In SAP PM ECC6.0, which of the following statements are true about Technical Objects?
(Choose your answer, choices are more than one)

A) The Material/Serial assigned to the Equipment need not be the same as the construction type.
B) Functional Location may have a construction type but not Material/Serial assigned to it.
C) A functional location may not have a subordinate functional location as well as an equipment
installed to it at the same time.
D) An equipment may have a subordinate functional location as well as an equipment installed to it at
the same time.
E) Both the functional location category and equipment category are used for number range decisions
for functional location and equipment creation.

In SAP PM as of ECC6.0, the Serial Profile assign to the material master do not have which of the
following parameters? (Choose your answer, choices are more than one)

A) Control the Synchronization of Equipment and Serial number.
B) Equipment category type default.
C) Ensure equipment creation is necessary during goods receipt.
D) Alignment of Asset, Serial, Equipment during goods receipt.
E) Set serial number user status for the Serial Master.

In SAP PM as of ECC6.0, the setting in-order to synchronize the equipment and serial number is
done where ? (only one answer)

A) Material type configuration.
B) Serial profile configuration.
C) Serial level in the Plant/Storage view.
D) Equipment type.
E) Serial number range.

As at ECC6.0 SAP PM, the material type "IBAU" has which of the following characteristics ?
(Choose your answer, choices are more than one)

A) It has Basic view and Classification view only.
B) It does not have Accounting view and Purchasing view.
C) It can be used as the header of a material BOM.
D) It can be assigned as construction type to a technical object.
E) It can be an assembly material in a multilevel material BOM.
.
SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 2
In SAP PM ECC6.0, the characteristics of the Profile for Default value for Maintenance Task List
are
(Choose your answer, choices are more than one)

A) Default the Maintenance Work Center.
B) Default the Task List Usage and Task List Status.
C) Assign a Field Key.
D) Ensure a graphic profile is available for Network operations maintenance.
E) Default the Control Key.
.
In SAP PM, which of the following not an influencing factor for the field selection of Equipment
specific fields ? (only one answer)

A) Equipment Category.
B) Equipment Reference Category.
C) Activity Category.
D) Technical Object type.
E) Maintenance Plant.

In SAP PM, which of the following objects can be classified using the Classification feature in SAP
? (Choose your answer, choices are more than one)

A) Functional Location.
B) Reference Functional Location.
C) Equipment.
D) Maintenance Work Center.
E) Maintenance Task List.

In SAP PM ECC6.0, the User Status is available for which of the following objects ? (Choose your
answer, choices are more than one)

A) Equipment Master.
B) Functional Location Master.
C) Reference Functional Location Master.
D) Permit Master.
E) Measuring Point.


In SAP PM, which of the following are correct concerning the User Status ? (Choose your answer,
choices are more than one)
SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 3

A) The User Status Profile can be assigned to the Equipment Category.
B) The User Status Profile can be assigned to the Functional Location Category.
C) The User Status Profile can be assigned to the Reference Functional Location Category.
D) The User Status Profile can be assigned to the Permit Category.
E) The User Status Profile can be assigned to the Measuring Point Category.
.
In SAP PM ECC6.0, which of the following are correct about the use of Alternative Labeling in
Functional Locations? (Choose your answer, choices are more than one)

A) It is only used for Actual Functional Location and not Reference Functional Location.
B) User Profile for assigning alternative labels can have multiple labels but only one label can be
activated for the user at one time.
C) The Structural indicator used for the alternative label to a functional location can be different from the
structural indicator of the functional location concerned.
D) The Structural indicator used for the alternative label to a functional location must be different from
the structural indicator of the functional location concerned.
E) The Structural indicator used for the alternative label to a functional location can be the same as the
structural indicator of the functional location concerned.

In SAP PM ECC6.0, which of the following are the common objects assignable to both the
Reference and Actual Functional Location Category. (only one answer)

A) Object Info Key.
B) Partner Determination Procedure.
C) User Status Profile.
D) Change Documents.
E) View Profile.

In SAP PM, which of the following cannot be entered or assigned to Reference Functional
Locations ?

