OUTLINE:
o o o o o Ministerial Goals/ Responsibilities Opening Remarks Goals of Infrastructural Development Key Strategies Adopted Accomplishments o Going Forward
........ we work smart
2
OUR MANDATE To develop and facilitate qualitative first class infrastructure to support the States growing population as well as serve as the critical development driver of the States vision of being Africas model megacity and Global Economic and Financial Hub.
SMART MINISTRY" ........ we work smart
3
WORK CULTURE
We work
Strategic in Orientation Maintenance conscious Accountable and open in all activities Responsive to our environment
&
Technologically
SMART MINISTRY"
driven
........ we work smart
4
MINISTRYS STRUCTURE
MINISTERIAL RESPONSIBILITIES Plan, design and implement road and bridge infrastructure programmes Rehabilitation and maintenance of Roads Boarding of Plants and Equipment
"SMART MINISTRY"
MINISTERIAL RESPONSIBILITIES
Consultants to MDAs on public infrastructure - Architectural Designs - Structural Designs - Quantity Surveying - Mechanical & Electrical Services Quality control of Civil Engineering and Building; projects Construction, rehabilitation and maintenance of Office and public buildings Research and Development
SMART MINISTRY " ..... we work smart
OPENING REMARKS
Midway into the 2nd term of this administration it is pertinent to state that our commitment remains the best interest of the people of Lagos State. We are committed to delivering high quality infrastructure that can support their socio-economic wellbeing. We have vigorously pursued the goals encapsulated in the States policy thrust/ goals which include: Infrastructure development Job creation towards the achievements of an economically viable State.
SMART MINISTRY " ..... we work smart
8
Increase focus on road network and neighbourhood connectivity The rationale behind these is the need to address the challenges of the anticipated growth in demand trips in Lagos Metropolitan area from the current 12m trips daily to 18m trips by 2020. The road sector, as a significant component, must prepare accordingly.
SMART MINISTRY " ..... we work smart
10
Our Goals
Lagos is determined to provide both the individual and corporate entities operating within it the enabling environment within which it could realise its goals and objectives. This includes the provision of first class socio economic infrastructure with demonstrated impacts such as
Stimulation of economic activities which affect Gross Domestic Product(GDP) directly; Reduction in transaction and trade costs, thus improving competitiveness Creation of Jobs Ensure poverty reduction; Socio economic well being
"SMART MINISTRY" ........ we work smart
12
KS
Direct funding of road rehabilitation & construction Private sector involvement concessions (High Capacity Projects) and PIIP Front loading of projects A robust monitoring of projects A more open tendering process
"SMART MINISTRY"
14
KS
Improved user friendly Road designs walkways (friendly to the physically challenged, streetlights,) Strategic identification/ selection of projects Innovation designs and construction methods Public Building that have features that are maintenance friendly and also friendly to the physically challenged
"SMART MINISTRY"
15
SC
Lagos topography poses as major challenge to infrastructure development especially roads. We are constantly having to do soil test. Many road projects are subject of massive soil replacement; this has enormous cost implications for projects Attitudinal challenges
- unhygienic behaviour (indiscriminate dumping of waste on roads
and Drainages; activities of roadside mechanics and car wash operators) - lack of public ownership of Infrastructure (vandalisation of road furniture and public utilities - axle loads on some inner roads usually heavier than can be designed for Quantum of fund portfolio required to prosecute our programmes
"SMART MINISTRY" ........ we work smart
17
PROGRESS REPORT
In the last two years . May 2011 to May 2013 we have accomplished the following Initiated 261 roads upgrade and reconstruction - y2012- 161 -Y2013 100. (These include a planned 53 no grading and surface dressing road programme across the State). Completed 82 nos roads adding 112.746km of high quality asphalted road to the States road stock Our landscape is now adorned with the first cable stayed bridge .
