Vous êtes sur la page 1sur 3

DAILY DRILLING MONITORING REPORT

#Report No. 66
09/11/2012

#Date:

Fixed Data:
Block

Field

Well No.

Spud date

12

Bibiyana

BY-16

09/10/2012

Co-ordinate:
Latiude
(deg. min. sec)

Longitude
(deg. min. sec)

RKB-GL

913550.524

10.3 m

24402.442

Well Data:
Date

Report
No.

Well
Configuration /
type

Drilling Company
/ Drilling Rig

Offset / Horizontal
Displacement

08/11/2012

65

Deviated

Weatherford

Depth MD

Depth
TVD

TVDSS

Progress

Survey Report
MD, TVD, Incl ,
Azmth

4,400

3,599.23

03

801.67

Lithology:
Depth

Percentage

Remarks

Shows: Gas / Oil


Depth

Remarks

Time Log
Time
Fro
To
m
00:0 01:0
0
0
01:0 01:3
0
0
01:3 02:3
0
0
02:3 10:3
0
0
10:3 11:3
0
0
11:3 12:0
0
0
12:0 13:0
0
0
13:0
14:3
0
0

Hour
s

Operations

01:0
0

HPJSM. Load RA source.

0:50

Shallow test LWD.

01:0
0

PU HWDP & jars and TIH w/ 8-1/2" clean out BHA w/ LWD to 250m

8:00

Cont TIH w/ clean out BHA to 3300m

1:00

Ream/ Back ream & was f/3300 m to 3440 m(gas 10%).

00:5
0
01:0
0
01:5
0

Cont cric & gas increase to 25%.Flows check (static). Cont circ
until gas less than 5%.
Cont TIH w/ cleanout BHA f/3440m & tag up @3738m. Unable to
work through.
Ream & wash f/3738m to 3980m ..
Note : attempted to TIH on elevators after reaming down each

14:3
0

16:0
0

01:5
0

16:0
0

17:3
0

01:5
0

17:3
0
21:0
0

00:3
0
00:3
0

01:5
0
07:0
0

std w/o success.


Tight Spots @3738m to 3746m,3828m,3957m.
TIH f/3980m to 4373m. MU TDS & safety wash f/4373m & tag up
@4400m
Circ 1.5 btms up @500 gpm 180 rpm(gas 6.5%). Flow check
(static)
Note: Some fine sand/silt over shakers just before btms up. Circ
until shakers clean.
TIH to 948m. Trip drill @ 20:12 hrs (29 sec).
Back ream & log out of hole w/ LWD@500gpm, 100rpm,100m/hr
f/4400m to 3914m.

Drilling Fluid Type: NAF


Fluid Parameters:
Time

Weight
ppg

Viscosit
y
sec/qt

Plastic
Viscosity
sps

Yield
Point
lb/100
sqft

Gel
lb/100
sqft

15

16/32/36

Filtrate
cc/30min

pH

22:00

11.50

66

3.2

Solids
(%)

Sand
(%)

Cake

Chloride
s
mg/L

Water (%)

temperat
ure in C

Temperat
ure out C

18.80

21.00

51,500

16.00

Pumps Data
Pum
p
No.

Made

Model

Liner

Bbl/St
k
(bbls)

Stk/Mi
n
(SPM)

Gal/Mi
n
(GPM)

Pressu
re
(psi)

AV-DC
(ft/mi
n)

AV-DP
(ft/min
)
0

Bit Data
Bit No.

Size (in)

Manufactu
rer

Model

Nozzles

Serial
No.

IADC code

01

8 1/2

MDSi516

JG2045

15/15/15/16/
16

In at (m)

Out at
(m)

Drilled (m)

total
Hours

WOB

RPM

Bit Grade
(t/b/g)

6.750

261.61

Drilling Parameters
WOB
(klbs)

RPM

Hole Size (in)

Torque

Shoe
depth

Casing
(Grade/Size)

Flow rate
(gpm)

Pressure (Psi)

ROP

Pump 1
....... spm, ......
psi

Pump 2
..... spm,
.....psi

Pump 3......
spm, .... psi

Safety Checks
Meetings

Inspect

Pre. job meeting


Op's & Safety meeting
Tool Box Talk

Remarks

HES/Safety: No reportable environmental or safety issue.


Name:
Ruhul Amin.
Designation:
Assistant Manager, DPD, Petrobangla.

Vous aimerez peut-être aussi