each
2580.00
Mazdoor II
16 Nos
231.00
each
3696.00
4 Nos
231.00
each
924.00
7200.00
7200.00 /500/10
144.00
10.00
64.10
each
each
2580.00
3696.00
each
924.00
7200.00
144.00
Bitumen sprayer
15.00
159.00
3 Nos
231.00
each
693.00
693.00
693.00 /500/10
25 Litres
13.86
202.00
1448.75
57.95 Litre
1650.75
1650.75 /8
206.34
714 Sqm
206.34 x 10 / 714.29
2.89
15.00
31.75
5 Nos
258.00
each
1290.00
5 Nos
231.00
each
1155.00
2445.00
2445.00 /500/10
25 Litres
48.90
202.00
57.95 Litre
1448.75
1650.75
1650.75 /8
250 kg
206.34
250kgs x 10sqm / 3
833.00 Sqm
206.34
2.48
15.00
66.38
3 Nos
231.00
each
693.00
693.00 /500/10
25 Litres
13.86
202.00
57.95 Litre
1448.75
1650.75
693.00
1650.75 /8
250 kg
206.34
250kgs x 10sqm / 4
625.00 Sqm
206.34
2500
3.30
15.00
32.16
5 Nos
258.00
each
1290.00
3 Nos
231.00
each
693.00
1983.00
1983.00 /500/10
39.66
15.00
54.66
Providing and Laying 25mm thick Mastic Asphalt Wearing Course with paving grade bitumen meeting the
requirements given in table 500 -- 29 prepared by using mastic cooker and slope after cleaning the
surface including providing and anto skid surface with bitumen percolated fine grained hard stone
chipping of 13.2mm nominal size at the rate of 0.005 cum per 10sqm and at an approx spacing of 10 cm
center to center in both directions pressed into surface when the temprature of surfaces is not less than
the 100 centigrade protruding 1mm to 4mm over mastic surface all complete as per standard
specification.
DATA
80.00
Kg
220 kg (or)
160 kg (or)
300 kg (or)
0.20
kg
79.94
#REF!
cum
6.40
#REF!
456.30
cum
36.50
1074.40
cum
214.88
3247.70 10 sqm
3247.70
917.39 10 sqm
917.39
MT
LS
6.91
#REF!
#REF!
200.00
100
54.51
5451.00
5651.00
3247.70
LABOUR CHARGES
1.50
258.00
Each
387.00
0.50
231.00
Each
115.50
3.50
258.00
Each
903.00
0.25
231.00
Each
57.75
0.50
266.00
Each
133.00
1596.25
917.39
60 / 70
0.00
0.00
0.00
0.00
0.00
0.00
79.94
0.00
79.94
Providing granular surface to required thickness including cost and conveyance of all
materials from approved quarry and consolidation by power roller as per clause 401 of
MoRTH specification
cum
Cost of sand
284.50
cum
210.53
0.54
cum
Cost of gravel
134.40
cum
72.58
10.00
sqm
Hire charges
44.34
10 sqm
44.34
10.00
sqm
Labour charges
84.97
10 sqm
84.97
412.42
1.00
cum
41.85
cum
41.85
3.00
Km
Conveyance
7.80
Km
23.40
Total
65.25
1 Providing granular surface to required thickness including cost and conveyance of all
materials from approved quarry and consolidation by power roller as per clause 401 of
MORTH Rev -- 5 specification- Rate for 100 mm thick or 1 cum
144.00
cum
53 mm to 22.40 mm metal
878.77
cum
126542.88
57.00
cum
571.70
cum
32586.90
86.40
cum
538.10
cum
46491.84
27.00
Kl
Water
120.00
Kl
3240.00
225.00
cum
Hire charges
225.00
cum
Labour charges
65199.39
2470.40
276531.41
1229.03
0.396
cum
908.70
cum
359.85
0.528
cum
760.96
cum
401.79
0.396
cum
531.40
cum
210.43
0.08
Kl
Water
120.00
Kl
9.60
1.000
cum
Labour charges
28.22
cum
28.22
1.000
cum
351.89
cum
351.89
1361.78
0.74
cum
Cost of sand
634.00
cum
469.16
0.54
cum
Cost of gravel
88.80
cum
47.95
1.00
cum
74.65
cum
74.65
591.76
Providing WBM Grade II 75 mm consolidated thick icluding cost and conveyance of all materials and
consolidation by power roller as per clause 404 of MoRTH specification
1.00
cum
#REF!
cum
#REF!