"SMART MINISTRY" ........ we work smart 19
On-going Projects
TOTAL NUMBER OF PROJECTS TOTAL NUMBER OF ROADS TOTAL LENGTH (Km)
3 3 7 2 0 0 0 9 0 1 1 5
4 7 16 2 0 0 0 12 0 1 1 8
2.445 2.245 27.778 4.200 0.000 0.000 0.000 32.710 0.000 1.100 0.300 13.744
7 6 12 3 1 5 7 11 1 8 9 6
13 17 22 3 6 5 8 18 1 19 11 9
6.885 14.390 35.616 3.465 2.120 5.242 7.475 18.466 0.260 12.445 6.539 9.480
"SMART MINISTRY
we work smart 20
t
On-going Projects
No OF PROJECTS 10 5 1 5 3 7 2 10 119 No OF ROADS 33 23 5 11 7 10 6 28 255 LENGTH (Km) 14.949 21.990 3.036 8.605 9.150 8.461 1.938 19.750 210.262
"SMART MINISTRY
we work smart 21
t
Y2012 AWARDS
S/N 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
LGA No of PROJECTS No of ROADS TOTAL LENGTHS (Km)
AGEGE AJEROMI-IFELODUN ALIMOSHO AMUWO- ODOFIN APAPA BADAGRY EPE ETI-OSA IBEJU-LEKKI IFAKO-IJAIYE IKEJA IKORODU KOSOFE LAGOS MAINLAND LAGOS ISLAND MUSHIN OJO OSHODI-ISOLO SOMOLU SURULERE TOTAL
7 1 9 1 1 3 4 4 1 6 8 4 6 3 1 4 3 5 2 2 75
6.885 1.210 30.625 0.420 2.120 1.150 2.620 6.821 0.26 9.815 5.675 8.660 10.419 2.390 3.020 3.78 9.150 7.063 1.938 1.770 ........ we 115.791 work smart
22
KSP 1:
We are happy to report the completion of the bridge and considerable progress is being made to handover the bridge for the use of the people of the State. The benefits to the State cannot be over emphasized. A survey conducted by TNS- RM shows that a great percentage of the respondents are convinced of the benefits of the bridge in terms of reduction in travel time and the exponential effect on health and social life of the people.
SMART MINISTRY
we work smart24
KSP 1:
We will like to put on record our appreciation of the tremendous support we have received from the people of the area. In the process of the construction of the Bridge property owners whose structure were an encumbrance on the right of way had assisted us in ensuring early take off. We acknowledge also the media for the untiring focus that had assisted us deliver this project on time.
SMART MINISTRY
we work smart25
KSP 1:
Total Length of Bridge: Total Length of Approach Bridge: Total Length of Main Bridge: Length of Cable Height of Pylon: Navigational Requirement: Width of the Bridge (carriageway): Walkway of the Bridge: Road Works at Ikoyi End: Road Works at Lekki End: Progress -
Clearance average 9m above High Water level 2.0m X 2 - 311.5m 72% 338.7m 8m x 2
"SMART MINISTRY"
26
SMART MINISTRY
SHOWN BELOW IS THE GEOTECHNICAL PROFILE VIS-A-VIS NUMBERS OF PILES USED, ITS DIAMETERS, DEPTHS AND SPACING BASED ON THE RESULTS OF SOIL INVESTIGATION / SOIL STRATA,
SMART MINISTRY
we work smart
28
SMART MINISTRY
we work smart29
SMART MINISTRY
we work smart30
"SMART MINISTRY"
31
: 7.2km : 14.6m
"SMART MINISTRY
33 we work smart
DURING CONSTRUCTION
SMART MINISTRY
we work smart
34
abate flooding on the road and the surrounding environment. improve traffic flow with adequate carriageway capacity. improve safety of lives and properties. enhance property value in the area.
SMART MINISTRY
we work smart 36
SMART MINISTRY
we work smart 37
KSP 5
"SMART MINISTRY"
39
KSP 5
"SMART MINISTRY"
40
1,860m 19.4m
"SMART MINISTRY"
43
"SMART MINISTRY"
44
"SMART MINISTRY"
45
"SMART MINISTRY"
46
Road Dimension
"SMART MINISTRY"
48
"SMART MINISTRY"
49
KSP9: ALTERNATIVE TO TOLL PLAZA II As part of the strategic road plan that will provide an alternative road to link Lekki-Epe Expressway in view of the tolled plaza, the project was awarded to Messrs Metropolitan Construction Company Limited. It is a 3.0Km DATE OF AWARD December, 2011
This project has been completed SOCIO ECONOMIC IMPORTANCE Post completion of the road, it will positively affect the development of the area and result in increased property value, as well as social and economic activities of the citizen.
