Date

7/16/2013

Irungattukottai

COIMBATORE

Irungattukottai
Cochin
CHENNAI
COIMBATORE

Emulsion SS 1 Packed
Emulsion RS 1 Packed
Emulsion SS 1 Packed
Emulsion RS 1 Packed
Emulsion - SS 1 - Bulk
Emulsion - RS 1 - Bulk
60/70
80/100
60/70
80/100
60/70
80/100
Diesel
Kerosene
Furnace oil

s3BB0
1

Basic Rate

Convyanc
rate

57590.00

1.69

36281.00

1.69

57590.00

1.69

36206.00

1.69

53648.00
32931.00
39921.00
39121.00
40021.00
39221.00
40886.00
40086.00
54.51
57.95
49.00

1.50
1.50
1.2763
1.2763
0.9924
0.9924
0.9924
0.9924

39715

38915

3
Irungattukottai

Cochin

Date

Emulsion - SS 1
Bulk

Emulsion - RS 1 Bulk

60/70

80/100

1-Jan-2013

52195.00
52345.00
52895.00
52895.00
53880.00
53880.00
52346.00
52596.00
51472.00
51562.00
51843.00
51753.00
53153.00
53648.00

31165.00
31365.00
31415.00
31415.00
31477.00
31477.00
31465.00
31775.00
32000.00
32112.00
32500.00
32388.00
32317.00
32931.00

37138.00
37428.00
37428.00
37428.00
37428.00
37428.00
37570.00
38070.00
38570.00
38750.00
39380.00
39200.00
39200.00
39921.00

36338.00
36628.00
36628.00
36628.00
36628.00
36628.00
36770.00
37270.00
37770.00
37950.00
38580.00
38400.00
38400.00
39121.00

16-Jan-2013
1-Feb-2013
16-Feb-2013
1-Mar-2013
16-Mar-2013
1-Apr-2013
16-Apr-2013
1-May-2013
16-May-2013
1-Jun-2013
16-Jun-2013
1-Jul-2013
16-Jul-2013

1-Aug-2013
16-Aug-2013

55263.00

33032.00

39921.00

39121.00

0
0

Coimbatore

Chennai

14.00%
2.00%

14.00%
2.00%

1.00%

1.00%

5.00%

5.00%

1-Sep-2013
16-Sep-2013
1-Oct-2013
16-Oct-2013
1-Nov-2013
16-Nov-2013
1-Dec-2013
16-Dec-2013

Name of work:

5/12/2012
Description

Basic Price
Detuct drum cost
Sub total
Excise Duty @
Education Cess ON ED @
Higher secondary Education
Cess ON ED @
Billable Price
VAT @
Total invoice value

Tamilnadu Vat @ 5%
Storage Charges on basic price
@
Detuct drum cost
Sub total

5.00%

5.00%

Conveyance
Least rate

Cochin
Cochin

Sub total
Aravakurichi

Distance

Avinashi

Distance

Bhavani

Distance

Dharapuram

Distance

Erode

Distance

60/70
80/100

Kangeyam

Distance

Karur

Distance

Kodumudi

Distance

Krishnarayapuram

Distance

Kulithalai

Distance

Madathukulam

Distance

Mulanoor

Distance

Palladam

Distance

Perundhurai

Distance

Tiruppurnorth

Distance

Tiruppursouth

Distance

Udumalapet

Distance

Vellkovil

Distance

70024.28
35670.29

60/70
80/100
Emulsion SS 1

34696.63

1.10.12

15.11.12

38737.50
37763.68
71095.82

35670.29
34696.63
70024.28

1-Oct-2012
16-Oct-2012
1-Nov-2012
16-Nov-2012

49550.00
52115.00

27815.00
29490.00

53145.00

30790.00

Distance
coefficient

Estimate
rate

Distance

Irungattukottai 77,552.00

428

Irungattukottai 48,570.00

428

COIMBATORE

COIMBATORE

2
2
2
2
2
2
2
2

Irungattukottai
Irungattukottai
Cochin
Cochin
CHENNAI
CHENNAI
COIMBATORE
COIMBATORE

COIMBATORE

10

11

Fuel charges

CHENNAI

60/70

80/100

60/70

80/100

Diesel

Kerosene

38103.00
38393.00
38393.00
38393.00
38393.00
38393.00
38535.00
39035.00
39535.00
39715.00
40345.00
40165.00
40165.00
40886.00

37303.00
37593.00
37593.00
37593.00
37593.00
37593.00
37735.00
38235.00
38735.00
38915.00
39545.00
39365.00
39365.00
40086.00

37238.00
37528.00
37528.00
37528.00
37528.00
37528.00
37670.00
38170.00
38670.00
38850.00
39480.00
39300.00
39300.00
40021.00

36438.00
36728.00
36728.00
36728.00
36728.00
36728.00
36870.00
37370.00
37870.00
38050.00
38680.00
38500.00
38500.00
39221.00

50.54
50.54
51.09
51.64
51.64
51.64
52.11
52.18
52.18
53.28
53.88
53.88
54.51
54.51

55.08
58.37
59.61
57.83
61.92
61.92
61.92
61.92
55.06
55.06
54.83
54.83
57.95
57.95

40886.00

40086.00

40021.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

39221.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

55.12

61.73

7/16/2013

As on

Sub Division
Cochin
Cochin

Irungattukottai

60/70

80/100
39,121.00
0.00
39,121.00
5,476.94
109.54

Coimbatore
Emulsion - Emulsion SS 1
RS 1
Packed
Packed
57,590.00
36,206.00
0.00
0.00
57,590.00
36,206.00
8,062.60
5,068.84
161.25
101.38

14.00%
2.00%

14.00%
2.00%

39,921.00
0.00
39,921.00
5,588.94
111.78

1.00%

1.00%

55.89

54.77

80.63

50.69

45,677.61
913.55
46,591.16
2,329.56
48,920.72

44,762.25
895.25
45,657.50
2,282.88
47,940.38

65,894.48
9,554.70
75,449.18

41,426.91
6,006.90
47,433.81

1,996.05

1,956.05

2,879.50

1,810.30

0.00
50,916.77

0.00
49,896.43

-1,500.00
76,828.68

-1,500.00
47,744.11

2.00%

14.50%

5.00%

5.00%

@ 5%

51223.02
51073.2

Aravakurichi

Karur

Palladam

Dharapuram

Erode

120 Km
x1.2763 x 2
= 306.31
51,223.08
0.92
51,224.00

461 Km
x1.2763 x 2
= 1176.75
51,073.18
0.82
51,074.00

125 Km
x1.69 x 1 =
211.25
77,039.93
0.07
77,040.00

125 Km
x1.69 x 1 =
211.25
47,955.36
0.64
47,956.00

50,916.77

49,896.43

76,828.68

47,744.11

271.00km

271.00km

119.00km

119.00km

271 Km
x1.2763 x 2
= 691.75
51,608.52
0.48
51,609.00

271 Km
x1.2763 x 2
= 691.75
50,588.18
0.82
50,589.00

119 Km
x1.69 x 1 =
201.11
77,029.79
0.21
77,030.00

119 Km
x1.69 x 1 =
201.11
47,945.22
0.78
47,946.00

120.00km

120.00km

125.00km

125.00km

120 Km
x1.2763 x 2
= 306.31
51,223.08
0.92
51,224.00

120 Km
x1.2763 x 2
= 306.31
50,202.74
0.26
50,203.00

125 Km
x1.69 x 1 =
211.25
77,039.93
0.07
77,040.00

125 Km
x1.69 x 1 =
211.25
47,955.36
0.64
47,956.00

284.00km

284.00km

94.30km

94.30km

284 Km
x1.2763 x 2
= 724.94
51,641.71
0.29
51,642.00

284 Km
x1.2763 x 2
= 724.94
50,621.37
0.63
50,622.00

94.3 Km
x1.69 x 1 =
159.37
76,988.05
0.95
76,989.00

94.3 Km
x1.69 x 1 =
159.37
47,903.48
0.52
47,904.00

249.00km

249.00km

73.90km

73.90km

249 Km
x1.2763 x 2
= 635.60
51,552.37
0.63
51,553.00

249 Km
x1.2763 x 2
= 635.60
50,532.03
0.97
50,533.00

73.9 Km
x1.69 x 1 =
124.89
76,953.57
0.43
76,954.00

73.9 Km
x1.69 x 1 =
124.89
47,869.00
0.00
47,869.00

302.70km

302.70km

100.00km

100.00km

Kangeyam

302.7 Km
x1.2763 x 2
= 772.67
51,689.44
0.56
51,690.00

302.7 Km
x1.2763 x 2
= 772.67
50,669.10
0.90
50,670.00

100 Km
x1.69 x 1 =
169.00
76,997.68
0.32
76,998.00

100 Km
x1.69 x 1 =
169.00
47,913.11
0.89
47,914.00

260.00km

260.00km

51.00km

51.00km

260 Km
x1.2763 x 2
= 663.68
51,580.45
0.55
51,581.00
Karur

Kodumudi

Krishnarayapuram

Kulithalai

260 Km
51 Km x1.69 51 Km x1.69
x1.2763 x 2
x 1 = 86.19 x 1 = 86.19
= 663.68
50,560.11
76,914.87
47,830.30
0.89
0.13
0.70
50,561.00
76,915.00
47,831.00

304.00km

304.00km

118.00km

118.00km

304 Km
x1.2763 x 2
= 775.99
51,692.76
0.24
51,693.00

304 Km
x1.2763 x 2
= 775.99
50,672.42
0.58
50,673.00

118 Km
x1.69 x 1 =
199.42
77,028.10
0.90
77,029.00

118 Km
x1.69 x 1 =
199.42
47,943.53
0.47
47,944.00

284.00km

284.00km

110.00km

110.00km

284 Km
x1.2763 x 2
= 724.94
51,641.71
0.29
51,642.00

284 Km
x1.2763 x 2
= 724.94
50,621.37
0.63
50,622.00

110 Km
x1.69 x 1 =
185.90
77,014.58
0.42
77,015.00

110 Km
x1.69 x 1 =
185.90
47,930.01
0.99
47,931.00

325.00km

325.00km

147.00km

147.00km

325 Km
x1.2763 x 2
= 829.60
51,746.37
0.63
51,747.00

325 Km
x1.2763 x 2
= 829.60
50,726.03
0.97
50,727.00

147 Km
x1.69 x 1 =
248.43
77,077.11
0.89
77,078.00

147 Km
x1.69 x 1 =
248.43
47,992.54
0.46
47,993.00

395.00km

395.00km

182.00km

182.00km

Madathukulam

Mulanoor

Palladam

Perundhurai

395 Km
x1.2763 x 2
= 1008.28
51,925.05
0.95
51,926.00

395 Km
x1.2763 x 2
= 1008.28
50,904.71
0.29
50,905.00

182 Km
x1.69 x 1 =
307.58
77,136.26
0.74
77,137.00

182 Km
x1.69 x 1 =
307.58
48,051.69
0.31
48,052.00

206.00km

206.00km

86.80km

86.80km

206 Km
x1.2763 x 2
= 525.84
51,442.61
0.39
51,443.00

206 Km
x1.2763 x 2
= 525.84
50,422.27
0.74
50,423.00

86.8 Km
x1.69 x 1 =
146.69
76,975.37
0.63
76,976.00

86.8 Km
x1.69 x 1 =
146.69
47,890.80
0.20
47,891.00

246.60km

246.60km

95.20km

95.20km

246.6 Km
x1.2763 x 2
= 629.47
51,546.24
0.76
51,547.00

246.6 Km
x1.2763 x 2
= 629.47
50,525.90
0.10
50,526.00

95.2 Km
x1.69 x 1 =
160.89
76,989.57
0.43
76,990.00

95.2 Km
x1.69 x 1 =
160.89
47,905.00
0.00
47,905.00

215.00km

215.00km

31.30km

31.30km

215 Km
x1.2763 x 2
= 548.81
51,465.58
0.42
51,466.00

215 Km
x1.2763 x 2
= 548.81
50,445.24
0.76
50,446.00

31.3 Km
x1.69 x 1 =
52.90
76,881.58
0.42
76,882.00

31.3 Km
x1.69 x 1 =
52.90
47,797.01
0.99
47,798.00

270.00km

270.00km

73.00km

73.00km

270 Km
x1.2763 x 2
= 689.20
51,605.97
0.03
51,606.00
Tiruppurnorth

229.00km

270 Km
73 Km x1.69 73 Km x1.69
x1.2763 x 2
x 1 = 123.37 x 1 = 123.37
= 689.20
50,585.63
76,952.05
47,867.48
0.38
0.95
0.52
50,586.00
76,953.00
47,868.00
229.00km

42.60km

42.60km

Tiruppursouth

229 Km
x1.2763 x 2
= 584.55
51,501.32
0.68
51,502.00

229 Km
x1.2763 x 2
= 584.55
50,480.98
0.02
50,481.00

42.6 Km
x1.69 x 1 =
71.99
76,900.67
0.33
76,901.00

42.6 Km
x1.69 x 1 =
71.99
47,816.10
0.90
47,817.00

239.00km

239.00km

36.00km

36.00km

239 Km
x1.2763 x 2
= 610.07
51,526.84
0.16
51,527.00
Udumalapet

Vellkovil

Difference
-3067.21
-3067.05
-1071.54

16.11.12

38177.50
37203.83
70782.99

239 Km
36 Km x1.69 36 Km x1.69
x1.2763 x 2
x 1 = 60.84 x 1 = 60.84
= 610.07
50,506.50
76,889.52
47,804.95
0.50
0.48
0.05
50,507.00
76,890.00
47,805.00

195.00km

195.00km

75.70km

75.70km

195 Km
x1.2763 x 2
= 497.76
51,414.53
0.47
51,415.00

195 Km
x1.2763 x 2
= 497.76
50,394.19
0.81
50,395.00

75.7 Km
x1.69 x 1 =
127.93
76,956.61
0.39
76,957.00

75.7 Km
x1.69 x 1 =
127.93
47,872.04
0.96
47,873.00

281.00km

281.00km

80.20km

80.20km

281 Km
x1.2763 x 2
= 717.28
51,634.05
0.95
51,635.00

281 Km
x1.2763 x 2
= 717.28
50,613.71
0.29
50,614.00

80.2 Km
x1.69 x 1 =
135.54
76,964.22
0.78
76,965.00

80.2 Km
x1.69 x 1 =
135.54
47,879.65
0.35
47,880.00

Difference
-560.00
-559.85
-312.83

31828.00
29308.00
29308.00
31368.00

31028.00
28508.00
28508.00
30568.00

77,040.00

125

47,956.00

125

77,766.00
48,231.00
51,224.00
51,074.00
51,260.00
50,259.00
51,253.00
50,252.00
54.51
57.95
49.00

428
428
120
461
461
461
44
44

114.42%

59784

100.00%

52249.61

114.42%

37719

100.00%

32965.39

55414
12

l charges

13

14

Coimbatore

Furnace oil
43.34
46.98
46.80
46.98
47.97
47.97
47.58
47.38
47.39
48.38
46.42
48.59
50.95
49.00

15

16

Irungattukottai

Emulsion Emulsion Emulsion Emulsion SS 1 Packed RS 1 Packed SS 1 Packed RS 1 Packed

56020.00
56170.00
56720.00
56720.00
57705.00
57705.00
56171.00
56421.33
55414.00
55504.00
55785.00
55695.00
57095.00
57590.00

38665.00
34615.00
34665.00
34665.00
34727.00
34727.00
34715.00
36526.62
35350.00
35462.00
35850.00
35738.00
35667.00
36206.00

56020.00
56170.00
56720.00
56720.00
57705.00
57705.00
56171.00
56171.00
55414.00
55504.00
55785.00
55695.00
57095.00
57590.00

38665.00
34615.00
34665.00
34665.00
34727.00
34727.00
34715.00
34715.00
35350.00
35462.00
35850.00
35738.00
35667.00
36281.00

17
Chennai
60/70

48.54

59204.99

36307.67

59204.99

36382.00

Division Tiruppur
Sub Division Avinashi
Coimbatore

Chennai

Irungattukottai
Emulsion - Emulsion SS 1
RS 1
Packed
Packed
57,590.00
36,281.00
0.00
0.00
57,590.00
36,281.00
8,062.60
5,079.34
161.25
101.59

