Package CP02

Code

Reference number of the document

Version

PSC-MTS-00002-13-B PSC-MTS-00002-13-B PSC-MTS-00003-13-B CP04 VC2-MTS-00573-B VC2-MTS-00573-B VC2-MTS-00576-B

PSC-IMP-PPG-ZSO-S00-00002-E-1A PSC-IMP-PPG-ZSO-S00-00002-V-1A PSC-IMP-PPG-ZPP-L20-00001-E/V

1A 1A 1A

VC2-ABT-TRE-WDO-D00-00502-B VC2-ABT-TRE-WDO-D00-00507-B VC2-IMP-TCM-WDO-D00-00189-E/V

1A 1A 2A

VC2-MTS-00576-B

VC2-IMP-TCM-WDO-D00-00197-E/V

2A

VC2-MTS-00576-B VC2-MTS-00576-B VC2-MTS-00577-B VC2-MTS-00578-B VC2-MTS-00578-B VC2-MTS-00579-B VC2-MTS-00581-B VC2-MTS-00581-B VC2-MTS-00581-B VC2-MTS-00582-B VC2-MTS-00585-B VC2-MTS-00585-B VC2-MTS-00585-B VC2-MTS-00585-B VC2-MTS-00586-B VC2-MTS-00586-B VC2-MTS-00587-B VC2-MTS-00587-B VC2-MTS-00588-B

VC2-IMP-TRE-WDO-D00-02062-E/V VC2-IMP-TRE-WDO-D00-02080-E/V VC2-ABT-TRE-WDO-D00-00503-B VC2-ABT-TRE-WDO-D00-00509-B VC2-ABT-TRE-WDO-D00-00510-B CP04-SMR-13-0107 VC2-ABT-TRE-WDO-D00-00512-B VC2-ABT-TRE-WDO-D00-00514-B VC2-ABT-TRE-WDO-D00-00515-B VC2-IMP-TRE-WDO-D00-02110-B VC2-IMP-TCM-WDO-D00-00250-E/V VC2-IMP-TCM-WDO-D00-00280-E/V VC2-IMP-TRE-WDO-D00-02102-B VC2-IMP-TRE-WDO-D00-02113-B VC2-ABT-TRE-WDO-D00-00513-B VC2-ABT-TRE-WDO-D00-00516-B VC2-IMP-TRE-WDO-D00-02121-B-1A VC2-IMP-TRE-WDO-D00-10288-B-1A VC2-IMP-TCM-WDO-D00-00272-V-2A