"SMART MINISTRY"
50
"SMART MINISTRY"
51
"SMART MINISTRY"
53
FILLING IN PLACE
LAYING OF INTERLOCKING STONE IN PROGRESS
KSP11: MAIDAN AGILITI: AGILITI: The contract for the rehabilitation /upgrading of Maidan Agiliti network of roads including construction of concrete deck-on-piles was awarded in June 2010. to CCECC. The project was phased due to limitation of funds and for ease of execution: Phase I:- is the construction of drain and culverts at Maidan-AinaAgiliti road and4 Nos network of roads and the construction of concrete deck-on-piles. Phase IIA:- comprises the completion of roads works on Ajanlekoko/Oluwo, Oremerin/Ibikunle, Oniyanrin and Adeyeye Streets and some ancilliary works on Maidan- Aina Agiliti Road. This was awarded in July 2012 to same company .
"SMART MINISTRY"
55
DETAILS OF PROJECT (PHASE I & PHASE II) -1800m x 18.6m -503x9m - 438x9m -75x9m -273x8m Bridge
Progress of work is 77% Phase I and Phase II is 2% 4. Expected completion date is July, 2013 for Phase I, while for Phase II is July, 2014
"SMART MINISTRY"
56
"SMART MINISTRY"
57
"SMART MINISTRY"
58
KSP 12: LAGOSLAGOS-BADAGRY EXPRESSWAY We are high on the road to delivering on this road project which has currently attained 74% completion under its Phase1 or Lot 1. Its rail component is already moving ahead very fast as tracks are being laid. The concept of the development was to do a 10 lane carriageway that incorporate Light Rail Transport (LRT) on the median and also a Bus Rapid Transit (BRT) systems Lot 1 extends from Eric Moore to Mazamaza Involved were 2 major contractors Messers JB Nig. Plc and CCECC Nig. Ltd. Both handled different parts of the job. What is emerging is an integrated transportation system especially around the Mile 2 axis with commuters having an option of the three modes of transportation.
SMART MINISTRY we work smart 59
60
SMART MINISTRY
we work smart
61
LBE LOT 1
PEDESTRIAN BRIDGE AT ODUNADE MARKET
"SMART MINISTRY"
62
LBE (LOT 1)
MILE 2 INTERCHANGE LRT SUBSUB-STATION MILE 2 INTERCHANGE :ALABA AREA
14 /03 /2013
14 /03 /2013
14 /03 /2013
14 /03 /2013
"SMART MINISTRY"
64
SMART MINISTRY
we work smart 66
SMART MINISTRY
we work smart 67
SMART MINISTRY
we work smart 68
SMART MINISTRY
we work smart 69
SMART MINISTRY
we work smart 70
SMART MINISTRY
we work smart 71
OSBORNE JETTY:
"SMART MINISTRY"
73
BADORE JETTY:
"SMART MINISTRY"
74
Pedestrian Bridges
SMART MINISTRY we work smart
75
PEDESTRIAN BRIDGES
Pedestrian bridges were initiated as a direct response to the need to make the roads safe for pedestrians to cross; Some of them are located on Federal roads or Federal agencies have properties affected by the bridges; we have worked with them to resolve areas of challenge which has enabled us to fully resume the construction effort particularly at Otto and the Secretariat point on the Lagos Ibadan Expressway. To date the State Government has awarded contracts for 9nos.
"SMART MINISTRY"
76
PEDESTRIAN BRIDGES
S/NO 1 2 3 4 5 6 7 8 9 DESCRIPTION OF ROAD Lagos Abeokuta Expressway Lagos Abeokuta Expressway Lagos Abeokuta Expressway Lagos / Ibadan Expressway Oshodi-Apapa Expressway Lagos-Ikorodu Road Muritala Muhammed Way Muritala Muhammed Way Lagos / Ibadan Expressway LOCATION Ile Epo Bus-Stop in Alimosho/Agege Local Government Area Ijaiye BusStop in Alimosho/IfakoIjaiye Local Government Area Cement Bus-Stop in Ikeja/Agege Local Government Area State Secretariat Alausa in Ikeja Local Government Area Ilasamaja Bus-Stop in Mushin/OshodiIsolo Local Government Area Igbobi Bus-Stop in Somolu / Mushin Local Government Area Loco Bus-Stop in Mainland Local Government Area Iddo Bus-Stop in Mainland Local Government Area Ogudu Bus-Stop in Kosofe Local Government Area
........ we work smart 77
"SMART MINISTRY"
PEDESTRIAN BRIDGES
CONSTRUCTION OF 4-LEGGED-PEDESTRIAN BRIDGES AT IDDO BUS-STOP ; LOCO BUS-STOP; and IGBOBI BUS-STOP Date of Award 12th March, 2012 Date of Commencement: 13th August, 2012. Percentage Progress: 45% (The contractor is on site) The State Government has improved on the design of the pedestrian bridges to accommodate the need of the physically challenged . Towards this end 4 nos of this model have been awarded and work has commenced them with appreciable levels of completion. These on completion will afford even the physically challenged to have the freedom of crossing the expressway by utilising the bridges in their wheelchairs.
