Vous êtes sur la page 1sur 17

AMMENDMENTS TO TENDER CONDITIONS NAME OF WORK :- Investigation, Design, Execution & Maintenance of the following components to lift 6.

70 TMC of water from + 214.000m to +300.000m, from fore shore of Udayasamudram Balancing Reservoir to proposed Balancing Reservoir near Brahamanavellemula Village, Narkatpally (Mandal), Nalgonda (District). 1. Approach Channel, Tunnel, Surgepool. 2. Pumping station including Annexe floors, draft tube tunnels etc., near Chowdampally Village, Narkatpally (Mandal), Nalgonda (District). 3. Supplying, erection, testing, commissioning of pumps and motors with associated civil, mechanical, electrical and instrumentation works. 4. Manufacturing, laying, testing, commissioning of pressure mains. 5. Formation of Balancing Reservoir of capacity 0.30 TMC near Brahamanavellemula village. 6. Left Canal, Right Canal and Right Branch Canal including all CM & CD works. 7. Distributary system for 1.00 lakh acre of ayacut suitable to micro irrigation system. 8. Infrastructural facilities for implementation of Micro irrigation for 1.00 lakh acre. 9. Off-line Reservoirs across Gudipally vagu, Shashleru vagu and Kanagal vagu in AMR SLBC Project. 10. Miscellaneous Items like preparation of land plan schedules, construction of structures on distributaries, providing drinking water supply system to enroute villages, plantation along the canal, formation of service roads along canals etc., and maintenance of entire system for 2 years after completion of project.

Corrigendum to the Tender Notice No.3 SE/2007-08, dated 29-08-2007. Vol.I Sl No 1 1 Page No. 2 8 Description Clause No. 3 Item No.l Miscellaneous items Sl.No.4 Subject Read for 4 NIT Notification Scope of work 5 Design and preparation of Engineering drawings for total lined distributary system consisting of Majors / Minors / Sub-minors and delivery structures like APMs, OFMs, Tail clusters and proportionate distributors. Read as 6 Design and preparation of Engineering drawings for unlined distributary system consisting of Majors / Minors / Sub-minors and delivery structures like APMs, OFMs, Tail clusters and proportionate distributors.

49

Clause No.32.1.3 Sl.No.4 of Volume.I Part.A

Technical Requirement Bidder should have manufactured, supplied, erected, tested and successfully commissioned large diameter steel water supply pipeline (buried and / or surface) having internal diameter of 1.10 m or more for a length of 2 (two) Kms or more with associated civil works which are working satisfactorily for at least 2 (two) years. The bidder has to submit certificate in proof of above or more.

Bidder should have manufactured, supplied, erected, tested and successfully commissioned large diameter steel water supply pipeline (buried and / or surface) having internal diameter of 1.00 m or more for a length of 2 (two) Kms or more with associated civil works which are working satisfactorily for at least 2 (two) years. The bidder has to submit certificate in proof of above or more.

Sl No 3

Page No. 63

Description Clause No. Volume.I Part.A Conditions of Contract Subject Read for BID IIF MY/OUR Bid is not accepted the sum shall be returned to me/us on application when intimation is sent to me/us of rejection or at the expiration of three months from last date of receipt of this Bid, whichever is earlier. If my/our Bid is accepted the earnest money shall be retained by the Government as security for the due fulfillment of this contract. If upon written intimation to me/us by the Superintending / Executive Engineers Office, I/We fail to attend the said office on the date herein fixed or if upon intimation being given to me/us by the Superintending /Executive Engineer or acceptance of my/our Bid, and if I/We fail to make the additional security deposit or to enter into the required contract as defined in condition 31.2 of the instructions to Bidders, then I/We agree to the forfeiture of the earnest money. a) For Manufacture of Pipes in all aspects 70% of the RMT will be paid. b) Balance 25% will be paid after pipes are laid in the trenches and coating, jointing and joint testing is carried out. c) Balance 5% will be paid after leakage /Hydrological pressure is carried out in case the coated pipes that are laid and after joint testing done in the trenches, The number of pumps are 2 (two) of Vertical Shaft single stage Francis Turbine pumps (similar to AMRP at Puttamgandi) not less than 12 MW capacity each. Read as IF MY/OUR Bid is not accepted the sum shall be returned to me/us on application when intimation is sent to me/us of rejection or at the expiration of Six months from last date of receipt of this Bid, whichever is earlier. If my/our Bid is accepted the earnest money shall be retained by the Government as security for the due fulfillment of this contract. If upon written intimation to me/us by the Superintending / Executive Engineers Office, I/We fail to attend the said office on the date herein fixed or if upon intimation being given to me/us by the Superintending /Executive Engineer or acceptance of my/our Bid, and if I/We fail to make the additional security deposit or to enter into the required contract as defined in condition 31.2 of the instructions to Bidders, then I/We agree to the forfeiture of the earnest money.

88

Clause No.42 & 42.1 of Volume.I Part.A

Payment Schedule for Pipe work

a) For Manufacture of Pipes in all aspects 70% of the Running Meter (RMT) will be paid. b) 20% will be paid after pipes are laid in the trenches and coating, jointing and joint testing is carried out. c) 5% will be paid after successful functioning of total unit. d) Balance 5% will be paid after expiry of guarantee period.