3A 3A 1A 1A 1A A 1A 1A 1A 2A 3A 2A 4A 3A 1A 1A 1A 1A 2A

VC2-MTS-00588-B VC2-MTS-00589-B VC2-MTS-00590-B CP05

VC2-IMP-TRE-WDO-D00-02105-B-3A VC2-IMP-TRE-WDO-D00-02109-B VC2-IMP-TRE-WDO-D00-02117-B-1A

3A 2A 1A

HNC-MTS-00151-13-B

HNC-IMP-TRE-WDS-D04-10001-B

2A

HNC-MTS-00154-13-B

HNC-IMP-PPG-ZTO-D00-00010-B

1A

HNC-MTS-00155-13-B

HNC-IMP-TCM-WDS-D22-00248-E/V

1A

HNC-MTS-00155-13-B

HNC-IMP-TDR-WDS-D22-00001-B

2A

HNC-MTS-00155-13-B

HNC-IMP-TRE-WDS-D22-00001-B

2A

HNC-MTS-00158-13-B

HNC-IMP-PPG-ZTO-D00-00020-E/V

4A

HNC-MTS-00158-13-B

HNC-IMP-TCM-ZTO-D00-00266-E/V

3A

HNC-MTS-00159-13-B

HNC-IMP-PPG-WUO-D04-00001-B

2A

HNC-MTS-00159-13-B

HNC-IMP-TCM-WUO-D04-00294-E/V

1A

HNC-MTS-00160-13-B

HNC-IMP-TDR-WDS-D22-00005-B

2A

HNC-MTS-00160-13-B

HNC-IMP-TDR-WOO-D03-03001-B

1A

HNC-MTS-00160-13-B

HNC-IMP-TRE-WDS-D22-10001-B

2A

HNC-MTS-00162-13-B HNC-MTS-00163-13-B HNC-MTS-00163-13-B HNC-MTS-00163-13-B

CP05-SMR-13-0005-B HNC-IMP-PPG-ZPQ-D00-00001-B HNC-IMP-TCM-ZPQ-D00-00233-E/V HNC-IMP-TDR-WOO-D21-21001-B

A 4A 3A 1A

HNC-MTS-00164-13-B

HNC-IMP-PPG-WUO-D05-00001-B

1A

HNC-MTS-00164-13-B HNC-MTS-00164-13-B HNC-MTS-00164-13-B

HNC-IMP-TDR-WAR-D04-04003-B HNC-IMP-TDR-WDS-D06-06002-B HNC-IMP-TDR-WOO-D06-06001-B

1A 1A 1A

HNC-MTS-00164-13-B

HNC-IMP-TDR-WOO-D29-29001-B

1A

HNC-MTS-00164-13-B

HNC-IMP-TRE-WAR-D04-04100-B

1A

HNC-MTS-00164-13-B

HNC-IMP-TRE-WDS-D06 - 06200-B

1A

HNC-MTS-00166-13-B

HNC-IMP-TDR-WAR-D22-22003-B

1A

HNC-MTS-00166-13-B HNC-MTS-00166-13-B

HNC-IMP-TDR-WOO-D07-07001-B HNC-IMP-TDR-WOO-D31-31001-B

1A 1A

HNC-MTS-00166-13-B

HNC-IMP-TRE-WAR-D22-22100-B

1A

HNC-MTS-00167-13-B HNC-MTS-00167-13-B HNC-MTS-00167-13-B HNC-MTS-00167-13-B HNC-MTS-00167-13-B

CP05-SMR-13-0007-B CP05-SMR-13-0008-B CP05-SMR-13-0009-B CP05-SMR-13-0010-B HNC-IMP-TDR-WOO-D13-13001-B 1A

HNC-MTS-00167-13-B

HNC-IMP-TRE-ZPQ-D00-90007-B

1A

HNC-MTS-00168-13-B

HNC-IMP-PPG-WUO-D04-00001-B

3A

HNC-MTS-00168-13-B

HNC-IMP-TCM-WUO-D04-00294-E/V

2A

HNC-MTS-00169-13-B HNC-MTS-00169-13-B VC2-MTS-00584-B VC2-MTS-00584-B

HNC-IMP-PPG-WDO-D00-00001-B HNC-IMP-TCM-WDO-D00-00271-E/V VC2-ABT-TRE-WDO-D00-00504-B VC2-ABT-TRE-WDO-D00-00511-B

4A 3A 1A 1A

English Title of the document

Responsible

Deadline to reply

Time left to reply

Remarks

Health & Safety Management Plan Health & Safety Management Plan Delivery Management Plan

14-Sep-13 14-Sep-13 20-Sep-13

-54 -54 -48

As-built drawings: Piled slab item As-built drawings: Piles pressing Reply to comment sheet for fence foudation design change Reply comment sheet regarding Variation Request(CP4/12-12/CP4.0033): Plastering to coating bitumen on cable trough wall VAR: Fence foundation design change VAR: Bitumen coating for cable trough walls As-built drawing: fence item As-built drawing: Drainage As-built drawing: Sewage Proposed repair of construction design for item internal road AS-BUILT DRAWING: GROUND WATER PURIFICATION PLANT AS-BUILT DRAWING: INDUSTRIAL AND DOMESTIC WATER SUPPLY AS-BUILT DRAWING: FIRE FIGHTING Cost estimate: External lighting Reply to comment sheet for profile of signboard Reply to comment sheet for profile of viglacera hanoi tiles Profile of signboard VIGLACERA HANOI TILES FOR BUILDING EDGE WALL OF SIDEWALK As-built drawing: Internal road As-built drawing: Land grading Statement for construction design Additional designs of July 2013 Reply to comment sheet

28-Aug-13 28-Aug-13 04-Sep-13

-71 -71 -64

04-Sep-13

-64

04-Sep-13 04-Sep-13 31-Aug-13 04-Sep-13 04-Sep-13 04-Sep-13 06-Sep-13 06-Sep-13 06-Sep-13 06-Sep-13 11-Sep-13 11-Sep-13 11-Sep-13 11-Sep-13 12-Sep-13 12-Sep-13 12-Sep-13 12-Sep-13 14-Sep-13

-64 -64 -68 -64 -64 -64 -62 -62 -62 -62 #VALUE! 10 copies submission for approva #VALUE! 10 copies submission for approva #VALUE! 10 copies submission for approva #VALUE! 10 copies submission for approval -56 -56 -56 -56 #VALUE! 10 copies submission for approva

Material and equipment profile for security building VAR: Cable trough 22kV VAR: Material change from PVC pipe D150 to HDPE pipe D160/125

14-Sep-13 19-Sep-13 19-Sep-13

#VALUE! 10 copies submission for approva #VALUE! 10 copies submission for approva -49