"SMART MINISTRY" ........ we work smart 78
"SMART MINISTRY"
79
"SMART MINISTRY"
80
"SMART MINISTRY"
81
"SMART MINISTRY"
82
SMART MINISTRY
we work smart
84
"SMART MINISTRY
we work smart 85
"SMART MINISTRY"
86
PB2:ISOPAKODOWO
During course of the year the Isopakodowo market was also completed. It will afford the traders of Osodi a right environment for trading. Most of the traders on the loop of the Oshodi bridge will now be housed within this complex. The State Government had targeted the following gains : Trading Environment : Formal and organised trading environment which reduced stress of trader and users. Job Creation : Creation of temporary jobs for skilled and unskilled labour during construction work.
"SMART MINISTRY
we work smart
87
ISOPAKODOWO: STATUS
"SMART MINISTRY
we work smart
88
90
3D IMPRESSION OF BUILDING
91
CONSTRUCTION
92
"SMART MINISTRY"
94
"SMART MINISTRY"
95
PB5: POLICE AREA OFFICES It will be recalled that there was the creation of 5 new Area Commands by The Nigeria Police as a way to effectively localise the combating of crime in the State. The State Government therefore commenced the construction of 3nos of the proposed Area Commands at AREA J ELEMORO, IBEJU-LEKKI AREA M IDIMU AREA l ILASHE
"SMART MINISTRY"
96
"SMART MINISTRY"
97
"SMART MINISTRY"
98
STREET LIGHTING
Streetlights are a major tool for improving the aesthetic condition of communities. They also improves illumination for motorists and pedestrians hence accidents are reduced to the minimal level and also ensure security of the neighbourhood. The State Government had also commenced a process of integrating streetlight components into new road construction works. Gradually, we are covering the whole of Lagos especially with the Handing over of the JibowuMaryland streelight project. We have also completed the construction of Damaged Pylons and High Tension Cable connecting Kirikiri Town, Snake Island, Ibasa, Ikare and other Riverline Communities
"SMART MINISTRY we work smart99
SMART MINISTRY
RESEARCH WORKS
There is a Mechanical Dept that has responsibility for all matters relating to maintenance of technical things. It also handles research matters. It has come up with such designs as the Pulverizing and Shredding machines; the Road Sweeping Machine. A prototype of this machine has been completed and an improved version which is of 85% progress is on going. The Dept is poised to deliver an improvised HOT AIR ROTARY FISH DRYING PLANT
"SMART MINISTRY
we work smart
102
"SMART MINISTRY
we work smart103
"SMART MINISTRY
RW 3:
PLANT
All economies leverage on their comparative advantage. Lagos State being endowed with large water bodies has an abundant supply of fish; a commodity with great economic potential both locally and internationally. The industry is challenged with wastage of those harvested but are unsold. We have taken up the challenge of developing machinery that will promote hygienic preservation methods of smoking and drying Rather than use smouldering of wood, charcoal, sawdust in an oven directly below fish laid out on mess trays, we have designed the Hot Air Rotary Fish Drying Plant powered by palm kernel shell cashew nut chaff, etc. this saves over 150% cost when compare to use of gas or any petroleum product.
"SMART MINISTRY we work smart 105
"SMART MINISTRY
"SMART MINISTRY
PWC
The Corporation has continued to demonstrate commitment to the discharge of its task of undertaking the day to day maintenance of roads within the State. It has within the years embarked on the rehabilitation of over 571 roads. It has recently launched an initiative to maintain 1000 roads within the year. Towards the realization of its goals the organization sought and obtained approval for the procurement of 2 additional asphalt plant located at Imota and Badagry. When fully operational it will impact on the ability of the organization to deliver on its mandate. The Corporation has also moved to fix 241 manhole covers made from composite resin fibre to ensure the safety of motorists on Lagos roads.
"SMART MINISTRY we work smart 109
PWC
There has been massive investment in the equipment that the Corporation needs to undertake its assignment. The equipment include
Roller Tractor Grader Wheel Loader Bulldozer Flood Light Pickup Pothole Patcher Tar-boiler Back Hoe 2 nos. 1 nos. 2 nos. 1 nos. 1 nos. 5 nos. 2 nos. 2 nos. 1 nos. 1 nos.
