Vous êtes sur la page 1sur 5

1.

GENERAL 1 Manufacturer's Name


Collaboration, if any 2 SERVICE

Supplier data As per make list Distribution As per the BOQ

3 Quantity 4 Reference standard 5 Reference list for similar supplies enclosed 6 Printed leaflets and catalogues for the equipment enclosed 2.0 1 2 3 TECHNICAL Rated output - ONAN Rated Voltage - HV - LV Rated current - HV - LV 4 5 6 7 No. of phases Installation Rated Frequency Short circuit rating of transformer Primary Secondary 8 System Earthing Primary Secondary 9 10 Number of winding HV winding Max Current density wdg at all taps Max Current density bushing LV winding Max Current density wdg Max Current density bushing Reference ambinent temperature Temp. rise at full load (over 50 deg C ambient ) - Winding Oil 14 15 NCT Details Withsatnd time without injury for Three phase dead short-circuit at terminal with rated voltage maintained 1 on the other side Single phase short circuit at terminal 2 with rated voltage maintained on other side

Nos Yes/No Yes/No

KVA KV KV A A

1200/1600/2000 11000 0.433 As per the requirement As per the requirement 3 50

Hz

KA KA

40 KA for 3 Sec 50 KA for 1 Sec NGR GROUNDED SOLIDLY GROUNDED 2

A/mm A/mm A/mm A/mm Deg C

2.8 1.4 2.8 1.4 50

11

12 13

Deg C Deg C

55 50 Considered

Sec

Sec

16

No load current 1 At 90% Rated Voltage 2 At 100% Rated Volatge 3 At 110 % Rated Voltage

Amps As per the requirement As per the requirement As per the requirement

18

19

1 2 3 4 5 6 7 Tap-changer operable at standing height from ground

Range of variation of transformation Ratio a) Increasing ratio with steps b) Decreasing ratio with steps TAP CHANGER Make & size of tap changer Type of tap changer Capacity Range- Steps X % variation Taps provided on HV winding Type of coolant

5% -5% Paragadeep 200 A Resistance type insteps of 2.5% +5% to -5% Yes Mineral Oil Yes

Page 1

8 Provided With Tap Position indicators Padlocking provisions All contacts silver plated 21 1 2 3 4 24 25 26 27 28 29 30 30 LOSSES No-load loss at rated voltage and frequency (without IS tolerances) Copper loss at rated current at 75 Deg.C (Normal Tap) without IS Tolerances Load loss at rated current at 75 Deg.C (Normal without IS Tolerances Tolerance on losses Connections (a) High voltage (b) Low voltage Vector group Reactance at rated current and frequency at 75 Deg. C Impedance at rated voltage, frequency and current at 75 Deg. C Resistance at 75 Deg. C Zero Sequence capacitance of HV winding X/R ratio Insulation strength of low voltage winding a) Impluse test b) Power frequency test Insulation strengthof low voltage Netural a) Impluse test b) Power frequency test Insulation strength of high voltage winding a) Impulse test b) Power frequency test KV peak KV KV peak KV KV peak KV NA 3KV NA 3KV 60KVp 20KVrms Yes/No Yes/No Yes/No Kw KW KW Furnished later MAX Star/Delta Star/Delta Delta Star Dyn11 Yes Yes Yes Furnished later

Percentag As per the require Percentag As per IS 2026 Furnished later Furnish later Furnish later

uF/ph

31

32

Page 2

33

Overload capacity of transformer both under hot and cold conditions with following overloads : - 10% - 20% - 30% - 50% - 75% - 100% Maximum flux density at rated voltage and frequency Tank material Thickness of sides Thickness of Bottom Thickness of Top Atmoseal type and breather as backup. Provided Core Type - core or Shell Core material Thickness of lamination Insulation of lamination Coil Type of Coil a) H V b) L V Conductor material Insulating material a) H V - Turn b) L V - Trun c) L V - Earth d) H V - L V Termination Connection - High voltage (Cable Box) - Low voltage (bus duct flange) Has neutral bushing been provided outside the transformer for earthing Marshalling Box 1 Degree of protection Provided with removable gland plate/ conduit 2 Knockout Terminal Block 1 Make 2 Type 3 20 % spare furnished

Sec Sec Sec Sec Sec Sec Tesla

As per IS 6600

34

1.65

35 1 2 3 4 5 36 1 2 3 4 37 1

yes/No

MS 5mm 6mm 6mm Yes

Core CRGO 0.3mm Carlite

2 3

Layer/disc Layer/Foil Cu craft paper craft paper PCB+PB+Oil PCB+PB+Oil Yes/No Yes/No Yes/No Yes Yes Yes

38

39

IP55 Yes

40

Elmex

Yes/No

Yes

41

Wirirng 1 Cable Type 2 Volatge grade 3 Conductor size

Volt Sq.mm

PVC 2KV 1.5Sq.mm

42

Trip & Alarm Contacts Ratings 1 Volatge grade 2 Rated/making current Accessories Each transformer furnished with fittings and accessories as per Annexure ? Shipping data 1 Weight of the heaviest package 2 Dimensions of the largest package (L x B x H) List of transformer fittings enclosed Test

Volt Amp

250V AC/DC 2 Amps

43

Yes/No

yes

47

Kg mm Yes/No

Furnish later Furnish later Yes

48 49

Page 3

1 Routine tests as per IS 2 Core bolt withstand voltage for 1 min. 3 Type test certificates as per specification available? 50 List of transformer protections provided : a) Oil temperature - Make - Type - Provision for Alarm & trip contacts b) Winding temperature - Make - Type - Provision for Alarm & trip contacts

Yes/No KV Yes/No

Yes Yes Yes

perfect control/Reputed Yes/No Yes

perfect control/Reputed Yes/No Yes

c)Local WTI and OTI with Digital Display provided

Yes/No

Yes

d) Buchholz Relay - Make - Type - Provision for Alarm & trip contacts e) Oil level gauge - Make - Type - Provision for Alarm & trip contacts f) Have all the alarm and trip contacts been wired upto terminal box g) Pressure relief device with trip contact provided

VIAT/Reputed Yes/No Yes

CGL/Reputed Yes/No Yes/No Yes/No Yes Yes Yes

Page 4

51

Details of Bushings HV 1 Type and make 2 Rating 3 Visible power frequency discharge voltage 4 One minute dry withstand power frequency voltage 5 Under oil flash over or puncture withstand power frequency voltage 6 Full wave withstand impulse voltage 7 Creepage distance in air (25 mm/KV) 8 Weight of assembled bushing L V Netural 1 Type and make 2 Rating 3 Visible power frequency discharge voltage 4 One minute dry withstand power frequency voltage 5 Under oil flash over or puncture withstand power frequency voltage 6 Full wave withstand impulse voltage 7 Creepage distance in air (25 mm/KV) 8 Weight of assembled bushing 9 Reference standards Paint shade Drawings/data GA Foundation plan BOM wiring diagram Bus duct flange details Will be submitted in the event of order. KV IS 2099 KV IS 2099 KV IS 2099 KV Yes/No Kg IS 2099 Yes IS 2099 RAL 7032 KV As per IS2099 KV As per IS2099 KV As per IS2099 KV Yes/No Kg As per IS2099 Yes Mahindra/Reputed IS 2099 Porcelain/ Mahindra/Reputed Make As per IS2099

52 53

Page 5

Vous aimerez peut-être aussi