(Choose your answer, choices are more than one)

A) Measuring Point.
B) Construction type.
C) Account Assignment data.
D) Planning Plant and Planner group.
E) Permits.
.
SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 4
In SAP PM, the functions of transaction code IH01 (Structural Display) are (Choose your answer,
choices are more than one)

A) To display both reference FL and actual FL.
B) To display equipments installed.
C) To display equipment hierarchy.
D) To display BOM of the construction type.
E) To display the Permits assigned.
.
In SAP PM, which of the following are TRUE about Reference Functional Location (FL) ?
(Choose your answer, choices are more than one)

A) It is created with "Reference Functional Location Category".
B) There are no "Labeling System" for it.
C) The Structural Indicator is the same for Reference FL and Actual FL.
D) Permits cannot be assigned.
E) A construction type can be assigned to it.
.
In SAP PM, which of the following can be assigned in the Reference Functional Location ?
(Choose your answer, choices are more than one)

A) Construction type.
B) Installation allowed indicator.
C) Planning plant and Planner group.
D) Material serial number.
E) Catalog Profile.
.
In SAP PM, which of the following are common features of Functional Location and Reference
Functional Location ?
(Choose your answer, choices are more than one)

A) Assignment of Documents from DMS.
B) Assignment of Construction type.
C) Multilingual text entry.
D) Assignment of Class for Classification.
E) Account Assignment Data.
.
In SAP PM, which of the following objects can be assigned with the construction type ?
(Choose your answer, choices are more than one)

SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 5
A) Functional Location.
B) Measuring Point.
C) Equipment.
D) Maintenance Task List Header.
E) Maintenance Work Center.
.
In SAP PM, the Maintenance Work Center created must be .. (only one answer)

A) Created for the Planning Plant.
B) Created with the necessary Standard Value Keys.
C) Created with the work center category with Application "I" for Plant Maintenance.
D) Created with the number range provided in Plant Maintenance customization.
E) Created with the correct validity period.
.
In SAP PM, which of the following objects do not have internal number assignment possibility ?
(Choose your answer, choices are more than one)

A) Functional Location.
B) Work Center.
C) Class Characteristics.
D) Measuring Point.
E) Material Master PRT.
.
In SAP PM, which of the following objects in SAP Plant Maintenance allows internal number
assignment ? (Choose your answer, choices are more than one)

A) Functional Location.
B) Measuring Point.
C) Measuring Document.
D) Equipment.
E) Work Center.
In SAP PM ECC6.0, which of the following statements are true about the use of Maintenance Plan
for External Services ?
(Choose your answer, choices are more than one)

A) Only one service master can be entered in the Maintenance Plan.
B) One or more framework PO can be entered in the Maintenance Plan.
C) Only one technical object can be entered in the Maintenance Plan.
D) One or more technical objects can be entered in the Maintenance Plan.
SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 6
E) No technical object can be entered in the Maintenance Plan.

In SAP PM as of ECC6.0, for Calibration Maintenance Planning, in order to automatically record
measuring documents into measuring points from results recording of inspection lot, what setup is
necessary ?
(only one answer)

A) set the automatic on recording parameter indicator in the measuring point category.
B) set the automatic on recording parameter indicator in the maintenance plan category.
C) link the inspection characteristics to the measuring point.
D) assign the the class characteristics used to create the measuring point to the inspection characteristics
used in the calibration plan.
E) assign an appropriate confirmation profile to the user.
.
In SAP PM ECC6.0, the characteristics of Maintenance Plan for External Services are ?
(Choose your answer, choices are more than one)

A) After approval of the Service Entry Sheet, the costs are debited into the Cost Center assigned in the
Maintenance Plan.
B) On maintenance due, Service Entry Sheet is generated against the Framework Purchase Order.
C) The General Ledger for the Expenses account to be debited at approval of the Service Entry Sheet is
defaulted from the Technical Object assigned in the Maintenance Plan.
D) After approval of the Service Entry Sheet, the costs are debited into the Settlement Order assigned in
the Maintenance Plan.
E) A Purchase Order document type is entered in the Maintenance Plan for the Framework Order
creation when maintenance is due.

In SAP PM ECC6.0, which of the following are true about Hierarchy in Maintenance Packages in
Preventive Maintenance? (Choose your answer, choices are more than one)

A) If two packages with the same hierarchy are due at the same time, then both packages are performed.
B) If two packages have different hierarchies, only the package with the higher hierarchy is performed.
C) If two packages with the same hierarchy are due at the same time, then the package with the least
operation time is performed.
D) If two packages have different hierarchies, only the package with the higher operation time is
performed.
E) If two packages with the same hierarchy are due at the same time, no packages will are performed.