217

Clause No.3 of Volume.I Part.E

Project Profile Scope of work

The number of pumps are 2 (two) of Vertical Shaft single stage Francis Turbine pumps not less than 12 MW capacity each.

Note :-

1) Wherever design and preparation of Engineering drawings for total lined distributory sysem should be read as design and preparation of Engineering drawings for distributory system in Volume.I of bid documents . 2) Wherever the combined efficiency of motor and pumps is not less than 91% should be read as the pump efficiency should be greater than 91% and motor efficiency should be greater than 98% and the combined efficiency should be greater than 89% in Volume.I of bid documents.

Sl No

Page No.

Description Clause No. Subject Read for Read as

In Clause 42 Payments of General Condition of Contract of bid document, the following para may be read in addition to clause 42.1: Payment terms of Electro-mechanical equipment and 220 KV line and 220 KV Sub-Station equipment and works shall be as follows. A) For Supply : i) 70% of the quoted price for supply of goods (FOR Price including all taxes and duties) shall be paid on receipt of goods at site based on certificate prepared by Stores authorities and suppliers representative, on the basis of various items received in accordance with the Contract Agreement. ii) 20% of quoted price shall be paid on erection of equipment on pro-rata contract value of the work completed as per the agreed construction schedule and on certification by the Engineer-in-charge and the suppliers representative. iii ) 5% of the quoted price shall be paid on successful testing and commissioning of each equipment as progressive payment against interim payment certificate prepared on the basis of various items supplied, erected, tested and commissioned in accordance with the Contract Agreement. iv) Final 5% of the quoted price for supply of material shall be paid on expiry of guarantee period. B) For erection, testing and commissioning: i) 50% of the quoted price for erection, testing and commissioning shall be paid after completion of erection of equipment based on certificate prepared by Engineer-incharge and suppliers representative, on the basis of various items erected in accordance with the Contract Agreement. ii) 40% of the quoted price for erection, testing and commissioning shall be paid after completion of testing and commissioning of equipment based on certificate prepared by Engineer-in-charge and suppliers representative, on the basis of various items erected in accordance with the Contract Agreement. iii) 5% of the quoted price for erection, testing and commissioning shall be paid after completion of testing and commissioning of each unit based on certificate prepared by Engineer-in-charge and suppliers representative, in accordance with the Contract Agreement. iv) Final 5% of the quoted price for erection, testing and commissioning shall be paid on expiry of guarantee period.

Sl No

Page No.

Description Clause No. Subject Read for Vol.II Part-I E & M Equipment. Read as

Clause No.1.4.4

Computation Of Weighted Average Efficiency:

Computation Of Weighted Average Efficiency: The weighted average efficiency of the prototype machine shall be determined from the guaranteed and field test values of the efficiencies at the rated static head of 86.00m in accordance with the for the purpose of penalty and rejection limits of efficiencies guaranteed.

Computation Of Weighted Average Efficiency: The weighted average efficiency of the prototype machine shall be determined from the guaranteed and field test values of the efficiencies at the rated static head of 86.00m in accordance with the for the purpose of penalty and rejection limits of efficiencies guaranteed. weighted average efficiency = 0.7 ( Efficiency at Minimum head ) + 0.3 ( Efficiency at maximum head ) Cooling water required for the pump-motor, and other equipment have to be drawn from draft tube through pumps and strainers and shall be arranged by the bidder. The pressure required at the inlet and outlet of the oil/air coolers shall be indicated by the Bidder. All connections necessary piping, fittings, valves, flow relays, pressure gauges etc. and other devices required within and out side casing and for connecting to the discharge pipe to draft tube shall be arranged by the manufacturer. Piping arrangement for discharge of cooling water to draft tube shall also be arranged. The quantity, purity and inlet pressure of cooling water required for the pump bearing shaft seals, runner labyrinths and any other components etc. that may require water for cooling, or lubrication shall be indicated by the bidder. Fine strainers required for shaft seal cooling water shall be provided by the bidder which will be capable of working continuously as a normal source of supply.

page No.15

Clause No.I.26

Cooling Water Piping and Cooling water required for the pump-motor, and Equipment other equipment have to be pumped from surge pool through pumps and strainers and shall be arranged by the bidder. The pressure required at the inlet and outlet of the oil/air coolers shall be indicated by the Bidder. All connections necessary piping, fittings, valves, flow relays, pressure gauges etc. and other devices required within and out side casing and for connecting to the discharge pipe shall be arranged by the manufacturer. Piping arrangement for discharge of cooling water outside the pump house shall also be arranged. The quantity, purity and inlet pressure of cooling water required for the pump bearing shaft seals, runner labyrinths and any other components etc. that may require water for cooling, or lubrication shall be indicated by the bidder. Fine strainers required for shaft seal cooling water shall be provided by the bidder which will be capable of working continuously as a normal source of supply.

