Académique Documents
Professionnel Documents
Culture Documents
Project Struktur
MOFCOM
Steering Committee MoHURD (Chair) MoE (member) MoH (member) GIZ (member)
BMZ
GIZ China
Joint Project Office (GIZ and Partners)
Chin. Experts
& Consulting
Local Authorities
Pilot Hospitals
PilotSchools
26 27
14 8
12 19
23 23
3 4
7 -
19 27
Tianjin
Urumqi Summe
22
25 100
6
14 42 Ningbo mild 2 6 9 6 3 26
16
11 58 Qingdao cold 2 11 9 2 3 27
17
18 81 Tianjin cold 3 9 8 1 1 22
5
7 19
1
1 9 Urumqi very cold 1 15 1 4 1 3 25
21
24 91
Category Climate Zone I100 - 199 beds II200 - 499 beds III500 - 799 beds IV800 -1199 beds V1200-1999 beds VI> 2000 beds <100 beds Insgesamt
Total 8 41 27 12 8 3 1 100
Energy Cost Shares of Total Costs (incl. Water) in 100 Chinese Hospitals (2011)
Energy Costs (incl. Water) of Total Costs - max. value + mid. value - min. value
All together
All together
More than 54 % hospital buildings were built before 2005 no external wall insulation High energy loss in the steam supply system (20-30%) Old water pipe system Problem with hydraulic balance in the heating and cooling system (controls and regulations) Capacity shortage of hospitals Project financing
5
Approaches Awareness raising through energy benchmarking Energy analysis to uncover main problems Prioritize the energy efficiency measures using a catalog Start with simple measures with short pay-pack periods Set up pilot project for demonstration Technical Options Quick steam generators Cogeneration/Trigeneration (KWK/K) Heat/Chill recovery technology External wall isolation Modernization of the heat/cooling system Set up effective energy consumption controlling system
100% Consumption In % (installed Capacity 750kW) 90% 80% 70% 60% 50% 40% 30%
Steam consumption in a German hospital Steam sterilization Steam kitchen Loss stand by
20%
10% 0% 1 2 3 4 5 6 7 8 9 101112131415161718192021222324 Source: Wolfgang Mller
Thank You!
Shecan Zhang