400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

Supervision Board

Authorization

Supervision Board

Subcontracting

Supervision Board

Subcontracting

Supervision Board

Completed items and project missing items

Supervision Board

Electrical shop drawing

Supervision Board

Mechanical shop drawing for level 5th

Supervision Board

Site Survey

Supervision Board

Window details at external walls

Supervision Board

Advance Payment

10

Supervision Board

Electrical shop drawing Report

10

11

Supervision Board

Main Power Supply

11

12

Supervision Board

Mechanical & electrical material

12

13

Supervision Board

Interior and exterior plastering at fire escape starirs

13

14

Supervision Board

Sand cement plaster concerns

14

15

Supervision Board

Material approval for conduit and accessories

15

16

Supervision Board

Reinforced concrete retainning wall and backfilling


status

16

17

Supervision Board

Building insulation-Rigid insulation Board

17

18

Supervision Board

Electrical Ligting Drawing

18

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

19

Supervision Board

Toilet outlets on Level 5

19

20

Supervision Board

Concrete roofing Tile

20

21

Supervision Board

Reception Area

21

22

Supervision Board

Staff Names and Duties

22

23

Supervision Board

Time Schedule

23

24

Supervision Board

Receiption Area Design

24

25

Supervision Board

Backfilling for Block (F) Foundation

25

26

Supervision Board

Submittal of mechanical material samples for approval

26

27

Supervision Board

Request for retaining wall information

27

28

Supervision Board

Project payments

28

29

Supervision Board

Material approval for concrete Blocks

29

30

Supervision Board

Submittal of footing insulation

30

31

Supervision Board

Mechanical work sample checking

31

32

Supervision Board

Main Water supply

32

33

Supervision Board

Submittal of mechanical material samples for approval

33

34

Supervision Board

Project manager

34

35

Supervision Board

Submittal wire mesh

35

36

Supervision Board

Submittal revision of Block F sewerage project

36

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

37

Supervision Board

Dismatch items between mechanical drawings and


architectural drawings

37

38

Supervision Board

Roof Insulation Detail suggestion

38

39

Supervision Board

Existing interior partition walls and exterior


stone cladding

39

40

Supervision Board

Existing roof drainage conditions

40

41

Supervision Board

Final approval of medical equipment

41

42

Supervision Board

Data sheet submittal

42

43

Supervision Board

Backfilling

43

44

Supervision Board

Ceiling plaster

44

45

Supervision Board

Footing Insulation

45

46

Supervision Board

Authority

46

47

Supervision Board

Mechanical Shop drawing sample

47

48

Supervision Board

Casting lean concrete for H block

48

49

Supervision Board

Submitting water proof membrane for foundation

49

50

Supervision Board

Electrical Earthing and lightning arrester Drawings

50

51

Supervision Board

Removing unsuitable backfilling and starting subgrade


preparation

51

52

Supervision Board

Bob-Cat transportation

52

53

Supervision Board

Material approval of cable tray,Ladder and accessories

53

54

Supervision Board

Submittal of footing insulation expanded polystrene


protecting Boards

54

55

Supervision Board

Submittal of wire mesh and corner bead samples

55

56

Supervision Board

Submitting mock up sample for plastering works

56

57

Supervision Board

(33Kv) substation plan

57

58

Supervision Board

Plastering wrok

58

59

Supervision Board

Sand and cement Materials

59

60

Sako Laboratory

Sand Samples

60

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

61

Supervision Board

Daily report

61

62

Supervision Board

Bonding Agent Plaster

62

63

Supervision Board

Electrical Shop Drawing

63

64

Supervision Board

Submittal of time schedule program

64

65

Supervision Board

Advance payment bank garnatee

65

66

Supervision Board

Elevated water tank

66

67

Supervision Board

Submittal of specification of UPVS pipes(Cosmoplast)

67

68

Supervision Board

Safety Procedure

68

69

Supervision Board

Submittal of site survey plan

69

70

Supervision Board

Block F first layer compaction test

70

71

Supervision Board

Boundary of the hospital

71

72

Supervision Board

Submission of shop drawing

72

73

Supervision Board

Appointed and authorized Engineer

73

74

Supervision Board

Mechanical shop drawing

74

75

Supervision Board

Submittal of Concrete Roofing Tiles

75

76

Supervision Board

Interior wall cement plastering

76

77

Supervision Board

Submittal of roof insulations materials

77

78

Supervision Board

Road No.1 Test

78

79

Supervision Board

External fair face concrete surfaces

79

80

Supervision Board

External Fair faced concrete surface

80

81

Supervision Board

Re-submitting of cable tray,ladder and accessories

81

82

Supervision Board

Electrical shop drawing

82

83

Supervision Board

Block F last layer ground compaction

83

84

Supervision Board

10x20x40 cm Concrete masonary unit test

84

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

85

Supervision Board

Ducting sample

85

86

Supervision Board

Corner Beads

86

87

Supervision Board

Reception Area

87

88

Supervision Board

Record of inspection

88

89

Supervision Board

Permission of performing work

89

90

Supervision Board

Permission of performing work

90

91

Supervision Board

Electrical shop drawing part 2

91

92

Supervision Board

Permit to work

92

93

Supervision Board

Confirmation of renovating damages in existing stone


cladding

93

94

Supervision Board

Permit to work

94

95

Supervision Board

Submittal of light weight concrete samples and mix


design

95

96

Supervision Board

Request for information for plastering work

96

97

Supervision Board

Electrical shop drawing

97

98

Supervision Board

Medical Equipment meetings

98

99

Supervision Board

Submittal of corner beads sample & technical data

99

100

Supervision Board

Permit to work in Road No.2

100

101

Supervision Board

Submittal of alcali resistance plaster mesh

101

102

Supervision Board

Permit to work

102

103

Supervision Board

Presentation of monthly report

103

104

Supervision Board

Patient rooms that have windows looking on rooms


adjacent to them

104

105

Supervision Board

Light weight concrete and mix design

105

106

Supervision Board

Submittal of emergency plan

106

107

Supervision Board

Getting permit of work for pouring light weight concrete

107

108

Supervision Board

Electrical shop drawing part 1

108

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

109

Supervision Board

Submittal of June 2011 activities schedule

109

110

Supervision Board

Road No.1 & road No.3 Test

110

111

Supervision Board

112

Supervision Board

Cast Iron Pipes

112

113

Supervision Board

Submission of Materials according to European norms


instead of British Norms

113

114

Supervision Board

Material inspection request ASSAN/Galvanized sheet


metals
LINK/ hanger,support,clamps

114

115

Supervision Board

Fees of the items

115

116

Supervision Board

Mechanical shop drawings-Level -5

116

117

Supervision Board

Black steel seamless pipe

117

118

Supervision Board

Permit to work

118

119

Supervision Board

Inspection request for (F) Block UPVC pipework

119

120

Supervision Board

Price analysis for Multitherm 400

120

121

Supervision Board

Inspection request for duct samples

121

122

Supervision Board

(G) Block underground cast iron pipe revision

122

123

Supervision Board

Tower crane and mechanical and electrical items

123

124

Supervision Board

Getting permit of work for casting concrete for Block F

124

125

Supervision Board

HVAC duct manufacturing on site

125

126

Supervision Board

Cement and Diesel materials

126

127

Supervision Board

Medical gases subcontractor

127

128

Supervision Board

Items that will be revised and changed by the consultant

128

129

Supervision Board

Electrical works subcontractor

129

130

Supervision Board

Inspection for G block underground cast iron and UPVC


pipe installation

130

131

Supervision Board

Reception Area Structural Design

131

132

Supervision Board

Reception Area Architectural Drawings

132

NO LETTER

Ref No.

111

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

133

Supervision Board

Mechanical and electrical inspections

133

134

Supervision Board

Electrical shop drawing

134

135

Supervision Board

UPVC fittings from warehouse of client

135

136

Supervision Board

Selection of plumbing fixture

136

137

Supervision Board

Regarding block (F) electrical shop drawing

137

138

Supervision Board

Getting permit of work for pouring light weight concrete

138

139

Supervision Board

Selection of plumbing fixture

139

140

Supervision Board

HVAC duct manufacturing on site

140

141

Supervision Board

Evaluating sub-contractor's work in fatih university

141

142

Supervision Board

Electrical shop drawing Revision D

142

143

Supervision Board

Work Completion certification

143

144

Supervision Board

Reception Building Foundation Excavation

144

145

Supervision Board

British standad Revisions

145

146

Supervision Board

Laborers on site

146

147

Supervision Board

Windows Sub Frame

147

148

Supervision Board

Masonary works at block F

148

149

Supervision Board

Invoice

149

150

Supervision Board

New electrical cable tray sample

150

151

Supervision Board

Elavated water tank material

151

152

Supervision Board

Removing and replacing tower crane

152

153

Supervision Board

Block (F) missing structural roof

153

154

Supervision Board

Project site elevation drawing

154

155

Supervision Board

PVC flooring in wet areas

155

156

Supervision Board

permit to work

156

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

157

Supervision Board

invitation to Turkey for material inspection

157

158

Supervision Board

Mechanical equipment concrete pads on roof

158

159

Supervision Board

Information request for 3 items

159

160

Supervision Board

Visiting factories Turkey

160

161

Supervision Board

Material submission- Insulation material

161

162

Supervision Board

Trip To Turkey

162

163

Supervision Board

Material submission-Black steel seamless pipe

163

164

Supervision Board

Monthly report

164

165

Supervision Board

Electrical shop drawing -part 1

165

166

Supervision Board

Material submission for galvanized steel pipe

166

167

Supervision Board

Electrical shop drawing -Part 2

167

168

Supervision Board

Reply to your letter with your 28th of June,2011 date /366


reference No. about
HVAC duct manufacturing

168

169

Supervision Board

Electrical lighting level -5 drawing

169

170

Supervision Board

selection of pump manufacturer

170

171

Supervision Board

Material submission - Galvanized steel fittings

171

172

Supervision Board

Material submission- Black steel seamless fittings

172

173

Supervision Board

Level-5 small power drawing

173

174

Supervision Board

Electrical steel junction box

174

175

Supervision Board

Material submission -Black steel seamless fittings

175

176

Supervision Board

Submission of air terminal Devices(Diffuser & Grills)

176

177

Supervision Board

Medical equipment -Sector X

177

178

Supervision Board

Waiting area structural design and calculation

178

179

Supervision Board

Medical equipment /Bed pan washer with sink

179

180

Supervision Board

Medical equipment/Bed Head Unit

180

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

181

Supervision Board

Pre-cast concrete roof tiles

181

182

Supervision Board

Single line diagram substation (SS-1)

182

183

Supervision Board

Request for information (RFI-01)

183

184

Supervision Board

Authorization letter

184

185

Supervision Board

Fridays

185

186

Supervision Board

Training Buildings by Previous Contractor

186

187

Supervision Board

Plaster mesh safety Data sheet

187

188

Supervision Board

Exterior Surfaces

188

189

Supervision Board

Existing Electrical poles on site

189

190

Supervision Board

Submission of 5th floor mechanical shop drawings

190

191

Supervision Board

Electrical steel junction box (Steel Knockout box)

191

192

Supervision Board

To whom may concern (Arabic)

192

193

Supervision Board

Inspection for (G) block underground cast iron and UPVC


pipe installation

193

194

Supervision Board

Elevated water tank

194

195

Supervision Board

Discrepancy items in electrical drawings

195

196

Supervision Board

Discrepancy items in architectural drawings

196

197

Supervision Board

Waiting area structural design and calculations

197

198

Supervision Board

Submittal of adjustable door frames

198

199

Supervision Board

Wet areas wall plastering

199

200

Supervision Board

Material submission for galvanized steel pipe

200

201

Supervision Board

Material submission -Galvanized fitting

201

202

Supervision Board

Section of pump manufacturer

202

203

Supervision Board

Material submission -Valves and Expansions Joints

203

204

Supervision Board

Bank Guarantee

204

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

205

Supervision Board

Yapi-KIM bonding agent material submital and price


analysis

205

206

Supervision Board

Material submission-fire smoke and volume dampers

206

207

Supervision Board

Material submission-flexible ducts & connector

207

208

Supervision Board

Selection of (HVAC) equipment's type

208

209

Supervision Board

Electrical subcontractor (CV)

209

210

Supervision Board

Electrical wires and cable material approval forms

210

211

Supervision Board

Substations transformer design and material submittal

211

212

Supervision Board

Sample exhibition

212

213

Supervision Board

Precast concrete roofing tiles

213

214

Supervision Board

Marble sample submittal

214

215

Supervision Board

circuit breakers(ACB,MCCB,MCB,CLCB)

215

216

Supervision Board

Luminaire type material approval

216

217

Supervision Board

Ceramic sample submittal

217

218

Supervision Board

Aluminum window sample submittal

218

219

Supervision Board

Revised time schedule (Rev. 1)

219

220

Supervision Board

Wiring accessories material approval

220

221

Supervision Board

Profile & CV for subcontractor termolift

221

222

Supervision Board

Material passage from border crossing

222

223

Supervision Board

Submittal of aluminum composite

223

224

Supervision Board

Request for information (RFI-02)

224

225

Supervision Board

Request for information (RFI-03)

225

226

Supervision Board

Precast concrete roofing tiles test Results

226

227

Supervision Board

Waiting area Gate

227

228

Supervision Board

Permission to remove tower crane

228

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

229

Supervision Board

Different in quantities

229

230

Supervision Board

Record of material inspection

230

231

Supervision Board

Request for information (RFI-04)

231

232

Supervision Board

Permission of starting ducting and pipe work

232

233

Supervision Board

Exterior staircase aluminum cladding

233

234

Supervision Board

Waiting area structural design

234

235

Supervision Board

Submittal of quantity survey

235

236

Supervision Board

Conjoined meeting

236

237

Supervision Board

Request for information (RFI-05)

237

238

Supervision Board

PVC flooring covering revised prices

238

239

Supervision Board

method of statement

239

240

Supervision Board

minutes of meeting about electro-mechanical shop


drawings.

240

241

Supervision Board

sprinkler system

241

242

Palm Consultant

400 Beds hospital design drawing

242

243

Supervision Board

medical equipment progress summary

243

244

Supervision Board

Waiting area structural design

244

245

Supervision Board

Plastering works price difference

245

246

Supervision Board

Sample of alunimum windows colors Type-1

246

247

Supervision Board

Submission of 5th floor mechanical shop drawings

247

248

Supervision Board

Submittal of monthly report form

248

249

Supervision Board

Elevated water tank

249

250

Supervision Board

Cable tray coordination drawing

250

251

Supervision Board

Sample of (UPVC) pipe work

251

252

Supervision Board

Revision(2) for the reception area plan

252

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

253

Supervision Board

Cable tray material approval forms

253

254

Supervision Board

Request for information (RFI-06)

254

255

Supervision Board

Request for Information (RFI-07)

255

256

Supervision Board

Request for Information (RFI-08)

256

257

Supervision Board

Electrical Design for the reception area

257

258

Supervision Board

Samples of PVC floor amd well coverings

258

259

Supervision Board

Submission Black steel fitting size (0.5 in -2 in)

259

260

Supervision Board

Mechanical desgin for the reception area

260

261

Supervision Board

Detail of window fixing

261

262

Supervision Board

Action on site

262

263

Supervision Board

264

Supervision Board

Official letter

264

265

Supervision Board

Black steel fitting size (1/2 in 2 in )

265

266

Supervision Board

Material submission valve

266

267

Supervision Board

Selection of (HVAC) equipment's type

267

268

Supervision Board

Monthly report

268

269

Supervision Board

Submission-Pipe work sample and welder approval test


certificate

269

270

Supervision Board

Material submission-hot boiler and steam boiler with


accessories

270

271

Supervision Board

Electrical local authority

271

272

Supervision Board

Submission-4th level mechanical shop drawing

272

273

Supervision Board

Residential department of Erbil (Arabic)

273

274

Supervision Board

UPS system riser diagram

274

275

Supervision Board

Request for information (RFI-07)

275

276

Supervision Board

Monthly report form

276

263

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

277

Supervision Board

Material submission-Silicone for duvting work

277

278

Supervision Board

PVC cost breakdown

278

279

Supervision Board

Reply letter (FON No. M-005)

279

280

Supervision Board

Black steel and galvanized fitting

280

281

Supervision Board

Sand test

281

282

Supervision Board

Sample of sand

282

283

Supervision Board

Materialsubmission-Sample of Medical gas system

283

284

Supervision Board

Mechanical material on the customs

284

285

Supervision Board

PVC flooring cost breakdown (price Analysis) 45US$

285

286

Supervision Board

Time schedule critical path and cash flow diagram

286

287

Supervision Board

Mechanical material on the customs

287

288

Supervision Board

Reception building Air ducting hole

288

289

Supervision Board

PVC flooring cost breakdown

289

290

Supervision Board

Mechanical units installation typical details

290

291

Supervision Board

External area drawing

291

292

Supervision Board

Ceramic tile

292

293

Supervision Board

UPVC pipe

293

294

Supervision Board

Mechanical unit installation typical detail

294

295

Supervision Board

Schedule of working in Ramadan feast

295

296

Supervision Board

Level 4 Electrical shop drawings (Electrical)

296

297

Supervision Board

Structural desing for parking area

297

298

Supervision Board

Roof Drain and windows opening samples

298

299

Supervision Board

Cost breakdown of PVC sheets for walls


(Price Analysis)

299

300

Supervision Board

Request for information (RFI-08)

300

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

301

Supervision Board

Project Elevations and Road sections on revised site plan

301

302

Supervision Board

Parking shed main structure samples

302

303

Supervision Board

Structural design of waiting area main gate

303

304

Supervision Board

Elevated water tank

304

305

Supervision Board

Submittal of quantity survey

305

306

Supervision Board

Selection of (fan coil units & Air handling units)

306

307

Supervision Board

308

Supervision Board

Roof insulation material

308

309

Supervision Board

Reception building parapets

309

310

Supervision Board

Submission of record of material inspection

310

311

Supervision Board

resubmittion of electrical design for waiting area

311

312

Supervision Board

313

Supervision Board

Submittal of monthly report form (first payment)

313

314

Supervision Board

Cost price of PVC sheet for walls

314

315

Supervision Board

External wall plastering mock-up

315

316

Supervision Board

Submittal of corrosion material

316

317

Supervision Board

Submission-CV for medical gas subcontractor

317

318

Supervision Board

Submission-Roof drainage shop drawing

318

319

Supervision Board

Mechanical and electrical materials

319

320

Supervision Board

% 4 of the contract price

320

321

Supervision Board

Calculation & Architectural of waiting area gate

321

322

Supervision Board

Interior wall ready plastering mock-up

322

323

Supervision Board

Permission for completing retaining wall

323

324

Supervision Board

Inspection

324

307

312

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

325

Supervision Board

Submission-Method of statement for medical gas system


and detail
shop drawing for medical gas sysytem

325

326

Supervision Board

Parking shed frame sample

326

327

Supervision Board

Roofing rigid insulation

327

328

Supervision Board

Multitherm 400

328

329

Supervision Board

Submission-Technical data for HVAC equipment

329

330

Supervision Board

LEvel 5 Electrical shop drawings (Electrical)

330

331

Supervision Board

Mek. Tecnical data for chiller units (Carrier type)

331

332

Supervision Board

Corrugated Pipes.( Alt yap borular onay sunumu )

332

333

Supervision Board

Electrical Design for the reception area

333

334

Supervision Board

Sub.Mechanical (Invoice and measures )

334

335

Supervision Board

Site Plan Parking Area

335

336

Supervision Board

Service Road to the Water Reservoir

336

337

Supervision Board

Connection Road

337

338

Supervision Board

Ceramic Tiles

338

339

Supervision Board

Selection HVAC Equipment

339

340

Supervision Board

Submittal of Payment No.1

340

341

Supervision Board

Water Resersvior External Finish

341

342

Supervision Board

Fire Water storage tank in part G

342

343

Supervision Board

Plastering thickness

343

344

Supervision Board

Sub. Of Mec.Shop Drawings (level 4th and level 3 )

344

345

Supervision Board

Level 5,Toilet and washbasin wall renovating

345

346

Supervision Board

Waiting Area Gate structural design

346

347

Supervision Board

Sub. For ( Record of Material inspection )

347

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

348

Supervision Board

Sub.for (Air handling units,SKM factory technical data )

348

349

Supervision Board

Submittal of XPS rigid insulation board

349

350

Supervision Board

Sub.of XPS & EPS adhesive mortar

350

351

Supervision Board

sub. Of XPS and EPS plaster material

351

352

Supervision Board

Parking shed

352

353

Supervision Board

Parking Shed main structural frame material

353

354

Supervision Board

Termination of Subcontractor of electrical works contract

354

355

Supervision Board

Bathroom Ceramic Tiles

355

356

Supervision Board

nspection for Reception area UPVC pipe installation

356

357

Supervision Board

Akfix Acrylic Sealant

357

358

Supervision Board

Brands of material and Devices

358

359

Supervision Board

Final Layer Plastering Material

359

360

Supervision Board

Sub. Of Electrical Elevator

360

361

Supervision Board

Room Floor levels on Administration area

361

362

Supervision Board

Suspended ceilings.( Tavan demeleri sunumu )

362

363

Supervision Board

Corrugated Pipes Cost breakdown( Alt yap borular )

363

364

Supervision Board

Medical equipment status ( medical ekipmanlardaki


gecikme )

364

365

Supervision Board

Site work

365

366

Supervision Board

Angle Iron Over Opening Door ( level 3) kat 3 de demir


kap alma yn

366

367

Supervision Board

AIR HANDLING UNITS

367

368

Supervision Board

Plaster thickness - Sva incelii fark durumu

368

369

Supervision Board

Roof Prime Coat-at astar kaplama sunumu

369

370

Supervision Board

Sun.CV for Mech.Engineer-Mek.Makine mh. Cv idareye


sunum

370

371

Supervision Board

AIR HANDLING UNITS CONCRETE PAD DETAILS

371

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

372

Supervision Board

SUB.-GENERATOR-JENERATOR
SUNUMU.CUK+NPOWER+FG

372

373

Supervision Board

GRP PIPES

373

374

Supervision Board

Roof Joint Sealant-Akrilik mastik kullanm alan ile ilgili

374

375

Supervision Board

376

Supervision Board

377

Supervision Board

378

Supervision Board

379

Supervision Board

LOAD CALCULATIONS

380

Supervision Board

FYI ABOUT FOR ENGINEER

381

Supervision Board

MEDICAL QUIPMENT TIME SCHEDULE

381

382

Supervision Board

READY MIX PLASTERING MATERIAL

382

383

Supervision Board

PLASTER BOARD MATERIAL-KNAUF KATALAG ALIPAN

384

Supervision Board

TERRAZO TILES-MOZAIK KARO SUNUMU

384

385

Supervision Board

ELECTRICAL LV SINGLE LINE DIAGRAM-ELECTRIC DRAW

385

386

Supervision Board

MAIN SEWAGE PIPE LOCATION-KANALIZASYON BORUSU


LOKASYONU

386

387

Supervision Board

388

Supervision Board

389

Supervision Board

390

Supervision Board

391

Supervision Board

Plaster thickness - Sva incelii fark durumu

391

392

Supervision Board

Sub.sanitary waste&vent system measurement level-5

392

393

Supervision Board

The consultant performance from the starting date until 30th


of September

393

394

Supervision Board

REAR ENTRANCE OF HOSPITAL

394

395

Supervision Board

Ducting Work calculation-Denen Kanal miktar


SUBSTATION ELECTRICAL SHOP DRAWINGS
ELECTRO-MECHANICAL SHOP DRAWINGS-LEVEL 2
SUBMITTAL FAN COIL UNITS SELECTION

ELECTRICAL PAYMENT NO.1

Bank Guarantee

AIR HANDLING UNIT REVSED PAD DETAILS


AUTHORIZATION LETTER

Air Handling Units Pads

Ref No.

375
376

377

378
379

380

383

387
388
389
390

395

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

396

Supervision Board

PAYMENT'S FORM

396

397

Supervision Board

MATERIAL APPROVAL FORM ( S-013)

397

398

Supervision Board

MATERIAL APPROVAL FORM ( S-014)

398

399

Supervision Board

MATERIAL APPROVAL FORM ( S-011)

399

400

Supervision Board

MATERIAL APPROVAL FORM ( S-012)

400

401

Supervision Board

EXTERIOR LIGHTING AND CABLE ROUT PLAN

401

402

Supervision Board

LV POWER CABLE MATERIAL SUBMIT

402

403

Supervision Board

SUBMITTAL OF MECHANICAL ,ELECTRICAL SHOP DRAWINGS

403

404

Supervision Board

PENDING DOCUMENTS AND SUBJECTS

404

405

Supervision Board

ELEVATOR MACHINE ROOM IN 6.FLOOR ROOF EXTERIOR WALL


FINISH

405

406

Supervision Board

TRAINING BUILDING DETAILS

406

407

Supervision Board

408

Supervision Board

409

Supervision Board

SUBMITTAL OF AUGUST MONTHLY REPORT

409

410

Supervision Board

ALUMINUM FLASHING SAMPLE

410

411

Supervision Board

PAMUKKALE ( BASEC ) CERTIFICATE

411

412

Supervision Board

SUB.FOR RECORD OF MATERIAL INSPECTION ( BLACK STEEL


SEAMLESS PIPES AND FITTINGS )

412

413

Supervision Board

SITE PLAN

413

414

Supervision Board

Submittal computer selection ( Air Handling units,


Exhaust fan)

414

415

Supervision Board

416

Supervision Board

417

Supervision Board

cem beyde bekliyor.Tavan deme fiyatlar hk

417

418

Supervision Board

Submittal of Calculations of cement sand plastering 1. layer


Level 5

418

419

Supervision Board

ROADS OF 400 BEDS HOSPITAL


SUB.FOR MEASUREMENT GALVANIZE PIPES

Material Approval Form. BUS-BAR hakknda


Material Approval Form. Topraklama sistemleri hakknda

Chiller bldg.Main Feeder Cable Tray Shop Drawings

Ref No.

407
408

415
416

419

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

420

Supervision Board

421

Supervision Board

422

Supervision Board

Roof Insulation Permit to Work

422

423

Supervision Board

Sub.Akustik and Ducting Work Accessories

423

424

Supervision Board

Sub. As build notification for ( mechanical work ) level 5-4

424

425

Supervision Board

Sub. Measurment for rain water pipe system

425

426

Supervision Board

sub.cof calculation of cement sand plastering 1. layer level 3

426

427

Supervision Board

428

Supervision Board

submittal of quantity survey

428

429

Supervision Board

sub. Of calculations of cement sand plastering 1.layer level 4

429

430

Supervision Board

400 mmx400 mm precast concrete roof tiles test results

430

431

Supervision Board

sub for measurement ducting work in level 5

431

432

Supervision Board

invitation for manufactures visit

432

433

Supervision Board

stud wall cost breakdown

433

434

Supervision Board

Suspended ceilings cost breakdown

434

435

Supervision Board

wall holes renovation cost breakdown

435

436

Supervision Board

marble windows frame cost breakdown

436

437

Supervision Board

sub. Carrier brand ( chiller,AHU), Aertesi ( fan coil units ),


Dynair ( exhaust fan) & ICI boilers

437

438

Supervision Board

439

Supervision Board

sub. Of calculations of cement sand plastering 1.layer level 1

439

440

Supervision Board

sub. CV for medical gas engineer - Arif CENGZ

440

441

Supervision Board

parking shed sandwich panel rof material

441

442

Supervision Board

submittal of quantity survey

442

443

Supervision Board

submittal (FAN COIL UNITS ) Aertesi brand

443

Landscape Cable Route Trench Detail


Main Bulding .Main Freeder Busbar Shop Drawing

No LETTER

Ref No.
420
421

427

438

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

444

Supervision Board

sub.AIR HANDLING UNITS Carrier brand

444

445

Supervision Board

medical equipment revision

445

446

Supervision Board

permit to work of parking shed works

446

447

Supervision Board

Permit to work of stud wall works

447

448

Supervision Board

Permit to work of final layer plastering works

448

449

Supervision Board

Permit to work of fencing type 2 works

449

450

Supervision Board

Revision of rear landscape of hospital

450

451

Supervision Board

sub. Measurment for ducting for level 5

451

452

Supervision Board

80x80 cm roofing concrete tiles

452

453

Supervision Board

Level 5 Inspection- cunduit and box

453

454

Supervision Board

Submittal of september monthly report

454

455

Supervision Board

Yap Kim material technical Datas

455

456

Supervision Board

submittal As built notification in level 4

456

457

Supervision Board

Level 3 inspection -conduit and GI box installed

457

458

Supervision Board

Level 4 inpection -conduit and GI box installed

458

459

Supervision Board

Minutes of meeting No.24 of 15th October 2011

459

460

Supervision Board

Sub. Measurment for sanitary waste and vent sys. & Domestic
hot , cold water

460

461

Supervision Board

Concrete compressive test result of waiting area

461

462

Supervision Board

Sub. Record of material inspection ( galvanize sheet & duct


accessories )

462

463

Supervision Board

Sub. Of mechanical drawings

463

464

Supervision Board

Elevated water tank

464

465

Supervision Board

465

466

Supervision Board

466

467

Supervision Board

Sub. Of calculations of cement sand plastering 1st layer


0

Ref No.

level

467

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

468

Supervision Board

Medical Gas pipes system

468

469

Supervision Board

Second payment

469

470

Supervision Board

stud wall cost breakdown

470

471

Supervision Board

Cable Sample

471

472

Supervision Board

Extra socket outlet

472

473

Supervision Board

Handicup light switch

473

474

Supervision Board

Sub. Record of material inspection ( domestic pipes insulation


& duct accessories )

474

475

Supervision Board

Corrugated Pipes Cost breakdown( Alt yap borular )

475

476

Supervision Board

Electricity bill

476

477

Supervision Board

Sub. For medical gas capacity

477

478

Supervision Board

Sub. For Computer selection ( Fan coil units ) SKM brand

478

479

Supervision Board

sub. Medical gas shop drawing

479

480

Supervision Board

Sub.Control valves box with alarm for medical gas system

480

481

Supervision Board

sub.Ball valves for medical gas system

481

482

Supervision Board

Sub. Bed unit for medical gas system

482

483

Supervision Board

Submittal quantity survey

483

484

Supervision Board

Medical gas pipe test result

484

485

Supervision Board

Sub. Of quntity Survey

485

486

Supervision Board

Sub. Level 1 (entrance ) Mechanical Shop Drawing

486

487

Supervision Board

Cable Trunking Material Inspection

487

488

Supervision Board

Sub. Of Ceramic & Marble Adhesive ( FLEKSMORTEL ) mastertile 93 flex


488

489

Supervision Board

Metal suspended Ceiling Cost Breakdown

489

490

Supervision Board

Permit to work of guard houses

490

491

Supervision Board

Metal suspended Ceiling types Cost Breakdown

491

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

492

Supervision Board

Knauf Fire Resistant Gypsum Board Technical Data sheet

492

493

Supervision Board

Level - 2 fire alarm shop drawing

493

494

Supervision Board

SUBMITTAL QUANTITY SURVEY NO.6

494

495

Supervision Board

SUBMITTAL QUANTITY SURVEY NO.11

495

496

Supervision Board

SUBMITTAL QUANTITY SURVEY NO.9

496

497

Supervision Board

SUBMITTAL QUANTITY SURVEY NO.10

497

498

Supervision Board

SUBMITTAL QUANTITY SURVEY NO.17

498

499

Supervision Board

SUBMITTAL QUANTITY SURVEY NO.18

499

500

Supervision Board

SUBMITTAL QUANTITY SURVEY NO.5

500

501

Supervision Board

SUBMITTAL QUANTITY SURVEY NO.16

501

502

Supervision Board

PERMIT TO WORK OF RC STORM WATER CHANNELS

502

503

Supervision Board

PERMIT TO WORK OF RETAINING WALLS

503

504

Supervision Board

DORUK EXPANSION JOINT SAMPLES AND CATALOGUES

504

505

Supervision Board

Elevated water tank

505

506

Supervision Board

Metal Suspended Ceiling Revised Quantities for Each new type

506

507

Supervision Board

Front entrance new design

507

508

Supervision Board

sub.of quantity survey index no:19

508

509

Supervision Board

sub.of quantity survey index no:20

509

510

Supervision Board

sub.of quantity survey index no:21

510

511

Supervision Board

sub.of quantity survey index no:22

511

512

Supervision Board

Electrical Design for the waiting area

512

513

Supervision Board

compaction

513

514

Supervision Board

submit medical gas shop drawing level 5

514

515

Supervision Board

sub.of quantity survey index no:23

515

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

516

Supervision Board

mechanical material submission schedule

516

517

Supervision Board

invitation for manufactures in turkey

517

518

Supervision Board

sub.of quantity survey index no:24-25

518

519

Supervision Board

reception building inspection conuits and GI box instalation

519

520

Supervision Board

Cable inspection

520

521

Supervision Board

Level ( 3 and 2 ) inspection

521

522

Supervision Board

sub.of quantity survey index no:26

522

523

Supervision Board

sub. Of october monthly report

523

524

Supervision Board

permit to work of marble wall cladding

524

525

Supervision Board

sub. Of Anti-fungal coating and duct sealant data sheet

525

526

Supervision Board

UPVC drainage pipes removal cost

526

527

Supervision Board

sub.ducting work measurement

527

528

Supervision Board

Revised structural design for the main gate

528

529

Supervision Board

Corrugated pipe material submitting

529

530

Supervision Board

Request information about submitted Q.S calculation

530

531

Supervision Board

sub.mechanical quantity survey

531

532

Supervision Board

Electrical quantity survey

532

533

Supervision Board

Level -( 5,4,3) fire alarm conduit inspection

533

534

Supervision Board

Medical equipment -submittal of sectors A,C and M

534

535

Supervision Board

Soft copy for all medical equipment sectors

535

536

Supervision Board

Sub. Of quantity survey

536

537

Supervision Board

Elevated water tank

537

538

Supervision Board

Reply for mechanical work passivity

538

539

Supervision Board

Sub. Of quantity survey ( plastering of level 2 )

539

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

540

Supervision Board

541

Supervision Board

542

Supervision Board

Sub. Quantity survey ( site work )index 31

542

543

Supervision Board

Sub. Quantity survey index 29

543

544

Supervision Board

Pre-Installation reqirement

544

545

Supervision Board

Health and Safety & Environment Plan

545

546

Supervision Board

PAYMENT NO.4

546

547

Supervision Board

SUBMITTAL OF QUANTITIY SURVEY

547

548

Supervision Board

Revised structural Project for rear entrance

548

549

Supervision Board

Sub. Of Quantity Survey ( No.32 )

549

550

Supervision Board

Front entrance new design

550

551

Supervision Board

Level - 2 Shop drawing

551

552

Supervision Board

level - 1 part -D, conduit and GI-box inspection

552

553

Supervision Board

Level-0-part ( F and G ), ( Conduit and GI-box )-inspection

553

554

Supervision Board

Level-5 wiring inspection

554

555

Supervision Board

Elevator submittal-KONE marka

555

556

Supervision Board

Sub. Of Quantity Survey ( No.33 )

556

557

Supervision Board

sub. Of sanitary sewer system layout&profile plan

557

558

Supervision Board

Staff parking lot structural design

558

559

Supervision Board

Sub. Of Quantity Survey ( No.34 )

559

560

Supervision Board

Cable inspection

560

561

Supervision Board

Material aproval form -Cable trunking

561

562

Supervision Board

Sub. Of Quantity Survey ( No.36 )

562

563

Supervision Board

Sub.( Carrier fan coil computer selection & catalog)

563

Staff parking lost

Ref No.
540
541

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

564

Supervision Board

Sub. Of Quantity Survey ( No.38 )

564

565

Supervision Board

Sub. Of Quantity Survey ( No.35 )

565

566

Supervision Board

Sub. Of Quantity Survey ( No.37 )

566

567

Supervision Board

Sub. Of Quantity Survey ( No.39 )

567

568

Supervision Board

Electrical cable handle trench detail drawings

568

569

Supervision Board

Electrical executed work break down

569

570

Supervision Board

Cable inspection

570

571

Supervision Board

Material on site submittal of cable quantity survey

571

572

Supervision Board

573

Supervision Board

Submittal Quantity survey ( 40 )

573

574

Supervision Board

Cable inspection

574

575

Supervision Board

Material on site submittal of cable quantity survey

575

576

Supervision Board

Sub. Of Quantity survey ( 41 )

576

577

Supervision Board

Sub. Of november monthly report

577

578

Supervision Board

sub.of parking lot structural design

578

579

Supervision Board

Material approval form.( s-019)

579

580

Supervision Board

Sub. Of Quantity Survey - 42

580

581

Supervision Board

Sub.Quantity survey Level-5,Level-1

581

582

Supervision Board

Level-4 wiring inspection

582

583

Supervision Board

Level-3 wiring inspection

583

584

Supervision Board

Sub.of Quantity survey -43

584

585

Supervision Board

Sub.of Quantity survey -44

585

586

Supervision Board

Sub.of Quantity survey -45

586

587

Supervision Board

Sub.of Quantity survey -46

587

No LETTER

Ref No.

572

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

588

Supervision Board

Sub.of Quantity survey -47

588

589

Supervision Board

Cooling Capacity of fan coil units operated with ethylene


glycol

589

590

Supervision Board

Sub.of Quantity survey -48

590

591

Supervision Board

sub.for ( record of material inspection)

591

592

Supervision Board

Duct size for fan coils

592

593

Supervision Board

sub. For (valves,expansion joint and strainer)duyar brand

593

594

Supervision Board

Sub.of Quantity survey -49

594

595

Supervision Board

Sub.of Quantity survey -50

595

596

Supervision Board

Sub.of Quantity survey -51

596

597

Supervision Board

Sub.of Quantity survey -52

597

598

Supervision Board

Sub.of retaining wall proposed elevations

598

599

Supervision Board

Generator set technical specification

599

600

Supervision Board

Invitation

600

601

Supervision Board

Sub.of Quantity survey -53

601

602

Supervision Board

Sub.of Quantity survey -54

602

603

Supervision Board

Sub. Air outlet accessories

603

604

Supervision Board

Sub. Mechanical quantity survey

604

605

Supervision Board

Sub.of Quantity survey -55

605

606

Supervision Board

Sub. Plumbing fixtures

606

607

Supervision Board

sub.level 1 and level 2 shop drawings

607

608

Supervision Board

Delay of sewage

608

609

Supervision Board

Sub.Quantity Survey 59

609

610

Supervision Board

Sub.Quantity Survey 56-57-58

610

611

Supervision Board

Mr. Cem

Ref No.

611

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

612

Supervision Board

Mr. Cem

612

613

Supervision Board

Mr. Cem

613

614

Supervision Board

80x80x4cm concrete tiles-tekrar sunuldu-tm test sonu.

614

615

Supervision Board

Revised medical equipment time schedule in the result of


delaying the revision

615

616

Supervision Board

Sub.Quantity Survey 60-61-62

616

617

Supervision Board

Sub.Quantity Survey 63-64-65

617

618

Supervision Board

Corrugated pipe material inspection

618

619

Supervision Board

Corrugated pipe material quantity

619

620

Supervision Board

Invitation

620

621

Supervision Board

Sub.Quantity Survey 67-68-69

621

622

Supervision Board

Rejected cable used as a sample only

622

623

Supervision Board

staff parking lot revised

623

624

Supervision Board

sub. Carrier computer R1 for fan coil

624

625

Supervision Board

Sub. Of Quantity survey No:2 -elektrik

625

626

Supervision Board

Sub. Of Quantity survey No:3-elektrik

626

627

Supervision Board

Sub. Of Quantity survey No:70

627

628

Supervision Board

Suspended ceiling material submitting

628

629

Supervision Board

Answer of chiller comments

629

630

Supervision Board

Sub. Of Quantity survey No:71

630

631

Supervision Board

Cost breakdown for excavation and removal unsitable soil

631

632

Supervision Board

Cost breakdown for granite floor

632

633

Supervision Board

Cost breakdown for antiacid ceramic tile

633

634

Supervision Board

Front entrance new design

634

635

Supervision Board

Corrugated pipe material quantity

635

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

636

Supervision Board

Medical & quality equipment requipment

636

637

Supervision Board

Material Approval form (Final Distribution Board-DB)

637

638

Supervision Board

Sub. Exhaust fan ( Dynair,Greenheck brand )

638

639

Supervision Board

Inspection for mechanical work

639

640

Supervision Board

Record of material inspection

640

641

Supervision Board

Sub. Mechanical quantity survey

641

642

Supervision Board

Chillers and Air handling units comments

642

643

Supervision Board

PAYMENT NO.4

643

644

Supervision Board

Submittla Fan Coil units comments

644

645

Supervision Board

UPVC Quantity Survey

645

646

Supervision Board

UPVC Pipes Inspection

646

647

Supervision Board

Electrical Shop Drawing

647

648

Supervision Board

Sub.of Parking lot Revised structural design

648

649

Supervision Board

Water treatment sytem and elevated water,GRP water tank

649

650

Supervision Board

Submittalof Quantity survey ( Construction Dept.) 72,73,74

650

651

Supervision Board

PAYMENT NO.4

651

652

Supervision Board

Sub. Of time schedule revised 2

652

653

Supervision Board

Submittalof Quantity survey ( Construction Dept.) 76

653

654

Supervision Board

Permit to work form for Sand Cement Screed Works

654

655

Supervision Board

Permit to work form for Suspended Ceiling Works

655

656

Supervision Board

Permit to work form for Sewage system Works

656

657

Supervision Board

Permit to work form for Storm water Works

657

658

Supervision Board

water proofing material technical data sheet - sika top seal


107

658

659

Supervision Board

Sub. Of Quantity survey (Construction Dept.)index 77

659

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

660

Supervision Board

Sub. Of Quantity survey (Construction Dept.)index 78

660

661

Supervision Board

Sub. Of Quantity survey (Construction Dept.)index 79

661

662

Supervision Board

sub. Company selection for pumps

662

663

Supervision Board

Material approval form ( S-021 )

663

664

Supervision Board

New Bill of Quantity

664

665

Supervision Board

Single Line Diagram

665

666

Supervision Board

Weak current cable sample

666

667

Supervision Board

Location and pecification of brad water RFI-No:11

667

668

Supervision Board

First installement mechanical,electrical and steel bars that


bought from yourside

668

669

Supervision Board

Excavation and Removal unsuitable soil quantites

669

670

Supervision Board

Granite Flooring

670

671

Supervision Board

Bed Head unit details & datasheet

671

672

Supervision Board

Approved sector ACM medical

672

673

Supervision Board

Marble wall cladding

673

674

Supervision Board

Generator set Status

674

675

Supervision Board

Answer for ( Fon ) M-15,16

675

676

Supervision Board

Repairing for water proofing of inside building

676

677

Supervision Board

Repairing for water proofing of roof

677

678

Supervision Board

Stud wall submittal

678

679

Supervision Board

Lift material submitting

679

680

Supervision Board

Kitchen Equipment design drawing

680

681

Supervision Board

Aluminum windows and doors technical data

681

682

Supervision Board

Expansion joint profiles technical data

682

683

Supervision Board

Furniture raw material tchnical properties

683

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

684

Supervision Board

Sewerage system drawings

684

685

Supervision Board

Patient room's airlock area wash basins

685

686

Supervision Board

Reply for letter No.79 sub.of Quantity survey level-3,4

686

687

Supervision Board

Reply for letter No.80 (Fon-15 )

687

688

Supervision Board

Emergency Light FRI no.12

688

689

Supervision Board

Reply for letter No.95. The percentage breakdown for


executed electrical work

689

690

Supervision Board

Level-5 lighting wiring pulled inspection

690

691

Supervision Board

Submittal of Qunatity survey no -4

691

692

Supervision Board

Level-4 lighting wiring pulled inspection

692

693

Supervision Board

Submittal of Quantity Survey ( Construction Dep.)No-5

693

694

Supervision Board

Sub.for Water proofing of inside building

694

695

Supervision Board

Sub. Of December mon thly report

695

696

Supervision Board

Level-3 lighting wiring pulled inspection

696

697

Supervision Board

Submittal of Quantity survay NO 6

697

698

Supervision Board

Level-2,Part (A,B,C) installed conduit and box inspection

698

699

Supervision Board

Submittal of Quantity Survey - 7

699

700

Supervision Board

Level-2,Part (D,E) installed conduit and box inspection

700

701

Supervision Board

Submittal of Quantity survey -8

701

702

Supervision Board

Level-1,Part (A,B,C) installed conduit and box inspection

702

703

Supervision Board

Submittal of Quantity Survey - No - 9

703

704

Supervision Board

Level-1,Part (D,E) installed conduit and box inspection

704

705

Supervision Board

Submittal of Quantity Survey - No - 10

705

706

Supervision Board

Level (3,4,5) cable Installed between (DB and smdb )

706

707

Supervision Board

Submittal of QuantitiY SURVEY -NO : 11

707

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

708

Supervision Board

Sub. Of ( FIRE HOSE CABEINAT )

708

709

Supervision Board

Answer for pending items

709

710

Supervision Board

Equipment layout/sterilization dept.in level zero

710

711

Supervision Board

Sub.compressed air system ( EKO MAK ) brand

711

712

Supervision Board

Sub. Water softener & sand filter systems

712

713

Supervision Board

Reply for letter No.143 Fon cable stroage reminder-2

713

714

Supervision Board

Reply for letter No141 Fire sealant material arount the


conduit

714

715

Supervision Board

Mr. CEM

715

716

Supervision Board

Approval of sectors A.C&M

716

717

Supervision Board

Floor Drain

717

718

Supervision Board

Sub. Fire system accsossaries ( TYCO ) brand

718

719

Supervision Board

Submit of stainless steel material

719

720

Supervision Board

Time schedule for medical equipment and yourletter No:127


dated 01.02.2012

720

721

Supervision Board

Sub. Of Compressors air system

721

722

Supervision Board

Sub. Of Expansion Tank

722

723

Supervision Board

Sub. Of hot water boilers

723

724

Supervision Board

staff parking lot revised

724

725

Supervision Board

Level-2 Surgey room RFI-No:13

725

726

Supervision Board

Level-0 work shop electrical installation RFI-No:14

726

727

Supervision Board

Sub. Of water softener & Sand filter systems

727

728

Supervision Board

Color selection of furnitures

728

729

Supervision Board

Revision according to your sewerage treatment plant


comments

729

730

Supervision Board

Shop drawing & equipment installation requirement for sector M

730

731

Supervision Board

Material approval form ( S-023 )

731

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

732

Supervision Board

Caterpillar Generator specification submittal

732

733

Supervision Board

Submittal of Quantity survey ( Construction Dep.)

