ECP-0034-10
VOLUMEN 1
Cortocircuito para la
Bellavista y Sub-estaciones
2,010
CONTENIDO
1.
ASPECTOS GENERALES.......................................................................................................7
1.
ASPECTOS GENERALES............................................................ 7
Introduccin...................................................................................... 7
Objetivo............................................................................................ 8
Alcances del Proyecto...................................................................... 8
Informacin de referencia y herramientas utilizadas........................ 9
2.
2.
3.
3.
DESCRIPCION DEL SISTEMA DE PROTECCION DEL AREA
DE ESTUDIO ......................................................................................................... 10
4.
a)
SUB-ESTACIN TOCACHE....................................................... 10
b)
c)
SUB-ESTACIN TARAPOTO..................................................... 13
d)
SUB-ESTACIN MOYOBAMBA................................................. 16
e)
SUB-ESTACIN RIOJA.............................................................. 18
f)
g)
ECP-0034-10
VERSION A
Cortocircuito para la
Bellavista y Sub-estaciones
4.
5.
6.
5.
a.
Objetivo....................................................................................... 22
b.
Metodologa Tcnica................................................................... 23
c.
a)
b)
d.
e.
CALCULOS DE CORTOCIRCUITO........................................................................................36
6.
CALCULOS DE CORTOCIRCUITO........................................... 36
6.2 Datos del Sistema Elctrico..................................................... 36
............................................................................................ 36
6.3 Metodologa y Criterios.......................................................... 36
7.
6.4
6.5
7.
a)
Proteccin de Distancia.............................................................. 47
b)
Proteccin de Sobrecorriente.....................................................50
.......................................................................................................................................50
8.
a.
S.E TOCACHE............................................................................ 56
b.
S.E BELLAVISTA........................................................................ 56
R1PSB = 2.0 x RFPE (Z3)=280.00 -prim. (Ohm/loop)................63
c.
S.E TARAPOTO.......................................................................... 65
ECP-0034-10
VERSION A
Cortocircuito para la
Bellavista y Sub-estaciones
9.
CALCULO DE LOS AJUSTES PARA LA FUNCIN DE
SOBRECORRIENTE (50/51, 50N/SIN, 67/67N)..................................................... 87
En el rel principal y respaldo REL670 se ajusta la funcin
distancia (21). Como para fallas entre fases est cubierto, solo se plantea ajuste
para fallas a tierra direccional................................................................................. 87
Para determinar el arranque se considera la capacidad nominal de
los transformadores de potencia de Bellavista, Tarapoto y Moyobamba (15MVA +
25MVA + 15MVA = 55MVA), el cual representa 230 amperios en 138kV..............87
Io> = 20%x230A = 46 Amp Io> = 48 Amp................................ 87
El rel principal REL670 se ajusta con la funcin distancia (21) y
como respaldo se ajustara la funcin tierra direccional. El arranque mximo se
considera en el caso hipottico de exportar energa de la central Wartzila (2 grupos
de 7.75MVA c/u), el cual representa 65 amperios en 138kV.................................. 88
I> =125%x65A = 81.25 Amp I> = 84 Amp................................. 88
Io> = 48 Amp Se considera similar al arranque del rel de
Tocache ................................................................................................................ 88
El rel principal REL511 se ajusta con la funcin distancia (21) y
como respaldo se dispone de un rel de tierra direccional de tiempo definido
SPAS120C. Se habilita en el REL511 la funcin de sobrecorriente de fases y tierra
direccional. Para determinar el arranque se considera la Potencia Nominal de los
transformadores de potencia de Tarapoto y Moyobamba (25MVA + 15MVA), el
cual representa 167 amperios en 138kV................................................................. 88
I> =125%x167A = 209 Amp I> = 180 Amp (Segn flujo resulta
90 Amp.).................................................................................................................. 88
Io> =20%x167A = 33.4 Amp Io> = 35 Amp.............................. 88
El arranque para el rel en 138kV se determina de acuerdo a su
capacidad nominal de 15MVA, el cual representa 63 amperios en 138kV. ...........89
I> =125%x63A =78.75 Amp I> = 75 Amp ................................. 89
Io> =20%x63A = 12.6 Amp Io> = 30 Amp................................. 89
El arranque para el rel en 10kV se determina de acuerdo a su
capacidad nominal de 15MVA, el cual representa 866 amperios en 10kV.............89
I> =125%x866A =1080 Amp I> = 1040 Amp ........................... 89
El arranque para el rel en 10kV de cada reactor de 2.5MVAR, se
determina de acuerdo a su capacidad nominal de 2.5MVAR, el cual representa 144
amperios en 10kV................................................................................................... 89
I> =130%x144A =188 Amp I> = 180 Amp ................................ 89
I>> =250%x144A =360 Amp I>> = 375 Amp ............................ 89
Io> =20%x144A = 28.8 Amp Io> = 30 Amp.............................. 89
ECP-0034-10
VERSION A
Cortocircuito para la
Bellavista y Sub-estaciones
...................................................................................................... 89
El arranque para el rel en 138kV se determina de acuerdo a su
capacidad nominal de 20MVA (ONAF), el cual representa 84 amperios en 138kV.
