Académique Documents
Professionnel Documents
Culture Documents
Date: 11/9/2013
Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:
Total Time: 21.67 Time from Spud: 21.06 Days Since Last DAFW / RI Case :
TVD End (mKB): 2,761.43
Water Depth (m) Target Depth (MD) (mKB)
Bibiyana
Actual Start Date
6/13/2013
Actual End Date
Bangladesh 4,410
Total AFE Amount (Cost)
7/19/2013 08:30
AFE/WBS Number
3,865.89 22,183,123
100794 Safety/Inspections
Date Safety Check Tour Des
11/9/2013 00:00 11/9/2013 00:00 11/9/2013 00:00 11/9/2013 00:00 11/9/2013 06:00 11/9/2013 06:00 11/9/2013 06:30 11/9/2013 06:30 11/9/2013 06:30 11/9/2013 06:30 11/9/2013 07:30 11/9/2013 09:30 11/9/2013 09:50 11/9/2013 11:00 11/9/2013 11:30 11/9/2013 12:00 11/9/2013 12:00 11/9/2013 12:15 11/9/2013 12:15 11/9/2013 13:30 11/9/2013 14:30 11/9/2013 16:00 11/9/2013 17:00 11/9/2013 17:30
Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Safety Procedures Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting PTW Audit PTW Audit Pre-Job Meeting Safety Meeting PTW Audit
Night Night Night Night Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Night Night Night Night Night Night
Cleaning mud sling @BYWP(PTW) Gen. Crane Lifting @BYWP Gen. Forklift Ops @BYWP Welding, cutting, grinding at Workshop @BYWP(PTW) Diesel transfer @BYWP(PTW) Gen. Crane Lifting @BYWP w/Kamal Ent., RADAR Cards, Tnt#09 @BYWP Gen. Housekeeping (K/E) @BYWP Gen. Forklift Ops @BYWP Slip and cut drill line@BYWP (PTW) Camera on rig floor @BYWP (PTW) Lay down 9 5/8 casing @BYWP (PTW) Camera on rig floor @BYWP (PTW) T-Card Audit RADAR, Ops, Tnt#09 & GEMS#01 @BYWP Welding, cutting, grinding at Workshop @BYWP(PTW) Works on generator at NOV @ BYWP (PTW) Gen. Crane Lifting @BYWP Gen. Forklift Ops @BYWP Diesel transfer Works on generator at NOV Service camp engine #1 @ BYWP (PTW) Ops. Review, Tnt#09 @BYWP Service camp engine #1 w/Kamal Ent., RADAR Cards, Tnt#09 @BYWP Gen. Crane Lifting @BYWP Gen. Housekeeping (K/E) @BYWP Slip and cut drill line @ BYWP (PTW) T-Card Audit PM on electrical air compressor @BYWP (PTW)
Incident Desc
11/9/2013 18:30 Pre-Tour Safety Meeting 11/9/2013 18:30 Pre-Job Meeting 11/9/2013 18:30 Pre-Job Meeting 11/9/2013 19:00 Pre-Job Meeting 11/9/2013 19:30 Safety Procedures 11/9/2013 22:30 Pre-Job Meeting Safety / Environmental Incidents
Incident Cat.
Page 1/5
Date: 11/9/2013
Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:
Total Time: 21.67 Time from Spud: 21.06 Days Since Last DAFW / RI Case :
11/9/2013 00:00
Daily Field Est Total (Cost) Cum Field Est To Date (Cost) Daily Mud Field Est (Cost) Cum Mud Cost to Date (Cost)
11/10/2013 00:00
Drilling Hours (hr) Cum Rotating Hrs on Casing
204,275
Operations Summary
5,377,833
486,016
Continued to POOH from 2181m to 1689m. Flow check @ 1689m, well static. Continued to POOH from 1689m to 192m. Flow check @ 192m, well static. Continued POOH to fishing jar on surface. Rig up TRS. POOH 9 5/8 casing and lay down. Pick up and make up clean out BHA and started RIH and RIH to 1777m. Fill up every 15 stands. Cut and slip @ 1777m. Continued RIH from 1777m to 1824m, Tight spot @ 1824m. Ream down from 1815m to 1834m. Continued RIH from 1834m to 1905m. Tight spot @ 1905m. Ream down from 1902m to 1921m. Continued RIH from 1921m to 1956m. Tight spot @ 1956m ream down from 1950m to 1979m. Continued RIH from 1979m to 2037m.