60/70

80/100

60/70

80/100

40,886.00
0.00
40,886.00
5,724.04
114.48

40,086.00
0.00
40,086.00
5,612.04
112.24

40,021.00
0.00
40,021.00
5,602.94
112.06

39,221.00
0.00
39,221.00
5,490.94
109.82

57.24

56.12

56.03

54.91

80.63

50.79

46,781.76
2,339.09
49,120.85

45,866.40
2,293.32
48,159.72

45,792.03
2,289.60
48,081.63

44,876.67
2,243.83
47,120.50

65,894.48
9,554.70
75,449.18

41,512.72
6,019.34
47,532.06

2,044.30

2,004.30

2,001.05

1,961.05

2,879.50

1,814.05

0.00
51,165.15

0.00
50,164.02

0.00
50,082.68

0.00
49,081.55

-1,500.00
76,828.68

-1,500.00
47,846.11

44 Km
x0.9924 x 2
= 87.33
51,252.48
0.52
51,253.00

44 Km 461 Km x1.5 461 Km x1.5


x0.9924 x 2
x2=
x2=
= 87.33
1383.00
1383.00
50,251.35
51,259.43
50,258.30
0.65
0.57
0.70
50,252.00
51,260.00
50,259.00

428 Km
x1.69 x 1 =
723.32
77,552.00
0.00
77,552.00

428 Km
x1.69 x 1 =
723.32
48,569.43
0.57
48,570.00

51,165.15

50,164.02

50,082.68

49,081.55

76,828.68

47,846.11

125.00km

125.00km

410.00km

410.00km

398.00km

398.00km

125 Km 410 Km x1.5 410 Km x1.5


x0.9924 x 2
x2=
x2=
= 248.10
1230.00
1230.00
50,412.12
51,129.25
50,128.12
0.88
0.75
0.88
50,413.00
51,130.00
50,129.00

398 Km
x1.69 x 1 =
672.62
77,501.30
0.70
77,502.00

398 Km
x1.69 x 1 =
672.62
48,518.73
0.27
48,519.00

461.00km

428.00km

428.00km

44 Km 461 Km x1.5 461 Km x1.5


x0.9924 x 2
x2=
x2=
= 87.33
1383.00
1383.00
50,251.35
51,259.43
50,258.30
0.65
0.57
0.70
50,252.00
51,260.00
50,259.00

428 Km
x1.69 x 1 =
723.32
77,552.00
0.00
77,552.00

428 Km
x1.69 x 1 =
723.32
48,569.43
0.57
48,570.00

402.00km

372.00km

372.00km

107 Km 402 Km x1.5 402 Km x1.5


x0.9924 x 2
x2=
x2=
= 212.37
1206.00
1206.00
50,376.39
51,108.83
50,107.70
0.61
0.17
0.30
50,377.00
51,109.00
50,108.00

372 Km
x1.69 x 1 =
628.68
77,457.36
0.64
77,458.00

372 Km
x1.69 x 1 =
628.68
48,474.79
0.21
48,475.00

456.00km

444.00km

444.00km

80.5 Km 456 Km x1.5 456 Km x1.5


x0.9924 x 2
x2=
x2=
= 159.78
1368.00
1368.00
50,323.80
51,246.67
50,245.54
0.20
0.33
0.46
50,324.00
51,247.00
50,246.00

444 Km
x1.69 x 1 =
750.36
77,579.04
0.96
77,580.00

444 Km
x1.69 x 1 =
750.36
48,596.47
0.53
48,597.00

380.00km

380.00km

125 Km
x0.9924 x 2
= 248.10
51,413.25
0.75
51,414.00
44.00km

44 Km
x0.9924 x 2
= 87.33
51,252.48
0.52
51,253.00
107.00km

107 Km
x0.9924 x 2
= 212.37
51,377.52
0.48
51,378.00
80.50km

80.5 Km
x0.9924 x 2
= 159.78
51,324.93
0.07
51,325.00
100.00km

44.00km

107.00km

80.50km

100.00km

461.00km

402.00km

456.00km

400.00km

400.00km

100 Km
x0.9924 x 2
= 198.48
51,363.63
0.37
51,364.00
70.00km

70 Km
x0.9924 x 2
= 138.94
51,304.09
0.91
51,305.00
129.00km

129 Km
x0.9924 x 2
= 256.04
51,421.19
0.81
51,422.00
107.00km

107 Km
x0.9924 x 2
= 212.37
51,377.52
0.48
51,378.00
154.00km

154 Km
x0.9924 x 2
= 305.66
51,470.81
0.19
51,471.00
170.00km

100 Km 400 Km x1.5 400 Km x1.5


x0.9924 x 2
x2=
x2=
= 198.48
1200.00
1200.00
50,362.50
51,103.72
50,102.59
0.50
0.28
0.41
50,363.00
51,104.00
50,103.00

380 Km
x1.69 x 1 =
642.20
77,470.88
0.12
77,471.00

380 Km
x1.69 x 1 =
642.20
48,488.31
0.69
48,489.00

444.00km

446.00km

446.00km

70 Km 444 Km x1.5 444 Km x1.5


x0.9924 x 2
x2=
x2=
= 138.94
1332.00
1332.00
50,302.96
51,216.03
50,214.90
0.04
0.97
0.10
50,303.00
51,217.00
50,215.00

446 Km
x1.69 x 1 =
753.74
77,582.42
0.58
77,583.00

446 Km
x1.69 x 1 =
753.74
48,599.85
0.15
48,600.00

383.00km

371.00km

371.00km

129 Km 383 Km x1.5 383 Km x1.5


x0.9924 x 2
x2=
x2=
= 256.04
1149.00
1149.00
50,420.06
51,060.33
50,059.20
0.94
0.67
0.80
50,421.00
51,061.00
50,060.00

371 Km
x1.69 x 1 =
626.99
77,455.67
0.33
77,456.00

371 Km
x1.69 x 1 =
626.99
48,473.10
0.90
48,474.00

411.00km

427.00km

427.00km

107 Km 411 Km x1.5 411 Km x1.5


x0.9924 x 2
x2=
x2=
= 212.37
1233.00
1233.00
50,376.39
51,131.80
50,130.67
0.61
0.20
0.33
50,377.00
51,132.00
50,131.00

427 Km
x1.69 x 1 =
721.63
77,550.31
0.69
77,551.00

427 Km
x1.69 x 1 =
721.63
48,567.74
0.26
48,568.00

358.00km

345.00km

345.00km

154 Km 358 Km x1.5 358 Km x1.5


x0.9924 x 2
x2=
x2=
= 305.66
1074.00
1074.00
50,469.68
50,996.51
49,995.38
0.32
0.49
0.62
50,470.00
50,997.00
49,996.00

345 Km
x1.69 x 1 =
583.05
77,411.73
0.27
77,412.00

345 Km
x1.69 x 1 =
583.05
48,429.16
0.84
48,430.00

332.00km

332.00km

70.00km

129.00km

107.00km

154.00km

170.00km

444.00km

383.00km

411.00km

358.00km

365.00km

365.00km

170 Km
x0.9924 x 2
= 337.42
51,502.57
0.43
51,503.00
81.00km

81 Km
x0.9924 x 2
= 160.77
51,325.92
0.08
51,326.00
102.00km

102 Km
x0.9924 x 2
= 202.45
51,367.60
0.40
51,368.00
38.30km

38.3 Km
x0.9924 x 2
= 76.02
51,241.17
0.83
51,242.00
82.30km

82.3 Km
x0.9924 x 2
= 163.35
51,328.50
0.50
51,329.00
52.30km

170 Km 365 Km x1.5 365 Km x1.5


x0.9924 x 2
x2=
x2=
= 337.42
1095.00
1095.00
50,501.44
51,014.38
50,013.25
0.56
0.62
0.75
50,502.00
51,015.00
50,014.00

332 Km
x1.69 x 1 =
561.08
77,389.76
0.24
77,390.00

332 Km
x1.69 x 1 =
561.08
48,407.19
0.81
48,408.00

510.00km

498.00km

498.00km

81 Km 510 Km x1.5 510 Km x1.5


x0.9924 x 2
x2=
x2=
= 160.77
1530.00
1530.00
50,324.79
51,384.51
50,383.38
0.21
0.49
0.62
50,325.00
51,385.00
50,384.00

498 Km
x1.69 x 1 =
841.62
77,670.30
0.70
77,671.00

498 Km
x1.69 x 1 =
841.62
48,687.73
0.27
48,688.00

435.00km

423.00km

423.00km

102 Km 435 Km x1.5 435 Km x1.5


x0.9924 x 2
x2=
x2=
= 202.45
1305.00
1305.00
50,366.47
51,193.06
50,191.93
0.53
0.94
0.07
50,367.00
51,194.00
50,192.00

423 Km
x1.69 x 1 =
714.87
77,543.55
0.45
77,544.00

423 Km
x1.69 x 1 =
714.87
48,560.98
0.02
48,561.00

477.00km

467.00km

467.00km

38.3 Km 477 Km x1.5 477 Km x1.5


x0.9924 x 2
x2=
x2=
= 76.02
1431.00
1431.00
50,240.04
51,300.27
50,299.14
0.96
0.73
0.86
50,241.00
51,301.00
50,300.00

467 Km
x1.69 x 1 =
789.23
77,617.91
0.09
77,618.00

467 Km
x1.69 x 1 =
789.23
48,635.34
0.66
48,636.00

423.00km

414.00km

414.00km

82.3 Km 423 Km x1.5 423 Km x1.5


x0.9924 x 2
x2=
x2=
= 163.35
1269.00
1269.00
50,327.37
51,162.43
50,161.30
0.63
0.57
0.70
50,328.00
51,163.00
50,162.00

414 Km
x1.69 x 1 =
699.66
77,528.34
0.66
77,529.00

414 Km
x1.69 x 1 =
699.66
48,545.77
0.23
48,546.00

450.00km

450.00km

81.00km

102.00km

38.30km

82.30km

52.30km

510.00km

435.00km

477.00km

423.00km

460.00km

460.00km

52.3 Km
x0.9924 x 2
= 103.81
51,268.96
0.04
51,269.00
52.30km

52.3 Km
x0.9924 x 2
= 103.81
51,268.96
0.04
51,269.00
70.00km

70 Km
x0.9924 x 2
= 138.94
51,304.09
0.91
51,305.00
86.80km

86.8 Km
x0.9924 x 2
= 172.28
51,337.43
0.57
51,338.00

52.3 Km 460 Km x1.5 460 Km x1.5


x0.9924 x 2
x2=
x2=
= 103.81
1380.00
1380.00
50,267.83
51,256.88
50,255.75
0.17
0.12
0.25
50,268.00
51,257.00
50,256.00

450 Km
x1.69 x 1 =
760.50
77,589.18
0.82
77,590.00

450 Km
x1.69 x 1 =
760.50
48,606.61
0.39
48,607.00

460.00km

450.00km

450.00km

52.3 Km 460 Km x1.5 460 Km x1.5


x0.9924 x 2
x2=
x2=
= 103.81
1380.00
1380.00
50,267.83
51,256.88
50,255.75
0.17
0.12
0.25
50,268.00
51,257.00
50,256.00

450 Km
x1.69 x 1 =
760.50
77,589.18
0.82
77,590.00

450 Km
x1.69 x 1 =
760.50
48,606.61
0.39
48,607.00

496.00km

483.00km

483.00km

70 Km 496 Km x1.5 496 Km x1.5


x0.9924 x 2
x2=
x2=
= 138.94
1488.00
1488.00
50,302.96
51,348.77
50,347.64
0.04
0.23
0.36
50,303.00
51,349.00
50,348.00

483 Km
x1.69 x 1 =
816.27
77,644.95
0.05
77,645.00

483 Km
x1.69 x 1 =
816.27
48,662.38
0.62
48,663.00

425.00km

413.00km

413.00km

86.8 Km 425 Km x1.5 425 Km x1.5


x0.9924 x 2
x2=
x2=
= 172.28
1275.00
1275.00
50,336.30
51,167.54
50,166.41
0.70
0.46
0.59
50,337.00
51,168.00
50,167.00

413 Km
x1.69 x 1 =
697.97
77,526.65
0.35
77,527.00

413 Km
x1.69 x 1 =
697.97
48,544.08
0.92
48,545.00

52.30km

70.00km

86.80km

460.00km

496.00km

425.00km

Diesel

Month

Tiruppur

Chennai

Excise Duty
@

Education
Cess ON
ED @

66026

60.46
60.46
60.96

1-Jan-13

50.54

50.13

14.0%

2%

18-Jan-13

51.09

50.68

14.0%

2%

15-Feb-13

51.64

51.23

14.0%

2%

22-Mar-13

52.19

51.78

14.0%

2%

1-Apr-13

52.11

51.78

14.0%

2%

15-Apr-13

52.18

51.82

14.0%

2%

10-May-13

53.28

52.92

14.0%

2%

31-May-13

53.88

52.92

14.0%

2%

1-Jun-13

53.88

53.93

14.0%

2%

14.0%
14.0%
14.0%

2%
2%
2%

14.0%

2%

14.0%

2%

61917.88
58.71

14.0%
14.0%

2%
2%

14.0%

2%

14.0%

2%

14.0%

2%

14.0%

2%

14.0%

2%

14.0%

2%

14.0%

2%

14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%

2%
2%
2%
2%
2%
2%
2%
2%
2%
2%
2%

Irungattukottai
Emulsion SS 1 Bulk

Emulsion RS 1 Bulk

53,648.00
0.00
53,648.00
7,510.72
150.21

32,931.00
0.00
32,931.00
4,610.34
92.21

75.11

46.10

61,384.04
8,900.69
70,284.73
3,514.24

37,679.65
5,463.55
43,143.20
2,157.16

2,682.40

1,646.55

0.00
76,481.37

0.00
46,946.91

3,942.00

788.4

0.00

428 Km x1.5 428 Km x1.5


x2=
x2=
1284.00
1284.00
77,765.37
48,230.91
0.63
0.09
77,766.00
48,231.00
76,481.37

46,946.91

398.00km

398.00km

398 Km x1.5 398 Km x1.5


x2=
x2=
1194.00
1194.00
77,675.37
48,140.91
0.63
0.09
77,676.00
48,141.00
428.00km

428.00km

428 Km x1.5 428 Km x1.5


x2=
x2=
1284.00
1284.00
77,765.37
48,230.91
0.63
0.09
77,766.00
48,231.00
372.00km

372.00km

372 Km x1.5 372 Km x1.5


x2=
x2=
1116.00
1116.00
77,597.37
48,062.91
0.63
0.09
77,598.00
48,063.00
444.00km

444.00km

444 Km x1.5 444 Km x1.5


x2=
x2=
1332.00
1332.00
77,813.37
48,278.91
0.63
0.09
77,814.00
48,279.00
380.00km

380.00km

1500
1,500.00

380 Km x1.5 380 Km x1.5


x2=
x2=
1140.00
1140.00
77,621.37
48,086.91
0.63
0.09
77,622.00
48,087.00
446.00km

446.00km

446 Km x1.5 446 Km x1.5


x2=
x2=
1338.00
1338.00
77,819.37
48,284.91
0.63
0.09
77,820.00
48,285.00
371.00km

371.00km

371 Km x1.5 371 Km x1.5


x2=
x2=
1113.00
1113.00
77,594.37
48,059.91
0.63
0.09
77,595.00
48,060.00
427.00km

427.00km

427 Km x1.5 427 Km x1.5


x2=
x2=
1281.00
1281.00
77,762.37
48,227.91
0.63
0.09
77,763.00
48,228.00
345.00km

345.00km

345 Km x1.5 345 Km x1.5


x2=
x2=
1035.00
1035.00
77,516.37
47,981.91
0.63
0.09
77,517.00
47,982.00
332.00km

332.00km

332 Km x1.5 332 Km x1.5


x 2 = 996.00 x 2 = 996.00
77,477.37
0.63
77,478.00

47,942.91
0.09
47,943.00

498.00km

498.00km

498 Km x1.5 498 Km x1.5


x2=
x2=
1494.00
1494.00
77,975.37
48,440.91
0.63
0.09
77,976.00
48,441.00
423.00km

423.00km

423 Km x1.5 423 Km x1.5


x2=
x2=
1269.00
1269.00
77,750.37
48,215.91
0.63
0.09
77,751.00
48,216.00
467.00km

467.00km

467 Km x1.5 467 Km x1.5


x2=
x2=
1401.00
1401.00
77,882.37
48,347.91
0.63
0.09
77,883.00
48,348.00
414.00km

414.00km

414 Km x1.5 414 Km x1.5


x2=
x2=
1242.00
1242.00
77,723.37
48,188.91
0.63
0.09
77,724.00
48,189.00
450.00km

450.00km

450 Km x1.5 450 Km x1.5


x2=
x2=
1350.00
1350.00
77,831.37
48,296.91
0.63
0.09
77,832.00
48,297.00
450.00km

450.00km

450 Km x1.5 450 Km x1.5


x2=
x2=
1350.00
1350.00
77,831.37
48,296.91
0.63
0.09
77,832.00
48,297.00
483.00km

483.00km

483 Km x1.5 483 Km x1.5


x2=
x2=
1449.00
1449.00
77,930.37
48,395.91
0.63
0.09
77,931.00
48,396.00
413.00km