89
I> =110%x84A = 92.4 Amp I> = 95 Amp .................................. 89
Io> =20%x84A = 16.8 Amp Io> = 80 Amp (Por coordinamiento)
89
El arranque para el rel en 22.9kV se determina de acuerdo a su
capacidad nominal de 20MVA (ONAF), el cual representa 504 amperios en 22.9kV.
90
I> =110%x504A = 554.4 Amp I> = 550 Amp ..........................90
Io> =20%x504A = 100.8 Amp Io> = 90 Amp ............................ 90
El arranque para el rel en 10kV se determina de acuerdo a su
capacidad nominal de 7MVA (ONAF), el cual representa 404 amperios en 10kV. 90
I> =110%x404A = 444.4 Amp I> = 440 Amp ............................ 90
El rel principal REL511 se ajusta con la funcin distancia (21) y
como respaldo se dispone de un rel de tierra direccional de tiempo definido
SPAS120C. Se habilita en el REL511 la funcin de sobrecorriente de fases y tierra
direccional. Para determinar el arranque se considera en el caso hipottico de
exportar energa de la central Wartzila (2 grupos de 7.75MVA c/u), el cual
representa 65 amperios en 138kV.......................................................................... 90
I> =125%x65A = 81.25 Amp I> = 80 Amp............................... 90
Io> =20%x65A = 13 Amp Io> = 40 Amp.................................... 90
El rel principal EPAC3000 se ajusta con la funcin distancia (21)
y como respaldo se dispone de un rel de fases y tierra direccional KCEG142, en
el cual se habilita la funcin de sobrecorriente de fases y tierra direccional. Para
determinar el arranque se considera la Potencia Nominal del transformador de
potencia de Moyobamba (15MVA), el cual representa 63 amperios en 138kV......90
I> =125%x63A = 78.75 Amp I> = 120 Amp (Segn flujo resulta
30 Amp)................................................................................................................... 90
Io> =20%x63A = 12.6 Amp Io> = 30 Amp................................ 90
El arranque para el rel en 138kV se determina de acuerdo a su
capacidad nominal de 30MVA (ONAF), el cual representa 126 amperios en 138kV.
91
I> =110%x126A = 138.6 Amp I> = 135 Amp ............................ 91
Io> =20%x126A = 25.2 Amp Io> = 27 Amp .............................. 91
ECP-0034-10
VERSION A
Cortocircuito para la
Bellavista y Sub-estaciones
10.
11.
a.
S.E. Bellavista............................................................................. 92
b.
S.E. Tarapoto.............................................................................. 98
RECOMENDACIONES Y CONCLUSIONES........................................................................100
11.
a)
RECOMENDACIONES............................................................. 100
b)
CONCLUSIONES..................................................................... 102
ANEXOS
ECP-0034-10
VERSION A
Cortocircuito para la
Bellavista y Sub-estaciones
ANEXO
ANEXO
ANEXO
ANEXO
ANEXO
ANEXO
ANEXO
1.
A
B
C
D
E
F
G
:
:
:
:
:
:
:
Diagramas Unifilares
Parmetros Elctricos
Resultados de la Simulacin de Flujos de Potencia
Resultados de las Simulaciones de Cortocircuito
Caractersticas de Impedancia
Curvas de sobrecorriente
Planillas de Ajuste
ASPECTOS GENERALES
Introduccin
El sistema aislado conformador por las subestaciones
Bellavista, Tarapoto y Moyobamba localizados en el
departamento de San Martin se interconectan mediante lneas
de transmisin en 138kV y son alimentados a travs de
centrales trmicas e hidrulicas. Dentro del sistema en 138kV
tambin se posee un subsistema en 60kV que enlaza las
subestaciones de Moyobamba, Rioja, Nueva Cajamarca y Gera.
Este gran sistema actualmente es operado por Electro Oriente
S.A. y posee una demanda de 30MW.
Debido a la necesidad de poseer energa confiable/segura,
incrementar la oferta de energa en la regin, reduccin del
alto costo de la energa y minimizar la contaminacin
ambiental de su generacin trmica local, se interconectar al
SEIN a travs de las siguientes nuevas instalaciones:
ECP-0034-10
VERSION A
Cortocircuito para la
Bellavista y Sub-estaciones
Objetivo
Los objetivos del presente estudio son:
ECP-0034-10
VERSION A
Recomendaciones y Conclusiones.
8
Cortocircuito para la
Bellavista y Sub-estaciones
2.
ECP-0034-10
VERSION A
Cortocircuito para la
Bellavista y Sub-estaciones
3.
SUB-ESTACIN TOCACHE
3.1.1.
Proteccin de la Nueva Baha L.T. 138 kV
Tocache Bellavista
Esta baha ser protegida por dos rels de distancia
multifuncin (Principal/Respaldo) modelo REL670/ABB,
con funciones:
b)
Recierre (79).