The cooling system shall be so designed that back The cooling system shall be so designed that back flushing shall be possible by reversing the direction flushing shall be possible by reversing the direction of of flow of cooling water to avoid flow of cooling water to avoid clogging of cooler pipes clogging of cooler pipes.

Sl No 3

Page No. 15

Description Clause No. Clause No.I.27 Subject Read for Miscellanaces Piping and The bidder shall supply all other miscellaneous Equipment equipment like air, water, and oil piping along with their accessories directly associated with the units. Such piping, for example, shall be the various pump drain piping; air inlet piping, governor and lubrication oil supply and return piping, etc. Suitable steel pipes shall be provided for all embedded piping. For connection to the exposed piping and for erection/replacement, flanged connections shall be provided. Discharge valve Each pump shall be provided with oil pressure operated butter fly valve or through flow type valve, and oil pressure operated needle valve or sluice valve as by pass use. The valve shall have maximum capacity to allow maximum flow of pump discharge. The valve shall be designed to withstand the maximum transient pressure of 50 x 2 m, and shall be free from vibration and abnormality under the whole operating range of pump including any transient conditions of operations. The inside diameter of the valve shall be recommended by the bidder. The valve shall be so designed as to be capable of closing from fully opened position under the condition of maximum flow at every head with minimum oil Pressure supplied to servomotor. Alternatively the bidder may quote for counterweight closing. The opening and closing time of the valve shall not be more than 60 seconds, including the operating time of bypass valve with normal operating pressure. Amount of leakage passing through the gaps shall not exceed 5 litres/min. under a Static head of 65 m including leakage through the bypass valve. Read as The bidder shall supply all other miscellaneous equipment like air, water, and oil piping along with their accessories directly associated with the units. Such piping, for example, shall be the various pump drain piping; air inlet piping, governor and lubrication oil supply and return piping, etc. Suitable steel pipes shall be provided for all embedded piping. For connection to the exposed piping and for erection/replacement, flanged connections shall be provided .Ventilation duct piping of suitable size shall be arranged for gallaries. Each pump shall be provided with oil pressure operated butter fly valve or through flow type valve, and oil pressure operated needle valve or sluice valve as by pass use. The valve shall have maximum capacity to allow maximum flow of pump discharge. The valve shall be designed to withstand the maximum transient pressure of 2.5 times of the maximum pressure head, and shall be free from vibration and abnormality under the whole operating range of pump including any transient conditions of operations. The inside diameter of the valve shall be recommended by the bidder. The valve shall be so designed as to be capable of closing from fully opened position under the condition of maximum flow at every head with minimum oil Pressure supplied to servomotor. Alternatively the bidder may quote for counter- weight closing. The opening and closing time of the valve shall not be more than 60 seconds, including the operating time of bypass valve with normal operating pressure.

18

Clause 1.33.1

Amount of leakage passing through the gaps shall not exceed 5 litres/min. under a Static head of 86 m. including leakage through the bypass valve.

Sl No 5

Page No. 23

Description Clause No. Clause No. 1.41.1 Subject Read for Pump Controller (Governer) 1 Permanent magnet generator (PMG) An independent permanent magnet generator suitable for direct connection through a dry flexible coupling to the extension of main motor shaft shall be supplied by the contractor for the purpose of providing power to the speed relays. The PMG shall be equipped with a numbered dome light and shall be electrically insulated from the main pump motor shaft to prevent shaft currents. The PMG shall actuate not less than 4 (four) over speed relays and 2 ( two) low speed relays in the pump controller cubicle. The speed relays shall have adequate range of operating settings and positive means of locking at the required setting. Exact value of settings shall be decided after the award of contract. One Speed indicator meter. One complete system of equipment, piping, connecting pipes, valves, bends, drains etc. for cooling water, oil and High-pressure compressed air systems for pump and controller equipment. The motor shall be designed & constructed so as to facilitate easy repair/replacement of motor stator bars and rotor poles. Starting of the motor shall be SFC/FCMA Soft starter. The motor shall be connected to a three phase 11KV/132 KV, 15 MVA stepup power transformer which shall be connected to 132 KV bus through a circuit Breaker. EFFICIENCY GUARANTEES: The efficiency of the motor at full discharge of pump shall be above 95% percent at the rated voltage and power factor and combined efficiency shall be above 85%. The weighted average efficiency shall be stated and guaranteed. The above efficiencies shall be subject to penalty and rejection as defined in clause 2.6.4. Read as 1 Toothed Wheel with 2 Nos. of Proximity switching sensor for measuring the speed of the machine which is coupled to the extension of main motor shaft shall be supplied by the contractor for the purpose of providing power to the speed relays. The Pump shall be equipped with a numbered dome light and shall be electrically insulated from the main pump motor shaft to prevent shaft currents. The Speed sensor shall actuate not less than 4 (four) over speed relays and 2 ( two) low speed relays in the pump controller cubicle. The speed relays shall have adequate range of operating settings and positive means of locking at the required setting. Exact value of settings shall be decided after the award of contract.