413.00km

413 Km x1.5 413 Km x1.5


x2=
x2=
1239.00
1239.00
77,720.37
48,185.91
0.63
0.09
77,721.00
48,186.00

Higher
secondary
Education
Cess ON
ED @

Emulsion
VAT @

Bitumen
VAT @

Bitumen
Central VAT
@

Storage
Charges on
basic price
@

Date

1%

14.5%

5%

2%

5%

1-Jan-2012

1%

14.5%

5%

2%

5%

16-Jan-2012

1%

14.5%

5%

2%

5%

1-Feb-2012

1%

14.5%

5%

2%

5%

16-Feb-2012

1%

14.5%

5%

2%

5%

1-Mar-2012

1%

14.5%

5%

2%

5%

16-Mar-2012

1%

14.5%

5%

2%

5%

1-Apr-2012

1%

14.5%

5%

2%

5%

16-Apr-2012

1%

14.5%

5%

2%

5%

1-May-2012

1%
1%
1%

14.5%
14.5%
14.5%

5%
5%
5%

2%
2%
2%

5%
5%
5%

16-May-2012
1-Jun-2012
16-Jun-2012

1%

14.5%

5%

2%

5%

1-Jul-2012

1%

14.5%

5%

2%

5%

16-Jul-2012

1%
1%

14.5%
14.5%

5%
5%

2%
2%

5%
5%

1-Aug-2012
16-Aug-2012

1%

14.5%

5%

2%

5%

1-Sep-2012

1%

14.5%

5%

2%

5%

16-Sep-2012

1%

14.5%

5%

2%

5%

1-Oct-2012

1%

14.5%

5%

2%

5%

16-Oct-2012

1%

14.5%

5%

2%

5%

1-Nov-2012

1%

14.5%

5%

2%

5%

16-Nov-2012

1%

14.5%

5%

2%

5%

1-Dec-2012

1%
1%
1%
1%
1%
1%
1%
1%
1%
1%
1%

14.5%
14.5%
14.5%
14.5%
14.5%
14.5%
14.5%
14.5%
14.5%
14.5%
14.5%

5%
5%
5%
5%
5%
5%
5%
5%
5%
5%
5%

2%
2%
2%
2%
2%
2%
2%
2%
2%
2%
2%

5%
5%
5%
5%
5%
5%
5%
5%
5%
5%
5%

16-Dec-2012

Chennai Diesel Price = 53.53 Rs/Ltr


6/1/2013
5/11/2013
4/1/2013

53.53 Most Recent price change date: Saturday, June 01, 2013
52.92

Chennai Diesel Price = 52.92 Rs/Ltr

51.78 Historical Diesel price change date: Saturday, May 11, 2013

Chennai Diesel Price = 51.78 Rs/Ltr

3/23/2013

51.78

2/16/2013

51.23 Historical Diesel price change date: Monday, April 01, 2013

1/18/2013

50.68

1/1/2013
10/27/2013
9/14/2012
8/1/2012
6/25/2012
7/1/2011
6/25/2011
11/2/2011

Chennai Diesel Price = 51.78 Rs/Ltr

50.13 Historical Diesel price change date: Saturday, March 23, 2013
50.16

Chennai Diesel Price = 51.23 Rs/Ltr

49.98 Historical Diesel price change date: Saturday, February 16, 2013
44.76

Chennai Diesel Price = 50.68 Rs/Ltr

43.83 Historical Diesel price change date: Friday, January 18, 2013
43.95

Chennai Diesel Price = 50.13 Rs/Ltr

43.8 Historical Diesel price change date: Tuesday, January 01, 2013
40.16

Chennai Diesel Price = 50.16 Rs/Ltr


Historical Diesel price change date: Saturday, October 27, 2012

Chennai Diesel Price = 50.16 Rs/Ltr


Historical Diesel price change date: Saturday, October 27, 2012

Chennai Diesel Price = 49.98 Rs/Ltr


Historical Diesel price change date: Friday, September 14, 2012

Chennai Diesel Price = 44.76 Rs/Ltr


Historical Diesel price change date: Wednesday, August 01, 2012

Chennai Diesel Price = 43.83 Rs/Ltr


Historical Diesel price change date: Wednesday, July 25, 2012

Chennai Diesel Price = 43.95 Rs/Ltr


Historical Diesel price change date: Friday, July 01, 2011

Chennai Diesel Price = 43.8 Ltr


Historical Diesel price change date: Saturday, June 25, 2011

Chennai Diesel Price = 40.16 Ltr

3 Rs/Ltr

rday, June 01, 2013

2 Rs/Ltr

turday, May 11, 2013

8 Rs/Ltr

nday, April 01, 2013

8 Rs/Ltr

turday, March 23, 2013

3 Rs/Ltr

turday, February 16, 2013

8 Rs/Ltr

day, January 18, 2013

3 Rs/Ltr

esday, January 01, 2013

6 Rs/Ltr

turday, October 27, 2012

6 Rs/Ltr

turday, October 27, 2012

8 Rs/Ltr

day, September 14, 2012

6 Rs/Ltr

ednesday, August 01, 2012

3 Rs/Ltr

ednesday, July 25, 2012

5 Rs/Ltr

day, July 01, 2011

turday, June 25, 2011

Sub Division:Avinashi
Date:
7/16/2013
Division: Tiruppur

COIMBAT
Emulsion ORE
SS 1 Packed
Packed

Earth
Gravel
Metal
Sand

Quarry
1 Km
3 Km
12 Km
80 Km

CMP
1 Km
3 Km
3 Km
49 Km

125.00 Km

77,039.81

71,265.00

-5,774.81

Avinashi

Sub Division

Name of work:
Reach

Cochin

60/70

120.00 Km

51,223.02

39,510.02

-11,713.00

Cochin

80/100

461.00 Km

51,073.20

38,470.00

-12,603.20 Aravakurichi
Avinashi
Bhavani
Dharapuram
Erode

Conveyance rate of Bitumen &

Irungattukottai 1.50/RTKM

Hincol invoice
dated:01.08.2011

Kangeyam
Karur
Kodumudi
Krishnarayapuram

Cochin
1.28/RTKM
CHENNAI
0.9924
COIMBATORE
0.9924
COIMBATORE
Least rate

1.69

Hincol invoice
dated:01.08.2011

Kulithalai

Cochin

60/70

51,223.02

Madathukulam

Cochin

80/100

51,073.20

Mulanoor

COIMBAT
Emulsion ORE
SS 1 Packed
Packed

125

77,039.81

Palladam
Perundhurai

7/16/2013
Irungattu
Emulsion kottai
SS 1 Packed
Packed
Irungattu
Emulsion kottai
SS 1 Bulk
Bulk
COIMBAT
Emulsion ORE
RS 1 Packed
Packed
Irungattu
Emulsion kottai
RS 1 Packed
Packed
Irungattu
Emulsion kottai
RS 1 Bulk
Bulk
CHENNAI
60/70

Distance

Tiruppurnorth
a

Tiruppursouth

428.00 Km

77,552.00

Udumalapet

428.00 Km

77,766.00

Vellkovil

125.00 Km

47,956.00

428.00 Km

48,570.00

428.00 Km

48,231.00

461.00 Km

51,260.00
50,259.00
51,223.02
51,073.20
51,253.00

80/100

461.00 Km

Cochin

60/70

120.00 Km

Cochin

80/100

461.00 Km

COIMBATORE 60/70

44.00 Km

CHENNAI

Estimate rate

Data based on Designs ,Highways,Chen


circulars received from higher authoritie

The following distances are appro


distance with reference to the hard

COIMBATORE80/100

Diesel
Kerosene
Furnace oil

44.00 Km

50,252.00

Diesel
Kerosene
Furnace
oil

54.51

Emulsion SS 1 Bulk
Emulsion RS 1 Packed

Least rate

57.95
49.00
51,073.20 c
47,956.00

#N/A

Kochi Refineries Ltd. Ambalamugal, Kochi - 682301

HINDUSTAN
COLAS
LIMITED. A-9,
SIPCOTand
Industrial
Kancheepuram
Data
for Bitumenious
concrete
SDBCPark,IRUNGATTUKOTTAI,Dist.
40 are to be revised with reference
to the IRC-111-2009 Specificati
Manali Refinery, Manali Chennai (Madras) - 600068
Hindustan Colas Limited AA-9,SIPCOT Industrial Park, Irungattukottai - 602105.

SDBC

To
Cochin
Cochin Coimbator
Irungattuk
Coimbator
Chennai
Bitumen Bitumen
eottai
e Bitumen
Bitumen
60/70
80/100 Emulsion
Emulsion
271
410
119
125
398
410
120
461
125
44
428
461
284
402
94.3
107
372
402
249
456
73.9
80.5
444
456
302.7
276.5
100
100
380
400

Metal
Quarry

Metal
CMP

gravel
Quarry

gravel
CMP

15
12
12
5
22

12
3
3
7
12

4
3
3
3
3

5
3
3
3
3

260

250

51

70

446

444

10

10

304
284
325

302
411
358

118
110
147

129
107
154

371
427
345

383
411
358

12
12
12

2
3
3

3
3
3

3
3
3

395

365

182

170

332

365

39

10

206

510

86.8

81

498

510

24

246.6

263.2

95.2

102

423

435

215

477

31.3

38.3

467

477

12

270

275

73

82.3

414

423

12

229

460

42.6

52.3

450

460

239

239

36

52.3

450

460

14

12

195

496

75.7

70

483

496

12

281

278.2

80.2

86.8

413

425

12

on Designs ,Highways,Chennai data book and CEs Circulars.Engineers are requested to verify and up date the data frequently if any
ceived from higher authorities.

wing distances are approximate distances.Taken from google map.Engineers are requesed to calculate actual
with reference to the hard copy

IRC-111-2009 Specifications for Dense Gaded Bituminous Mixes

Division

Karur
Tiruppur
Erode
Dharapuram
Erode
Tiruppur
Karur
Erode
Karur
Karur
Dharapuram
Dharapuram

Sub
Sugested route
Division

1. 271 km, Salem Ernakulam Highway/NH 544 and SH 21-(Via) Trissur,V


Tiruppur
Erode

Aravakuri
chi

Tiruppur
Tiruppur

2. 302 km, Salem Ernakulam Highway/NH 544 (via) Trissur,Vadakancherr


3. 284 km, NH 85 and SH 17 (via) Munnar, Udumalai, Palladam, Pollachi
1. 221km, Salem - Ernakulam Highway/NH 544 (Via) Vadakancherry,Pala
2. 239km, Salem Ernakulam Highway/NH 544 (via) Pollachi, Palladam

Dharapuram
Avinashi
3.

272km, NH 85 and SH 17 (via) Munnar, Udumalai, Dharapuram,Mulan

Dharapuram

1. 284 km, Salem - Ernakulam Highway/NH 544 (via) Trissur,Vadakanche

2. 294 km, Salem Ernakulam Highway/NH 544 (via) Trissur,Vadakancherr


Bhavani

3. 326 km, Salem Ernakulam Highway/NH 544 and SH 21 (via) Trissur,Va


Dharapur 1.
am
2.
Erode

226km, Salem - Ernakulam Highway/NH 544 (Via) Trissur,Vadakanche


240km, NH 85 and SH 17 (via) Munnar, Udumalai, Dharapuram
1. 277 km, Salem - Ernakulam Highway/NH 544 (via) Trissur,Vadakanche
2. 292 km, Salem Ernakulam Highway/NH 544 (via) Trissur,Vadakancherr
3. 287 km, Salem Ernakulam Highway/NH 544 and SH 21 (via) Trissur,Va

Kangeyam

1. 247 km, Salem Ernakulam Highway/NH 544 (via) Trissur,Vadakancherr


2. 248 km, Salem Ernakulam Highway/NH 544 and SH 21 (via) Trissur,Va
1. 301 km, Salem Ernakulam Highway/NH 544 and SH 21 (via) Trissur,Va
2. 306 km, Salem Ernakulam Highway/NH 544 and NH 81 (via) Trissur,V

Karur

3. 344 km, Salem - Ernakulam Highway/NH 544 (via) Trissur,Vadakanche

1. 284 km, Salem Ernakulam Highway/NH 544 (via) Trissur,Vadakancherr


Kodumudi

2. 291 km, Salem Ernakulam Highway/NH 544 and SH 21 (via) Trissur,Va


3. 316 km, Salem - Ernakulam Highway/NH 544 (via) Trissur,Vadakanche
1. 325 km, Salem Ernakulam Highway/NH 544 and SH 21 (via) Trissur,Va
Krishnara
2. 331 km, Salem Ernakulam Highway/NH 544 and NH 81 (via) Trissur,V
yapuram
3. 369 km, Salem - Ernakulam Highway/NH 544 (via) Trissur,Vadakanche
1. 341 km, Salem Ernakulam Highway/NH 544 and SH 21(via) Trissur,Va
Kulithalai 2. 347 km, Salem Ernakulam Highway/NH 544 and NH 81 (via) Trissur,V
3. 390 km, Salem - Ernakulam Highway/NH 544 (via) Trissur,Vadakanche
Madathuk 1. 206 km, Salem Ernakulam Highway/NH 544 (via) Trissur,Pollachi,Udum
ulam
2. 213 km, NH 85 and SH 17 (via) Trissur,Munnar,Udumalai
1. 247 km, Salem Ernakulam Highway/NH 544 and SH 21 (via) Trissur,Po
Mulanoor 2. 281 km, Salem Ernakulam Highway/NH 544 (via) Trissur,Pallakadu,Ma
3. 261 km, NH 85 and SH 17 (via) Munar,Udumalai,Dharapuram
1. 215 km, Salem Ernakulam Highway/NH 544 (via) Trissur,Pallakadu,Ma
Palladam 2. 215 km, Salem Ernakulam Highway/NH 544 and SH 19 (via) Trissur,Va
3. 248 km, NH 85 and SH 17 (via) Trissur,Munnar,Udumalai
Perundhur 1. 259 km, Salem - Ernakulam Highway/NH 544 (via) Trissur,Pallakadu,M
ai
2. 269 km, Salem Ernakulam Highway/NH 544 (via) Trissur,Vadakancherr
1. 229 km, Salem Ernakulam Highway/NH 544 (via) Trissur,Pallakadu,Ma
Tiruppurnorth2. 232 km, Salem Ernakulam Highway/NH 544 and SH 19 (via) Trissur,Va
3. 265 km, NH 85 and SH 17 (via) Trissur,Munnar,Udumalai,Palladam
1. 229 km, Salem Ernakulam Highway/NH 544 (via) Trissur,Pallakadu,Ma
Tiruppursouth2. 232 km, Salem Ernakulam Highway/NH 544 and SH 19 (via) Trissur,Va
3. 265 km, NH 85 and SH 17 (via) Trissur,Munnar,Udumalai,Palladam
Udumalap 1. 195 km, Salem Ernakulam Highway/NH 544 (via) Trissur,Vadakancherr
et
2. 201 km, NH 85 and SH 17 (via) Trissur,Munnar,Udumalai
1. 261 km, Salem Ernakulam Highway/NH 544 (via) Trissur,Vadakancherr
Vellkovil 2. 264 km, Salem Ernakulam Highway/NH 544 and NH 81 (via) Trissur,Pa
3. 275 km, NH 85 and SH 17 (via) Trissur,Munnar,Udumalai,Dharapuram,

296.2

89
70.6
40
71.2
0.6
20

Km 282/4 of Salem - Cochin road to Ambalamugal (Refineries) Km 0/0-89/0


Salem - Cochin road (Trissur - Mannuthu (Bypass) Km 168/4-239/0 (Up to Vadakk
Vadakkancherry - Mudappallur - Nemmara - Kollengode - Muthalamada - Gopalap
Avinashi - Tiruppur - Palladam - Pollachi - Cochin road (via) Meenkarai km 99/6-2
Pollachi - Palladam loop road km 0/0-0/6
Avinashi - Tiruppur - Palladam - Pollachi - Cochin road (via) Meenkarai km 27/4-7

296.2

4.8

SH 21-(Via) Trissur,Vadakancherry, Pollachi,Dharapuram,Mulanur

) Trissur,Vadakancherry, Palakad,Coimbatore,Palladam, Dharapuram,Mulanur


lai, Palladam, Pollachi
ia) Vadakancherry,Palakadu,Coimbatore
) Pollachi, Palladam

lai, Dharapuram,Mulanur

ia) Trissur,Vadakancherry, Palakad,Coimbatore,Avinashi, Perundurai

) Trissur,Vadakancherry, Pollachi,Palladam,Avinashi, Perundurai


SH 21 (via) Trissur,Vadakancherry,Pollachi,Dharapuram,Vellakoil, Erode

ia) Trissur,Vadakancherry,Pollachi,Dharapuram
lai, Dharapuram
ia) Trissur,Vadakancherry, Palakad,Coimbatore,Avinashi, Perundurai
) Trissur,Vadakancherry, Palakad,Coimbatore,Palladam, Kangyam
SH 21 (via) Trissur,Vadakancherry,Pollachi,Palladam,Tiruppur,Perundurai

