Vous êtes sur la page 1sur 5

PERFECT ELECTRO MEK PAKISTAN

Department:---------------------------------Sl No. DUE TIME WEEK


1 2 3 4 5 6 7 8

Date:---------------------------------

MAINTENANCE OBJECTIVE

TIME SCHEDULE
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Serial No.

WEEK

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Serial No.

Approved by:------------------------------

Perfect solution to your Elektro Mek problems at your own convenience

PERFECT ELECTRO MEK PAKISTAN

Department:----------------------------------

Date:---------------------------------

Sl No. MAINTENANCE OBJECTIVE 1 Dusting & cleaning of complete equipment internally with blower etc. 2 Verification of tripping and ON/OFF (Mechanical) operation of all breakers contactors and relays etc. 3 Dusting & cleaning of complete equipment externally with some detergent element like glint etc. 4 Assuring right termination i.e. true thimbling of all connections. 5 Tightining of all terminations. 6 Assuring healthy insulation of cables and air insulations/mounting of bus bars in proper position. 7 Assuring proper vermin proofing of equipment. 8 Cleaning of open contact with contact cleaning spray. 9 Calibration of measuring instrument and protection relays etc. 10 Assuring Healthy Earthing. 11 Any other task as per manufacturer recommendation or Engineer incharge.

DUE TIME 04 W WEEK 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 1 04 W 2 3 4 12 W 5 6 7 12 W 8 9 12 W 10 16 W WEEK 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 24 W 2 3 24 W 4 5 52 W 6 7 26 W 8 9 10

TIME SCHEDULE

Approved by:------------------------------

Perfect solution to your Elektro Mek problems at your own convenience

PERFECT ELECTRO MEK PAKISTAN

Department:---------------------------------Sl No. MAINTENANCE OBJECTIVE 1 Visual inspection including cleaning, dusting and greasing. 2 Examination and reporting of vibration, bearings, sound, termination and coupling arrangement/allignment. 3 Thermographic survey. Temprature monitoring, measuring and recording. 4 Load verification with respect to basic data & manufacturers recommendation 5 Cleaning of winding. 6 Insulation test by magger. 7 General overhauling and inspection of bearing etc. 8 Power Factor varification of motor and P.F. equipment. 9 Assuring Healthy earthing 10 Any other task as per manufacturers recommendation and with the approval of Engineer incharge. DUE TIME 04 W 04 W

Date:---------------------------------

TIME SCHEDULE
WEEK 1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

12 W

12 W 52 W 52 W 52 W 52 W 26 W

WEEK 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9

Approved by:------------------------------

Perfect solution to your Elektro Mek problems at your own convenience

PERFECT ELECTRO MEK PAKISTAN

Department:---------------------------------Sl No. MAINTENANCE OBJECTIVE 1 Visual inspection including cleaning, dusting and greasing. 2 Examination and reporting of vibration, bearings, sound, termination and coupling arrangement/allignment. 3 Thermographic survey. Temprature monitoring, measuring and recording. 4 Load verification with respect to basic data & manufacturers recommendation 5 Assurance of proper Carbon tension. 6 Insulation test by magger. 7 General overhauling and inspection of bearing and size of Carbon bushes etc. 8 Power Factor varification of Motor and P.F equipment. 9 Assuring Healthy Earthing. 10 Any other task as per manufacturers recommendation and with the approval of Engineer incharge. DUE TIME 04 W 04 W

Date:---------------------------------

TIME SCHEDULE
WEEK 1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

12 W

12 W 26 W 52 W 52 W 52 W 26 W

WEEK 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 Approved by:------------------------------

Perfect solution to your Elektro Mek problems at your own convenience

PERFECT ELECTRO MEK PAKISTAN

Department:---------------------------------Sl No. MAINTENANCE OBJECTIVE 1 Visual inspection of mounting, Termination and cleaning/dusting etc. 2 Examination of Oil level. 3 Thermographic survey. Temprature monitoring, measuring and recording. 4 Silica gel examination. May be replaced if colour changed. 5 Oil testing (rating x 3) If loose properties may be replaced/dehyderated. 6 Examination of Bushing and tightening of Nuts & Bolts etc. 7 Bucholze relay tripping varification if installed. 8 Examination of oil seals. If crakes found may be replaced. 9 Mechanical operation of Tap changer. 10 Assuring Healthy earthing. 11 Any other task as per manufacturers recommendation and with the approval of Engineer incharge. DUE TIME 04 W 04 W 04 W

Date:---------------------------------

TIME SCHEDULE
WEEK 1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

26 W 52 W 52 W 52 W 52 W 52 W 26 W

WEEK 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 Approved by:------------------------------

Perfect solution to your Elektro Mek problems at your own convenience