PROJECT :
General Information :
Dimension :
Lane width
Number of girder each lane
Space between girder c/c
Span of girder
Bridge class
Lane Load
q
P
Truck Load
W=
V=
:
:
:
:
:
:
:
3.6 m
3
unit
1.2 m
18 m
AASHTO load clasification HS20-44
2
Lane
3.05 m (Free space)
for moment calculation
for shear calculation
960 kg/m'
8250 kg
12000 kg
3600
4200
+
~
14400
9000
=
mm
18000 kg
4200
Material Grade :
- Concrete
:
K- Steel
:
fy' :
- Reinforcement steel :
0,1W
0,4W
0,4W
1830
610
3050
0,1W
0,4W
0,4W
610
350 fc' :
240 Mpa
fy :
28 Mpa
390 Mpa
c :
s :
2400
7850
kg/m3
kg/m3
Detail Design :
A). Reinforcement Concrete Slab
MH* = (S+0,6/10)xP
--->
MH=0,8xMH*
5 cm =
--->
0.05
Moment, DL (plate , t=
20 cm) , Mp=1/10.qc.l2
--->
16
1.8
-
1.8
0.38
--->
--->
200
Mu/(fy.z)
As :
---> 623.41 mm2
Concrete cover :
Use :
D 16 200 ---> 1005.71 OK
Use reinforcement at perpendicular with trafic, along bridge width.
67%
33%
13
13
89%
tmin = 1,2.(S+3)/30
0.19
tmin = (S+3)/30
0.16
(ACI 7.12)
12.47
mm Use :
13
300
7200 kg
32,825.52
kg
100800
mm2
502.00 mm
200.80 mm
2,5.A :
A/2,5 :
Lane directon
502
200.80
65
201
65
160
1.91
30
130
mm
1,926
502
{ 4}
65
632
65
d :
c :
b0 :
12
Vc :
384093.42 N
38.4
Ton
> 21.6 Ton OK
331
B). GIRDER
LL distribution, qH:
3.05
P=
960
kg/m'
960
480
1.8
1.8
1.8
70
)x
+
---->
---->
1.8
0.27
=1,3*(1*((1/8)*AD96*K10^2)+1
/8)*AD90*K10^2)+
((1/4)*AD93*K10))*1,27)
S:
1.8
1.8
---->
---->
175,797.5
175.8
1,3*(1*((1/8)*AD99*K13^2)+1,
)*AD93*K13^2)+
((1/4)*AD96*K13))*1,27)
45,168.0
45.2
---->
---->
---->
>
Truck Load
4200
4200
9000
---->
1.06
7200 kg
7200
2.4
1.8
7.2
7.2
2.4
7.2
x ### +
1.8
0.5
kg
VT
7.2
M u = [ M M H H I FD ]
---->
209.94
t.m
Used
---->
51.62
ton
Used
---->
---->
---->
2.25 m
0.9 m
1.2 m
each side
each side
each side
4.5
---->
1.80
Used
Shape analyze :
1800
a
F fy = 180*a*0.85 fc'
200
230
Try profile :
IWF : 700.300.13.24
F=
235.5 cm2
h
A
a = Ffy/180.0,85fc'
--->
F fy
Positive moment bMn must be check with :
B
For : h/tw = 50.15
bf /2
L
h
p , p , b p : b=0 . 85 M n
tf
tw
iy
50
b =
0.85
1700/fyt = ###
Mn = F fy(A/2+20-a/2)
---->
273.58
t-m
Md=Mn
---->
232.54
t-m
>
Mu =
209.94 t-m
OK
Shear Calculation :
The shear calculation for symetric profil single or doubel without stiffener with (h/tw) 260 are : Vd = v Vn
where :
v =
0.9
and for (h/tw) 1100/fyw ----> Vn = 0.6 fyw.Aw
where :
Aw = d.tw
So for profile : IWF 700.300.13.24
Aw :
9100 mm2
h/tw = 50.15
~
50
Vn = 0.6 fyw.Aw
1100/fyt =
71
---->
131.04 ton
Vd = Vn
---->
4.50
117.94
OK
Vu =
51.62
m (typical)
Slab Thickness :
200 mm
WF25
0
WF25
0
WF25
0
WF25
0
WF25
0
WF25
0
WF25
0
WF25
0
WF25
0
IWF 700.300.13.24
WF25
0
WF25
0
WF25
0
IWF 700.300.13.24
IWF 700.300.13.24
Need to be added shear connector use shear connector Nail type diameter 20 mm with 125 mm length.