) Trissur,Vadakancherry, Palakad,Coimbatore,Palladam
SH 21 (via) Trissur,Vadakancherry,Pollachi,Palladam
SH 21 (via) Trissur,Vadakancherry, Pollachi,Dharapuram,Mulanur,Aravakuraichi
NH 81 (via) Trissur,Vadakancherry, Palakad,Coimbatore,Palladam,Kangeyam, Vellaokoil

ia) Trissur,Vadakancherry, Palakad,Coimbatore,Avinshi,Perundurai,Erode, Kodumudi

) Trissur,Vadakancherry, Palakad,Coimbatore,Palladam,Kangeyam, Kodumudi

SH 21 (via) Trissur,Vadakancherry, Pollachi,Dharapuram,Vellaokoil,Kodumudi


ia) Trissur,Vadakancherry, Palakad,Coimbatore,Avinshi,Perundurai,Erode
SH 21 (via) Trissur,Vadakancherry, Pollachi,Dharapuram,Mulanur,Aravakuraichi,Karur
NH 81 (via) Trissur,Vadakancherry,Palakad,Coimbatore,Palladam,Kangeyam, Vellaokoil, Karur
ia) Trissur,Vadakancherry, Palakad,Coimbatore,Avinshi,Perundurai,Erode
SH 21(via) Trissur,Vadakancherry, Pollachi,Dharapuram,Mulanur,Aravakuraichi,Karur
NH 81 (via) Trissur,Vadakancherry, Palakad,Coimbatore,Palladam,Kangeyam,Vellakoil
ia) Trissur,Vadakancherry, Palakad,Coimbatore,Avinashi, Perundurai,Bhavani,Namakkal
) Trissur,Pollachi,Udumalai

SH 21 (via) Trissur,Pollachi,Dharapuram,Mulanur
) Trissur,Pallakadu,Malumichampatty,Sulur,Palladam,Koduvai Dharapuram
i,Dharapuram
) Trissur,Pallakadu,Malumichampatty,Sulur
SH 19 (via) Trissur,Vadakancherry, Pollachi

ia) Trissur,Pallakadu,Malumichampatty,Avinashi,Perundhurai
) Trissur,Vadakancherry,Pollachi,Palladam,Tiruppur,Perundhurai
) Trissur,Pallakadu,Malumichampatty,Sulur,Karanampettai, Samalapuram,Avinashi
SH 19 (via) Trissur,Vadakancherry,Pollachi,Palladam
Udumalai,Palladam
) Trissur,Pallakadu,Malumichampatty,Sulur,Karanampettai, Samalapuram,Avinashi
SH 19 (via) Trissur,Vadakancherry,Pollachi,Palladam
Udumalai,Palladam
) Trissur,Vadakancherry,Pollachi

) Trissur,Vadakancherry,Pollachi,Palladam,Dharapuram
NH 81 (via) Trissur,Pallakadu,Malumichampatty,Sulur,Palladam,Kangeyam
Udumalai,Dharapuram,Vellakoil

neries) Km 0/0-89/0
68/4-239/0 (Up to Vadakkanchery)
- Muthalamada - Gopalapuram km 0/0 - 40/0 (Kerala SH 58)
via) Meenkarai km 99/6-28/4

via) Meenkarai km 27/4-7/4

Date:

7/16/2013

IRC metal - Quarry

13 Km

IRC metal - CMP

12 Km

Gravel

3 Km

Sand

94 Km

Lime Powder

25 Km

Bitumen - CMP

220 Km

Emulsion - site

45 Km

Bitumen conveyance Chennai


Bitumen conveyance Cochin
Emulsion conveyance

420 Km

225 Km

0.99924
1.2763
1.69
COST OF MATERIALS

Diesel

54.51

Oil

49.00

Kerosine

57.95

Head Mazdoor

266.00

Mazdoor I

258.00

Mazdoor II

231.00

Emulsion Bitumen SS--I

57590.00

Emulsion Bitumen RS--I

36206.00

Basic Prize for 80 / 100

39121.00

Basic Prize for 60 / 70

39921.00

Basic Prize for 30 / 40

0.00

Furnace Oil

49.00

GSB Lead

23

Granular 53 -- 22.40 Gr

13

780.67

98.10

878.77

Granular 22.40 -- 4.75 Gr

13

473.60

98.10

571.70

Granular 4.75 Gr

13

440.00

98.10

538.10

Quarry fines

13

92.40

67.95

160.35

WMM 45-22.4

13

810.60

98.10

908.70

WMM 22.4-2.36

13

662.86

98.10

760.96

WMM 2.36 and below

12

440.00

91.40

531.40

37.0 mm IRC metal

12

773.00

91.40

864.40 CMP

26.5 mm IRC metal

12

731.00

91.40

822.40 CMP

25.0 mm IRC metal

12

731.00

91.40

822.40 CMP

22.4 mm IRC metal

12

1061.00

91.40

1152.40 CMP

13.20 mm IRC

12

983.00

91.40

1074.40 CMP

11.2 mm IRC metal

12

668.00

91.40

759.40 CMP

6.70 mm IRC

12

496.00

91.40

587.40 CMP

6.00 mm IRC

12

496.00

91.40

587.40 CMP

5.60 mm IRC

12

496.00

91.40

587.40 CMP

4.75 mm IRC

13

440.00

98.10

538.10 CMP

Below 4.75 mm IRC

13

440.00

98.10

538.10 CMP

Quarry fines

94

92.40

363.90

456.30 CMP

13.20 mm IRC Metal

13

983.00

98.10

1081.10

45 mm IRC Metal

13

757.00

98.10

855.10

Sand for Mortar

94

110.00

524.00

634.00

Quarry Rubbish

72.60

16.20

88.80

Gravel

111.00

23.40

134.40

Sand for filling

25

110.00

174.50

284.50

COST OF BITUMEN - 16-07-13


Cost of bulk bitumen 60/70 at CMP site

80 / 100

Basic price

39121.00 39921.00

ED @ 14 %
EDN CESS @ 3 % ON ED
SUB TOTAL

5476.94

5588.94

164.31

167.67

44762.25 45677.61

VAT 5 %

2238.11

Total
Conveyance at Rs.1.2763 /RTKM 2 x

60 / 70

CMP

tc

220.00km 225.00km

Storage charges 5%
Total
Cost of bulk bitumen 30/40 at CMP site

2283.88

47000.36 47961.49
574.34

561.57

1956.05

1996.05

49530.75 50519.11
30 / 40

Basic price

0.00

ED @ 14 %

0.00

EDN CESS @ 3 % ON ED

0.00

SUB TOTAL

0.00

VAT 5 %

0.00

Total

0.00

Conveyance at Rs.0.99924 /RTKM 2 x


Storage charges 5%

420.00km

839.36
0.60

Total

839.96

COST OF EMULSION - 16-07-13


SS1
57590.00

Basic price
Eecise Duty @ 14.42%

8304.48

Billable Price

65894.48

VAT 14.5 %

9554.70

Total Invoice Value

75449.18

Deduct for Drums Cost

-1500.00
73949.18

Conveyance at Rs.1.69 /RTKM 1 x

37.00km

0.00

Storage charges 5%

2879.50
Total

76828.68
RS1
36206.00
5220.91
41426.91
6006.90
47433.81
-1500.00
45933.81
0.00
1810.30
47744.11

Basic price
Eecise Duty @ 14.42%
Billable Price
VAT 14.5 %
Total Invoice Value
Deduct for Drums Cost
Conveyance at Rs.1.69 /RTKM 1 x
Storage charges 5%

37.00km
Total

Cost of Furnace Oil at CMP site


Basic price

49.00

ED @ 14 %

6.86

EDN CESS @ 3 % ON ED

0.21

SUB TOTAL

56.07

VAT 5%

2.80

Total

58.87
Total
Per Liter

58.87
0.06

HIRECHARGES AND LABOUR CHARGES FOR EARTHWORK / GRAVEL SOLING


WATER SPRINKLER:
Hire charges excluding fuel charges per day
Fuel charges per day at the rate of 3.25 Lr.per hour

1112.00
26 Litres/day

54.51 per litre

Total hire charges including fuel per day

2529.26

Daily out turn of water sprinkler


Hire charges for 1 cum

1417.26

1000 cum
2529.26 /1000

2.53 (A)

POWER ROLLER:
Hire charges excluding fuel charges per day
Fuel charges per day at the rate of 2.50 Lr.per hour

720.00
20 Litres/day

54.51 per litre

Total hire charges including fuel per day

1810.20

Out turn of power roller per hour


Hire charges of roller per cum

1090.20

425 cum
1810.20 /425

4.26 (B)

Total hire charge (A+B)

6.79

LABOUR CHARGES:
Labour charges for 100 cum
Mazdoors I class
Rate for 1 cum
Total hire charges and labour charges for one cum

2 Nos

258.00

516.00 /100

each

516.00
5.16
11.95

HIRECHARGES AND LABOUR CHARGES FOR GRANULAR SUB BASE WITH COARSE GRADED MATERIALS

(Table400-2)

Taking out put= 225 cum

1. Vibratory roller 80-10


Hire charges
Fuel charges

5428.00/day
20 liters/day

5428.00
54.51

1090.20
6518.20

Rate for one hour

814.78

855.00/day

855.00

2. Water tanker 6 KL capacity


Hire charges
Fuel charges

25 liters/day

54.51

1362.75
2217.75

Rate for one hour

277.22

1205.00/day

1205.00

3. Loader 5 Cum Capacity / Day


Hire charges
Fuel charges

80 liters/day

54.51

4360.80
5565.80

Rate for one hour

695.73

Hire and fuel charges for machineries for 300 cum of Granular
1. Wet Mix Plant 75 tonne capacity

6 hours

1116.63

hour

6699.78

2. Electric Generating set 125 KVA

6 hours

647.38

hour

3884.28

4.5 hours

277.22

hour

1247.49

6 hours

695.73

hour

4174.38

3.00

Day

31050.00

3. Water Tanker 6 KL Capacity


4. Front end loader 1 Cum bucket capacity
5. Tipper 10 tonne Capacity (1Km 450*3=1350)

450 Km

10% Cost of Carriage to cover loading and unloading

For 23 Kms

3105.00

6. Motor Grader 110 HP

6 hours

1691.63

hour

10149.78

7. Vibratory Roller 8 -- 10 tonnes

6 hours

814.78

hour

4888.68
65199.39

Labour charges for 225 cum of Granular


Head Mazdoor Or Mate

0.40 No.

266.00

each

106.40

Mazdoors I class

2.00 Nos

258.00

each

516.00

Mazdoor II class

8.00 Nos

231.00

each

1848.00
2470.40

HIRECHARGES AND LABOUR CHARGES FOR GRANULAR SUB BASE


WATER SPRINKLER:
Hire charges excluding fuel charges per day
Fuel charges per day at the rate of 3.25 Lr.per hour

1112.00
26 Litres/day

54.51 per litre

Total hire charges including fuel per day

2529.26

Daily out turn of water sprinkler


Hire charges for 1 cum or 10 sqm of 100 mm thick

1417.26

1000 sqm or 100 cum


2529.26 /100

25.29 (A)

POWER ROLLER:
Hire charges excluding fuel charges per day
Fuel charges per day at the rate of 2.50 Lr.per hour

720.00
20 Litres/day

54.51 per litre

Total hire charges including fuel per day

1810.20

Out turn of power roller 950 sqm of 100 mm thick or


Hire charges of roller per 10 sqm of 100 mm thick

1090.20

95 cum
1810.20 /95

19.05 (B)

Total hire charge (A+B)

44.34

LABOUR CHARGES:
For mixing
Labour charges for 950 sqm
Mazdoors I class

6 Nos

258.00

each

1548.00

Mazdoor II class

24 Nos

231.00

each

5544.00

Total labour charges for mixing for 950 sqm


Rate for 10 sqm of 100 mm thick

7092.00
7092.00 /95

74.65

For spreading
Labour charges for 100 cum
Mazdoors I class

4 Nos

258.00

each

Total labour charges for mixing for 100 cum


Rate for 10 sqm of 100 mm thick

1032.00
1032.00

1032.00 /100

Total labour charges for 10 sqm of 100 mm th or 1 cum


Total Hire charges and labour charges 10 sqm of 100 mm thic or 1 cum

10.32 (D)
84.97

(A+B+C+D)

129.31

HIRECHARGES AND LABOUR CHARGES FOR WBM Grade II and III 75 mm thick
WATER SPRINKLER:
Hire charges excluding fuel charges per day
Fuel charges per day at the rate of 3.50 Lr.per hour

1112.00
28 Litres/day

54.51 per litre

Total hire charges including fuel per day


Daily out turn of water sprinkler 75 mm thick
Hire charges for 1 cum or 10 sqm of 100 mm thick

1526.28
2638.28

450 sqm
2638.28 /450

58.63 (A)

POWER ROLLER:
Hire charges excluding fuel charges per day
Fuel charges per day at the rate of 2.50 Lr.per hour

720.00
20 Litres/day

54.51 per litre

Total hire charges including fuel per day


Out turn of power roller 75 mm thick
Hire charges of roller per 10 sqm of 75 mm thick

1090.20
1810.20

450 sqm
1810.20 x10 /450

40.23 (B)

Total hire charge for 10 sqm of 75 mm thick (A+B)

98.86 (C)

LABOUR CHARGES:
1.Spreading 10 sqm of 75 mm thick
a)Mazdoor I class

1.08 x 3/16 Nos

258.00

each

52.25

b)Mazdoor II class

1.08 x 1/4 Nos

231.00

each

62.37

c)Mazdoor II class

1.08 x 1/3 Nos

231.00

each

83.16

2) Forming edge bunds as per SI No. 69

1.25

3) Maintaing berms for traffic barigading, danger light etc., as SI No. 70

1.25

4) Watering and keeping the surface moist for 15days as per SI. No. 71

1.25

5) Rent for tools including baskets,sharpening pick axes etc., as per SI NO. 72

1.25

6) Sundries such as rope water pots

0.97

Total labour charges


Total Hire charges and labour charges 10 sqm of 100 mm thic or 1 cum

203.75 (D)
(C+D)

302.61

HIRECHARGES AND LABOUR CHARGES FOR WET MIX MACADAM 300 mm thick
Machineries
1.Loader 5 cum capacity
Hire and running charges per day
Fuel charges 80 litres per day
Total hire charges including fuel per day
Total hire charges including fuel per hour
2.Tipper
Hire and running charges per day
Fuel charges 3.25 litres per hour
Total hire charges including fuel per day
Total hire charges including fuel per hour
3.Water tanker
Hire and running charges per day
Fuel charges 25 litres per day
Total hire charges including fuel per day
Total hire charges including fuel per hour
4.Vibratory Power Roller 8 -- 10 tonne
Hire and running charges per day
Fuel charges 3.00 litres per hour
Total hire charges including fuel per day
Total hire charges including fuel per hour
5.Motor grader including fuel /hour

80 litres/day

26 litres/day

25 litres/day

24 litres/day

6.Base mix plant(Pug mill) including fuel/hour


Hire and fuel charges for machineries for 100 cum of WMM
1. Loader
6 hours
2. Basemix plant (Pug mill)
6 hours
3. Tipper
24
4. Water tanker
24
5. Motor grader
4
6. Vibratory Power Roller 8 -- 10 Tonne
6
Total hire charges including fuel 100 cum of WMM
Hire and fuel charges for machineries for 1 cum of WMM
Labour charges for 100 cum of WMM

hours
hours
hours
hours

54.51 per/ltr

54.51 per/ltr

54.51 per/ltr

54.51 per/ltr

1205.00
4360.80
5565.80
695.73
1094.00
1417.26
2511.26
313.91
855.00
1362.75
2217.75
277.22
5428.00
1308.24
6736.24
842.03
1691.63
834.88

695.73
834.88
313.91
277.22
1691.63
842.03

35189.48 /100

Head Mazdoor
0.50 Nos
266.00 each
Mazdoors I
8.63 Nos
258.00 each
Mazdoors II
2.00 Nos
231.00 each
Total labour charges for 100 cum of WMM
Total labour charges for 1 cum of WMM
2821.54 /100
Total Hire charges and labour charges 10 sqm of 100 mm thic or 1 cum
(A+B)