Also to ensure that the roads ha are more durable it has introduced Zycosoil added to asphalt to improve its water resistance capacity and ensure durability
"SMART MINISTRY we work smart 110
S/N
LG
NO OF ROADS
Completed On-going
AGEGE AJEROMI-IFELODUN ALIMOSHO AMUWO - ODOFIN APAPA BADAGRY EPE ETI-OSA IBEJU-LEKKI IFAKO-IJAIYE TOTAL- 530 Palliatives - 47
33 4 53 4 3 4 9 42 2 29
1 8 11 6 14 4 5 7 1 6
IKEJA IKORODU KOSOFE LAGOS MAINLAND LAGOS ISLAND MUSHIN OJO OSHODI-ISOLO SOMOLU SURULERE
102 19 62 16 8 15 3 7 6 22
9 9 6 3 5 4 1 6
"SMART MINISTRY"
111
"SMART MINISTRY
"SMART MINISTRY
"SMART MINISTRY
MTL
The laboratory is critical to the States plan to ensure that incidence of collapse building is averted. Its activities include:
Providing uniform control tests on building and civil engineering materials
Provide information and advisory services to MDAs on projects Register all independent MTLs Monitor performance of MTLs Undertake enlightenment construction materials
"SMART MINISTRY
on
quality
of
MTL
The Departments activities have direct impact on the campaign to stem collapse of building S/NO 1 2 3 TEST CARRIED OUT Sub-soil investigation Tensil test on steel Portable Destructive (PUNDIT) Ultrasonic Indicator NonTester NO OF SAMPLES 91 4108 336 buildings
4248
"SMART MINISTRY
we work smart
117
The 21st Century is a period that requires more effective management of the several infrastructure assets; not only do we have high level of depreciation of such assets we have also traced the decline to a low level of maintenance culture. The LASG is determined to ensure the effective management and maintenance of its assets. these assets must be properly maintained so that they continue to support the delivery of a wide range of government services which fulfil social and economic needs of the State. Office of Facility Management and Maintenance (OFMM) objective is to create a framework that provides a consistent approach to the management planning and delivery of maintenance across the State.
"SMART MINISTRY" ........ we work smart 119
Some of the benefits of improved infrastructure maintenance: Preserve taxpayers investments in public buildings. Help buildings function as intended and operate at peak efficiency, including minimizing energy consumption. Prevent failures of building systems and the attendant consequences. Sustain a safe and healthy environment by keeping buildings and their components in good repair and structurally sound Provide maintenance in ways that are cost-effective.
"SMART MINISTRY"
120
Accordingly, the Office undertook condition assessments at the following Lagos State Facilities and have created maintenance frameworks:
City Hall Secondary Schools and District Offices (635 TOTAL) LASUCOM; LASUTH Mother and Child Centre's: Ikorodu, Ajeromi, Ifako Ijaiye, Isolo Accident and Emergency Center Lagos House Marina; Lagos House Ikeja Lagos Security Control Command Centre Lagos State Secretariat Blocks 1:3 General Hospital Isolo; Lagos Island; Gbagada Office of the Public Defender JIC Taylor, Igbosere Magistrate Courthouse
"SMART MINISTRY" ........ we work smart 121
Going Forward
"SMART MINISTRY
we work smart
122
We are at a critical stage on our project delivery. We have been careful in selecting projects and also phasing them to ensure they are delivered on schedule. Please recall that it is our avowed commitment that projects will never be abandoned on our watch. The year 2013 awards are a testament to this. There are a number of projects being in the second phase. It is our plan to further deepen our capacity to effectively monitor projects. We will continue to ensure that all our people centred projects are delivered and people allowed to reap the benefits enshrined in the planned development.
"SMART MINISTRY we work smart 123
conclusion
"SMART MINISTRY
In the last 24 months, we have marched forward in delivering first class infrastructure for the benefit of the people of this State. We understand that it is our place to ensure the delivery of the infrastructure base upon which both business and people can reach the zenith of their potential. We adopted better delivery strategy on all projects; we are getting better value for every expenditure that government makes. We salute our leader the Governor Mr. Babatunde Raji Fashola, SAN, for the opportunity he gave us to serve our dear State. His leadership and support has seen us this far. Let me commend my very able and committed colleague, Engr Ganiyu Johnson, for his support and contribution to all that we have done. Our lieutenants and all members of the Works family I salute your dedication. We are determined to be a change agent and leave the states infrastructure better than we met it.
"SMART MINISTRY" ........ we work smart 125