29

Clause No.1.51

Schedule of Requirements

One Speed measuring and indicator unit. One complete system of equipment, piping, connecting pipes, valves, bends, drains etc. for cooling water, oil and High-pressure compressed air systems for pump and controller equipment. (Redundent) The motor shall be designed & constructed so as to facilitate easy repair/replacement of motor stator bars and rotor poles. Starting of the motor shall be (SFC) system / LCI system / VFD based starting system. The motor shall be connected to a three phase 220/11KV/20 MVA stepdown power transformer which shall be connected to 220 KV bus through a circuit Breaker. EFFICIENCY GUARANTEES:The Pump Efficiency Should be greater than 91% and motor efficency should be greater than 98% and the combined efficiency should be greater than 89%.The above efficiencies shall be subject to penalty and rejection as defined in clause 2.6.4.

45

Clause No. 2.3.1

General

46

Clause No.2.6.1

Efficiency and out put guarantees

Sl No 9 10

Page No. 62 78

Description Clause No. Clause No.2.32 Clause No.3.6 Subject Read for Schedule of Requirements Spares for Stastic Excitation and Regulation Equipment(common for two units) 15. One set of vibration detectors III-B) Pumps Starting Equipment :-For starting of pumps the bidder may quote either Static frequency converter (SFC) system/FCMA or any alternative starting system. Starting equipment offered shall be suitable to start the pump- motor smoothly and without inrush current. The motor shall be soft started and reach 90% of rated speed with in 5 minutes. The bidder shall include the necessary transformers , H.T Switch gear, and all the control equipment in their scope of supply 4.1 SCOPE OF SUPPLY Following shall be included in scope of supply: a) The type of data acquisition, control and monitoring 1 Lot system having provision for Local/Remote control panel as per requirement, Mosaic Mimic board with metering instruments complete in all respects to serve 2units and two 220 KV feeders , two station transformer feeders, 11KV cubicles, SABS b) Protective Relaying panels for Read as 15.One set of vibration detectors for motor and pump III-B) Pumps Starting Equipment :-For starting of pumps the bidder may quote either Static frequency converter (SFC) system / VFD starting system. Starting equipment offered shall be suitable to start the pumpmotor smoothly and without inrush current. The motor shall be soft started and reach 90% of rated speed with in 5 minutes. The bidder shall include the necessary transformers , H.T Switch gear, and all the control equipment in their scope of supply

11

79 Section IV Clause No.4.1

Control and Relaying Equipment

4.1 SCOPE OF SUPPLY Following shall be included in scope of supply: a) The type of data acquisition, control and monitoring 1 Lot system having provision for Local/Remote control panel as per requirement, Mosaic Mimic board with metering instruments complete in all respects to serve 2units and two 220 KV feeders , two station transformer feeders , 11KV cubicles, SABS b) Protective Relaying panels for - Motor and Motor Transoformers (20 MVA) 2 Sets - Motor and Motor Transoformers (15 MVA) 4 Sets - 220 KV feeders 1 Set - 220 KV feeders 2 Sets - Station Transformers (12.5 MVA) 2 Sets. - 220 KV inter bus protection Relays 2 Sets c) Power Line Carrier Communication (PLCC) - Bus section Isolator on customer 220 KV Bus 1 Set panels for 220 KV feeders 1 Set. - Station Transformers (15 MVA) 2 Sets. c) Power Line Carrier Communication (PLCC) panels for 220 KV feeders 2 Sets.

12

81

Clause 4.2

General provisions pump 3) Station Transformers 2Nos. (132KV/ 11KV) stations 2sets (one set for each transformer)

3) Station Transformers 2Nos. (220KV/11KV) 2sets (one set for each transformer)

Sl No 13

Page No. 81

Description Clause No. Clause 4.2 Subject Read for Read as General provisions pump d) 220 KV Line Protection and Metering (For TWO b)220 KV Line Protection and Metering for feeder stations . FEEDERS) one set for each feeder General provisions pump C ) Inter Bus protection with (Two sets) (Between stations . customer & Transco Buses) Bus bar voltage frequency indication recorders 1 Set active & reactive power flow with MDI hand reset. 2 Sets active & reactive energy meters for each feeder static type of 0.2 accuracy class shall be provided as finalised during design & engineering. Transco metering will provide in switch yard near Transco metering C.T.. Protection OC & E/F Protection. All connect up relays & Trip relays C) 2 Sets active & reactive energy meters for feeder static type of 0.2 accuracy class shall be provided as finalised during design & engineering. Transco metering will provide in switch yard near Transco metering C.T.. Protection OC & E/F Protection. All connect up relays & Trip relays

14

82

Clause No.4.2

15 16

83 87

Clause No.4.2 Clause No.4.5

Local Unit Control Architechture of the proposed system

4.2 LOCAL UNIT CONTROL &METERING BOARD i) The architecture of the proposed system shall comprise the following a) Automation calls for the local data acquisition and control comprising: Unit level control Station auxiliaries dual control 220 KV switchgear dual control

4.3 LOCAL UNIT CONTROL &METERING BOARD i) The architecture of the proposed system shall comprise the following a) Automation calls for the local data acquisition and control comprising: Unit level control Station auxiliaries dual control including line control

