Agenda
Company Profile Manufacturing Process Encon Projects With Cost Benefit Focus on Last 03 Years Encon Efforts Reduction In Energy Consumption Global Norms / Bench Mark : Road Map Innovative Projects
Agenda
Company Profile Manufacturing Process Encon Projects With Cost Benefit Focus on Last 03 Years Encon Efforts Reduction In Energy Consumption Global Norms / Bench Mark : Road Map Innovative Projects
Rabriyawas Location
8/23/2013 4:12 PM
Company Profile
4200 TPD Cement Plant ( Make FLS) consisting One Raw Mill (340 TPH) & Coal Mill ( 40 TPH) and Cement Mills ( 2X120 TPH OPC) along with 15 MW Power Plant , was set up by M/s DLF Group in1996. DLF Cement was acquired by Gujarat Ambuja Cements Ltd. in December, 1999 Kiln upgraded from 4200 to 6000 TPD in 2007 New 6th Stage SLC String New 260 TPH Raw Mill New 25 TPH Coal Mill (2008) New CPP of 18.7 MW in July 08. 500 TPD Synthetic gypsum manufacturing plant (Aug2011) Environmental clearance obtained for 3.6 million TPA capacity & consent to operate for 7000 TPD clinker
5
8/23/2013 4:12 PM
Energy Policy
We are committed to conserve energy in cement manufacturing, power generation and related activities by optimization and efficient use of resources in a cost effective manner. We are committed to reduce our specific energy consumption on a continual basis year over year. To accomplish this we shall: 1. 2. 3. 4. 5. 6. 7. 8. Create awareness and impart training to employees for energy conservation. Monitor energy consumption regularly in various departments, analyze the information and take necessary steps for continual improvement through an effective energy management information system. Comply to all applicable legal requirements & strive to go beyond compliance. Conduct Energy Audit to further identify potential areas and equipments for energy conservation. Consider energy efficiency performance for all procurements of energy consuming equipments Implement innovative ideas / modifications for improvement and upgradation of the equipments. The policy shall be communicated to all stakeholders both internal & external. Carry out on-going process optimization and diagnostic studies to maintain high productivity and capacity utilization to minimize specific energy consumption.
8/23/2013 4:12 PM
8/23/2013 4:12 PM
Unit Head
Head Works
Pillar Champions
CF Jaiprakash Vrati Coal Anil Chordia Geo Mukul Grag
Academy Co-ordination
Yogesh Nagayach Pushpanjali Rawat Nikhil Handa Vikas Sharma Rajat Mukherjee
Head Works
To ensure the achievements of set EARN targets for each year Include EARN pillars targets as a part of yearly KPIs Ensure hurdle free working in coordination with all plant EARN Champions Ensuring implementation of various ideas / practices / projects in a timely manner
10
pillar
Meeting the deadlines as decided by corporate PMO office Work in coordination with Academy coach to work out any innovative ideas
Line Team
Academy
Implementation of
To
ideas
Follow
work in coordination with EARN champion for achieving set reduction target for respective pillar EARN targets as a part of wave & tracking of same
Include
12
Ambuja Cements Limited, Rabriyawas Note Unit Execution part will be done jointly by Project & Line team
Rabriyawas Unit was adjudged for Productivity Merit Award 2010-2011 by Rajasthan State Productivity Council, Jaipur. The Award was given by the Hon'ble Industry Minister on 4th April, 2013.
14
Regional Leadership Retreat ( RLR) - 2013 Holcim EARN Regional Award for Most Improved Plant in Electrical Energy Pillar
15
8/23/2013 4:12 PM
Agenda
Company Profile Manufacturing Process Encon Projects With Cost Benefit Focus on Last 03 Years Encon Efforts Reduction In Energy Consumption Global Norms / Bench Mark : Road Map Innovative Projects
16
18
Agenda
Company Profile Manufacturing Process Encon Projects With Cost Benefit Focus on Last 03 Years Encon Efforts Reduction In Energy Consumption Global Norms / Bench Mark : Road Map Innovative Projects
19
New roller crusher 4 rolls 3.6 m Adding 22 rows of RFT grates (6.6 x 3.6 m) Existing hammer crusher
20
8/23/2013 4:12 PM
Benefits Observed: Kiln MTBF reduced on account of Hammer crusher inlet chute jamming with big coating pieces & clinker balls. Consistency observed in kiln running
21
8/23/2013 4:12 PM
Benefit Observed: Improvement in bottom stagescyclone efficiency and reduction in preheater exit gas temperature by 20-30 Deg Cen. ( Saving of approx. 5-8 Kcal/ Kg-cl)
22
8/23/2013 4:12 PM
Installation of new coriolis coal feeding system. Benefit Observed: Expected Kiln MTBF Improvement due to facilitity of fine coal feeding in existing all three Coriolis system to meet any emergency. Also introduce second fuel in all the three system of coal firing lines.
