Académique Documents
Professionnel Documents
Culture Documents
User Advisory - Each individual sheet of this Excel Workbook "Tool" is locked and password protected. The user may only enter date in the "yellow" cells of the blank form.
Instruction # 1 Before starting, study the Form with the sample data. Consider the header data, the line data columns and the number of lines for the largest Unit. Instruction # 2 If you need to add columns or additional data boxes in the header area then you must unlock the form. The password is jop Instruction # 3 Make whatever changes to the header block data fields and columns. Changes you may require is Deg. C vs. Deg F or Bar vs. psig. Instruction # 4 Add additional line number rows by copy and paste at the bottom of the current form. Instruction # 5
If you made modifications to the blank form it is recommended that the same changes be made to the "Sample" sheet also.
Instruction #6 After you have completed the modifications required to fit your project, select a new password and protect the new "Project" or "Company" version.form.
rrent form.
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 3 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 4 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 5 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 6 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 7 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 8 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 9 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 10 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 11 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 12 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 13 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 14 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 15 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 16 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 17 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 18 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 19 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 20 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 21 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 22 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 23 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 24 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 25 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 26 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 27 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 28 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 29 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 30 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 31 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 32 of 35
Project Name: Proj. Number: Unit Number: Insulation Type Line Size P&ID REV. Line Number Line Class Tracing Type Service or Commodity Phase Gas/Liq Line origin Line Destination
PME:
Date: Date: By: Design Stress Temp Anal. PWHT Req'd. Req'd. (oF)
Page 33 of 35
Project Name: Jamnagar Cumine Upgrade Proj. Number: 2007-123455 Unit Number: 20 (And prefix for all line Numbers) Insulation Type Line Size P&ID REV. Service or Commodity Unit Feed Reactor #1 Feed Reactor #2 Feed Reactor #3 Feed Nitrogen Ih Product Phase Gas/Liq L L L L Gas Liq
Line Number
Line Class
Tracing Type
Ih Ih Ih Ih
20-21
2007
AGL1
16"
Process Vent
Gas
SAMPLE
PME: CKR: Revision: Line Destination Reactor Feed Reactor #1 Reactor #2 Reactor #3 Reactor #1,2 &3 Line 202007AGL1 Unit Relief Header Line 202120AGL2 Design Press (PSIG) 100 100 100 100 100 100
JOP ARL 3 Design Temp (oF) 300 300 300 300 300 300
Line origin Battery Limits Line 202001AGL1 Line 202001AGL1 Line 202001AGL1 Line 202110AGL1 Reactor #1 Line 202006AGL1
90
350
Yes
MPLE