733

734

Supervision Board

Friday work information

734

735

Supervision Board

Weak current cable sample

735

736

Supervision Board

Approval of sectors A.C&M

736

737

Supervision Board

Submittal of Qunatity survey index 84-Cons.Dept

737

738

Supervision Board

739

- Sub . CV

738

Supervision Board

Sub.of Qunatity survey -Index 85,86,87,88 & 89 Cons.Dept.

739

740

Supervision Board

Sub. Of medical gas level 5,4,3 shop drawing

740

741

Supervision Board

Reply to trimestral report No.3 on main contractor's


performance and progress on the site up to 30 th january 2012
in 400 Bed Hospital in Sulaimaniyah

741

742

Supervision Board

Request for information regarding level 1

742

743

Supervision Board

Sub. Of Quantity survey index 90 Cons.Dept.

743

744

Supervision Board

Sub. Of Quantity survey index 91 Cons.Dept.

744

745

Supervision Board

Sub. Of Quantity survey index 92 Cons.Dept.

745

746

Supervision Board

Sub. Of Quantity survey index 93 Cons.Dept.

746

747

Supervision Board

Fire alarm wire ( 2*1*0,8mm) RFI No:15

747

748

Supervision Board

Cable Trunking Material Inspection

748

749

Supervision Board

Electrical Quantity survey for cable trunking

749

750

Supervision Board

Sub. Of january monthly report

750

751

Supervision Board

Medical equipment-submittal of sectors D & F

751

752

Supervision Board

Sub. Of quantity survey index 94 cons.dept.

752

753

Supervision Board

Sub. Of quantity survey index 95 cons.dept.

753

754

Supervision Board

Friday work information

754

755

Supervision Board

Sub. Mechanical quantity survey

755

Medical gas engineer

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

756

Supervision Board

Sub. For transparent stone cladding protection material

756

757

Supervision Board

Business trip for checking furniture samples

757

758

Supervision Board

suspended ceiling shop drawing for level 3,4,5

758

759

Supervision Board

Medical equipment -submittal of sectors G

759

760

Supervision Board

Suspended ceiling revised price

760

761

Supervision Board

sub. Of Fuel tank

761

762

Supervision Board

Sub. Of storm water and staff parking drain project

762

763

Supervision Board

Aluminum door frame

763

764

Supervision Board

Interior wall paint

764

765

Supervision Board

Revised BOQ and new variation order with the price for the
electrical work

765

766

Supervision Board

Sub. Of Quantity survey index 96

766

767

Supervision Board

sub. Of varition order for mecanical items

767

768

Supervision Board

Subject of ( Fire house Cabinet)

768

769

Supervision Board

Subject of ( Finsh Floor Change )

769

770

Supervision Board

Resubmittal of HOVAL Boilers

770

771

Supervision Board

Payment NO.6

771

772

Supervision Board

Payment NO.6

772

773

Supervision Board

Submittal of Quantity Survey For (CONS DEP)Index - 97

773

774

Supervision Board

Madical Equipment - submittal of sectors - H

774

775

Supervision Board

Sockets location on (Stud wall )in Patient rooms.

775

776

Supervision Board

Reply for Letter 245 , Break down fo Electrical work .

776

777

Supervision Board

Cable Inspection In the site .

777

778

Supervision Board

Electrical Quantity survey for cable in main warehouse.

778

779

Supervision Board

MV Switch gear and transformer rooms (ARCH)

779

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

780

Supervision Board

As Built Notification

780

781

Supervision Board

Concrete Surface Hardener (submittal car parking area)

781

782

Supervision Board

Electrical Works Variation Order

782

783

Supervision Board

Stone Cladding Water Repellent Paint Permit to Work Form

783

784

Supervision Board

Inspection of Drain work in parking area

784

785

Supervision Board

Submit of Fuel & LPG Tank

785

786

Supervision Board

DUYAR brand of valves

786

787

Supervision Board

Kitchen Equipment Revised project ( with-3- drawings)

787

788

Supervision Board

Tiling work , March, 18/2012 Ref:No: 317

788

789

Supervision Board

MV Switch gear and transformer rooms (ARCH)

789

790

Supervision Board

Inspection of Mechanical Materials

790

791

Supervision Board

Sewage Treatment System Revised Projeccts and Dewatering


system

791

792

Supervision Board

Water Softener System

792

793

Supervision Board

Lift Technical data and projects

793

794

Supervision Board

Suspended ceiling profile

794

795

Supervision Board

Ceramic and porcelain tile adhesive material

795

796

Supervision Board

Record of Inspection

796

797

Supervision Board

Level-0,Part (A,B,C,D,E,F,G)installed conduit and box


Inspection.

797

798

Supervision Board

Reply ffor letter . NO:297-FON For Electrical room walls in


level-3

798

799

Supervision Board

Level-(5,4,3) Load Calculation

799

800

Supervision Board

Level-(2,1,0) shop -Drawing

800

801

Supervision Board

submittal of mechanical quantity survey

801

802

Supervision Board

Anti Bacterial Paint

802

803

Supervision Board

Fire Escape stair -Green Paint

803

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

804

Supervision Board

Madical Equipment - submittal of sectors - L

804

805

Supervision Board

Vitra Plumbing fixtures

805

806

Supervision Board

Sbmittal of Storm water drain pipe line for RD1

806

807

Supervision Board

Anti Bacterial Paint Data Sheet & Specification

807

808

Supervision Board

Medical Equipment - Submittal of Sectors - B

808

809

Supervision Board

Medical Equipment - Submittal of Sectors - I

809

810

Supervision Board

Anti -Bacterial Paint (Ref- letter No-370)

810

811

Supervision Board

Submittal of clamp for medical gas system (CLAMP)

811

812

Supervision Board

Lightning Protection and Earthen shop- Drawing

812

813

Supervision Board

Material approval form (S-024)

813

814

Supervision Board

Qantity Survey Idex No: 12, For Level - o

814

815

Supervision Board

Approval of D,F,G and H Sectors

815

816

Supervision Board

Submittal Mechanical quantty survey

816

817

Supervision Board

Submittal of Inspection for Mechanical works

817

818

Supervision Board

Anti - acid Ceramic and Porcelain tile Cost breakdown

818

819

Supervision Board

Modular Operating Theatre Materials

819

820

Supervision Board

Circular Manhole sample

820

821

Supervision Board

Storm water drain pipe line for RD1

821

822

Supervision Board

Storage Shade

822

823

Supervision Board

Staff Parking Lot

823

824

Supervision Board

suspended ceiling in some Rooms.

824

825

Supervision Board

Material Approval Form (E-026)

825

826

Supervision Board

Material Approval form (E-025)

826

827

Supervision Board

SMATV system shop-drawing and Technical specification

827

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

828

Supervision Board

Public Address system shop - drawing and Technical


specification

828

829

Supervision Board

Nurse Call System shop - drawing and Technical specification

829

830

Supervision Board

IP CCTV System shop-drawing and Technical specificcation

830

831

Supervision Board

Fire Alarm System Shop -drawing and Technical specification

831

832

Supervision Board

Data system Shop-drawing and Technical Specification

832

833

Supervision Board

Clock system shop - drawing and Technical specification .

833

834

Supervision Board

Friday working Information

834

835

Supervision Board

Submittel of Madical gas pipes

835

836

Supervision Board

MV Switch gear and transformer rooms .

836

837

Supervision Board

Reply for letter . No : 244, lift of Machine roomless

837

838

Supervision Board

Level - 2, Part - C, Expanding (DB) room (Architectural.

838

839

Supervision Board

Interior Paste Material

839

840

Supervision Board

Level -1 - Power System wiring Inspection, (024).

840

841

Supervision Board

Medical equipment - submittal of sectors U

841

842

Supervision Board

submittal of Octobar Monthly Report

842

843

Supervision Board

Medical Equipment - Submittal of sectors V

843

844

Supervision Board

Reply for letter No : 403 , Lifts.

844

845

Supervision Board

Reply for Letter No : 233 SMDB sample approval.

845

846

Supervision Board

Binyapi Brand Joint Grouting Material

846

847

Supervision Board

Cable Inspection In the site .

847

848

Supervision Board

Electrical quantity survey for Cable in Electrical Department


Warehouse.

848

849

Supervision Board

Time schedule of submittal of Medical Equipment Sectors

849

850

Supervision Board

Equipment layout / bed pan washer.

850

851

Supervision Board

Medical Equipment-submittal of sectors - X

851

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

852

Supervision Board

Fuel and LPG tanks.

852

853

Supervision Board

Suspending ceiling work

853

854

Supervision Board

Qantity Survey Idex No: 13, For Level - 1, Installed wire.

854

855

Supervision Board

Soft copy of submitted medical equipment

855

856

Supervision Board

Q.S Calculations ( construction ) Index 98 & 99

856

857

Supervision Board

Computar Selection for Pumps.

857

858

Supervision Board

Soft copy of submitted medical equipment Items for sector - L

858

859

Supervision Board

Level - (1,0 )Percentage work done and Material on site


(Quantity Survey ).

859

860

Supervision Board

Payment Report No: 7

860

861

Supervision Board

20cm thickness slab cost breakdown

861

862

Supervision Board

Submittal of Hot & Steam Boilers.

862

863

Supervision Board

Mill - Mix Plaster

863

864

Supervision Board

Paint work

864

865

Supervision Board

Material Approval Form (E-026)

865

866

Supervision Board

TEST (Main Gate)- Staff Parking area footing Test/2

866

867

Supervision Board

Level -2 -Power system wiring Inspection, (028)

867

868

Supervision Board

Reply for letter No: 290 Submittal for Caterpillar Generator.

868

869

Supervision Board

Reply for letter No:420, Power Transformer.

869

870

Supervision Board

Soft copy of Srctors A, C & M

870

871

Supervision Board

Monthly Report of February 2012, submittal

871

872

Supervision Board

Submittal Mechanical quantty survey

872

873

Supervision Board

Staff Parking Lot

873

874

Supervision Board

Submittal Medical gas piping work quantity survey

874

875

Supervision Board

Surgeons Washstand details item (U11272)

875

(Anti Bactarial paint)

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

876

Supervision Board

Material Approval form for Low Voltage Switchgear(E-027)

876

877

Supervision Board

Binyapi Brand Joint Grouting Material

877

878

Supervision Board

Fly - Screen

878

879

Supervision Board

Reply to your Letter No .473 - Sector U

879

880

Supervision Board

Medicaal Equipment - Submittal of sectors W

880

881

Supervision Board

Reply to yur Letter 482 - Time Schedule for Medical utility


Equipment .

881

882

Supervision Board

Sample (Intem Brand) for suspending ceilling.

882

883

Supervision Board

Testing thicness for Aluminum Panel

883

884

Supervision Board

Galvanize Pipes Inspection

884

885

Supervision Board

Mechanical Quantity Survey for Galvanize Pipes

885

886

Supervision Board

Submittal Mechanical quantty survey

886

887

Supervision Board

Resubmit of Fire house cabinet ( Fetas )

887

888

Supervision Board

Nurse Call System Corridor Light location RFI - No :16

888

889

Supervision Board

Single Line Diagram load calculation.

889

890

Supervision Board

Block ( H ) Trenches shop drawing.

890

891

Supervision Board

Chillar Unit Test Factory

891

892

Supervision Board

Signing Authorization

892

893

Supervision Board

Earthing system drawing

893

894

Supervision Board

Leve - 2 Lighting system wiring Inspection , (029 )

894

895

Supervision Board

water supply , fire water , patable water distribution.

895

896

Supervision Board

Parking Area Quantities

896

897

Supervision Board

Sewage Treatment Plant Buildings Drawings

897

898

Supervision Board

Incinerator Submittal

898

899

Supervision Board

Parking shed Galvanized pipe size

899

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

900

Supervision Board

20 Cm thickness slab on grade unit price

900

901

Supervision Board

Inspection of Duct Insulation

901

902

Supervision Board

Working on Friday

902

903

Supervision Board

Resubmit of LPG tank & fuel Tank

903

904

Supervision Board

Freezing cell ( V - 51252 ) & Cooling Cell ( V 51212 )

904

905

Supervision Board

Document for Approval Sector - B

905

906

Supervision Board

Information Request for Items ( S31252 ) & ( S 30212 )

906

907

Supervision Board

Kitchen Equipment Electrical And Mechanical Drawingss

907

908

Supervision Board

Summary of A,C and M Sectors.

908

909

Supervision Board

Surgeons Washstand details item (U11272)

909

910

Supervision Board

Submittal of Quantity survey Index No:14 ,For level-2


Installed.wire.

910

911

Supervision Board

Submittal of ( boiler room technical Proposal )

911

912

Supervision Board

Reply for Weak Current System Comments.

912

913

Supervision Board

Sewage Treatment System

913

914

Supervision Board

Sector - X Missing compliance sheet and resbmission of


summary

914

915

Supervision Board

Storm Water line Drawings

915

916

Supervision Board

Dray wall Details.

916

917

Supervision Board

Submittal of Mounthly Report March 2012

917

918

Supervision Board

Submittal of Mechanical Material on sife

918

919

Supervision Board

Inspection of Galvanize Sheets

919

920

Supervision Board

Mechanical quantity Survey for Galvanize Sheets

920

921

Supervision Board

Submittal of Quantity survey NO: 15, Feb Level-2, Installed


.wire.

921

922

Supervision Board

Mechanical Inspection

922

923

Supervision Board

Ip Cameras (E-028)

923

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

924

Supervision Board

Telephone Exchange (E-029)

924

925

Supervision Board

Data Switches (E-030)

925

926

Supervision Board

Reply for letter No: 517 Submittal for Caterpillar Generator.

926

927

Supervision Board

Level - 1 Lighting system wiring Inspection , ( 030 ).

927

928

Supervision Board

Single Line Diagram load calculation.

928

929

Supervision Board

Submittal of Quantity survey index No:16 ,For level-1


Installed.wire.

929

930

Supervision Board

Invitation for technical visit

930

931

Supervision Board

Reply for Letter no:501 , Low voltage switch gear.

931

932

Supervision Board

Seramic and porcelain tile cost breakdown

932

933

Supervision Board

Proposal (LVSB) - Location.

933

934

Supervision Board

Reply for letter No : 500 Luminaries submittal.

934

935

Supervision Board

Reply for Letter No: 578, Quantity Survey Electrical.

935

936

Supervision Board

Mechanical quantity survey for valves

936

937

Supervision Board

Inspection of Valves

937

938

Supervision Board

Submittal (Medical gas piping work ) quantity survey

938

939

Supervision Board

RD3 Storm water line drawings.

939

940

Supervision Board

Water Reservoir and pumping Station Pumps

940

941

Supervision Board

submittal of mechanical quantity survey

941

942

Supervision Board

Cable try and low current wire Inspection in the site.

942

943

Supervision Board

Electrical Quantity survey for Cable Tray and low current wire

943

944

Supervision Board

Medical Equipment - Submittal of Sectors( O,S, And,T)

944

945

Supervision Board

Total Station calibration

945

946

Supervision Board

Payment No: 8 submittal

946

947

Supervision Board

Q.S Calculations ( construction ) Index - (101)

947

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

948

Supervision Board

Q.S Calculations ( construction ) Index - (102)

948

949

Supervision Board

Q.S Calculations ( construction ) Index - (104)

949

950

Supervision Board

Renew Bank Guarantee

950

951

Supervision Board

Lighting shop drawing level-2 and 1

951

952

Supervision Board

Inspectiion of UPVC Materials

952

953

Supervision Board

Mechanical Quantity Survey for UPVC materials

953

954

Supervision Board

Mechanical Inspection

954

955

Supervision Board

Final Shop drawing for the Operation Rooms.

955

956

Supervision Board

Add Items sector

956

957

Supervision Board

Mechanical Equipment reply to your Letter No: 472

957

958

Supervision Board

Medical Equipment to Reply your Letter No: 479

958

959

Supervision Board

Resubmit Mechanical Shop drawing level - 1

959

960

Supervision Board

Porcelain steps and Balustrade Details

960

961

Supervision Board

Anti-Acid Tile Porcelain tile Revised Cost Breakdown

961

962

Supervision Board

Dirty Utility / Bed pan washer

962

963

Supervision Board

Medical Equipment - Reply to your Letter No: 526

963

964

Supervision Board

Medical Equipment - Reply to your Letter No: 495

964

965

Supervision Board

Medical Equipment - Reply to your Letter No: 496

965

966

Supervision Board

Steel Frame for Dry Walls

966

967

Supervision Board

Cable tray shop Drawing and section for level - 1

967

968

Supervision Board

Wiring Devices submittal form ( E - 031 )

968

969

Supervision Board

Equipment Layout / Sterilization dept . In level Zero

969

970

Supervision Board

Modular Operating theatre Material

970

971

Supervision Board

Dewatering System

971

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

972

Supervision Board

Quantity Survey Calculations ( construction )Index 77 & 96

972

973

Supervision Board

Medical Equipment -Reply to your Letter No:473

973

974

Supervision Board

Medical Equipment -Reply to your Letter No:560

974

975

Supervision Board

Medical Equipment - Submittal of Sectors N

975

976

Supervision Board

Chiller Units base submittal

976

977

Supervision Board

Resubmit Mechanical Quantity survey

977

978

Supervision Board

Water Tank Treatment

978

979

Supervision Board

Medical Equipment-Soft copy of Sectors - (N,O,S,T ) -And


additional Items

979

980

Supervision Board

Submittal of Mounthly Report April , 2012

980

981

Supervision Board

Submittal Mechanical quantty survey

981

982

Supervision Board

Submittal of Fire house cabinet sample ( FETAS )

982

983

Supervision Board

Submittal of Mechanical Inspections

983

984

Supervision Board

Quantity Survey Calculations ( construction )Index 88

984

985

Supervision Board

Lightning protection system Inspection

985

986

Supervision Board

Water Treatment Sytem Cost Breakdown

986

987

Supervision Board

Medical Equipment Layout/Radiology dept.In level Zero

987

988

Supervision Board

Electrical Quantity survey for Lightning Protection system

988

989

Supervision Board

Submittal of Bed Head Unit Sample.

989

990

Supervision Board

MV Cable root of Chiller Transformer Sewage Building and


Training Center.

990

991

Supervision Board

Reply of letter No: 438, master Clock System Specs and


Drawings.

991

992

Supervision Board

Reply for letter No 499, low Current System-Nurse Call System

992

993

Supervision Board

Reply for letter No 669 wiring device submittal.

993

994

Supervision Board

Fire alarm Cable Inspection in the site.

994

995

Supervision Board

Medical Equipment Soft Copy of Reply Letters

995

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

996

Supervision Board

Medical Equipment -New model and replacment for Gamma


Camera (item No. 86 - C41212)

996

997

Supervision Board

Block ( H ) shop drawing Plan.

997

998

Supervision Board

Reply for letter No 500 Luminaries submittal

998

999

Supervision Board

Replay for letter No 665 procurement and Delivery Schedule.

999

1000

Supervision Board

Q.S Calculations ( construction ) Index -97

1000

1001

Supervision Board

water Tank Treatment Quantity

1001

1002

Supervision Board

Variation NO: 3 For Electrical work

1002

1003

Supervision Board

Medical equipment - submittal of sectors p

1003

1004

Supervision Board

Remaining Prices of Add Items Sector.

1004

1005

Supervision Board

Q.S Calculations ( construction ) Index -105, 106, 107

1005

1006

Supervision Board

Asphalt Road Works

1006

1007

Supervision Board

Low current cable Inspection form No: ( 033 ).

1007

1008

Supervision Board

Electrical Quantity Survey for Low current Cable.

1008

1009

Supervision Board

SMATV system shop-drawing

1009

1010

Supervision Board

IP CCTV,Data,Telephone and TV system Shop-Drawings.

1010

1011

Supervision Board

Fire Alarm System Shop - Drawing.

1011

1012

Supervision Board

Road - 1 X - Sections.

1012

1013

Supervision Board

Quantity Survey Calculation ( Construction ) Index - 52

1013

1014

Supervision Board

Public Address system shop - drawing .

1014

1015

Supervision Board

Inspection of chiller Units

1015

1016

Supervision Board

Payment No: 9 submittal

1016

1017

Supervision Board

Reply for letter No: 648 Low Voltage Switch Gear Technical
specification.

1017

1018

Supervision Board

Uninterruptible Power Systems. (E- 032 )

1018

1019

Supervision Board

Electrical Low Current Cable Material Bill.

1019

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1020

Supervision Board

Invitation for Manufactures Visits.

1020

1021

Supervision Board

Invitation for Manufactures Visits.

1021

1022

Supervision Board

Medical Equipment - Delivery Payment terms

1022

1023

Supervision Board

Resubmit mechanical shop drawing level 1 Rev.2

1023

1024

Supervision Board

Nurse Call System shop - drawing

1024

1025

Supervision Board

Access Control System shop - Drawing

1025

1026

Supervision Board

Antibacterial Paint Quantity.

1026

1027

Supervision Board

Medical Equipment Reply for Letter No 480 - Sector V


evaluation

1027

1028

Supervision Board

Medical Equipment Reply for Letter No 561 - Approval of


Sector V - Part one

1028

1029

Supervision Board

Medical Equipment Reply for Letter No 705 - Summary notes of


Sector F

1029

1030

Supervision Board

Luminaries Status Submittal List ( 1 and 2).

1030

1031

Supervision Board

Reply for Letter No 649 Luminaries Submittal.

1031

1032

Supervision Board

Lightning Protection system Revised design

1032

1033

Supervision Board

Submit of Packing list

1033

1034

Supervision Board

Shaft wall Demolishing

1034

1035

Supervision Board

Sub-base Layer

1035

1036

Supervision Board

Medical Equipment Reply to your letter No 706

1036

1037

Supervision Board

Medical Equipment Reply for Letter No: 704

1037

1038

Supervision Board

Medical Equipment Time Schedule

1038

1039

Supervision Board

Electrical Subcontractor

1039

1040

Supervision Board

Cost Breakdown of Galvanized Duct and fiberglass Insulation


works

1040

1041

Supervision Board

Antiacid tile quantity

1041

1042

Supervision Board

Reply for letter No: 610 Caterpillar Generators Comments


Reply Submittal.

1042

1043

Supervision Board

Reply for Letter No: 641 Single line diagram.

1043

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1044

Supervision Board

Submittal Mechanical quantty survey

1044

1045

Supervision Board

Submittal of Mechanical Inspections

1045

1046

Supervision Board

Sunddy Meeting 17th June

1046

1047

Supervision Board

Inspection of ( Volume damper, Diffusers, Linear grille )

1047

1048

Supervision Board

Mechanical quantity survey for ( volume damper, linear grille )

1048

1049

Supervision Board

Submittal of May 2012 Monthly report.

1049

1050

Supervision Board

Vinyl Acrilic corner guard and wall guard material

1050

1051

Supervision Board

Quantity Survey Calculations (construction ) Index 98 & 110

1051

1052

Supervision Board

Paint Material Submittal (Betek Hygienic )

1052

1053

Supervision Board

Submittal of Stom water lay out Plan

1053

1054

Supervision Board

Modification for MRI Site

1054

1055

Supervision Board

LOw current cable and Distribution Board Inspection form No: (


034 ).

1055

1056

Supervision Board

Electrical Quantity Survey for low current Cable DBP ,DBL,


SMDBP AND SMDBL

1056

1057

Supervision Board

High Voltage Cable Submittal (E-033).

1057

1058

Supervision Board

Reply for Letter NO: 707 , LVSB - 31 Location Prosal

1058

1059

Supervision Board

Reply for Letter No:711 , Level - 1 Cable Tray shop Drawings.

1059

1060

Supervision Board

Lighting shop drawing level-0

1060

1061

Supervision Board

Quantity survey Calculation ( Construction ) Index - 101, 108,


109, & 112

1061

1062

Supervision Board

Level - 0 lighting system wiring inspection form No:(035)

1062

1063

Supervision Board

Monthly Report - May 2012 Updated by the consulatnt

1063

1064

Supervision Board

Concrete Test

1064

1065

Supervision Board

Inspection of ( Duct Insulation 38mm )

1065

1066

Supervision Board

Mechanical Quantity survey for (Duct insulation 38mm)

1066

1067

Supervision Board

Inspection of ( Fuel & LPG Tank )

1067

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1068

Supervision Board

Mechanical Quantity Survey for Fuel & LPG Tank )

1068

1069

Supervision Board

Mechanical variation Order

1069

1070

Supervision Board

Inspection of ( Medical gas pipes )

1070

1071

Supervision Board

Mechanical Quantity survey of ( Medical gas Copper Pipes and


fitting

1071

1072

Supervision Board

Medical Equipment - Reply to your letter No:806

1072

1073

Supervision Board

Cable Tray , MHXMH Cable H, FREE 2x1.5mm Inspection form


No : (036).

1073

1074

Supervision Board

Electrical Quantity Survey for Cable Try and NHXMH Cable.

1074

1075

Supervision Board

Submittal of Chillers Concrete pad Details

1075

1076

Supervision Board

Submittal of Fuel Tank concrete pad cetails

1076

1077

Supervision Board

Quantity survey Calculations (construction ) Index,52,77,96,97


,98 & 102

1077

1078

Supervision Board

Electrical Arrived Material Bill

1078

1079

Supervision Board

Kerbestone Dimension.

1079

1080

Supervision Board

Glass Material Submittal

1080

1081

Supervision Board

Pool Ceramic Material Submittal

1081

1082

Supervision Board

Skylight material submittal

1082

1083

Supervision Board

Incinerator Submittal

1083

1084

Supervision Board

Kitchen Equipment Shop Drawing In level - 0

1084

1085

Supervision Board

Q - Matic System Shop Drawing.

1085

1086

Supervision Board

Manhole Cover

1086

1087

Supervision Board

Ready mix self-leveling screed material for under PVC flooring.

1087

1088

Supervision Board

Chiller Transformer Submittal. ( E- 034 )

1088

1089

Supervision Board

Submittal of Mechanical Inspections

1089

1090

Supervision Board

submittal of mechanical quantity survey

1090

1091

Supervision Board

Level-5,4,3 Tel, Data system Installed cable inspection form


No:(037)

1091

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1092

Supervision Board

Level-5,4,3 Fire Alarm system Installed cable inspection form


No:(038)

1092

1093

Supervision Board

Level-5,4,3 MATV system Installed cable inspection form No:


(039)

1093

1094

Supervision Board

Level-5,4,3 IP Camera system Installed cable inspection form


No:(040)

1094

1095

Supervision Board

Level-5,4,3 Public Address system Installed cable inspection


form No:(041)

1095

1096

Supervision Board

Level-5,4,3 Clock system Installed cable inspection form No:


(042)

1096

1097

Supervision Board

Level-5,4,3 Nursse Call system Installed cable inspection form


No:(043)

1097

1098

Supervision Board

Submit of medical gas system shop drawing level 1 ,2

1098

1099

Supervision Board

Submittal of quantity survey Index: No: 17 For level - 0


Installed wire.

1099

1100

Supervision Board

Quantity survey ( construction ) Index 115 & 116

1100

1101

Supervision Board

Revised Time schedule (Rev. 3) submittal

1101

1102

Supervision Board

Submittal of Mechanical shop Drawing in level - 0

1102

1103

Supervision Board

Submittal of Medical gas system, Fitting

1103

1104

Supervision Board

Quantity survey Calculations ( Construction ) Index 99 & 117

1104

1105

Supervision Board

Quantity survey ( construction ) Index 110 & 119

1105

1106

Supervision Board

Quantity survey ( construction ) Index 118

1106

1107

Supervision Board

Concrete Test

1107

1108

Supervision Board

Certificate of Origin for the Chiller Units

1108

1109

Supervision Board

Additional Works BOQ No: 14.

1109

1110

Supervision Board

Layout and shop drawing (MEP ) for medical equipment level 5

1110

1111

Supervision Board

Parking Shed Cost Breakdown

1111

1112

Supervision Board

layout and shop drawing for medical equipment level 4

1112

1113

Supervision Board

Quantity survey calculation ( construction ) Index 113

1113

1114

Supervision Board

Quantity survey calculation ( construction ) Index 121

1114

1115

Supervision Board

Quantity survey calculation ( construction ) Index 120

1115

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

1116

Supervision Board

payment Certificate No: 10

1116

1117

Supervision Board

Crushed Aggregate base course

1117

1118

Supervision Board

Medical Equipment - Time Schedule

1118

1119

Supervision Board

Generator price Deduction

1119

1120

Supervision Board

Decorative wall Panel

1120

1121

Supervision Board

Porcelain Cladding Details of Lift walls

1121

1122

Supervision Board

Shuresh, Twana, Gembay BeHafe.

1122

1123

Supervision Board

Medical Equipment - Intensive Care bed Head Unit Sample

1123

1124

Supervision Board

Fountains

1124

1125

Supervision Board

Morg Area Roof Drawing

1125

1126

Supervision Board

Dewatering System

1126

1127

Supervision Board

PVC Adhesive materials

1127

1128

Supervision Board

Out door Lighting Submittal (E-035)

1128

1129

Supervision Board

water Tank Treatment

1129

1130

Supervision Board

Road work Design Drawing and Revised Cross Sections of Road


-1

1130

1131

Supervision Board

Out door Lighting Submittal (E-036)

1131

1132

Supervision Board

LV Panels Shop Drawing

1132

1133

Supervision Board

Medical Equipment reply to your letter No 807

1133

1134

Supervision Board

Medical Equipment reply to your letter No 876

1134

1135

Supervision Board

Medical Equipment reply to your letter No 879

1135

1136

Supervision Board

Reply for letter No: 819 , High Voltage Cable Submittal.

1136

1137

Supervision Board

Reply for letter NO: 469 , Low Current Systems - SMATV

1137

1138

Supervision Board

Reply for letter No: 870 , Low Current installed cable Level
-5,4,3-Inspection.

1138

1139

Supervision Board

Layout and Shop drawing ( MEP ) for medical equipment level 3

1139

(Price)

(Price)

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1140

Supervision Board

Inspection of ( Medical gas pipes 22mm Thickness )

1140

1141

Supervision Board

Mechanical Quantity survey for (Medical Gas Pipes )

1141

1142

Supervision Board

Medical Equipment - Reply to your letter No: 875

1142

1143

Supervision Board

Caterpillar Generator on side inspection form No (044 )

1143

1144

Supervision Board

Electrical Quantity Survey for Caterpiller Generator

1144

1145

Supervision Board

Electrical Generator Bill

1145

1146

Supervision Board

Mechanical Quantity survey for (Pipe Thermal Insulations)

1146

1147

Supervision Board

Mechanical Quantity survey for ( Air handling Units )

1147

1148

Supervision Board

Mecjanical Quantity survey for ( Volume Dampers,


Diffusers,Grille

1148

1149

Supervision Board

Inspection of ( Air handling Units )

1149

1150

Supervision Board

Inspection of ( Thermal Insulation of Pipe )

1150

1151

Supervision Board

Inspection of ( Volume damper, Diffusers, Linear grille )

1151

1152

Supervision Board

PE Pipe Submittal

1152

1153

Supervision Board

Incinerator Submittal ( Puchasement )

1153

1154

Supervision Board

Mechanical Quantity Survey fo ( Fan Coil Units )

1154

1155

Supervision Board

Inspection of ( Fan Coil Units )

1155

1156

Supervision Board

Medical Equipment - Reply to your Letter No: 874

1156

1157

Supervision Board

HVAC Control Products submittal

1157

1158

Supervision Board

Submittal of Mechanical Inspections

1158

1159

Supervision Board

submittal of mechanical quantity survey

1159

1160

Supervision Board

Factory Visit

1160

1161

Supervision Board

Lighting Ip - 44 Code

1161

1162

Supervision Board

SARAY aluminum for sky light

1162

1163

Supervision Board

Wiring Devices submittal form ( E - 037 )

1163

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

1164

Supervision Board

Incinerator PLC wiring diagram

1164

1165

Supervision Board

Modification for MRI Site

1165

1166

Supervision Board

Ispection of ( Black Steel Pipe 6,4 inch )

1166

1167

Supervision Board

Mecahnical Quantity survey for ( Black Steel Pipe 6,4 inch)

1167

1168

Supervision Board

FUEL tank pad & wall footing details

1168

1169

Supervision Board

Heavy traffic Expansion Joint

1169

1170

Supervision Board

Distribution Board and LIHCH Cable H.FREE Inspection form


No:(045).

1170

1171

Supervision Board

Electrical Quantity Survey for low current Cable DBP ,DBL,


SMDBP AND SMDBL

1171

1172

Supervision Board

Medical Equipment Reply for Letter No:880

1172

1173

Supervision Board

Quantity survey Calculations ( Construction ) Index No : 114

1173

1174

Supervision Board

Two Tower Crane

1174

1175

Supervision Board

Medical Equipment Reply to Letter No: 840

1175

1176

Supervision Board

Submittal of Mechanical Inspection

1176

1177

Supervision Board

submittal of mechanical quantity survey

1177

1178

Supervision Board

Quantity survey Calculations(Construction) Index No : 114

1178

1179

Supervision Board

Level 2, 1 Fire Alarm , Nurse Call and MATV System Installed


Cable Inspection form No:(046).

1179

1180

Supervision Board

Inspection of (Plumbing Fixtures )

1180

1181

Supervision Board

Mecahnical Quantity survey for (Plumbing Fixtures).

1181

1182

Supervision Board

Quantity survey Calculations(Construction) Index No : 128

1182

1183

Supervision Board

Quantity survey Calculations(Construction) Index No : 99 &117

1183

1184

Supervision Board

Quantity Survey Calculations ( Construction ) index-129 , 130


&132

1184

1185

Supervision Board

Road work Design Drawing and Revised Cross Sections of RD

1185

1186

Supervision Board

Quantity survey Calculations(Construction) Index No : 123 &


127

1186

1187

Supervision Board

Quantity Servey Calculations ( Construction ) Index-131

1187

--

( Kurdish Letter )

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1188

Supervision Board

Design Drawings and Cross Sections of RD-2

1188

1189

Supervision Board

Quantity Servey Calculations( Construction )Index No -133

1189

1190

Supervision Board

Medical Equipment - Reply to your Letter NO : 572

1190

1191

Supervision Board

Material Approval Form (E - 038 )

1191

1192

Supervision Board

Elevator Material Inspection Form No: ( 047 )

1192

1193

Supervision Board

Elevator Material Quantity Servey

1193

1194

Supervision Board

Elevator Material And Low Current Calble Material Bill.

1194

1195

Supervision Board

Material Approval Form (E - 039 )

1195

1196

Supervision Board

Reply for Letter No: 952, HV Cable Submittal

1196

1197

Supervision Board

Surgical Room Panels Shop Drawings

1197

1198

Supervision Board

BMS System Drawing and Catalogue

1198

1199

Supervision Board

Low Currents Systems Room Details and Drawings.

1199

1200

Supervision Board

Reply for your letter No: 905 Uninterruptable Power System

1200

1201

Supervision Board

Layout for the Gamma Camera

1201

1202

Supervision Board

Caterpillar Generator on side inspection form No (048 )

1202

1203

Supervision Board

Inspection of ( Kitchen Equipment's )

1203

1204

Supervision Board

Mechanical Quantity Survey for ( Kichen Equipment's)

1204

1205

Supervision Board

Submit of Hot water storage tank ( ATABOOYLER )

1205

1206

Supervision Board

Submit of ( Hydrothrapy pool )

1206

1207

Supervision Board

Submit of ( Domestic soft cold water tank )

1207

1208

Supervision Board

Medical Equipment Time Schedule

1208

1209

Supervision Board

Electrical Quantity Survey for Caterpiller Generator

1209

1210

Supervision Board

Electrical Generator Bill

1210

1211

Supervision Board

Aluminum Suspended ceiling

1211

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1212

Supervision Board

Quantity survey Calculations (Construction ) Index 130

1212

1213

Supervision Board

Submit of Flexible Duct

1213

1214

Supervision Board

Submital of fire system ( sprinklers , fire hydrant )

1214

1215

Supervision Board

Submit of GRP Tank

1215

1216

Supervision Board

Elevator

1216

1217

Supervision Board

Replacing asphalt to colored interlocking tiles

1217

1218

Supervision Board

Layout and Shop Drawing MEP for Medical Equipment Level - 2

1218

1219

Supervision Board

Final modificaltion for MRI site

1219

1220

Supervision Board

LVSB - 31 Board Room ( ARCH )

1220

1221

Supervision Board

Payment Certificate No: 11

1221

1222

Supervision Board

Road work Design and X - Sections of RD3

1222

1223

Supervision Board

Water Softener System

1223

1224

Supervision Board

Elevators.

1224

1225

Supervision Board

Quantity Survey Calculations (Construction ) Index 135

1225

1226

Supervision Board

Inspection of (Medical gas pipe 22mm

1226

1227

Supervision Board

Mechanical Quantity survey for ( Medical gas 22mm )

1227

1228

Supervision Board

Mechanical Quantity Survey for (Expansion Joint)

1228

1229

Supervision Board

Inspection of ( Expansion Joint )

1229

1230

Supervision Board

Mechanical Quantity Survey for ( Stainless Steel Sheet )

1230

1231

Supervision Board

Inspection of ( stainless Steel Sheet )

1231

1232

Supervision Board

Submit of Medical gas system shop drawing level - 0

1232

1233

Supervision Board

Submit of the ( HEAT EXCHANGER )

1233

1234

Supervision Board

Submittal of june 2012 Monthly report

1234

1235

Supervision Board

Submit of the ( Medical gas valves )

1235

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

1236

Supervision Board

Drawing of ( Lift - 1,2 ) (Waiting Area ), SMDB -Kitchen) Board


and SLD.

1236

1237

Supervision Board

Drawing of ( USMDB -21,22) (UMDB - 31) (UDB-L,C) Board and


SLD

1237

1238

Supervision Board

Drawing of UDB -214,216,221,223,225,226,)Board and SLD

1238

1239

Supervision Board

Nurse Call system Shop - Drawing.

1239

1240

Supervision Board

Shop Drawing for medical Equipment for level 5,4,3

1240

1241

Supervision Board

Medical Equipment - Reply to your Letter NO : 878

1241

1242

Supervision Board

Reply for Letter Invitation From Manufactures Visit

1242

1243

Supervision Board

Fuel Tank Concrete Base Works

1243

1244

Supervision Board

Additional works Bill no: 14

1244

1245

Supervision Board

New Inspection of ( AIR HANDLING UNIT )

1245

1246

Supervision Board

Low Current Cable Inspection form No: ( 049 ).

1246

1247

Supervision Board

Electrical Quantity Survey for Low current Cable.

1247

1248

Supervision Board

Duct Insulation Measurement

1248

1249

Supervision Board

Equipment Layout / Mortuary refrigerator

1249

1250

Supervision Board

Reply for Letter Invitation From Manufactures Visit

1250

1251

Supervision Board

Road Work.

1251

1252

Supervision Board

Medical Equipment - Reply to your letter No. 877

1252

1253

Supervision Board

Quantity servey Calculations ( Construction ) index 130

1253

1254

Supervision Board

Damper Material on site

1254

1255

Supervision Board

Electrical Low Current Cable Material Bill.

1255

1256

Supervision Board

Tel, Data Systems ( WAP , TBS ) Points. RFI - No: 17

1256

1257

Supervision Board

Medical Equipment - Item No:211 (Model:61234).

1257

1258

Supervision Board

Medical Equipment - Reply to your letter No:823

1258

1259

Supervision Board

Heavy Traffic Expansion Joint Profile

Ref No.

1259

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1260

Supervision Board

Reply for Letter MV switch Gear.

1260

1261

Supervision Board

Reply for surgical Room panel shop drawing

1261

1262

Supervision Board

Drawing for Parking area Board and SLD.

1262

1263

Supervision Board

LV and Generators Building ( ARCH )

1263

1264

Supervision Board

Duct Insulation Measurement

1264

1265

Supervision Board

Material Approval Form ( 040 )

1265

1266

Supervision Board

Reinforcement Details for Manholes Cover

1266

1267

Supervision Board

Medical Equipment - Reply to Letter No: 822

1267

1268

Supervision Board

Submit of the ( 1- Medical Air compressor & Filter dryer)


Medical Vacuum System )

1269

Supervision Board

Submit of the (1- Vacuum, Oxygan & Nitrogen Gauges )


Medical AVSU Control Boxx & Cp,[pmemts )

1270

Supervision Board

Heat Exchanger

1270

1271

Supervision Board

Submital of July 2012 Monthly Report for your review and


approval.

1271

1272

Supervision Board

Quantity Survey Calculations ( Construction ) Index: 139

1272

1273

Supervision Board

Dedication Of Mechanical Engineer

1273

1274

Supervision Board

Subgared preperation

1274

1275

Supervision Board

Mechanical Quantity survey for ( Galvanize Sheet )

1275

1276

Supervision Board

Inspection of ( Galvanize Sheet )

1276

1277

Supervision Board

Medical Equipment sector A Replacment of Item NO: 78

1277

1278

Supervision Board

Medical Equipment Sector A Items.