SUB-ESTACIN BELLAVISTA
3.2.1.
Tocache
10
Cortocircuito para la
Bellavista y Sub-estaciones
Recierre (79).
3.2.2.
Proteccin
Bellavista Tarapoto
de
la
Baha
de
L.T.
138kV
Sobrecorriente Direccional
(67/67N)
Recierre (79).
de fases y tierra
3.2.3.
Proteccin del Transformador de Potencia de
la Nueva S.E. Bellavista
ECP-0034-10
VERSION A
11
Cortocircuito para la
Bellavista y Sub-estaciones
El
nuevo
transformador
de
potencia
de
(138131%)/10kV y 15MVA (ONAN) y grupo de
conexin YNd5, ser protegido por un rel diferencial,
modelo 7UT613/SIEMENS, con funciones:
3.2.4.
Proteccin de cinco (05) Reactores de 10 kV,
2.5 MVAR (c/u)
Cada reactor ser protegido por el rel de
sobrecorriente, modelo 7SJ610/SIEMENS, con funciones:
3.2.6.
Proteccin del Transformador de Potencia de
la S.E. Bellavista
El transformador de potencia de la S.E. Bellavista
Existente de (132131%)/22.9/10kV y 15/15/5.3 MVA
(ONAN) y 20/20/7 MVA (ONAF) y grupo de conexin
YNynOd5 es protegido por el rel diferencial
TPU2000R/ABB con las funciones:
ECP-0034-10
VERSION A
12
Cortocircuito para la
Bellavista y Sub-estaciones
3.2.7.
Proteccin de las Celdas de Salida 22.9kV de
la S.E. Bellavista
En 22.9kV se cuenta con cinco (05) salidas. Cada uno es
protegido por un recloser HAWER, el cual posee un rel
de sobrecorriente Microtrip 2, con funciones:
SUB-ESTACIN TARAPOTO
3.3.1.
Proteccin
Tarapoto Bellavista
de
la
Baha
de
L.T.
138kV
ECP-0034-10
VERSION A
13
Cortocircuito para la
Bellavista y Sub-estaciones
Sobrecorriente Direccional
(67/67N)
Recierre (79).
de fases y tierra
3.3.2.
Proteccin de
Tarapoto Moyobamba
la
Baha
de
L.T.
138kV
Recierre (79).
3.3.3.
Sobrecorriente
(67P/67N).
Direccional
de
fases
tierra
14
Cortocircuito para la
Bellavista y Sub-estaciones
3.3.4.
Proteccin del Transformador de Potencia de
la S.E. Tarapoto
El transformador de potencia de la S.E. Tarapoto
Existente de (132131%)/22.9/10kV y 25/7/25MVA
(ONAN) y 30/9/30MVA (ONAF) y grupo de conexin
YNyn0d5 es protegido por un rel diferencial
TPU2000R/ABB con funciones:
3.3.5.
Proteccin de las Celdas de Salida 22.9kV de
la S.E. Tarapoto
En 22.9kV se cuenta con dos salidas (Alim 2 - Lamas y
Alim 6 - Juan Guerra). Cada uno es protegido por un rel
de sobrecorriente marca ABB, modelo SPAJ 141C, con
funciones:
ECP-0034-10
VERSION A
15
Cortocircuito para la
Bellavista y Sub-estaciones
SUB-ESTACIN MOYOBAMBA
3.4.1.
Proteccin de
Moyobamba Tarapoto
la
Baha
de
L.T.
138kV
ECP-0034-10
VERSION A
16
Cortocircuito para la
Bellavista y Sub-estaciones
Recierre (79).
Sobrecorriente
(67P/67N).
Direccional
de
fases
tierra
3.4.2.
Proteccin del Transformador de Potencia de
la S.E. Moyobamba
El transformador de potencia de la S.E. Moyobamba
Existente de (132131%)/22.9/10kV y 15/15/7MVA
(ONAN) y 20/20/9MVA (ONAF) y grupo de conexin
YNyn0d5 es protegido por un rel diferencial
KBCH130/ALSTOM con funcin:
3.4.3.
ECP-0034-10
VERSION A
17
Cortocircuito para la
Bellavista y Sub-estaciones
3.4.4.
Proteccin de las Celdas de Salida 10kV de la
S.E. Moyobamba
La celda de salida 1 y 3 cuenta para su proteccin con
rels de sobrecorriente SPAJ140C/ABB y IAC52B con
funciones:
e)
SUB-ESTACIN RIOJA
3.5.1.
Proteccin
Moyobamba Rioja
de
Llegada
de
L.T.
60kV
Rioja
ECP-0034-10
VERSION A
18
Cortocircuito para la
Bellavista y Sub-estaciones
3.5.3.
3.5MVA
3.5.4.