4174.38
5009.28
7533.84
6653.28
6766.52
5052.18
35189.48
351.89 (A)
133.00
2226.54
462.00
2821.54
28.22 (B)
380.11

Prime coat over wbm surface using 7 kg bitumen per 10 sqm


Labour charges for 500 sqm
For preparing the surface
Mazdoors I

10 Nos

258.00

each

2580.00

Mazdoors II

16 Nos

231.00

each

3696.00

7 Nos

231.00

each

1617.00

For applying primer


Mazdoors II
Total labour charges for 500 sqm

7893.00

Labour charges for 10 sqm

157.86

Hirecharges for machinaries


Hire charges for Bitumen boiler 750 litres capacity excluding fuel per day
Fuel charges kerosin 25 ltrs

25 Ltrs

202.00
57.95

Hire charges for Bitumen boiler 750 litres capacity including fuel per day
Hire charges for Bitumen boiler 750 litres capacity including fuel per houry
Hourly out turn of bitumen boiler
Hire charges of bitumen boiler using 7 kg per 10 sqm
Total Hire and labour charges for 10 sqm

1448.75
1650.75
206.34

125 kg
206.34 x 7 /125

11.56
169.42

Tack coat over BT surface using 5 kg bitumen 80/100


LABOUR CHARGES FOR 500 SQM
For preparing the surface
Mazdoor I

8 Nos

258.00

each

2064.00

5 Nos

258.00

each

1290.00

For applying tack coat


Mazdoor I
Total labour charges for 500 sqm

3354.00

Labour charges for 10 sqm

3354.00 /500/10

67.08

Hirecharges for machinaries


Hire charges for Bitumen boiler 750 litres capacity
Fuel charges

25 ltrs kerosin

202.00
25

57.95

litre

1448.75

Total hire charges including fuel per day

1650.75

Total hire charges including fuel per hour

206.34

Hourly out turn of bitumen boiler

125 kg

Hire charges of bitumen boiler using 5 kg per 10 sqm

206.34 x 5 /125

8.25

Total Hire and labour charges for 10 sqm

75.33

Tack coat over WBM surface using 10 kg bitumen 80/100


LABOUR CHARGES FOR 500 SQM
For preparing the surface
Mazdoor I

10 Nos

258.00

each

2580.00

Mazdoor II

16 Nos

231.00

each

3696.00

10 Nos

258.00

each

2580.00

For applying tack coat


Mazdoor I
Total labour charges for 500 sqm

8856.00

Labour charges for 10 sqm

8856.00 /500/10

177.12

Hirecharges for machinaries


Hire charges for Bitumen boiler 750 litres capacity
Fuel charges

25 ltrs kerosin

202.00
25

57.95

litre

1448.75

Total hire charges including fuel per day

1650.75

Total hire charges including fuel per hour

206.34

Hourly out turn of bitumen boiler


Hire charges of bitumen boiler using 10 kg per 10 sqm
Total Hire and labour charges for 10 sqm

125 kg
206.34 x 10 /125

16.51
193.63

Bituminous Mecadam 75 mm thick with CMP and Paver finishing


HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour

1054.00

Cost of fuel diesel

30 Litres

54.51 per Ltr.

1635.30

Heating the bitumen furnace oil

25 Litres

49.00 per Ltr.

1225.00

170 Litres

49.00 per Ltr.

8330.00

Heating the aggregate furnace oil


Total hire charges including cost of fuel

12244.30

Out turn of CMP per hour for 75 mm thick BM

90 sqm

Hire charges of CMP for 10 sqm

12244.30 x10 /90

1360.48 (A)

2. Vibratory Roller 80-100 KN


Hire charges including fuel charges per hour
Cost of fuel diesel

678.50
2.5 Litres

54.51 per Ltr.

Total hire charges for power roller

136.28
814.78

Out turn of Power roller per hour for 75 mm thick BM 250 sqm
Hire charges of power roller for 10 sqm

814.78 x10 /250

32.59 (B)

3 Paver finisher
Hire charges excluding fuel charges per day

2447.00

Hire charges per hour

305.88

Fuel charges per hour diesel

6 Litres

54.51 per Ltr

Total hire charges including cost of fuel

327.06
632.94

Out turn of Paver per hour for 75 mm thick BM

90 sqm

Hire charges of paver for 10 sqm

632.94 x10 /90

70.33

4. Tipper Trucks
Hire charge excluding fuel per day

1094.00

Hire charges per hour

136.75

Fuel charges per hour 3.25 litres of diesel

3.25 Litres

54.51 per Ltr

Total hire charges including cost of fuel

313.91

Number of tipper required per CMP unit

6 Nos

Out turn of tipper per hour

90 sqm

Hire charges for tipper per 10 sqm

6x

313.91 x10 /90

209.27 (D)

Total hire charges of machinery per 10 sqm of BM 75 mm th.(A+B+C+D)

1672.67 (E)

LABOUR CHARGES FOR 1200 SQM


For loading materials in to CMP

OR
Mazdoor I
Mazdoor II

For attending paver finisher

Mazdoor I

809.06

33 Nos

258.00 each

8514

25 Nos

231.00 each

5775

10 Nos

258.00 each

2580

Total labour charges for 1000 sqm


Labour charges per 10 sqm

177.16

16869
16869.00 x10 /1000

Total rate Hire and labour charges for 10 sqm of BM 75 mm thick

(E+F)

168.69 (F)
1841.36

Bituminous Mecadam 50 mm thick with CMP and Paver finishing


HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour

1212.00

Cost of fuel diesel

30 Litres

54.51 per Ltr.

1635.30

Heating the bitumen furnace oil

25 Litres

49.00 per Ltr.

1225.00

170 Litres

49.00 per Ltr.

8330.00

Heating the aggregate furnace oil


Total hire charges including cost of fuel

12402.30

Out turn of CMP per hour for 50 mm thick BM

135 sqm

Hire charges of CMP for 10 sqm

12402.30 x10 /135

918.69 (A)

2. Vibratory Roller 80-100 KN


Hire charges including fuel charges per hour
Cost of fuel diesel

678.50
2.5 Litres

54.51 per Ltr.

Total hire charges for power roller

136.28
814.78

Out turn of power roller per hour for 50 mm thick BM 350 sqm
Hire charges of power roller for 10 sqm

814.78 x10 /350

23.28 (B)

3 Paver finisher
Hire charges excluding fuel charges per day

2447.00

Hire charges per hour

305.88

Fuel charges per hour diesel

6 Litres

54.51 per Ltr

Total hire charges including cost of fuel

327.06
632.94

Out turn of Paver per hour for 50 mm thick BM

135 sqm

Hire charges of paver for 10 sqm

632.94 x10 /135

46.88

4. Tipper Trucks
Hire charge excluding fuel per day

1094.00

Hire charges per hour

136.75

Fuel charges per hour 3.25 litres of diesel

3.25 Litres

54.51 per Ltr

Total hire charges including cost of fuel

177.16
313.91

Number of tipper required per CMP unit

6 Nos

Out turn of tipper per hour

135 sqm

Hire charges for tipper per 10 sqm

6x

313.91 x10 /135

Total hire charges of machinery per 10 sqm of BM 50 mm th.(A+B+C+D)

139.52 (D)
1128.37 (E)

LABOUR CHARGES FOR 1200 SQM


For loading materials in to CMP

Mazdoor I
Mazdoor II

For attending paver finisher

Mazdoor I

33 Nos

258.00 each

8514

25 Nos

231.00 each

5775

10 Nos

258.00 each

2580

Total labour charges for 1200 sqm


Labour charges per 10 sqm

16869
16869.00 x10 /1200

Total rate Hire and labour charges for 10 sqm BM 50 mm thick

(E+F)

140.58 (F)
1268.95

Dense Bituminous Mecadam 75 mm thick with CMP and Paver finishing


HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour

1212.00

Cost of fuel diesel

30 Litres

54.51 per Ltr.

1635.30

Heating the bitumen furnace oil

25 Litres

49.00 per Ltr.

1225.00

170 Litres

49.00 per Ltr.

8330.00

Heating the aggregate furnace oil


Total hire charges including cost of fuel

12402.30

Out turn of CMP per hour for 75 mm thick DBM

90 sqm

Hire charges of CMP for 10 sqm

12402.30 x10 /90

1378.03 (A)

2. Vibratory Roller
Hire charges including fuel charges per hour
Cost of fuel diesel

5428 Day
2.5 Litres

54.51 per Ltr.

Total hire charges for power roller

678.50
136.28
814.78

Out turn of roller per hour for 75 mm thick DBM

220 sqm

Hire charges of power roller for 10 sqm

814.78 x10 /220

37.04 (B)

3 Paver finisher
Hire charges excluding fuel charges per day

2447.00

Hire charges per hour

305.88

Fuel charges per hour diesel

6 Litres

54.51 per Ltr

Total hire charges including cost of fuel

327.06
632.94

Out turn of Paver per hour for 75 mm thick DBM

90 sqm

Hire charges of power roller for 10 sqm

632.94 x10 /90

70.33

4. Tipper Trucks
Hire charge excluding fuel per day

1094.00

Hire charges per hour

136.75

Fuel charges per hour 3.25 litres of diesel

3.25 Litres

54.51 per Ltr

Total hire charges including cost of fuel

177.16
313.91

Number of tipper required per CMP unit

6 Nos

Out turn of tipper per hour

90 sqm

Hire charges for tipper per 10 sqm

6x

313.91 x10 /90

Total hire charges of machinery per 10 sqm of DBM 75 mm th.(A+B+C+D)

209.27 (D)
1694.67 (E)

LABOUR CHARGES FOR 1000 SQM


For loading materials in to CMP

Mazdoor I
Mazdoor II

For attending paver finisher

Mazdoor I

33 Nos

258.00 each

8514.00

25 Nos

231.00 each

5775

10 Nos

258.00 each

2580

Total labour charges for 1000 sqm


Labour charges per 10 sqm

16869
16869.00 x10 /1200

Total rate Hire and labour charges for 10 sqm of DBM 75 mm thick (E+F)

168.69 (F)
1863.36

Dense Bituminous Mecadam 50 mm thick with CMP and Paver finishing


HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour

1212.00

Cost of fuel diesel

30 Litres

54.51 per Ltr.

1635.30

Heating the bitumen furnace oil

25 Litres

49.00 per Ltr.

1225.00

170 Litres

49.00 per Ltr.

8330.00

Heating the aggregate furnace oil


Total hire charges including cost of fuel

12402.30

Out turn of CMP per hour for 50 mm thick DBM

135 sqm

Hire charges of CMP for 10 sqm

12402.30 x10 /135

918.69 (A)

2.Vibratory Roller
Hire charges including fuel charges per hour
Cost of fuel diesel

5428 Day
2.5 Litres

54.51 per Ltr.

Total hire charges for power roller

678.50
136.28
814.78

Out turn of roller per hour for 50 mm thick DBM

320 sqm

Hire charges of power roller for 10 sqm

814.78 x10 /320

25.46 (B)

3 Paver finisher
Hire charges excluding fuel charges per day

2447.00

Hire charges per hour

305.88

Fuel charges per hour diesel

6 Litres

54.51 per Ltr

Total hire charges including cost of fuel

327.06
632.94

Out turn of Paver per hour for 50 mm thick DBM

135 sqm

Hire charges of paver for 10 sqm

632.94 x10 /135

46.88

4. Tipper Trucks
Hire charge excluding fuel per day

1094.00

Hire charges per hour

136.75

Fuel charges per hour 3.25 litres of diesel

3.25 Litres

54.51 per Ltr

Total hire charges including cost of fuel

177.16
313.91

Number of tipper required per CMP unit

6 Nos

Out turn of tipper per hour

135 sqm

Hire charges for tipper per 10 sqm

6x

313.91 x10 /135

Total hire charges of machinery per 10 sqm of DBM 50 mm th.(A+B+C+D)

139.52 (D)
1130.55 (E)

LABOUR CHARGES FOR 1200 SQM


For loading materials in to CMP

Mazdoor I
Mazdoor II

For attending paver finisher Mazdoor I

33 Nos

258.00 each

8514

25 Nos

231.00 each

5775

10 Nos

258.00 each

2580

Total labour charges for 1200 sqm


Labour charges per 10 sqm

16869
16869.00 x10 /1200

Total rate Hire and labour charges for 10 sqm of DBM 50 mm thick

(E+F)

140.58 (F)
1271.13

Bituminous Concrete 40 mm thick with CMP and Paver finishing


HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour

1212.00

Cost of fuel diesel

30 Litres

54.51 per Ltr.

1635.30

Heating the bitumen furnace oil

25 Litres

49.00 per Ltr.

1225.00

170 Litres

49.00 per Ltr.

8330.00

Heating the aggregate furnace oil


Total hire charges including cost of fuel

12402.30

Out turn of CMP per hour for 40 mm thick BC

170 sqm

Hire charges of CMP for 10 sqm

12402.30 x10 /170

729.55 (A)

2. Vibratory Roller
Hire charges including fuel charges per hour
Cost of fuel diesel

5428 Day
2.5 Litres

54.51 per Ltr.

Total hire charges for power roller

678.50
136.28
814.78

Out turn of roller per hour for 40 mm thick BC

400 sqm

Hire charges of power roller for 10 sqm

814.78 x10 /400

20.37 (B)

3 Paver finisher
Hire charges excluding fuel charges per day

2447.00

Hire charges per hour

305.88

Fuel charges per hour diesel

6 Litres

54.51 per Ltr

Total hire charges including cost of fuel

327.06
632.94

Out turn of Paver per hour for 40 mm thick BC

170 sqm

Hire charges of paver roller for 10 sqm

632.94 x10 /170

37.23

4. Tipper Trucks
Hire charge excluding fuel per day

1094.00

Hire charges per hour

136.75

Fuel charges per hour 3.25 litres of diesel

3.25 Litres

54.51 per Ltr

Total hire charges including cost of fuel

177.16
313.91

Number of tipper required per CMP unit

6 Nos

Out turn of tipper per hour

170 sqm

Hire charges for tipper per 10 sqm

6x

313.91 x10 /170

Total hire charges of machinery per 10 sqm of BC 40 mm th.(A+B+C+D)

110.79 (D)
897.94 (E)

LABOUR CHARGES FOR 1200 SQM


For loading materials in to CMP

Mazdoor I
Mazdoor II

For attending paver finisher

Mazdoor I

33 Nos

258.00 each

8514

25 Nos

231.00 each

5775

10 Nos

258.00 each

2580

Total labour charges for 1200 sqm


Labour charges per 10 sqm

16869
16869.00 x10 /1200

Total rate Hire and labour charges for 10 sqm BC 50 mm thick

(E+F)

140.58 (F)
1038.52

Bituminous Concrete 50 mm thick with CMP and Paver finishing


HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour

1212.00

Cost of fuel diesel

30 Litres

54.51 per Ltr.

1635.30

Heating the bitumen furnace oil

25 Litres

49.00 per Ltr.

1225.00

170 Litres

49.00 per Ltr.

8330.00

Heating the aggregate furnace oil


Total hire charges including cost of fuel

12402.30

Out turn of CMP per hour for 40 mm thick BC

170 sqm

Hire charges of CMP for 10 sqm

12402.30 x10 /170

729.55 (A)

2. Vibratory Roller
Hire charges including fuel charges per hour
Cost of fuel diesel

5428 Day
2.5 Litres

54.51 per Ltr.

Total hire charges for power roller

678.50
136.28
814.78

Out turn of roller per hour for 40 mm thick BC

400 sqm

Hire charges of power roller for 10 sqm

814.78 x10 /400

20.37 (B)

3 Paver finisher
Hire charges excluding fuel charges per day

2447.00

Hire charges per hour

305.88

Fuel charges per hour diesel

6 Litres

54.51 per Ltr

Total hire charges including cost of fuel

327.06
632.94

Out turn of Paver per hour for 40 mm thick BC

170 sqm

Hire charges of paver roller for 10 sqm

632.94 x10 /170

37.23

4. Tipper Trucks
Hire charge excluding fuel per day

1094.00

Hire charges per hour

136.75

Fuel charges per hour 3.25 litres of diesel

3.25 Litres

54.51 per Ltr

Total hire charges including cost of fuel

177.16
313.91

Number of tipper required per CMP unit

6 Nos

Out turn of tipper per hour

170 sqm

Hire charges for tipper per 10 sqm

6x

313.91 x10 /170

Total hire charges of machinery per 10 sqm of BC 40 mm th.(A+B+C+D)

110.79 (D)
897.94 (E)

LABOUR CHARGES FOR 1200 SQM


For loading materials in to CMP

Mazdoor I
Mazdoor II

For attending paver finisher

Mazdoor I

33 Nos

258.00 each

8514

25 Nos

231.00 each

5775

10 Nos

258.00 each

2580

Total labour charges for 1200 sqm


Labour charges per 10 sqm

16869
16869.00 x10 /1200

Total rate Hire and labour charges for 10 sqm BC 50 mm thick

(E+F)

140.58 (F)
1038.52

DBM 50 mm thick with CMP and Paver finishing (Pneumatic Tyred Roller)
HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour

1212.00

Cost of fuel diesel

30 Litres

54.51 per Ltr.