1278

1279

Supervision Board

Actual Work Progress

1279

1280

Supervision Board

Poteable water and irrigation system pipe submittal

1280

1281

Supervision Board

Submit of the ( Carbon Dioxide or CO2 fire system )

1281

1282

Supervision Board

MRI Site Layout - final Modification

1282

1283

Supervision Board

Inspection of ( Galvanize Sheet )Part 2

1283

(-2
(2-

1268
1269

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1284

Supervision Board

Mechanical Quntity survey for ( Galvanize Sheet ) part 2

1284

1285

Supervision Board

Mechanical Quntity survey for Black steel Pipes

1285

1286

Supervision Board

Inspection of ( Black Steel Pipes )

1286

1287

Supervision Board

Medical Equipment - Alternative offer for Item No: 371-190783

1287

1288

Supervision Board

Medical Equipment - reply to your letter No:1158

1288

1289

Supervision Board

Mechanical Quantity survey for ( Domestic Pumps, Fire Pumps,


Chilled & Heating Pumps, Expansion tanks

1289

1290

Supervision Board

Inspection of (Domestic pumps, Fire pumps, Chilled & Heating


pumps, Expansion tanks)

1290

1291

Supervision Board

Mechanical Quantity Survey for (plumbing Fixtures )

1291

1292

Supervision Board

Inspection of (plumbing Fixtures )

1292

1293

Supervision Board

Control Panel, critical Panel , Surgery Panell And Anesthesia


panel

1293

1294

Supervision Board

Submittal of Quantity Survey Index:No: 18 Low Current


System.

1294

1295

Supervision Board

Mechanical Quantity Survey for ( Valves, Strainers & Flexible


pipes )

1295

1296

Supervision Board

Inspection of ( Valves, Strainers & Flexible Pipes )

1296

1297

Supervision Board

Water Tank Treatment Meterial Certificate

1297

1298

Supervision Board

Stair ( levl - 5 to 6 ) And Morg Roof Structural Analysis Reports

1298

1299

Supervision Board

Natural Stone Sample

1299

1300

Supervision Board

Road 4 X sections

1300

1301

Supervision Board

Submittal of Mechanical Inspections

1301

1302

Supervision Board

submittal of mechanical quantity survey

1302

1303

Supervision Board

Elevator Material Inspection Form No: ( 050 )

1303

1304

Supervision Board

Elevator Material Inspection Quntity survey

1304

1305

Supervision Board

LOw Current Cable and Elevator material inspetion form No:


(051)

1305

1306

Supervision Board

Electrical quantity survey for LOw Current Cable and Elevator


material.

1306

1307

Supervision Board

Material Approval form ( E - 041 )

1307

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1308

Supervision Board

Submittal of Quantity Survey Index No: 19 , Low Current


System.

1308

1309

Supervision Board

Submittal of Quantity Survey Index No: 20, Low Current


System.

1309

1310

Supervision Board

Drawing for Generator Building Sound Proof Insulation

1310

1311

Supervision Board

Quantity survey calculations (Constructions)


Index: 140 & 141

1311

1312

Supervision Board

Color Selection for laboratory Bench

1312

1313

Supervision Board

Medical Equipment - Intensive Care bed Head Unit Sample

1313

1314

Supervision Board

Curbstone and Beharton Material

1314

1315

Supervision Board

Chiller Area Slab on Grade Works

1315

1316

Supervision Board

Mechanical Pipe Size weight Quantity table

1316

1317

Supervision Board

Quantity Survey Calculations ( Constructions) Index No: (142143-145 & 146 )

1317

1318

Supervision Board

Generator Set Document

1318

1319

Supervision Board

Layout and Shop Drawing for Medical Equipment Level - 1

1319

1320

Supervision Board

Quantity Survey Calculations ( constructions) Index No: (144)

1320

1321

Supervision Board

Quantity Survey Calculations ( constructions) Index No: (136 137 -& 138)

1321

1322

Supervision Board

Rear Entrance Stair Structural Design

1322

1323

Supervision Board

Payment No : 12

1323

1324

Supervision Board

RD2 Cross Section and Natural Ground Level Data

1324

1325

Supervision Board

Quantity Survey Calculations ( constructions) Index No: (147)

1325

1326

Supervision Board

Quantity Survey Calculations ( constructions) Index No: (149)

1326

1327

Supervision Board

Coordination Drawing for ( Suspended Ceiling. Mechanical


Duct and lighting )

1327

1328

Supervision Board

Level - 2 and 1 Installed low current cable inspection form No:


(052).

1328

1329

Supervision Board

Transformer Inspetion form No:(053)

1329

1330

Supervision Board

Arrived Transformer Quantity survey

1330

1331

Supervision Board

Electrical Low current Cable Elevator Material Bill

1331

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1332

Supervision Board

Mechanical quntity survey for (Medical gas system Pipes)

1332

1333

Supervision Board

Inspection of (Medical gas pipes)

1333

1334

Supervision Board

Quantity Survey Calculations ( constructions) Index No: (134)

1334

1335

Supervision Board

Submittal of Sewage Treatment Package unit Inspection

1335

1336

Supervision Board

Electrical Transformer Bill

1336

1337

Supervision Board

Wiring Devices Subnittal form ( E-042) Electrical Department.

1337

1338

Supervision Board

Revised Item included in Payment No; 12

1338

1339

Supervision Board

Resubmit of the ( Ground Reservoir & Pump station

1339

1340

Supervision Board

Resubmit of Rear Entrance stair case structural Desin

1340

1341

Supervision Board

Kerbstone Price Analysis

1341

1342

Supervision Board

Lead Shield Covering Places and Sizes

1342

1343

Supervision Board

Reply for Chiller Units Comments

1343

1344

Supervision Board

BMS System Technical Details, Drawing and Catalogue

1344

1345

Supervision Board

Submittal of Medical gas system Inspection

1345

1346

Supervision Board

Submittal of Medical gas system Quantity survey


(in Level 2 )

1346

1347

Supervision Board

Cost Breakdown of Kerbstone and Gutter

1347

1348

Supervision Board

Access Control System shop - Technical Details, Certification


Drawing and Catalogue.

1348

1349

Supervision Board

Queue System Technicall Details, Certification , Drawing and


Catalogue.

1349

1350

Supervision Board

Security Management System Technical Details, Certification


and Catalogue.

1350

1351

Supervision Board

AUDIOVISUAL SYSTEM Technical Details and Catalogue.

1351

1352

Supervision Board

Request a Letter to the custom of IBRAHIM KHALIL

1352

1353

Supervision Board

Inspection of ( Fire Hose Cabinet )

1353

1354

Supervision Board

Mechanical Quantity Survey for ( Fire hose Cabinet )

1354

1355

Supervision Board

Quantity Survey Calculations ( constructions) Index No: (150)

1355

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1356

Supervision Board

Fan Coil Units Catalogs

1356

1357

Supervision Board

Resubmit of the ( Hot water storage tank )

1357

1358

Supervision Board

Submit of Mechanical Shop Drawing in level 0 ( G Block )

1358

1359

Supervision Board

Resubmit of the ( ground Resevoir & Pump station )

1359

1360

Supervision Board

Medical Equipment / Item H54232

1360

1361

Supervision Board

Inspection of ( Stainless Steel Water Tank )

1361

1362

Supervision Board

Mechanical quantity Survey for ( Stainless Steel Water Tank)

1362

1363

Supervision Board

Inspection of ( Hot water Pump )

1363

1364

Supervision Board

Mechanical Quantity survey for ( Hot water Pump)

1364

1365

Supervision Board

Submittal of Medical gas system Inspection

1365

1366

Supervision Board

Submittal of Medical gas system Quantity survey

1366

1367

Supervision Board

Irrigation System Pipes

1367

1368

Supervision Board

Reply for Letter No: 1033 , Uninterrupatable Power System

1368

1369

Supervision Board

Submit of the ( Galvanize steel sheet Coating Z 350 )

1369

1370

Supervision Board

Inspection of ( Kitchen Equipment's )

1370

1371

Supervision Board

Mechanical Quantity survey for (Duct Acoustic insulation )

1371

1372

Supervision Board

Inspection of (Duct Acoustic Insulation )

1372

1373

Supervision Board

Inspection of (UPVC Pipes, fitting)

1373

1374

Supervision Board

Mechanical Quantity Survey for (UPVC Pipes, FITTING)

1374

1375

Supervision Board

Revised Morgue Roof Design and Stair Design

1375

1376

Supervision Board

Submital of Sewage Treatment Package Units and Sludge


Dewatering Units Inspection

1376

1377

Supervision Board

Quantity survey for Medical Equipment - Sector A & C

1377

1378

Supervision Board

Inspection of Medical Equipment - Sector A & C

1378

1379

Supervision Board

Renew Bank Guarantee

1379

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1380

Supervision Board

Medical Equipment Paking List.

1380

1381

Supervision Board

Quantity Survey Calculations ( Construction ) Index 151 & 155

1381

1382

Supervision Board

Quantity Survey Calculations ( Construction ) Index 152 &153

1382

1383

Supervision Board

Quantity Survey Calculations ( Construction ) Index 154

1383

1384

Supervision Board

Medical Equipment - Sector F Replacement of Item No: 198

1384

1385

Supervision Board

Medical Equipment - Sector X Approval

1385

1386

Supervision Board

Carbon dioxide fire system

1386

1387

Supervision Board

Mechanical Quantity survey for ( Air handling Units )

1387

1388

Supervision Board

Inspection of ( Air handling Units )

1388

1389

Supervision Board

Submittal of Medical gas system Inspection

1389

1390

Supervision Board

Submittal Medical gas quantty survey

1390

1391

Supervision Board

Submittal Mechanical Quantty survey

1391

1392

Supervision Board

Submittal of Mechanical Inspections

1392

1393

Supervision Board

Mechanical Quantity survey for ( Fire Dampers, Air ventilation


system )

1393

1394

Supervision Board

Inspection of ( Fire Dampers, Air ventilation System )

1394

1395

Supervision Board

LPG , Fuel Tank Earthing System.

1395

1396

Supervision Board

Medical Equipment - packing list of Sector ( C ) Item No:75

1396

1397

Supervision Board

Submittal of mechanical Inspections

1397

1398

Supervision Board

Electrical Quantity Survey for Electrical Cable Material .

1398

1399

Supervision Board

Arrived Cable material inspection form No: ( 054 ).

1399

1400

Supervision Board

Answer of field observation notice ( FON )

1400

1401

Supervision Board

IPEK Sub - contractor Cancellation

1401

1402

Supervision Board

Inspection of ( Medical gas system valves and record )

1402

1403

Supervision Board

Mechanical Quantity Survey for ( Medical gas system valves


and Record )

1403

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1404

Supervision Board

Submittal of Medical gas system Inspection

1404

1405

Supervision Board

Submit of the ( Ext work of Mechanical for Medical Equipment


installation )

1405

1406

Supervision Board

Quantity Survey Calculations ( construction ) Index 156

1406

1407

Supervision Board

Quantity Survey Calculations ( construction ) Index


159 & 160

1407

1408

Supervision Board

Quantity Survey Calculations ( construction ) Index 162

1408

1409

Supervision Board

Fuel Tank Around CMU works and LPG slab on grade

1409

1410

Supervision Board

Sewage Treatment Package Unite and Sludge dewatering units


Inspection

1410

1411

Supervision Board

Medical Equipment - Sector P - Laundry

1411

1412

Supervision Board

Payment No : 13

1412

1413

Supervision Board

Quantity Survey Calculation ( Construction ) Index 157

1413

1414

Supervision Board

Appointed Engineer for Road Works.

1414

1415

Supervision Board

Electrical Low Current Material , and Cable Bills.

1415

1416

Supervision Board

Quantity Survey Calculation ( Construction ) Index 164

1416

1417

Supervision Board

Arrived alow Current Material Inspection form No (055)

1417

1418

Supervision Board

Electrical Quantity Survey for Low Current Material

1418

1419

Supervision Board

Asphalt Mix dexign formula for Binder & Surface Layers

1419

1420

Supervision Board

Medical Equipment -Certivicate of Origin

1420

1421

Supervision Board

Medical Equipment - Sector W - Instruments.

1421

1422

Supervision Board

Quantity of Kerbstone Price Analysis

1422

1423

Supervision Board

Inspection of (Mechanical Materials)

1423

1424

Supervision Board

Mechanical Quantity survey for (Mechancal Marerials)

1424

1425

Supervision Board

Drawing for Generator Building Sound Proof Insulation

1425

1426

Supervision Board

Quantity Survey For Medical Equipment - Sector


AMC&D

1426

1427

Supervision Board

Quantity Survey For Medical Equipment - Sector


AMC&D

1427

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

1428

Supervision Board

Medical Equipment - Quantity Control Letters

1428

1429

Supervision Board

Submit of Medical Gas system Shop Drawing REV.1

1429

1430

Supervision Board

Shop Drawing for medical Equipment for sterilization Dept.

1430

1431

Supervision Board

Reply to Letter No 1318 ( Dated By 23/9/2012)

1431

1432

Supervision Board

Approval of Sector B

1432

1433

Supervision Board

Medical Equipment - Inspection of Sector (F) Part - 1 & Sector


(D) Part - 2

1433

1434

Supervision Board

Quantity survey for Medical Equipment - of Sector (F) Part - 1


& Sector (D) Part - 2

1434

1435

Supervision Board

Starting Installation Suspended Celling in Level - 5

1435

1436

Supervision Board

Submittal of Steam System Accessories

1436

1437

Supervision Board

Air Ventilation System

1437

1438

Supervision Board

Submittal of Medical gas Pipe system Expansion Joint.

1438

1439

Supervision Board

Road Ready for Compaction Test

1439

1440

Supervision Board

1441

Supervision Board

Medical Equipment - Inspection of Sector (F) Part - 1

1441

1442

Supervision Board

Medical Equipment - Quantity Survey of Sector F - Part 1

1442

1443

Supervision Board

Medical Equipment - Inspection of Sector (C) Part - 2

1443

1444

Supervision Board

Medical Equipment - Quantity Survey of Sector C - Part 2

1444

1445

Supervision Board

Medical Equipment - Quantity Survey of Sector D - Part 1

1445

1446

Supervision Board

Medical Equipment - Inspection of Sector (D) Part - 1

1446

1447

Supervision Board

Medical Equipment - Quantity Survey of Sector M - Part 1

1447

1448

Supervision Board

Medical Equipment - Inspection of Sector (M) Part - 1

1448

1449

Supervision Board

Medical Equipment - Quantity Survey of Sector A - Part 2

1449

1450

Supervision Board

Medical Equipment - Inspection of Sector (A) Part - 2

1450

1451

Supervision Board

Qurban Feast Holiday

1451

Rebaz surveyer

Ref No.

1440

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1452

Supervision Board

The Main Entrance of Hospital

1452

1453

Supervision Board

Quantity survey Calculation ( Construction ) Index - 163

1453

1454

Supervision Board

Quantity survey Calculation ( Construction ) Index - 165 & 169

1454

1455

Supervision Board

Quantity survey Calculation ( Construction ) Index - 158

1455

1456

Supervision Board

Medical Equipment Sector - P

1456

1457

Supervision Board

Mechanical Quantity survey for ( Galvanize & Black Steel Pipes


)

1457

1458

Supervision Board

Inspection of (Air Handling Units)

1458

1459

Supervision Board

Inspection of (Galvanize & Black Steel Pipes)

1459

1460

Supervision Board

Mechanical Quantity Survey for (Air Handling Units)

1460

1461

Supervision Board

Decreasing the Amount from the Bank Guarantee

1461

1462

Supervision Board

Laboratory

1462

1463

Supervision Board

Farwarding a Letter to Directtarate of fuel Distribution

1463

1464

Supervision Board

Inspection of (Galvanize Steel Sheets)

1464

1465

Supervision Board

Mechanical Quantity Survey for (Galvanize Steel Sheets)

1465

1466

Supervision Board

Reducing the Number of the menholes to be constructed


between B -F Block

1466

1467

Supervision Board

Laboratory Test

1467

1468

Supervision Board

Transformer & Auto Park Road Design

1468

1469

Supervision Board

Alem Road & Emergency Entrance

1469

1470

Supervision Board

Lead Shielding thickness for Radiology room walls

1470

1471

Supervision Board

Main Entrance Design

1471

1472

Supervision Board

Submit of the (Anesthetic Gas Scavenging Sysem)

1472

1473

Supervision Board

Submittal Medical gas system in level 2 Quntity Survey

1473

1474

Supervision Board

Submittal of Medical gas system Inspection

1474

1475

Supervision Board

Electrical Quantity Survey for Lighting Fixture

1475

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1476

Supervision Board

Lighting Fixture Inspection form No:(056)

1476

1477

Supervision Board

Officially Letter Request about the Special Drain

1477

1478

Supervision Board

Road Between ( Block F & B )

1478

1479

Supervision Board

Bank Guarantee

1479

1480

Supervision Board

Submit of G Block Mechanical shop drawings

1480

1481

Supervision Board

Quantity Survey Calculations (Construction ) Index


168 & 171

1482

Supervision Board

Quantity Survey Calculations (Construction ) Index - 166

1482

1483

Supervision Board

Quantity Survey Calculations (Construction ) Index - 104

1483

1484

Supervision Board

Quantity Survey Calculations (Construction ) Index - 148

1484

1485

Supervision Board

Quantity Survey Calculations (Construction ) Index - 170

1485

1486

Supervision Board

Medical Equipment - Quantity Survey of Sector D - Part - 2

1486

1487

Supervision Board

Medical Equipment Inspection of Sector D - Part - 2

1487

1488

Supervision Board

Medical Equipment Inspection of Sector- A - Part - 3

1488

1489

Supervision Board

Medical Equipment - Quantity Survey of Sector A - Part - 3

1489

1490

Supervision Board

Medical Equipment Inspection of Sector- F - Part - 2

1490

1491

Supervision Board

Medical Equipment -Quantity Survey of Sector - F- Part - 2

1491

1492

Supervision Board

Medical Gas pipes Expansion joint

1492

1493

Supervision Board

Quantity Survey Calculations (Construction) Index - 172

1493

1494

Supervision Board

Quantity Survey Calculations (Construction) Index - 173

1494

1495

Supervision Board

Quantity Survey Calculations (Construction) Index - 174

1495

1496

Supervision Board

Quantity Survey Calculations (Construction) Index - 175

1496

1497

Supervision Board

Quantity Survey Calculations (Construction) Index - 176

1497

1498

Supervision Board

Steam System Accessories

1498

1499

Supervision Board

Comments & Explanations for BMS System.

1499

1481

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1500

Supervision Board

Submit of the Condensate pumps & Fuel Oil Transfer Pumps

1500

1501

Supervision Board

Inspection of (Medical gas system Pipes & fittings

1501

1502

Supervision Board

Mechanical Quantity Survey for ( Medical gas System Pipes &


fittings)

1502

1503

Supervision Board

Medical gas System Second Master Alarm Panel Location

1503

1504

Supervision Board

Quantity Survey Calculations (Construction) Index - 177

1504

1505

Supervision Board

Quantity Survey Calculations (Construction) Index - 178

1505

1506

Supervision Board

Quantity Survey Calculations (Construction) Index - 179

1506

1507

Supervision Board

Reply for Audio Visual System Submittal Comments

1507

1508

Supervision Board

Shop Drawing of Suspended Ceiling for waiting area

1508

1509

Supervision Board

Medical Equipment - Reply to Sector W Approval form


comments (Letter No: 1518 & 1506)

1509

1510

Supervision Board

Electrical Lighting Fixture and Accessories Bills.

1510

1511

Supervision Board

Flexible Duct Break Down ( Coast Detail )

1511

1512

Supervision Board

Payment No : 14

1512

1513

Supervision Board

Main Entrance Design

1513

1514

Supervision Board

Submittal Mechanical Quantty survey

1514

1515

Supervision Board

Submittal of Mechanical Inspections.

1515

1516

Supervision Board

Detail of Suspeded ceiling in corridors

1516

1517

Supervision Board

Submit of the ( Water Hammer Arrester )

1517

1518

Supervision Board

GIC - LAMINAR Flow Ceiling System

1518

1519

Supervision Board

Set of Mechanical Shop Drawings

1519

1520

Supervision Board

Medical gas system Quantity Survey

1520

1521

Supervision Board

Medical gas System Ispection

1521

1522

Supervision Board

Medical Equipment Shop drawings maintenance Room

1522

1523

Supervision Board

Medical gas system test in level - 5

1523

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1524

Supervision Board

Lableing & Marking Details

1524

1525

Supervision Board

Power Plant Control Board Bills.

1525

1526

Supervision Board

Medical Equipment - Reply to B Sector Letters ( No: 1157,


1318, 1519 & 1579 )

1526

1527

Supervision Board

Electrical Quantity Survey for Fancoil Two - Way Valve and


Thermostat.

1527

1528

Supervision Board

Fan Coil Valve and Thermostat Inspection form No: (057)

1528

1529

Supervision Board

Medical Equipment - Inspection of Sector A - part 4

1529

1530

Supervision Board

Medical Equipment Quantity Survey of Sector A - Part 4

1530

1531

Supervision Board

Medical Equipment Quantity Survey of Sector D - Part 3

1531

1532

Supervision Board

Medical Equipment - Inspection of Sector D - part 3

1532

1533

Supervision Board

Medical Equipment - Inspection of Sector F - part 3

1533

1534

Supervision Board

Medical Equipment Quantity Survey of Sector F - Part 3

1534

1535

Supervision Board

Medical Equipment - Submittal of PACS

1535

1536

Supervision Board

Site Security

1536

1537

Supervision Board

Medical Equipment final Layout of the Bed Head Unit.

1537

1538

Supervision Board

sidewalk detail

1538

1539

Supervision Board

Packing list of Sector A - Part 4 & Sector F Part - 3

1539

1540

Supervision Board

Packing list & Certificate of Origin of Sector A - Part 4 & Sector


F Part - 3

1540

1541

Supervision Board

Submittal of Packing list & Certificate of Origin of Sector D


Part - 3

1541

1542

Supervision Board

Submittal of Packing list of Sector D - Part - 3

1542

1543

Supervision Board

Electrical Material Inspection form No: (058).

1543

1544

Supervision Board

Electrical Quantity Survey for Electrical Poles and LV


Switchgears.

1544

1545

Supervision Board

Medical Equipment - Reply to B sector Letter No: 1615

1545

1546

Supervision Board

Quantity Survey Calculations (Construction ) Index 167 & 182

1546

1547

Supervision Board

Decreasing the Amount from the Bank Guarantee

1547

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1548

Supervision Board

Medical Equipment - Bed head unit colour code request

1548

1549

Supervision Board

Reply to Letter No 1 - ( Dated By 26/9/2012)

1549

1550

Supervision Board

Medical Equipment - Reply to Sector X Approval form


comments

1550

1551

Supervision Board

Medical Equipment submittal of Electrical & mechanical Layout


for laundry department

1551

1552

Supervision Board

Sewage Treatment Area concrete Pad

1552

1553

Supervision Board

Quantity Survey Calculations (Construction) Index - 82

1553

1554

Supervision Board

Submittal of Medical gas system Inspections

1554

1555

Supervision Board

Submittal of Medical gas system Quantity Survey.

1555

1556

Supervision Board

Mechanical Quantity Survey for(Hot Water Storage tanks )

1556

1557

Supervision Board

Inspection of (Hot Water Storage tanks )

1557

1558

Supervision Board

Reply for Access Control System Submitted Shop - Drawing.

1558

1559

Supervision Board

Reply for B.M.S Comments Shop - Drawing.

1559

1560

Supervision Board

Mecahnical Quantity Survey for (Flexible duct)

1560

1561

Supervision Board

Inspection of (Flexible Duct)

1561

1562

Supervision Board

Level 5,4,3 Medical gas Vacuum Moisture Trap line.

1562

1563

Supervision Board

Submittal Mechanical Quantty survey

1563

1564

Supervision Board

Submittal Mechanical Inspections

1564

1565

Supervision Board

Submittal Medical gas system Quantity Survey

1565

1566

Supervision Board

Submittal of Medical gas System Inspection

1566

1567

Supervision Board

Submittal of mecanical Inspections

1567

1568

Supervision Board

Submittal of Mecanical Quantity Survey

1568

1569

Supervision Board

Payment No : 15

1569

1570

Supervision Board

Assan Brand Aluminume Sheet for Cladding

1570

1571

Supervision Board

Mechanical Quantity Survey for (CHILLER UNITE NO:5)

1571

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1572

Supervision Board

Inspection of (CHILLER NO:5)

1572

1573

Supervision Board

Request for Additional time.

1573

1574

Supervision Board

Submittal of Incinerator Unit Inspection

1574

1575

Supervision Board

Quantity Survey Calculations (Construction) Index - 183 & 188

1575

1576

Supervision Board

Quantity Survey Calculations (Construction) Index - 172

1576

1577

Supervision Board

Submittal of Electrical water Heater

1577

1578

Supervision Board

Submittal of Manholes Cover for (Sanitary waste & vent


system.)

1578

1579

Supervision Board

Medical Equipment - Inspection of Sector D - part 4

1579

1580

Supervision Board

Medical Equipment - Quantity Survey of Sector D - part 4

1580

1581

Supervision Board

Medical Equipment - Inspection of Sector -Add - part 1

1581

1582

Supervision Board

Medical Equipment - Quantity Survey of Sector -Add - part 1

1582

1583

Supervision Board

Medical Equipment - Inspection of Sector -F - part 4

1583

1584

Supervision Board

Medical Equipment - Quantity Survey of Sector F - part 4

1584

1585

Supervision Board

Medical Equipment - Inspection of Sector -L - part 1

1585

1586

Supervision Board

Medical Equipment - Quantity Survey of Sector - L - part 1

1586

1587

Supervision Board

Medical Equipment - Inspection of Sector -O - part 1

1587

1588

Supervision Board

Medical Equipment - Quantity Survey of Sector - O - part 1

1588

1589

Supervision Board

Medical Equipment - Inspection of Sector -M - part 2

1589

1590

Supervision Board

Medical Equipment - Quantity Survey of Sector - M - part 2

1590

1591

Supervision Board

Quantity Survey Calculations (Construction) Index - 186

1591

1592

Supervision Board

Quantity Survey Calculations (Construction) Index - 193

1592

1593

Supervision Board

Quantity Survey Calculations (Construction) Index - 202 , 203

1593

1594

Supervision Board

Quantity Survey Calculations (Construction) Index - 180

1594

1595

Supervision Board

Quantity Survey Calculations (Construction) Index - 192 , 204

1595

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1596

Supervision Board

Quantity Survey Calculations (Construction) Index - 187

1596

1597

Supervision Board

Quantity Survey Calculations (Construction) Index - 191

1597

1598

Supervision Board

Medical Equipment of Packing list & certificate of orighin for


Sector O - Part 1

1598

1599

Supervision Board

Medical Equipment - Submittal of Packing List & certificate of


Origin for Sector O - Part 1

1599

1600

Supervision Board

Quantity Survey Calculations (Construction) Index - 190

1600

1601

Supervision Board

Quantity Survey Calculations (Construction) Index - 199

1601

1602

Supervision Board

Quantity Survey Calculations (Construction) Index - 200

1602

1603

Supervision Board

Flexible Duct Price.

1603

1604

Supervision Board

Quantity Survey Calculations (Construction) Index - 194 & 195

1604

1605

Supervision Board

Quantity Survey Calculations (Construction) Index - 205

1605

1606

Supervision Board

Quantity Survey Calculations (Construction) Index - 196 & 197

1606

1607

Supervision Board

Casting Reinforced Concrete in Apart of RD - 4

1607

1608

Supervision Board

Quantity Survey Calculations (Construction) Index - 201

1608

1609

Supervision Board

Payment No : 15

1609

1610

Supervision Board

Quantity Survey Calculations (Construction) Index - 172

1610

1611

Supervision Board

Completion Schedule

1611

1612

Supervision Board

Sidewalk and Curbstone Detail

1612

1613

Supervision Board

Answer for Laminar Floor Ceiling System

1613

1614

Supervision Board

Submit of Alumiume Sheet for Cladding

1614

1615

Supervision Board

Casting of reinforced conrete for Autopark and Transformer Roads

1615

1616

Supervision Board

Q.S calculation (Construction) Index 207

1616

1617

Supervision Board

Submittal of Electrical Shop Drawing For Laundry Department

1617

1618

Supervision Board

Submittal of Electrical Shop Drawing For Sterilization Department

1618

1619

Supervision Board

Some modification in Radiology Department

1619

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1620

Supervision Board

Arrived Low Current Material Inspection Form No:(059)

1620

1621

Supervision Board

MV and LV switchgear inspection form No:(060)

1621

1622

Supervision Board

Electrical Material Bills

1622

1623

Supervision Board

Aluminum Door Frame

1623

1624

Supervision Board

Casting Reinforced Concrete for Services Yard Between (block


H&F)

1624

1625

Supervision Board

Answer for flexible duct

1625

1626

Supervision Board

Submittal of missing packing list A-Part 2,3,4

1626

1627

Supervision Board

Submittal of missing packing list for Sector C-Part 3

1627

1628

Supervision Board

Submittal of missing packing list for Sector D-Part 1,2 &3

1628

1629

Supervision Board

Submittal of missing packing list for Sector F-Part 1,2 &3

1629

1630

Supervision Board

Submittal of missing certificate of origin for sector A-Part


2,3,4

1630

1631

Supervision Board

Submittal of missing of certificate of origin for sector C-Part 3

1631

1632

Supervision Board

Submittal of missing of certificate of origin for Sector D-Part


1,2&3

1632

1633

Supervision Board

Submittal of missing of certificate of origin for Sector F-Part


1,2&3

1633

1634

Supervision Board

Request to write a letter to Ministry of Health

1634

1635

Supervision Board

Submittal Mechanical Quantty survey

1635

1636

Supervision Board

1637

Supervision Board

Building Management System Material Inspection Form No:


(061)

1637

1638

Supervision Board

Distribution of Board ,Light Poles and General Building


Isolation form No:(062)

1638

1639

Supervision Board

Supervision Board/Completion Construction of Al-Suleymany


400 beds Hospital

1639

1640

Supervision Board

Building Management System Material Q.S.

1640

1641

Supervision Board

DIstribution of Board ,Light Poles and General Building


Isolation Q.S.

1641

1642

Supervision Board

Low Current Material Q.S.

1642

1643

Supervision Board

Medical Equipment - Submittal of PACS Revised Offer

1643

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1644

Supervision Board

Inspection of ( Duct Thermal Insulation )

1644

1645

Supervision Board

Inspection of ( Exhaust Fan)

1645

1646

Supervision Board

Mechanical Quantity Survey for (Exhaust Fan)

1646

1647

Supervision Board

Mechanical Quantity Survey for (Duct Thermal Insulation )

1647

1648

Supervision Board

Request to write a letter to Ministry of Health

1648

1649

Supervision Board

3 Numbers of opening In the F block reinforced concrete slab

1649

1650

Supervision Board

Medical Equipment-Submittal of service Program

1650

1651

Supervision Board

Inspection of (Medical gas Copper Pipes )

1651

1652

Supervision Board

Mechanical Quantity Survey for(Medical gas copper Pipes)

1652

1653

Supervision Board

Mechanical quantity survey for Hydrotherapy pool (fitting and


accessories)

1653

1654

Supervision Board

Inspection of Hydrotherapy pool (fitting and accessories )

1654

1655

Supervision Board

Medical Gas Material Inspection

1655

1656

Supervision Board

Medical Gas Material Inspection

1656

1657

Supervision Board

Medical Gas Material Inspection

1657

1658

Supervision Board

Medical Equipment -Air Conditioner Unit for radiology


Department

1658

1659

Supervision Board

Submittal of floor duct layout for Radiology Department

1659

1660

Supervision Board

Changing Bills for Payment No:15

1660

1661

Supervision Board

Resubmit of Aluminume Sheet for Cladding

1661

1662

Supervision Board

Mechanical Quantity Survey For Water Softener & Sand Filter


System

1662

1663

Supervision Board

Inspection of Water Softener & Sand Filter

1663

1664

Supervision Board

Medical Gas Anesthesia Scavenging System Catalog

1664

1665

Supervision Board

Submittal of mechanical Inspection

1665

1666

Supervision Board

Submittal Mechanical Quantity Survey

1666

1667

Supervision Board

Electrical Material Quantity Survey

1667

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1668

Supervision Board

Electrical Material Inspection Form No:(064)

1668

1669

Supervision Board

Airport Quality Control

1669

1670

Supervision Board

Pneumatic Tubing System Submittal

1670

1671

Supervision Board

Medical Gas System Pipe Inspection

1671

1672

Supervision Board

Medical Gas System Pipe Quantity Survey

1672

1673

Supervision Board

Q.S. calculations (construction) index 198

1673

1674

Supervision Board

Q.S. calculations (construction) index 103

1674

1675

Supervision Board

Q.S. calculations (construction) index 181

1675

1676

Supervision Board

Q.S. calculations (construction) index 185

1676

1677

Supervision Board

Inspection of Carbon Dioxide Automatic Fire System

1677

1678

Supervision Board

Mechanical Quantity Survey for Prismatic Silencer & Laminar


flow

1678

1679

Supervision Board

Mechanical Quantity Survey For Bathtub and Ablution Faucet

1679

1680

Supervision Board

Inspection of Bathtub & Ablution Faucet

1680

1681

Supervision Board

Mechanical Quantity Survey Carbon Dioxide Automatic Fire system

1681

1682

Supervision Board

Inspection of Prismatic Silencer & Laminar Flow

1682

1683

Supervision Board

Submit of test inspection request for mechanical work

1683

1684

Supervision Board

Q.S. Calculation (construction) index 206

1684

1685

Supervision Board

Q.S. Calculation (construction) index 189

1685

1686

Supervision Board

Submit of Renal Dialysis R/O plant

1686

1687

Supervision Board

Electircal Material Inspection Form No: (065)

1687

1688

Supervision Board

Nurse Call Material Q.S.

1688

1689

Supervision Board

Electrical Material Inspection Form No:(066)

1689

1690

Supervision Board

Building Manegment System Material Q.S.

1690

1691

Supervision Board

Payment No:16

1691

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1692

Supervision Board

Invitation for Pneumatic Tubing & BMS System Referenced


Project

1692

1693

Supervision Board

Pneumatic Tubing System Quotation Submittal

1693

1694

Supervision Board

Q.S. calculation (construction) index 184

1694

1695

Supervision Board

Q.S. calculation (construction) index 211

1695

1696

Supervision Board

Decreasing the Amount from the Bank Guarantee

1696

1697

Supervision Board

Q.S. Calculation (Consturction) Index 226

1697

1698

Supervision Board

Q.S. Calculation (Consturction) Index 213

1698

1699

Supervision Board

Q.S. Calculation (Consturction) Index 216

1699

1700

Supervision Board

Q.S. Calculation (Consturction) Index 219

1700

1701

Supervision Board

Q.S. Calculation (Consturction) Index 225

1701

1702

Supervision Board

Q.S. Calculation (Consturction) Index 224

1702

1703

Supervision Board

Payment No:16

1703

1704

Supervision Board

Submittal Mechanical Quantity Survey

1704

1705

Supervision Board

Submittal of Mechanical Inspection

1705

1706

Supervision Board

Q.S Calculation (Construction) Index 218

1706

1707

Supervision Board

Q.S Calculation (Construction) Index 227

1707

1708

Supervision Board

Q.S. Calculation (Construction) Index 220 & 223

1708

1709

Supervision Board

Cold Water & Domestic Cold Water Pipes Insulation

1709

1710

Supervision Board

Shifting a Door In Sterilizition Department

1710

1711

Supervision Board

Mechanical Shop Drawing For Sterilization Department

1711

1712

Supervision Board

Wall Paper Cost Breakdown (Price)

1712

1713

Supervision Board

Main Entrance Lighting Fixtures Submittal

1713

1714

Supervision Board

Connecting Stair Lights To UPS System RFI-No:18

1714

1715

Supervision Board

Drawing For UPS-SLD ,USMDB-4,3,2,1, SMDB-LAUND AND


STERILAZATION

1715

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1716

Supervision Board

Q.S Calculation (construction) index 215

1716

1717

Supervision Board

Q.S Calculation (construction) index 217

1717

1718

Supervision Board

Inspection of Expansion joints, valves and duct insulation

1718

1719

Supervision Board

Mechanical Quantity Survey for Expansion Joints , valves and


duct insulation

1719

1720

Supervision Board

Medical Equipment - Inspection of Sector A - Part 5

1720

1721

Supervision Board

Medical Equipment - Quantity Survey of Sector A - Part 5

1721

1722

Supervision Board

Medical Equipment - Inspection of Sector C - Part 3

1722

1723

Supervision Board

Medical Equipment - Quantity Survey of Sector C - Part 3

1723

1724

Supervision Board

Medical Equipment - Inspection of Sector D - Part 5

1724

1725

Supervision Board

Medical Equipment - Quantity Survey of Sector D Part 5

1725

1726

Supervision Board

Medical Equipment - inspection of Sector F - Part 5

1726

1727

Supervision Board

Medical Equipment - Quantity Survey Of sector F -Part 5

1727

1728

Supervision Board

Medical Equipment - Inspection of Sector G

1728

1729

Supervision Board

Medical Eqipment - Quantity Survey of Sector G - Part 1

1729

1730

Supervision Board

Medical Equipment - Inspectio of Sector H - Part 1

1730

1731

Supervision Board

Medical Equipment - Quantity Survey of Sector H - Part 1

1731

1732

Supervision Board

Medical Equipment - Inspection of Sector I - Part 1

1732

1733

Supervision Board

Medical Equipment - Quantity Survey of Sector I- Part 1

1733

1734

Supervision Board

Medical Equipment - Inspection of Sector L- Part 2

1734

1735

Supervision Board

Medical Equipment - Quantity Survey of Sector L- Part 2

1735

1736

Supervision Board

Medical Equipment - Inspection of Sector U- Part 1

1736

1737

Supervision Board

Medical Equipment - Quantity Survey of Sector U- Part 1

1737

1738

Supervision Board

Medical Equipment - Inspection of Sector V- Part 1

1738

1739

Supervision Board

Medical Equipment - QuantitySurvey of Sector V- Part 1

1739

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1740

Supervision Board

Medical Equipment - Inspection of ADD Items - Part 2

1740

1741

Supervision Board

Medical Equipment - Quantity Survey of ADD Items -Part 2

1741

1742

Supervision Board

Submit of Drinking Fountain

1742

1743

Supervision Board

Porcelain Treads and Risers Cost Breakdown

1744

Supervision Board

Main Entrance Suspended Ceiling Cost Breakdown (Price)

1744

1745

Supervision Board

Automatic Aluminum Slide Cost Breakdown

1745

1746

Supervision Board

Counters Cost Breakdown

1746

1747

Supervision Board

Retaining Wall External Plastering

1747

1748

Supervision Board

Slab on Grade Concrete Works on Roads

1748

1749

Supervision Board

Medical Equipment -certificate of origin for Sector A-part 5

1749

1750

Supervision Board

Medical Equipment -certificate of origin for Sector C-part 3

1750

1751

Supervision Board

Medical Equipment -certificate of origin for Sector D-part 5

1751

1752

Supervision Board

Medical Equipment -certificate of origin for Sector F-part 5

1752

1753

Supervision Board

Medical Equipment -certificate of origin for Sector G-part 1

1753

1754

Supervision Board

Medical Equipment -certificate of origin for Sector H-part 1

1754

1755

Supervision Board

Medical Equipment -certificate of origin for Sector I-part 1

1755

1756

Supervision Board

Medical Equipment -certificate of origin for Sector V-part 1

1756

1757

Supervision Board

Medical Equipment -certificate of origin for Sector U-part 1

1757

1758

Supervision Board

Medical Equipment -certificate of origin for Add Items-Part 2

1758

1759

Supervision Board

Submit of as built mechanical drawing in level 5

1759

1760

Supervision Board

Medical Equipment-inspection of Sector F - Part 6

1760

1761

Supervision Board

Medical Equipment - Quantity Survey of Sector F - Part 6

1761

1762

Supervision Board

Medical Equipment - Certificate of Origin for Sector F - Part 6

1762

1763

Supervision Board

Medical Equipment - Mechanical shop drawing for Dialysis


Department

1763

(Price)

(Price)

1743

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1764

Supervision Board

Packs system

1764

1765

Supervision Board

Medical Equipment Value for new Items

1765

1766

Supervision Board

Medical Equipment - Missing Certificate of Origin for Sector D Part 5

1766

1767

Supervision Board

Medical Equipment - Missing Packing List for Sector D - Part 5

1767

1768

Supervision Board

Medical Equipment - Missing Packing List for Sector D - Part 5

1768

1769

Supervision Board

Medical Equipment - Missing Certificate of Origin for Sector v Part 1

1769

1770

Supervision Board

Medical Equipment - Missing Certificate of Origin for Sector v Part 1

1770

1771

Supervision Board

Medical Equipment - Missing Certificate of Origin for Sector v Part 1

1771

1772

Supervision Board

Decreasing the Amount from the Bank Guarantee

1772

1773

Supervision Board

Submittal of Mechanical list of Inspections

1773

1774

Supervision Board

Coordination Shop drawing & Design For Suspending Celling


for Leve - 1

1774

1775

Supervision Board

Coordination Shop drawing & Design For Suspending Celling


for Leve - (5,4, & 3)

1775

1776

Supervision Board

Mecahnical Inspection for


1- Steam System Accessories 2 -Cast Iron Pipes & Fitting.

1776

1777

Supervision Board

Mecahnical Quantity Survey for


1- Steam System Accessories 2 -Cast Iron Pipes & Fitting.

1777

1778

Supervision Board

Quantity Survey(Calculation) Index 210

1778

1779

Supervision Board

Quantity Survey(Calculation) Index 212

1779

1780

Supervision Board

Mechanical Quantity Survey For Plumbing System Plastic Grill


and terrace Siphon.

1780

1781

Supervision Board

Mechanical Inspection For Plumbing System Plastic Grill and


terrace Siphon.

1781

1782

Supervision Board

Mechanical Fire Fighting system Extinguiser Brand: Fetas

1782

1783

Supervision Board

Mechanical Fire Fighting system Extinguiser Brand: Fetas

1783

1784

Supervision Board

Coordination Shop Drawing of Suspeding Ceiling for Reception


area building.

1784

1785

Supervision Board

Revised AC unit for Radiology Department

1785

1786

Supervision Board

Renew Bank Guarantee No: 1308/2011

1786

1787

Supervision Board

Medical Equipment Training.

1787

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

1788

Supervision Board

Quantity Survey calculations (construction) Index208

1788

1789

Supervision Board

Quantity Survey calculations (construction) Index209

1789

1790

Supervision Board

External Retaining walls Plastering

1790

1791

Supervision Board

Mechanical Inspection of Boilers.

1791

1792

Supervision Board

Mechanical Quantity survey of Boilers.

1792

1793

Supervision Board

Required change in floor of level - 2 for MCC - 31 , 32 & DDC -2

1793

1794

Supervision Board

Idicating location for AC unit for Electrical rooms.


RFI-NO:19

1794

1795

Supervision Board

Drwing for FACAD Light and Luminaries type.

1795

1796

Supervision Board

Medical Equipment - T - Sector Replaced Items.

1796

1797

Supervision Board

Drawing for MCC - R ,31 ,32 , 02 , and 01

1797

1798

Supervision Board

Reply for Access Control System Submitted Drawing and


Details.

1798

1799

Supervision Board

Reply for Queue Matic System Drawing And Details.