Comments
139.0 Halliburton batch mixer in customs. CCTV: driller has camera for derrick,stabbing board, mud pump. STP recorder non-operational Drillers MD Totco monitor at Rig floor, Not in service. No ETA. Iron Roughneck spinners, not in service because of bad hydraulic leak. No spare seals on location. Having to use standalone spinners. Drillers rig floor communciation hands free microphone not working. No ETA. No back up flow line encoder for SLS. MD Totco flowline indicator not reading. WDI flowline sensor three weeks ETA. No ETA from SLS. Safety Observation Cards
Observation Typ # Rpts Com
Un-Safe Behavior
69 While lowering down the drill line one person was near the V door, could hit by the drill line.Stopped him and asked him to maintain a safe distance, he agreed.Tenet #4 TOUHID ZAMAN-WDI-Roustabout
Daily Contacts
Contact
Shayne Atkins Stephen Joubert Randy Roberts Kitichai Leekitchakorn Mahbubur Rahman Ismail Hossain Time Log
Start Time End Time Phase Activity Dur (hr) Unsched Event? UE Time (hr) UE Ref No. Com
00:00
06:30
INTCSG2, DRILL
TOH
6.50 Yes
6.50 19
Continue to trip out the hole wet with 9 5/8" casing fish. F/2181 T/221m. Pull wiper rubber and perform flow check. Continue tripping out the hole to the top of the fish. Break off and lay out Fishing Equipment. Hold safety meeting and rig up equipment to lay out 9 5/8" casing fish. Lay out 9 5/8" fish. 8jts of casing including shoe track. Lost 2 casing centralizers and 3 stop rings in the hole. Clean off rig floor and install wear bushing. Pick up 12 1/4" Clean out/Milling BHA. Trip in to 44m. Trip in with BHA down to 645m. Fill up and break circulation. Continue tripping in to the shoe at 1800. Hold trip drill and cut 130ft of drill line. Rig Service Trip in to 2037 reaming tight spots as needed. Tight spot @ 1824.
SSE
06:30 08:00 08:30 09:00 12:30 13:30 15:30 20:00 21:30 22:00
08:00 08:30 09:00 12:30 13:30 15:30 20:00 21:30 22:00 00:00
INTCSG2, DRILL INTCSG2, DRILL INTCSG2, DRILL INTCSG2, DRILL INTCSG2, DRILL INTCSG2, DRILL INTCSG2, DRILL INTCSG2, DRILL INTCSG2, DRILL INTCSG2, DRILL
TOH FISHBHAL/D FISHBHAL/D FISHBHAL/D WHDWB BHAP/U TIH DRLLNSC UNITMAIN REAM
1.50 Yes 0.50 Yes 0.50 Yes 3.50 Yes 1.00 Yes 2.00 Yes 4.50 Yes 1.50 Yes 0.50 Yes 2.00 Yes
1.50 19 0.50 19 0.50 19 3.50 19 1.00 19 2.00 19 4.50 19 1.50 19 0.50 19 2.00 19
Personnel
Company Total Headcount
Page 2/5
Date: 11/9/2013
Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:
Total Time: 21.67 Time from Spud: 21.06 Days Since Last DAFW / RI Case :
SSE
Weatherford Aker-Kvaerner Weatherford Halliburton Weatherford MI Swaco Gyrodata Inc Weatherford NOV - Fluids Services HAL - Wireline Weatherford Weatherford Chevron Smith International Weatherford Chevron Weatherford Weatherford Chevron Weatherford Weatherford Chevron Weatherford Weatherford Mud Checks
Date Depth (MD) (mKB) Depth (TVD) (mKB)
24 1 3 5 2 2 0 7 0 5 0 1 0 4 0 0 0 11 0 0
Shamolima Catering Wellhead Eng LWD/MWD Cementing DD Mud Engineers Gyrodata TRS Solids Control Wireline Ayun ent PetroBangla Inspection Completion/Liner hands WWT Bangla Industrial Hunting Casing NOV Tech WWS HES
5 SLS
0 BanglaCat
11/9/2013 22:00
Flow Line Temperature (C) Vis 3rpm Fluid Density (lb/gal)
3,038.0
Gel 10 sec (lbf/100ft)
2,761.43 NAF
Gel 10 min (lbf/100ft)
Active Pit
Gel 30 min (lbf/100ft)
11.20
Vis 6rpm Vis 300rpm
16.0
Vis 600rpm
27.0
Funnel Viscosity (s/qt)
30.0
PV Calc (Pas)
21 0
ROC (Wet) (% by wt) (lb/lb) Retort NAF by Volume (%)
10
pH Filtration Sz (m) NAF/Water Ratio Chlorides (mg/L)
11
CaCl2 (mg/L)
50
Electric Stability (V)
79
Water Phase Salinity (mg/L)
74 324,200
Retort Water by Volume (%)
59,000
High Gravity Solids (lb/bbl) Corrected Solids (%)
271,514.00 16.26
API Filtrate (cc/30min) API Filter Cake (1/32")
625.0
Retort Solids (% by Volume) (%)
168.59
NaCl (mg/L)
18.75
HTHP Filtrate (cc/30min)
19.25
HTHP Filter Cake (1/32")
62.00 1
Visibility (km)
3.4
T Low (C)
Support Vessels
Vessel Name Vessel Type Arrival Date Depart Date Note
Unscheduled Events
Referen ce No. Start Date End Date Event Type Unsch Maj Cat Unsch Detail Description Accountable Party Contractor
19
11/8/2013
NPT
FSH
OH
Droped shoe 9 5/8" shoe track and 6 jts of casing in the hole.