17 18

89 107

Clause No.4.6 Clause No.5.2.3

ii) FEEDER CONTROL and Inter bus equipment ii) FEEDER CONTROL (2sets.) SAB1&SAB2 Shall feed g) Emergency lighting board g) Emergency lighting board all the pump house notes All Loads of unit auxiliaries of three units like All Loads of unit auxiliaries of two units like Each SAB(SAB1&2)Shall 1)Incoming feeders, : 1 Nos. have 2000A with drawout type ACBs 1)Incoming feeders, : 2 Nos. 2000A with drawout type ACBs

Control philosophy

19

107

Clause No.5.2.4

Sl No 20

Page No. 118 & 119

Description Clause No. Clause No. 5.3 & 5.3.1 Subject Read for 11KV Switch gare panels 2)11KV, 1000A out going feeders a) 1000A Out going feeders for units, 10 MVA,11KV/11KV - 2 Nos b) Starting Transformer feeder - 2Nos. c) Spare feeder of 1000A capacity - 2 No Read as 2)11KV, 1000A out going feeders a) 1000A Out going feeders for units, 10 MVA,11KV/11KV - 2 Nos b) Spare feeder of 1000A capacity - 1 No

21

119

Clause No.5.3&5.3.1

11KV Switch gare panels 3)11KV, 150 A Switch gear compartments for a) 150 A out going feeders 1 MVA, 11KV/415V, Station Transformer feeder - 2 Nos b) Feeders of 150A capacity - 2 Nos c) Spare Feeders - 2 Nos.

3)11KV, 150 A Switch gear compartments for a) 150 A out going feeders 1 MVA, 11KV/415V, Station Transformer feeders - 2 Nos b) Feeders of 150A capacity - 2 Nos

22

133

Clause No.5.4.2 &5.4.2.01

Details of Panels Rrequired

5.4.2.01 The Star-Delta type Starter Panels shall be supplied for the following pumps. The capacities of Pumps given below are tentative. The bidder shall design the suitable capacity of pump required and starter panel shall be given accordingly. a) De-watering pump 100 KW/ - 6 Nos b) Drainage pumps 50KW - 2nos. c) Cooling water pumps 25 KW - 2 Nos per each unit (one main + one standby) d) Compressor air system pump-25 KW - 2 Nos (one main + one standby)

5.4.2.01 The Star-Delta type Starter Panels shall be supplied for the following pumps. The capacities of Pumps given below are tentative. The bidder shall design the suitable capacity of pump required and starter panel shall be given accordingly. a) De-watering pump 100 KW/ - 3 Nos b) Drainage pumps 50KW - 2nos. c) Cooling water pumps 25 KW or as required - 2 Nos per each unit (one main + one standby) d) Compressor air system pump-25 KW or as required 2 Nos (one main + one standby)

Star - Delta Starter Panels for the above Pumps Star - Delta Starter Panels for the above Pumps shall be shall be provided with following components: provided with following components:

Sl No 23

Page No.

Description Clause No. Subject Read for DOL type strater 5.4.2.2.The DOL type Starter Panels shall be supplied for the following for each unit The capacity of pumps given below are tentative. Bidder shall design the suitable capacity of pump required and starter panel given accordingly. a) Oil lift pump - 10 KW - 2 Nos b) Grease pump - 1.5KW - 1 Nos c) Turbine top cover Read as 5.4.2.2.The DOL type Starter Panels shall be supplied for the following for each unit The capacity of pumps given below are tentative. Bidder shall design the suitable capacity of pump required and starter panel given accordingly. a) Oil lift pump - 10 KW - 2 Nos b) Turbine top cover

134 Clause No.5.4.2.2

24

139

Clause No.5.5.0

Motor Transformers

5.5.0 MOTOR TRANSFORMERS 2N0s. (Two ) 15 MVA, 220 KV /11 KV, 3 Phase, 50 Hz outdoor type, oil filled, with on load tap changer with RTCC panel power transformers with OFW cooled, complete with fittings accessories, spares, special tools & tackles etc.

5.5.0 MOTOR TRANSFORMERS AND STATION TRANSFORMERS a) 2Nos. (Two) 20 MVA, 220 KV /11 KV, 3 Phase, 50 Hz outdoor type, oil filled, with on load tap changer with RTCC panel power transformers with ONAF cooled, complete with fittings, accessories, spares, special tools & tackles etc. b) 2Nos. (Two) 12.5 MVA ,220 KV /11 KV, 3 Phase, 50 Hz outdoor type, oil filled, with on load tap changer with RTCC panel power transformers with ONAF cooled, complete with fittings, accessories, spares, special tools & tackles etc.

25

139

Clause No.5.5.1

Scope of Supply

5.5.1 SCOPE OF SUPPLY: The scope of this specification covers design, engineering, manufacture, shop testing prior to dispatch, inspection, packing, forwarding, delivery at site, testing and Commissioning of 2 Nos. 220 KV/11V, 3 phase 15 MVA oil filled, Outdoor type Power Transformers complete with necessary fittings and accessories.

