Académique Documents
Professionnel Documents
Culture Documents
Siemens LV 70 2004
2/2
Siemens LV 70 2004
Technical overview of busbar trunking systems System overview of busbar trunking systems Contents CD system overview Description Engineering CD system (25 A 40 A) Technical data Dimensions
Page 2/4 2/6 3/1 3/2 3/4 3/6 3/14 3/20 3/22
Technical overview of busbar trunking systems System overview of busbar trunking systems Contents BD01 system overview Description Engineering BD01 system (40 A 160 A) Technical data Dimensions
Page 2/4 2/6 4/1 4/2 4/4 4/7 4/12 4/30 4/33
Technical overview of busbar trunking systems System overview of busbar trunking systems Contents BD2 system overview Description Engineering Fire barriers BD2 system (160 A 1250 A) Technical data Dimensions
Page 2/4 2/6 5/1 5/2 5/4 5/12 5/23 5/30 5/77 5/84
Siemens LV 70 2004
2/3
2
BD01 40 63 100 125 160 400 50 60 4 (PE = enclosure) IP54 5/+ 40
BD2A BD2C
690
50 60
5/+ 40
1000
50 60
4 or 5
IP34 IP54
5/+ 40
690
50 60
3, 4, 5, 6 (PE = enclosure)
IP54
5/+ 40
2/4
Siemens LV 70 2004
2
Edgewise, flat (tap-off points downwards) 2 3 On one side: every 0.5 or 1 m Up to 63 A Insulated Al or Cu conductors, painted sheet steel housing 0.76 Can be combined with networkable tap-off units for lighting control systems
0.5 3.25
Up to 400 A
Can be combined with networkable tap-off units for lighting control systems, remote switching and load monitoring
0.5 3.2
Up to 800 A
Information about the LD and LX systems: from your Siemens sales outlet. Can be combined with networkable tap-off units for remote switching and load monitoring
0.35 3
Up to 1250 A
Siemens LV 70 2004
2/5
6 1
B 0 1 -K B D
3
B D 0 1
B 0 1 -K
2/6
Siemens LV 70 2004
CD system 3 Reduced planning costs through simplified engineering Quick-release plug-in connection for fast assembly Tap-off points on both sides for optimized utilization of the busbar Even electrical loading of the CD system conductors achieved by connecting an equal number of tap-off plugs to each individual phase Versatility through high degree of protection to IP54 of the standard version Tap-off plugs allow fast, flexible load relocation (even on live systems).
BD01 system Flexible power supply Junction units for changes in direction Fast, simple planning Time-saving assembly Reliable mechanical and electrical connection High stability, low weight Positive opening and closing of tap-off points Versatile tap-off units Few basic elements Modular system reduces stock-holding High degree of protection to IP54 with tap-off points at sides and bottom for extreme ambient conditions, otherwise IP50. a Page 4/2
a Page 3/2
Up to 1250 A
Up to 5000 A
Design software BusbarSelect Design software for busbar trunking systems up to 1250 A This CD-ROM is available free of charge from your sales outlet.
BD2 system 1 Fast, simple planning Time-saving, cost-efficient assembly Reliable, safe operation Flexible modular system with simple solutions for every application Early planning of power distribution possible without precise knowledge of consumer locations Fast operational readiness through quick, simple assembly High degree of protection to IP54 for use in harsh industrial environments Innovative construction: No compensating units for expansion compensation required. a Page 5/2
LD system 4 The busbar trunking system for optimized power distribution in industry. Detailed information about this system is available from your sales outlet.
Up to 6300 A
Technical Information These planning aids are available from your sales outlet. LV 71.T Planning Guide SIVACON 8PS Busbar trunking systems LDA/LDC, BD2A/BD2C 160 A to 5000 A LV 72.T Planning Guide SIVACON 8PS Busbar trunking systems LXA/LXC over 800 A
LX system 5 The busbar trunking system for power transmission and distribution in buildings. Detailed information about this system is available from your sales outlet.
Leaflet
Siemens LV 70 2004
2/7
2/8
Siemens LV 70 2004