1799

1800

Supervision Board

Reply for Audio Visual System Submittal Comments

1800

1801

Supervision Board

Electrical Connection Inspection Form No : (067)

1801

1802

Supervision Board

Quantity Survey Calculations ( Construction ) Index 214

1802

1803

Supervision Board

Elevator , generator and Main Buuilding Earthing Systems


Inspection form No:(068)

1803

1804

Supervision Board

MV,I V Switchgears inspection form No: (069)

1804

1805

Supervision Board

Level - 0 low current cable and DB Connection Inspection form


NO:(070)

1805

1806

Supervision Board

Quantity Survey for Inspection Letters Index -(67,68,69,70)

1806

1807

Supervision Board

Sewage line of FD - 2

1807

1808

Supervision Board

1809

Supervision Board

Quantity Survey , Medical gas System Pipe Instalation Level 2 C Block

1809

1810

Supervision Board

Inspection of , Medical gas System Pipe Instalation Level - 2 C


Block

1810

1811

Supervision Board

Quantity Survey , Medical gas System Pipe Instalation Level 2 C Block

1811

Carpark Roof Floor Wuartz Reinforced Polyurethane Coating.

38.50 US$

Ref No.

1808

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1812

Supervision Board

Inspection of , Medical gas System Pipe Instalation Level - 2 C


Block

1812

1813

Supervision Board

Medical Equipment - Inspection of Sector D - Part 6

1813

1814

Supervision Board

Medical Equipment - Quantity Survey of Sector D - Part 6

1814

1815

Supervision Board

Medical Equipment - Inspection of Sector F - Part 7

1815

1816

Supervision Board

Medical Equipment - Quantity Survey of Sector F - Part 7

1816

1817

Supervision Board

Medical Equipment - Inspection of Sector G - Part 2

1817

1818

Supervision Board

Submittal Mechanical Quantity Survey

1818

1819

Supervision Board

Medical Equipment - Quantity Survey of Sector G - Part 2

1819

1820

Supervision Board

Medical Equipment - Inspection of Sector H - Part 2

1820

1821

Supervision Board

Medical Equipment - Quantity Survey of Sector H - Part 2

1821

1822

Supervision Board

Medical Equipment - Inspection of Sector I - Part 2

1822

1823

Supervision Board

Medical Equipment - Quantity Survey of Sector I - Part 2

1823

1824

Supervision Board

Medical Equipment - Inspection of Sector S - Part 1

1824

1825

Supervision Board

Medical Equipment - Inspection of Sector O - Part 2

1825

1826

Supervision Board

Medical Equipment - Quantity Survey of Sector O - Part 2

1826

1827

Supervision Board

Medical Equipment - Quantity Survey of Sector S - Part 2

1827

1828

Supervision Board

Medical Equipment - Inspection of Sector V - Part 2

1828

1829

Supervision Board

Medical Equipment - Quantity Survey of Sector V - Part 2

1829

1830

Supervision Board

Medical Equipment - Inspection ADD ITEMS - Part 3

1830

1831

Supervision Board

Medical Equipment - Quantity Survey of


ADD ITEMS - Part 3

1831

1832

Supervision Board

Quantity Survey Calculation (construction ) Index 234

1832

1833

Supervision Board

Quantity Survey Calculation (construction ) Index 242

1833

1834

Supervision Board

Inspection of Material On side RENAL hemodialysis water


treatment unit.

1834

1835

Supervision Board

Quantity Survey of Material On side RENAL hemodialysis water


treatment unit.

1835

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1836

Supervision Board

Air And Dirty Seperator Brand Ataboyler Catalog

1836

1837

Supervision Board

Quantity Survey of Medical Gas System Pipe Instalation Level


2 D Block.

1837

1838

Supervision Board

Inspection of Medical Gas System Pipe Instalation Level 2 D


Block.

1838

1839

Supervision Board

Quantity Survey of Medical Gas System Pipe Instalation Level


2 C,E, Block.

1839

1840

Supervision Board

Inspection of Medical Gas System Pipe Instalation Level 2 C,E,


Block.

1840

1841

Supervision Board

Inspection of Medical Gas System AVSU Instalation Level


5,4,3,2, and valves Instalation Level 5,4,3

1841

1842

Supervision Board

Quantity Survey of Medical Gas System AVSU Instalation Level


5,4,3,2, and valves Instalation Level 5,4,4

1842

1843

Supervision Board

Quantity Survey Calculation (Construction) Index - 244

1843

1844

Supervision Board

Quantity Survey Calculation (Construction) Index - 236

1844

1845

Supervision Board

Quantity Survey Calculation (Construction) Index - 245

1845

1846

Supervision Board

Quantity Survey Calculation (Construction) Index - 247

1846

1847

Supervision Board

Mechanical inspection submittal

1847

1848

Supervision Board

Mechanical Quantity Survey Submittal

1848

1849

Supervision Board

Submittal of Sewage Treatment Plant Package units


Installation Inspection

1849

1850

Supervision Board

Quantity Survey Calculation (Construction) Index - 235

1850

1851

Supervision Board

Quantity Survey Calculation (Construction) Index - 241

1851

1852

Supervision Board

Quantity Survey Calculation (Construction) Index - 237

1852

1853

Supervision Board

Coordination Shop Drawing of Suspendeing Ceiling for Level 2

1853

1854

Supervision Board

Medical Equipment - Certificate of Origin for Sector D - Part 6

1854

1855

Supervision Board

Medical Equipment - Certificate of Origin for Sector F - Part 7

1855

1856

Supervision Board

Medical Equipment - Certificate of Origin for Sector G - Part 2

1856

1857

Supervision Board

Medical Equipment - Certificate of Origin for Sector H - Part 2

1857

1858

Supervision Board

Medical Equipment - Certificate of Origin for Sector I - Part 2

1858

1859

Supervision Board

Medical Equipment - Certificate of Origin for Sector O - Part 2

1859

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

1860

Supervision Board

Medical Equipment - Certificate of Origin for Sector V - Part 2

1860

1861

Supervision Board

Medical Equipment - Certificate of Origin for ADD SECTORS Part 3

1861

1862

Supervision Board

Quantity Survey Calculation (Construction) Index - 248

1862

1863

Supervision Board

Quantity Survey Calculation (Construction) Index - 243

1863

1864

Supervision Board

ACU Distrbution for Radiology Department

1864

1865

Supervision Board

Quantity Survey Calculation (Construction) Index 231,232,233

1865

1866

Supervision Board

Quantity Survey Calculation (Construction) Index - 249

1866

1867

Supervision Board

Submittal of Sewage Treatment Plant Package Units


Installation Inspection/Electrical.

1867

1868

Supervision Board

Submit of Sterilization Mechanical Shop Drqwing.

1868

1869

Supervision Board

Payment No # 17

1869

1870

Supervision Board

Quantity Survey Calculation (Construction) Index - 240

1870

1871

Supervision Board

Quantity Survey Calculation (Construction) Index - 228

1871

1872

Supervision Board

Medical Equpment - Cerficate of Origin for Sector L


Part - 2

1872

1873

Supervision Board

Medical Equipment - Changing the Model of Item (555) in


Sector (O)

1873

1874

Supervision Board

Quantity Survey Calculation (Construction) Index - 238

1874

1875

Supervision Board

Quantity Survey Calculation (Construction) Index - 246

1875

1876

Supervision Board

Internal Signage text Kurish Translation

1876

1877

Supervision Board

Payment No # 17

1877

1878

Supervision Board

1879

Supervision Board

Pneumatic Tubing System Material Inspection Form No:(071)

1879

1880

Supervision Board

Quantity Survey For Inspection Index - (71)

1880

1881

Supervision Board

Quantity Survey Calculations (Construction) Index 249

1881

1882

Supervision Board

Quantity Survey Calculation (Construction) Index - 230

1882

1883

Supervision Board

Quantity Survey Calculation (Construction) Index - 239

1883

Request a Letter to the custom of IBRAHIM KHALIL

Ref No.

1878

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1884

Supervision Board

Quantity Survey Calculation (Construction) Index - 250

1884

1885

Supervision Board

Quantity Survey Calculation (Construction) Index - 251

1885

1886

Supervision Board

Mechanical Quantity Survey for Boilers

1886

1887

Supervision Board

Inspection of Boilers

1887

1888

Supervision Board

Mechanical Quantity Survey for Air Compressor & Air Tank

1888

1889

Supervision Board

Inspection of Air Compressor & Air Tank

1889

1890

Supervision Board

Medical Equipment - Item No: 232 in Sector ( G )

1890

1891

Supervision Board

Resubmit of As Built Mechanical Drawing in level 5

1891

1892

Supervision Board

Coordination Shop Drawing of Suspendeing Ceiling for Level 1

1892

1893

Supervision Board

Medical Equipment - Installation of Medical Equipment, Utility


Equipment & Medical Furniture.

1893

1894

Supervision Board

RD 2 Area Seweage line Revised Drawing.

1894

1895

Supervision Board

Submit of Drinking Fountain

1895

1896

Supervision Board

Medical Equipment Gamma camera Recommended Lead.

1896

1897

Supervision Board

Medical Equipment - Typical isolated WC for the Gamma


Camera site

1897

1898

Supervision Board

Medical Equipment , Revised Mechanical shop drawing for


level - 1

1898

1899

Supervision Board

Authorization

1899

1900

Supervision Board

Inspection of Medical Gas System AVSU Instalation Level


5,4,3,2, and valves Instalation Level 5,4,3

1900

1901

Supervision Board

Inspection Of Medical Gas System Pipe Instalation Level 2C - E


Block

1901

1902

Supervision Board

Inspection of Medical Gas System Pipe Instalation Level 2 D


Block.

1902

1903

Supervision Board

Medical Gas System Pipe Instalation Level 2 C Block

1903

1904

Supervision Board

Decreasing the Amount from the Bank Guarantee

1904

1905

Supervision Board

Medical Equipment - Electrical Shop Drawing (Rev . 3) for Level


-1

1905

1906

Supervision Board

Medical Equipment - Gamma Camera isolated WC.

1906

1907

Supervision Board

Quantity Survey Calculation (Construction) Index - 252 ,253 ,


256

1907

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

1908

Supervision Board

Submit of AS built mechanical drawing in level 4

1908

1909

Supervision Board

Quantity Survey Calculation (Construction) Index - 257

1909

1910

Supervision Board

Submittal Mechanical quntity Survey.

1910

1911

Supervision Board

Medical Gas System Pipe Test Inspection Level 2 All Block

1911

1912

Supervision Board

Medical Equipment - Dental Shop Drawing

1912

1913

Supervision Board

Medical Equipment - Dental unit Shop Drawing

1913

1914

Supervision Board

Quantity Survey Calculation (Construction) Index - 258 - 259

1914

1915

Supervision Board

Counter's Price Difference

1915

1916

Supervision Board

Electrical Material inspection form No:(071).

1916

1917

Supervision Board

Quantity Survey Inspection form Letter No: (71).

1917

1918

Supervision Board

Request a Letter to the custom of IBRAHIM KHALIL

1918

1919

Supervision Board

Re - Design Calculations for External Existing RW Part 4-5


( Behind the Reception )

1919

1920

Supervision Board

Medical Equipment - Names of Engineers And Technical staff

1920

1921

Supervision Board

Raised Flooring Price Analysis

1921

1922

Supervision Board

Grass and Additional Black Agricultural soil Price Analysis

1922

1923

Supervision Board

RD2 Existing Retaining Wall Demolishing Price Analysis

1923

1924

Supervision Board

Under Epoxy Floor Covering Surface Preparation Works Price


Analysis

1924

1925

Supervision Board

Submittal Mechanical Quantity survey

1925

1926

Supervision Board

Medical Equipment - Soft Copy of Final Summary for All


Sectors.

1926

1927

Supervision Board

Traffic signs

1927

1928

Supervision Board

Submittal Mechanical Quantity survey

1928

1929

Supervision Board

Quantity Survey Calculation (Construction) Index - 264 - 266 269

1929

1930

Supervision Board

Quantity Survey Calculation (Construction) Index - 271 - 272

1930

1931

Supervision Board

Payment No # 18

1931

(Price)

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

1932

Supervision Board

Pneumatic Tubing System Installation Inspection form No:


(072)

1932

1933

Supervision Board

Q.S for Inspection Letters Index - (72)

1933

1934

Supervision Board

Level - 5,4,3 Lighting and wiring device installation Inspection


form No:(073)

1934

1935

Supervision Board

Quantity Survey for Inspection Letters Index -(73)

1935

1936

Supervision Board

Roof 5 ,3 AHU and B.M.S Connection Installation Inspection


form NO: (074)

1936

1937

Supervision Board

Quantity Survey for Inspection Letters Index -(74)

1937

1938

Supervision Board

Medical gas system Pipe Instalation Level 1 all block and level
0 A block

1938

1939

Supervision Board

Medical gas system Pipe Instalation Level 1 all block and level
0 A block

1939

1940

Supervision Board

Quantity Survey for Inspection Letters Index (261 , 262 , 263)

1940

1941

Supervision Board

Quantity Survey for Inspection Letters Index (270 , & 273 )

1941

1942

Supervision Board

Medical Equipment - Inspection of Sectors for Payment No: 18

1942

1943

Supervision Board

Medical Equipment - Quantity Survey of Sectors for Payment


No: 18

1943

1944

Supervision Board

Medical Equipment - Certificate of Origin Of Sectors for


Payment No: 18

1944

1945

Supervision Board

Quantity Survey for Inspection Letters Index ( 276 ,278 , & 279 )

1945

1946

Supervision Board

Quantity Survey for Inspection Letters Index (265 , 266 & 274 )

1946

1947

Supervision Board

External Hospital Sign Boards Price Analysis

1947

1948

Supervision Board

Submittal of Mechanical Inspection

1948

1949

Supervision Board

Electrical Material in (Ibrahim Khalil Boarder)

1949

1950

Supervision Board

Inapection of Aluminum Cladding

1950

1951

Supervision Board

Additional Plants and Landscape Items

1952

Supervision Board

Submit Of Mechanical Break Down.

1952

1953

Supervision Board

Medical Equipment - Fire water sprinkler in Medical rooms

1953

1954

Supervision Board

Resubmit for Air Separator (ATABOYLER)

1954

1955

Supervision Board

Cancellation of Bank Guarantee

1955

(Price)

Ref No.

1951

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1956

Supervision Board

Proposal & Cost Break Down for Painting the Retaining wall

1956

1957

Supervision Board

Medical Mechanic Room Fan Installation

1957

1958

Supervision Board

Resumit of Mechanical AS built Drawing in LEVEL 4

1958

1959

Supervision Board

Medical gas catalogs.

1959

1960

Supervision Board

Quantity Survey for Inspection Letters Index (100 , 254 , 255)

1960

1961

Supervision Board

Surgical Control Panel Connections Installation Inspection


form No:(075)

1961

1962

Supervision Board

Quantity Survey Inspection form Letter No: (75).

1962

1963

Supervision Board

Submittal Mechanical Quantity survey

1963

1964

Supervision Board

Submit of Mechanical AS Built drawing in LEVEL 3

1964

1965

Supervision Board

Facad Lighting Submittal (E - 044 )

1965

1966

Supervision Board

Capaacitor Bank Installation Inspection form No:(076)

1966

1967

Supervision Board

Quantity Survey for Inspection Letters Index - (76)

1967

1968

Supervision Board

Emergency and Exit Sign installation inspection form No: (077)

1968

1969

Supervision Board

Quantity Survey for Inspection Letters Index - (77)

1969

1970

Supervision Board

3, Flag and Flagpole price analysis

1970

1971

Supervision Board

Payment No # 19

1971

1972

Supervision Board

Quantity Survey for Inspection Letters Index - (280)

1972

1973

Supervision Board

Medical Equipment - Inspection of Sectors for Payment No: 19

1973

1974

Supervision Board

Medical Equipment Quantity Survey of Sectors for Payment


No:19

1974

1975

Supervision Board

Medical Equipment - Certificate of Origin fo Sectors For


Payment No: 19

1975

1976

Supervision Board

Sumit Laundry Department Channel.

1976

1977

Supervision Board

Renew Bank Guarantee No:1332/2011

1977

1978

Supervision Board

Submit Laundry Department Channel.

1978

1979

Supervision Board

Quantity Survey Calculation (Construction) Index - 294 & 296

1979

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

1980

Supervision Board

Quantity Survey Calculation (Construction) Index - 295

1980

1981

Supervision Board

wall picture Stickers Price Analysis

1981

1982

Supervision Board

Mechanical Quantity survey.

1982

1983

Supervision Board

Quantity Survey Calculation (Construction) Index - 227

1983

1984

Supervision Board

Quantity Survey Calculation (Construction) Index - 292

1984

1985

Supervision Board

Quantity Survey Calculation (Construction) Index - 291

1985

1986

Supervision Board

Submittal Mechanical Quantity survey

1986

1987

Supervision Board

Quantity Survey of Medical Gas System mechanic Room


piping , Bed Head Unit Piping and valves instaalation (Level 2 ,
1 , 0)

1987

1988

Supervision Board

Inspection of Medical Gas System mechanic Room piping , Bed


Head Unit Piping and valves instaalation (Level 2 ,1,0)

1988

1989

Supervision Board

Medical Equipment - Changing the Item No: 636 of Sector (V).

1989

1990

Supervision Board

Electrical Material in (Ibrahim Khalil Boarder)

1990

1991

Supervision Board

CMU Menhole Cost Break Down

1991

1992

Supervision Board

Medical Equipment - Price for Equipment for Liver Transplant


Operation

1992

1993

Supervision Board

Medical Equipment - Price for Equipment for Neurology


Department.

1993

1994

Supervision Board

Medical Equipment - Price for Equipment for Bone


Densitometry

1994

1995

Supervision Board

Third party committee certification of ten number Elevators

1995

1996

Supervision Board

Facad Lighting Submittal (E - 045 )

1996

1997

Supervision Board

Quantity Survey Calculation (construction) Index 282

1997

1998

Supervision Board

Medical Equipment - Medical Equipment Installation Program

1998

1999

Supervision Board

Request a Letter to the custom of IBRAHIM KHALIL

1999

2000

Supervision Board

Quantity Survey Calculation (construction) Index 281 & 285

2000

2001

Supervision Board

Quantity Survey Calculation (construction) Index 284 & 288

2001

2002

Supervision Board

Quantity Survey Calculation (construction) Index - 276

2002

2003

Supervision Board

Quantity Survey Calculation (construction) Index - 289 , 290 &


293

2003

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

2004

Supervision Board

Quantity Survey Calculation (construction) Index - 276, & 286

2004

2005

Supervision Board

Quantity Survey Calculation (construction) Index - 287

2005

2006

Supervision Board

Level - 2 , 1 Lighting and wiring device installation Inspection


form No:(078)

2006

2007

Supervision Board

Quantity Survey for Inspection Letters Index - (78)

2007

2008

Supervision Board

Stairs and Elevator Lighting and wiring device installation


Inspection form No: (079)

2008

2009

Supervision Board

Quantity Survey for Inspection Letters Index - (79)

2009

2010

Supervision Board

Medical Equipment - price for second MRI in the 400 Bed


Hospital .

2010

2011

Supervision Board

Payment No:20

2011

2012

Supervision Board

Medical Gas AVSU (Area Valve Servis Unit) Quantity Installed


on side.

2012

2013

Supervision Board

Quantity Survey Calculation (construction) Index 222

2013

2014

Supervision Board

Inspection for Electrical work.

2014

2015

Supervision Board

Quantity Survey Calculation (construction) Index 311

2015

2016

Supervision Board

Quantity Survey Calculation (construction) Index 309

2016

2017

Supervision Board

Quantity Survey Calculation (construction) Index 315

2017

2018

Supervision Board

Quantity Survey Calculation (construction) Index 304

2018

2019

Supervision Board

Mechanical Quantity survey.

2019

2020

Supervision Board

Mechanical Department - inspection of Sectors (P) for Payment


No: 20

2020

2021

Supervision Board

Medical Equipment - inspection of Sectors for Payment No:


20

2021

2022

Supervision Board

Medical Equipment - Quantity Survey of Sectors for Payment


No: 20

2022

2023

Supervision Board

Medical Equipment - Certificate of Origin of Sectors for


Payment No: 20

2023

2024

Supervision Board

Sewage Tretment Area Landscape Cost Breakdown(price)

2024

2025

Supervision Board

Medical Equipment - price for second MRI in the 400 Bed


Hospital .

2025

2026

Supervision Board

Retest Road Asphalt

2026

2027

Supervision Board

Concrete Road Cost Breackdown (price)

2027

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

2028

Supervision Board

Core Drilling Cost Breakdown (price)

2028

2029

Supervision Board

Cutting On Wall Cost Breakdown (price)

2029

2030

Supervision Board

Door Adjustment Works Cost Breakdown (price)

2030

2031

Supervision Board

Aluminum Doors and windows (Different size) Cost Breakdown


(price)

2031

2032

Supervision Board

Steel Trench Works For Cabling Cost Breakdown (price)

2032

2033

Supervision Board

Upper Aluminum Frame For WC Cost Breakdown (price)

2033

2034

Supervision Board

Trench Iron Cover Cost Breakdown (price)

2034

2035

Supervision Board

Version Order For Duct Work Insulation

2035

2036

Supervision Board

Electrical Trench Cost Breakdown (price)

2036

2037

Supervision Board

Removing and Rebuilding 2 columns of Gererator Building


Cost Breakdown (price)

2037

2038

Supervision Board

Irrigation Point System Cost Breakdown (price)

2038

2039

Supervision Board

Iron Steps for Roof Cost Breakdown (price)

2039

2040

Supervision Board

Kitchen Equipemnt Cost Breakdown (price)

2040

2041

Supervision Board

Rediation Shielded windows Cost Breakdown (price)

2041

2042

Supervision Board

Step and Rise Adjustment Works According to Project Size


Cost Breakdown (price)

2042

2043

Supervision Board

Contractor Cost for time Extension Cost Breakdown (price)

2043

2044

Supervision Board

Bended Metal Sheet Expansion Joints Cost Breakdown (price)

2044

2045

Supervision Board

Aluminum Skirting Cost Breakdown (price)

2045

2046

Supervision Board

Kerbstone Painting Cost Breakdown (price)

2046

2047

Supervision Board

Automatic Aluminum Slide Door for Main Enterance Cost


Breakdown (price)

2047

2048

Supervision Board

Steel Lintel Cost Breakdown (price)

2048

2049

Supervision Board

Galvanized L Profile Around the Trench Cost Breakdown


(price)

2049

2050

Supervision Board

Demolishing and Rebuilding - Repairng Works Cost


Breakdown (price)

2050

2051

Supervision Board

Medical Equipment - Price for Equipment for Liver Transplant


Operation

2051

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

2052

Supervision Board

Completion Certificate

2052

2053

Supervision Board

Variation No:(4) for Electrical works.

2053

2054

Supervision Board

Payment No # 21

2054

2055

Supervision Board

Payment No # 22

2055

2056

Supervision Board

Alucobond Faade and roof cladding

2056

2057

Supervision Board

Shed with trapezoidal metal sheet cost Breakdown.

2057

2058

Supervision Board

Passing wall for duct and pipes cost breakdown.

2058

2059

Supervision Board

As Built Drawing for Level - 2

2059

2060

Supervision Board

Cutting On Wall Cost Breakdown (price)

2060

2061

Supervision Board

Core Drilling Cost Breakdown (price)

2061

2062

Supervision Board

Passing wall for duct and pipes cost breakdown. (price)

2062

2063

Supervision Board

Submit of Oxygen Generator Plant

2063

2064

Supervision Board

Inspection of medical for payment 21

2064

2065

Supervision Board

Quantity survey of medical for payment 21

2065

2066

Supervision Board

Certificate of Origin for payment 21

2066

2067

Supervision Board

Medical Equipment-Inspection of Sector (N) for Payment No.21

2067

2068

Supervision Board

Quantity survey of sector N for payment 21

2068

2069

Supervision Board

Medical Equipment Certificate of origin of Sector (N) for


Payment 21

2069

2070

Supervision Board

Warranty Certificate of operation Theatre wall cladding

2070

2071

Supervision Board

Variation No:(4) for Electrical works.

2071

2072

Supervision Board

Medical Gas System Pipe Test Inspection All Level

2072

2073

Supervision Board

Q.S calculation (contruction) index 310

2074

2074

Supervision Board

Q.S calculation (contruction) index 302

2075

2075

Supervision Board

Q.S calculation (contruction) index 312

2076

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

2076

Supervision Board

Q.S calculation (contruction) index 311 & 322

2077

2077

Supervision Board

Q.S calculation (contruction) index 309 & 320

2078

2078

Supervision Board

Q.S calculation (contruction) index 262 & 315

2079

2079

Supervision Board

Mechanical-Price offer for two tanks for Gamma Camera waste


water

2080

2080

Supervision Board

Mechanical equipment-Inspection for Add sector -part 7

2082

2081

Supervision Board

Mechanical equipment-Quantity survey for Add sector -part 7

2083

2082

Supervision Board

Q.s. calculation (construction) index 305

2084

2083

Supervision Board

Submit of Clorinatuion System

2085

2084

Supervision Board

Q.s. calculation (construction) index 302

2086

2085

Supervision Board

Q.s. calculation (construction) index 297

2087

2086

Supervision Board

Q.s. calculation (construction) index 309

2088

2087

Supervision Board

Q.s. calculation (construction) index 319

2089

2088

Supervision Board

Q.s. calculation (construction) index 317

2090

2089

Supervision Board

Q.s. calculation (construction) index 316

2091

2090

Supervision Board

Medical Equipment-Inspection of Sectors Payment No:22

2092

2091

Supervision Board

Medical Equipment Quantity Survey of Sector for Payment


No:22

2093

2092

Supervision Board

Medical Equipment-certificate of Origin of Sectors for Payment


No:22

2094

2093

Supervision Board

Q.S. calcutation (Construction )Index 293

2095

2094

Supervision Board

Q.S. calcutation (Construction )Index 321

2096

2095

Supervision Board

50 number Thjia oriantales Nena

2097

2096

Supervision Board

Sterilization Studwall Cost Breakdown

2098

2097

Supervision Board

Q.S. Calculation Index 307

2099

2098

Supervision Board

Submittal Mechanical Quantity Survey

2100

2099

Supervision Board

Q.S. Calculation (Construction) Index 285

2101

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

2100

Supervision Board

Q.S. Calculation (Construction) Index 265

2102

2101

Supervision Board

Q.S. Calculation (Construction) Index 313

2103

2102

Supervision Board

Q.S. Calculation (Construction) Index 300

2104

2103

Supervision Board

Q.S. Calculation (Construction) Index 337

2105

2104

Supervision Board

Q.S. Calculation (Construction) Index 338

2106

2105

Supervision Board

Electrical System Training Course

2107

2106

Supervision Board

Q.S. Calculation (Construction) Index 328

2108

2107

Supervision Board

Drawing for Operating Theater Camera System

2109

2108

Supervision Board

Q.S. Calculation (Construction) Index 330

2110

2109

Supervision Board

Q.S. Calculation (Construction) Index 360

2111

2110

Supervision Board

Q.S. Calculation (Construction) Index 369

2112

2111

Supervision Board

Q.S. Calculation (Construction) Index 339

2113

2112

Supervision Board

Q.S. Calculation (Construction) Index 377

2114

2113

Supervision Board

Q.S. Calculation (Construction) Index 362

2115

2114

Supervision Board

Q.S. Calculation (Construction) Index 359

2116

2115

Supervision Board

Q.S. Calculation (Construction) Index 340

2117

2116

Supervision Board

Q.S. Calculation (Construction) Index 376

2118

2117

Supervision Board

Q.S. Calculation (Construction) Index 375

2119

2118

Supervision Board

Q.S. Calculation (Construction) Index 333

2120

2119

Supervision Board

Q.S. Calculation (Construction) Index 346

2121

2120

Supervision Board

Q.S. Calculation (Construction) Index 306

2122

2121

Supervision Board

Q.S. Calculation (Construction) Index 373

2123

2122

Supervision Board

Q.S. Calculation (Construction) Index 352

2124

2123

Supervision Board

Q.S. Calculation (Construction) Index 377

2125

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

2124

Supervision Board

Electrical Material in (Ibrahim Khalil Boarder)

2126

2125

Supervision Board

Q.S. Calculation (Construction) Index 336

2127

2126

Supervision Board

Q.S. Calculation (Construction) Index 372

2128

2127

Supervision Board

Q.S. Calculation (Construction) Index 351

2129

2128

Supervision Board

Q.S. Calculation (Construction) Index 361

2130

2129

Supervision Board

Q.S. Calculation (Construction) Index 331

2131

2130

Supervision Board

Q.S. Calculation (Construction) Index 334

2132

2131

Supervision Board

Q.S. Calculation (Construction) Index 380

2133

2132

Supervision Board

Q.S. Calculation (Construction) Index 363

2134

2133

Supervision Board

Q.S. Calculation (Construction) Index 367

2135

2134

Supervision Board

Q.S. Calculation (Construction) Index 370

2136

2135

Supervision Board

Q.S. Calculation (Construction) Index 260

2137

2136

Supervision Board

Q.S. Calculation (Construction) Index 378

2138

2137

Supervision Board

Q.S. Calculation (Construction) Index 210

2139

2138

Supervision Board

Q.S. Calculation (Construction) Index 285

2140

2139

Supervision Board

Q.S. Calculation (Construction) Index 318

2141

2140

Supervision Board

Q.S. Calculation (Construction) Index 265

2142

2141

Supervision Board

Q.S. Calculation (Construction) Index 332

2143

2142

Supervision Board

Q.S. Calculation (Construction) Index 339

2144

2143

Supervision Board

Q.S. Calculation (Construction) Index 353

2145

2144

Supervision Board

Q.S. Calculation (Construction) Index 355

2146

2145

Supervision Board

Submit Key Safe Box for Avsu (Zone Service Unit+Local Alarm Panel) 2147

2146

Supervision Board

Electrical System Training Course

2148

2147

Supervision Board

Q.S. Calculations (Construction) Index 301

2149

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

2148

Supervision Board

Q.S. Calculations (Construction) Index 299

2150

2149

Supervision Board

Q.S. Calculations (Construction) Index 275

2151

2150

Supervision Board

Q.S. Calculations (Construction) Index 379

2152

2151

Supervision Board

Q.S. Calculations (Construction) Index 374

2153

2152

Supervision Board

Q.S. Calculations (Construction) Index 327

2154

2153

Supervision Board

Q.S. Calculations (Construction) Index 347

2155

2154

Supervision Board

Q.S. Calculations (Construction) Index 329

2156

2155

Supervision Board

Asia Cell (Booster Network)

2157

2156

Supervision Board

Over 20 % Quantity Revised of Acrylic Resin Base Paint Works

2158

2157

Supervision Board

Reques for interm payment certificate

2159

2158

Supervision Board

Water Threatment, Incinerator and Medical gas System training

2160

2159

Supervision Board

Payment No:22

2161

2160

Supervision Board

Q.S. Calculations (Construction) Index 371

2162

2161

Supervision Board

Q.S. Calculations (Construction) Index 349

2163

2162

Supervision Board

Q.S. Calculations (Construction) Index 350

2164

2163

Supervision Board

Final Payment

2164

Supervision Board

Submit Key Safe Box For Air,Vacuum,O2

2165

2165

Supervision Board

Elec. System (Queue-matic and Time Attendance)

2166

2166

Supervision Board

Q.S. Calculation Index 307

2167

2167

Supervision Board

Q.S. Calculation Index 358

2168

2168

Supervision Board

2169

2169

Supervision Board

2170

2170

Supervision Board

2171

2171

Supervision Board

2172

2127B

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

2172

Supervision Board

Q.S. Calculation Index 307

2173

2173

Supervision Board

Q.S. Calculation Index 382

2174

2174

Supervision Board

Q.S. Calculation Index 383

2175

2175

Supervision Board

Q.S. Calculation Index 384

2176

2176

Supervision Board

Q.S. Calculation Index 381

2177

2177

Supervision Board

2178

Supervision Board

Implementation Certificate

2179

2179

Supervision Board

Project Experince Certificate

2180

2180

Supervision Board

Epoxy Paint Price Analysis

2181

2181

Supervision Board

Road Asphalt test

2182

2182

Supervision Board

Electrical Generators-running and operating

2183

2183

Supervision Board

Test to Labaratory of Government

2184

2184

Supervision Board

Retest Road Asphalt

2185

2185

Supervision Board

Q.S Calculation index 348

2186

2186

Supervision Board

Q.S Calculation index 368

2187

2187

Supervision Board

Q.S Calculation index 324

2188

2188

Supervision Board

Q.S Calculation index 323

2189

2189

Supervision Board

Q.S Calculation index 250

2190

2190

Supervision Board

Q.S Calculation index 385

2191

2191

Supervision Board

Q.S Calculation index 371

2192

2192

Supervision Board

Q.S Calculation index 325

2193

2193

Supervision Board

Road Handover Letter

2194

2194

Supervision Board

Q.S Calculation index 354

2195

2195

Supervision Board

Q.S Calculation index 357

2196

2178

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

2196

Supervision Board

2197

2197

Supervision Board

2198

2198

Supervision Board

2199

2199

Supervision Board

2200

2200

Supervision Board

2201

2201

Supervision Board

Response of Client About Roadwork

2202

2202

Supervision Board

Q.S. Calculation (Construction) Index 386

2203

2203

Supervision Board

reimbursement of first half 50% retention money

2204

2204

Supervision Board

Waste water treatment out water

2205

2205

Supervision Board

DELAY IN HANDLING OVER AND RELEASE OF RETENTION MONEY

2206

2206

Supervision Board

Submition of bank credit

2207

2207

Supervision Board

Q.S. Calculation (Construction) Index 364

2208

2208

Supervision Board

Q.S. Calculation (Construction) Index 387

2209

2209

Supervision Board

Sengerde

2210

2210

Supervision Board

2211

Supervision Board

2212

Supervision Board

2213

Supervision Board

2214

Supervision Board

2215

Supervision Board

2216

Supervision Board

2217

Supervision Board

2218

Supervision Board

2219

Supervision Board

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

2220

Supervision Board

2221

Supervision Board

2222

Supervision Board

2223

Supervision Board

2224

Supervision Board

2225

Supervision Board

2226

Supervision Board

2227

Supervision Board

2228

Supervision Board

2229

Supervision Board

2230

Supervision Board

2231

Supervision Board

2232

Supervision Board

2233

Supervision Board

2234

Supervision Board

2235

Supervision Board

2236

Supervision Board

2237

Supervision Board

2238

Supervision Board

2239

Supervision Board

2240

Supervision Board

2241

Supervision Board

2242

Supervision Board

2243

Supervision Board

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

2244

Supervision Board

2245

Supervision Board

2246

Supervision Board

2247

Supervision Board

2248

Supervision Board

2249

Supervision Board

2250

Supervision Board

2251

Supervision Board

2252

Supervision Board

2253

Supervision Board

2254

Supervision Board

2255

Supervision Board

2256

Supervision Board

2257

Supervision Board

2258

Supervision Board

2259

Supervision Board

2260

Supervision Board

2261

Supervision Board

2262

Supervision Board

2263

Supervision Board

2264

Supervision Board

2265

Supervision Board

2266

Supervision Board

2267

Supervision Board

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

2268

Supervision Board

2269

Supervision Board

2270

Supervision Board

2271

Supervision Board

2272

Supervision Board

2273

Supervision Board

2274

Supervision Board

2275

Supervision Board

2276

Supervision Board

2277

Supervision Board

2278

Supervision Board

2279

Supervision Board

2280

Supervision Board

2281

Supervision Board

2282

Supervision Board

2283

Supervision Board

2284

Supervision Board

2285

Supervision Board

2286

Supervision Board

2287

Supervision Board

2288

Supervision Board

2289

Supervision Board

2290

Supervision Board

2291

Supervision Board

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

2292

Supervision Board

2293

Supervision Board

2294

Supervision Board

2295

Supervision Board

2296

Supervision Board

2297

Supervision Board

2298

Supervision Board

2299

Supervision Board

2300

Supervision Board

2301

Supervision Board

2302

Supervision Board

2303

Supervision Board

2304

Supervision Board

2305

Supervision Board

2306

Supervision Board

2307

Supervision Board

2308

Supervision Board

2309

Supervision Board

2310

Supervision Board

2311

Supervision Board

2312

Supervision Board

2313

Supervision Board

2314

Supervision Board

2315

Supervision Board

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

2316

Supervision Board

2317

Supervision Board

2318

Supervision Board

2319

Supervision Board

2320

Supervision Board

2321

Supervision Board

2322

Supervision Board

2323

Supervision Board

2324

Supervision Board

2325

Supervision Board

2326

Supervision Board

2327

Supervision Board

2328

Supervision Board

2329

Supervision Board

2330

Supervision Board

2331

Supervision Board

2332

Supervision Board

2333

Supervision Board

2334

Supervision Board

2335

Supervision Board

2336

Supervision Board

2337

Supervision Board

2338

Supervision Board

2339

Supervision Board

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

2340

Supervision Board

2341

Supervision Board

2342

Supervision Board

2343

Supervision Board

2344

Supervision Board

2345

Supervision Board

2346

Supervision Board

2347

Supervision Board

2348

Supervision Board

2349

Supervision Board

2350

Supervision Board

2351

Supervision Board

2352

Supervision Board

2353

Supervision Board

2354

Supervision Board

2355

Supervision Board

2356

Supervision Board

2357

Supervision Board

2358

Supervision Board

2359

Supervision Board

2360

Supervision Board

2361

Supervision Board

2362

Supervision Board

2363

Supervision Board

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

2364

Supervision Board

2365

Supervision Board

2366

Supervision Board

2367

Supervision Board

2368

Supervision Board

2369

Supervision Board

2370

Supervision Board

2371

Supervision Board

2372

Supervision Board

2373

Supervision Board

2374

Supervision Board

2375

Supervision Board

2376

Supervision Board

2377

Supervision Board

2378

Supervision Board

2379

Supervision Board

2380

Supervision Board

2381

Supervision Board

2382

Supervision Board

2383

Supervision Board

2384

Supervision Board

2385

Supervision Board

2386

Supervision Board

2387

Supervision Board

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

2388

Supervision Board

2389

Supervision Board

2390

Supervision Board

2391

Supervision Board

2392

Supervision Board

2393

Supervision Board

2394

Supervision Board

2395

Supervision Board

2396

Supervision Board

2397

Supervision Board

2398

Supervision Board

2399

Supervision Board

2400

Supervision Board

2401

Supervision Board

2402

Supervision Board

2403

Supervision Board

2404

Supervision Board

2405

Supervision Board

2406

Supervision Board

2407

Supervision Board

2408

Supervision Board

2409

Supervision Board

2410

Supervision Board

2411

Supervision Board

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

2412

Supervision Board

2413

Supervision Board

2414

Supervision Board

2415

Supervision Board

2416

Supervision Board

2417

Supervision Board

2418

Supervision Board

2419

Supervision Board

2420

Supervision Board

2421

Supervision Board

2422

Supervision Board

2423

Supervision Board

2424

Supervision Board

2425

Supervision Board

2426

Supervision Board

2427

Supervision Board

2428

Supervision Board

2429

Supervision Board

2430

Supervision Board

2431

Supervision Board

2432

Supervision Board

2433

Supervision Board

2434

Supervision Board

2435

Supervision Board

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

2436

Supervision Board

2437

Supervision Board

2438

Supervision Board

2439

Supervision Board

2440

Supervision Board

2441

Supervision Board

2442

Supervision Board

2443

Supervision Board

2444

Supervision Board

2445

Supervision Board

2446

Supervision Board

2447

Supervision Board

2448

Supervision Board

2449

Supervision Board

2450

Supervision Board

2451

Supervision Board

2452

Supervision Board

2453

Supervision Board

2454

Supervision Board

2455

Supervision Board

2456

Supervision Board

2457

Supervision Board

2458

Supervision Board

2459

Supervision Board

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

2460

Supervision Board

2461

Supervision Board

2462

Supervision Board

2463

Supervision Board

2464

Supervision Board

2465

Supervision Board

2466

Supervision Board

2467
2468
2469
2470
2471
2472
2473
2474
2475
2476
2477
2478
2479
2480
2481
2482
2483

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2484
2485
2486
2487
2488
2489
2490
2491
2492
2493
2494
2495
2496
2497
2498
2499
2500
2501
2502
2503
2504
2505
2506
2507

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2508
2509
2510
2511
2512
2513
2514
2515
2516
2517
2518
2519
2520
2521
2522
2523
2524
2525
2526
2527
2528
2529
2530
2531

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2532
2533
2534
2535
2536
2537
2538
2539
2540
2541
2542
2543
2544
2545
2546
2547
2548
2549
2550
2551
2552
2553
2554
2555

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2556
2557
2558
2559
2560
2561
2562
2563
2564
2565
2566
2567
2568
2569
2570
2571
2572
2573
2574
2575
2576
2577
2578
2579

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2580
2581
2582
2583
2584
2585
2586
2587
2588
2589
2590
2591
2592
2593
2594
2595
2596
2597
2598
2599
2600
2601
2602
2603

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2604
2605
2606
2607
2608
2609
2610
2611
2612
2613
2614
2615
2616
2617
2618
2619
2620
2621
2622
2623
2624
2625
2626
2627

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2628
2629
2630
2631
2632
2633
2634
2635
2636
2637
2638
2639
2640
2641
2642
2643
2644
2645
2646
2647
2648
2649
2650
2651

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2652
2653
2654
2655
2656
2657
2658
2659
2660
2661
2662
2663
2664
2665
2666
2667
2668
2669
2670
2671
2672
2673
2674
2675

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2676
2677
2678
2679
2680
2681
2682
2683
2684
2685
2686
2687
2688
2689
2690
2691
2692
2693
2694
2695
2696
2697
2698
2699

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2700
2701
2702
2703
2704
2705
2706
2707
2708
2709
2710
2711
2712
2713
2714
2715
2716
2717
2718
2719
2720
2721
2722
2723

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2724
2725
2726
2727
2728
2729
2730
2731
2732
2733
2734
2735
2736
2737
2738
2739
2740
2741
2742
2743
2744
2745
2746
2747

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2748
2749
2750
2751
2752
2753
2754
2755
2756
2757
2758
2759
2760
2761
2762
2763
2764
2765
2766
2767
2768
2769
2770
2771

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2772
2773
2774
2775
2776
2777
2778
2779
2780
2781
2782
2783
2784
2785
2786
2787
2788
2789
2790
2791
2792
2793
2794
2795

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2796
2797
2798
2799
2800
2801
2802
2803
2804
2805
2806
2807
2808
2809
2810
2811
2812
2813
2814
2815
2816
2817
2818
2819

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2820
2821
2822
2823
2824
2825
2826
2827
2828
2829
2830
2831
2832
2833
2834
2835
2836
2837
2838
2839
2840
2841
2842
2843

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2844
2845
2846
2847
2848
2849
2850
2851
2852
2853
2854
2855
2856
2857
2858
2859
2860
2861
2862
2863
2864
2865
2866
2867

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2868
2869
2870
2871
2872
2873
2874
2875
2876
2877
2878
2879
2880
2881
2882
2883
2884
2885
2886
2887
2888
2889
2890
2891

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2892
2893
2894
2895
2896
2897
2898
2899
2900
2901
2902
2903
2904
2905
2906
2907
2908
2909
2910
2911
2912
2913
2914
2915

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2916
2917
2918
2919
2920
2921
2922
2923
2924
2925
2926
2927
2928
2929
2930
2931
2932
2933
2934
2935
2936
2937
2938
2939

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2940
2941
2942
2943
2944
2945
2946
2947
2948
2949
2950
2951
2952
2953
2954
2955
2956
2957
2958
2959
2960
2961
2962
2963

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2964
2965
2966
2967
2968
2969
2970
2971
2972
2973
2974
2975
2976
2977
2978
2979
2980
2981
2982
2983
2984
2985
2986
2987