Proteccin de Celdas de Salida 20kV del
Transformador 3.5MVA
Las salidas 1, 2, 3 y 4 son protegidas por rels de
sobrecorriente modelo IAC52B/GE con funcin:
3.5.5.
4.5MVA
ECP-0034-10
VERSION A
19
Cortocircuito para la
Bellavista y Sub-estaciones
3.5.6.
Proteccin de la Celda de Salida 20kV del
Transformador 4.5MVA
La nica salida que alimenta CEMENTOS SELVA es
protegido por un rel de sobrecorriente modelo
SPAA121C/ABB con funcin:
f)
Rioja
3.6.2.
Proteccin del Transformador de Potencia de
10/11.5MVA
El transformador de potencia de la S.E. Nueva Cajamarca
Existente de (6022.5%)/20KV, 10MVA (ONAN),
11.5MVA (ONAF) y grupo de conexin YNd11, es
protegido por un rel diferencial multifuncin modelos
T60/GE con funcin:
3.6.3.
Proteccin de la Celda de Llegada 10kV y
Salidas 10kV
La celda de llegada general 10kV es protegido a travs
de dos (02) rels de sobrecorriente multifuncin modelos
F650/GE y REF541/ABB, con funciones:
ECP-0034-10
VERSION A
Cortocircuito para la
Bellavista y Sub-estaciones
g)
SUB-ESTACIN GERA I
3.7.1.
Proteccin
Moyobamba Gera I
de
Llegada
de
L.T.
60kV
3.7.2.
Proteccin del Transformador de Potencia de
10/3/10MVA
El transformador de potencia de la S.E. Gera Existente
de (6022.5%)/22.9/10KV, 10/3/10MVA (ONAN) y
grupo de conexin YNynd5, es protegido por un rel
diferencial multifuncin modelo TPU2000R/ABB con
funcin:
3.7.3.
ECP-0034-10
VERSION A
21
Cortocircuito para la
Bellavista y Sub-estaciones
3.7.4.
5.
Objetivo
Los
clculos
obtenidos
nos
permiten
observar
el
comportamiento del sistema en estado estacionario,
determinndose los niveles de tensin en barra y la
distribucin del flujo de potencia (Potencia Activa y Reactiva).
Adems nos permite verificar la capacidad de transmisin de
sus equipos elctricos, observando que no operen en
condiciones de sobrecarga y/o niveles de tensin en barras
fuera del rango permitido por la norma tcnica de calidad
(NTCSE) y el COES.
ECP-0034-10
VERSION A
22
Cortocircuito para la
Bellavista y Sub-estaciones
b.
Metodologa Tcnica
Para evaluar los resultados de flujo de carga en rgimen
estacionario se consideran como criterios de calidad y
confiabilidad que el sistema debe satisfacer las siguientes
condiciones:
Niveles de tensin admisibles en barra
Operacin Normal
Nominal)
5%VN
(VN:
Tensin
Operacin Normal
Nominal)
100%SN
(SN:
Pot.
ECP-0034-10
VERSION A
23
Cortocircuito para la
Bellavista y Sub-estaciones
c.
ECP-0034-10
VERSION A
24
Cortocircuito para la
Bellavista y Sub-estaciones
determinar
Maxima Demanda =
Media Demanda =
Minima Demanda =
las
siguientes
30MW
25MW
15MW
SUBESTAC
ION
BELLAVISTA
SALIDAS
CODI
GO
BELLAVIST BEA
S06
SAPOSOA BES01
ECP-0034-10
VERSION A
Act.Po
w.
MW
MAXIMA
React.P
ow.
Mvar
fdp
10
0.500
22.9
0.570
kV
MINIMA
React.P
ow.
Mvar
fdp
Act.Po
w.
MW
0.276
0.88
0.240
0.191
0.78
0.000
1.00
0.195
0.000
1.00
25
Cortocircuito para la
Bellavista y Sub-estaciones
BIAVO
PICOTA
SISA
S-1
JUANJUI
S-2
S-3
BES03
BES04
BES05
BS021
BS022
BS023
22.9
0.400
0.187
0.91
0.281
0.000
1.00
22.9
1.200
0.644
0.88
0.926
0.320
0.95
22.9
0.705
0.100
0.99
0.235
0.122
0.89
10
0.950
0.377
0.93
0.340
0.252
0.80
10
0.310
0.092
0.96
0.129
0.106
0.77
10
0.174
0.076
0.92
0.082
0.080
0.72
MAXIMA
SUBESTAC
ION
SALIDAS
ALIM 1
ALIM 3
ALIM 4
TARAPOT
O
ALIM 5
ALIM 7
ALIM 2
ALIM 6
S-1
MOYOBA
MBA
S-2
S-3
RIOJA
NUEVA
CAJAMAR
CA
GERA I
SERSA
YORONG
OS
YURACYA
CU
SURITOR
CEMENTO
SELVA
SAN
FERNAND
O
NV
CAJAMAR
CA
PSE GERA
CODI
GO
Act.P
ow.
React.P
ow.
fdp
Act.Pow.