In SAP PM ECC6.0, When the Call Horizon is 0 %, (only one answer)

SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 7
A) The Planning will be done for the entire horizon of the scheduling period.
B) The Call Date is exactly one cycle before the Plan Date / Due Date.
C) The Call Date is exactly one cycle later then the Plan Date / Due Date.
D) The Call Date = Plan Date / Due Date.
E) This is not possible as 0 (Zero) is not a valid entry.
.
In SAP PM ECC6.0, When the Call Horizon is 100 %, ___________________ .
(only one answer)

A) The Planning will be done for the entire horizon of the scheduling period.
B) The Call Date is exactly one cycle before the Plan Date / Due Date.
C) The Call Date is exactly one cycle later then the Plan Date / Due Date.
D) The Call Date = Plan Date / Due Date.
E) The Call Date is at the end of the horizon of the scheduling period.

In SAP PM ECC6.0, which of the following are common data fields available in the Maintenance
Item for Call Object Maintenance Order and Maintenance Notification ?
(Choose your answer, choices are more than one)

A) Planning Plant and Planner Group.
B) Maintenance Work Center and Maintenance Activity Type.
C) Priority.
D) Automatic Determination of Task indicator.
E) Scheduling Parameters.

In SAP PM ECC6.0, the Single Cycle Maintenance Plan for call object Maintenance Notification
will have the following characteristics EXCEPT.
(more the one answers)

A) Only one Maintenance Item is allowed for each Maintenance Plan.
B) One or more Maintenance Items are allowed for each Maintenance Plan.
C) Each Maintenance Item can only have one Reference Object.
D) Each Maintenance Item can have one or more Reference Object.
E) Each Maintenance Item must have a Maintenance Task List.
.
In SAP PM ECC6.0, when a Maintenance Plan is created to call External Service's Service Entry
Sheet, which of the following data are mandatory (in the Standard SAP system) in the Maintenance
Item.
(Choose your answer, choices are more than one)

SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 8
A) Framework Purchase Order.
B) G/L Account.
C) Settlement Order.
D) Service Master.
E) Order type.
.
In SAP PM ECC6.0, the Maintenance Plan for call object service entry sheet will have the following
Maintenance Plan Structure characteristics.
(Choose your answer, choices are more than one)

A) One Maintenance Item only for each Maintenance Plan.
B) One or more Maintenance Item for each Maintenance Plan.
C) The Maintenance Item requires one more technical objects to be entered.
D) Maintenance Task List is not mandatory but possible in the Maintenance Item.
E) A Purchase Order, G/L Account, and Settlement order is required.
.
In SAP PM, which of the following planning data cannot be defaulted from the Technical Object
entered in the Maintenance Plan ?
(Choose your answer, choices are more than one)

A) Planning Plant and Planner Group.
B) Maintenance Work Center.
C) Order type.
D) Priority.
E) Maintenance Activity Type.
.
In SAP PM, which of the following are not mandatory entries in a Single Cycle Maintenance Plan
where the call object is a maintenance order ?
(Choose your answer, choices are more than one)

A) Maintenance Strategy.
B) Maintenance Task List.
C) Technical Objects.
D) Maintenance Order type.
E) Counter.
.
In SAP PM, what are the possible call objects from the scheduling of a Maintenance Plan which can
be configured to the Maintenance Category ?
(Choose your answer, choices are more than one)

SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 9
A) Maintenance Notification.
B) Maintenance Order.
C) Purchase Requisition.
D) Purchase Order.
E) Service Entry Sheet.

In SAP PM, what are the options for use or selection of the maintenance task list in the
Maintenance Plan ?
(Choose your answer, choices are more than one)

A) You can create new Maintenance Task list in the Maintenance Plan while creating the Maintenance
item.
B) You can choose or select from existing Maintenance Task list in the Maintenance item.
C) You can ignore and not include a Maintenance Task list in the Maintenance item of the Maintenance
Plan.
D) You can include one Maintenance Task list in the Maintenance plan header to be used for all
Maintenance Items.
E) You can include either a suitable Equipment Task list or Functional Location Task list or General
Task list in the Maintenance item.

In SAP PM, the Maintenance Plan for Maintenance Strategy of Service Procurement requires
which of the following data ? (Choose your answer, choices are more than one)

A) Framework Purchase Order.
B) Service Contract.
C) Settlement Maintenance Order.
D) Group Notification.
E) Service Master.

In SAP PM Preventive Maintenance, the Maintenance Order type in the Maintenance item of the
Maintenance Plan is defaulted via which of the following ? (only one answer)

A) Maintenance Plant.
B) Maintenance Planning Plant.
C) Maintenance Plant and Planner Group.
D) Maintenance Planning Plant and Planner Group.
E) Planner Group.