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
2988
2989
2990
2991
2992
2993
2994
2995
2996
2997
2998
2999
3000
3001
3002
3003
3004
3005
3006
3007
3008
3009
3010
3011

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3012
3013
3014
3015
3016
3017
3018
3019
3020
3021
3022
3023
3024
3025
3026
3027
3028
3029
3030
3031
3032
3033
3034
3035

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3036
3037
3038
3039
3040
3041
3042
3043
3044
3045
3046
3047
3048
3049
3050
3051
3052
3053
3054
3055
3056
3057
3058
3059

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3060
3061
3062
3063
3064
3065
3066
3067
3068
3069
3070
3071
3072
3073
3074
3075
3076
3077
3078
3079
3080
3081
3082
3083

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3084
3085
3086
3087
3088
3089
3090
3091
3092
3093
3094
3095
3096
3097
3098
3099
3100
3101
3102
3103
3104
3105
3106
3107

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3108
3109
3110
3111
3112
3113
3114
3115
3116
3117
3118
3119
3120
3121
3122
3123
3124
3125
3126
3127
3128
3129
3130
3131

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3132
3133
3134
3135
3136
3137
3138
3139
3140
3141
3142
3143
3144
3145
3146
3147
3148
3149
3150
3151
3152
3153
3154
3155

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3156
3157
3158
3159
3160
3161
3162
3163
3164
3165
3166
3167
3168
3169
3170
3171
3172
3173
3174
3175
3176
3177
3178
3179

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3180
3181
3182
3183
3184
3185
3186
3187
3188
3189
3190
3191
3192
3193
3194
3195
3196
3197
3198
3199
3200
3201
3202
3203

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3204
3205
3206
3207
3208
3209
3210
3211
3212
3213
3214
3215
3216
3217
3218
3219
3220
3221
3222
3223
3224
3225
3226
3227

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3228
3229
3230
3231
3232
3233
3234
3235
3236
3237
3238
3239
3240
3241
3242
3243
3244
3245
3246
3247
3248
3249
3250
3251

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3252
3253
3254
3255
3256
3257
3258
3259
3260
3261
3262
3263
3264
3265
3266
3267
3268
3269
3270
3271
3272
3273
3274
3275

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3276
3277
3278
3279
3280
3281
3282
3283
3284
3285
3286
3287
3288
3289
3290
3291
3292
3293
3294
3295
3296
3297
3298
3299

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3300
3301
3302
3303
3304
3305
3306
3307
3308
3309
3310
3311
3312
3313
3314
3315
3316
3317
3318
3319
3320
3321
3322
3323

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3324
3325
3326
3327
3328
3329
3330
3331
3332
3333
3334
3335
3336
3337
3338
3339
3340
3341
3342
3343
3344
3345
3346
3347

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3348
3349
3350
3351
3352
3353
3354
3355
3356
3357
3358
3359
3360
3361
3362
3363
3364
3365
3366
3367
3368
3369
3370
3371

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3372
3373
3374
3375
3376
3377
3378
3379
3380
3381
3382
3383
3384
3385
3386
3387
3388
3389
3390
3391
3392
3393
3394
3395

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3396
3397
3398
3399
3400
3401
3402
3403
3404
3405
3406
3407
3408
3409
3410
3411
3412
3413
3414
3415
3416
3417
3418
3419

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3420
3421
3422
3423
3424
3425
3426
3427
3428
3429
3430
3431
3432
3433
3434
3435
3436
3437
3438
3439
3440
3441
3442
3443

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3444
3445
3446
3447
3448
3449
3450
3451
3452
3453
3454
3455
3456
3457
3458
3459
3460
3461
3462
3463
3464
3465
3466
3467

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3468
3469
3470
3471
3472
3473
3474
3475
3476
3477
3478
3479
3480
3481
3482
3483
3484
3485
3486
3487
3488
3489
3490
3491

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3492
3493
3494
3495
3496
3497
3498
3499
3500
3501
3502
3503
3504
3505
3506
3507
3508
3509
3510
3511
3512
3513
3514
3515

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3516
3517
3518
3519
3520
3521
3522
3523
3524
3525
3526
3527
3528
3529
3530
3531
3532
3533
3534
3535
3536
3537
3538
3539

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3540
3541
3542
3543
3544
3545
3546
3547
3548
3549
3550
3551
3552
3553
3554
3555
3556
3557
3558
3559
3560
3561
3562
3563

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3564
3565
3566
3567
3568
3569
3570
3571
3572
3573
3574
3575
3576
3577
3578
3579
3580
3581
3582
3583
3584
3585
3586
3587

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3588
3589
3590
3591
3592
3593
3594
3595
3596
3597
3598
3599
3600
3601
3602
3603
3604
3605
3606
3607
3608
3609
3610
3611

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3612
3613
3614
3615
3616
3617
3618
3619
3620
3621
3622
3623
3624
3625
3626
3627
3628
3629
3630
3631
3632
3633
3634
3635

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3636
3637
3638
3639
3640
3641
3642
3643
3644
3645
3646
3647
3648
3649
3650
3651
3652
3653
3654
3655
3656
3657
3658
3659

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3660
3661
3662
3663
3664
3665
3666
3667
3668
3669
3670
3671
3672
3673
3674
3675
3676
3677
3678
3679
3680
3681
3682
3683

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3684
3685
3686
3687
3688
3689
3690
3691
3692
3693
3694
3695
3696
3697
3698
3699
3700
3701
3702
3703
3704
3705
3706
3707

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3708
3709
3710
3711
3712
3713
3714
3715
3716
3717
3718
3719
3720
3721
3722
3723
3724
3725
3726
3727
3728
3729
3730
3731

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3732
3733
3734
3735
3736
3737
3738
3739
3740
3741
3742
3743
3744
3745
3746
3747
3748
3749
3750
3751
3752
3753
3754
3755

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3756
3757
3758
3759
3760
3761
3762
3763
3764
3765
3766
3767
3768
3769
3770
3771
3772
3773
3774
3775
3776
3777
3778
3779

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3780
3781
3782
3783
3784
3785
3786
3787
3788
3789
3790
3791
3792
3793
3794
3795
3796
3797
3798
3799
3800
3801
3802
3803

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3804
3805
3806
3807
3808
3809
3810
3811
3812
3813
3814
3815
3816
3817
3818
3819
3820
3821
3822
3823
3824
3825
3826
3827

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3828
3829
3830
3831
3832
3833
3834
3835
3836
3837
3838
3839
3840
3841
3842
3843
3844
3845
3846
3847
3848
3849
3850
3851

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3852
3853
3854
3855
3856
3857
3858
3859
3860
3861
3862
3863
3864
3865
3866
3867
3868
3869
3870
3871
3872
3873
3874
3875

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3876
3877
3878
3879
3880
3881
3882
3883
3884
3885
3886
3887
3888
3889
3890
3891
3892
3893
3894
3895
3896
3897
3898
3899

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3900
3901
3902
3903
3904
3905
3906
3907
3908
3909
3910
3911
3912
3913
3914
3915
3916
3917
3918
3919
3920
3921
3922
3923

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3924
3925
3926
3927
3928
3929
3930
3931
3932
3933
3934
3935
3936
3937
3938
3939
3940
3941
3942
3943
3944
3945
3946
3947

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3948
3949
3950
3951
3952
3953
3954
3955
3956
3957
3958
3959
3960
3961
3962
3963
3964
3965
3966
3967
3968
3969
3970
3971

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3972
3973
3974
3975
3976
3977
3978
3979
3980
3981
3982
3983
3984
3985
3986
3987
3988
3989
3990
3991
3992
3993
3994
3995

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
3996
3997
3998
3999
4000
4001
4002
4003
4004
4005
4006
4007
4008
4009
4010
4011
4012
4013
4014
4015
4016
4017
4018
4019

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4020
4021
4022
4023
4024
4025
4026
4027
4028
4029
4030
4031
4032
4033
4034
4035
4036
4037
4038
4039
4040
4041
4042
4043

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4044
4045
4046
4047
4048
4049
4050
4051
4052
4053
4054
4055
4056
4057
4058
4059
4060
4061
4062
4063
4064
4065
4066
4067

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4068
4069
4070
4071
4072
4073
4074
4075
4076
4077
4078
4079
4080
4081
4082
4083
4084
4085
4086
4087
4088
4089
4090
4091

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4092
4093
4094
4095
4096
4097
4098
4099
4100
4101
4102
4103
4104
4105
4106
4107
4108
4109
4110
4111
4112
4113
4114
4115

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4116
4117
4118
4119
4120
4121
4122
4123
4124
4125
4126
4127
4128
4129
4130
4131
4132
4133
4134
4135
4136
4137
4138
4139

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4140
4141
4142
4143
4144
4145
4146
4147
4148
4149
4150
4151
4152
4153
4154
4155
4156
4157
4158
4159
4160
4161
4162
4163

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4164
4165
4166
4167
4168
4169
4170
4171
4172
4173
4174
4175
4176
4177
4178
4179
4180
4181
4182
4183
4184
4185
4186
4187

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4188
4189
4190
4191
4192
4193
4194
4195
4196
4197
4198
4199
4200
4201
4202
4203
4204
4205
4206
4207
4208
4209
4210
4211

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4212
4213
4214
4215
4216
4217
4218
4219
4220
4221
4222
4223
4224
4225
4226
4227
4228
4229
4230
4231
4232
4233
4234
4235

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4236
4237
4238
4239
4240
4241
4242
4243
4244
4245
4246
4247
4248
4249
4250
4251
4252
4253
4254
4255
4256
4257
4258
4259

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4260
4261
4262
4263
4264
4265
4266
4267
4268
4269
4270
4271
4272
4273
4274
4275
4276
4277
4278
4279
4280
4281
4282
4283

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4284
4285
4286
4287
4288
4289
4290
4291
4292
4293
4294
4295
4296
4297
4298
4299
4300
4301
4302
4303
4304
4305
4306
4307

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4308
4309
4310
4311
4312
4313
4314
4315
4316
4317
4318
4319
4320
4321
4322
4323
4324
4325
4326
4327
4328
4329
4330
4331

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4332
4333
4334
4335
4336
4337
4338
4339
4340
4341
4342
4343
4344
4345
4346
4347
4348
4349
4350
4351
4352
4353
4354
4355

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4356
4357
4358
4359
4360
4361
4362
4363
4364
4365
4366
4367
4368
4369
4370
4371
4372
4373
4374
4375
4376
4377
4378
4379

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4380
4381
4382
4383
4384
4385
4386
4387
4388
4389
4390
4391
4392
4393
4394
4395
4396
4397
4398
4399
4400
4401
4402
4403

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4404
4405
4406
4407
4408
4409
4410
4411
4412
4413
4414
4415
4416
4417
4418
4419
4420
4421
4422
4423
4424
4425
4426
4427

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4428
4429
4430
4431
4432
4433
4434
4435
4436
4437
4438
4439
4440
4441
4442
4443
4444
4445
4446
4447
4448
4449
4450
4451

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4452
4453
4454
4455
4456
4457
4458
4459
4460
4461
4462
4463
4464
4465
4466
4467
4468
4469
4470
4471
4472
4473
4474
4475

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4476
4477
4478
4479
4480
4481
4482
4483
4484
4485
4486
4487
4488
4489
4490
4491
4492
4493
4494
4495
4496
4497
4498
4499

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4500
4501
4502
4503
4504
4505
4506
4507
4508
4509
4510
4511
4512
4513
4514
4515
4516
4517
4518
4519
4520
4521
4522
4523

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4524
4525
4526
4527
4528
4529
4530
4531
4532
4533
4534
4535
4536
4537
4538
4539
4540
4541
4542
4543
4544
4545
4546
4547

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4548
4549
4550
4551
4552
4553
4554
4555
4556
4557
4558
4559
4560
4561
4562
4563
4564
4565
4566
4567
4568
4569
4570
4571

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4572
4573
4574
4575
4576
4577
4578
4579
4580
4581
4582
4583
4584
4585
4586
4587
4588
4589
4590
4591
4592
4593
4594
4595

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4596
4597
4598
4599
4600
4601
4602
4603
4604
4605
4606
4607
4608
4609
4610
4611
4612
4613
4614
4615
4616
4617
4618
4619

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4620
4621
4622
4623
4624
4625
4626
4627
4628
4629
4630
4631
4632
4633
4634
4635
4636
4637
4638
4639
4640
4641
4642
4643

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4644
4645
4646
4647
4648
4649
4650
4651
4652
4653
4654
4655
4656
4657
4658
4659
4660
4661
4662
4663
4664
4665
4666
4667

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4668
4669
4670
4671
4672
4673
4674
4675
4676
4677
4678
4679
4680
4681
4682
4683
4684
4685
4686
4687
4688
4689
4690
4691

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4692
4693
4694
4695
4696
4697
4698
4699
4700
4701
4702
4703
4704
4705
4706
4707
4708
4709
4710
4711
4712
4713
4714
4715

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
4716
4717
4718
4719
4720
4721
4722
4723
4724
4725
4726
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
1091
1092
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
1132
1133
1134
1135
1136
1137
1138

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
1163
1164
1165
1166
1167
1168
1169
1170
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

400 BEDS HOSPITAL PROJECT IN SULAIMANI 2011

GALALA

DA YAPI

General Contracting & Tras

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.

Sent to

Subject \ Description

Ref No.

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

1/2/2011
3/2/2011
1/3/2011
19/3/2011

136

4/28/2011

124

4/25/2011

79

4/6/2011

9/4/2011

99

4/12/2011

9/4/2011

102

4/13/2011

10/4/2011

123

4/25/2011

10/4/2011

141

5/2/2011

10/4/2011

104

4/13/2011

11/4/2011

163

5/4/2011

31/3/2011
3/4/2011
3/4/2011
3/4/2011
4/4/2011
4/4/2011
4/4/2011
5/4/2011

47 3/26/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

11/4/2011

92

4/12/2011

11/4/2011

101

4/20/2011

14/4/2011

120

4/21/2011

118 4/20/2011

14/4/2011

197

5/17/2011

118 4/20/2011

14/4/2011

175

5/10/2011

16/4/2011

111

4/16/2011

16/4/2011

208

5/21/2011

16/4/2011

116

4/18/2011

115

4/18/2011

207

5/21/2011

128

4/25/2011

12/4/2011

16/4/2011
17/4/2011
17/4/2011
17/4/2011
17/4/2011
18/4/2011
18/4/2011
19/4/2011
19/4/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

23/4/2011

262

6/2/2011

23/4/2011

127

4/25/2011

23/4/2011

164

5/7/2011

26/4/2011

134

4/27/2011

26/4/2011

147

5/3/2011

27/4/2011

192

5/16/2011

30/4/2011

142

5/2/2011

30/4/2011

140

5/2/2011

30/4/2011

153

5/4/2011

30/4/2011

167

5/8/2011

1/5/2011

154

5/4/2011

1/5/2011

155

5/4/2011

2/5/2011

216

5/24/2011

2/5/2011

162

5/4/2011

172

5/9/2011

161

5/4/2011

5/7/2011

184

5/12/2011

5/7/2011

235

5/30/2011

206

5/21/2011

30/4/2011

2/5/2011
2/5/2011
3/5/2011

5/9/2011
5/9/2011
5/10/2011
5/10/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

5/10/2011
5/11/2011

202

5/17/2011

5/14/2011

214

5/23/2011

5/14/2011

195

5/17/2011

5/16/2011

398

7/3/2011

5/17/2011

203

5/18/2011

19/5/2011

239

5/30/2011

21/5/2011

248

6/1/2011

22/5/2011

222

5/26/2011

22/5/2011

261

6/2/2011

223

5/26/2011

28/5/2011

233

5/30/2011

29/5/2011

249

6/1/2011

5/14/2011
5/14/2011
5/11/2011

5/15/2011
5/16/2011
5/16/2011

5/17/2011

23/5/2011
23/5/2011
25/5/2011

29/5/2011
29/5/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

29/5/2011
29/5/2011

247

6/1/2011

30/5/2011

243

5/31/2011

30/5/2011

258

6/2/2011

30/5/2011

259

6/2/2011

31/5/2011

252

6/1/2011

4/6/2011

270

6/5/2011

4/6/2011

279

6/7/2011

4/6/2011

284

6/7/2011

5/6/2011

319

6/18/2011

5/6/2011

280

6/7/2011

5/6/2011

278

6/7/2011

5/6/2011

281

6/7/2011

7/6/2011

267

6/12/2011

7/6/2011

514

7/28/2011

8/6/2011

300

6/13/2011

9/6/2011

308

6/15/2011

9/6/2011

373

6/30/2011

12/6/2011

307

6/15/2011

29/5/2011

1/6/2011
1/6/2011

5/6/2011

8/6/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

12/6/2011
13/6/2011
NO LETTER
13/6/2011

303

6/14/2011

15/6/2011

341

6/22/2011

15/6/2011

315

6/16/2011

16/4/2011

367

6/28/2011

16/4/2011

377

7/2/2011

15/6/2011

333

6/21/2011

16/6/2011

728

9/12/2011

16/6/2011

365

6/28/2011

18/6/2011

728

9/12/2011

18/6/2011

340

6/22/2011

19/6/2011

366

6/28/2011

19/6/2011

347

6/25/2011

19/6/2011

402

7/4/2011

338

6/22/2011

14/6/2011

15/6/2011

16/6/2011

19/6/2011
19/6/2011
19/6/2011

21/6/2011
27/6/2011

General Contracting & Trasportation Co.

Date sent
22/6/2011

REPLY
LETTER

DATE

343

6/23/2011

376

7/2/2011

379

7/2/2011

27/6/2011

375

6/30/2011

28/6/2011

458

7/19/2011

28/6/2011

389

7/2/2011

30/6/2011

446

7/18/2011

2/7/2011

413

7/6/2011

4/6/2011

471

7/21/2011

4/7/2011

550

8/3/2011

4/7/2011

418

7/9/2011

23/6/2011
23/6/2011
23/6/2011
25/6/2011
25/6/2011
26/6/2011
27/6/2011
27/6/2011
27/6/2011

28/6/2011

3/7/2011

4/7/2011
4/7/2011
4/7/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

5/7/2011
5/7/2011
6/7/2011
6/7/2011

416

7/7/2011

9/7/2011

470

7/21/2011

9/7/2011

423

7/10/2011

9/7/2011

454

7/19/2011

9/7/2011

428

7/11/2011

10/7/2011

452

7/19/2011

472

7/21/2011

10/7/2011

453

7/19/2011

10/7/2011

429

7/11/2011

506

7/26/2011

450

7/19/2011

507

7/26/2011

9/7/2011
10/7/2011

9/7/2011

10/7/2011
10/7/2011
13/7/2011
13/7/2011
13/7/2011
13/7/2011
14/7/2011
14/7/2011
16/7/2011
16/7/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

16/7/2011

489

7/23/2011

16/7/2011

475

7/21/2011

16/7/2011

494

7/27/2011

442

7/18/2011

457

7/19/2011

17/7/2011

518

7/28/2011

19/7/2011

473

7/21/2011 APPROVED

20/7/2011

469

7/21/2011

20/7/2011

474

7/21/2011

498

7/26/2011

16/6/2011
17/7/2011
17/7/2011
17/7/2011
17/7/2011
17/7/2011

19/7/2011

20/7/2011
21/7/2011
21/7/2011
21/7/2011

695

21/7/2011

496

7/26/2011

23/7/2011

513

7/27/2011

23/7/2011

540

8/2/2011

23/7/2011

599

23/7/2011

539

23/7/2011

9/5/2011 APPROVED

8/15/2011 APPROVED
8/2/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

23/7/2011

575

23/7/2011

563

8/6/2011

24/7/2011

554

8/3/2011

500

7/26/2011

8/10/2011 REJECTED

24/7/2011
24/7/2011
25/7/2011
25/7/2011

529

8/1/2011 approved

25/7/2011
25/7/2011

505

7/26/2011

25/7/2011

547

8/3/2011

25/7/2011

511

7/27/2011

25/7/2011

512

7/27/2011

28/7/2011

560

8/6/2011

26/7/2011

686

9/4/2011

28/7/2011

561

8/6/2011

28/7/2011

557

8/4/2011

28/7/2011

545

8/3/2011

28/7/2011

562

8/6/2011

28/7/2011

550

8/3/2011

25/7/2011
25/7/2011

26/7/2011

27/7/2011
27/7/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

28/7/2011
30/7/2011

549

8/3/2011

31/7/2011

528

8/1/2011

31/7/2011

553

8/3/2011

569

8/8/2011

579

8/10/2011

600

8/15/2011

8/3/2011

709

9/8/2011

8/3/2011

567

8/8/2011

8/5/2011

564

8/6/2011

8/6/2011

696

9/5/2011

8/6/2011

631

8/20/2011

8/6/2011

584

8/11/2011

8/6/2011

708

8/7/2011

8/7/2011

582

8/10/2011

8/7/2011

615

8/17/2011

31/7/2011
31/7/2011
31/7/2011
8/1/2011
8/1/2011
8/2/2011
8/2/2011
8/2/2011
8/2/2011
8/2/2011

8/9/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

8/9/2011

611

8/17/2011

8/9/2011

588

8/13/2011

8/9/2011

699

9/7/2011

8/9/2011

624

8/18/2011

8/9/2011

692

9/4/2011 APPROVED

8/9/2011

625

8/18/2011 APPROVED

8/10/2011

614

8/17/2011

8/10/2011

616

8/17/2011

605

8/16/2011

14/8/2011

613

8/17/2011

14/8/2011

607

8/16/2011 APPROVED

14/8/2011

661

8/24/2011

15/8/2011

708

9/7/2011

15/8/2011

621

8/18/2011

16/8/2011

672

8/27/2011

16/8/2011

698

9/7/2011

16/8/2011

698

9/7/2011

16/8/2011

622

8/18/2011

13/8/2011
13/8/2011

13/8/2011

15/8/2011
15/8/2011

16/8/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

17/8/2011

668

17/8/2011

690

17/8/2011

670

REJECTED- SILICON
8/27/2011 TYPE

17/8/2011

643

8/22/2011

17/8/2011

635

8/20/2011

669

8/27/2011 REJECTED

18/8/2011

636

8/21/2011

20/8/2011

634

8/20/2011

21/8/2011

644

8/22/2011

21/8/2011

660

8/24/2011

22/8/2011

671

8/27/2011

22/8/2011

652

8/23/2011

23/8/2011

653

8/23/2011

24/8/2011

707

9/7/2011 REJECTED

25/8/2011

679

8/29/2011 REJECTED

8/27/2011 REJECTED
9/4/2011

18/8/2011
18/8/2011
18/8/2011

21/8/2011

27/8/2011
9/4/2011

711

9/8/2011

9/6/2011

723

9/12/2011

9/6/2011

734

9/12/2011

9/6/2011

733

9/12/2011

9/6/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

9/6/2011
9/7/2011

767

9/22/2011

9/7/2011

720

9/11/2011

9/8/2011

747

9/17/2011

748

9/17/2011

9/11/2011

739

9/13/2011 APPROVED

9/11/2011

732

9/12/2011

9/12/2011

765

9/21/2011 APPROVED

741

9/17/2011

9/14/2011

781

9/26/2011

9/14/2011

758

9/20/2011 APPROVED

9/15/2011

923

### APPROVED

9/15/2011

766

9/21/2011 APPROVED

9/17/2011

745

9/17/2011

762

9/20/2011

830

10/4/2011 APPROVED

9/10/2011
9/10/2011
9/10/2011

9/13/2011

9/14/2011
9/14/2011

9/15/2011
9/15/2011
9/17/2011
9/17/2011
9/17/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

9/17/2011

803

10/1/2011

9/17/2011

759

9/20/2011 APPROVED

9/17/2011

802

10/1/2011 REJECTED

794

10/1/2011

800

10/1/2011

804

10/1/2011

9/25/2011

801

10/1/2011

9/25/2011

808

10/1/2011

9/25/2011

886

9/26/2011

785

### TOILET WALL


(CONC.BLOCK
WALL THICK 10cm
9/27/2011 AND 1.2 m HIGHT)

9/26/2011

817

10/2/2011 APPROVED

9/26/2011

832

10/4/2011 APPROVED

9/17/2011
9/17/2011

9/18/2011
9/19/2011
9/21/2011
9/21/2011
9/22/2011
9/24/2011
9/24/2011
9/24/2011
9/25/2011
9/25/2011
9/24/2011
9/25/2011

General Contracting & Trasportation Co.

Date sent
9/26/2011

REPLY
LETTER

831

DATE

10/4/2011

9/26/2011
9/26/2011
9/26/2011
9/27/2011
9/27/2011

899

APPROVED### MATERIAL

9/27/2011

862

elektrik szleme
### iptali

9/28/2011

849

### APPROVED

9/28/2011

823

10/3/2011

9/28/2011

863

###

10/1/2011

881

###

10/1/2011

895

###

10/1/2011

1012

10/1/2011

889

9/27/2011

9/29/2011

APPROVED

APPROVEDASPEN
### 60X60
###

10/1/2011
10/1/2011
10/1/2011
10/2/2011

831

10/4/2011 REJECTED

10/2/2011

838

10/6/2011

10/2/2011

824

10/3/2011 APPROVED

10/2/2011

890

10/3/2011

###

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

10/3/2011

913

10/3/2011

889

### APPROVED-MARKA
GRPAPPROVED,CORRU
### GATED REJECTED

10/4/2011

882

###

10/4/2011

891

### Not Accepted

10/4/2011

892

###

10/4/2011

949

### RESUBMT

10/4/2011

922

###

10/4/2011

868

### REJECTED

10/4/2011

851

###

10/4/2011

866

###

921

### rejected

852

###

898

###

10/4/2011
10/4/2011

APPROVEDMarka SKM

10/4/2011

10/5/2011
10/5/2011
10/5/2011
10/6/2011
10/6/2011
10/6/2011
10/8/2011
10/8/2011
10/8/2011
10/8/2011
10/9/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

10/9/2011
10/9/2011

943

### REJECTED

10/9/2011

905

### APPROVED

10/9/2011

884

### RESUBMIT

945

### RESUBMT

10/10/2011

967

### APPROVED

10/10/2011

911

###

982

11/2/2011

10/11/2011

900

###

10/12/2011

942

### APPROVED IEC

10/12/2011

922

### APPROVED

10/13/2011

875

### APPROVED

10/13/2011

971

###

944

### marka onayland

912

###

10/9/2011
10/9/2011
10/9/2011

10/11/2011
10/11/2011
10/11/2011
10/11/2011
10/11/2011

APPROVED

10/15/2011
10/15/2011
10/15/2011
10/15/2011
10/15/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

10/15/2011

902

###

10/15/2011

906

###

10/16/2011

883

### APPROVED

10/16/2011

920

### APPROVED

10/16/2011

921

### REJECTED

10/18/2011

940

###

10/18/2011

926

###

10/19/2011

932

###

10/20/2011

991

###

10/16/2011
10/17/2011
NO LETTER
10/18/2011

10/18/2011

REJECTED

10/20/2011
10/20/2011

1018

### REJECTED

10/20/2011
10/20/2011

968

###

APPROVED

10/20/2011

1047

###

APPROVED

10/22/2011

966

### APPROVED

10/22/2011

989

###

969

### REJECTED

APPROVED

10/22/2011
10/22/2011

General Contracting & Trasportation Co.

Date sent
10/22/2011

REPLY
LETTER

DATE

970

### APPROVED

10/22/2011

990

###

REJECTED

10/22/2011

987

###

APPROVED

10/23/2011

933

###

10/24/2011

951

###

10/24/2011

973

10/22/2011

10/22/2011
10/22/2011
10/23/2011

11/1/2011 APPROVED

10/24/2011
10/24/2011

988

10/25/2011

985

11/3/2012 APPRPOVED

10/25/2011

975

11/1/2011 APPRPOVED

10/25/2011

974

11/1/2011 APPRPOVED

###

10/25/2011
10/26/2011

1021

### resubmit

10/26/2011
10/27/2011

950

10/27/2011

1035

### resubmit

10/29/2011

1034

###

### REJECTED

10/29/2011
10/29/2011
10/29/2011

1087

12/8/2011 APPROVED

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

10/29/2011

1026

10/29/2011

984

10/29/2011

1004

### RESUBMT

10/30/2011

1042

###

10/30/2011

1052

###

10/30/2011

1043

###

10/30/2011

1025

### material Approved

10/31/2011

977

###
11/2/2011 APPROVED

11/1/2011 %25 discount

11/1/2011
11/1/2011
11/2/2011

1022

###

11/3/2011

1027

###

11/13/2011

1024

### resubmit

11/13/2011
11/13/2011
11/13/2011
11/14/2011
11/14/2011

1087

11/14/2011

1023

###

11/15/2011

1005

###

11/15/2011

1038

###

1141

### APPROVED

12/8/2011 APPROVED

11/15/2011
11/17/2011
11/17/2011

General Contracting & Trasportation Co.

Date sent
11/17/2011

REPLY
LETTER

1085

DATE

12/8/2011 REJECTED

11/17/2011
11/23/2011

1036

### APPROVED

11/23/2011

1037

### APPROVED

1087

12/8/2011 APPROVED

11/24/2011
11/24/2011
11/24/2011
11/24/2011
11/24/2011
11/24/2011
11/24/2011
11/24/2011
11/24/2011

1046

###

11/27/2011

1142

### asma tavan

11/27/2011

1070

12/6/2011 APPROVED

11/28/2011

1075

12/6/2011 APPROVED

11/26/2011

11/28/2011
11/28/2011

1103

11/28/2011

1072

12/6/2011 APPROVED

1107

### APPROVED

###

11/28/2011
11/28/2011
11/28/2011
11/28/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

11/28/2011
11/29/2011
11/30/2011

1082

11/30/2011

1106

11/30/2011

1083

12/8/2011 APPROVED

11/30/2011

1084

12/8/2011 APPROVED

12/4/2011

135

2/2/2012 APPROVED

12/4/2011

1079

12/8/2011 APPROVED
###

12/3/2011
12/3/2011

12/7/2011

12/4/2011
12/4/2011
12/5/2011

1143

### APPROVED

12/5/2011

1116

### approved

12/8/2011

1171

### Approved

12/8/2011

123

1/31/2012

12/8/2011

1093

###

12/10/2011

1140

### APPROVED

12/11/2011

1108

###

12/6/2011
12/7/2011
12/11/2011

12/11/2011
12/11/2011

1/3/2012 APPROVED

General Contracting & Trasportation Co.

Date sent
12/11/2011

REPLY
LETTER

138

DATE

2/2/2012

12/12/2011
12/12/2011
12/12/2011

1144

### APROVED

12/14/2011

1168

### APPROVED

12/17/2011

1147

###

12/18/2011

1144

### APROVED

12/18/2011

1130

###

12/18/2011

1/3/2012

12/18/2011

1148

###

12/18/2011

1152

###

12/12/2011
12/13/2011
12/14/2011

12/18/2011
12/18/2011

94

12/18/2011

1168

12/19/2011

23

1/29/2012 APPROVED-KONE
### APPROVED
1/8/2012

12/19/2011
12/20/2011

1168

### APPROVED

12/20/2011

1135

###

12/21/2011

1153 27.12.20120APPROVED

12/22/2011

1169

12/24/2011

11

###
1/5/2012 APPROVED

General Contracting & Trasportation Co.

Date sent
12/24/2011

12/24/2011

REPLY
LETTER

DATE

1169

###

1169

hakedi dneminde
### yazsz verilmiti.

12/25/2011

10

12/25/2011

1169

###

12/25/2011

95

1/29/2012

12/25/2011

1154

###

12/26/2011

1155

###

12/26/2011

1169

###

12/26/2011

1170

###

12/26/2011

1/3/2012

12/27/2011

1/2/2012 APPROVED

12/27/2011

1/2/2012

12/27/2011

1172

### APPROVED

12/28/2011

22

1/8/2012 APPROVED

12/28/2011

25

1/8/2012 APPROVED

12/28/2011

24

1/8/2012 APPROVED

12/28/2011

1/2/2012 APPROVED

12/29/2011

10

1/5/2012

12/31/2011

14

1/7/2012 APPROVED

1/2/2012

14

1/7/2012 APPROVED

1/5/2012 APPROVED

12/25/2011

12/26/2011

12/27/2011

12/28/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

1/2/2012
1/2/2012

11

1/5/2012

1/2/2012

14

1/7/2012 APPROVED

1/2/2012

28

1/8/2012 APPROVED

1/2/2012

11

1/5/2012

1/2/2012

21

1/8/2012 APPROVED

1/2/2012

14

1/7/2012 APPROVED

1/4/2012

42

1/14/2012 APPROVED

1/5/2012

98

1/29/2012 APPROVED

1/5/2012

37

1/10/2012 APPROVED

1/5/2012

42

1/14/2012 APPROVED

1/5/2012

149

2/5/2012 APPROVED

1/7/2012

101

1/7/2012

waiting

1/3/2012
1/3/2012
1/3/2012
1/3/2012
1/4/2012
1/4/2012
1/4/2012

1/29/2012

1/7/2012

42

1/14/2012 APPROVED

1/7/2012

43

1/14/2012 APPROVED

1/7/2012

waiting

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

1/7/2012

waiting

1/7/2012

waiting

DATE

1/8/2012

38

1/11/2012

1/8/2012

127

2/1/2012

1/8/2012

41

1/14/2012 APPROVED

1/8/2012

41

1/14/2012 APPROVED

1/8/2012

62

1/16/2012 APPROVED

1/8/2012

40

1/14/2012

83

1/24/2012 APPROVED

1/10/2012

46

1/14/2012

1/10/2012

65

1/16/2012

1/12/2012

79

1/24/2012

1/12/2012

83

1/24/2012 APPROVED

1/12/2012

66

1/16/2012 APPROVED

1/12/2012

83

1/24/2012 APPROVED

1/14/2011

82

1/24/2012 155 -07.02.2012

1/14/2011

64

1/16/2012 APPROVED

1/15/2011

132

2/2/2012 APPROVED

malzeme listesi ingilizce istendi sonra


tekrar yaplarak gnderildi

1/9/2012
1/9/2012
1/10/2012

1/12/2012

1/12/2012

1/14/2011
1/14/2011

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

1/15/2011
1/15/2011

142

2/2/2012
APPROVED
-GREENHECK
1/29/2012 BRAND

1/15/2011

97

1/15/2011

164

1/15/2011

104

1/29/2012 APPROVED

1/15/2011

105

1/29/2012

1/16/2011

99

1/29/2012

1/17/2011

76

1/24/2012 APPROVED

2/9/2012 rejected

1/17/2011
1/17/2011

156

1/17/2011

102

1/29/2012 APPROVED

1/17/2011

120

1/31/2012

1/21/2012

89

1/28/2012

1/21/2012

146

2/4/2012 Resubmit

1/21/2012

157

2/7/2012 APPROVED

1/22/2012

147

2/4/2012 APPROVED

1/23/2012

93

2/7/2012

1/28/2012

1/23/2012
1/24/2012

137

2/2/2012 APPROVED

1/24/2012

136

2/2/2012 APPROVED

1/24/2012

87

1/28/2012 APPROVED

1/25/2012

147

2/2/2012 APPROVED

1/24/2012
1/24/2012

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

1/26/2012
1/28/2012
1/28/2012
1/28/2012

121

1/31/2012

122

1/31/2012

155

2/7/2012

1/30/2012

119

1/31/2012

1/31/2012

163

2/9/2012

1/31/2012

129

2/2/2012

1/31/2012

130

They both
2/2/2012 approved

1/28/2012
1/28/2012
1/29/2012
1/31/2012
1/29/2012
1/30/2012
1/30/2012
1/30/2012
1/30/2012
1/30/2012

1/31/2012

2/1/2012
2/2/2012
2/4/2012
2/4/2012
2/4/2012

February,
2012. Start

General Contracting & Trasportation Co.

Date sent
2/4/2012
2/4/2012
2/4/2012
2/4/2012
2/4/2012
2/4/2012
2/4/2012
2/4/2012
2/4/2012
2/4/2012
2/4/2012
2/4/2012
2/6/2012
2/4/2012
2/12/2012
2/4/2012
2/12/2012
2/4/2012
2/12/2012
2/4/2012
2/12/2012
2/4/2012
2/4/2012
2/4/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
2/5/2012
2/5/2012
2/6/2012
2/6/2012
2/6/2012
2/7/2012
2/7/2012
No LETTER
2/7/2012
2/7/2012
2/7/2012
2/8/2012
2/8/2012
2/8/2012
2/8/2012
2/8/2012
2/9/2012
2/11/2012
2/11/2012
2/11/2012
2/11/2012
2/11/2012
2/13/2012
2/13/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
2/13/2012
2/15/2012
2/15/2012
2/15/2012
2/16/2012
2/16/2012
2/18/2012
2/18/2012
2/19/2012
2/19/2012
2/19/2012
2/19/2012
2/19/2012
2/20/2012
2/20/2012
2/20/2012
2/20/2012
2/20/2012
2/21/2012
2/22/2012
2/22/2012
2/23/2012
2/23/2012
2/23/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

2/23/2012
2/25/2012
2/25/2012
2/26/2012
2/26/2012
2/26/2012
2/26/2012
2/26/2012
2/26/2012
2/27/2012
2/27/2012
2/27/2012
2/28/2012
2/28/2012
2/29/2012
1/3/2012
1/3/2012
1/3/2012
4/3/2012
6/3/2012
5/3/2012
6/3/2012
6/3/2012
6/3/2012

APPROVED

MARCH ,2012

START
APPROVED

General Contracting & Trasportation Co.

Date sent
6/3/2012
11/3/2012
12/3/2012
12/3/2012
12/3/2012
12/3/2012
13/3/2012
18/3/2012
25/3/2012
24/3/2012
25/3/2012
25/3/2012
25/3/2012
25/3/2012
25/3/2012
27/3/2012
27/3/2012
27/3/2012
27/3/2012
27/3/2012
27/3/2012
28/3/2012
3/28/2012
3/28/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

29/3/2012
29/3/2012
30/3/2012
31/3/2012
2/4/2012
2/4/2012
2/4/2012
2/4/2012
3/4/2012
3/4/2012
3/4/2012
3/4/2012
3/4/2012
3/4/2012
3/4/2012
4/4/2012
4/4/2012
4/4/2012
4/4/2012
4/4/2012
4/4/2012
4/4/2012
4/4/2012
4/4/2012

April 2012

start

General Contracting & Trasportation Co.

Date sent
4/4/2012
4/4/2012
4/4/2012
4/4/2012
4/4/2012
4/4/2012
4/4/2012
4/4/2012
4/4/2012
4/4/2012
4/4/2012
5/4/2012
5/4/2012
8/4/2012
9/4/2012
9/4/2012
9/4/2012
9/4/2012
9/4/2012
10/4/2012
10/4/2012
10/4/2012
10/4/2012
10/4/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

11/4/2012
11/4/2012
11/4/2012
12/4/2012
14/4/2012
14/4/2012
15/4/2012
16/4/2012
16/4/2012
16/4/2012
16/4/2012
17/4/2012
25/4/2012
17/4/2012
17/4/2012
17/4/2012
17/4/2012
17/4/2012
17/4/2012
17/4/2012
18/4/2012
19/4/2012
19/4/2012
19/4/2012

APPROVED

General Contracting & Trasportation Co.

Date sent
19/4/2012
22/4/2012
24/4/2012
24/4/2012
24/4/2012
24/4/2012
25/4/2012
26/4/2012
26/4/2012
26/4/2012
26/4/2012
26/4/2012
26/4/2012
26/4/2012
26/4/2012
26/4/2012
26/4/2012
21/4/2012
26/4/2012
29/4/2012
30/4/2012
4/30/2012
4/30/2012
4/30/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
5/2/2012
5/2/2012
5/2/2012
5/2/2012
5/2/2012
5/3/2012
5/3/2012
5/3/2012
5/5/2012
5/5/2012
5/5/2012
5/5/2012
5/5/2012
5/5/2012
5/6/2012
5/6/2012
5/6/2012
5/7/2012
5/7/2012
5/8/2012
5/8/2012
5/8/2012
5/9/2012
5/9/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
5/9/2012
5/9/2012
5/9/2012
5/10/2012
5/12/2012
5/12/2012
5/13/2012
5/12/2012
5/13/2012
5/13/2012
5/14/2012
5/14/2012
5/15/2012
5/15/2012
5/15/2012
5/15/2012
5/15/2012
5/15/2012
5/20/2012
5/20/2012
5/17/2012
5/16/2012
5/16/2012
5/19/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
5/20/2012
5/20/2012
5/21/2012
5/20/2012
5/21/2012
5/21/2012
5/21/2012
5/21/2012
5/22/2012
5/22/2012
5/22/2012
5/22/2012
5/22/2012
5/22/2012
5/22/2012
5/23/2012
5/23/2012
5/23/2012
5/23/2012
5/23/2012
5/23/2012
5/23/2012
5/24/2012
5/24/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
5/24/2012
5/24/2012
5/24/2012
5/24/2012
5/24/2012
5/24/2012
5/27/2012
5/27/2012
5/27/2012
5/27/2012
5/27/2012
5/27/2012
5/28/2012
5/28/2012
5/28/2012
5/30/2012
5/30/2012
5/30/2012
5/31/2012
5/31/2012
5/31/2012
6/2/2012
6/2/2012
6/3/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
6/3/2012
6/3/2012
6/3/2012
6/3/2012
6/4/2012
6/4/2012
6/4/2012
6/5/2012
6/5/2012
6/5/2012
6/5/2012
6/5/2012
6/5/2012
6/5/2012
6/5/2012
6/5/2012
6/6/2012
6/6/2012
6/6/2012
6/7/2012
6/7/2012
6/7/2012
6/7/2012
6/7/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
6/7/2012
6/7/2012
6/10/2012
6/10/2012
6/10/2012
6/10/2012
6/10/2012
6/11/2012
6/11/2012
6/11/2012
6/11/2012
6/11/2012
6/11/2012
6/11/2012
6/12/2012
6/17/2012
6/13/2012
6/13/2012
6/13/2012
6/13/2012
6/14/2012
6/14/2012
6/14/2012
6/16/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
6/16/2012
6/16/2012
6/16/2012
6/14/2012
6/14/2012
6/17/2012
6/17/2012
6/17/2012
6/18/2012
6/19/2012
6/19/2012
6/21/2012
6/21/2012
6/21/2012
6/20/2012
6/20/2012
6/20/2012
6/23/2012
6/24/2012
6/25/2012
6/26/2012
6/26/2012
6/26/2012
6/26/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
6/26/2012
6/26/2012
6/26/2012
6/26/2012
6/27/2012
6/27/2012
6/27/2012
6/27/2012
6/27/2012
6/27/2012
6/27/2012
6/27/2012
6/28/2012
6/28/2012
6/28/2012
6/28/2012
6/28/2012
6/28/2012
7/1/2012
7/1/2012
7/1/2012
7/1/2012
7/1/2012
7/1/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
7/1/2012
7/1/2012
7/1/2012
7/1/2012
7/1/2012
7/1/2012
7/1/2012
7/2/2012
7/2/2012
7/2/2012
7/3/2012
7/4/2012
7/4/2012
7/5/2012
7/5/2012
7/7/2012
7/7/2012
7/7/2012
7/7/2012
7/7/2012
7/8/2012
7/8/2012
7/8/2012
7/8/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
7/9/2012
7/9/2012
7/31/2012
7/10/2012
7/10/2012
7/10/2012
7/10/2012
7/10/2012
7/10/2012
7/10/2012
7/10/2012
7/10/2012
7/11/2012
7/11/2012
7/11/2012
7/12/2012
7/12/2012
7/14/2012
7/14/2012
7/14/2012
7/14/2012
7/14/2012
7/14/2012
7/14/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
7/15/2012
7/15/2012
7/15/2012
7/16/2012
7/16/2012
7/16/2012
7/16/2012
7/16/2012
7/16/2012
7/16/2012
7/16/2012
7/16/2012
7/17/2012
7/17/2012
7/17/2012
7/17/2012
7/17/2012
7/17/2012
7/18/2012
7/18/2012
7/18/2012
7/19/2012
7/21/2012
7/22/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
7/22/2012
7/22/2012
7/22/2012
7/22/2012
7/23/2012
7/23/2012
7/23/2012
7/23/2012
7/23/2012
7/24/2012
7/24/2012
7/24/2012
7/24/2012
7/24/2012
7/24/2012
7/24/2012
7/24/2012
7/24/2012
7/24/2012
7/24/2012
7/25/2012
7/25/2012
7/25/2012
7/25/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
7/25/2012
7/26/2012
7/28/2012
7/28/2012
7/28/2012
7/28/2012
7/28/2012
7/28/2012
7/29/2012
7/29/2012
7/29/2012
7/29/2012
7/29/2012
7/29/2012
7/29/2012
7/29/2012
7/29/2012
7/30/2012
7/30/2012
7/31/2012
7/31/2012
7/31/2012
7/31/2012
7/31/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
7/31/2012
7/31/2012
7/31/2012
8/1/2012
8/1/2012
8/1/2012
8/1/2012
8/2/2012
8/2/2012
8/2/2012
8/2/2012
8/2/2012
8/4/2012
8/4/2012
8/5/2012
8/5/2012
8/5/2012
8/5/2012
8/5/2012
8/5/2012
8/5/2012
8/5/2012
8/5/2012
8/5/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
8/6/2012
8/6/2012
8/6/2012
8/6/2012
8/6/2012
8/6/2012
8/7/2012
8/8/2012
8/8/2012
8/8/2012
8/8/2012
8/8/2012
8/8/2012
8/8/2012
8/8/2012
8/8/2012
8/9/2012
8/9/2012
8/9/2012
8/9/2012
8/9/2012
8/11/2012
8/11/2012
8/11/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
8/12/2012
8/12/2012
8/12/2012
8/12/2012
8/13/2012
8/13/2012
8/13/2012
8/14/2012
8/14/2012
8/14/2012
8/14/2012
8/15/2012
8/16/2012
8/16/2012
8/16/2012
8/23/2012
8/23/2012
8/25/2012
8/25/2012
8/26/2012
8/27/2012
8/27/2012
8/27/2012
8/28/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
8/28/2012
8/28/2012
8/28/2012
8/29/2012
8/29/2012
8/29/2012
8/29/2012
8/29/2012
8/29/2012
8/30/2012
8/30/2012
9/1/2012
9/1/2012
9/1/2012
9/1/2012
9/1/2012
9/1/2012
9/1/2012
9/1/2012
9/1/2012
9/1/2012
9/1/2012
9/1/2012
9/2/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
9/2/2012
9/2/2012
9/2/2012
9/3/2012
9/3/2012
9/3/2012
9/4/2012
9/4/2012
9/4/2012
9/5/2012
9/5/2012
9/5/2012
9/5/2012
9/5/2012
9/5/2012
9/5/2012
9/5/2012
9/5/2012
9/5/2012
9/5/2012
9/6/2012
9/6/2012
9/6/2012
9/8/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
9/8/2012
9/8/2012
9/9/2012
9/10/2012
9/11/2012
9/11/2012
9/11/2012
9/13/2012
9/13/2012
9/13/2012
9/13/2012
9/13/2012
9/16/2012
9/16/2012
9/16/2012
9/16/2012
9/17/2012
9/17/2012
9/17/2012
9/17/2012
9/18/2012
9/19/2012
9/19/2012
9/20/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
9/20/2012
9/22/2012
9/23/2012
9/23/2012
9/26/2012
9/26/2012
9/26/2012
9/26/2012
9/26/2012
9/27/2012
9/27/2012
9/27/2012
9/29/2012
9/29/2012
9/30/2012
9/30/2012
9/30/2012
9/30/2012
9/30/2012
9/30/2012
9/30/2012
10/1/2012
10/1/2012
10/2/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

1422

10/8/2012

10/2/2012
10/3/2012
10/3/2012
10/3/2012
10/3/2012
10/3/2012
10/3/2012
10/3/2012
10/3/2012
10/4/2012
10/4/2012
10/4/2012
10/4/2012
10/6/2012
10/6/2012
10/6/2012
10/7/2012
10/7/2012
10/7/2012
10/7/2012
10/7/2012
10/8/2012
10/8/2012
10/8/2012

ANSWER

General Contracting & Trasportation Co.