11/9/2013
25.0
105.0
Page 3/5
Date: 11/9/2013
Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:
Total Time: 21.67 Time from Spud: 21.06 Days Since Last DAFW / RI Case :
Received
Consumed
Cum On Loc
11/9/2013
22,500.0
6,015.0
154,968.0
------211.78 Drive Sub, Float Sub, 1x5''DP, Bumper Sub, Fishing jar, 6-1/2'' DC, HWDP
Comment
6.500
HWDP 6-1/2'' DC Fishing jar Bumper Sub 1x5''DP Float Sub Drive Sub Drilling Parameters
Wellbore Depth Start (MD) (mKB) TVD Start (mKB) Depth End (MD) (mKB) TVD End (mKB) Drill Time (hr)
49.30
Original Hole
Cum Depth Drilled (mKB) Pick-Up String Weight (1000lbf)
3,038
Cum Drilling Time (hr)
2,761.43
Flow Rate (gpm) Drilling Torque
3,038
Weight on Bit (1000lbf)
2,761.43
RPM (rpm)
0.00
Stand Pipe Pressure (psi)
0.00
Drill Str Wt (1000lbf)
------240.98 12.25" Milling Bit, 12" N.B. Stab, 8" Drill Collar, 11 3/4" Stg Stab, 8" Drill Collar, X/O 4 1/2IFB x 6 5/8, HWDP, Drilling Jars - Hydraulic, HWDP
Comment
6.500
BHA to clean out and mill Casing Stabilizers and lock rings. String/BHA Components
Item Des Len (m) Mass/Len (lb/ft)
HWDP Drilling Jars - Hydraulic HWDP X/O 4 1/2IFB x 6 5/8 8" Drill Collar 11 3/4" Stg Stab 8" Drill Collar 12" N.B. Stab 12.25" Milling Bit Drilling Parameters
Wellbore Depth Start (MD) (mKB) TVD Start (mKB) Depth End (MD) (mKB) TVD End (mKB) Drill Time (hr)
49.30 49.30
Original Hole
Cum Depth Drilled (mKB) Pick-Up String Weight (1000lbf)
3,038
Cum Drilling Time (hr)
2,761.43
Flow Rate (gpm) Drilling Torque
3,038
Weight on Bit (1000lbf)
2,761.43
RPM (rpm)
0.00
Stand Pipe Pressure (psi)
0.00
Drill Str Wt (1000lbf)
30 Casing Strings
Casing Description Comment Set Depth (MD) (mKB) Set Depth (TVD) (mKB) Run Date
Page 4/5
Date: 11/9/2013
Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:
Total Time: 21.67 Time from Spud: 21.06 Days Since Last DAFW / RI Case :
Item Des
OD (in)
ID (in)
Tubing Strings
Tubing Description Comment Set Depth (MD) (mKB) Run Date
Tubing Components
Top Depth (mKB) Bottom Depth (mKB) Length (m) Joints Item Description OD Nominal (in) ID (in)
BOP Test
Date Com
10/29/2013 Wellbores
Wellbore Name
Shell test BOPs and related equipment to 250/5k psi, ok, Full BOP test was done on 22 October'13.
Parent Wellbore
Original Hole
Date
5/27/2013
EW (m) DLS (/30m)
7/22/2013
EW (m) DLS (/30m)
Page 5/5