Vous êtes sur la page 1sur 3

-1- 1

Name of Work :Name of Work :- Lowering ,Laying & Jointing 160 mm dia P.V.C. pipe ine at !i age "#N$%&P'% (& )#*#%+ ,e-tion 'nder $.aroi %.W.).). Tal:- Kheralu Dist:- Mehsana.

$etai ed )pe-ifi-ation
+tem No - : 1 /0-a!ation for pipe ine tren-.e, in- .a ,afty pro!i,ion, 1,ing ,ite rai , and ,ta-king e0-a!ated ,t1ff 1p to a ea of 20 mtr - eaning t.e ,ite et- -omp. +n a ,ort, of ,oi and ,oft m1rram ift 1p to 1.30 mtr. $ept.. (A) Ordinary soil and soft murrum 1. The specification of the item shall be as per and as per description of the item more o(er. &. The rates includes the cost of e)ca(ation in all sorts of soil includin* shorin* struttin* +aterin* rammin* etc. and sides shall be directed. ,. The e)ca(ation shall be done as per plan .The bottom shall be le(eled and shall be properly dressed as directed. -. The contractor ha(e to e)ca(ate the trenches as per plan. The e)cessi(e e)ca(ation shall be brou*ht to desired le(el by ...././. 1:0:11. 0. The contractor ha(e to set ri*ht the incomin* pipe line' telephone cable ' etc +ith any e)tra cost. The contractor shall be fully responsible for any dama*e or any accident occurred durin* the e)ca(ation. 2. 3)ca(ated materials shall be stac"ed at distance of not less than &.11 mtrs from the ed*e of e)ca(ated trench' and surplus stuff shall be remo(ed +ith in a lead of 41 mtr as directed by 3n*ineer in /har*e. 5. The trenches shall be (ertically e)ca(ated and bottom shall be dressed as per re6uired *radient. The e)tra e)ca(ation for 7oints shall be done +ith out any e)tra cost. 8. The contractor ha(e to pro(ide ni*ht +atch man' fencin* ' site rails and crossin* by plan" etc. +ith out any e)tra cost. 4. The road surface bro"en for e)ca(ated stuff of road surface. 11. 9urplus e)ca(ated stuff ha(e to be remo(ed and disposed as directed out side to+n limit. e)ca(ation shall be rectified by usin* the dressed properly as .!.D. hand boo" #ol. $o. 1%& '

-2- 2 11. The decision re*ardin* classification of strata shall rate +ith the 3n*ineer in char*e and his decision shall be final and bindin* to the contractor. 1&. ayment shall be made on /mt basis. +tem No.4 Lowering aying and 5ointing of PVC pipe and ,pe-ia , of fo owing - a,, and diameter in- 1ding -o,t of -on!eyan-e from ,tore to ,ite of work in- 1ding -o,t of a6o1r, materia , e0-ept -ement ,o !ent, gi!ing ,ati,fa-tory .ydra1 i- te,ting a, per +)+ -ode et-.-omp ete. 1 The e)ca(ation for trenches shall be prepared before layin* the pipe & as per re6uired +idth and depth so that ade6uate space shall be made a(ailable for 7oints ipe shall be lifted from store to site by the contractor at his o+n cost. Durin* erection no dama*e shall be accure to pipe. , Dama*e if any shall be reco(ered from the contractor. ipe shall be laid .efore layin* the pipe it shall be brushed throu*h out the len*th so that dust soil can be remo(ed from the pipe. in the trench in strai*ht line 0. 2 2 The 7ointin* materials such as #/ coupler sol(ent cement' bends' tees' etc. +ill be supplied by the department. All the specials such tees' bends' reducers' etc shall be fi)ed as per instruction of 3n*ineer in /har*e in pipe line. ipe line shall be hydraulically tested .The len*th of section shall not more than ,11 mtr The section in test shall be sub7ected to pressure 1.0 times minimum +or"in* pressure durin* testin* no lea"a*e shall be obser(ed in the 7oints. :ea" if any obser(ed at his o+n cost as per the instruction of 3n*ineer ;n /har*e . ayment shall be +ithhold for testin*. 8) ayment shall be made on <MT basis. +tem No.2 %efi ing t.e pipe ine tren-.e, in 13 -m t.i-k ayer in- . ramming watering -on,o idation di,po,a of ,1rp 1, ,t1ff a, dire-ted wit.in a radio1, of 2 km. 1. &. ,. The +or" shall be carried out as per the description of the item and as per specification laid do+n in .!.D. hand boo" #ol. ; % ;;. The fillin* shall be properly rammed and consolidated incl. necessary +aterin* etc. complete as directed. The e)ternal earth if re6uired shall ha(e to brou*ht by the contractor from

-3- 3 out side and the surplus earth shall be remo(e and dispose off on directed out side the to+n limit +ithout any e)tra cost. -. ayment shall be made on cum. .asis. ;tem $o - : Manufacture' supply and deli(ery of cast iron Detachable 7oints (9hort % lon*) complete +ith 7oint flan*es duly drilled' synthetic rubber sealin* rin*s manufactured from styrene butadine rubber (9.<) and other re6uired accessories such as nut' bolts etc.conformin* to ;9 specification 854--1488 or its latest re(ision if any suitable for use +ith A./. ressure pipes. Deli(ery of 7oints includin* its accessories includin* loadin*' unloadin*' cartin*' stac"in*' insurance' all ta)es' octroi etc. complete. 1. &. /;D 7oint should be of best 6uality % appro(ed by 3n*ineer-in- char*e. ;t shall be of best 6uality as per rele(ant ;9 specification and rate shall be includin* loadin* unloadin*' cartin*' insurance and labour char*e etc. complete. ,. -. 0. =oint should be of re6uired thic"ness +ith , coats of appro(ed ma"e epo)y paint. The diameter should be suitable for #/ pipe. The payment shall be made on $o. basis.

9i*nature of /ontractor

Deputy 3)ecuti(e 3n*ineer' .>.Dharoi ro7.9ub.Dn Vadnagar

Vous aimerez peut-être aussi