In SAP PM Preventive Maintenance, which of the following parameters are controlled by the
Maintenance Plan Category ? (Choose your answer, choices are more than one)
SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 10

A) Maintenance Plan number range.
B) Call object.
C) Relevancy of change documents creation.
D) Settlement Profile.
E) Allowed Reference Objects.

In SAP MM ECC6.0, which of the following are mandatory data fields when creating a Service
Master ?
(Choose your answer, choices are more than one)

A) Service Description.
B) Service Category.
C) Valuation Class.
D) Pricing Control.
E) Purchasing Group.

In SAP PM ECC6.0, which of the following are true about Costing management in Plant
Maintenance.
When the Maintenance Order is Released, which of the following costs treatment is true for
Invoices of External procurement.
(only one answer)

A) Invoice from external procurement can be registered as Actual costs only after the Order is set with
status "TECO".
B) Invoice from external procurement can be registered as Actual costs before and after the Order is set
with status "TECO".
C) Invoice from external procurement can be registered as Actual costs only after the Order is set with
status "CLSD".
D) Invoice from external procurement can only be registered as Actual costs only before the Order is set
with status "TECO".
E) Invoice from external procurement cannot be registered as Actual costs regardless of the Order status.

In SAP PM ECC6.0, which of the following transactions allow you to possibly create a Maintenance
Order ? (Choose your answer, choices are more than one)

A) IH01 Structural Display.
B) IW21 Create Maintenance Notification.
C) IP10 Scheduling of Maintenance Plan.
D) CC04 Product Structure Browser.
SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 11
E) IW38 Change Maintenance Order List.

In SAP PM, which of the following control key in the standard SAP system is used for the scenario
External Processing Process with External work center whereby activities completed are completed
via confirmation and External work center will invoice the work done ?
(only one answer)

A) PM01.
B) PM02.
C) PM03.
D) PM04.
E) PM05.

In SAP PM, which of the following scenarios results in Purchase Requisition generated in the
Maintenance Order ?
(Choose your answer, choices are more than one)

A) Item Category "R" for components.
B) Item Category "N" for components.
C) Control Key "PM02" for operations.
D) Control Key "PM03" for operations.
E) Control Key "PM05" for operations.

In SAP PM ECC6.0, the transaction code ADSUBCON for processing the subcontracting of the
refurbishment scenario, which of the following are supported by that transaction ?
(Choose your answer, choices are more than one)

A) Transfer of refurbishment material to the subcontractor via MB1B or MIGO.
B) Creating of the Purchase Requisition for the subcontracting scenario.
C) Converting the Subcontracting Purchase Requisition to Purchase Order.
D) Transfer of refurbishment material to the subcontractor via SD Delivery.
E) Goods receipt of the Purchase Order to receive the return of the completed refurbish material.

In SAP PM ECC6.0, the following statements describes the features and functions of
subcontracting the refurbishment process, select statements which are correct about it ?

(Choose your answer, choices are more than one)
A) Only the standard SAP provided Order type PM04 can be used for the maintenance order creation
of this scenario, no specific configuration is required.
B) An MM purchase info record with subcon category should be created for the subcon services
SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 12
charges.
C) The material (equipment) will be transferred to the subcontractor and seen as special stock type "O".
D) Transaction IW8W will be used to receive the completed refurbished material (equipment).
E) Item Category "L" is registered in the Purchase Documents for this scenario.

In SAP PM the differences between use of PM02 and PM03 for external maintenance work
procurement in the Maintenance Order are the following except ?
(Choose your answer, choices are more than one)

A) The same Item Category is used in both types of Purchase Documents.
B) A different Account Assignment is used in the Purchase Documents.
C) Completion of the approved services done are always represented by a Material document.
D) Both scenario can perform invoice verification with reference to Service Entry Sheet.
E) In Both scenario, Purchase Requisition or Purchase Order can be created before the Maintenance
order is Released.

In SAP PM, what are the similarities of control key PM02 and PM03 used for external
procurement of maintenance services in Plant Maintenance ?
(Choose your answer, choices are more than one)

A) Both uses the goods receipts (MIGO) transaction to complete the services.
B) Both uses the same account assignment object indicator in the Purchase Requisition.
C) Both uses invoice verification transaction (MIRO) to complete the invoice entry.
D) Both do not require a work center entry in the operation concerned.
E) Both will update the maintenance order "GMPS" system status upon completion of the services.