0.24
cum
Binding materials
591.76
cum
142.02
10.00
sqm
302.61
10 sqm
302.61
#REF!
#REF!
Providing WBM Grade III 75 mm consolidated thick icluding cost and conveyance of all materials and
consolidation by power roller as per clause 404 of MoRTH specification
1.00
cum
#REF!
cum
#REF!
0.24
cum
Binding materials
591.76
cum
142.02
10.00
sqm
302.61
10 sqm
302.61
#REF!
#REF!
WBM Grade II
1000
1.625
0.225
731.25
817.34
597680
1000
1.625
0.075
243.75
1027.47
250446
Total
848126
911.64
888849
Total
888849
WMM
1000
1.625
0.300
975
kg
10.00
sqm
76828.68
Mt
159.00 10 sqm
537.80
159.00
696.80
69.68
2 Providing and laying Tack coat over PC with WMM surface treated with prime coat
using 2.50 kgs of bitumen emulsion RS1/Bulk Bitumen VG 10 for 10sqm area including
cost and conveyance of bituminous binder including labour charges for preparing the
surface and applying the required quantity of bitumen as tack coat by bitumen sprayer
etc., complete As per clause 503 MORTH Rev -- 5 Specification
2.50
kg
10.00
sqm
47744.11
Mt
119.36
31.75 10 sqm
31.75
151.11
15.11
3 Providing and Laying of Tack Coat using bitumen emulsion RS1/Bulk Bitumen of VG 10
at the rate of 3.0Kg / 10 sqm over the LCC surface treated with primer preparatory to
another bituminous construction over it. As per clause 503 MORTH Rev -- 5 specification
3.00
kg
10.00
sqm
47744.11
Mt
143.23
32.16 10 sqm
32.16
175.39
17.54
4 Providing and laying of Tack Coat using bitumen emulsion RS1/VG 10 Bulk Bitumen at
the rate of 2.00 kg per ten square meter over the BT surface treated with primer
preparatory to another bituminous construction over it. As per clause 503 MORTH Rev -2.00
kg
10.00
sqm
47744.11
Mt
95.49
66.38 10 sqm
66.38
161.87
16.19
0.24
cum
1001.89
cum
240.45
0.25
cum
578.72
cum
144.68
0.23
cum
538.10
cum
123.76
53.20
kg
Mt
2687.62
10.00
sqm
50519.11
1271.13 10 sqm
1271.13
4467.64
8935.28
cum
26.50 mm metal
822.40
cum
131.58
0.37
cum
987.40
cum
365.34
0.47
cum
13.20 mm metal
1074.40
cum
504.97
1001.89
cum
611.94 cum
336.57
0.45
cum
2.36 mm metal
538.10 cum
242.15
578.72
538.10
538.10
538.10
0.24
cum
1001.89
cum
240.45
0.25
cum
578.72
cum
144.68
0.23
cum
538.10
cum
123.76
53.20
kg
Mt
2687.62
10.00
sqm
50519.11
1435.70 10 sqm
1435.70
4632.21
9264.42
cum
26.50 mm metal
822.40
cum
131.58
0.37
cum
987.40
cum
365.34
0.47
cum
13.20 mm metal
1074.40
cum
504.97
1001.89
cum
611.94 cum
336.57
0.45
cum
2.36 mm metal
538.10 cum
242.15
578.72
538.10
538.10
538.10
cum
900.07
cum
360.03
0.35
cum
565.42
cum
197.90
0.36
cum
538.10
cum
193.72
71.30
kg
Mt
3602.01
10.00
sqm
50519.11
1863.36 10 sqm
1863.36
6217.02
8289.36
cum
37.50 mm metal
864.40
cum
121.02
0.49
cum
26.50 mm metal
822.40
cum
402.98
0.37
cum
1016.40
cum
376.07
900.07
611.94 cum