Date sent
10/8/2012
10/9/2012
10/9/2012
10/9/2012
10/9/2012
10/9/2012
10/9/2012
10/9/2012
10/9/2012
10/10/2012
10/10/2012
10/10/2012
10/10/2012
10/13/2012
10/13/2012
10/13/2012
10/13/2012
10/13/2012
10/14/2012
10/14/2012
10/14/2012
10/16/2012
10/16/2012
10/14/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
10/14/2012
10/15/2012
10/16/2012
10/17/2012
10/17/2012
10/17/2012
10/17/2012
10/20/2012
10/20/2012
10/20/2012
10/20/2012
10/21/2012
10/21/2012
10/21/2012
10/21/2012
10/21/2012
10/21/2012
10/21/2012
10/21/2012
10/21/2012
10/21/2012
10/21/2012
10/21/2012
10/24/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
10/25/2012
10/29/2012
10/29/2012
10/29/2012
10/30/2012
10/31/2012
10/31/2012
10/31/2012
10/31/2012
11/1/2012
11/3/2012
11/3/2012
11/4/2012
11/4/2012
11/4/2012
11/5/2012
11/5/2012
11/5/2012
11/6/2012
11/7/2012
11/7/2012
11/7/2012
11/7/2012
11/7/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
11/7/2012
11/7/2012
11/7/2012
11/7/2012
11/8/2012
11/10/2012
11/10/2012
11/10/2012
11/10/2012
11/10/2012
11/11/2012
11/11/2012
11/11/2012
11/11/2012
11/11/2012
11/11/2012
11/11/2012
11/12/2012
11/12/2012
11/12/2012
11/12/2012
11/12/2012
11/12/2012
11/12/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
11/12/2012
11/13/2012
11/13/2012
11/13/2012
11/13/2012
11/13/2012
11/13/2012
11/13/2012
11/13/2012
11/13/2012
11/13/2012
11/13/2012
11/15/2012
11/15/2012
11/15/2012
11/15/2012
11/17/2012
11/17/2012
11/17/2012
11/18/2012
11/18/2012
11/18/2012
11/18/2012
11/19/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
11/19/2012
11/19/2012
11/20/2012
11/21/2012
11/21/2012
11/21/2012
11/21/2012
11/21/2012
11/21/2012
11/21/2012
11/21/2012
11/21/2012
11/22/2012
11/22/2012
11/25/2012
11/25/2012
11/25/2012
11/25/2012
11/25/2012
11/26/2012
11/26/2012
11/26/2012
11/26/2012
11/26/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
11/27/2012
11/27/2012
11/27/2012
11/28/2012
11/28/2012
11/29/2012
11/29/2012
11/29/2012
11/29/2012
11/29/2012
11/29/2012
11/29/2012
12/2/2012
12/2/2012
12/3/2012
12/4/2012
12/4/2012
12/6/2012
12/6/2012
12/6/2012
12/6/2012
12/6/2012
12/6/2012
12/8/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
12/8/2012
12/8/2012
12/9/2012
12/9/2012
12/9/2012
12/9/2012
12/9/2012
12/9/2012
12/9/2012
12/9/2012
12/9/2012
12/9/2012
12/9/2012
12/9/2012
12/9/2012
12/9/2012
12/9/2012
12/9/2012
12/9/2012
12/10/2012
12/10/2012
12/10/2012
12/10/2012
12/10/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

12/10/2012
12/10/2012
12/11/2012
12/11/2012
12/11/2012
12/11/2012
12/11/2012

12/11/2012
12/12/2012
12/12/2012
12/12/2012
12/12/2012
12/12/2012
12/12/2012
12/12/2012
15/12/2012
15/12/2012
15/12/2012
15/12/2012
16/12/2012
16/12/2012
16/12/2012
16/12/2012
16/12/2012

Resubmit

General Contracting & Trasportation Co.

Date sent
17/12/2012
17/12/2012
17/12/2012
17/12/2012
18/12/2012
18/12/2012
18/12/2012
18/12/2012
18/12/2012
18/12/2012
18/12/2012
18/12/2012
18/12/2012
18/12/2012
19/12/2012
19/12/2012

19/12/2012
20/12/2012
20/12/2012
20/12/2012
20/12/2012
20/12/2012
20/12/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
20/12/2012
20/12/2012
20/12/2012
20/12/2012
22/12/2012
22/12/2012
23/12/2012
23/12/2012
23/12/2012
23/12/2012
23/12/2012
24/12/2012
24/12/2012
24/12/2012
24/12/2012
24/12/2012
24/12/2012
24/12/2012
24/12/2012
24/12/2012
25/12/2012
25/12/2012
25/12/2012
26/12/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
26/12/2012
26/12/2012
26/12/2012
26/12/2012
26/12/2012
29/12/2012
29/12/2012
29/12/2012
29/12/2012
29/12/2012
29/12/2012
29/12/2012
29/12/2012
29/12/2012
29/12/2012
29/12/2012
29/12/2012
29/12/2012
30/12/2012
30/12/2012
30/12/2012
30/12/2012
30/12/2012
30/12/2012

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
30/12/2012
30/12/2012
1/2/2012
1/2/2012
1/2/2012
1/5/2012
1/5/2012
1/5/2012
1/5/2012
1/5/2012
1/5/2012
1/5/2012
1/6/2013
1/6/2013
1/6/2013
1/6/2013
1/6/2013
1/7/2013
1/7/2013
1/7/2013
1/7/2013
1/8/2013
1/8/2013
1/8/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013
1/8/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
1/8/2013
1/8/2013
1/9/2013
1/9/2013
1/9/2013
1/9/2013
1/9/2013
1/9/2013
1/9/2013
1/12/2013
1/12/2013
1/12/2013
1/12/2013
1/12/2013
1/12/2013
1/12/2013
1/12/2013
1/12/2013
1/12/2013
1/12/2013
1/13/2013
1/13/2013
1/13/2013
1/13/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
1/13/2013
1/13/2013
1/13/2013
1/13/2013
1/13/2013
1/13/2013
1/13/2013
1/13/2013
1/15/2013
1/15/2013
1/15/2013
1/15/2013
1/15/2013
1/15/2013
1/15/2013
1/15/2013
1/15/2013
1/15/2013
1/16/2013
1/16/2013
1/16/2013
1/17/2013
1/21/2013
1/19/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
1/20/2013
1/20/2013
1/20/2013
1/20/2013
1/20/2013
1/22/2013
1/22/2013
1/22/2013
1/22/2013
1/22/2013
1/22/2013
1/22/2013
1/22/2013
1/22/2013
1/22/2013
1/22/2013
1/22/2013
1/22/2013
1/23/2013
1/23/2013
1/23/2013
1/24/2013
1/24/2013
1/21/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
1/21/2013
1/24/2013
1/24/2013
1/24/2013
1/24/2013
1/24/2013
1/26/2013
1/24/2013
1/24/2013
1/24/2013
1/24/2013
1/24/2013
1/24/2013
1/24/2013
1/24/2013
1/24/2013
1/24/2013
1/24/2013
1/24/2013
1/24/2013
1/27/2013
1/27/2013
1/28/2013
1/28/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
1/28/2013
1/28/2013
1/28/2013
1/28/2013
1/28/2013
1/28/2013
1/28/2013
1/28/2013
1/28/2013
1/28/2013
1/28/2013
1/28/2013
1/28/2013
1/29/2013
1/29/2013
1/29/2013
1/29/2013
1/29/2013
1/29/2013
1/29/2013
1/29/2013
1/29/2013
1/29/2013
1/29/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

1/29/2013
1/29/2013
1/29/2013
1/29/2013
1/29/2013
1/30/2013
1/30/2013
1/30/2013
1/30/2013
1/30/2013
1/31/2013
2/2/2013
2/2/2013
2/3/2013
2/3/2013
2/3/2013
2/5/2013
2/5/2013
2/5/2013
2/6/2013
2/6/2013
2/6/2013
2/7/2013
2/7/2013

Resubmit

General Contracting & Trasportation Co.

Date sent
2/7/2013
2/9/2013
2/9/2013
2/9/2013
2/9/2013
2/9/2013
2/9/2013
2/10/2013
2/10/2013
2/13/2013
2/13/2013
2/14/2013
2/17/2013
2/19/2013
2/20/2013
2/23/2013
2/23/2013
2/23/2013
2/23/2013
2/23/2013
2/24/2013
2/24/2013
2/24/2013
2/24/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
2/24/2013
2/25/2013
2/25/2013
2/27/2013
3/2/2013
3/2/2013
3/2/2013
3/3/2013
3/3/2013
3/4/2013
3/4/2013
3/5/2013
3/5/2013
3/6/2013
3/6/2013
3/6/2013
3/6/2013
3/6/2013
3/6/2013
3/6/2013
3/6/2013
3/6/2013
3/6/2013
3/6/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
3/7/2013
3/7/2013
3/7/2013
3/7/2013
3/7/2013
3/7/2013
3/7/2013
3/7/2013
3/9/2013
3/9/2013
3/9/2013
3/9/2013
3/9/2013
3/9/2013
3/9/2013
3/10/2013
3/11/2013
3/12/2013
3/12/2013
3/12/2013
3/12/2013
3/13/2013
3/14/2013
3/14/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
3/17/2013
3/18/2013
3/25/2013
3/25/2013
3/27/2013
3/27/2013
3/27/2013
3/28/2013
3/28/2013
3/28/2013
3/28/2013
3/28/2013
3/28/2013
3/28/2013
3/31/2013
3/30/2013
3/30/2013
4/1/2013
4/1/2013
4/1/2013
4/1/2013
4/1/2013
4/1/2013
4/2/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
4/2/2013
3/31/2013
4/2/2013
4/2/2013
4/3/2013
4/3/2013
4/4/2013
4/4/2013
4/4/2013
4/6/2013
4/7/2013
4/9/2013
4/10/2013
4/10/2013
4/10/2013
4/10/2013
4/10/2013
4/11/2013
4/11/2013
4/13/2013
4/13/2013
4/13/2013
4/13/2013
4/13/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
4/13/2013
4/15/2013
4/15/2013
4/15/2013
4/15/2013
4/15/2013
4/21/2013
4/22/2013
4/23/2013
4/23/2013
4/23/2013
4/24/2013
4/24/2013
4/24/2013
4/27/2013
4/27/2013
4/28/2013
4/28/2013
4/28/2013
4/28/2013
4/28/2013
4/29/2013
4/29/2013
4/29/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
4/29/2013
5/2/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

5/2/2013
5/2/2013
5/2/2013
5/2/2013
5/2/2013
5/2/2013
5/2/2013
5/5/2013
5/5/2013

Resubmet

5/5/2013

Resubmet

5/5/2013

Resubmet

5/5/2013
5/6/2013
5/6/2013
5/6/2013
5/7/2013
5/7/2013
5/7/2013
5/13/2013
5/14/2013
5/13/2013
5/15/2013
5/15/2013
5/15/2013

bu tarihte teslim aldim

General Contracting & Trasportation Co.

Date sent
5/15/2013
5/15/2013
5/15/2013
5/2/2013
5/1/2013
5/1/2013
5/21/2013
5/22/2013
5/23/2013
5/25/2013
5/25/2013
5/25/2013
5/27/2013
5/27/2013
5/2/2013
5/2/2013
5/2/2013
6/4/2013
6/5/2013
6/6/2013
6/6/2013
6/8/2013
6/9/2013
6/10/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
6/10/2013
6/11/2013
6/13/2013
6/13/2013
6/13/2013
6/15/2013
6/16/2013
6/17/2013
6/17/2013
6/18/2013
6/18/2013
6/22/2013
6/22/2013
6/22/2013
6/29/2013
6/29/2013
6/29/2013
6/29/2013
6/29/2013
6/29/2013
6/29/2013
6/29/2013
6/29/2013
6/29/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
6/29/2013
7/1/2013
7/1/2013
7/1/2013
7/1/2013
7/1/2013
7/1/2013
7/1/2013
7/1/2013
7/1/2013
7/1/2013
7/2/2013
7/2/2013
7/2/2013
7/2/2013
7/2/2013
7/2/2013
7/3/2013
7/3/2013
7/3/2013
7/3/2013
7/6/2013
7/1/2013
7/6/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
7/6/2013
7/7/2013
7/7/2013
7/7/2013
7/9/2013
7/9/2013
7/9/2013
7/9/2013
5/10/2013
5/10/2013
5/10/2013
7/17/2013
7/17/2013
7/17/2013
7/17/2013
7/1/2013
7/22/2013
7/24/2013
7/28/2013
7/28/2013
8/5/2013
8/5/2013
8/5/2013
8/5/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent
8/5/2013
8/5/2013
8/5/2013
8/5/2013
8/5/2013

8/20/2013
8/26/2013
9/4/2013
9/11/2013
9/11/2013

9/16/2013
9/23/2013
9/23/2013
9/23/2013
9/23/2013
9/23/2013
9/23/2013
9/23/2013
9/23/2013
9/23/2013
9/28/2013
9/28/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

10/10/2013
10/10/2013
10/10/2013

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

General Contracting & Trasportation Co.

Date sent

REPLY
LETTER

DATE

400 BEDS HOSPITAL PROJECT IN SULAIMANI- 2011

DA YAPI

GALALA

N. TURZM TEKS. SAN. VE TC. LTD.T.

No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

General Contracting & Trasportation Co.


Subject \ Description

Ref No.

Date Received

21

1/2/2011

Starting date of the project

1/2/2011

Supervision Board

Subcontracting

10/2/2011

Supervision Board

Subcontracting

30

1/3/2011

Supervision Board

Reception Area

41

16/3/2011

Supervision Board

Elec.work (Minutes of meeting)

44

19/3/2011

Supervision Board

Reply to DG (letter 004)date 19/3/2011

47

26/3/2011

Supervision Board

Minutes of meeting

52

27/3/2011

Supervision Board

Main power supply

79

6/4/2011

Supervision Board

Revising

92

12/4/2011

Supervision Board

Plastering the interior areas of the stairs

99

12/4/2011

Supervision Board

Building Insulation

100

12/4/2011

Supervision Board

Concrete roofing tiles

101

12/4/2011

Supervision Board

Cement Plaster for interior wall

102

13/4/2011

Supervision Board

request

103

13/4/2011

Supervision Board

Insulation Board on Roofing

104

13/4/2011

Supervision Board

Backfilling

111

16/4/2011

Supervision Board

Main water supply

112

17/4/2011

Supervision Board

Concrete Block

115

18/4/2011

Supervision Board

Retaining wall

116

18/4/2011

Supervision Board

Soft Copy

118

20/4/2011

Supervision Board

Organization chart hard copy

120

21/4/2011

Supervision Board

Getting action

121

23/4/2011

Supervision Board

Elec.Conduit and accessories for approval

123

25/4/2011

Supervision Board

Mechanical shop drawing

124

25/4/2011

Supervision Board

Ready air duct flange

125

25/4/2011

Supervision Board

General comments on submittal approval

126

25/4/2011

Supervision Board

Roof insulation detail

127

25/4/2011

Supervision Board

Wire mesh

128

25/4/2011

Supervision Board

Safety Procedure

133

27/4/2011

Supervision Board

existing roof drainage conditions

134

27/4/2011

Supervision Board

Elevated water tank

136

28/4/2011

Supervision Board

Ceiling plaster

140

2/5/2011

Supervision Board

Retaining wall

141

2/5/2011

Supervision Board

Explanation

142

2/5/2011

Supervision Board

Starting day of Alsulaimanyah hospital


s.c.a.r.l

144

2/5/2011

Supervision Board

Approval of Medical equipment

147

3/5/2011

Supervision Board

Fixing the Damaged parts

153

4/5/2011

Supervision Board

Lean Concrete in Part H

154

4/5/2011

Received From
Supervision Board

Handing over the site of the project

Supervision Board

15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

40
41
42
43
44
45
46

47
48
49
50
51
52
53
54
55
56
57
58
59
60
61

Supervision Board

Water proof membrane for foundation

155

4/5/2011

Supervision Board

Protection Board

161

4/5/2011

Supervision Board

Engineer name as requested

162

4/5/2011

Supervision Board

Electrical light drawing

163

4/5/2011

Supervision Board

Interior Partition Walls

164

7/5/2011

Supervision Board

Glasswool Air Duct and pipe insulation

166

8/5/2011

Supervision Board

Approval of mechanical shop drawing


(level-5) as EC-13

167

8/5/2011

Supervision Board

Approval of Mechanical PVC and fitting as


EC-17

168

8/5/2011

Supervision Board

Rejection of Mechanical fire damper

169

8/5/2011

Supervision Board

Resubmit fitting for HVAC,steam,fire fighting and


domestic water piping

170

8/5/2011

Supervision Board

Sketch Design for Machine Room

171

9/5/2011

Supervision Board

Resubmit Cable trays with the accessories

172

9/5/2011

Supervision Board

Main entrance (Reception) building sketch

175

10/5/2011

Supervision Board

The new revise for the Road 1

176

10/5/2011

Supervision Board

Galvanised wire mesh and corner Beads as


EC22

184

12/5/2011

Supervision Board

Weekly report

185

12/5/2011

Supervision Board

Substation 33 kv plan (Kurdish)

186

12/5/2011

Supervision Board

Request for appointed and authorized


engineer name

190

16/5/2011

Supervision Board

Subsmission of shop drawings conform

191

16/5/2011

Supervision Board

Approval Galvanized datasheet

192

16/5/2011

Supervision Board

Actual site construction works in Daily report

194

17/5/2011

Supervision Board

Approval of UPVC pipe specification(Cosmplast)

195

17/5/2011

Supervision Board

Approval of clamp and hanger of for air duct,steam


compressed air,waste water and rain water pipes

196

17/5/2011

Supervision Board

Black steel seemless pipe

197

17/5/2011

Supervision Board

Minutes of CIM no.5 of 8th may 2011

198

17/5/2011

Supervision Board

Original version of Guarantee

199

17/5/2011

Supervision Board

Minutes of CIM no.6 of 15th may 2011

200

17/5/2011

Supervision Board

Approval of bonding agent

202

17/5/2011

Supervision Board

Incorrect Level (5) Shop Drawing

203

18/5/2011

Supervision Board

Electrical Level 5 Shop drawing as submitted with EC 27

205

19/5/2011

Supervision Board

Plastering works

206

21/5/2011

Supervision Board

Valves,strainers,expansion joints and check valves

207

21/5/2011

Supervision Board

Galvanized steel welded Pipes

208

21/5/2011

Supervision Board

Elevated Water tank

214

23/5/2011

Supervision Board

Electrical earthing lighting arrestor drawings

216

24/5/2011

Supervision Board

Interior Wall Cement Plaster

222

26/5/2011

Supervision Board

External Fire Escape Concrete Surfaces

223

26/5/2011

Supervision Board

Electrical Site Labor's name and number

224

26/5/2011

Supervision Board

Request for site inspection

225

26/5/2011

Supervision Board

Duct and galvanized sheet type

226

26/5/2011

Supervision Board

Some General form as guidance for the main contractor


to use

227

28/5/2011

Supervision Board

Monthly progress

230

29/5/2011

Supervision Board

Cable tray and ladder with Cable tray

233

30/5/2011

Supervision Board

Multitherm 400cost break down

234

30/5/2011

62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83

84

85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100

101
102
103
104
105
106
107
108
109
110
111
113
114

115
116
117
118
119
120
121
122
123
124
125

Supervision Board

Plaster Mock-Up

235

30/5/2011

Supervision Board

Drawing revision

337

6/22/2011

Supervision Board

Approval of revised level -5 mechanical shop drawing

239

30/5/2011

Supervision Board

Minutes of M & F technical meeting on 25th may 2011

240

31/5/2011

Supervision Board

400 Beds Hospital/Documents and Plans

242

31/5/2011

Supervision Board

permission for executing electrical work

243

31/5/2011

Supervision Board

Corner beads

247

1/6/2011

Supervision Board

Concrete roofing tiles

248

1/6/2011

Supervision Board

Revised electrical shop drawing for level 5

249

1/6/2011

Supervision Board

Time schedule

250

1/6/2011

Supervision Board

Second part of level -5 electronic shop drawing

252

1/6/2011

Supervision Board

Shop drawing

256

2/6/2011

Supervision Board

Communication

257

2/6/2011

Supervision Board

Permit to work

258

2/6/2011

Supervision Board

first layer of interior plastering

259

2/6/2011

Supervision Board

Roofing Insulation material

261

2/6/2011

Supervision Board

Mismatching between mechanical drawing and


architectural drawing

262

2/6/2011

Supervision Board

minutes of CIM No.6 of 24th may 2011

263

2/6/2011

Supervision Board

Permission for executing electrical works as EC50

267

6/12/2011

Supervision Board

Permit to work

270

5/6/2011

Supervision Board

Minutes of Technical meeting No.2 of 1st June 2011

275

6/6/2011

Supervision Board

Permit to work

278

6/6/2011

Supervision Board

Light weight concrete and mix design

279

6/7/2011

Supervision Board

Corner beads

280

6/7/2011

Supervision Board

Protex plaster mesh

281

6/7/2011

Supervision Board

Access of 400 bed Hospital

282

6/7/2011

Supervision Board

Minutes of meeting of 5th june 2011

283

6/7/2011

Supervision Board

plaster expansion joint

284

6/7/2011

Supervision Board

Site safety inspection Report No.3

288

6/8/2011

Supervision Board

Status of current works on site

289

6/8/2011

Supervision Board

Light weight concrete material perlite & cemarin 260(EC


52)

300

6/13/2011

Supervision Board

Cast iron Pipes

303

6/14/2011

Supervision Board

Fee of the items

305

6/14/2012

Supervision Board

Electrical shop drawing part -1 level -5

307

6/15/2011

Supervision Board

Emergency plan as contractor's letter 106 dated 9-6-2011

308

6/15/2011

Supervision Board

Changing estimation style

314

6/16/2011

Supervision Board

Tower crane price

315

6/16/2011

Supervision Board

General report on main contractor's performance and


progress on site

317

6/18/2011

Supervision Board

Meeting on medical equipment

319

6/18/2011

Supervision Board

Submittal of June 2011 Aactivities Schedule

324

6/19/2011

Supervision Board

Corrupted Electrical works

325

6/19/2011

Supervision Board

minutes of meeting No.10 of 12th June 2011

329

6/21/2011

Supervision Board

Meeting No.11 of 19th June 2011

331

6/21/2011

Supervision Board

Shop drawing sample

332

6/21/2011

126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164

165
166
167
168

Supervision Board

Inspection for (F) block UPVC pipe work

333

6/21/2011

Supervision Board

Material inspection request

335

6/21/2011

NO Have

Supervision Board

Drawing revision

337

6/21/2011

NO Have

Supervision Board

Reception Area

338

6/22/2011

Supervision Board

Temporary lift

339

6/22/2011

Supervision Board

Floor concrete part F

340

6/22/2011

Supervision Board

Submission of materials according to European Norms

341

6/22/2011

Supervision Board

Mechanical supervisor needed

342

6/23/2011

Supervision Board

Electrical shop drawing

343

6/23/2011

Supervision Board

Site Generator

345

6/25/2011

Supervision Board

Mechanical inspection

346

6/25/2011

Supervision Board

New electrical sub contractor

347

6/25/2011

Supervision Board

Electrical Work permit

350

6/25/2011

Supervision Board

Base Line Program

356

6/28/2011

Supervision Board

Reception Area structural design

362

6/28/2011

Supervision Board

Minutes of medical equipment meeting No.1 20th june


2011

363

6/28/2011

Supervision Board

Minutes of medical equipment meeting No.3 26th june


2011

364

6/28/2011

Supervision Board

G block underground iron pipe revision

365

6/28/2011

Supervision Board

HVAC Duct manufacturing on site

366

6/28/2011

Supervision Board

Mechanical shop drawing

367

6/28/2011

Supervision Board

preparing estimation for plastering

369

6/29/2011

Supervision Board

Light weight conc.

373

6/30/2011

Supervision Board

Corner beads

374

6/30/2011

Supervision Board

Reception Building foundation excavation

375

6/30/2011

Supervision Board

Selection of Plumbing fixture

376

7/2/2011

Supervision Board

Black steel seemless pipe

377

7/2/2011

Supervision Board

British Standard revision

378

7/2/2011

Supervision Board

HVAC Duct manufacturing on site

379

7/2/2011

Supervision Board

FON No.1- Electrical

380

7/2/2011

Supervision Board

Windows between two bedrooms in level -5

381

7/2/2011

Supervision Board

Windows sub-frame

389

7/2/2011

Supervision Board

Manholes and chambers

390

7/2/2011

Supervision Board

Time schedule meeting

391

7/3/2011

Supervision Board

General note

394

7/3/2011

Supervision Board

Shop drawing

398

7/3/2011

Supervision Board

Inspection for (G) block underground cast iron

402

19/6/2011

Supervision Board

Minutes of meeting No.12 of 3rd june 2011(monthly


progres meeting)

405

7/5/2011

Supervision Board

Invitation to Turkey for material inspection

407

7/5/2011

Supervision Board

New Cable tray Sample

413

7/6/2011

Supervision Board

Visiting Factories in Turkey

416

7/7/2011

Supervision Board

Electrical Comments in the site

417

7/9/2011

Supervision Board

Block (F) Structural Roofing

418

7/9/2011

Supervision Board

Trip To Turkey

423

7/10/2011

Supervision Board

Technical data of medical equipment

424

7/10/2011

169

170
171
172

173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188

189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209

Supervision Board

Checking calculation of estimation

425

7/10/2011

Supervision Board

Sub-Light WeIght Concrete

426

7/11/2011

Supervision Board

Poor supervision of the site works

427

7/11/2011

Supervision Board

Material submission for galvanized steel pipes

428

7/11/2011

Supervision Board

Selection of Pump manufacture

429

7/11/2011

Supervision Board

Electrical Site Inspection

433

7/14/2011

Supervision Board

Removing and replacing tower crane

434

7/16/2011

Supervision Board

Lift

437

7/16/2011

Supervision Board

Collection materials

438

7/17/2011

Supervision Board

Working on Friday

442

7/18/2011

Supervision Board

FON No.3 -Block Walls substation H

444

7/18/2011

Supervision Board

FON No.2-Civil works

446

7/18/2011

Supervision Board

Request for information

449

7/19/2011

Supervision Board

Reception Area Design

450

7/19/2011

Supervision Board

Electrical shop Drawing

452

7/19/2011

Supervision Board

Electrical Shop Drawing

453

7/19/2011

Supervision Board

Material submission-Black Steel seamless pipe

454

7/19/2011

Supervision Board

Cable Tray

455

7/19/2011

Supervision Board

Plaster mesh safety data sheet

457

7/19/2011

Supervision Board

British Standard revision-1

458

7/19/2011

Supervision Board

Electrical shop drawing

459

7/19/2011

Supervision Board

Concrete Block Wall

462

7/20/2011

Supervision Board

Out standing Project Requirments

463

7/20/2011

Supervision Board

Elevator room part C level 6

464

7/21/2011

Supervision Board

Adding and removing concrete block wall

467

7/21/2011

Supervision Board

Information request for 3 items

468

7/21/2011

Supervision Board

Inspection for G block

469

7/21/2011

Supervision Board

Material submission-Insulation material

470

7/21/2011

Supervision Board

Elevator water tank

471

7/21/2011

Supervision Board

HVAC Duct manufacturing

472

7/21/2011

Supervision Board

Galvized box

473

7/21/2011

Supervision Board

Elevated Water tank

474

7/21/2011

Supervision Board

Electrical sub-station

475

7/21/2011

Supervision Board

Request for insapection

476

7/21/2011

Supervision Board

Minutes of meeting No:12 of 9th July 2011

486

7/23/2011

Supervision Board

Minutes of meeting No.14 of 18th July 2011

487

7/23/2011

Supervision Board

Precast concrete Roof tiles

489

7/23/2011

Supervision Board

Bank Guarantee (Arabic)

492

7/24/2011

Supervision Board

Request for Information

494

7/25/2011

Supervision Board

wet area wall plastering

496

7/26/2011

Supervision Board

Discrepancy items in architectural Drawing

497

7/26/2011

Supervision Board

Discrepancy items in architectural Drawing

498

7/26/2011

Supervision Board

Darin subcontracor

500

7/26/2011

Supervision Board

Precast concrete Tile

505

7/26/2011

No have

No have

No have

210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253

Supervision Board

Electrical shop drawing

506

7/26/2011

Supervision Board

Bead Head Unit

507

7/26/2011

Supervision Board

Ceramic sample submission

511

7/27/2011

Supervision Board

Aluminum windows sample submission

512

7/27/2011

Supervision Board

Material submission for galvanized steel pipes

513

7/27/2011

Supervision Board

400 Bed Hospital-Monthly progress Reports

514

7/28/2011

Supervision Board

Electricity local Authority

515

7/28/2011

Supervision Board

Reception Area structural design

516

7/28/2011

Supervision Board

Level 5 Mechanical shop drawing

518

7/28/2011

Supervision Board

Waiting Area Gate

519

7/30/2011

Supervision Board

Request for Information (RFI-04)

528

8/1/2011

Supervision Board

Substation Design and material submission

529

8/1/2011

Supervision Board

Approval procedures and communication exchange

536

8/2/2011

Supervision Board

Submission for valves and expansion joints

539

8/2/2011

Supervision Board

Material submission for galvanized steel fittings

540

8/2/2011

Supervision Board

Precast concrete roofing tiles-approval

545

8/3/2011

Supervision Board

catalogues for cable

546

8/3/2011

Supervision Board

substation luminaire catalogue submission

547

8/3/2011

Supervision Board

Record of material inspection

549

8/3/2011

Supervision Board

Explanation

550

8/3/2011

Supervision Board

Commitment to spesification

551

8/3/2011

Supervision Board

waiting area structural design

552

8/3/2011

Supervision Board

permission to work -ducting and piping work

553

8/3/2011

Supervision Board

material submission -flexible ducts and connectors

554

8/3/2011

Supervision Board

Staircase outview

555

8/4/2011

Supervision Board

PVC catalogues

556

8/4/2011

Supervision Board

Window between two bedrooms in level -5

557

8/4/2011

Supervision Board

Changing room function

558

8/4/2011

Supervision Board

Request for material approval (Wiring accessories, cable


management
circuit protection)

560

8/6/2011

Supervision Board

Request for information

561

8/6/2011

Supervision Board

Request for information

562

8/6/2011

Supervision Board

Material submission for fire smoke and volume damper

563

8/6/2011

Supervision Board

Plaster works price difference

564

8/6/2011

Supervision Board

waiting area structural design

567

8/8/2011

Supervision Board

Mechanical FON No.M-001

568

8/8/2011

Supervision Board

Submission of Quantity survey

569

8/8/2011

Supervision Board

Plastering and air duct

571

8/9/2011

Supervision Board

FON No.M-002

572

8/9/2011

Supervision Board

Duct passage

573

8/9/2011

Supervision Board

Explanation

574

8/9/2011

Supervision Board

Bonding Agent Material

575

8/10/2011

Supervision Board

Completion construction of 400 beds hospital project at


Sulaimaniyah

577

8/10/2011

Supervision Board

FON No.M-003

578

8/10/2011

Supervision Board

Painting's method statement

579

8/10/2011

No have

approvel

254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297

Supervision Board

Main Building

580

8/10/2011

Supervision Board

Part (F,G & H)Block Walls

581

8/10/2011

Supervision Board

Cable Tray Coordination Drawings

582

8/10/2011

Supervision Board

400 Bed Hospital Monthly Progress Reports Form

584

8/11/2011

Supervision Board

Revision (2) for the reception area plan

585

8/13/2011

Supervision Board

RFI-Light of Lift Shaft

588

8/13/2011

Supervision Board

Sand used in cement plastering

591

8/13/2011

Supervision Board

waiting area plan

598

8/15/2011

Supervision Board

Selection of Pump manufacturers

599

8/15/2011

Supervision Board

Sprinkler system

600

8/15/2011

Supervision Board

Health department of Salahaddin

601

8/15/2011

Supervision Board

Doors width infectious disease ward

602

8/15/2011

Supervision Board

Windows sub-frame

603

8/15/2011

Supervision Board

FON No.M-005

604

8/16/2011

Supervision Board

Action on site

605

8/16/2011

Supervision Board

Existing PVC cost braek down

606

8/16/2011

Supervision Board

Material submission-Valves

607

8/16/2011

Supervision Board

Cable tray approval

611

8/17/2011

Supervision Board

FON No. M-006

612

8/17/2011

Supervision Board

Black steel fitting size (1l2'' -2'')

613

8/17/2011

Supervision Board

Submission-Black steel fitting size (0.5'' - 2'')Georg


Fischer

614

8/17/2011

Supervision Board

Sample of UPVC pipe works

615

8/17/2011

Supervision Board

Mechanical design for sewage and sanitary

616

8/17/2011

Supervision Board

Removing test -Failed sand from the site

617

8/17/2011

Supervision Board

Special notebook

620

8/18/2011

Supervision Board

Electrical local authourity

621

8/18/2011

Supervision Board

400 bed hospital/Monthly progress Reports form

622

8/18/2011

Supervision Board

RFI-Shaver socket outlet

624

8/18/2011

Supervision Board

Sample of PVC floor and wall covering

625

8/18/2011

Supervision Board

To Ibrahim Khalil Customs (Kurdish)

626

8/18/2011

Supervision Board

Level 5 Mechanical shop drawing

631

8/20/2011

Supervision Board

Time Schedule,Critical path and cash flow

634

8/20/2011

Supervision Board

Cement Plaster

635

8/20/2011

Supervision Board

PVC flooring cost breakdown

636

8/21/2011

Supervision Board

External Area drawing

637

8/21/2011

Supervision Board

FON No. M-007

638

8/21/2011

No have

Supervision Board

Submission-Pipe work sample and welder approval test


certificate

640

8/21/2011

No have

Supervision Board

Black steel and galvanized fitting

643

8/22/2011

Supervision Board

Reception building air ducting hole

644

8/22/2011

Supervision Board

Providing a supervisory architectural engineer in the site

651

8/23/2011

Supervision Board

External Area drawing

652

8/23/2011

Supervision Board

Ceramic tile

653

8/23/2011

Supervision Board

Last revised of architectural drawing

654

8/23/2011

Supervision Board

Boundary of Hospital

659

8/24/2011

APPROVED

No have

298
299
300
301
302
303
304
305
306
310

307
308
309
311
312
313
314
315

316
317
318
319
320
321
322
323
324
325
326

327
328
329
330
331
332
333
334
335
336
337
338

Supervision Board

PVC flooring Price

660

8/24/2011

Supervision Board

Selection of HVAC equipment's Type

661

8/24/2011

Supervision Board

UPS system Riser Diagram

666

8/27/2011

Supervision Board

FON No.E-004

667

8/27/2011

Supervision Board

Material submission-Silicon for ducting work

668

8/27/2011

Supervision Board

Submission-Sample of medical Gas pipe system

669

8/27/2011

Supervision Board

Reply to FON. M-005

670

8/27/2011

Supervision Board

Mechanical Unit installation Typical details

671

8/27/2011

Supervision Board

Submission of 4th Level mechanical shop drawing

672

8/27/2011

Supervision Board

Minutes of Meeting no.17 of 14th August 2011

673

9/3/2011

Supervision Board

Minutes of Meeting no.18 of 21th August 2011

675

9/3/2011

Supervision Board

Fence

677

8/29/2011

Supervision Board

Water proof

678

8/29/2011

Supervision Board

Mechanical Units on Light weight Concrete

679

8/29/2011

Supervision Board

Minutes of Meeting no.5 of 24th August 2011

685

9/3/2011

Supervision Board

Committee Decision

686

9/4/2011

Supervision Board

Complete walls

688

9/4/2011

Supervision Board

PVC sheets for walls

690

9/4/2011

Supervision Board

Result of Testing for tile 80x80 CM

691

9/4/2011

Supervision Board

Reception Area Electrical Drawings

692

9/4/2011

Supervision Board

Submission of adjustable door frame

695

9/5/2011

Supervision Board

Aluminum color sample

696

9/5/2011

Supervision Board

RFI for Block (F)

698

9/7/2011

Supervision Board

RFI -changing room outlet sockets

699

9/7/2011

Supervision Board

Documents and plans

701

9/7/2011

Supervision Board

Shortcomings of the works

702

9/7/2011

Supervision Board

Report of consultancy

704

9/7/2011

Supervision Board

Hot boiler and steam boiler

706

9/7/2011

Supervision Board

UPVC

707

9/7/2011

Supervision Board

Elevated Water tank

708

9/7/2011

Supervision Board

Revised specification for C-Sector

709

9/8/2011

Supervision Board

Execution Internal walls structrual Re inforcement

710

9/8/2011

Supervision Board

Electrical shop drawings for level 4

711

9/8/2011

Supervision Board

Window opening mock-up approval and time schedule

712

9/8/2011

Supervision Board

Floor covering scheme

714

9/10/2011

Supervision Board

Slab completion

715

9/10/2011

Supervision Board

Waiting Area gate structural design

720

9/11/2011

Supervision Board

Revised design and BOQ-Main power supply and


substation

721

9/11/2011

Supervision Board

Design of Entrance elevation

722

9/11/2011

Supervision Board

Structural design for parking area

723

9/12/2011

Supervision Board

Providing soft-Copy for catalogue

727

9/12/2011

Supervision Board

price analysis for Multhiterm 400

728

9/12/2011

Supervision Board

Duct installation

729

9/12/2011

Supervision Board

Reception Building parapet

732

9/12/2011

Approved

No have

339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361

Supervision Board

RFI about wiring of socket outlet

733

9/12/2011

Supervision Board

Cost breakdown for PVC sheets for walls

734

9/12/2011

Supervision Board

Minutes of meeting No.19 of 10th September 2011

736

9/13/2011

Supervision Board

Site Inspection report 11-9-2011

737

9/13/2011

Supervision Board

Roof insulation material

739

9/13/2011

Supervision Board

Marble and ceramic tile dimension

740

9/14/2011

Supervision Board

Submission of monthly report form (1st Payment)

741

9/14/2011

Supervision Board

Multitherm 400

742

9/17/2011

Supervision Board

Mechanical and electrical materials

745

9/17/2011

Supervision Board

Elevated Water tank

747

9/17/2011

Supervision Board

Selection of fan coil units and air handlings unit

748

9/17/2011

Supervision Board

Worker's site attendance

750

9/18/2011

Supervision Board

Daily Report

751

9/18/2011

Supervision Board

Site Inspection report 14-9-2011

755

9/20/2011

Supervision Board

workers on site

756

9/20/2011

Supervision Board

FON E-006

757

9/20/2011

Supervision Board

Sika mono top 610

758

9/20/2011

Supervision Board

Multitherm 400

759

9/20/2011

Supervision Board

PVC wall sheet price agreement

760

9/20/2011

Supervision Board

site inspection Report 18-9-2011

761

9/20/2011

Supervision Board

Waiting Area gate structural design

762

9/20/2011

Supervision Board

Providing a mechanical supervisory engineer

763

9/21/2011

Supervision Board

warning

Supervision Board

contractor's inspection request-Ref.contractor's


communication 310
dated 12/9/2011

765

9/21/2011

Supervision Board

Roof drainage shop drawing

766

9/21/2011

Supervision Board

Parking shed main structural sample

767

9/22/2011

Supervision Board

Gypsum wall scheme

768

9/22/2011

Supervision Board

Window's Glass sample -windows catalogue and data


sheet

769

9/22/2011

Supervision Board

Cement Plaster

770

9/22/2011

Supervision Board

Site inspection on september 22-2011 @ 9:30 AM

771

9/22/2011

Supervision Board

Roads of 400 Beds Hospital

772

9/22/2011

Supervision Board

STUD WALL

773

9/24/2011

Supervision Board

Mismatching rear landscape area elavation with the


profile 2

778

Supervision Board

Test

779

Supervision Board

External Wall plastering

781

Supervision Board

Road Works

Supervision Board

Level 5 Toilet and Wash Basin Wall renovation

Supervision Board

Submittal of Quantity Survey


Supervision(4-5 katta almalar )

Supervision Board

meeting

Supervision Board

CORRUGATED PIPE CATALOGUE

794

Supervision Board

PARKING LOT DESIGN

800

Supervision Board

WATER TANK FINISHING

801

Supervision Board

SUB.TECHNICAL DATA FOR HVAC EQ.