In SAP PM, when will the system update the Maintenance Operation of Control Key "PM03"
(External Services Procurement) to system status of "EOPD" ?
(only one answer)

A) When the External Services Purchase Requisition is created.
B) When the External Services Purchase Order is created.
C) When the External Services Operations in the Maintenance Order is Released.
D) When the External Services Purchase Order's Service Entry Sheet is entered.
E) When the External Services Purchase Order's Service Entry Sheet is approved.

In SAP PM, which of the following changes or updating can be done to the maintenance order
when it is already technically completed?
(Choose your answer, choices are more than one)

SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 13
A) Long Text.
B) Goods receipt of remaining Non-Stock Purchase Order.
C) Settlement rule.
D) Additional Invoice Amount posted.
E) Overhead calculations.

In SAP PM, the Material Reservation Document created from component assignment in the
Maintenance Order has the following characteristics.
(Choose your answer, choices are more than one)

A) The Reservation cannot be accessed via MB22 (Change Reservations).
B) The Reservation cannot be deleted manually.
C) The Reservation's movement allowed indicator is set automatically by releasing the maintenance
order.
D) The Reservation is generated when you release the maintenance order.
E) The Reservation is deleted when the maintenance order is technically completed.

In SAP PM, what is true about the "ATCO" system status in Maintenance Notification.
(Choose your answer, choices are more than one)

A) the "ATCO" or "All tasks completed" indicator is automatically set when all task are set completed.
B) the "ATCO" is at the Notification header status and the Individual task status.
C) without the "ATCO" indicator with task outstanding, the Notification cannot be completed
automatically when the order is to be technically completed.
D) the "ATCO" status cannot be manually set.
E) A notification may not have the "ATCO" indicator if there are no task entered in the notification.

In SAP PM, which of the following maintenance order status can be revoked or reset ?
(Choose your answer, choices are more than one)

A) From Release to Created.
B) From Business Completion to Technical Completion.
C) From Technical Completion to Release.
D) From Locked to Un-locked.
E) From Printed to Not Yet Printed.

Which of the following are common configuration assignments for Maintenance order type and
Maintenance order notification ?
(Choose your answer, choices are more than one)

SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 14
A) Catalog Profile.
B) Object Information Key.
C) Priority Type.
D) Settlement Profile.
E) Default Value Profile.

In SAP PM, the Estimated Cost of maintenance in the maintenance order contains the following
characteristics.
(Choose your answer, choices are more than one)

A) It can only be entered before the maintenance order released.
B) It can only be entered before the maintenance order is technically completed.
C) Only values can be entered and not quantities.
D) Both quantities and values can be entered.
E) The estimated costs will be used as Maintenance Budget control and checking.

In SAP PM, the "Movement Allowed Indicator" in the Reservation of a material component with
"L" item category is flagged when _______________ .
(only one answer)

A) The Maintenance Order is created with a "CRTD" status.
B) The Maintenance Order is released.
C) The Maintenance Order which is Technically Completed is revoked to Released Status.
D) The indicator is set manually in the Reservation document.
E) When Material Availability check is successful.

In SAP PM, the process for "Goods Issue and Install equipment" requires you to enter which of the
following data ?
(Choose your answer, choices are more than one)

A) Equipment number.
B) Functional location.
C) Movement type.
D) Account assignment object.
E) Purchase order number.

In SAP PM, which of the following functions are possible using IE4N ?
(Choose your answer, choices are more than one)

A) Install equipment with material but without serial number.
SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 15
B) Dismantle equipment with material but without serial number.
C) Install equipment with material and serial number.
D) Dismantle equipment with material and serial number.
E) Install equipment without material and serial number.

In SAP PM, the Historical Maintenance Order allows you to do which of the following ?
(Choose your answer, choices are more than one)

A) Record material withdrawal records for Item Category "L".
B) Record material withdrawal records for Item Category "N".
C) Record operation work done.
D) Record actual costs.
E) Record measuring point/counter readings.

In SAP PM ECC6.0, which of the following is true about cost management for maintenance
operations in maintenance order ?
(only one answer)

A) The Control Key assign to the Maintenance Operation determine the costing relevancy of the
operations.
B) The user cannot influence the costing relevancy indicator from the Control Key in the Maintenance
Order.
C) The costing relevancy indicator for maintenance order operation is influenced by the Costing Variant
assigned to the Order.
D) The costing relevancy indicator in the Control Key can only be changed before the Maintenance
Order is released.
E) The costing relevancy for Maintenance Operations is influenced by the Account Assignment of the
Technical Object copied into the Maintenance Order.