5.5.1 SCOPE OF SUPPLY: The scope of this specification covers design, engineering, manufacture, shop testing prior to dispatch, inspection, packing, forwarding, delivery at site, testing and Commissioning of 2 Nos. 220 KV/11V, 3 phase 20 MVA oil filled, Outdoor type Power Transformers complete with necessary fittings and accessories,and 2Nos 220/11KV 3phase 12.5MVA oil filled outdoor type power transformer complete with necessary fittings and accessories.

10

Sl No 26

Page No. 140

Description Clause No. Clause No.5.5.3 Subject Read for Oil Immersed 5.5.3 OIL IMMERSED TRANSFORMER Transformer Requirement REQUIRMENT. 1. No. required. : 4 Nos. as per IEC 726 and ISS 2026 2. No. of Phases : Three 3. Frequency. : 50 Hz. 4. No. of windings : Two 5. Type of cooling : OFW 6. Rated output : 20000 KVA Read as 5.5.3 OIL IMMERSED TRANSFORMER REQUIRMENT. 1. No. required. : 4 Nos. as per IEC 726 and ISS 2026 2. No. of Phases : Three 3. Frequency. : 50 Hz. 4. No. of windings : Two 5. Type of cooling : ONAF 6. Rated output : 20000 KVA-2Nos,12,500KVA-2Nos

27

148 Clause No.5.5.7.2

Cooling Equipment and 5. 5.7.2 415 V, 3 Phase, 50 Hz, supply connections Controls to local control panel will be provided. Both groups of pumps shall be supplied from normal source.

5. 5.7.2 415 V, 3 Phase, 50 Hz, supply connections to local control panel will be provided. Both groups of fans shall be supplied from normal source.

28

148 Clause No.5.5.7.3

Cooling Equipment and 5. 5.7.3 Means shall be provided for auto and Controls local manual operation of each group of pumps. Necessary interlocks and changeover circuitry shall be provided in the local panels.

5. 5.7.3 Means shall be provided for auto and local manual operation of each group of fans. Necessary interlocks and changeover circuitry shall be provided in the local panels.

29

148 Clause No.5.5.7.4

Cooling Equipment and Provision ( i. e required number of relays, contacts Deleted. Controls etc.) shall be made in the panel in transformer pumps circuit to enable the employer to provide electrical and mechanical interlocks between the transformer fire fighting equipment and transformer cooler equipment to prevent operation of fan in the event of operation of automatic fire protection system. Details of automatic fire protection system will be finalized with the successful bidder.

11

Sl No 30

Page No.

Description Clause No. Subject Read for Cooling Equipment and Control equipment for the cooling pumps shall be Controls mounted completely wired in weather proof local control panel complete with isolating switches, HRC fuses, contractors, thermal overload relays, automatic control equipment, and auto/manual selector switch etc. The terminal blocks shall be of Type CATDM4 of Elemex make for C.Ts and CATM4 for other circuits. Cooling Equipment and Provisions shall be made in local cooler control Controls panel for connecting indicating lights provided on the purchaser's remote control panel for following indication 1) First set of contacts of winding temperature indicator operated. 2) Second set of contacts of winding temperature indicators operated 3) Pump-A ON'/OFF/TRIP 4) Pump-B ON'/OFF/TRIP Cooling Equipment and Provision shall be made in control circuit for two (2) Controls sets of 1 NO + 1 NC, 2A, 220V DC contacts for annunciating following two (2)conditions on the remote control panel. 1) Any Pump tripped. 2) AC supply failed 3) Oil circulation failed in Pump A circuit / Pump B circuit cooling water circulation failed in Pump A circuit / pump B circuit Station Battery, Battery 2 sets of 220 V DC Batteries of minimum of 500charger & DC Distribution Ampere Hour or Higher capacity and 2 sets of 24 V, boards. 500AH shall be provided. The battery shall be able to support the complete station load for a period of 10 hrs, with out AC supply. Read as Control equipment for the cooling fans shall be mounted completely wired in weather proof local control panel complete with isolating switches, HRC fuses, contractors, thermal overload relays, automatic control equipment, and auto/manual selector switch etc. The terminal blocks shall be of Type CATDM4 of Elemex make for C.Ts and CATM4 for other circuits. Provisions shall be made in local cooler control panel for connecting indicating lights provided on the purchaser's remote control panel for following indication 1) First set of contacts of winding temperature indicator operated. 2) Second set of contacts of winding temperature indicators operated 3) Group -A ON'/OFF/TRIP 4) Group-B ON'/OFF/TRIP Deleted.

148 Clause No.5.5.7.5

31

148 Clause No.5.5.7.6

32

148 Clause No.5.5.7.7

33

158

Clause No..5.7

1 set of 220 V DC Batteries of minimum of 500-Ampere Hour or Higher capacity and 2 sets of 24 V, 500AH shall be provided. The battery shall be able to support the complete station load for a period of 10 hrs, with out AC supply.

12

Sl No 34

Page No.