802

Supervision Board

MEDICAL GAS SYSYTEM

803

362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382

764

9/21/2011

9/26/2011
9/26/2011
9/26/2011

784

9/27/2011

785

9/27/2011

786

788

792

9/27/2011
9/28/2011
10/1/2011
10/1/2011
10/1/2011
10/1/2011
10/1/2011

383
384
385
386
387
388
389
390
391

804

Supervision Board

SELECTION HVAC EQUIPMENT

Supervision Board

ANGLE IRON OVER OPENING DOORS

Supervision Board

PLASTER THICKNESS

Supervision Board

SITE WORK

Supervision Board

Shop Drawing for main power supply

Supervision Board

Waiting Are gate structural design

817

Supervision Board

Fon No. M-008

822

Supervision Board

Akfix Acrylic Sealant

823

Supervision Board

Roof Prime Coat

824

Supervision Board

FON E-007

825

( LEVEL 5)

392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410

411
412
413
414
415
416
417

420
421
422
423
424
425

10/1/2011
10/1/2011

809

10/1/2011

815

10/2/2011
10/2/2011
10/3/2011
10/3/2011
10/3/2011

10/4/2011

Supervision Board

PAYMENT NO.1

826

Supervision Board

Roof nsulaton

827

Supervision Board

RECORD OF INSPECTION-REGARD.OUR LETTER-32417.09.2011

830

Supervision Board

SUB.FOR AIR HANDLING UNITS SKM

831

Supervision Board

SUB.FOR RECORD OF MATERIAL INSPECTION

832

Supervision Board

ELECTRICAL PAYMENT

833

Supervision Board

PLASTER THICKNESS

838

Supervision Board

COMPRESSIVE STRENGTH OF TILES -KARO TEST

839

Supervision Board

MUNITES OF MEETING NO.20 OF 20th SEPTMBER 2011

840

Supervision Board

TIME SCHEDULE REPORT SEPTEMBER 2011

846

Supervision Board

INSPECTION FOR RECEPTION AREA UPVC PIPE


INSTALLATION

849

Supervision Board

MUNITES OF MEETING NO.22 OF 2ND OCTOBER 2011

850

Supervision Board

PLASTER BOARD MATERIAL

851

Supervision Board

PLASTER THICKNESS

852

Supervision Board

ELECTRICAL SUBCONTRACTOR

862

10/15/2011

Supervision Board

BRAND OF MATERIAL AND DEVICES

863

10/15/2011

Supervision Board

ELECTRICAL DESIGN FR RECEPTION BUILDING

864

10/15/2011

Supervision Board

TERRAZO TILE FOR FLOORING

866

10/15/2011

Supervision Board

Documents Submission

867

10/15/2011

Supervision Board

READY MIX PLASTERING MATERIAL

868

10/15/2011

Supervision Board

CERAMIC TILES

871

10/15/2011

Site Plan

875

Concrete Block Wall- Ambulance Garage Level 1

877

Elevator Catalogue

881

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

419

807

808

10/1/2011

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Electrical substation shop drawing

882

Permit to work - roof insulation works

883

Power Transformers

884

BRAND

885

Sub. For mechanical drawing level 3 & 4

886

munites of meeting No.23 of 9 th October 2011

887

Weekly site visit report 12.10.2011

888

GRP Pipes and corrugated pipes

889

Sub.CV for Mechanical Engineer

890

Ducting work calculation

891

Elektrik almalarnda
aksaklklar ve mhendis
bulumay

10/4/2011
10/4/2011

GER VERLD.YANLI
YAZILMI

10/4/2011

5. KATTA INPECTION
ONAYLANAN ODALAR

10/4/2011

REJECTED

10/4/2011
10/4/2011
10/6/2011
10/6/2011
10/8/2011
10/9/2011
10/10/2011
10/10/2011
10/10/2011
10/10/2011

22 MM DEN SONRAKNE
UCRET FARKI STEME
DURUMU

10/16/2011

FILE-4

10/18/2011

FILE-4

10/18/2011

FILE-4

10/18/2011

FILE-4

10/18/2011

FILE-4

10/18/2011
10/18/2011

FILE-4

10/18/2011

FILE-4

10/18/2011

FILE-4

10/18/2011

FILE-4

10/18/2011

FILE-4

10/18/2011

FILE-4

10/18/2011

FILE-4

APPROVEDkone

426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Sub. -Fan coil units selection

892

Quantity survey approval - procedure and forms

893

Room floor Levels on administration area

895

Yap-Kim internet site

896

Permit to work No:3 concrete masonry unit level 6

897

Air handling Units PADS

898

Parking Shed Main Structural frame material

899

Aluminum flashing sample on the roof

900

landscape cable route trench details

902

Concrete Block Wall

903

MV cable accessories

905

Main Building feeder ( bushbar trunk ) shop drawings

906

munites of meeting No.24 of 15 th October 2011

909

munites of meeting No.25 of 16 th October 2011

910

Pending documents and subjects

911

Sub. Of calculation of cement sand plastering 1. layer


level 5

912

GENERATOR CATALOGUES-CUMMINS POWER APPROVED

913

COC no 411

915

Sub. Of Quantity Survey forms

919

Sub. Acoustic and ducting work accessories

920

Sub. As built notification for mechanical work

921

Sub. For record of material inspection

922

CV for medical gas subcontractor

923

Precast concrete roof tiles 40x40 cm

926

Reminder - waiting are cube test

927

Munites of meeting No:24 of 15th October 2011

931

Travelling Permission

932

Sub. Measurement for ducting work in level 5

933

Electrical room floor finish

934

Request for pool area finishing

935

Sub. Schematic layout water tank

936

Rear Landscape

937

Quantity survey - 1. layer plaster on level 4

940

Final BOQ for the MEP revised design

941

Pamukkale Multicore cable certification

942

MV cable submittal

943

Earth and Lighting arrestor material submittal

944

Electrical Exterior lighting cable route

945

Electrical works

949

Sub.record of material inspection ( galvanized sheet )

950

80x80 cm roofing concrete tiles

951

Time Schedule report October 2011

959

Compacting Back filling for RD1

960

Medical gases engineer cv. Arif CENGZ

966

10/18/2011

FILE-4

10/18/2011

FILE-4

10/19/2011

FILE-4

10/19/2011

FILE-4

10/19/2011

FILE-4

10/19/2011

FILE-4

10/19/2011

FILE-4

10/19/2011

FILE-4

10/19/2011

FILE-4

10/19/2011

FILE-4

10/19/2011

FILE-4

10/19/2011

FILE-4

10/19/2011

FILE-4

10/20/2011

FILE-4

10/20/2011

FILE-4

10/20/2011

FILE-4

10/20/2011

FILE-4

10/22/2011

FILE-4

10/24/2011

FILE-4

10/24/2011

FILE-4

10/24/2011

FILE-4

10/24/2011

FILE-4

10/24/2011

FILE-4

10/24/2011

FILE-4

10/24/2011

FILE-4

10/25/2011

FILE-4

10/25/2011

FILE-4

10/25/2011

FILE-4

10/25/2011

FILE-4

10/25/2011

FILE-4

10/26/2011

FILE-4

10/26/2011

FILE-4

10/26/2011

FILE-4

10/26/2011

FILE-4

10/26/2011

FILE-4

10/26/2011

FILE-4

10/26/2011

FILE-4

10/26/2011

FILE-4

10/27/2011
10/27/2011
10/27/2011
10/31/2011
10/31/2011
10/31/2011

APPROVEDCarrier

tuvalet duvarlarnn deimesi

APPROVED

10 gn trkiye ziyareti elektrik hakknda

elektirik odalarnn

su tankn dzenleme ematik olarak


APPROVED

marka onayland

470
`
472
473
474
475
476
477
478
479

481
482
483
484
485
486
487
488
489
490
491

Supervision Board

Submittal mechanical shop drawings

967

10/31/2011

Supervision Board

Submittal for chiller units carrier Brand

968

10/31/2011

Supervision Board

Submittal fan coil units-aertesi brand

969

10/31/2011

Supervision Board

Submittal Air Handling units carrier brand

970

10/31/2011

Supervision Board

Submittal computer selection ( AHU and Exhaust fan )


SKM Band

971

10/31/2011

Supervision Board

Level 5 final inspection

973

11/1/2011

Supervision Board

Level 4 inspection

974

11/1/2011

Supervision Board

Level 3 Part E inspection

975

11/1/2011

Supervision Board

Corrugated Pipe

977

11/1/2011

Supervision Board

Monthly Report

978

11/1/2011

Supervision Board

Civil Engineer

982

11/2/2011

Supervision Board

Second paymend

984

Sub.-as built notification in Level 4 -Mechanical works

985

Permit to work 4 Final Layer Plastering work- approved

987

11/13/2011

Yap-Kim Fine Plaster data sheet-approved

988

11/13/2011

989

11/13/2011

990

11/13/2011

991

11/13/2011

Quantity survey index - 4

993

11/13/2011

FON NO M-011- TABB VE EKSKLER

995

11/13/2011

Stud WALL cost Breakdown

1004

11/16/2011

cable trunking material ispection.Gelen kablo tavalar


beenilmedi.rejected

1005

11/16/2011

Revision of Concrete Block

1008

11/19/2011

suspended ceiling

1012

Medical gas work

1015

Wall holes reparing cost breakdown

1018

Roof cracks under light weight concrete

1020

Quantity Survey-Sanitary waste ,vent system,domestic


hot and cold water

1021

Submittal-Computer selection of SKM ( fan Coil Unit )

1022

Submittal-Level-1 ( Entrance ) mechanical shop drawings

1023

Submittal-Ball Valves for medical gas system

1024

Submittal-Record of material inspection-Domestic pipes


insulation and duct accessories

1025

Medical gas pipe system

1026

Submittal medical gas shop drwaing-Level-5

1027

FON No: M-102

1031

Windows Frame Marble

1032

Revision of Part-G Elevation

1033

Elevated Water tank

1034

Submittal-Main Sewage and Rain water

1035

Quantity survey Index - 6

1036

Quantity survey Index - 11

1037

Sub.-Ceramic and Marble adhesive-BASF Fleskmortel 93


flex

1038

specificatin of the project

1039

pamukkale LV cable testing

1042

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

492
493
494
495
496
497
498
499
500
501
502

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

504
505

Supervision Board
Supervision Board

Parking Shed sandwich panel -

approved

Permit to work 5 - Parking Shed Stud WALL cost Breakdown -

Rejected

Rejected

APPROVE Carrier

APPROVE Carrier

11/2/2011
11/3/2011

11/19/2011
11/20/2011
11/21/2011
11/21/2011
11/23/2011

will be RESUBMIT

11/23/2011

REJECTED

11/23/2011

APPROVED

11/23/2011

RESUBMIT

11/23/2011

APPROVED

11/23/2011
11/23/2011
11/24/2011
11/24/2011
11/24/2011
11/24/2011
11/24/2011
11/24/2011
11/24/2011
11/26/2011
11/27/2011
11/28/2011

REJECTED

506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

11/28/2011

RFI-Location of lighting switch

1043

Doruk expansion joint profile samples

1046

Qyantity survey level-1 plastering

1047

RFI - Extra socket outlet

1052

Site inspection 23.11.2011

1053

Quantity Survey index - 5 5,13,16,17,18 and road ,find


the atachment of the approved quantity survey

1055

Break down price for revised drawing

1061

Yap-Kim Fine Plaster

1065

12/3/2011

Pipes for medical gas system

1070

12/6/2011

Site inspection 30.11.2011

1071

12/6/2011

11/29/2011
11/29/2011
11/30/2011
11/30/2011
11/30/2011
12/1/2011

Quantity survey Index -22

1072

12/6/2011

Test-cube test for footing of reception building

1073

12/6/2011

Fence front wall steel barier

1074

12/6/2011

Quantity survey Index-9,19 & 20

1075

12/6/2011

Sub.-Anti-fungal coating and duct sealant data sheet

1079

12/8/2011

Marble cladding for interior

1080

12/8/2011

Permit to work-retaining walls and guard houses

1081

12/8/2011

quantity survey index-24 & 25

1082

12/8/2011

Material inspection -pamukkale single core wire

1083

12/8/2011

Site inspection -Electrical-level 3 part B&C,Level 2 part 1A


& 1B

1084

12/8/2011

Knauf fire resistant gypsum board technical data sheet

1085

12/8/2011

Windows and glass-technical data sheet and schedule


request

1086

12/8/2011

Quantity survey index-10,12 & 15

1087

12/8/2011

Time schedule report november 2011

1089

12/10/2011

Mechanical work passivity

1091

12/10/2011

Electrical Drawing for Reception Building

1092

12/11/2011

soft copy for medical equipment sectors

1093

12/11/2011

Quantity survey index-21 resubmit

1103

12/13/2011

FON-Electrical-Level 5

1105

12/14/2011

Site electrical work inspection for reception building

1106

12/14/2011

Quantity survey index-23

1107

12/14/2011

Elevated Water tank

1108

12/14/2011

Time Schedule

1109

12/14/2011

Site inspection 02.11.2011

1110

12/14/2011

Pipe and duct works

1111

12/14/2011

Testing,analysis and report of copper tubes

1114

12/15/2011

FON No. M-013

1115

12/15/2011

Sub.-Corrugated pipes

1116

12/15/2011

Front Entrance New Design

1130

12/20/2011

Quantity Survey

1134

12/21/2011

Cable inspec tion

1135

12/21/2011

Plumbing pipes crossing cable tray and trunking in level


5&4

1137

12/24/2011

Level 5 witing inspection

1139

12/24/2011

Quantity survey Index -27

1140

12/25/2011

APPROVED

YORKSHIRE MEDICAL
waterproof test well done,unsafe scaffolding

APPROVED

APPROVED

REJECTED

APPROVED
APPROVED
APPROVED
REJECTED

APPROVED

APPROVED

APPROVED

549
550
551
552
553
554

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Suspended ceiling cost break down

1141

12/25/2011

Metal suspended ceiling revised quantity for each type

1142

12/25/2011

Structural design main gate

1143

12/25/2011

Quantity survey Index -29 & 32

1144

12/25/2011

Requirements for medical and utility equipment-Level 5

1146

12/25/2011

Revised structure design for rear entrance

1147

12/25/2011

Level 1 GI Boxes Inspection

1148

12/26/2012

conduit and box inspection

1152

12/27/2011

cable trunk sample approval

1153

12/27/2011

cable on site inspection

1154

12/27/2011

cable on site inspection

1155

12/27/2011

cable stroage observation noticed

1156

12/27/2011

Plumbing pipes crossing electrical room of level-1 Part-E

1164

12/28/2011

Garbage casting

1165

12/28/2011

Quantity survey Index -30,33& 34

1168

12/29/2011

Quantity survey Index -36,37,38,39,40

1169

12/29/2011

cable on site inspection

1170

12/29/2011

YEAR OF 2011

Level-5,4,3 fire alarm inspection

1171

12/29/2011

TOTAL Received LETTERS

Conduit 25 mm approval

1172

12/29/2011

1172 NEXT NEW SERIAL

Time schedule report December 2011

1/2/2012

Quantity survey index 41 & 43

1/2/2012

Parking area lot structural design

1/2/2012

Level-2 shop drawing

1/3/2012

Cable survey

1/3/2012

Quantity survey index 28

1/3/2012

Quantity survey index 37 & 44

10

1/5/2012

Carrier fan coil unit computer selection

11

1/5/2012

Cable stroage observation noticed-reminder

12

1/7/2012

Rejected cables used for installation observation noticed

13

1/7/2012

Quantity survey index 45-46-47-48-49

14

1/7/2012

New revision for rear retaining wall

20

1/8/2012

Valves,expansion joint and strainer

21

1/8/2012

Quantity survey index 42

22

1/8/2012

Sanitary sewer system layout profile plan

23

1/8/2012

Level-3 wiring inspection

24

1/8/2012

Level-4 wiring inspection

25

1/8/2012

Duct and insulation material inspection

28

1/8/2012

Quantity sur vey-mechanical

37

1/10/2012

Tiles 80x80 cm

38

1/11/2012

Corrugated pipe material quantity

40

1/14/2012

Quantity survey index 60,61,62,63,64,65,66

41

1/14/2012

Quantity survey index 50,51,52,53,54,59

42

1/14/2012

Quantity survey index 56,57,58

43

1/14/2012

Staff parking lot revised

46

1/14/2012

APPROVED

APPROVED
APPROVED
APPROVED

APPROVED

APPROVED
APPROVED

APPROVED
APPROVED
APPROVED
APPROVED

592
593
594
595
596
597
598

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Health and safety &enviromental plan And process


planning for safety at work

57

1/15/2012

Corrugated pipe material inspection

62

1/16/2012

Mechanical work correction

63

1/16/2012

Front Entrance New Design

64

1/16/2012

Submitted Carrier fan coil unit computer selection Rev.01

65

1/16/2012

Suspended ceiling material submitting

66

1/16/2012

Bill No.11 specification

69

1/18/2012

4Th , Payment

76

1/23/2012

Blinding concrete under foundation for retaining wall

77

1/23/2012

Quantity Survey for Electric socket wiring level 3&4

79

1/23/2012

Field observation notice ( Fon ) M-FON -015

80

1/23/2012

Cost breakdown for excavation

82

1/23/2012

Quantity survey index-67-68-69-70-71

83

1/23/2012

Revision of sector X

85

1/25/2012

Revised Road No.2 drwawing

86

1/25/2012

Floor waterproofing technical datasheet ( SIKA top seal


107 )

87

1/28/2012

Number of mechanical worker at site

88

1/28/2012

Revised Structure design - parking lot

89

1/28/2012

Time schedule revised

93

1/28/2012

Elevator Submittal KONE brand approved

94

1/29/2012

The percentage breakdown for executed electric works

95

1/29/2012

Field observation notice ( Fon ) M-FON -016

96

1/29/2012

Exhaust fans ( Dynair , Greenheck)-GREENHECK


APPROVED

97

1/29/2012

Air outlet accessories

98

1/29/2012

Chillers and AHU comments

99

1/29/2012

Medical and Utility Requirement

100

1/29/2012

Mechanical shop drawing level 1 Rev.00 & level 2 Rev.01

101

1/29/2012

Inspection for UPVC pipes

102

1/29/2012

Pending items

103

1/29/2012

Inspection for antifungals and duct sealant

104

1/29/2012

Quantity Survey ( mechanical )

105

1/29/2012

Training Hall drawing

106

1/29/2012

Finish cot for plastering

116

1/30/2012

Generator set status

119

1/31/2012

Electrical shop drawing

120

1/31/2012

Material aproval form ( S-021 )

121

1/31/2012

Single line diagram

122

1/31/2012

Approval sector SCM

123

1/31/2012

Medical Equipment time schedule in the result of delaying


the revision

127

2/1/2012

Meeting

128

2/1/2012

repairing for water proofing of roof

129

2/2/2012

Stud wall

130

2/2/2012

Site instruction 11

131

2/2/2012

Corrugated pipe material quantity

132

2/2/2012

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED
APPROVED

APPROVED

APPROVED

Start February 2012.

Medical ve mekanik
almalar
APPROVED

635
636
637
638
639

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Water proofing material

133

2/2/2012

Permit to work-Marble wall cladding

135

2/2/2012

Permit to work-Suspended ceiling it to work

136

2/2/2012

permit to work-Sand cement screed

137

2/2/2012

Staff parking lot

138

2/2/2012

Windows-changing from AD2 to AD2a

139

2/2/2012

Fon for cable tray insulation in level-5

140

2/2/2012

Fon for fire sealant material around the conduit

141

2/2/2012

Final Distribution board sample

142

2/2/2012

Fon cable stroage reminder-2

143

2/2/2012

Time schedule

145

2/2/2012

Water treatment system and elevated water GRP tank

146

2/2/2012

Quantity survey index-75 & 77

147

2/2/2012

Plumping fixtures

149

2/5/2012

Adjustment of total station Lika 407

153

2/7/2012

Time schedule report January 2012

154

2/7/2012

excavation and removal of unsuitable soil

155

2/7/2012

UPV Quantity survey

156

2/7/2012

Quantity survey-index 72,73,74

157

2/7/2012

Deficiency in gatalogue and technical data of the medical


equipment

162

2/9/2012

Answer for FON 15&16

163

2/9/2012

mechanical work

164

2/9/2012

Sewage specification

165

2/9/2012

Level 5 screed

175

2/12/2012

Medical Equipment MEP provision in Level 4 and Level 3

177

2/12/2012

Level-2 Surgery Room RFI-No:13

178

2/13/2012

Trimestral report No.3

180

2/13/2012

Minutes of meeting no.27 of 8 th February 2012

182

2/14/2012

Level 3,4 & 5 Lighting wiring pulling inspection

183

2/14/2012

Revised time schedule

185

2/15/2012

Aluminum profile-cuhadarolu ST 60 system

186

2/15/2012

Shop drawing & Equipment installation rewuipment for


sector M

187

2/15/2012

New BOQ for Electrical items

188

2/15/2012

Cahnging operation room of ophthalmic pediatric

190

2/16/2012

RFI- Emergency light

193

2/20/2012

New system-pneumatic tubes

194

2/20/2012

Approval-seweage system drawings

195

2/20/2012

RFI-14 Level 0 electrical installation

196

2/21/2012

Submittal - Low current Cable

197

2/21/2012

Fire alarm wire ( 2*1*0.8mm) RFI-No:15

198

2/21/2012

Gypsum Board on site

199

2/21/2012

Hot water boiler

201

2/22/2012

Answer for pending items

202

2/22/2012

Fire hose cabinet

203

2/22/2012

Supervision Board
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

665
666
667
668
669
670
671
672
673
674

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

675
676
677

Supervision Board
Supervision Board
Supervision Board

APPROVED
APPROVED
APPROVED

Kap olan pencerelercizimler Atakan beye


verildi.04.02.2012

APPROVED-PENTA
BRAND

Approved
Approved

Rejected

APPROVED

678
679
680
681
682
683
684

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

685
686
687
688
689
690
691
692
693
694
695
696

Supervision Board
Supervision Board
supervision board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

697
701
702
703
704
705

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

708
709
710
711
712

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

715
716

Supervision Board
Supervision Board
Supervision Board
Supervision Board

Level-2 parts-A,B,C,D & E conduit & boxesinspection

204

2/22/2012

Level-1 parts -A,B,C,D & E conduit & boxes inspection

205

2/22/2012

FON-015 Comments on reply

206

2/22/2012

Sewerage treathment plant revision according to our


comment

207

2/22/2012

Request for information regarding level 1

211

2/25/2012

Work on Friday

218

2/26/2012

Doruk expansion joint (INTERNAL)

219

2/26/2012

Fire System accessories (TYCO)

221

2/27/2012

water reservoir external wwall finish

231

2/29/2012

Inspection for the installed cables

232

2/29/2012

SMDB Sample approval ( Letter No -731)Date:13/2/2012

233

2/29/2012

Cable Trunk Material delivery inspection

234

2/29/2012

Submittal - weber saint - Gobain Waterproof.123WB

235

2/29/2012

Location and specification of water cooler

237

2/29/2012

Floor Drain (Regarding Letter NO 717 )

238

2/29/2012

Patient Rooms Airlock area wash basin

239

2/29/2012

Lift of Mechine roomless

244

3/1/2012

Proportion of Breakdown For Electical Work

245

3/1/2012

Submittal - Lift (Wittur) Rgarding Letter 679)

246

3/1/2012

Suspended ceiling shop drawing level 3-4 & 5

248

3/3/2012

Approval of Variation in Price for Sectors A ,C & M

250

3/6/2012

Resubmittal fo Hoval Boiler

253

3/6/2012

Kitchen Equipment Design Drawings

254

3/6/2012

Variation Order for Medical Items

255

3/6/2012

Computer Selection for Pumps

252

3/6/2012

Air Compressors Letter No - (721)

256

3/6/2012

Quantity Survey Index 84 ,85 ,86 ,87 ,88 ,& ,89

257

3/6/2012

Expansion Joint Detail for Suspended ceiling

258

3/6/2012

Bed Head Unit details & datasheet unit item(624-v11712)

261

3/8/2012

Quantity Survey Index -79 (letter no 661 )

267

3/8/2012

Quantity Survey Payment No. 06

268

3/8/2012

Time Schedule Report Fevruary 2012

271

3/10/2012

Quantity survey Index 90,91,92,93,95,&96

273

3/11/2012

Expansion Tank

278

3/12/2012

Quantity Survey - Cable Trunk

280

3/12/2012

Fire hose cabinet (Letter No 786 )

281

3/12/2012

Fuel Tank

282

3/12/2012

283

3/12/2012

Mechanical Gas Levels (3, 4, & 5 ) Shop drawing

286

3/13/2012

Storm Water And staff Prking drain

287

3/13/2012

Water softener and sand filter systems

288

3/13/2012

Shop drawing & Equipment installation requirement for


sector M

289

3/13/2012

Submittal for Caterpillar generator

290

3/13/2012

Electrical Works variation Order

291

3/13/2012

--------

(letter No -772 )

(Letter No : 761 )

CV for medical gas Engineer

(Letter : 738 )

Approved

Start March 2012

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

727

Supervision Board
Supervision Board

729

Supervision Board
Supervision Board

731

Supervision Board
Supervision Board
Supervision Board

734

Supervision Board
Supervision Board
Supervision Board

736
737

Supervision Board
Supervision Board

Supervision Board
738
739

Supervision Board
Supervision Board

740

Supervision Board
Supervision Board
Supervision Board

743

Supervision Board
Supervision Board
Supervision Board
Supervision Board

747
748
749
750

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

756
757

Supervision Board
Supervision Board

Bed Head Unit

292

3/13/2012

Inspection of drain works (Parking Area )

293

3/13/2012

Concrete surface Hardener

294

3/13/2012

Equipment layout / Sterilization dept.In Level Zero

295

3/13/2012

Furniture raw material and catalogue (ASD Luminar)

296

3/14/2012

FON for Electrical room walls in Level -3

297

3/14/2012

Drainage absence in concrete structures

298

3/14/2012

Disposal cold room storage " Relocation

299

3/14/2012

MV Switch Gear and Transformer Rooms

300

3/14/2012

Staff parking lot revised

316

3/14/2012

Site Inspection - Wall Tiling .

317

3/18/2012

Operation theatre cladding - Material Definition

318

3/18/2012

Request for glazing sample and technical datasheet

319

18/3/2012

Changing Electrical Shaft Position

322

3/19/2012

Permit to work - Stone cladding water protection Paint

323

3/19/2012

DUYAR VALVES Technical data for information

324

3/19/2012

wall Tiles Instalation Blocking Electrical Outlet

334

3/25/2012

Mechanical Activities Started in Level -2 with out


coordination Approval .

335

3/25/2012

As built Notification HVAC

338

3/26/2012

Fuel and LPG Tanks

339

3/26/2012

QUANTITY SURVEY APPROVAL(Electric )


Index:04,05,06,08,09,10,level-2(A,B,&C)Conduit and box
& Material on site

340

3/27/2012

Preparation of Variation order and BOQ

341

3/27/2012

FON Removal of Formworks

343

3/27/2012

Fire Escape Stair -Green Painting ,

345

3/28/2012

Field Observation Notice (FON) M-FON-018

349

3/28/2012

Submittal For Remaining Sectors

355

3/29/2012

Shop Drawing For Sectors C & M

356

3/29/2012

Quantity of Anti - Bacterial Paint

357

3/29/2012

Building Operation theatre Earthing System

358

3/29/2012

MV Switch Gear and Transformers rooms

359

3/29/2012

ENTRY Gate Design

374

4/2/2012

Sand Cement Screed

375

4/2/2012

Storm water Drain Line - for DR1

376

4/2/2012

Vitra Plumbing Fixture (letter No:805)dated 29/3/2012

377

4/2/2012

Anti-Bacterial Paint Datasheet & Specification

380

4/3/2012

Ceramic and Porcelain Tile Adhesive Material

381

4/3/2012

Fire escape Stair -Green Paint.

382

4/3/2012

Suspended Ceiling Profile

383

4/3/2012

Soft-Copy for submittal sectors

384

7/4/1905

Shop drawing for Pre Installation Requirments in the level


0,3,4,&5

385

4/3/2012

Complete Proposal Design of the project roads

387

4/4/2012

Load Calculation for Level - 5, 4, & 3

388

4/4/2012

Inspection for Boxes and Conduits in Level -0

389

4/4/2012

Shop drowing and Load Calculation for Level-0,1 & 2

390

4/4/2012

APPROVED

758

Supervision Board

Med Equip Pre-Installation Requirments Level 2 Peiatric


ICU Dept.

391

Supervision Board

Med.Equip pre-installation Reqirements, Level 2,ICUML


and ICCU

392

Supervision Board

Med.Equip Pre-Installation Reqirements, Level 2,


Operating Theatre Dept.

393

4/4/2012

Supervision Board

Med Equip Pre - installation Requirments, Level 2


Maternity and Neonatology.

394

4/4/2012

Supervision Board

Med.Equipment Pre-Installation Requirements, Level


2,Delivery and IVF Dept

395

4/4/2012

Supervision Board

Med.Equipment Pre-Installation Requirements, Level 2,


Ambu-Care- Op Dept.

396

4/4/2012

Time Schedule

397

4/5/2012

Block Wall Part B Level O

398

5/4/2012

Level-2, Part-C, Expanding (DB) room ( Architectural )

399

4/7/2012

Lifts .!

403

4/8/2012

Frame Works Removal

405

4/9/2012

Revised Submittal for Layout and list of kitchen


Equipment.

406

4/9/2012

Site work Activity

408

4/10/2012

Duct insulation 38mlm

409

4/10/2012

Modular Operating Theatres Materkal

410

4/10/2012

Interior Paste Material (Betek)

411

4/10/2012

Documents for Approval of Sector B-R1

413

4/11/2012

Indpection of level 3 duct without FCU, Block B PVC Pipe


and Block E G1

414

4/11/2012

Inspection of Black Steel Pipe Material

416

4/11/2012

Mechanical Quantity Survey

417

4/11/2012

Sand Cement Plaster

419

4/11/2012

Power Transformer

419

4/4/2012

Power Transformer

420

4/4/2012

Stainless steel Duct Material

421

4/12/2012

Suspended Ceiling Height

422

4/12/2012

Sewerage treathment system revised project and


Dewatering system

423

4/12/2012

Strome water Drain RD1

424

4/12/2012

Clamp for Medical gas Pipes

425

4/12/2012

Revised time schedule

428

4/12/2012

Generator Cabinet

430

4/14/2012

Soft copy of Final Submitted Medical Equipment Sectors-L

436

15/4/2012

Mechanical Appliance Color

437

15/4/2012

Master Clock System Specs and Drawings

438

15/4/2012

Wutter Lift Comments Reply

439

15/4/2012

Lift with Machine Room

440

15/4/2012

MV Switchgear and Transformer Room Drawings

441

15/4/2012

Staff Parking Lot

442

15/4/2012

Lightening Protection Submittal

443

15/4/2012

Lightening and Earthing system shop drawing

444

15/4/2012

Level-1 Socket wire inspection

445

15/4/2012

Soft copy of Submitted Medical Equipment (sector A,C &


M)

447

16/4/2012

Isolation Power system submittal

450

16/4/2012

SMDB and Transformer Technical Specification

451

16/4/2012

Dedication of a room inside the building of the project

452

16/4/2012

Supervision Board

765

Supervision Board
Supervision Board
Supervision Board

768

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

774

Supervision Board
Supervision Board
Supervision Board

777

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

782
783
784
785

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

788

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

793

Supervision Board
Supervision Board

795

Supervision Board
Supervision Board
Supervision Board

798

Supervision Board
Supervision Board

800

Supervision Board

4/4/2012

Supervision Board
Supervision Board

801

Supervision Board
Supervision Board

804

Supervision Board
Supervision Board

805
806
807
808
809
810

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

818

Supervision Board
Supervision Board
Supervision Board
Supervision Board

822

Supervision Board
Supervision Board

824

Supervision Board
Supervision Board

826
827
828

Supervision Board
Supervision Board
Supervision Board
Supervision Board

830

Supervision Board
Supervision Board
Supervision Board

833

Supervision Board
Supervision Board

835

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

840
841

Supervision Board
Supervision Board
Supervision Board

March & February monthly report

455

4/17/2012

Approval of Quantity Survey Index - (1,2,3,4,5)Mechanical

456

4/17/2012

Equipment layout Bedpan washer

464

19/4/2012

Hot and Steam Boilers

465

19/4/2012

Binyapi Brand Joint Grouting Material

466

19/4/2012

Revision of sector X

467

19/4/2012

Missing of Complianc sheet for submittal of sector - X

468

19/4/2012

Low Current Systems - SMATV

469

19/4/2012

I sector evaluation - Main Remarks

472

22/4/2012

U sector evaluation - Main Remarks

473

22/4/2012

Accept of Price for new items

474

22/4/2012

Approved Quantity survey index -97

476

23/4/2012

Approval Quantity survey Level-0 (Electorical)

477

23/4/2012

Shop drawing for approved medical equipment

478

4/23/2012

I sector evaluation-Main remarks- Part-2

479

4/23/2012

V sector evaluation-Main remarks

480

23/4/2012

Requirments of Survey and Payment

481

23/4/2012

Time schadual for Medical and Utility Equipment

482

23/4/2012

Revised Specification for Item 732 - B10007

483

23/4/2012

Payment No: 7

487

26/4/2012

Approval of Quantity Survey Index - 12 ( Electrical )

488

26/4/2012

Documents for Approval of Sector B-R1

490

4/26/2012

Fair Alarm System

491

4/28/2012

Power Transformers Comments Reply

492

28/4/2012

Computer Selection for Pumps

493

4/28/2012

Field Observation Notice (FON) M-FON-019

494

28/4/2012

I Sector evaluation-Main remarks- 2nd Part

495

4/28/2012

L sector evaluation - Main Remarks

496

28/4/2012

Fuel and LPG Tanks

497

28/4/2012

Low current system - Access Control Systems

498

28/4/2012

Low current systems-Nurse Call system

499

28/4/2012

Luminaries Submittal

500

28/4/2012

Low Voltage Switch Geear Technical Specification

501

2/28/2012

Block (H ) Trenches shop drawing

502

2/28/2012

Low current system - Telephone & Data Network

516

4/30/2012

Stand - by generators comments Reply

517

4/30/2012

Surgeon washstand details item ( U11272 )

518

4/30/2012

Time Schedule report April 2012

520

5/2/2012

Parking area quantities

522

5/2/2012

Galvanized Pipe - Request for Approval

525

5/2/2012

Approval of Sector 1 - part one

526

5/3/2012

Set up Room : Window change

528

5/5/2012

Suspended ceiling sample

529

5/5/2012

Reqest for Approval-Multi-mixed Plaster (Binyapi)

530

5/5/2012

Has been Approved

Approved
Approved

Approved
Approved

Approved

Supervision Board

844

Supervision Board
Supervision Board
Supervision Board
Supervision Board

848
849
850
851
852
853
854
855
856
857
858

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

860
861
862
863
864
865
866
867
868
869
870
675
676
677
678
679
680
681
682

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Supervision Board
683
684
685
686
687
688
689
690

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Request for Approval - Anti Bacterial paint (Osib Boya)

531

5/5/2012

Field Observation notice ( FON ) M-FON-020

536

5/5/2012

Fire House Cabinet FETAS.

537

5/5/2012

Anti-Acid Ceramic and Porcelain Tiles Cost breakdown


with Sand-Cement

542

5/6/2012

Parking Shed Galvanized Pipe size

543

5/6/2012

Parking Shed

546

5/6/2012

Guarantee will be out dated

549

5/7/2012

Additional Items - Chiller and Laminar Flow Device

550

5/7/2012

Water supply, fire water distribution and Hospital potable


water supply line

551

5/7/2012

Duct Insulation Material

552

5/7/2012

Sewage Treatment Plant Building Design Drawing

553

5/7/2012

Minutes of meeting held on 3rd May 2012

554

5/7/2012

Information for Item S 30212

555

5/7/2012

Malfunctioned Lift

556

5/7/2012

Vision Panel Blocking Up

557

5/7/2012

Quantity survey - Mechanical - Galvanized Pipes

558

5/8/2012

Quantity survey - Mechanical

559

5/8/2012

Approval of Sector - U - Part one

560

5/8/2012

Approval of Sector - V -Part one

561

5/8/2012

Quantity survey - Mecanical - Galvanized Pipes

562

5/8/2012

U sector evaluation - Main Remarks - 2

563

5/8/2012

Block Wall Revision

568

5/12/2012

Additinol work

570

5/13/2012

Approval of Sector G

572

5/13/2012

Low Current Systems

576

5/14/2012

Nurse Call System Corridor Lights

577

5/14/2012

Quantity Survey Electrical

578

5/14/2012

Lightening Protection

580

5/14/2012

Approval of Sector L -Part One

581

5/14/2012

Demolish of Block wall

582

5/14/2012

Freezing and Cooling Cells

583

5/14/2012

Quantity Survey - Index 98

584

5/14/2012

Surgeon,s Washstand Details item (U11272)

585

5/14/2012

Quantity servey - Mechanical survey.

586

5/14/2012

Sanitation Pipe passages

587

5/14/2012

Incinerator

588

5/16/2012

Medical Equipment Pre-Installations Requirements, Ots,


Induction Rooms, Preparation rooms, First Aid Roomss,
Shock and Treatment Room , Plaster Room

589

5/16/2012

Kitchen Equipment Layout

590

5/16/2012

Freezing and Cooling Cells

591

5/16/2012

Level-2 Lighting wire Inspection

592

5/16/2012

Level-2 Sockets wiring Inspection

593

5/16/2012

Earth System Drawing

594

5/16/2012

Level-1- Lighting Inspection

595

5/16/2012

FON-Medical gas pipes passing through Electrical Room in


Level-5

596

5/16/2012

Approved
Approved

Approved

Approved

691
692
693
694
695
696
697
698

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Concrete Test

597

5/16/2012

601

5/17/2012

Quantity survey-Velve & Gas Pipes - Mehanical Survey

605

5/17/2012

Storm water Line Drawing

606

5/17/2012

LPB Tank Details and Calculation

607

5/17/2012

Duct Galvanized sheet material

608

5/17/2012

Boiler Room Technical Proposal

609

5/17/2012

Caterpillar Genrators Comments Reply Submittal

610

5/17/2012

Approval of Sector D

615

5/19/2012

Approval of Sector F

616

5/19/2012

Operation Room Requirements, Layout & Shop drawing

623

5/20/2012

Quantity Survey -Index 74,80 & 81

624

5/20/2012

Sector - S items Clafiictions

627

5/20/2012

Sector - X ( Clothes and Textile ) Documents completion


receipt.

628

5/20/2012

Cable Tray and Low current Wire in Electrical warehouse

629

5/21/2012

Storm water line Drawing RD3

630

5/21/2012

Mechanical Material on Site

631

5/21/2012

Sewage Treatment System

632

5/21/2012

Progress Inspections

633

5/21/2012

Water Reservoir and Pumping station Pumps

634

5/21/2012

Q.S Calculations ( Construction ) Index - 104

637

5/22/2012

Steel Frame For Dry walls.

640

5/23/2012

Single Line Diagram

641

5/23/2012

Steel Frame For Dry walls.

645

5/24/2012

Approval of sector - H

646

5/24/2012

Scrub Sink Drwing

647

5/24/2012

Low voltage Switchgear Technical Specification

648

5/24/2012

Quantity survey

(About Signed verification )

Luminaires Submittal

649

5/24/2012

Supervision Board

Recommendations for Medical Equipment delivery and


logistics

650

5/24/2012

Supervision Board

Reminder For Power Supply Cord And Plug BS Standard


for Medical Equipment

651

5/24/2012

Minutes of technical meeting M-005 held on 23/5/2012

652

5/24/2012

Replacement of storm water Pipe.

657

5/27/2012

Demolish of Block wall

659

5/28/2012

Procurement and Delivery Schedule

665

5/30/2012

Cable Tray and Low current Wire inspection

666

5/30/2012

Baseline Program for Medical Equipment

667

5/30/2012

Final Layout for the sterilization

668

5/30/2012

Wiring Device Submittal

669

5/30/2012

Fixed Medical Equipment Items Distribution

672

5/31/2012

Chiller Units Base

673

5/31/2012

Valves.

674

5/31/2012

Dirty Utility - Bed pan Washers

675

5/31/2012

Progress Inspections

676

5/31/2012

Equipment Layout Sterilization Department Level-0

677

5/31/2012

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Rejected

733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Medical Equipment Panels-New Items Specifications and


Distribution

678

5/31/2012

Equipment layout -Radiology Dept. in Level Zero

679

5/31/2012

Water Tank Treatment System cost Break down

686

6/2/2012

Quantity survey - Payment No -8

688

6/2/2012

Quantity survey Level 2 & 5 (Mechanical )

689

6/2/2012

Time Schedule Report May 2012

690

6/2/2012

Details and Program of Item NO.684

697

6/3/2012

Revised In Block wall Level - 1 Part - E

698

6/3/2012

Submittal for PACS

699

6/3/2012

Chiller Request

700

6/3/2012

Water Pipe to the Hospital

702

6/3/2012

Procurement and Delivery Schedule

703

6/4/2012

Medical Equipment, Summary Notes, Sector-H

704

6/4/2012

Medical Equipment, Summary Notes, Sector-F

705

6/4/2012

Medical Equipment, Summary Notes, Sector-D

706

6/4/2012

LVSB - 31 Location Proposal

707

6/4/2012

Radiology Department Layout

708

6/4/2012

Fire Alarm Cable Birtas Type ( 2x1.5mm )

710

6/4/2012

Level - 1 Cable Tray Shop Drawings.

711

6/4/2012

Porcelain Steps and Balustrade Details

712

6/5/2012

Modular Operating Theatres ' Material

713

6/5/2012

Cube Test

716

6/5/2012

Mechanical Shop Drawing Level 1 ( HVAC Piping, G1


Piping & Ducting )

717

6/5/2012

UPVC Pipe material inspection

719

6/5/2012

Progress Inspections

720

6/5/2012

Fire Hose Cabinet sample ( FETAS )

721

6/5/2012

Level -1 & 2 - Lighting Shop Drawings

722

6/6/2012

Baseline Program for Medical Equipment

723

6/6/2012

Incidental works for Medical Equipment Installation

730

6/10/2012

Transferring Material

731

6/10/2012

Complete proposal Design for the roads of the Project

732

6/10/2012

Low Current Wire in Electrical Warehouse

733

6/10/2012

Lighting Protection System Inspection

734

6/11/2012

Medical Request to Submit Drawing for Level - 0,1 & 2

735

6/11/2012

Reply Comments on Wiring Device Submittal

736

6/11/2012

Low Current Cable Inspection

737

6/11/2012

Concrete Interlock Blocks Road Instead of Asphalt


Pavement.

738

6/11/2012

Monthly Report - May 2012 - Update.

