This topic describes how to configure a BTS for the BSC. The site helps to achieve the radio transmit/receive function and radio coverage of cells under the site. The BSC performs the centralized control and management over the site and radio resource allocation for the site. 8.1 Adding a BTS This topic describes how to add a BTS for the BSC and configure the cell basic attributes, TRX attributes, and equipment attributes for the BTS. 8.2 Configuring the Internal Connection of a BTS This topic describes how to configure the internal connection of a BTS. The internal connection of a BTS must be configured in cabinet groups. The communication between BTS cabinet groups is based on the internal connection between the main cabinet of the main cabinet group and the main cabinet of the extension cabinet group. 8.3 Configuring a Site Chain This topic describes how to configure a site chain to add a path between BTSs or between a BTS and the BSC.

2.

3.

Issue 01 (2007-09-21)

Huawei Technologies Proprietary

8-1

8 Configuring a BTS

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

8.1 Adding a BTS


This topic describes how to add a BTS for the BSC and configure the cell basic attributes, TRX attributes, and equipment attributes for the BTS. Scenario BSC initial configuration

Mandatory/ Mandatory Optional

Prerequisite
l l l

The GEIUB/GOIUB is configured. There are idle ports on the GEIUB/GOIUB in the GMPS or GEPS. The GXPUM/GXPUT is configured for the GMPS or GEPS where the GEIUB/GOIUB is located.

Preparation
NOTE

This part describes how to add a BTS on the GEIUB in the GMPS.

Table 8-1 Example of data to be negotiated and planned for adding a BTS Parameter Site attributes Site Name BTS Type Upper-Level Port No. Multiplexing Mode Abis Mode Config Ring Cell Attributes Cell Name Frequency Band PCU Name Example BTS1 BTS3012 0 GEIUB Port 4:1 Auto no Cell 1 GSM900 PCU 1 Source Network planning Network planning Network planning Network planning Network planning Network planning Network planning Network planning Network planning
Issue 01 (2007-09-21)

8-2

Huawei Technologies Proprietary

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

8 Configuring a BTS

Parameter MCC MNC LAC CI BCC NCC Cell ExtType Cell Type TRX attributes Freq Config TRX Config FH Mode Antenna feeder attributes Tributary No. Band Type TRX Transmit and Receive Relationship

Example 460 01 8240 1 1 1 Normal Cell Normal Cell 988 (main BCCH frequency), 994 TRX 0, TRX 1 None Downlink Tributary PGSM900 TRX No.1: 0, A TRX No.2: 1, B

Source Network planning Network planning Network planning Network planning Network planning Network planning Network planning Network planning Network planning Network planning Network planning Network planning Network planning Network planning

Procedure
Step 1 Start the wizard for adding a BTS. 1. When adding a BTS for the first time, you can start the wizard for adding a BTS only on the GEIUB/GOIUB in the GMPS or GEPS. On the BSC6000 Local Maintenance Terminal, right-click a GEIUB in the GMPS. A shortcut menu is displayed, as shown in Figure 8-1.

Issue 01 (2007-09-21)

Huawei Technologies Proprietary

8-3

8 Configuring a BTS

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

Figure 8-1 GEIUB subrack shortcut menu

2.

If a BTS already exists, you can add a cascaded BTS under this BTS. On the management tree, right-click a BTS. A shortcut menu is displayed, as shown in Figure 8-2. Figure 8-2 Site shortcut menu

Step 2 Click Add Site. A dialog box is displayed, as shown in Figure 8-3. Figure 8-3 Add Site dialog box (1)

Step 3 Click Add Site. A dialog box is displayed, as shown in Figure 8-4.
8-4 Huawei Technologies Proprietary Issue 01 (2007-09-21)

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

8 Configuring a BTS

Figure 8-4 Add New Site dialog box

Step 4 Set the parameters by referring to Table 8-1.


NOTE

if Config Ring is yes, clickOKA Set Rev Info dialog box is displayed.