226.42
0.63 cum
2.36 mm metal
538.10 cum
339.00
565.42
538.10
Total rate for 1 cum
538.10
538.10
DATA FOR DBM 100 (9m Paver and Pneumatic Tyred Roller)
1 Dense Bituminous macadam 80 - 100 mm consolidated thickness using 4.5 % of bitumen
60/70 gradeas per clause 507 of MoRTH specification
0.40
cum
900.07
cum
360.03
0.35
cum
565.42
cum
197.90
0.36
cum
538.10
cum
193.72
71.30
kg
Mt
3602.01
10.00
sqm
50519.11
2109.60 10 sqm
2109.60
6463.26
8617.68
cum
37.50 mm metal
864.40
cum
121.02
0.49
cum
26.50 mm metal
822.40
cum
402.98
0.37
cum
1016.40
cum
376.07
900.07
611.94 cum
226.42
0.63 cum
2.36 mm metal
538.10 cum
339.00
565.42
538.10
Total rate for 1 cum
538.10
538.10
1058.74
Cum
211.75
0.43
580.19
Cum
249.48
0.08
538.10
Cum
43.05
37.00
10.00
Kg
50519.11
Mt
1268.95 10 sqm
1869.21
1268.95
3642.44
7284.88
987.40
Cum
177.73
0.82
1074.40
Cum
881.01
Total
1058.74
611.94
Cum
348.81
0.43
538.10
Cum
231.38
Total
2.36 mm and below
580.19
538.10
538.10
927.48
Cum
593.59
0.44
507.91
Cum
223.48
0.13
538.10
Cum
69.95
50519.11
Mt
3132.18
1841.36
10 sqm
1841.36
62.00
10.00
Kg
5860.56
7814.08
864.40
Cum
86.44
0.38
822.40
Cum
312.51
0.52
1016.40
Cum
528.53
927.48
611.94
Cum
507.91
0.17
538.10
Cum
91.48
599.39
538.10
538.10
Cum
538.10
cum
835.00
cum
108.55
0.17
cum
562.50
cum
95.63
0.26
cum
538.10
cum
139.91
50.30
kg
50519.11
Mt
2541.11
10.00
sqm
1038.52
10 sqm
1038.52
3923.72
392.37
9809.30
cum
13.20 mm metal
1074.40
cum
257.86
0.76
cum
11.20 mm metal
759.40
cum
577.14
835.00
cum
575.08
cum
379.55
0.34
cum
2.80 mm metal
538.10
cum
182.95
562.50
cum
2.36 mm metal
538.10
cum
538.10
538.10
cum
1060.48
cum
233.31
0.24
cum
592.01
cum
142.08
0.26
cum
538.10
cum
139.91
62.40
kg
50519.11
Mt
3152.39
10.00
sqm
0.00
10 sqm
1038.52
4706.21
470.62
9412.42
Cum
987.40
Cum
157.98
0.84
Cum
13.20 mm metal
1074.40
Cum
902.50
1060.48
cum
611.94
cum
446.72
0.27
cum
2.80 mm metal
538.10
cum
145.29
592.01
cum
2.36 mm metal
538.10
cum
538.10
538.10
DATA FOR BC 40MM (USING PENUMATIC TYRED ROLLER & 9 M WIDTH PAVER)
1 Bituminous concrete 40 mm consolidated thickness using 5.1 % of bitumen 60/70grade
as per clause 507 of MORTH Rev -- 5 specification
Rate per 10 sqm of 40 mm compacted thick
0.13
cum
835.00
cum
108.55
0.17
cum
562.50
cum
95.63
0.26
cum
538.10
cum
139.91
50.30
kg
50519.11
Mt
2541.11
10.00
sqm
1169.29
10 sqm
1169.29
4054.49
405.45
10136.23
cum
13.20 mm metal
1074.40
cum
257.86
0.76
cum
11.20 mm metal
759.40
cum
577.14
835.00
cum
575.08
cum
379.55
0.34
cum
2.36 mm metal
538.10
cum
182.95
562.50
cum
2.36 mm metal
538.10
cum
538.10
538.10
0.25
cum
810.9
cum
202.73
0.14
cum
427.84
cum
59.90
28.00
kg
50519.11
Mt
1414.54
10.00
sqm
684.85
10 sqm
684.85
2362.02
236.20
19.0mm-9.5 mm
1.00
cum
810.90
cum
810.9