1635.30

Heating the bitumen furnace oil

25 Litres

49.00 per Ltr.

1225.00

170 Litres

49.00 per Ltr.

8330.00

Heating the aggregate furnace oil


Total hire charges including cost of fuel

12402.30

Out turn of CMP per hour for 50 mm thick DBM

135 sqm

Hire charges of CMP for 10 sqm

12402.30 x10 /135

918.69 (A)

2.Pneumatic Tyred Roller


Hire charges including fuel charges per hour
Cost of fuel diesel

1243 Day
2.5 Litres

1243.00
0.00 per Ltr.

Total hire charges for power roller

0.00
1243.00

Out turn of roller per hour for 50 mm thick DBM

320 sqm

Hire charges of power roller for 10 sqm

1243.00 x10 /320

38.84 (B)

3 Paver finisher (9m Width)


Hire charges excluding fuel charges per day

2674.00

Hire charges per hour

2674.00

Fuel charges per hour diesel

6 Litres

0.00 per Ltr

Total hire charges including cost of fuel

0.00
2674.00

Out turn of Paver per hour for 50 mm thick DBM

135 sqm

Hire charges of paver for 10 sqm

2674.00 x10 /135

198.07

4. Tipper Trucks
Hire charge excluding fuel per day

1094.00

Hire charges per hour

136.75

Fuel charges per hour 3.25 litres of diesel

3.25 Litres

54.51 per Ltr

Total hire charges including cost of fuel

177.16
313.91

Number of tipper required per CMP unit

6 Nos

Out turn of tipper per hour

135 sqm

Hire charges for tipper per 10 sqm

6x

313.91 x10 /135

Total hire charges of machinery per 10 sqm of DBM 50 mm th.(A+B+C+D)

139.52 (D)
1295.12 (E)

LABOUR CHARGES FOR 1200 SQM


For loading materials in to CMP

Mazdoor I
Mazdoor II

For attending paver finisher Mazdoor I

33 Nos

258.00 each

8514

25 Nos

231.00 each

5775

10 Nos

258.00 each

2580

Total labour charges for 1200 sqm


Labour charges per 10 sqm

16869
16869.00 x10 /1200

Total rate Hire and labour charges for 10 sqm of DBM 50 mm thick

(E+F)

140.58 (F)
1435.70

DBM 100 mm thick with CMP and Paver finishing (Pneumatic Tyred Roller)
HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour

1212.00

Cost of fuel diesel

30 Litres

54.51 per Ltr.

1635.30

Heating the bitumen furnace oil

25 Litres

49.00 per Ltr.

1225.00

170 Litres

49.00 per Ltr.

8330.00

Heating the aggregate furnace oil


Total hire charges including cost of fuel

12402.30

Out turn of CMP per hour for 75 mm thick DBM

90 sqm

Hire charges of CMP for 10 sqm

12402.30 x10 /90

1378.03 (A)

2.Pneumatic Tyred Roller


Hire charges including fuel charges per hour
Cost of fuel diesel

1243 Day
2.5 Litres

1243.00
0.00 per Ltr.

Total hire charges for power roller

0.00
1243.00

Out turn of roller per hour for 50 mm thick DBM

220 sqm

Hire charges of power roller for 10 sqm

1243.00 x10 /220

56.50 (B)

3 Paver finisher (9m Width)


Hire charges excluding fuel charges per day

2674.00

Hire charges per hour

2674.00

Fuel charges per hour diesel

6 Litres

0.00 per Ltr

Total hire charges including cost of fuel

0.00
2674.00

Out turn of Paver per hour for 50 mm thick DBM

90 sqm

Hire charges of paver for 10 sqm

2674.00 x10 /90

297.11

4. Tipper Trucks
Hire charge excluding fuel per day

1094.00

Hire charges per hour

136.75

Fuel charges per hour 3.25 litres of diesel

3.25 Litres

54.51 per Ltr

Total hire charges including cost of fuel

177.16
313.91

Number of tipper required per CMP unit

6 Nos

Out turn of tipper per hour

90 sqm

Hire charges for tipper per 10 sqm

6x

313.91 x10 /90

Total hire charges of machinery per 10 sqm of DBM 50 mm th.(A+B+C+D)

209.27 (D)
1940.91 (E)

LABOUR CHARGES FOR 1000 SQM


For loading materials in to CMP

Mazdoor I
Mazdoor II

For attending paver finisher Mazdoor I

33 Nos

258.00 each

8514

25 Nos

231.00 each

5775

10 Nos

258.00 each

2580

Total labour charges for 1000 sqm


Labour charges per 10 sqm

16869
16869.00 x10 /1000

Total rate Hire and labour charges for 10 sqm of DBM 50 mm thick

(E+F)

168.69 (F)
2109.60

Bituminous Concrete 40 mm thick with CMP and Paver finishing (Pneumatic Tyred Roller)
HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour

1212.00

Cost of fuel diesel

30 Litres

54.51 per Ltr.

1635.30

Heating the bitumen furnace oil

25 Litres

49.00 per Ltr.

1225.00

170 Litres

49.00 per Ltr.

8330.00

Heating the aggregate furnace oil


Total hire charges including cost of fuel

12402.30

Out turn of CMP per hour for 40 mm thick BC

170 sqm

Hire charges of CMP for 10 sqm

12402.30 x10 /170

729.55 (A)

2. Pneumatic Tyred Roller


Hire charges including fuel charges per hour

1243 Day

1243.00

Cost of fuel diesel


Total hire charges for power roller

1243.00

Out turn of roller per hour for 40 mm thick BC

400 sqm

Hire charges of power roller for 10 sqm

1243.00 x10 /400

31.08 (B)

3 Paver finisher (9m Width)


Hire charges excluding fuel charges per day

2674.00

Hire charges per hour

2674.00

Fuel charges per hour diesel


Total hire charges including cost of fuel

2674.00

Out turn of Paver per hour for 40 mm thick BC

170 sqm

Hire charges of paver roller for 10 sqm

2674.00 x10 /170

157.29

4. Tipper Trucks
Hire charge excluding fuel per day

1094.00

Hire charges per hour

136.75

Fuel charges per hour 3.25 litres of diesel

3.25 Litres

54.51 per Ltr

Total hire charges including cost of fuel

177.16
313.91

Number of tipper required per CMP unit

6 Nos

Out turn of tipper per hour

170 sqm

Hire charges for tipper per 10 sqm

6x

313.91 x10 /170

Total hire charges of machinery per 10 sqm of BC 40 mm th.(A+B+C+D)

110.79 (D)
1028.71 (E)

LABOUR CHARGES FOR 1200 SQM


For loading materials in to CMP

Mazdoor I
Mazdoor II

For attending paver finisher

Mazdoor I

33 Nos

258.00 each

8514

25 Nos

231.00 each

5775

10 Nos

258.00 each

2580

Total labour charges for 1200 sqm


Labour charges per 10 sqm

16869
16869.00 x10 /1200

Total rate Hire and labour charges for 10 sqm BC 50 mm thick

(E+F)

140.58 (F)
1169.29

Bituminous Concrete 25 mm thick with CMP and Paver finishing


HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour

1212.00

Cost of fuel diesel

30 Litres

54.51 per Ltr.

1635.30

Heating the bitumen furnace oil

25 Litres

49.00 per Ltr.

1225.00

170 Litres

49.00 per Ltr.

8330.00

Heating the aggregate furnace oil


Total hire charges including cost of fuel

12402.30

Out turn of CMP per hour for 25 mm thick BC

270 sqm

Hire charges of CMP for 10 sqm

12402.30 x10 /270

459.34 (A)

2.Power Roller 80-100 KN


Hire charges including fuel charges per hour
Cost of fuel diesel

828.00
20 Litres

54.51 per Ltr.

Total hire charges for power roller

1090.20
1918.20

Out turn of roller per hour for 25 mm thick BC

400 sqm

Hire charges of power roller for 10 sqm

1918.20 x10 /400

47.96 (B)

3 Paver finisher
Hire charges excluding fuel charges per day

2447.00

Hire charges per hour

305.88

Fuel charges per hour diesel

6 Litres

54.51 per Ltr

Total hire charges including cost of fuel

327.06
632.94

Out turn of Paver per hour for 25 mm thick BC

270 sqm

Hire charges of paver for 10 sqm

632.94 x10 /270

23.44

4. Tipper Trucks
Hire charge excluding fuel per day

1094.00

Hire charges per hour

136.75

Fuel charges per hour 3.25 litres of diesel

3.25 Litres

54.51 per Ltr

Total hire charges including cost of fuel

177.16
313.91

Number of tipper required per CMP unit

6 Nos

Out turn of tipper per hour

270 sqm

Hire charges for tipper per 10 sqm

6x

313.91 x10 /270

Total hire charges of machinery per 10 sqm of BC 25 mm th.(A+B+C+D)

69.76 (D)
600.50 (E)

LABOUR CHARGES FOR 2000 SQM


For loading materials in to CMP

Mazdoor I
Mazdoor II

For attending paver finisher

Mazdoor I

33 Nos

258.00 each

8514.00

25 Nos

231.00 each

5775.00

10 Nos

258.00 each

2580.00

Total labour charges for 1200 sqm


Labour charges per 10 sqm

16869.00
16869.00 x10 /2000

Total rate Hire and labour charges for 10 sqm BC 25 mm thick

(E+F)

84.35 (F)
684.85

Semi Dense Bituminous Concrete 25 mm thick with CMP and Paver finishing
HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour

1212.00

Cost of fuel diesel

30 Litres

54.51 per Ltr.

1635.30

Heating the bitumen furnace oil

25 Litres

49.00 per Ltr.

1225.00

170 Litres

49.00 per Ltr.

8330.00

Heating the aggregate furnace oil


Total hire charges including cost of fuel

12402.30

Out turn of CMP per hour for 25 mm thick SDBC

270 sqm

Hire charges of CMP for 10 sqm

12402.30 x10 /270

459.34 (A)

2. Vibratory Roller 80-100 KN


Hire charges including fuel charges per hour
Cost of fuel diesel

678.50
2.5 Litres

54.51 per Ltr.

Total hire charges for power roller

136.28
814.78

Out turn of roller per hour for 25 mm thick SDBC

500 sqm

Hire charges of power roller for 10 sqm

814.78 x10 /500

16.30 (B)

3 Paver finisher
Hire charges excluding fuel charges per day

2447.00

Hire charges per hour

305.88

Fuel charges per hour diesel

6 Litres

54.51 per Ltr

Total hire charges including cost of fuel

327.06
632.94

Out turn of Paver per hour for 25 mm thick SDBC

270 sqm

Hire charges of paver for 10 sqm

632.94 x10 /270

23.44

4. Tipper Trucks
Hire charge excluding fuel per day

1094.00

Hire charges per hour

136.75

Fuel charges per hour 3.25 litres of diesel

3.25 Litres

54.51 per Ltr

Total hire charges including cost of fuel

177.16
313.91

Number of tipper required per CMP unit

6 Nos

Out turn of tipper per hour

270 sqm

Hire charges for tipper per 10 sqm

6x

313.91 x10 /270

Total hire charges of machinery per 10 sqm of SDBC 25 mm th.(A+B+C+D)

69.76 (D)
568.84 (E)

LABOUR CHARGES FOR 2000 SQM


For loading materials in to CMP

Mazdoor I
Mazdoor II

For attending paver finisher

Mazdoor I

33 Nos

258.00 each

8514.00

25 Nos

231.00 each

5775.00

10 Nos

258.00 each

2580.00

Total labour charges for 1200 sqm


Labour charges per 10 sqm

16869.00
16869.00 x10 /2000

Total rate Hire and labour charges for 10 sqm SDBC 25 mm thick

(E+F)

84.35 (F)
653.19

PC with seal coat Type A with CMP and Paver finishing


HIRE CHARGES FOR MACHINERY
1.Central Hot Mix Plant
Hire charges excluding fuel charges per hour

1212.00

Cost of fuel diesel

30 Litres

54.51 per Ltr.

1635.30

Heating the bitumen furnace oil

25 Litres

49.00 per Ltr.

1225.00

170 Litres

49.00 per Ltr.

8330.00

Heating the aggregate furnace oil


Total hire charges including cost of fuel

12402.30

Out turn of CMP per hour for premix carpet

325 sqm

Hire charges of CMP for 10 sqm

12402.30 x10 /325

381.61 (A)

2. Vibratory Roller
Hire charges including fuel charges per hour
Cost of fuel diesel

678.50
2.5 Litres

54.51 per Ltr.

Total hire charges for power roller

136.28
814.78

Out turn of roller per hour for pre mix carpet

1000 sqm

Hire charges of Vibratory Roller for 10 sqm


Out turn of roller per hour for seal coat

814.78 x10 /1000

8.15 (B)

500 sqm

Hire charges of Vibratory Roller for 10 sqm

814.78 x10 /500

16.30 (C)

3 Paver finisher
Hire charges excluding fuel charges per day

2447.00

Hire charges per hour

305.88

Fuel charges per hour diesel

6 Litres

54.51 per Ltr

Total hire charges including cost of fuel

327.06
632.94

Out turn of Paver per hour for 25 mm thick SDBC

325 sqm

Hire charges of paver for 10 sqm

632.94 x10 /325

19.48 (D)

4. Tipper Trucks
Hire charge excluding fuel per day

1094.00

Hire charges per hour

136.75

Fuel charges per hour 3.25 litres of diesel

3.25 Litres

54.51 per Ltr

Total hire charges including cost of fuel

177.16
313.91

Number of tipper required per CMP unit

6 Nos

Out turn of tipper per hour

325 sqm

Hire charges for tipper per 10 sqm

6x

313.91 x10 /325

Total hire charges of machinery per 10 sqm of PC with seal coat.(A+B+C+D+E)

57.95 (E)
483.49 (F)

LABOUR CHARGES FOR 2000 SQM


For loading materials in to CMP

Mazdoor I
Mazdoor II

For attending paver finisher

Mazdoor I

33 Nos

258.00 each

8514

25 Nos

231.00 each

5775

10 Nos

258.00 each

2580

Total labour charges for 1200 sqm


Labour charges per 10 sqm

16869
16869.00 x10 /2000

Total rate Hire and labour charges for 10 sqm PC with Seal coat

(F+G)

84.35 (G)
567.84

Premix Carpet with seal coat with Mini Hot Mix Plant
HIRE CHARGES FOR MACHINERY
1.Mini Hot Mix Plant
Hire charges excluding fuel charges per hour

209.25

Cost of fuel diesel

15 Litres

54.51 per Ltr.

817.65

Heating the aggregate furnace oil

45 Litres

49.00 per Ltr.

2205.00

Total hire charges including cost of fuel

3231.90

Out turn of mini hot mix plant per hour for PC


Hire charges of CMP for 10 sqm

180 sqm
3231.90 x10 /180

179.55 (A)

2.Power Roller 80-100 KN


Hire charges including fuel charges per day
Cost of fuel diesel

828.00
20 Litres

54.51 per Ltr.

Total hire charges for power roller

1090.20
1918.20

Out turn of of PC per day

500 sqm

Hire charges of power roller for 10 sqm

1918.20 x10 /500

Out turn of of seal coat per day

38.36 (B)

1000 sqm

Hire charges of power roller for 10 sqm

1918.20 x10 /1000

19.18 (C)

3 Bitumen boiler
Hire charges excluding fuel charges per day
Fuel charges kerosine

202.00
25 Litres

57.95 Litre

Total hire charges including cost of fuel

1448.75
1650.75

Hire charges per hour

1650.75 /8

Out turn of Bitumen boiler per hour

206.34

125 kg

Hire charges of bitumen boiler for 1 kg of bitumen

206.34 /125

Bitumen required for 10 sqm of PC

14.6 kg

Hire charges of bitumen boiler for PC 10 sqm

14.6 kg

Bitumen required for 10 sqm of sealcoat type A

9.8 kg

Hire charges of bitumen boiler for 10 sqm of seal coat

9.8 kg

1.65

1.65 kg

24.09 (D)

1.65 kg

16.17 (E)

Total hire charges for PC and seal coat (A+B+C+D+E)

277.35 (F)

LABOUR CHARGES FOR 10 SQM


For PC 10 sqm
For seal coat

Mazdoor I
Mazdoor II

0.75 No

258.00 each

193.50

0.25 No

231.00 each

57.75

Total Labour charges per 10 sqm PC with seal coat


Total rate Hire and labour charges for 10 sqm of PC with seal coat

251.25 (G)
(F+G)

528.60

Built up spray grout 75 mm thick


1.Power Roller 80-100 KN
Hire charges including fuel charges per hour
Cost of fuel diesel

828.00
20 Litres

54.51 per Ltr.