Step 5 Click OK. A dialog box is displayed, as shown in Figure 8-5. Figure 8-5 Add Site dialog box (2)

Step 6 Click Next. A dialog box is displayed, as shown in Figure 8-6.


Issue 01 (2007-09-21) Huawei Technologies Proprietary 8-5

8 Configuring a BTS

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

Figure 8-6 Cell view

Step 7 Select a BTS, and then click Add Cell. A dialog box is displayed, as shown in Figure 8-7. Figure 8-7 Adding a cell

Step 8 Set the parameters by referring to Table 8-1.


NOTE

To add more cells at a time, set Number of Cells. The added cells are named the current Cell Name plus a number in sequence.

Step 9 Click OK. A dialog box is displayed, as shown in Figure 8-8.

8-6

Huawei Technologies Proprietary

Issue 01 (2007-09-21)

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

8 Configuring a BTS

Figure 8-8 Add Site dialog box (3)

Step 10 Select the added cell, and then click Cell Attributes. A dialog box is displayed, as shown in Figure 8-9.

Issue 01 (2007-09-21)

Huawei Technologies Proprietary

8-7

8 Configuring a BTS

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

Figure 8-9 Configuring cell attributes

Step 11 Set the cell basic attributes by referring to Table 8-1.


NOTE

l l l

The CI of a cell must be unique. If you select GPRS Support, the BSC must be configured with a PCU. If the BTS does not support the GRPS function or the GPRS services are unavailable in the cell, do not select GRPS Support. When you select EDGE Support, GRPS Support is selected automatically if the GPRS function is not configured. You also have to select a PCU from the PCU drop-down list.

Step 12 Click OK to return to the dialog box shown in Figure 8-9. Step 13 Click Next. A dialog box is displayed, as shown in Figure 8-10.

8-8

Huawei Technologies Proprietary

Issue 01 (2007-09-21)

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

8 Configuring a BTS

Figure 8-10 Add Site dialog box (4)

Step 14 Click Site Attributes. A dialog box is displayed, as shown in Figure 8-11.

Issue 01 (2007-09-21)

Huawei Technologies Proprietary

8-9

8 Configuring a BTS

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

Figure 8-11 Site Device Attributes dialog box

NOTE

If the configured TRXs are in different cabinet groups, click Site Inner Connection to configure the internal connections of the BTS. For details, refer to 8.2 Configuring the Internal Connection of a BTS.

Step 15 Double-click DDPU. A dialog box is displayed, as shown in Figure 8-12.

8-10

Huawei Technologies Proprietary

Issue 01 (2007-09-21)

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

8 Configuring a BTS

Figure 8-12 Set Antenna Feeder Property dialog box

NOTE

l l l

This topic takes configuring one antenna feeder port on the DDPU as an example. If the antenna feeder port is not required, you can delete the DDPU. You have to specify at least one TRX for the downlink tributary of the DDPU. For other tributaries, retain the default settings. The DDPU has two paths: A and B. The two paths are independent of each other. The data configurations of the DDPU must be consistent with the physical connections, and the frequency band of the TRX must be the same as the frequency band of the DDPU.

Step 16 Set the parameters by referring to Table 8-1, as shown in Figure 8-13. For the parameters on the Extended Connection Attributes tab page, retain the default settings. Figure 8-13 Setting antenna feeder attributes

Issue 01 (2007-09-21)

Huawei Technologies Proprietary

8-11

8 Configuring a BTS

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

Step 17 Click OK to return to the dialog box shown in Figure 8-11. Step 18 Click OK to return to the dialog box shown in Figure 8-10. Step 19 Click Finish. The configuration of a BTS is complete. ----End

8.2 Configuring the Internal Connection of a BTS


This topic describes how to configure the internal connection of a BTS. The internal connection of a BTS must be configured in cabinet groups. The communication between BTS cabinet groups is based on the internal connection between the main cabinet of the main cabinet group and the main cabinet of the extension cabinet group. Scenario BSC initial configuration

Mandatory/ Optional. The internal connection must be configured when the TRXs of a BTS Optional are configured in different cabinets and the cabinets are in different cabinet groups.