Description Clause No. Subject Read for Station Battery, Battery charger & DC DB Scope of supply : The scope of supply against this specification covers manufacture, assembly, testing at works, packing, supply by Road, delivery at Project site, erection, testing and commissioning of 220V D.C & 24 D.C. system . 1) a. 220V Bank, 500AH capacity high discharging performance, maintenance free sealed batteries along with accessories, fittings etc. 2 No. b Battery charging equipment for the above consisting of - 2 Nos i) Silicon controlled rectifier type float charger - 2 Nos ii) Silicon diode rectifier type boost charger - 2 Nos. c) D.C Distribution Board (220V) - 1 No. Read as Scope of supply : The scope of supply against this specification covers manufacture, assembly, testing at works, packing, supply by Road, delivery at Project site, erection, testing and commissioning of 220V D.C & 24 D.C. system . 1) a. 220V Bank, 500AH capacity high discharging performance, maintenance free sealed batteries along with accessories, fittings etc. 1 No. b Battery charging equipment for the above consisting of - 1 No i) Silicon controlled rectifier type float charger ii) Silicon diode rectifier type boost charger c) D.C Distribution Board (220V) 1No.

159 Clause No..5.7.1.2

35

177

Clause 5.8

Station UPS system and 5.8. STATION UPS SYSTEM AND ACDBs AC DBS The bidder shall design and supply suitable capacity for SCADA and other systems if required. Constant Voltage Constant Frequency (CVCF), 50 Hz, 100% redundancy UPS system and which shall be able to meet the station UPS load. The UPS battery shall meet the UPS load for One hour back-up in case of AC supply failure.

5.8. STATION UPS SYSTEM AND ACDBs & OTHER BATTERY SYSTEM REQUIRED The bidder shall design and supply suitable capacity for SCADA and other systems if required. Constant Voltage Constant Frequency (CVCF), 50 Hz, 100% redundancy UPS system and which shall be able to meet the station UPS load. The UPS battery shall meet the UPS load for One hour back-up in case of AC supply failure, and Other battery system Required.

13

Sl No

Page No.

Description Clause No. Clause 5.12 Subject Read for EOT crane EOT CRANE : 1(One) No. The scope and supply covers the design, manufacture, testing at works, supply by road, delivery at site, erection, testing and commissioning of 60/15 T. indoor, bridge type electrically operated over head crane, of intermittent duty, controlled from cabin through master controllers. The girders, wheels and rails, end carriages, trolleys, walkways, ladders, hooks, hoist ropes, rope drums, slings, wheels, drives, down shop lends etc.complete with all other accessories and necessary flouting fittings etc. Read as EOT CRANE : 1(One) No. The scope and supply covers the design, manufacture, testing at works, supply by road, delivery at site, erection, testing and commissioning of 60/15 T.Or suitable capacity indoor, bridge type electrically operated over head crane, of intermittent duty, controlled from cabin through master controllers. The girders, wheels and rails, end carriages, trolleys, walkways, ladders, hooks, hoist ropes, rope drums, slings, wheels, drives, down shop lends etc., complete with all other accessories and necessary flouting fittings etc. Note:- EOT Crane capacity shall be 10% higher than the heaviest package / equipment to be handled by the crane. Hook reaches shall be upto the draft tube gallery.

36 183

Vol.II Part-II Canals. Sl Page No No. 1 2 1 Page. No. 14 Clause No. 3 Section.I Clause No.1.1.2.13 Subject Read for 6 Description Read as 7 5 Guidelines for designs of V. CONVEYANCE. 1.85 Cumecs/million Sq.meteres or as per the canals and distributory A minimum of 10% for lined and 25% for unlined is permeability observed on different classifications of soils system towards transmission losses is to be considered along the reach whichever is higher. while designing canals/distributaries.

14

Sl No 2

Page No. Page. No.17 1

Description Clause No. Subject Read for Segniorage charges. SEIGNIORAGE CHARGES Deleted. Seigniorage charges : The seigniorage charges for the materials covered under this work shall be recovered from the contractors bill at the rates applicable as per relevant government orders.. The rates are liable to be revised and amended from time to time by the state Govt. by ratification in the Andhra Pradesh Gazette. If the revised seigniorage fee is more that above mentioned, the recovery from the contractors bills is as per revised rates. If the above materials are obtained from leased quarries, the contractor shall produced clearance certificate from the lease holders, duly counter signed by the Department in such cases no recovery will be made from the bills. Read as

Vol.II part-III 220 KV line and Substation. Sl No 1 1 Page No. 2 III-5 Clause No. 3 Clause No.I Subject 5 Introduction Description Read for Read as 7 6 The proposed 220 KV sub-station to be constructed The proposed 220 KV sub-station to be constructed at at pumping station near Choudampally Village, pumping station near Choudampally Village, Nalgonda/Narketpally Mandal in Nalgonda Nalgonda/Narketpally Mandal in Nalgonda District for District for providing power supply to the pumps, providing power supply to the pumps, will receive 220 KV will receive 220 KV power supply from two lines (a) power supply from 220 KV sub-station Narketpally. This 220 KV sub-station Narketpally, (b) 220 KV sub-station will feed 2 Nos. 12 MW pump motors through switchyard of Narketpally. This sub-station will feed 2X20 MVA, 220 KV/11KV power transformers and 2 Nos. 2 Nos. 12 MW pump motors through 2X20 MVA, 12.5 MVA station transformers. 220 KV/11KV power transformers.