300 mm
out impact)
1728
kg-m/m'
1382.4
kg-m/m'
--->
70
kg/m2
--->
### kg-m/m'
--->
### kg/m2
0.38
Use
0.3
4,133
kg-m/m'
4.13E+07 N.mm
Concrete cover :
30 mm
Use
67%
###
OK
---->
566.6
kg/m'
---->
4,868.9 kg/m'
---->
7,082.0 kg/m'
---->
990.0
kg/m'
,3*(1*((1/8)*AD96*K10^2)+1,67*(((1
*AD90*K10^2)+
4)*AD93*K10))*1,27)
kg/m'
Ton/m'
*(1*((1/8)*AD99*K13^2)+1,67*(((1/8
D93*K13^2)+
4)*AD96*K13))*1,27)
kg/m'
Ton/m'
---->
54.00
T.m
---->
13.70
T.m
13.19
cm
WF25
0
WF25
0
IWF 700.300.13.24
Joint
OutputCase
Text
CaseType
Text
U1
Text
U2 U3 R1
Kgf Kgf Kgf
1 DEAD
1 LIVE
1 RAIN
1 FINISH
LinStatic
LinStatic
LinStatic
LinStatic
0
0
0
0
0
0
0
0
2 DEAD
2 LIVE
2 RAIN
2 FINISH
LinStatic
LinStatic
LinStatic
LinStatic
0
0
0
0
0
0
0
0
3 DEAD
3 LIVE
3 RAIN
3 FINISH
LinStatic
LinStatic
LinStatic
LinStatic
0
0
0
0
0
0
0
0
4 DEAD
4 LIVE
4 RAIN
4 FINISH
LinStatic
LinStatic
LinStatic
LinStatic
0
0
0
0
0
0
0
0
11 DEAD
11 LIVE
11 RAIN
11 FINISH
LinStatic
LinStatic
LinStatic
LinStatic
0
0
0
0
0
0
0
0
12 DEAD
12 LIVE
12 RAIN
12 FINISH
LinStatic
LinStatic
LinStatic
LinStatic
0
0
0
0
0
0
0
0
13 DEAD
13 LIVE
13 RAIN
13 FINISH
LinStatic
LinStatic
LinStatic
LinStatic
0
0
0
0
0
0
0
0
14 DEAD
14 LIVE
14 RAIN
14 FINISH
LinStatic
LinStatic
LinStatic
LinStatic
0
0
0
0
0
0
0
0
15 DEAD
15 LIVE
15 RAIN
15 FINISH
LinStatic
LinStatic
LinStatic
LinStatic
0
0
0
0
0
0
0
0
16 DEAD
16 LIVE
16 RAIN
16 FINISH
LinStatic
LinStatic
LinStatic
LinStatic
0
0
0
0
0
0
0
0
5374.94
0
162
810
6346.94
5374.94
0
162
810
6346.94
9356.96
6357.23
324
1620
17658.19
9356.96
9842.77
324
1620
21143.73
9356.96
6357.23
324
1620
17658.19
9356.96
9842.77
324
1620
21143.73
9356.96
6357.23
324
1620
17658.19
9356.96
9842.77
324
1620
21143.73
5374.94
0
162
810
6346.94
5374.94
0
162
810
6346.94
R2
Kgf-m
Pile Cap
kg
Kgf-m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Pressure
(q) 7,2T
12000
11520
43000
12000
11520
43000
12000
11520
43000
12000
11520
43000
12000
11520
43000
12000
11520
43000
12000
11520
43000
12000
11520
43000
12000
11520
43000
12000
11520
43000
Total of Pile
So for pile should be use 2 pile each girder foundation
Total pile use :
20
0.69
0.69
0.96
1.04
0.96
1.04
0.96
1.04
0.69
0.69
Total of Pile
13
use 2 pile each girder foundation
Units