React.P
ow.
fdp
MW
Mvar
MW
Mvar
10
3.299
1.171
0.94
1.197
0.887
0.8
10
2.42
0.737
0.96
0.9
0.59
0.84
10
1.7
0.676
0.93
0.669
0.499
0.8
10
1.46
0.497
0.95
0.538
0.375
0.82
kV
TAS01
TAS03
TAS04
TAS05
TAS07
TAS02
TAS06
MSS01
MSS02
MSS03
RI-S02
10
2.5
0.637
0.97
0.77
0.501
0.84
22.9
1.75
0.804
0.91
0.685
0.572
0.77
22.9
0.85
0.212
0.97
0.355
0.128
0.94
10
1.7
0.443
0.97
0.563
0.385
0.83
10
0.625
0.246
0.93
0.247
0.235
0.72
10
1.3
0.336
0.97
0.46
0.267
0.86
10
1.4
0.314
0.98
0.478
0.278
0.86
RI-S01
10
0.052
0.011
0.98
0.024
0.023
0.72
RI-S03
10
0.35
0.14
0.93
0.146
0.1
0.83
RI-S04
10
0.725
0.151
0.98
0.281
0.168
0.86
RI-S05
20
2.68
0.474
0.98
1.422
0.226
0.99
NCS01
10
0.25
0.226
0.74
0.053
0.034
0.84
NCS02
10
2.05
0.442
0.98
0.629
0.272
0.92
GES01
10
0.6
0.147
0.97
0.172
0.123
0.81
30.52
9.416
12.017
6.734
TOTA
L=
ECP-0034-10
VERSION A
MINIMA
26
Cortocircuito para la
Bellavista y Sub-estaciones
SUBESTAC
ION
BELLAVIST
A
JUANJUI
TARAPOTO
MOYOBAM
BA
GERA I
GERA II
SALIDAS
CODI
GO
kV
MAXIMA
MINIMA
Act.Pow.
Act.Pow.
MW
MW
CAT 1
0.48
CAT 2
0.48
0.858
0.790
CAT 3
0.48
1.405
1.300
CAT 4
0.48
1.361
1.260
EMD
4.16
1.713
SKODA-310
2.4
WARTSILA 1
10
5.336
5.600
WARTSILA 2
10
5.402
5.700
3512
0.48
0.756
CAT 2
C32
0.48
0.695
CAT 3
3412
0.48
0.417
CUMMINS
0.48
0.940
CAT 1
0.48
1.507
1.500
CAT 2
0.48
CAT 1
1.541
1.500
CAT 3412
0.354
EMD
1.436
ALKO
0.698
GE 1
10
2.807
GE 2
10
2.838
GE 1
10
TOTAL
=
1.756
31.820
17.650
ECP-0034-10
VERSION A
27
Cortocircuito para la
Bellavista y Sub-estaciones
SUBESTA
CION
SALIDAS
BELLAVIS
TA
SAPOSOA
BELLAVIST
A
BIAVO
PICOTA
SISA
S-1
JUANJUI
S-2
S-3
ALIM 1
ALIM 3
TARAPOTO
ALIM 4
ALIM 5
SUBESTACI
SALIDAS
ON
ALIM 7
TARAPOTO
TAS07
TAS02
TAS06
MSS01
MSS02
MSS03
0.542
0.299
22.9
0.617
0.000
22.9
0.433
0.203
22.9
1.300
0.697
22.9
0.764
0.108
10
1.029
0.408
10
0.336
0.100
10
0.188
0.082
10
3.573
1.268
10
2.621
0.798
10
1.841
0.732
10
1.581
0.538
kV
Act.P
ow.
MW
MAXIMA
React.Po
w.
Mvar
0.69
22.9
1.895
0.871
22.9
0.921
0.23
10
1.841
0.48
10
0.677
0.266
10
1.408
0.364
RI-S02
10
1.516
0.34
RI-S01
10
0.056
0.012
RI-S03
10
0.379
0.152
RI-S04
10
0.785
0.164
CEMENTO
RI-S05
SELVA
20
2.902
0.513
ALIM 2
S-2
S-3
SERSA
YORONG
OS
YURACYA
CU
SURITOR
ECP-0034-10
VERSION A
CODI
GO
10
2.708
S-1
RIOJA
BES06
BES01
BES03
BES04
BES05
BS021
BS022
BS023
TAS01
TAS03
TAS04
TAS05
kV
10
ALIM 6
MOYOBAMB
A
CODI
GO
MAXIMA
React.Po
w.
Mvar
Act.Po
w.
MW
fd
p
0.8
8
1.0
0
0.9
1
0.8
8
0.9
9
0.9
3
0.9
6
0.9
2
0.9
4
0.9
6
0.9
3
0.9
5
Act.Po
w.
MW
MINIMA
React.Po
w.
Mvar
0.260
0.207
0.211
0.000
0.304
0.000
1.003
0.347
0.255
0.132
0.368
0.273
0.140
0.115
0.089
0.087
1.296
0.961
0.975
0.639
0.725
0.540
0.583
0.406
fd Act.Po
p
w.