810.9
cum
6.70 mm metal
445.90
cum
258.62
0.42
cum
2.80 mm metal
402.90
cum
169.22
427.84
cum
11.20 mm metal
759.40
cum
75.94
0.16
cum
6.7 mm metal
587.40
cum
93.98
0.11
cum
538.10
cum
59.19
30.00
kg
50519.11
Mt
1515.57
10.00
sqm
653.19
10 sqm
653.19
Bitumen 60 / 70 grade
Labour and Hire chargescharges
2397.88
239.79
cum
969.34
cum
969.34
0.13
cum
935.13
cum
121.57
30
Kg
50519.11
mt
1515.57
10.00
sqm
Labour Charges
610.55
10 sqm
610.55
10.00
sqm
Hire charges
146.75
10 sqm
146.75
3363.78
4485.04
cum
Cost of 45 mm Metal
855.10
cum
513.06
0.34
cum
1152.40
cum
391.82
0.06
cum
1074.40
cum
64.46
969.34
22.4 mm -- 2.80 mm
0.60
cum
1074.40
cum
644.64
0.34
cum
759.40
cum
258.20
0.06
cum
538.10
cum
32.29
935.13
0.18
cum
1074.40
cum
193.39
0.09
cum
759.40
cum
68.35
0.09
cum
587.40
cum
52.87
24.40
kg.
50519.11
mt.
1232.67
10.00
sqm
567.84
10 sqm
567.84
2115.11
211.51
2820.15
Size Rate
Amount
Qty
Size Rate
Amount
0.050
90 mm
322.00
16.10
0.025
63 mm
465.00
11.63
0.450
63 mm
465.00
209.25
0.200
53 mm
565.00
113.00
0.425
53 mm
565.00
240.13
0.725
45 mm
757.00
548.83
0.050
45 mm
757.00
37.85
0.025
22.4 mm
1061.00
26.53
0.025
22.4 mm
1061.00
26.53
0.025 11.20 mm
668.00
16.70
529.86
1.000
716.69
1.000
53 - 9.50 mm
Size of metal
Rate
45 - 22.40 mm
53.00 mm
565.00
45.00 mm
757.00
46.50 mm
757.00
37.50 mm
773.00
45.00 mm
757.00
26.50 mm
731.00
37.50 mm
773.00
25.00 mm
731.00
26.50 mm
731.00
22.40 mm
1061.00
25.00 mm
731.00
Total
4053.00
22.40 mm
1061.00
Average rate
810.60
13.20 mm
11.20 mm
668.00
22.40 mm
1061.00
7026.00
13.20 mm
983.00
780.67
11.20 mm
668.00
6.70 mm
496.00
6.00 mm
496.00
Total
Average rate
Quantity required
134.4 cum
is for
9.50 - 2.36 mm
6.70 mm
496.00
5.60 mm
496.00
6.00 mm
496.00
4.75 mm
440.00
5.60 mm
496.00
Total
4.75 mm
440.00
Average rate
2.36 mm
Total
Average rate
172.80 cum for
2368.00
473.60
225 cum of granular
440.00
2.36 mm
4640.00
662.86
440.00
1.00
cum
44.00
Kgs
1.00
cum
Labour Charges
1081.10
cum
1081.10
49530.75
cum
2179.35
182.08
cum
182.08
Total
3442.53
Cum
1 Providing Premix Bitumen Patches to 50mm thick using 45mm IRC metal including cost
and conveyance of metal from approved quarry to work site and stacking them at the
site to the departmental gauge using 44kg of bitumen for premixing including cost of
bitumen which will be supplied by contractor including labour charges for heating the
bitumen and mixing with metal and labour charges for attending bitumen patches etc.,
complete
1.00
cum
44.00
Kgs
1.00
cum
Labour Charges
855.10
cum
855.10
49530.75
cum
2179.35
182.08
cum
182.08
Total
3216.53
Cum
LABOUR CHARGES
1.08 (1/6)
258.00
Each
46.44
1.08 (1/8)
258.00
Each
34.83
LS
3.78
3.10
LS
15.75
LS
4.73
LS
LS
LS
2.31
2.31
0.55
0.625 Cum
113.80
1 Cum
182.08