In SAP PM ECC6.0, which of the following statement is true about Costing Relevancy setting in the
Plant Maintenance ? (Choose your answer, choices are more than one)

A) You can change it in the component detail in the Maintenance order for Stock items.
B) You can change it in the component detail in the Bills of Material.
C) You can change it in the component detail in the Maintenance order for Non-Stock items.
D) You can change it in the operations detail in the Maintenance order for control key PM01.
E) You can change it in the operations detail in the Maintenance order for control key PM02.

In SAP ECC6.0 for Plant Maintenance, which of the following costs treatment is true ?
(Choose your answer, choices are more than one)
SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 16

A) No actual costs are posted from Service Entry Sheet which is not approved.
B) Invoice postings from "Stock" items are never registered as actual costs in the Maintenance Order.
C) Unplanned goods issue with reference to the Maintenance Order are never included into the Actual
Costs of the Maintenance Order.
D) The goods receipt of External procurement (from control key PM02) is registered into the Actual
Costs of the Maintenance Order.
E) The goods receipt of External procurement (from "N" or non-stock material) is registered into the
Actual Costs of the Maintenance Order.

In SAP ECC6.0 for Plant Maintenance, the Costing Variant provides price/costs
calculation/determination for which of the following ? (Choose your answer, choices are more than
one)

A) Materials/Components.
B) Activity types for Operations.
C) Subcontracting.
D) External Processing.
E) Overhead Costing Sheet.

In SAP PM, the Estimated Cost of maintenance in the maintenance order contains the following
characteristics.
(Choose your answer, choices are more than one)

A) It can only be entered before the maintenance order released.
B) It can only be entered before the maintenance order is technically completed.
C) Only values can be entered and not quantities.
D) Both quantities and values can be entered.
E) The estimated costs will be used as Maintenance Budget control and checking.

In SAP CO, the Costing Variant allows you to do the following ?
(Choose your answer, choices are more than one)

A) Calculate the surcharge or overhead for internal orders.
B) Calculate the surcharge or overhead for sales orders.
C) Calculate the surcharge or overhead for production orders.
D) Calculate the surcharge or overhead for purchase orders.
E) Calculate the surcharge or overhead for maintenance orders.

SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 17
In SAP PM, Which of the following are possible settlement receivers for a Maintenance Order
except one ? (only one answer)

A) Vendor Account.
B) General Ledger Account.
C) Cost Center.
D) Another Maintenance Order.
E) WBS Element.

When is the last choice of entering a settlement rule in the order ?
(only one answer)

(A) When an order is released.
(B) Before the order is set Final Confirmation.
(C) After settlement.
(D) When the Overhead is calculated.
(E) Before Technical Completion.
Costing results shown as value category in the maintenance order are:
(only one answer)

(A) Grouping of costs based on value categories.
(B) Grouping of costs from a group of cost centers assigned to the various object types in the maintenance
order.
(C) Grouping of costs based on material type of components and control key of operations.
(D) Grouping of costs based on object type in the maintenance order.
(E) Grouping of costs from a group of costs elements.

When analyzing Maintenance order costing; cost analysis can be displayed using cost element and
value category, what is the relationship of these 2 types of cost analysis report ?
(Choose your answer, choices are more than one)

(A) Groups of cost elements are used to specify or assigned to the value categories.
(B) Value category analysis is a summary report while Cost element report is a more detail report.
(C) Value category analysis is accessible in PM while Cost element report analysis is accessible in CO.
(D) Groups of value categories are used to specify or assigned to the cost element.
(E) Cost Element analysis report contains the Actual costs posted to the maintenance order while Value
category analysis report will show both the planned and actual costs posted to the maintenance order.

Information regard which CO object should bear the maintenance costs is stored in which data
element in the Maintenance Order ?
SAMPLE QUESTIONS FOR UNDERSTANDING
SAP (Plant Maintenance) CERTIFICATION

Collection: Asif Iqbal
Collected by: Asif Iqbal - asifiqbal.sap@gmail.com Copyright 2010-2012 CW Wong

Page 18
(only one answer)

(A) Cost segment.
(B) Profitability segment.
(C) Object List.
(D) Cost center.
(E) Settlement rule.

Disclaimer:
Above data has been collected from Internet and various sources. It is still advisable that
preparation of SAP examination should be done by attending the right SAP courses and study the
designated training materials.
Use this document for review of the specific topics only.
Collected by: Asif Iqbal asifiqbal.sap@gmail.com
Credit: Mr. W.C.Wah.

Vous aimerez peut-être aussi