15

Sl No 2

Page No. III-5

Description Clause No. Clause No.I Subject Read for 220 KV Substation
220 KV Sub-Station The specification shall also cover sub-station structural material, cables, lighting and all other associated equipment. 1. 220 KV SF6 Circuit Breakers : 5 Nos (Including One Spare) 2. 220 KV Isolators with Earth Switch : 3 Nos (Including one spare) (3 ph units) 3. 220 KV Isolators without : 8 Nos Earth Switch (Including one spare) (3 ph. Units) 4. 220 KV CVTs (Including three nos. as spare) : 9 Nos. 5. 220 KV CTs : 24 Nos (Including Six nos. as spare) 6. 220 KV Lightning Arrestors : 18 Nos (Including six spares) 7. 220 KV PTS : 12 Nos (Including three nos. as spare)

Read as 220 KV Sub-Station The specification shall also cover sub-station structural material, cables, lighting and all other associated equipment. 1. 220 KV SF6 Circuit Breakers : 6 Nos (Including One Spare) 2. 220 KV Isolators with Earth Switch : 1 No. (3 ph units) 3. 220 KV Isolators without : 7 Nos Earth Switch ( including one spare) (3 ph. Units) 4. 220 KV CVTs (1No.spare ): 4 Nos. 5. 220 KV CTs : 21 Nos (Including Three nos. as spare) 6. 220 KV Lightening Arrestors : 18 Nos (Including Three spares) 7. 220 KV PTS : 7 Nos (Including One no. as spare)

III - 7

Clause 1.1.3

Terminal points.

13. Marshalling boxes : 4 Nos 13. Marshalling boxes : 5 Nos 14. P.T marshalling boxes : 5 Nos 14. P.T marshalling boxes : 2Nos 15. Wave Traps : 4 Nos 15. Wave Traps : 3 Nos Bus conductors clamps, connectors etc. shall Bus conductors clamps, connectors etc. shall include include 10% extra. 10% extra. d) Design supply and erection of Switchyard d) Design supply and erection of Switchyard equipment. equipment. i) 1 No. Incoming feeder. i) 2 Nos. Incoming feeders ii) (a) 2 Nos. outgoing feeders for 2 Nos. 20 MVA 220 / 11 ii) 2 Nos. outgoing feeders for 2nos. 20 MVA KV Transformers 220/11KV Transformers (b) 2 Nos. outgoing feeders for 2 Nos. 12.5 MVA 220 / 11 KV Transformers

16

Sl No 4

Page No. III-25

Description Clause No. Clause 1.15.1 Subject Read for 220 KV Switch yard The Bus bar is made up of twin ACSR moose bundle conductor per phase . Equipment inter connection and overhead cross connections shall be done with single moose ACSR conductor except in bus coupler bay where it shall be with twin moose ACSR conductor . The insulator strings in the tension strings of main bus shall be of double string, where as suspension and pilot insulator strings shall be single string. Also at important road and line crossing inside the substation the suspension strings shall be of double string. The type of isolator is horizontal double break type. 2.1 INTRODUCTION For extension of supply to the pumping station of Udayasamudram Lift Irrigation Scheme takingoff from foreshore of Udayasamudram Balancing Reservoir of AMR SLBC Project Lift scheme near Choudampally Village, Nalgonda/Narketpally Mandal, Nalgonda District, it is proposed to string second circuit on the existing DC line towers from _____________ 220 KV Sub-station to the pumping station. The length of line to be strung is about ____ Kms. It is also necessary to erect terminal tower and additional towers if required. To have alternate supply to this pumping station second circuit is to be strung on the existing DC towers of _______________________ (AMRP) Line from _____________ AMRP Pump House site to this pumping station. The Length of Line is about _____ Kms Read as The Bus bar is made up of twin ACSR moose bundle conductor per phase . Equipment inter connection and overhead cross connections shall be done with single moose ACSR conductor. The insulator strings in the tension strings of main bus shall be of double string, where as suspension and pilot insulator strings shall be single string. Also at important road and line crossing inside the substation the suspension strings shall be of double string. The type of isolator is horizontal double break type.

III-56

Clause No. 2.1

220 KV double circuit transmission line

2.1 INTRODUCTION For extension of supply to the pumping station of Udayasamudram Lift Irrigation Scheme takingoff from foreshore of Udayasamudram Balancing Reservoir of AMR SLBC Project Lift scheme near Choudampally Village, Nalgonda/Narketpally Mandal, Nalgonda District, it is proposed to take supply from Narketpally 220 KV Substation to the pumping station site. It is also necessary to erect terminal tower and additional towers if required.

1.8.4.0 EARTHING MAT:- The following para may be read after clause 1.8.4.10 Clause 1.8.4.11:- Earth mat design and calculations shall be got approved as per the soil resistivity before execution of earth mat work.

Superintending Engineer, AMR SLBC Project, Circle No.II, G.V.Gudem, Nalgonda

17

Vous aimerez peut-être aussi