Total hire charges for power roller

1090.20
1918.20

Out turn of roller per day for 75 mm thick BUSG

225 sqm

Hire charges of power roller for 10 sqm

1918.20 x10 /225

85.25 (A)

2 Bitumen boiler
Hire charges excluding fuel charges per day
Fuel charges kerosine

202.00
25 Litres

57.95 Litre

Total hire charges including cost of fuel

1448.75
1650.75

Hire charges per hour

1650.75 /8

Out turn of Bitumen boiler per hour

206.34

125 kg

Hire charges of bitumen boiler for 1 kg of bitumen

206.34 /125

Bitumen required for 10 sqm of BUSG

30 kg

Hire charges of bitumen boiler for PC 10 sqm

30 kg

1.65 kg

1.65
49.50 (B)

3.Mechanical sprayer
Hire charges for mechanical sprayer per 10 sqm

12.00

Total hire charges of machinery per 10 sqm of BUSG.(A+B+C)

146.75

LABOUR CHARGES FOR 110 sqm


Head Mazdoor

1 Nos

266.00 each

266

Mazdoor I

25 Nos

258.00 each

6450

Total labour charges for 110 sqm


Labour charges per 10 sqm

6716
6716.00 x10 /110

610.55

Tack coat over WBM surface using 4 kg bitumen emusion


LABOUR CHARGES FOR 500 SQM
For preparing the surface
Mazdoor I

10 Nos

258.00

each

2580.00

Mazdoor II

16 Nos

231.00

each

3696.00

4 Nos

231.00

each

924.00

For applying tack coat


Mazdoor II
Total labour charges for 500 sqm
Labour charges for 10 sqm

7200.00
7200.00 /500/10

144.00

Hirecharges for machinaries


Bitumen sprayer

10.00

Total hitre charges and labour charhes

64.10

Prime coat over WMM surface using 7 kg bitumen emusion


LABOUR CHARGES FOR 500 SQM
For preparing the surface
Mazdoor I
10 Nos
258.00
Mazdoor II
16 Nos
231.00
For applying tack coat
Mazdoor II
4 Nos
231.00
Total labour charges for 500 sqm
Labour charges for 10 sqm
7200.00 /500/10
Hirecharges for machinaries

each
each

2580.00
3696.00

each

924.00
7200.00
144.00

Bitumen sprayer

15.00

Total hitre charges and labour charhes


Tack coat over Prime Coat surface using 2.5 kg of VG 10
LABOUR CHARGES FOR 500 SQM

159.00

For applying tack coat


Mazdoor II

3 Nos

231.00

each

693.00

Total labour charges for 500 sqm

693.00

Labour charges for 10 sqm


Hire charges for Bitumen boiler 750 liters capacity
Fuel charges kerosine

693.00 /500/10
25 Litres

13.86
202.00
1448.75

57.95 Litre

Total hire charges including cost of fuel


Hire charges per hour
Out turn of Bitumen boiler per hour

1650.75
1650.75 /8

206.34

250 kg x 10 sqm / 3.5

Hire charges of bitumen boiler for 3.5 kg / 10 sqm

714 Sqm

206.34 x 10 / 714.29

Hire charges of bitumen Sprayer


Total Hire and Labour Charges for 10 sqm
Tack coat over BT surface using 2.0 kg VG 10
LABOUR CHARGES FOR 500 SQM

2.89
15.00
31.75

For preparing the surface


Mazdoor I

5 Nos

258.00

each

1290.00

5 Nos

231.00

each

1155.00

For applying tack coat


Mazdoor II
Total labour charges for 500 sqm
Labour charges for 10 sqm
Hire charges for Bitumen boiler 750 liters capacity
Fuel charges kerosine

2445.00
2445.00 /500/10
25 Litres

48.90
202.00

57.95 Litre

Total hire charges including cost of fuel


Hire charges per hour
Out turn of Bitumen boiler per hour
Hire charges of bitumen boiler for 3.0 kg / 10 sqm
Hire charges of bitumen sprayer
Total Hire and Labour Charges for 10 sqm

1448.75
1650.75

1650.75 /8
250 kg

206.34

250kgs x 10sqm / 3
833.00 Sqm

206.34

2.48
15.00
66.38

Tack coat over LCC surface using 3.0 kg of VG 10


LABOUR CHARGES FOR 500 SQM
For applying tack coat
Mazdoor II

3 Nos

231.00

each

Total labour charges for 500 sqm

693.00

Labour charges for 10 sqm


Hire charges for Bitumen boiler 750 liters capacity
Fuel charges kerosine

693.00 /500/10
25 Litres

13.86
202.00

57.95 Litre

Total hire charges including cost of fuel

1448.75
1650.75

Hire charges per hour


Out turn of Bitumen boiler per hour

693.00

1650.75 /8
250 kg

Hire charges of bitumen boiler for 4.0 kg / 10 sqm


Hire charges of bitumen sprayer

206.34

250kgs x 10sqm / 4
625.00 Sqm

Total Hire and Labour Charges for 10 sqm

206.34

2500

3.30
15.00
32.16

Tack coat over BT surface using 2.5 kg bitumen emusion


LABOUR CHARGES FOR 500 SQM
For preparing the surface
Mazdoor I

5 Nos

258.00

each

1290.00

3 Nos

231.00

each

693.00

For applying tack coat


Mazdoor II
Total labour charges for 500 sqm
Labour charges for 10 sqm

1983.00
1983.00 /500/10

39.66

Hirecharges for machinaries


Bitumen sprayer

15.00

Total hitre charges and labour charhes

54.66

Providing and Laying 25mm thick Mastic Asphalt Wearing Course with paving grade bitumen meeting the
requirements given in table 500 -- 29 prepared by using mastic cooker and slope after cleaning the
surface including providing and anto skid surface with bitumen percolated fine grained hard stone
chipping of 13.2mm nominal size at the rate of 0.005 cum per 10sqm and at an approx spacing of 10 cm
center to center in both directions pressed into surface when the temprature of surfaces is not less than
the 100 centigrade protruding 1mm to 4mm over mastic surface all complete as per standard
specification.
DATA
80.00

Kg

Cost of Bitumen of 30 / 40 Grade

220 kg (or)

0.11 cum Cost of Lime Powder

160 kg (or)

0.08 cum Cost of Quarry Dust

300 kg (or)

0.20

kg

79.94
#REF!

Cost of 13.20 mm IRC Metal

10.00 sqm Hire Charges for Machineries

cum

6.40
#REF!

456.30

cum

36.50

1074.40

cum

214.88

3247.70 10 sqm

3247.70

917.39 10 sqm

917.39

10.00 sqm Labour Charges


LS

MT

For 20mm stones for grips

LS

Rate For 10sqm of 25mm thick

6.91
#REF!

Rate per 1 Sqm

#REF!

BITUMEN MASTIC WEARING COAT 25 MM THICK


Bitumen Mastic Wearing Coat = 25mm thick
Unit -- 1 1 Sqm and taking output as 17.40 Sqm
HIRE CHARGES FOR MACHINERIES
Mastic Cooker
Hire Charges / Day ( Local Rate )

200.00

Full Charges @ 100 Litres of Diesel @

100

54.51

5451.00

Hire Charges per 17.40 Sqm

5651.00

Hire Charges per 10 Sqm

3247.70

LABOUR CHARGES
1.50

Nos Mazdoor I Class for allowing mastic covers

258.00

Each

387.00

0.50

Nos Mazdoor II Class

231.00

Each

115.50

3.50

Nos Mazdoor I Class for spraying

258.00

Each

903.00

0.25

Nos Mazdoor II Class for surface

231.00

Each

57.75

0.50

Nos Head Mazdoor

266.00

Each

133.00

Total Labour Charges for 17.40 Sqm


Labour Charges for 10.00 Sqm

1596.25
917.39

60 / 70
0.00
0.00
0.00
0.00
0.00
0.00
79.94
0.00
79.94

Providing granular surface to required thickness including cost and conveyance of all
materials from approved quarry and consolidation by power roller as per clause 401 of
MoRTH specification

Rate for 10 sqm of 100 mm thick or 1 cum


0.74

cum

Cost of sand

284.50

cum

210.53

0.54

cum

Cost of gravel

134.40

cum

72.58

10.00

sqm

Hire charges

44.34

10 sqm

44.34

10.00

sqm

Labour charges

84.97

10 sqm

84.97
412.42

Data for Earthwork Excavation

1.00

cum

Earthwork Excavation (Item No 62)

41.85

cum

41.85

3.00

Km

Conveyance

7.80

Km

23.40

Total

65.25

DATA FOR GSB

1 Providing granular surface to required thickness including cost and conveyance of all
materials from approved quarry and consolidation by power roller as per clause 401 of
MORTH Rev -- 5 specification- Rate for 100 mm thick or 1 cum

144.00

cum

53 mm to 22.40 mm metal

878.77

cum

126542.88

57.00

cum

9.50mm to 2.36mm metal

571.70

cum

32586.90

86.40

cum

2.36 mm and below

538.10

cum

46491.84

27.00

Kl

Water

120.00

Kl

3240.00

225.00

cum

Hire charges

225.00

cum

Labour charges

65199.39 225 cum

65199.39

2470.40 225 cum

2470.40

Total rate for 225 cum

276531.41

Rate for one cum

1229.03

DATA FOR WMM


1 Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix
Macadam specification including premixing the material with water at OMC in
mechanical mix plant carriage of mixed material by tipper to site laying in uniform
layers with pavers in sub base/base course on well prepared surface and compacting
with vibratory roller to achieve the desired density etc., complete as per clause 406
MORTH Rev -- 5 Specification

0.396

cum

Cost of 45-22.4 mm graded metal

908.70

cum

359.85

0.528

cum

Cost of 22.4-2.36 mm graded metal

760.96

cum

401.79

0.396

cum

Cost of 2.36 mm metal and below

531.40

cum

210.43

0.08

Kl

Water

120.00

Kl

9.60

1.000

cum

Labour charges

28.22

cum

28.22

1.000

cum

Hire charges for machineries

351.89

cum

351.89
1361.78

Rate for 1 cum Rs. 1361.78

For binding materials to WBM


Rate for 1 cum of binding materials

0.74

cum

Cost of sand

634.00

cum

469.16

0.54

cum

Cost of gravel

88.80

cum

47.95

1.00

cum

Labour charges for mixing

74.65

cum

74.65

Rate per 1 cum

591.76

Providing WBM Grade II 75 mm consolidated thick icluding cost and conveyance of all materials and
consolidation by power roller as per clause 404 of MoRTH specification

Rate for 10 sqm of 75 mm thick

1.00

cum

63-45 mm graded metal

#REF!

cum

#REF!

0.24

cum

Binding materials

591.76

cum

142.02

10.00

sqm

Labour and Hire charges

302.61

10 sqm

302.61
#REF!
#REF!

Providing WBM Grade III 75 mm consolidated thick icluding cost and conveyance of all materials and
consolidation by power roller as per clause 404 of MoRTH specification

Rate for 10 sqm of 75 mm thick

1.00

cum

53-22.40 mm graded metal

#REF!

cum

#REF!

0.24

cum

Binding materials

591.76

cum

142.02

10.00

sqm

Labour and Hire charges

302.61

10 sqm

302.61
#REF!
#REF!

WBM Grade II

1000

1.625

0.225

731.25

817.34

597680

WBM Grade III

1000

1.625

0.075

243.75

1027.47

250446

Total

848126

911.64

888849

Total

888849

WMM

1000

1.625

0.300

975

DATA FOR PRIME COAT & TACK COAT


1 Providing and laying Prime Coat over WMM surface using 7 kgs. of bitumen emulsion
SS1 for 10 sqm.area including cost and conveyance of bituminous binder including
labour charges for preparing the surface and applying the required quantity of bitumen
as tack coat by bitumen sprayer etc., complete as per clause 502 of MORTH Rev -- 5
7.00

kg

10.00

sqm

Cost of Emulsion SS1


Hire and labour charges

76828.68

Mt

159.00 10 sqm

537.80
159.00

Rate for 10 Sqm

696.80

Rate for 1 Sqm

69.68

2 Providing and laying Tack coat over PC with WMM surface treated with prime coat
using 2.50 kgs of bitumen emulsion RS1/Bulk Bitumen VG 10 for 10sqm area including
cost and conveyance of bituminous binder including labour charges for preparing the
surface and applying the required quantity of bitumen as tack coat by bitumen sprayer
etc., complete As per clause 503 MORTH Rev -- 5 Specification
2.50

kg

10.00

sqm

Cost of bitumen emulsion RS1


Hire and labour charges

47744.11

Mt

119.36

31.75 10 sqm

31.75

Rate for 10 Sqm

151.11

Rate for 1 Sqm

15.11

3 Providing and Laying of Tack Coat using bitumen emulsion RS1/Bulk Bitumen of VG 10
at the rate of 3.0Kg / 10 sqm over the LCC surface treated with primer preparatory to
another bituminous construction over it. As per clause 503 MORTH Rev -- 5 specification
3.00

kg

10.00

sqm

Cost of bitumen emulsion RS1


Hire and labour charges

47744.11

Mt

143.23

32.16 10 sqm

32.16

Rate for 10 Sqm

175.39

Rate for 1 Sqm

17.54

4 Providing and laying of Tack Coat using bitumen emulsion RS1/VG 10 Bulk Bitumen at
the rate of 2.00 kg per ten square meter over the BT surface treated with primer
preparatory to another bituminous construction over it. As per clause 503 MORTH Rev -2.00

kg

10.00

sqm

Cost of bitumen emulsion RS1


Hire and labour charges

47744.11

Mt

95.49

66.38 10 sqm

66.38

Rate for 10 Sqm

161.87

Rate for 1 Sqm

16.19

DATA FOR DBM 50

1 Dense Bituminous macadam 50 -- 75 mm consolidated thickness using 4 % of bitumen


60/70 grade as per clause 505 of MORTH Rev -- 5 specification

0.24

cum

37.50-13.20 mm graded metal

1001.89

cum

240.45

0.25

cum

13.20-2.36 mm graded metal

578.72

cum

144.68

0.23

cum

2.36 mm and below

538.10

cum

123.76

53.20

kg

Mt

2687.62

10.00

sqm

Bitumen 60/70 grade


Labour and Hire charges

50519.11

1271.13 10 sqm

1271.13

Total rate of 50 mm thick for 10 sqm

4467.64

Rate for one cum

8935.28

WORKING OUT METAL RATE


26.50 - 13.20 mm metal
0.16

cum

26.50 mm metal

822.40

cum

131.58

0.37

cum

25.00 & 22.40 mm metal

987.40

cum

365.34

0.47

cum

13.20 mm metal

1074.40

cum

504.97

Rate for one cum

1001.89

13.20 - 2.36 mm metal


0.55

cum

11.20, 6.70, 6, 5.60 & 4.75mm metal

611.94 cum

336.57

0.45

cum

2.36 mm metal

538.10 cum

242.15

Rate for one cum


2.36 mm and below

578.72
538.10

Rate for one cum

538.10
538.10

DATA FOR DBM 50 (9m Paver and Pneumatic Tyred Roller)