MW
0.9
0.834
7
0.9
0.742
1
0.9
0.384
7
0.9
0.61
7
0.9
0.268
3
0.9
0.498
7
0.9
0.518
8
0.9
0.026
8
0.9
0.158
3
0.9
0.304
8
0.9
1.54
8
fd
p
0.7
8
1.0
0
1.0
0
0.9
5
0.8
9
0.8
0
0.7
7
0.7
2
0.8
0
0.8
4
0.8
0
0.8
2
MINIMA
React.Po
w.
Mvar
fdp
0.543
0.84
0.619
0.77
0.139
0.94
0.417
0.83
0.255
0.72
0.289
0.86
0.301
0.86
0.025
0.72
0.108
0.83
0.182
0.86
0.245
0.99
28
Cortocircuito para la
Bellavista y Sub-estaciones
NUEVA
CAJAMARCA
GERA I
d.
SAN
FERNAND
O
NV
CAJAMAR
CA
PSE GERA
NCS01
10
0.271
0.245
0.7
4
0.057
0.037
0.84
NCS02
10
2.22
0.479
0.9
8
0.681
0.295
0.92
GES01
10
0.65
0.159
0.9
7
0.186
0.133
0.81
TOT
AL
33.05
3
10.198
13.01
4
7.293
Escenarios Evaluados
Para el anlisis de flujo de carga se ha considerado los
siguientes casos:
Escenario B
:
Mnima Demanda)
OPERACIN
NORMAL
(Mxima
ECP-0034-10
VERSION A
Escenario A
Escenario C
Caso C.1.Aislada.
:
L.T
(F/S)
Operacin
29
Cortocircuito para la
Bellavista y Sub-estaciones
e.
Escenario A
(Reactor
Avenida Mnima
Tension S.E. Tocache (Antes de la Energizacion) =
139.14kV (1.008p.u.).
Tension S.E. Tocache (Despues de la Energizacion) =
143.62kV (1.041p.u.).
Tension S.E. Bellavista (Despues de la Energizacion) =
141.84kV (1.028p.u.).
Estiaje Mnima
Tension S.E. Tocache (Antes de la Energizacion) =
141.34kV (1.024p.u.).
Tension S.E. Tocache (Despues de la Energizacion) =
142.73kV (1.034p.u.).
Tension S.E. Bellavista (Despues de la Energizacion) =
140.96kV (1.021p.u.).
ECP-0034-10
VERSION A
30
Cortocircuito para la
Bellavista y Sub-estaciones
ECP-0034-10
VERSION A
31
Cortocircuito para la
Bellavista y Sub-estaciones
Escenario B
:
Mnima Demanda)
OPERACIN
NORMAL
(Mxima
ECP-0034-10
VERSION A
32
Cortocircuito para la
Bellavista y Sub-estaciones
Escenario C
Demanda)
CONTIGENCIA
N-1
(Mxima
ECP-0034-10
VERSION A
33
Cortocircuito para la
Bellavista y Sub-estaciones
ECP-0034-10
VERSION A
34
Cortocircuito para la
Bellavista y Sub-estaciones
ECP-0034-10
VERSION A
35
Cortocircuito para la
Bellavista y Sub-estaciones
6.
CALCULOS DE CORTOCIRCUITO
6.1
Objetivos
El clculo de corrientes de cortocircuito tiene como objetivo
determinar las corrientes mximas y mnimas de falla del rea
en estudio cuyos resultados permitirn:
6.2
6.3
Metodologa y Criterios
ECP-0034-10
VERSION A
Cortocircuito para la
Bellavista y Sub-estaciones
6.4
6.5
Caso 01 :
SEIN
Caso 02 :
F/S
Caso 03 :
6.5.1.
Caso
01:
Interconectado al SEIN
Operacin
del
Sistema
37
Cortocircuito para la
Bellavista y Sub-estaciones
Transformador
15MVA
Juanjui
Tarapoto
Moyobamba
Rioja
Tocache
ECP-0034-10
VERSION A
Transformador
30/9/30MVA
Transformador
20/20/9MVA
Transfomador
3.5MVA
Transfomador
4.5MVA
Nueva
Cajamarca
Transfomador
11.5MVA
Gera I
Transformador
10/3/10MVA
Gera II
Subesta
cin
Transfomador
2MVA
Transfomador
2.2MVA
10
13
8
10
22.
9
10
13
8
22.
9
10
13
8
60
10
60
20
60
20
60
20
60
22.
