Vous êtes sur la page 1sur 4

Experience summary Around 6 years of experience working for EPCI oil and gas projects as a Mechanical Package /Drilling

engineer for FPSO Topsides/ Marine, Semi submersibles and Drill ships . I have been involved at FEED verification, Procurement, Detail and Construction stages of various projects. Main work areas include verification of Feed design of sub-contractors, Vendor selection, Machinery arrangement, Design reviews, Vendor data review, and Engineering support for construction and operation activities at Shipyard.

Current status Working as Mechanical Package Engineer, since May 2008 in Larsen Oil and Gas Private Limited, Singapore for Petroprod1 FPSO Project. Handling Packages: Emergency Generator, Fresh water production unit, Nitrogen generator, Air/Nitrogen Receivers, Helicopter Refueling System, Lube oil/Diesel oil/seawater transfer pump, Offshore Pedestal Crane, Sterilizer/Hot water calorifier, Lifeboats, Life rafts, Sewage Treatment plant, Fuel oil booster pumps package, Pilot Transfer Arrangement, Laboratory Container, Fast Rescue boat, Submersible Cargo pump Writing off technical specs for above packages and evaluation and selection of vendor proposals as per project technical, commercial and rules requirement. Conduct meeting with various other disciplines and project and operation staff for feasibility of design and layouts. Checking all detail engineering interface with client, vendor, attending FAT class and other disciplines Involved in system design and layout of above packages and site coordination for technical troubleshooting during installation/commissioning. Involved in system design as per rule requirements

Experience details Project Engineer( Mechanical and Drilling (Feb 2007-May 2008) in Neptune Marine Oil and Gas Private Limited, Singapore

Project and work scope : Neptune Explorer Up gradation Project, Drill Ship, Drilling capacity - 3500ft water depth, Client Reliance Industries, India Involved in detail engineering/layout/Installation of the Drilling systems and equipments. Handled Mud Pump package, drilling equipments on drill floor, pipe handling equipment packages, Third Party equipment packages like ROV and Cementing Unit, Burner Boom,

LWD/MWD Units, Mud Logging units, Solid Cuttings and Removal Package. HP and LP System, Drill water system, Bunkering system, Bulk handling system, HP Air system, brine and base oil system. Coordination with Yard on various installation and fabrication issues and site trouble shooting. Interaction with Client on various operational and technical issues

Neptune Discoverer Up gradation Project, Drill Ship, 1500ft water depth, Client- PDVSA Venezuela( worlds fourth largest oil company) Involved in detail engineering/layout/installation of the Drilling equipments like Mud pump, Charging pump, Mixing and transfer pump, Iron Roughneck, X-Mas Tree Handling Crane, and Burner Boom. Mud tanks conversion. Coordination with Yard on various installation and fabrication issues and site trouble shooting. Interaction with Client on various operational and technical issues

Designation Daewoo Shipbuilding & Marine Engg. Co. Ltd, South Korea (EPCI Company) - (Feb.2003-Feb 2007) As Consultant Drilling/Mechanical Engineer( Projects Department) Project Seadrill GVA7500 (EPCI Project), Ultra Deep water Semi Submersible Drilling Rig Project, Drilling capacity 7500 ft water depth and 35,000 ft drilling depth. ( currently involved ), Turnkey project Duration September 2005 Feb 2007 Rules & Regulations NMD, PSA, DNV, NORSOK Work scope Verification of feed design and input to detail engineering and design review Responsible for handling all static and rotating equipments in Dry Bulk Storage System, Cementing System, Mud Mixing and storage system, High pressure mud system, Mud treatment system, Drill water, Bunker Loading stations, Burner Boom, Base oil, Brine system, ,Bilge Separator, Incinerator and involved in all other equipments on Drill Floor Making Purchase Specifications, Technical bid evaluation, Vendor selection, Vendor Data Review along with its calculations, Equipment List Carrying out the detail engineering of the drilling system as per operatibility , constructability and other design parameters Checking the design as per the relevant rules and regulations applicable to the project and implementing the same in improving the system design Conduct technical discussions with clients, vendors and subcontractors for various BFE and OFE equipments and issuing Additional Cost estimates and various design and site deliverables Involved in Freezing detail engineering, and conducting design reviews using PDMS

Machinery Arrangement and Equipment Layout considering key aspects of - Maintenance and Material Handling considerations - Accessibility - Constructability - Operatibility - General Arrangement Involved in Equipment installation and mechanical completion with technical support to yard and site troubleshooting ucation

Project DALIA, FPSO Topsides Project, Client TOTAL E& P ANGOLA, Oil rate capacity 2, 40,000 bopd. , 1200 to 1400 m water depth. Duration August 2004 Dec. 2005 ( FROM FEED REVIEW, DETAIL ENGG, UNTILL EQUIPMENT INSTALLATION AND COMMISSIONING ASSISTANCE) Work scope Handled various static (tanks, pressure vessels, filters) and rotating equipments( Pumps etc.) in Seawater Sulphate Removal Module , includes Coarse and Fine Filters, Deaeration tower and pumps Technical bids evaluation, Vendor selection and checking vendor prints along with its calculations Perform interface engineering in coordination with other engineering disciplines. Technical discussions with clients, vendors and subcontractors. Set up scope descriptions and technical specifications and writes the associated minutes of meeting and Site Query Oversee cost impact as per project specifications in terms of Additional Cost Information (ACI) Responsible for the Equipments (Pumps, Vessels etc.) installation on the Deck, involving supervision of Equipment installation drawings/Layout freezing Design review and interface check in PDMS Technical support to Fabrication Yard through site surveys, supervision and trouble shooting Project BP- Atlantis (EPCI Project), Production and Quarters Semi-Submersible Platform. Water depth 2,165m with production capacity 1,50,000 bopd & 180 MMSCFD of gas Duration April 2003 - June 2004 Rules & Regulations ABS, US Coast Guard, SOLAS Work scope Making Purchase Specifications, Technical bid evaluation, Vendor selection, vendor prints check along with its calculations Performed Equipment Layout and Arrangement Design coupled with Material Handling, Removal and Concept Study Handled Chilled Media System involving static equipment s(pressure vessels, storage tanks, special equipment, etc.) as well as rotating machinery (pump, centrifuges, compressors etc.) in accordance with the project specifications, company quality standards, safety issues, applicable

specifications, codes, norms and standards Carrying out the detail engineering(System review and check) Co-ordinate with other key personnel in other disciplines Conducted technical discussions with clients, vendors and subcontractors. Set up scope descriptions and technical specifications and writes the associated minutes of meeting Provide technical assistance at Construction Site Awards Letter of Appreciation from DSME for preparing change order requests towards reimbursement of cost as per the contractual agreement between DSME and client for DALIA-FPSO July 2005.

Vous aimerez peut-être aussi