Prerequisite
l l

The TRX of the BTS is configured in different cabinet groups. Each cabinet group has at least one available E1 port.

Preparation
NOTE

This topic describes how to configure the connection between two cabinet groups where the TRX is configured.

Table 8-2 Example of data to be negotiated and planned for configuring the internal connection of a BTS Parameter Out-Port/In-Port Example 1/9 2/8 Source BSC internal planning BSC internal planning

Procedure
Step 1 On the BSC6000 Local Maintenance Terminal, right-click a BTS. A shortcut menu is displayed, as shown in Figure 8-14.

8-12

Huawei Technologies Proprietary

Issue 01 (2007-09-21)

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

8 Configuring a BTS

Figure 8-14 Site shortcut menu

Step 2 Choose Add or Delete Site Chain. A dialog box is displayed, as shown in Figure 8-15. Figure 8-15 Add or Delete Site Chain dialog box (1)

Step 3 Select the BTS, and then click Add or Delete Chain. A dialog box is displayed, as shown in Figure 8-16.

Issue 01 (2007-09-21)

Huawei Technologies Proprietary

8-13

8 Configuring a BTS

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

Figure 8-16 Add and Delete Site Chain dialog box (2)

Step 4 Click Inner Connection. A dialog box is displayed, as shown in Figure 8-17. Figure 8-17 Configuring connections between cabinet groups

Step 5 Set the parameters by referring to Table 8-2. Step 6 Click OK to save the configurations. Step 7 Click OK to return to the dialog box shown in Figure 8-15. Step 8 Click Finish. The configuration of the BTS internal connection is complete. ----End

8-14

Huawei Technologies Proprietary

Issue 01 (2007-09-21)

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

8 Configuring a BTS

8.3 Configuring a Site Chain


This topic describes how to configure a site chain to add a path between BTSs or between a BTS and the BSC. Scenario BSC initial configuration

Mandatory/ Optional. A site chain must be added when there is insufficient transmission paths Optional between BTSs or between a BTS and the BSC.

CAUTION
A site chain should not be added between BTSs that are configured on the GEIUB/GOIUB in different subracks.

Prerequisite
l l

There are available ports in the BTS. There are available ports on the GEIUB/GOIUB.

Preparation
NOTE

This topic describes how to add a site chain between a BTS and a GEIUB in the GMPS.

Table 8-3 Example of data to be negotiated and planned for configuring a site chain Parameter GE(O)IUB Subrack No. GE(O)IUB Slot No. GE(O)IUB Port No. Site Port No. Example Subrack 0 Slot 20 1 GEIUB Port 1 Site Port Source BSC internal planning BSC internal planning BSC internal planning BSC internal planning

Procedure
Step 1 On the BSC6000 Local Maintenance Terminal, right-click a BTS. A shortcut menu is displayed, as shown in Figure 8-18.

Issue 01 (2007-09-21)

Huawei Technologies Proprietary

8-15

8 Configuring a BTS

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

Figure 8-18 Cell shortcut menu

Step 2 Choose Add or Delete Site Chain. A dialog box is displayed, as shown in Figure 8-19. Figure 8-19 Add or Delete Site Chain dialog box (1)

Step 3 Select the BTS, and then click Add or Delete Chain. A dialog box is displayed, as shown in Figure 8-20.

8-16

Huawei Technologies Proprietary

Issue 01 (2007-09-21)

HUAWEI BSC6000 Base Station Controller BSC Initial Configuration Guide

8 Configuring a BTS

Figure 8-20 Add and Delete Site Chain dialog box (2)

Step 4 Click New Port. A dialog box is displayed, as shown in Figure 8-21. Figure 8-21 Add Site Subchain dialog box

Step 5 Set the parameters by referring to Table 8-3. Step 6 Click OK to save the configurations and return to the dialog box shown in Figure 8-20. Step 7 Click OK to return to the dialog box shown in Figure 8-19. Step 8 Click Finish. The configuration of a site chain is complete. ----End
Issue 01 (2007-09-21) Huawei Technologies Proprietary 8-17