9
10
10
4.1
6
7.141
1.058
1.268
6.629
1.922
1.119
0.431
1.857
0.900
0.989
1.158
4.026
5.164
11.194
0.011
0.740
0.793
1.180
5.426
1.603
0
0.904
1.054
0.904
1.244
0.716
1.051
1.076
1.176
0
1.176
0
0.910
0
1.335
1.169
1.312
5.768
3.306
2.222
3.001
4.757
0.022
Cortocircuito para la
Bellavista y Sub-estaciones
Bellavista
Transformad
or
20/20/7MVA
Transformad
or 15MVA
Juanjui
Transfomado
r 2MVA
Tarapoto
Transformad
or
30/9/30MVA
Moyobam
ba
Transformad
or
20/20/9MVA
Rioja
Transfomado
r 3.5MVA
Transfomado
r 4.5MVA
Nueva
Cajamarc
a
Transfomado
r 11.5MVA
Gera I
Transformad
or
10/3/10MVA
Gera II
Transfomado
r 2.2MVA
ECP-0034-10
VERSION A
138
22.9
10
138
10
22.9
10
138
22.9
10
138
60
10
60
0.809
2.634
5.421
0.809
5.152
0.849
1.416
0.759
3.127
8.683
0.569
0.912
4.192
0.693
0.804
2.210
1.837
0.804
1.816
0.793
1.064
0.755
2.495
1.915
0.567
0.900
1.727
0.680
0.799
1.665
0.972
0.799
0.967
0.729
0.752
0.751
1.783
0.984
0.564
0.883
0.947
0.665
1.125
3.567
0
1.125
1.743
0.334
0.712
1.032
4.641
0.010
0.708
1.429
0
1.041
0.860
0.262
0
0.860
0.115
0.154
0.102
0.818
0.263
0.009
0.611
0.594
0
0.513
0.608
0.132
0
0.608
0.058
0.098
0.054
0.593
0.132
0.009
0.491
0.327
0
0.304
20
60
20
60
0.824
0.693
0.970
0.549
0.788
0.680
0.913
0.541
0.731
0.665
0.828
0.532
0
1.041
0
0.807
0
0.513
0
0.465
0
0.304
0
0.290
20
0.816
0.769
0.706
60
22.9
10
10
0.827
0.913
4.468
2.420
0.815
0.885
1.755
1.264
0.800
0.830
0.954
0.795
1.186
1.185
1.936
2.528
0.557
0.255
0.114
0.114
0.318
0.131
0.057
0.057
4.16
3.697
0.780
0.405
0.020
0.014
0.011
39
Cortocircuito para la
Bellavista y Sub-estaciones
6.5.2.
Caso 02: L.T. 138kV Tingo Mara Hunuco
(L-1121) F/S
ESTIAJE MAXIMA DEMANDA 2011
Trifsic
Monofsica
a
Subestaci
Ik''A
Ubicacin
kV
3*I0 (kA)
n
(kA)
R = 0
R = 0
13
Tocache
Barra
1.076
0.995
8
13
1.030
1.241
8
Transformador 22.
3.419
3.991
20/20/7MVA
9
Bellavista
10
7.085
0
13
1.030
1.241
Transformador
8
15MVA
10
6.546
1.917
22.
1.116
0.431
Transfomador
9
Juanjui
2MVA
10
1.854
0.900
13
0.973
1.144
8
Transformador 22.
Tarapoto
3.997
5.132
30/9/30MVA
9
10 11.115
0.011
13
0.732
0.788
8
Transformador
Moyobamba
60
1.175
1.597
20/20/9MVA
10
5.408
0
60
0.901
1.172
Transfomador
3.5MVA
20
1.053
0
Rioja
60
0.901
1.172
Transfomador
4.5MVA
20
1.242
0
60
0.714
0.908
Nueva
Transfomador
Cajamarca
11.5MVA
20
1.049
0
60
1.072
1.331
Transformador 22.
Gera I
1.168
1.311
10/3/10MVA
9
10
5.758
2.221
10
3.304
3.000
Transfomador
Gera II
4.1
2.2MVA
4.756
0.022
6
ECP-0034-10
VERSION A
40
Cortocircuito para la
Bellavista y Sub-estaciones
Monofsica
3*I0 (kA)
R=
R = 100
50
0.718
0.543
0.852
0.606
0.263
0.132
0.852
0.606
0.115
0.058
0.154
0.098
0.103
0.054
0.813
0.592
0.263
0.132
0.009
0.009
0.609
0.490
0.593
0.327
0.513
0.304
0.513
0.304
0.464
0.290
0.557
0.318
0.255
0.131
0.114
0.057
41
Cortocircuito para la
Bellavista y Sub-estaciones
Gera II
ECP-0034-10
VERSION A
Transfomad
or 2.2MVA
10
2.420
4.16
3.696
5
1.26
4
0.78
0
0.795
2.527
0.114
0.057
0.405
0.020
0.014
0.011
42
Cortocircuito para la
Bellavista y Sub-estaciones
6.5.3.
