Form 10.3. Installation checklist: Aerobic Treatment Unit Client name: Completed by: 1.

Type of aerobic treatment unit: Suspended- ro!t" #ttac"ed- ro!t" Combination attac"ed%suspended- ro!t" Rotatin biolo ical contactor a. (anufacturer: (odel: (anufacturer-assembled (aterial Concrete Plastic%Poly )iber lass 't"er: pd lbs%day (*'D+, C*'D) Reference #: Permit(s) #: Time: Date: Comments:

Se$uencin batc" reactor #dapti&e mec"anical aerator 't"er:

Contractor-assembled

b.

c. d. e.

(anufacturer "ydraulic ratin : (anufacturer or anic ratin : Dosin met"od Demand Timed i. -f timed, (anufacturer-inte rated flo! e$uali.ation Contractor-constructed flo! e$uali.ation (anufacturer/s load bearin ratin : Sealant used in tan1 seam: Type of sealant:

f. . 4.

(psf or ma0imum burial dept") 2# 3es 2o

50ca&ation%Settin tan1 a. 6ater present in e0ca&ation -f yes, de!aterin durin construction b. c. *ottom of e0ca&ation 7e&el )ree of roc1 or debris

3es

2o

*eddin material: Dept": )ree of lumps, clods, roc1s, or anic material, fro.en matter and debris -f non-compactable beddin , mi ration of fines mana ed Tan1 le&el 2# Type: Type: Type: 3es 2# 't"er: 3es 2o 2o

in

d. 8.

-nsulation Tan1 #ccess Riser 7id

9.

)loatation (buoyancy) pre&ention a. *uoyancy calculation pro&ided on desi n b. #nti-floatation implemented by desi n: Tan1 collar Dead man

+.

*ac1fill a. *ac1fill material: -f non-compactable bac1fill, mi ration of fines mana ed

b. c. :.

Compacted )ree of lumps, clods, or anic material, boulders, fro.en matter and debris

3es 3es 3es

2o 2o 2o

Comments:

#erobic treatment unit access a. #ccess risers and lids on tan1 Riser manufacturer: (odel #: 7id manufacturer: (odel #: b. c. Risers to rade Sealant used in tan1%riser connections Type of sealant: 2#

3es

2o

;.

Considerations for #T< !it" media a. (edia present b. c. d. -f yes, (anufacturer-installed Contractor-installed

3es

2o

(edia secured (anufacturer uidance follo!ed 2#

3es 3es 3es

2o 2o 2o

=.

Pipin a. Pipin in appropriate se$uence (inlet%outlet) b. Pipe specifications (material and nominal diameter) -nlet: 'utlet: 5lectrical conduit: #ir supply: Pipe ele&ations -nlet: 'utlet: >oints in e0ca&ated area 3es 2o

c.

d. e.

Pipin sealed (includin electrical conduit) Type of sealant: -nlet: 'utlet: #ir supply: 5lectrical conduit: >unction bo0:

3es

2o

?.

@entin %#ir supply a. #ir supply met"od: #spirator #erator @enturi 't"er: b. c. d. #ir filter%screen present: @entin in place

Compressor

*lo!er

)ree air 3es 3es 2o 2o

-f blo!er%compressor: i. 2umber of drop lines: ii. Drop lines supported 3es 2o

iii. 2umber of diffusers: i&. Type of diffusers: 1A. Clarification%)iltration a. Type: Clarifier b. c. d. 2# )iltration 2# 2# 2# #cti&e 2# 2# 2# 3es 3es 3es 2o 2o 2o

Settlin tan1

Comments:

5ffluent screen%tertiary filter present Clarifier inspection plu s in place Bi " !ater alarm present

11. Slud e return approac": Passi&e a. -f acti&e, is pump installedC 14. Control panel: a. Controls panel installed b. -s enclosure !aterti "tC

3es 3es 3es

2o 2o 2o

18. Tan1 !aterti "tness testin : 2ot re$uired (anufacturer tested )ield tested (et"od: 6ater @acuum Results: Pass )ail 19. #larm(s): a. Types: b. 2# #ir pressure Bi " !ater Telemetry 3es 3es 3es 3es 3es 2o 2o 2o 2o 2o

#larms installed

1+. (anufacturer installation procedures follo!ed: 1:. Site stabili.ation a. 5rosion control measures in place -f yes, describe: b. c. Soil mounded o&er #T< Site accessibility restricted

#T< D #erobic treatment unit *'D+ D +-day *ioc"emical o0y en demand C*'D D Carbonaceous bioc"emical o0y en demand psf D pounds per s$uare foot