23
8/23/2013 4:12 PM
Agenda
Company Profile Manufacturing Process Encon Projects With Cost Benefit Focus on Last 03 Years Encon Efforts Reduction In Energy Consumption Global Norms / Bench Mark : Road Map Innovative Projects
24
72
Nil 8
7.5
Nil
Nil
Nil
12.00
Final report received in Dec'11 . Job will be initiated from Jan'12 onwards
Nil 25
1 2 3 4 5 6
2000 kW SPRS Retrofitting from SLC Fan to Bag House Fan 3 no. mono block pumps replaced with submersible pump in raw mill-1 Stop one blower from Raw Mill-1 product air slide without affecting the operation Installtion of VVFD for Coal Mill -2 Booster Fan there by reduction in Bag house fan specific power consumption. Removal of CCRD motors from coal stacker and coal reclaimer Transparaent Sheet on workshop roof for using day light
26
Thermal Energy Raw Mix & Fuel mix optimisation in Kiln , Thereby 100 % Petcoke usage in Kiln as well as SLC (around 65 % fuel basis). Budgeted Petcoke taregt was 31 % in 2012 . In Acutal it was achieved 49.86 % resulted saving in fuelmix cost. Short dip tube installtion in ILC Lower stage cyclones ( 6th Stage) of KS-1 & KS-2 string . Also modification in ILC Cyclone 6th & 5th both the stings gas duct. tangential entry based on CFD analysis there by Saving of 8-10 Kcal/Kg-cl achieved Maximise AFR usage by installtion of AFR burnout chamber in SLC TA duct.
Nil
2,193.00
2,193.00
90.00
88.00
176.00
7.50
108.30
118.80
27
29
Carbon Black
Trade Rejects
Cow-Dung
Biomass
Paint Sludge
BF Flue Dust
30
31
32
Agenda
Company Profile Manufacturing Process Encon Projects With Cost Benefit Focus on Last 03 Years Encon Efforts Reduction In Energy Consumption Global Norms / Bench Mark : Road Map Innovative Projects
33
34
35
35
36
Agenda
Company Profile Manufacturing Process Encon Projects With Cost Benefit Focus on Last 03 Years Encon Efforts Reduction In Energy Consumption Global Norms / Bench Mark : Road Map Innovative Projects
37
1 VFD in CM-1 main bag filter fan (561FN2) VFD in cement mill-2Bag filter fan 2 (562FN2) 3 VFD in CM-2 ESP fan -(562FN3) 4 VFD in coal firing blower for Kiln (481BL2) 5 6 7 8 VFD in coal firing blower SLC Firing (451BL5) VFD in cement Mill-1 Feed belt JPF Fan (531-FN1) VFD in cement Mill-2 Feed belt JPF Fan (532-FN1) VFD in Packing plant JPF fans (664 FN-1 to FN-4)
672
958
400.00
250.00
1.9
40
8/23/2013 4:12 PM
Agenda
Company Profile Manufacturing Process Encon Projects With Cost Benefit Focus on Last 03 Years Encon Efforts Reduction In Energy Consumption Global Norms / Bench Mark : Road Map Innovative Projects
41
43
Inlet Plenum
44
Inlet Plenum
45
46
Bag House Fan speed Installation of SPRS in place of GRR Compressed air cons. (upto clinkerisation) Filtration area Air to cloth ratio (Designed) Overall Saving
Gross: 22206 * 62 Nos. Bags holes dummy New: 21983 * 0.98 0.87
448 + 90 + 220 58 = 700 KWH = 700 X 24 / 6017 = 2.80 kWh/ T-Cl
47
48