CONSTRUCTION DRAWINGS OF WORKS TRAIN WORKSHOP (FOR AREA No4) - Part 2 Super structure Maintenance plan Reply comment sheet regarding report and drawings of Lighting & Power Substation and Traction Rectifier Substation (for area No 21(B),22, 24) - FOUNDATION STRUCTURE CONTRUCTION DESIGN REPORT -Lighting & Power Substation and Traction Rectifier Substation (for area No 21B,22, 24)- FOUNDATION STRUCTURE Lighting & Power Substation and Traction Rectifier Substation (for area No 21B,22, 24)FOUNDATION STRUCTURE ACCEPTANCE, INSPECTION, TESTING AND COMMISSIONING PLAN REPLY PIC'S COMMENTS SHEET REGARDING ACCEPTANCE, INSPECTION, TESTING AND MMISSIONING Interface control document - Contruction interface between building no-4;6;21B;22;24 with CP04 packege Reply Comment sheet regarding Interface control document-Contruction interface between building no-4;6;21B;22;24 with cp-04 packege CONTRUCTION DESIGN REPORT - Lighting & Power Substation and Traction Rectifier Substation (for area No 21(B),22, 24) REPORT ON CONTRUCTION DESIGN FOR AREA NO3 Lighting & Power Substation and Traction Rectifier Substation (for area No 21(B),22, 24)- SUPER STRUCTURE Site modification request For area A QUALITY MANAGEMENT PLAN COMMENT SHEET Quality Management Plan Contruction design report for area no.21 Interface control document Construction interface on test pile works of building no.5 between cp-05 package and cp-04 package. CONTRUCTION DESIGN STATEMENT-WORKS TRAIN WORKSHOP (FOR ARENA No4) CONTRUCTION DESIGN STATEMENT FOR AREA NO.6 (STABLING AREA) CONTRUCTION DESIGN REPORT FOR AREA NO.6 (STABLING AREA)

28-Aug-13

-71

31-Aug-13

-68

31-Aug-13

-68

31-Aug-13

-68

31-Aug-13

-68

05-Sep-13

-63

05-Sep-13

-63

07-Sep-13

-61

07-Sep-13

-61

07-Sep-13

-61

07-Sep-13

-61

07-Sep-13

-61

10-Sep-13 11-Sep-13 11-Sep-13 11-Sep-13

#VALUE! 10 copies submission for approval -57 -57 -57

12-Sep-13

-56

12-Sep-13 12-Sep-13 12-Sep-13

-56 -56 -56

CONTRUCTION DESIGN REPORT FOR AREA NO 28 & 29 ( DRIVER &TECHNICAL STAFF ROOMS ) CONSTRUCTION DESIGN DRAWING FOR AREA No 4 (WORKS TRAIN WORKSHOP)- DETAILED DESIGN OF ARCHITECTURE CONSTRUCTION DESIGN DRAWING FOR AREA No 6 (STABLING AREA)-DETAILED DESIGN OF STRUCTURE CONTRUCTION DESIGN STATEMENT LIGHTING & POWER SUBSTATION AND TRACTION RECTIFIER SUBSTATION (FOR AREA NO 21(B), 22, 24) CONTRUCTION DESIGN REPORT FOR AREA NO.7 CONTRUCTION DESIGN REPORT FOR AREA NO 31B CONTRUCTION DESIGN DRAWING FOR AREA N0 21B,22,24 DETAILED DESIGN OF ARCHITECTURE SITE MODIFICATION REQUEST OF EXPANSION JOINT OF CONCRETE YARD OF AREA A SITE MODIFICATION REQUEST OF ACCESS TO AREA A SITE MODIFICATION REQUEST OF PLASTIC CEILING SITE MODIFICATION REQUEST OF DOUBLE FLUORESCENT TUBE CONTRUCTION DESIGN REPORT REPORT on Trial mix of concrete grade m150(b10),m200(b15) and concrete for temporary work Interface control document - Contruction interface between building no-4;6;21B;22;24 with CP04 packege Comment sheet on Interface control documentContruction interface between building no4;6;21B;22;24 with cp-04 packege Program of pressing and testing pile plan Reply comment sheet regarding program of pressing and testing pile As-built drawing: Trough for services As-built drawing: External lighting

12-Sep-13

-56

12-Sep-13

-56

12-Sep-13

-56

12-Sep-13

-56

12-Sep-13 12-Sep-13

-56 -56

12-Sep-13

-56

18-Sep-13 18-Sep-13 18-Sep-13 18-Sep-13 18-Sep-13

-50 -50 -50 -50 -50

18-Sep-13

-50

18-Sep-13

-50

18-Sep-13

-50

19-Sep-13 19-Sep-13 10-Sep-13 10-Sep-13

-49 -49 -58 -58