1 Dense Bituminous macadam 50 -- 80 mm consolidated thickness using 4 % of bitumen


60/70 gradeas per clause 507 of MoRTH specification

0.24

cum

26.50-13.20 mm graded metal

1001.89

cum

240.45

0.25

cum

13.20-2.36 mm graded metal

578.72

cum

144.68

0.23

cum

2.36 mm and below

538.10

cum

123.76

53.20

kg

Mt

2687.62

10.00

sqm

Bitumen 60/70 grade


Labour and Hire charges

50519.11

1435.70 10 sqm

1435.70

Total rate of 50 mm thick for 10 sqm

4632.21

Rate for one cum

9264.42

WORKING OUT METAL RATE


26.50 -- 13.20 mm metal
0.16

cum

26.50 mm metal

822.40

cum

131.58

0.37

cum

25.00 & 22.40 mm metal

987.40

cum

365.34

0.47

cum

13.20 mm metal

1074.40

cum

504.97

Rate for one cum

1001.89

13.20 -- 2.36 mm metal


0.55

cum

11.20, 6.70, 6, 5.60 & 4.75mm metal

611.94 cum

336.57

0.45

cum

2.36 mm metal

538.10 cum

242.15

Rate for one cum


2.36 mm and below

578.72
538.10

Rate for one cum

538.10
538.10

DATA FOR DBM 100


1 Dense Bituminous macadam 80 - 100 mm consolidated thickness using 4.5 % of bitumen
60/70 gradeas per clause 505 of MORTH Rev -- 5 specification
0.40

cum

37.50-13.20 mm graded metal

900.07

cum

360.03

0.35

cum

13.20-2.36 mm graded metal

565.42

cum

197.90

0.36

cum

2.36 mm and below

538.10

cum

193.72

71.30

kg

Mt

3602.01

10.00

sqm

Bitumen 60/70 grade


labour and Hire charges

50519.11

1863.36 10 sqm

1863.36

Total rate of 75 mm thick for 10 sqm

6217.02

Rate for one cum

8289.36

WORKING OUT METAL RATE


37.50 - 13.20 mm metal
0.14

cum

37.50 mm metal

864.40

cum

121.02

0.49

cum

26.50 mm metal

822.40

cum

402.98

0.37

cum

25, 22.40 & 13.20 mm metal

1016.40

cum

376.07

Total rate for 1 cum

900.07

13.20 - 2.36 mm metal


0.37 cum

11.20, 6.7, 6, 5.60 & 4.75 mm metal

611.94 cum

226.42

0.63 cum

2.36 mm metal

538.10 cum

339.00

Total rate for 1 cum

2.36 mm and below

565.42

538.10
Total rate for 1 cum

538.10
538.10

DATA FOR DBM 100 (9m Paver and Pneumatic Tyred Roller)
1 Dense Bituminous macadam 80 - 100 mm consolidated thickness using 4.5 % of bitumen
60/70 gradeas per clause 507 of MoRTH specification
0.40

cum

37.50-13.20 mm graded metal

900.07

cum

360.03

0.35

cum

13.20-2.36 mm graded metal

565.42

cum

197.90

0.36

cum

2.36 mm and below

538.10

cum

193.72

71.30

kg

Mt

3602.01

10.00

sqm

Bitumen 60/70 grade


labour and Hire charges

50519.11

2109.60 10 sqm

2109.60

Total rate of 75 mm thick for 10 sqm

6463.26

Rate for one cum

8617.68

WORKING OUT METAL RATE


37.50 - 13.20 mm metal
0.14

cum

37.50 mm metal

864.40

cum

121.02

0.49

cum

26.50 mm metal

822.40

cum

402.98

0.37

cum

25, 22.40 & 13.20 mm metal

1016.40

cum

376.07

Total rate for 1 cum

900.07

13.20 - 2.36 mm metal


0.37 cum

11.20, 6.7, 6, 5.60 & 4.75 mm metal

611.94 cum

226.42

0.63 cum

2.36 mm metal

538.10 cum

339.00

Total rate for 1 cum

2.36 mm and below

565.42

538.10
Total rate for 1 cum

538.10
538.10

DATA FOR BM 50MM


1 Bituminous macadam 50 mm consolidated thickness using bitumen 60/70 gradeas per
clause 504 of MORTH Rev -- 5 specification
0.20

Cum 26.50 -- 13.20 mm graded metal

1058.74

Cum

211.75

0.43

Cum 13.20 -- 2.36 mm graded metal

580.19

Cum

249.48

0.08

Cum 2.36 mm and below

538.10

Cum

43.05

37.00
10.00

Kg

Bitumen 60/70 grade

Sqm Labour & Hire charges for machinaries

50519.11

Mt

1268.95 10 sqm

1869.21
1268.95

Total rate of 50 mm thick for 10 sqm

3642.44

Rate for one cum

7284.88

WORKING OUT METAL RATE


26.50 -- 11.20 mm metal
0.18

Cum 25 & 22.40 mm metal

987.40

Cum

177.73

0.82

Cum 13.20 mm metal

1074.40

Cum

881.01

Total

Rate for 1 Cum

1058.74

13.20 -- 2.36 mm metal


0.57

Cum 11.20, 6.70, 6, 5.60 & 4.75 mm metal

611.94

Cum

348.81

0.43

Cum 2.36 mm metal

538.10

Cum

231.38

Total
2.36 mm and below

Rate for 1 Cum


538.10
Rate for 1 Cum

580.19
538.10
538.10

DATA FOR BM 100MM


1 Bituminous macadam 75 mm consolidated thickness using bitumen 60/70 grade as per
clause 504 of MORTH Rev -- 5 specification
0.64

Cum 37.50 -- 13.20 mm graded metal

927.48

Cum

593.59

0.44

Cum 13.20 -- 2.36 mm graded metal

507.91

Cum

223.48

0.13

Cum 2.36 mm and below

538.10

Cum

69.95

50519.11

Mt

3132.18

1841.36

10 sqm

1841.36

62.00
10.00

Kg

Bitumen 60/70 grade

Sqm labour and Hire charges for machinaries


Total rate of 75 mm thick for 10 sqm

5860.56

Rate for one cum

7814.08

WORKING OUT METAL RATE


37.50 -- 13.20 mm metal
0.10

Cum 37.50 mm metal

864.40

Cum

86.44

0.38

Cum 26.50 mm metal

822.40

Cum

312.51

0.52

Cum 25, 22.40 & 13.20 mm metal

1016.40

Cum

528.53

Rate for 1 Cum

927.48

13.20 -- 2.36 mm metal


0.83

Cum 11.20, 6.70, 6, 5.6 & 4.75 mm metal

611.94

Cum

507.91

0.17

Cum 2.36 mm metal

538.10

Cum

91.48

Rate for 1 Cum

599.39

538.10

538.10

2.36 mm metal & Below


1

Cum 2.36 mm metal


Total

Cum

Rate for 1 Cum

538.10

DATA FOR BC 40MM


1 Bituminous concrete 40 mm consolidated thickness using 5.1 % of bitumen 60/70grade
as per clause 507 of MORTH Rev -- V specification
Rate per 10 sqm of 40 mm compacted thick
0.13

cum

19.00 -- 9.50 mm IRC metal

835.00

cum

108.55

0.17

cum

9.50 - 2.36 mm IRC metal

562.50

cum

95.63

0.26

cum

2.36mm and Below

538.10

cum

139.91

50.30

kg

Bitumen 60/70 grade

50519.11

Mt

2541.11

10.00

sqm

Labour and Hire charges

1038.52

10 sqm

1038.52

Rate for 10 Sqm

3923.72

Rate for 1 Sqm

392.37

Rate for 1 Cum

9809.30

Working out metal rate


19.00 - 9.50 mm
0.24

cum

13.20 mm metal

1074.40

cum

257.86

0.76

cum

11.20 mm metal

759.40

cum

577.14

Rate for one cum

835.00

9.50 - 2.36 mm metal


0.66

cum

6.70, 6, 5.60 & 4.75 mm metal

575.08

cum

379.55

0.34

cum

2.80 mm metal

538.10

cum

182.95

Rate for one cum

562.50

2.36 mm metal Below


1

cum

2.36 mm metal

538.10

cum

Rate for one cum

538.10
538.10

DATA FOR BC 50MM


1 Bituminous concrete 50 mm consolidated thickness using 5.1 % of bitumen 60/70grade
as per clause 507 of MORTH Rev -- V specification
Rate per 10 sqm of 40 mm compacted thick
0.22

cum

26.50 -- 13.20 mm IRC metal

1060.48

cum

233.31

0.24

cum

13.20 - 2.36 mm IRC metal

592.01

cum

142.08

0.26

cum

2.36mm and Below

538.10

cum

139.91

62.40

kg

50519.11

Mt

3152.39

10.00

sqm

0.00

10 sqm

1038.52

Bitumen 60/70 grade


Labour and Hire charges

Rate for 10 Sqm

4706.21

Rate for 1 Sqm

470.62

Rate for 1 Cum

9412.42

WORKING OUT METAL RATE


26.50 -- 13.20 mm
0.16

Cum

25 & 22.40 mm metal

987.40

Cum

157.98

0.84

Cum

13.20 mm metal

1074.40

Cum

902.50

Rate for one cum

1060.48

13.20 -- 2.36 mm metal


0.73

cum

11.2, 6.70, 6, 5.60 & 4.75 mm

611.94

cum

446.72

0.27

cum

2.80 mm metal

538.10

cum

145.29

Rate for one cum

592.01

2.36 mm metal Below


1

cum

2.36 mm metal

538.10

cum

Rate for one cum

538.10
538.10

DATA FOR BC 40MM (USING PENUMATIC TYRED ROLLER & 9 M WIDTH PAVER)
1 Bituminous concrete 40 mm consolidated thickness using 5.1 % of bitumen 60/70grade
as per clause 507 of MORTH Rev -- 5 specification
Rate per 10 sqm of 40 mm compacted thick
0.13

cum

19.00 -- 9.5 mm IRC metal

835.00

cum

108.55

0.17

cum

9.50 -- 2.36 mm IRC metal

562.50

cum

95.63

0.26

cum

2.36 mm and Below IRC metal

538.10

cum

139.91

50.30

kg

Bitumen 60/70 grade

50519.11

Mt

2541.11

10.00

sqm

Labour and Hire charges

1169.29

10 sqm

1169.29

Rate for 10 Sqm

4054.49

Rate for 1 Sqm

405.45

Rate for 1 Cum 40

10136.23

WORKING OUT METAL RATE


19.00 -- 9.50 mm
0.24

cum

13.20 mm metal

1074.40

cum

257.86

0.76

cum

11.20 mm metal

759.40

cum

577.14

Rate for 1 Cum

835.00

9.50 -- 2.36 mm metal


0.66

cum

6.70, 6, 5.6 & 4.75 mm metal

575.08

cum

379.55

0.34

cum

2.36 mm metal

538.10

cum

182.95

Rate for 1 Cum

562.50

2.36 mm metal Below


1

cum

2.36 mm metal

538.10

cum

Rate for one Cum

538.10
538.10

DATA FOR BC 25MM


2 Bituminous concrete 25 mm consolidated thickness using 5.1 % of bitumen 60/70grade
as per clause 512 of MoRTH specification
Rate per 10 sqm of 25 mm compacted thick

0.25

cum

19--9.5 mm IRC metal

810.9

cum

202.73

0.14

cum

9.5 - 2.36 mm IRC metal

427.84

cum

59.90

28.00

kg

50519.11

Mt

1414.54

10.00

sqm

684.85

10 sqm

684.85

Bitumen 60/70 grade


Labour and Hire charges
Rate for 10 sqm

2362.02

Rate for 1 sqm

236.20

Working out metal rate

19.0mm-9.5 mm
1.00

cum

Cost of 13.2 mm metal

810.90

cum

Rate for one cum

810.9
810.9

9.50 - 2.80 mm metal


0.58

cum

6.70 mm metal

445.90

cum

258.62

0.42

cum

2.80 mm metal

402.90

cum

169.22

Rate for one cum

427.84

DATA FOR SDBC

1 Semi Dense Bituminous Concrete 25 mm consolidated thickness using % of 60 / 70 grade


bitumen per clause 508 of MoRTH specification
0.10

cum

11.20 mm metal

759.40

cum

75.94

0.16

cum

6.7 mm metal

587.40

cum

93.98

0.11

cum

2.8 mm and below metal

538.10

cum

59.19

30.00

kg

50519.11

Mt

1515.57

10.00

sqm

653.19

10 sqm

653.19

Bitumen 60 / 70 grade
Labour and Hire chargescharges

Rate for 10 Sqm

2397.88

Rate for 1Sqm

239.79

DATA FOR BUSG


1 Providing and laying "BUSG" Buit Up Spray Grout -- 75 mm thick
Rate per 10 sqm of 40 mm compacted thick
1.00

cum

Cost of 53mm -- 13.2mm metal

969.34

cum

969.34

0.13

cum

Cost of 22.4mm -- 2.8mm metal

935.13

cum

121.57

30

Kg

50519.11

mt

1515.57

10.00

sqm

Labour Charges

610.55

10 sqm

610.55

10.00

sqm

Hire charges

146.75

10 sqm

146.75

Cost of bitumen 60/70

Rate for 10 sqm 0.075 thick


Rate for one Cum

3363.78
4485.04

Working out metal rate


53 mm -- 13.2 mm
0.60

cum

Cost of 45 mm Metal

855.10

cum

513.06

0.34

cum

Cost of 22.40 mm metal

1152.40

cum

391.82

0.06

cum

Cost of 13.20 mm metal

1074.40

cum

64.46

Rate for one cum

969.34

22.4 mm -- 2.80 mm
0.60

cum

Cost of 13.2 mm Metal

1074.40

cum

644.64

0.34

cum

Cost of 11.20 mm metal

759.40

cum

258.20

0.06

cum

Cost of 2.80 mm metal

538.10

cum

32.29

Rate for one cum

935.13

DATA FOR PCWSC


1 Providing and laying premix carpet with seal coat type A including cost and conveyance of
all materials as per clause 509 of MoRTH specification WITH Mini Hot mix Plant

0.18

cum

Cost of 13.20 mm metal

1074.40

cum

193.39

0.09

cum

Cost of 11.20 mm metal

759.40

cum

68.35

0.09

cum

Cost of 6.70 mm metal

587.40

cum

52.87

24.40

kg.

Cost of bitumen 60/70

50519.11

mt.

1232.67

10.00

sqm

Labur & Hire charges for machineries

567.84

10 sqm

567.84

Rate for 10 Sqm

2115.11

Rate for 1 Sqm

211.51

Rate for 1 Cum

2820.15

WBM metal rate-2013 -- 2014


Grade II
Grade III
Qty

Size Rate

Amount

Qty

Size Rate

Amount

0.050

90 mm

322.00

16.10

0.025

63 mm

465.00

11.63

0.450

63 mm

465.00

209.25

0.200

53 mm

565.00

113.00

0.425

53 mm

565.00

240.13

0.725

45 mm

757.00

548.83

0.050

45 mm

757.00

37.85

0.025

22.4 mm

1061.00

26.53

0.025

22.4 mm

1061.00

26.53

0.025 11.20 mm

668.00

16.70

529.86

1.000

Cost of Granular material


Size of metal

716.69

1.000

Cost of material for WMM


Rate

53 - 9.50 mm

Size of metal

Rate

45 - 22.40 mm

53.00 mm

565.00

45.00 mm

757.00

46.50 mm

757.00

37.50 mm

773.00

45.00 mm

757.00

26.50 mm

731.00

37.50 mm

773.00

25.00 mm

731.00

26.50 mm

731.00

22.40 mm

1061.00

25.00 mm

731.00

Total

4053.00

22.40 mm

1061.00

Average rate

810.60

13.20 mm

983.00 22.40 - 2.36 mm

11.20 mm

668.00

22.40 mm

1061.00

7026.00

13.20 mm

983.00

780.67

11.20 mm

668.00

6.70 mm

496.00

6.00 mm

496.00

Total
Average rate
Quantity required
134.4 cum
is for

225 cum of granular

9.50 - 2.36 mm
6.70 mm

496.00

5.60 mm

496.00

6.00 mm

496.00

4.75 mm

440.00

5.60 mm

496.00

Total

4.75 mm

440.00

Average rate

2.36 mm

440.00 2.36 and below

Total
Average rate
172.80 cum for

4.75 and below

2368.00
473.60
225 cum of granular

440.00

2.36 mm

4640.00
662.86

440.00

DATA FOR ADVANCE PATCHES


1 Providing Premix Bitumen Patches to 25mm thick using 13.20mm IRC metal including
cost and conveyance of metal from approved quarry to work site and stacking them at
the site to the departmental gauge using 44kg of bitumen for premixing including cost of
bitumen which will be supplied by contractor including labour charges for heating the
bitumen and mixing with metal and labour charges for attending bitumen patches etc.,
complete

1.00

cum

Cost of 13.20mm IRC Metal

44.00

Kgs

Cost of 60 / 70 Bulk Bitumen

1.00

cum

Labour Charges

1081.10

cum

1081.10

49530.75

cum

2179.35

182.08

cum

182.08

Total

3442.53
Cum

1 Providing Premix Bitumen Patches to 50mm thick using 45mm IRC metal including cost
and conveyance of metal from approved quarry to work site and stacking them at the
site to the departmental gauge using 44kg of bitumen for premixing including cost of
bitumen which will be supplied by contractor including labour charges for heating the
bitumen and mixing with metal and labour charges for attending bitumen patches etc.,
complete

1.00

cum

Cost of 45mm IRC Metal

44.00

Kgs

Cost of 60 / 70 Bulk Bitumen

1.00

cum

Labour Charges

855.10

cum

855.10

49530.75

cum

2179.35

182.08

cum

182.08

Total

3216.53
Cum

LABOUR CHARGES
1.08 (1/6)

Labour for patches and cutting Maz -- I

258.00

Each

46.44

1.08 (1/8)

Removed the picked up stuff Maz -- I

258.00

Each

34.83

LS

3.78

Brushing and Cleaning the Surface


Spreading and cleaning the surface

3.10

Premixing the chips with hot


bitumen in the drum mixer and
laying of 0.625 cum of metal
with 44kg of Bitumen
Levelling and Tambing the
premix in the patches and pot
holes rolling etc
Special tools such as wire
brush
Regulation Traffic
Sundries such as barricading
arrangements

LS

15.75

LS
4.73
LS
LS
LS

2.31
2.31
0.55

0.625 Cum

113.80

1 Cum

182.08