739

6/12/2012

Minutes of Meeting No: 32 of 10th June 2012

743

6/12/2012

Pattern Desigh for Floor Level - 2

744

6/12/2012

Data switch HP Submittal

746

6/13/2012

Fire Alarm Shop Drawings

747

6/13/2012

Low Current system - Clock system specifications and


shop drawings.

748

6/13/2012

Quantity Survey - Electrical ( Lighting Protection System )

749

6/13/2012

Supervision Board

773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Quantity Survey - Payment No -9

750

6/13/2012

Block Wall Revision

751

6/13/2012

Item V50232 Moved to P 10006 ( Laundry )

752

6/13/2012

Inspection of Chiller Units

753

6/13/2012

Water tank Treatment System ( Water Proofing )

754

6/13/2012

Dewatering System

755

6/13/2012

Block H Drainage Plan

756

6/13/2012

Packing List and Inspection of Chillers Units

757

6/13/2012

759

6/14/2012

Putty Filler Works

760

6/14/2012

Call for Weekly Meeting - Sunday 17th June 2012-10.00AM

762

6/16/2012

Control Console in Operating Theatres Modular walls

764

6/17/2012

MV Cable rout of chillers and Transformers, Sewage


Building and Training center

765

6/17/2012

Luminaires Comment Reply

766

6/17/2012

Proposal for New Technology of Lightening Projection


System

767

6/17/2012

Luminaires Comment Reply

768

6/17/2012

Luminaires Status Submittal

769

6/17/2012

Low voltage Switchgear Technical Specification

770

6/17/2012

Quantity survey-Index - 16 ( Electrical )

774

6/18/2012

Invitation for Manufactures Visits

775

6/19/2012

Access Control

777

6/19/2012

Low Current Systems-Clock system Specification and


shop Drawings

778

6/19/2012

Minutes of Meeting No: 33 of 17th June 2012

779

6/19/2012

Granite Sample

780

6/19/2012

Medical Equipment - Delivery Payment Items

781

6/20/2012

Telephone Exchnge Catalogue

782

6/20/2012

Paint Material Submittal

783

6/21/2012

Nurse Call System

784

6/21/2012

Telephone And Data Shop Drawings

785

6/21/2012

IP CCTV System

786

6/21/2012

Sector P Laundry - BM Equipment

787

6/21/2012

Call for Weekly Meeting - Sunday 24th June 2012-10.00AM

791

6/23/2012

Modules'Color of Operating Theatre

792

6/23/2012

New Item O 10000, no 706, "Ice Making Machine" Mew


Distribution's

793

6/23/2012

Medical Equipment Site Inspection Report

794

6/23/2012

Cost Breakdown - Galvanized Duct and Fiberglass


Insulation Works

795

6/23/2012

Mechanical Shop Drawing Level-1 R2

796

6/23/2012

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Medical Equipment Time Schedule

805

6/26/2012

Supervision Board

Minutes of Meeting of Medical Equipment sectors I,O,S


&T

806

6/26/2012

Supervision Board

Medical gases and Electrical Requirments for Customized


BHU ( Replacing new Item V 10001 )

807

6/26/2012

Minutes of Meeting About sectors I, L, U & V

809

6/26/2012

D Sector Item NO : 121 & 123

810

6/26/2012

Bed Head Unit Sample

811

6/26/2012

Critical Panels 10001 , Updated Distribution and Medical


Gases Requirments for Clinic At Level - 1

812

6/26/2012

Supervision Board
Supervision Board
Supervision Board
Supervision Board

Approved

816
817
818
819
820
821
822

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Medical Equipment Site Inspection Report

813

6/26/2012

Inspection of Volume Damper, Diffuser and Linear Grille

814

6/26/2012

Corner Guard and Wall Guard

815

6/26/2012

Sluggishness of Work Progress

816

6/26/2012

Medical gases and Electrical Requirments for Customized


BHU ( Replacing new Item V 10001 )

818

6/26/2012

High Voltage Cable Submittal

819

6/26/2012

Submittal for Mechanical Inspection

820

6/26/2012

Approval of sector B - Part 1

822

6/26/2012

Approval of Sector N

823

6/26/2012

Generator Specification

827

6/27/2012

MRI Layout Proposal by the Contractor

828

6/27/2012

Water tank Surface's Treatment

829

6/27/2012

Storm Water Layout

830

6/27/2012

MRI Layout Proposal by the Contractor

831

6/27/2012

Generator Comments Reply

832

6/30/2012

LV Panels Technical Submission

833

6/30/2012

MRI Layout Proposal by the Contractor

834

6/30/2012

MEP Minutes of meeting

835

6/30/2012

Single Line Diagram Comments Reply

836

6/30/2012

DB, SMDB & Low Current Cable Delivery Inspection

837

6/30/2012

Contractor Monthly Progrees Report - May

839

6/30/2012

Sector P Laundry - BM Equipment

840

6/30/2012

Granite Stone

841

6/30/2012

Call For Weekly Meeting - Sunday 30th June 201210:00am

842

6/30/2012

Level - 0 Lighting shop Drawings

857

7/2/2012

New Model of Gamma Camera - Item No 86 C41212 Approval form

APPROVED

859

7/2/2012

Quantity Survey - (Electrical )

861

7/2/2012

Quantity Survey - Index 101 ,109 ,112

862

7/2/2012

863

7/2/2012

864

7/2/2012

Approved

865

7/2/2012

Approved

866

7/2/2012

Approved

Quantity Survey Index - Mechanical

868

7/3/2012

Approved

Quantity Survey Index - 52, 77, 96, 97, 98, and 102

869

7/3/2012

Approved

Low Current Installed Cable Level -5, 4, & 3 - Inspection

870

7/4/2012

Primer and Self Leveling Grout - PVC Floors

871

7/4/2012

Time Schedule

873

7/4/2012

Sector -L- Approval Form Delivery - Part - 2

874

7/4/2012

Sector -V- Approval Form Delivery - Part - 2

875

7/4/2012

Sector -T- Approval Form Delivery

877

7/4/2012

Sector -S - Approval Form Delivery

878

7/4/2012

Sector -O - Approval Form Delivery

879

7/4/2012

Sector -I - Approval Form Delivery Part - 3

880

7/4/2012

Sub-base layer and Kerb stone Dimension

884

7/7/2012

Time Schedule Report June 2012


Fuel and LPG Tank

Madical Gas Pipe Material

APPROVED

APPROVED

Duct Installation (38mm )

APPROVED

Approved

Approved

858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

I Sector. Note about colours of workbenches and cabinets


(KOC buro Bespoken )

885

7/7/2012

Road Kerbs Dimention

886

7/7/2012

Manholes' covers

887

7/7/2012

Pool's Tiles - Material submittal

888

7/7/2012

Revision of Part - F

894

7/8/2012

Suspended Ceiling - Permit to work

895

7/9/2012

Approved

Skylight Material Submittal

896

7/9/2012

Approved

Fuel Tank and Chiller Pad

897

7/9/2012

Transformers & MV switchgear Rooms Trench

898

7/9/2012

Glasses Approval

901

7/10/2012

Approved

Quantity survey - Mechanical

902

7/10/2012

Approved

Manpower And Electrical Site Work

903

7/10/2012

Approved

Kitchen Equipment Shop Drawing - Level - 0

904

7/10/2012

Approved

Uninterruptable Power System

905

7/10/2012

Approved

Incinerator

906

7/10/2012

Approved

Intensive Care Bedhead Unit Sample

909

7/11/2012

Level - 0 Lighting Inspection


APPROVED

910

7/11/2012

Approved

Cable Tray and Index 2x1.5mm Cable on site Inspection

911

7/11/2012

Supervision Board

Quantity Survey - Electrical


APPROVED

912

7/11/2012

Approved

Supervision Board

Quantity Survey - Electrical Index - 17


APPROVED
Quantity Survey - Heating and Cooling pipes ( Level - 2, B
Block )
APPROVED

914

7/11/2012

Approved

915

7/11/2012

Approved

Call for weekly Meeting - Sunday 15th July 2012-10:00am

917

7/12/2012

Progress Inspections

924

7/15/2012

Approved

Decorative Wall Panel - Request for Approval

925

7/15/2012

Approved

PVC Adhesive materials ( UZIN Brand )

930

7/16/2012

Approved

Morgue Area Roof Drawings

931

7/16/2012

Approved

Minutes of Meeting No : 35 of 3rd July 2012

932

7/16/2012

Interim Certificate Payment No: 10

933

7/16/2012

Approved

Medical Gas Fittings

934

7/16/2012

Approved

Medical gas shop Drawing level 1 and 2

935

7/16/2012

Approved

Transformer 3.5MV A for Chillers

942

7/17/2012

Approved

Minutes of Meeting on -36 of 15th July 2012

944

7/17/2012

Road Works

945

7/17/2012

HV Cables Reply Letter

952

7/19/2012

Approved

LV Panels Shop Drawing

953

7/19/2012

Approved

Contractor Revised Time Schedule - July 2012

954

7/19/2012

Approved

LV Panels Shop Drawing

956

7/19/2012

Approved

Time Schedule Rev - 3

961

7/22/2012

Cross Section - Road 1

962

7/22/2012

Approved

Quantity Survey Index - 115 & 116

963

7/22/2012

Approved

Test of compaction

964

7/22/2012

LVSB - 31 Location Comments Reply

965

7/22/2012

Quantity Survey Index - 110 & 119

968

7/23/2012

Approved

Quantity Survey Index - 99 & 117

969

7/23/2012

Approved

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Quantity Survey Index - 118

970

7/23/2012

Lighting IP 44

971

7/23/2012

Generator Inspection

972

7/23/2012

Mechanical Shop Drawing Level-0

973

7/23/2012

Quantity Survey Index - 105, 106, & 107

976

7/23/2012

Inspection of Fan Coil Unit

978

7/24/2012

Inspection of Thermal Pipe Insulation

979

7/24/2012

HVAC Control Product

980

7/24/2012

PE Pipes

981

7/24/2012

Rejected

Quantity Survey Index - 120

985

7/25/2012

Approved

Quantity Survey Mechanical

986

7/25/2012

Quantity survey - Mechanical

987

7/25/2012

Fuel Tank and Pad & Wall footing Detail

988

7/25/2012

SMATV Reply Letter ( Number of Points )

989

7/25/2012

Reply for Low Current Inspection Level 3 ,4 & 5

990

7/25/2012

SUBMITTAL For Waiting Device

991

7/25/2012

Outdoor lighting Pole

992

7/25/2012

Inspection of Volume Dampers and Grills

993

7/25/2012

Madical Gas Pipe Material

994

7/25/2012

Inspection of Air Handling Unit

995

7/25/2012

Progress Inspections

996

7/25/2012

SARAY Aluminum for sky Light

997

7/26/2012

Furniture Arrived To The Project

1000

7/29/2012

Quantity Survey - Index 113 & 121

1001

7/29/2012

Crushed Aggregate Base Course

1002

7/29/2012

Quantity survey - Mechanical

1003

7/29/2012

BMS Schedule of Equipment & BMS Requirments

1006

7/30/2012

Heavy Traffic Expansion Joint

1007

7/30/2012

Medical Equipment Related MEP Shop Drawing

1015

7/31/2012

Supervision Board

Mechanical Shop Drawing for Medical Equipment


Requirements Level 3

1017

7/31/2012

Supervision Board

Mechanical Shop Drawing for Medical Equipment


Requirements Level 4

1018

7/31/2012

Supervision Board

Mechanical Shop Drawing for Medical Equipment


Requirements Level 5

1019

7/31/2012

Time Schedule Report July 2012

1020

7/31/2012

Mechanical shop Drawing for Medical Equipment's Level-3

1021

7/31/2012

Mechanical shop Drawing for Medical Equipment's Level-4

1022

7/31/2012

Mechanical shop Drawing for Medical Equipment's Level-5

1023

7/31/2012

Inspection of Black Steel Pipes

1024

7/31/2012

Sector F Final Decisions

1026

7/31/2012

Sector D Final Decisions

1027

7/31/2012

U.P.S.Comments Reply

1033

8/1/2012

DB's & LIHCH Cable Delivery Inspection

1034

8/1/2012

Working Without Permission

1035

8/1/2012

Interior Luminaries

1036

8/1/2012

BMS System Submittal

1037

8/1/2012

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Approved

Approved

Rejected

Approved

Approved

Approved

Approved

946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

HV Cables Submittal Comments Reply

1038

8/1/2012

Inspection of Plumbing Fixtures

1039

8/1/2012

Maintenance Program for Medical & Utility Equipment

1040

8/2/2012

Submittal for PACS ( Repeated Request )

1041

8/2/2012

Bio Medical Shop Drawing

1042

8/2/2012

Final Modification for MRI site

1043

8/2/2012

Engineer of Construction

1045

8/4/2012

Sector H Final Decisions

1046

8/5/2012

Replacing Asphalt to Colored Inter Lacking Tiles

1047

8/5/2012

Quantity Survey - Index 123 & 127


Quantity Survey - Index 122,124,125,126
Quantity Survey - Index - 111,114,128,131

1048
1049
1050

8/6/2012

Approved

8/6/2012

Approved

8/6/2012

Approved
Approved

Quantity Survey - Index - 129,132

1051

8/6/2012

Minutes of Meeting of 2 August 2012

1054

8/6/2012

Field Observation Notice ( FON ) M - FON - 021

1055

8/6/2012

Flexible Duct

1056

8/6/2012

GRP Water Tank

1057

8/6/2012

Attention

1058

8/6/2012

Domestic Soft Cold Water Tank

1059

8/6/2012

Hot Water Storage Tanks

1060

8/6/2012

Generators and Elevators Documents

1070

8/9/2012

Reply the Comments for Sector B & N

1071

8/9/2012

Construction Work.

1072

8/9/2012

Medical Equipment Time Schedule

1073

8/9/2012

Weekly minutes of Meeting

1074

8/9/2012

MV Switch Gear

1076

8/9/2012

Low Current System Room Drawing

1077

8/9/2012

Nurse Call system Shop Drawings

1078

8/9/2012

Surgical Room Panel Shop Drawings

1079

8/9/2012

Lift Material Inspection

1080

8/9/2012

Medical Equipment Maintenance Service

1083

8/11/2012

Quantity Survey - Mechanical

1084

8/11/2012

Quantity Survey - Electrical

1085

8/11/2012

Fire Fighting System

1089

8/11/2012

Hydrotherapy Pool

1090

8/11/2012

Modification for MRI

1091

8/11/2012

Incinerator PLC wiring Driagram

1092

8/11/2012

Inspection of Stainless Steel Material

1093

8/11/2012

Inspection of Kitchen Equipment

1094

8/11/2012

Minutes of Meeting No :39 of 5th August 2012

1095

8/12/2012

Payment No: 11

1096

8/12/2012

Duct insulation Measurement

1097

8/12/2012

Quantity Survey - Mechanical

1100

8/13/2012

Quantity Survey - Mechanical

1101

8/13/2012

990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Quantity Survey - Electrical

1102

8/13/2012

Reply for Surgical Room Panel Shop Drawing

1105

8/13/2012

Gamma Camera Layout

1106

8/13/2012

NoS.3 Caterpillar Generators Site Inspection

1107

8/13/2012

Low Current Cables on Site Inspection

1108

8/13/2012

Inspection of Expansion joints

1109

8/13/2012

Approved

Inspection of Medical Gas Pipes

1110

8/13/2012

Approved
Approved

R.C Detail for Manhole Cover

1111

8/13/2012

Supervision Board

Medical Equipment Pre-Installations Requirements, Level


- 1 ,(Laboratory Department )

1112

8/14/2012

Supervision Board

Medical Equipment Pre-Installations Requirements, Level


- 1 ( Nuclear Medical Department )

1113

8/14/2012

Supervision Board

Medical Equipment Pre-Installations Requirements, Level


- 1 ( Outpatient Department )

1114

8/14/2012

Supervision Board

Medical Equipment Pre-Installations Requirements, Level


- 1 ( Accident and Emergency Department )

1115

8/14/2012

Quantity Survey - Index 135

1123

8/14/2012

Approved

Heavy Traffic Expansion Joint

1124

8/14/2012

Resubmit

Surgical Room Panel Shop Drawings

1116

8/14/2012

Approved

Medical Equipment Reply

1117

8/14/2012

Medical Gas Valves

1118

8/14/2012

Incinerator PLC wiring Driagram

1119

8/14/2012

Heat Exchanger

1120

8/14/2012

Water softener system

1121

8/14/2012

Approved

LV and Generators Building (ARCH )

1132

8/15/2012

Approved

Sector G Final Decisions

1133

8/15/2012

Data & Telephone System RFI

1134

8/15/2012

Gamma Camera Layout

1135

8/15/2012

Medical Equipment Pre- Installation Requirement

1136

8/15/2012

Medical Equipment Pre- Installation Requirement Level -1


( physiothrapy Department )

1137

8/15/2012

Sector G Item N,211, Comments

1138

8/15/2012

Dedication of Mechanical Engineer

1139

8/15/2012

MRI site layout Comments

1140

8/15/2012

Mortuary Refrigerators layout Comments

1141

8/15/2012

Shop Drawing Related to Medical Equipment, Level


-3,4,&5

1142

8/15/2012

USB's Single Line Diagram

1143

8/16/2012

Underground Conduit

1144

8/16/2012

Lift (1,2) ( Waiting Area ) ( SMDB - Kitchen ) Board SLD

1145

8/16/2012

MV Switch Comments Reply

1146

8/16/2012

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Approved

Approved

Approved

Board SLD for Park Area

1147

8/16/2012

Supervision Board

Medical Equipment Pre- Installation Requirments, Level -1


( Limited Care Dialysis Department )

1148

8/16/2012

Supervision Board

Medical Equipment Pre- Installation Requirments, Level -1


( General Support Services )

1149

8/16/2012

Supervision Board

Medical Equipment Pre- Installation Requirments, Level -1


( Observation Department )

1150

8/16/2012

UDMFB ( 21,22) (UMDB31),(UDB-LC)SLD

1151

8/16/2012

Quantity Survey - Electrical

1153

8/16/2012

Approved

Quantity Survey - Index - 130

1154

8/16/2012

Approved

Sector N Final Decisions

1156

8/16/2012

Sector B - Part 1 Final Decisions

1157

8/16/2012

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Supervision Board
Supervision Board

1034
1035
1036
1037
1038
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

1068

Supervision Board

Supervision Board
1069
1070
1071
1072
1073
1074
1075
1076

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

New Items Approval Form Delevery

1158

8/16/2012

AVSU Control Box and Components

1159

8/22/2012

Medical Air Compressor, Filter Dryer And Vacuum System

1160

8/22/2012

Medical Equipment for Level 3,4, & 5

1161

8/22/2012

Air Handling Units Parts

1162

8/22/2012

Medical Gas Systerm Level - 0

1163

8/22/2012

Design Drawings and - X Sections of RD 2

1165

8/22/2012

Shop Drawing Related to Medical Equipment, Level -2

1175

8/26/2012

1176

8/26/2012

Galvanized Sheet - Material on Site

1186

8/29/2012

Gamma camera Room and nuclear Medicine Department


Pre-Installation Requirements

1187

8/29/2012

Anesthesia " and "Surgeon" panel in the OTs

1190

8/29/2012

Item C19732 "Dental X-ray Orthoradial" No 78, Revised


Approval Form

1191

8/29/2012

Item 190783, No : 371 Revised Specifications

1192

8/29/2012

Aluminum False Ceiling

1193

8/29/2012

Monthly Report - July/August/ 2012 -

1194

8/29/2012

Final Decision and Revised/Corrected Approval Forms for


Sectors S,T,U,V,I,L,O, and New Items.

1201

8/30/2012

Time Schedule Report August 2012

1211

9/2/2012

Galvanized Sheet - Material on Site

1216

9/3/2012

Minutes of Meeting No.40 of 28Th August 2012

1217

9/3/2012

Double Shift Work Request To Complete The Works on


Time

1218

9/3/2012

Critical Panel Redistribution ( item No: 710-V1001)

1220

9/3/2012

Paving Tile ( Side Walk Precast - Concrete )

1221

9/3/2012

Mechanical Pipes

1222

9/3/2012

Quantity Survey - Mechanical

1225

9/4/2012

Electrical Sub - Contractor

1228

9/4/2012

Potable Water and Irrigation Pipes

1231

9/5/2012

Carrbon Dioxide CO2 Fire System

1232

9/5/2012

Galvanized Duct Material

1233

9/5/2012

Black Steel pipes Materil

1234

9/5/2012

Galvanized Duct Material

1235

9/5/2012

Water Pumps ( Domestic, Fire Fighting and Chilled Water


Pumps)

1236

9/5/2012

New Items Maintenance

1240

9/6/2012

Minutes of Meeting No: 41 of 2nd September 2012

1241

9/6/2012

Measurement of Duct Insulation

1242

9/8/2012

Color Selection for Laboratory Baench

1244

9/8/2012

Opretation Theatre & Induction Rooms provisions: Control


Panel, Anesthesia Panel, Surgery Panel & Critical Panel

1245

9/9/2012

Natural Stone Sample

1246

9/9/2012

Black Steel pipes - Materil Site

1255

9/10/2012

1256

9/10/2012

External and Faade Lighting Design.

1258

9/10/2012

Recommended Documents

1262

9/12/2012

Special Report - Site Works up to 29 August 2012

1263

9/12/2012

U.P.S System Resubmittal

1264

9/12/2012

Medical Equipment,Evaluatin and Approval Update

Opretation Theatre & Induction Rooms provisions: Control


Panel, Anesthesia Panel, Surgery Panel & Critical Panel

Approved

APPROVED

APPROVED

1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Stair and Morgue Roof - Structural Design

1265

9/12/2012

Quantity survey - Payment 12

1266

9/12/2012

Minutes of Meeting No 42 Sunday 9th September 2012

1274

9/17/2012

Quantity survey Mechanical - Inspection of ( Plumbing


Fixtures

1275

9/17/2012

Elevator Material on Site ( Inspection Form )

1279

9/17/2012

Low Current Cable and Elevator on Site

1280

9/17/2012

Control Panel Surgical Critical Panels And Anaesthesia

1281

9/17/2012

Rear Entrancec stair Case

1282

9/17/2012

Gamma camera Room and nuclear Medicine Department


Pre-Installation Requirements

1283

9/17/2012

Laundry Equipment Submittal

1284

9/17/2012

1285

9/17/2012

Gen Set Documents

1286

9/17/2012

Elevator Material on Site.

1287

9/17/2012

Low Current Cable and Elevator Material on Site

1288

9/17/2012

Generator Building Sound Attenuator

1289

9/17/2012

Control Panel Surgical Critical Panels And Anaesthesia

1290

9/17/2012

Inspection of Pulmbing Fixtures - Mechanical

1291

9/17/2012

Sewage Treatment System Unint Inspection

1292

9/17/2012

Water Tank Treatment Material

1293

9/17/2012

Inspection of ( Valves, Strainers & Flexible Pipes ) Mechanical

1294

9/17/2012

Inspection of Medical Gas Pipes - Mechanical

1295

9/17/2012

Water Tank Treatment ( Water Proofing )

1298

9/18/2012

Wiring Device Submittal

1306

9/20/2012

Transformers Site Inspection

1307

9/20/2012

Guarantee will be Outdated

1308

9/20/2012

HVAC Equipment Electric Load Detail

1309

9/20/2012

Fixing Water Pipe Passages

1316

9/22/2012

Mechanical pipes Level - 0

1317

9/22/2012

Ground Reservoir pumps

1319

9/23/2012

FON - M - 022

1321

9/23/2012

Quantity Survey - Index 139,144, & 149

1322

9/23/2012

Reply for Chiller Comments

1320

9/23/2012

Level 1, 2, Low Current Cable Inspetion

1325

9/24/2012

MCC Panels

1326

9/24/2012

Pending Actions for the Commented works

1327

9/24/2012

Quantity Survey - Index 142, 143, 145, & 146

1328

9/24/2012

Quantity Survey - Index 140m 141

1329

9/24/2012

Quantity Survey - Index 136, 137 & 138

1330

9/24/2012

COC Numbers - Errata Corrige

1335

9/25/2012

FON - M - 023

1336

9/25/2012

Pending Shop Drawings

1342

9/27/2012

Minutes of Meeting No: 43 of 24th , September 2012

1344

9/27/2012

Hydrotherapy Pool and Irrigation System

1345

9/27/2012

Packing List and Warehousing of Medical Equipment

1346

9/27/2012

Reflected Ceiling Coordination Drawing

APPROVED

1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

TransPort Document

1347

9/27/2012

Concern on Medical Equipment Pre - Installation works at


Level 3, 4, & 5.

1348

9/27/2012

Lead Shielding for Radiology Protectection

1351

9/29/2012

Assembly Factories GE Medical Equipment

1352

9/29/2012

Quantity Survey - Mechanical

1353

9/29/2012

Hot Water Storage Tanks

1356

9/30/2012

Fire House cabinet

1357

9/30/2012

Hydrotherapy Pool and Irrigation System

1358

9/30/2012

Resubmit of Ground Reservoir Pump

1359

9/30/2012

Fan Coil Units Catalogue

1360

9/30/2012

Mechanical shop Drawing Level 0 Block G

1361

9/30/2012

Time Schedule Report September 2012

1362

9/30/2012

Absence of Mechanical Engineer

1363

9/30/2012

Inspection of Medical gas pipe Level - 2

1371

10/1/2012

Progress Inspections

1372

10/1/2012

1376

10/1/2012

1377

10/1/2012

Gamma Camera Room

1383

10/2/2012

Daily Report

1384

10/2/2012

Quantity of Kerbstone.

1385

10/2/2012

Concrete works water Splashing .

1386

10/2/2012

FON - M - 024

1387

10/4/2012

Medical Equipment - Intensive Care Bed Unit Sample

1388

10/4/2012

Kerbstone and Gutters

1396

10/4/2012

Minutes of Meeting No 44 of 1st October 2012 - Monthly


Meeting

1397

10/4/2012

Elevator Material Quantity Survey

1398

10/4/2012

Arrived Transformer Quantity Survey

1399

10/4/2012

Quantity Survey - Index 150

1400

10/4/2012

Quantity Survey - Electrical Index - 18, 19, & 20

1401

10/4/2012

Medical Equipment, New offer Approval for Item H5432

1404

10/4/2012

Cable Arrangement Between Block - H & Transformers


Rooms.

1417

10/8/2012

Electrical Manpower

1418

10/8/2012

Medical Equipment - Payment

1419

10/8/2012

Electrical Manhole

1420

10/8/2012

IPEK Sub - Contractor Cancellation

1422

10/8/2012

Comments on the BMS System

1427

10/9/2012

GL Steel Duct Sheet Coatin Z - 350

1428

10/9/2012

Answer on Field Observation Notice

1429

10/9/2012

Inspection of Stainless Steel Water Tanks

1430

10/9/2012

Inpection of UPVC Pipes and Fittings

1431

10/9/2012

Inspection of Hot Water Pump

1432

10/9/2012

Inspection of Duct Acoustic Insulation

1433

10/9/2012

Inspection of Medical Gas System

1434

10/9/2012

Irrigation System Pipes

1435

10/9/2012

MRI site layout -Medical Equipment


Medical Equipment, ICU Bed Head unit sample Comments

APPROVED
APPROVED

APPROVED

Approved
Approved

1165
1166
1167
1168
1169
1170
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Carbon Dioxide Fire System

1436

10/9/2012

Revised Morgue Roof and Stair Design

1439

10/10/2012

Quantity Survey - Index 134 & 147

1440

10/10/2012

Comments on the Access Control System

1441

10/10/2012

List of Delayed works and pending deliveries.

1442

10/10/2012

Need Response for Our Letters.

1447

10/11/2012

Failed Concrete wall out of Payment

1448

10/11/2012

U.P.S System Resubmittal

1449

10/11/2012

Inspection of Kitchen Equipment

1450

10/11/2012

Inspection of Air Handling Unit

1451

10/11/2012

Minutes of weekly Meeting

1458

10/15/2012

Mechanical Survey

1459

10/15/2012

APPROVED

Quantity Survey - Medical Gas

1460

10/15/2012

APPROVED

Inspection of Fire Dampers and Air Ventilation System

1463

10/15/2012

APPROVED
RESUBMIT

Inspection of Chiller Units Installations

1464

10/15/2012

Supervision Board

Inspection of Sewage Treatment package Unit and Sludge


Dewatering Unit

1465

10/15/2012

Supervision Board

Inspection of Sewage Treatment package Unit and Sludge


Dewatering Unit

1466

10/15/2012

Asphalt Mix Design Formula for Binder & Surface layers

1467

10/15/2012

Queue System Submittal

1468

10/15/2012

Drawing for Generator Building Sound Insulation

1469

10/15/2012

Audio Visual System Submittal

1470

10/15/2012

Security Mangement System Submittal

1471

10/15/2012

Inspection of Medical Equipment for A & C Part One.

1472

10/15/2012

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

APPROVED

RESUBMIT

APPROVED

RESUBMIT

APPROVED

Mechanical Survey

1476

10/17/2012

Supervision Board

Extra Work of Mechanical for Medical Equipment


Installation

1477

10/17/2012

Supervision Board

Inspection of Medical Gas Pipe Level - 2 Block B and Level


0 All pipes

1479

10/17/2012

Inspection of Medical Gas Valves.

1480

10/17/2012

Progress Inspections

1481

10/17/2012

Inspection of Medical Gas System Level 2 Block E

1482

10/17/2012

REJECTED

Quantity survey Mechanical

1485

10/18/2012

APPROVED

Quantity survey Mechanical

1486

10/18/2012

APPROVED

Inspection of Medical Equipment - Sectors

1488

10/20/2012

Payment No: 13

1493

10/21/2012

APPROVED

Quantity Survey - Medical Equipment

1494

10/21/2012

APPROVED

Missing Exhaust Fans in Schedule

1495

10/22/2012

FON - M - 025

1496

10/22/2012

Blood Warmer (Item No: 198 - F35200)

1500

10/22/2012

Time Schedule Report October 2012

1501

10/22/2012

Approval of Quntity survey - Mechanical

1505

10/24/2012

APPROVED

Sector W Approval Form Delivery

1506

10/24/2012

APPROVED

Sector X Approval Form Delivery

1507

10/29/2012

APPROVED

Mechanical Shop drawing for Sterilization Department

1508

10/30/2012

Medical Gas Shop Drawing R1 level 0, 1 and 2

1509

10/30/2012

FON - M - 026

1510

10/30/2012

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

REJECTED

REJECTED

1209
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231

Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board
Supervision Board

Low Current Material Inspection

1511

10/30/2012

Steam System Accessories

1513

10/31/2012

Fuel Tank Earthing System

1514

10/31/2012

Air Ventilation System (Twin Fans)

1515

10/31/2012

Medical Gas Pipes Expansion Joint

1516

10/31/2012

Trimestral Report

1517

10/31/2012

Sector W Approval Form Delivery - Part 2 for Sub-sets for


Gynecology and Orthopedies.

1518

10/31/2012

Approval of sector B - Part 3, Item 36,42, 51, 60, 63, & 71

1519

10/31/2012

Maintenance Program for Medical & Utility Equipment


(Repeated Request)

1520

10/31/2012

Submittal for PACS ( Repeated Request )

1521

10/31/2012

Set of Shop Drawing

1528

11/3/2012

Fuel Tank Earthing System

1539

11/5/2012

Transformer & Auto Park Road

1541

11/5/2012

Alem Road & Emergency Interance

1542

11/5/2012

Site Inspection

1545

11/6/2012

Supervision Board

Level 2 Mechanical Shop - Drawings (Water Piping


Distribution and Drain) for Medical Equipment.

1548

11/7/2012

Supervision Board

Minutes of Meeting No.46 of 5th November 2012 Monthly Meeting.

1549

11/7/2012

Fuel Oil Tank Installation - Safety Requirement

1550

11/7/2012

Road Between ( Block F & B )

1553

11/8/2012

Quantity Survey - Electrical

1554

11/8/2012

Quantity Survey - Medical Equipment

1555

11/8/2012

Supervision Board
Supervision Board
Supervision Board
Supervision Board

Please Turn Over Next Page.

Supervision Board

Quantity Survey - Index - 151, 152 ,153, 154, 155, 156,


157, 159, 160, 161, 162, & 164.

1559

11/8/2012

Supervision Board

Quantity Survey - Index - 158, 163, 165, & 169

1560

11/8/2012

1561

11/8/2012

Supervision Board

Bank Guarantee (NORTH BANK)

Supervision Board

Generator Building Insulation Drawing

1568

11/12/2012

Supervision Board

Field Observation Notice

1569

11/12/2012

Supervision Board

Block wall Redesign

1570

11/12/2012

Supervision Board

Letter No : 1448 Dated 11-10-2012

1571

11/12/2012

Supervision Board

Cracks in Interior Cement Plaster

1572

11/12/2012

Supervision Board

Laundry Revised Submittal

1573

11/12/2012

Supervision Board

Medical Gas Pipes Expansion Joints

1574

11/12/2012

Supervision Board

Level - 1 Mechanical Shop Drawings ( Water Piping


Distribution And Drain )for Medical Equipment.

1577

11/13/2012

Supervision Board

Lead Shield fo Radiology protection

1578

11/13/2012

Supervision Board

Approval of SectorB - Part 4, Item 37, 48, 49, 50, 61, & 69

1579

11/13/2012

Supervision Board

Road Subsiding.

1582

11/15/2012

Supervision Board

Main Entrance Design

1584

11/17/2012

APPROVED

Supervision Board

Inspection of Air Handling Unit

1585

11/17/2012

APPROVED

Supervision Board

Inspection of Galvanized Steel Duct Sheets

1586

11/17/2012

APPROVED

Supervision Board

Inspection of Galvanized And Black Steel Pipes.

1587

11/17/2012

APPROVED

Supervision Board

Inspection of Medical Gas pipe Level 2 Block C, D and E.

1592

11/18/2012

Resubmit

Supervision Board

Mechanical Shop Drawing Level 0 Block G

1593

11/18/2012

Supervision Board

Quantity Survey - Electrical

1595

11/20/2012

Supervision Board

Site Inspection

1597

11/21/2012

Supervision Board

Anaesthetic Gas Seavenging System

1600

11/20/2012

Supervision Board

Reques About the Special Drains

1601

11/20/2012

Supervision Board

Contractor / ConsultantRelationship

1602

11/20/2012

Supervision Board

Medical Gas System Second Master Alarm

1603

11/20/2012

Supervision Board

Inspection of Medical Gas Pipe and Fitting Material

1604

11/20/2012

APPROVED

Supervision Board

Quantity Survey - Index 166, 168, 171, 148, & 104

1608

11/21/2012

APPROVED

Supervision Board

Electrical Works Observation Noticed

1610

11/21/2012

Supervision Board

Marble Cap

1613

11/22/2012

Supervision Board

Site Security

1614

11/25/2012

APPROVED

APPROVED

APPROVED

Supervision Board

Approval of SectorB - Part 5, Items

1615

11/25/2012

Supervision Board

Defects in the Roads

1617

11/25/2012

Supervision Board

Pending Items

1619

11/26/2012

Supervision Board

Water Hammer Arrester

1620

11/26/2012

Supervision Board

Steam System Accessories

1621

11/26/2012

Supervision Board

Quantity Survey - Electrical

1622

11/26/2012

Supervision Board

Electrical & Biomedical Department

1623

11/26/2012

Supervision Board

Condensate Pumps And Fuel Oil Transfer Pumps

1624

11/26/2012

Supervision Board

Fan Coid valve and Thermostat Survey

1625

11/27/2012

Supervision Board

Quantity Survey - Index - 173

1628

11/27/2012

Supervision Board

Our Letter No: 1628 Dated 27/11/2012

1629

11/28/2012

Supervision Board

Sterilization Department Shop Drawings

1630

11/28/2012

Supervision Board

Quantity Survey - Index ; 170 , 177, & 178

1631

11/28/2012

APPROVED

Supervision Board

Quantity Survey - Index ; 174 , 175, 176 & 180

1632

11/28/2012

APPROVED

Supervision Board

Lab Test Result (Bihartorn)

1633

11/28/2012

Supervision Board

Medical Equipment - Submittal of Electrical & Mechanicla


Layout for Laundry Department.

1634

12/1/2012

Supervision Board

Connecting Sewage System

1639

12/1/2012

Supervision Board

Road Defects

1640

12/1/2012

Supervision Board

Sector W Final Decisions

1641

12/1/2012

Supervision Board

Sewage Treatment Area Concrete Pad

1642

12/1/2012

Supervision Board

Changing Windows to Door

1647

12/2/2012

Supervision Board

Training Course Program

1657

12/3/2012

Supervision Board

Sterilization Department Shop Drawings

1658

12/3/2012

Supervision Board

Sidewalk Detail

1662

12/4/2012

Supervision Board

Medical Equipment Bed Head Unit Color Code Request

1663

12/4/2012

Supervision Board

Maintenance Program for Medical & Utility Equipment


(Repeated Request)

1664

12/4/2012

Supervision Board

Time Sechedule Report November 2012

1665

12/4/2012

1666

12/4/2012

Supervision Board

Bank Guarantee (NORTH BANK)

Supervision Board

Site Inspection in Dialysis Department in level 1 for


Medical Equipment Pre - installation

1668

12/4/2012

Supervision Board

Site Inspection in physiotherapy Department in level 1 for


Medical Equipment Pre - installation

1669

12/4/2012

Supervision Board

Site Inspection in Laboratory Department for Medical


Equipment Pre - installation

1670

12/4/2012

APPROVED

APPROVED

APPROVED

APPROVED

APPROVED

Supervision Board

Site Inspection in Dialysis Department in level 1 for


Medical Equipment Pre - installation

1671

12/4/2012

Supervision Board

Laminar Flow Ceiling System

1673

12/5/2012

Supervision Board

Spreading Wearing Course of the Roads

1674

12/5/2012

Supervision Board

Progress Inspections

1675

12/5/2012

Supervision Board

Inspection of Medical Gas Pipe Tes Level 5 Block B

1676

12/5/2012

Supervision Board

Inspection of Medical Gas Pipe Tes Level 5

1677

12/5/2012

Supervision Board

Quantity Survey - Medical Gas System

1678

12/5/2012

Supervision Board

Final Layout of B.H.U

1680

12/5/2012

Supervision Board

Quantity Survey - Medical Equipment

1681

12/5/2012

Supervision Board

Final Decisions List For Sector X Approval

1685

12/9/2012

Supervision Board

Final Decisions List For Sector B Approval

1686

12/9/2012

Supervision Board

Quantity Survey - Index 167 & 182

1687

12/9/2012

Supervision Board

EC No:1369 dated 3-12-2012

1689

12/10/2012

Supervision Board

EC No:1314 dated 12-11-2012

1690

12/10/2012

Supervision Board

EC No:1361 dated 27-11-2012

1691

12/10/2012

Supervision Board

EC No:1360 dated 27-11-2012

1692

12/10/2012

Supervision Board

EC No:1346 dated 22-11-2012

1693

12/10/2012

Supervision Board

EC No:1370 dated 22-11-2012

1694

12/10/2012

Supervision Board

EC No:1373 dated 3-11-2012

1695

12/10/2012

Supervision Board

EC No:1330 dated 3-11-2012

1696

12/10/2012

Supervision Board

Quantity Survey - Index - 82

1697

12/10/2012

Supervision Board

EC No:1377 dated 5-11-2012

1698

12/10/2012

Supervision Board

FON - M - 027

1699

12/10/2012

Supervision Board

EC NO: 1340 Dated 18th November 2012

1700

12/10/2012

APPROVED

IN COMEING LETTERS DETAILS 2011


LETTER NO :

TO

1172

YEAR

LETTERS NO

FILE NO

TOTAL LETTERS

TO

350

2011

FILE

350

350

362

TO

607

2011

FILE

607-362

245
206

611

TO

817

2011

FILE

817-611

882

TO

945

2011

FILE

945-882

63

949

TO

1111

2011

FILE

1111-949

162

1114

TO

1172

2011

FILE

1172-1114

58

65-1

64

TO

65

DETAILS , 2012

2012

LETTERs NO :

FILE

66

TO ,,,,,,,,,,,,,,,

66

TO

198

2012

FILE

198-66

132

199

TO

278

2012

FILE

278-199

79

280

TO

359

2012

FILE

359-280

79
42

374

TO

416

2012

FILE

10

416-374

417

TO

465

2012

FILE

11

465-417

48

466

TO

546

2012

FILE

12

546-466

80

549

TO

2012

FILE

13

640-549

91
70

641

TO

712

TO

791

TO

917

TO

1001

TO

1121

TO

1298

TO

1419

TO

1577

TO

1713

TO

TO

97

TO

201

TO

472

TO

640
711
787
915
1000
1120
1295
1404
1574
1710
1788
93
200
472

2012

FILE

14

711-641

2012

FILE

15

787-712

75

2012

FILE

16

915-791

124

2012

FILE

17

100-917

83
119

2012

FILE

18

1120-1001

2012

FILE

19

1295-1121

174

2012

FILE

20

1404-1298

106

2012

FILE

21

1574-1419

155

2012

FILE

22

1710-1577

133
55
91

2012

FILE

23

188-1713

2013

FILE

24

93-2

2013

FILE

25

-97

2013

FILE

26

-97

2013

FILE

27

-97

SENT - OR - OUTGOING LETTERS DETAILS


YEAR

LETTERS NO
1

TO

276

277

TO

570

571

TO

780

781

TO

985

986

TO

1201

TO

1401

TO

1713

TO

,,,,,,,,,,,

276

276

FILE

570-277

293

FILE

780-571

209

2012

FILE

985-781

204

2012

FILE

1200-986

214

FILE

1201 - 1400

200

FILE

1712-1401

311

FILE

FILE

2011
2011

1400

TOTAL LETTERS
1

2011

1200

1712

FILE NO

2012

2012
2012

2013
2013

SLEYMANYE 400 YATAKLI HASTANE


ANTYES

COMING LETTERS - 7

SLEYMANYE 400 YATAKLI HASTANE


ANTYES

400 YATAKLI HASTANE


ANTYES

E CLADDING

400 YATAKLI HASTANE


ANTYES

ATION BOARD (30 mm)

FILE NO: 1

INTERNALL PLASTER

SLEYMANYE 400 YATAKLI HASTANE


ANTYES

EXTERNAL PLASTER

SLEYMANYE 400 YATAKLI HASTANE


ANTYES

OUT GOING LETTERS - 3

FILE NO: 3

ATION BOARD (50 mm)

SLEYMANYE 400 YATAKLI HASTANE


ANTYES

ALT YAPI ONAYLAMI CZM

FILE NO: 1

400 YATAKLI HASTANE


ANTYES

CED UPSTAND

400 YATAKLI HASTANE


ANTYES

OOF MEBRANE

400 YATAKLI HASTANE


ANTYES

FILE NO: 7
FILE NO: 1

FILE NO: 1
FILE NO: 1

FILE NO: 1

FILE NO: 1

MARBLE CLADDING

SLEYMANYE

MARB

SLEYMANYE

EXPENDED INSU

SLEYMANYE

EXPENDED INSU

FILE NO: 1

SLEYMANYE 400 YATAKLI HASTANE


ANTYES

LIGHT WEIGHT CONCRETE

SLEYMANYE

MINERAL F

FILE NO: 1

SLEYMANYE 400 YATAKLI HASTANE


ANTYES

SAND AND CEMENT SCREED

SLEYMANYE

WATER PR

FILE NO: 1

SLEYMANYE 400 YATAKLI HASTANE


ANTYES

GEOTEXTILE MEMBRANE

SLEYMANYE 400 YATAKLI HASTANE


ANTYES

CEMENT TILES

SLEYMANYE 400 YATAKLI HASTANE


ANTYES

FILE NO: 1
FILE NO: 1

FILE NO: 1