del SEIN
Subestaci
n
Bellavista
Juanjui
Tarapoto
Moyobamba
Rioja
Nueva
Cajamarca
Gera I
Gera II
ECP-0034-10
VERSION A
Caso 03
Monofsica
3*I0 (kA)
R = 0
0.786
3.329
0
0.786
1.804
0.427
0.891
0.854
4.420
0.011
0.662
1.440
0
1.088
0
1.088
0
0.856
0
1.236
1.282
2.195
2.964
0.022
43
Cortocircuito para la
Bellavista y Sub-estaciones
Subestaci
n
Ubicacin
Transformador
20/20/7MVA
Bellavista
Transformador
15MVA
Juanjui
Tarapoto
Moyobamb
a
Transfomador
2MVA
Transformador
30/9/30MVA
Transformador
20/20/9MVA
Transfomador
3.5MVA
Rioja
Transfomador
4.5MVA
Nueva
Cajamarca
Gera I
ECP-0034-10
VERSION A
Transfomador
11.5MVA
Transformador
10/3/10MVA
Monofsica
3*I0 (kA)
R=
R=
R=
0
50
100
0.695
0.619
0.504
2.927
0.262
0.132
0.695
0.619
0.504
1.633
0.115
0.058
0.331
0.154
0.098
0.706
0.102
0.054
0.759
0.669
0.533
3.956
0.263
0.132
0.010
0.009
0.009
0.590
0.536
0.452
1.280
0.584
0.326
0.963
0.504
0.302
0.963
0.504
0.302
0.760
0.456
0.288
1.098
0.550
0.317
1.157
0.255
0.131
1.913
0.114
0.057
44
Cortocircuito para la
Bellavista y Sub-estaciones
Gera II
ECP-0034-10
VERSION A
Transfomador
2.2MVA
10
2.383
4.16
3.669
1.26
2
0.78
0
0.796
2.499
0.114
0.057
0.405
0.020
0.014
0.011
45
Cortocircuito para la
Bellavista y Sub-estaciones
6.5.4.
C.T.
CLA
SE
I
saturaci
n (A)
I
falla
(A)
OBSERVACIO
NES
138
600 / 5
5P20
12000
1076
NO SE SATURA
138
600 / 5
5P20
12000
1030
NO SE SATURA
SALIDA TARAPOTO
138
200 / 5
5P20
4000
1030
NO SE SATURA
TRANSFORMADOR
15MVA, 138/10KV
138
100 / 1
5P20
2000
1030
NO SE SATURA
10
1000 / 1
5P20
20000
6546
NO SE SATURA
TRANSFORMADOR
20/20/7MVA,
138
100/ 5
5P20
2000
1030
NO SE SATURA
22.9
500 / 5
5P20
10000
3419
NO SE SATURA
10
400 / 5
5P20
8000
7085
NO SE SATURA
138
200 / 5
5P20
4000
973
NO SE SATURA
138
100 / 5
5P20
2000
973
NO SE SATURA
138
150 / 5
5P20
3000
973
NO SE SATURA
22.9
250/5
5P20
5000
NO SE SATURA
10
2000 / 5
5P20
40000
138
100/ 5
5P20
2000
3997
1111
5
732
60
200/5
5P20
4000
1175
NO SE SATURA
10
550/5
5P20
11000
5408
NO SE SATURA
UBICACIN
S.E.
TOCACHE
S.E.
BELLAVIST
A
SALIDA A
BELLAVISTA
SALIDA TOCACHE
138/22.9/10KV
S.E.
TARAPOTO
S.E.
MOYOBAM
BA
SALIDA A
BELLAVISTA
SALIDA A
MOYOBAMBA
TRANSFORMADOR
30/9/30 MVA,
132/22.9/10 KV
TRANSFORMADOR
20/20/9 MVA,
132/60/10KV
NO SE SATURA
NO SE SATURA
ECP-0034-10
VERSION A
46
Cortocircuito para la
Bellavista y Sub-estaciones
7.
ECP-0034-10
VERSION A
47
Cortocircuito para la
Bellavista y Sub-estaciones
Ajuste de la Zona 1
El alcance de la zona 1 normalmente se ajusta entre un 80
o 90% de la impedancia de la lnea, para evitar operaciones
innecesarias cuando se presente una falla ms all de la
barra remota.
La primera zona de la proteccin de distancia es
normalmente de operacin instantnea y tiene por finalidad
proveer un despeje rpido de fallas que ocurran a lo largo
de la lnea.
Z1 = K x ZLnea ;
tz1 = 0 ms.
Donde:
K
Constante
Ajuste de la zona 2
El objetivo de esta zona es proteger completamente la lnea
y actuar como zona de respaldo ante la no operacin de la
zona 1 de la lnea ubicada en la subestacin remota.
Como valor mnimo de ajuste se escoge el 120% de la
impedancia de la lnea a proteger.
Z2 = 120% ZLINEA
ECP-0034-10
VERSION A
Cortocircuito para la
Bellavista y Sub-estaciones
ADYACENTE
49
Cortocircuito para la
Bellavista y Sub-estaciones
b)
Proteccin de Sobrecorriente
50
Cortocircuito para la
Bellavista y Sub-estaciones
ECP-0034-10
VERSION A
51
Cortocircuito para la
Bellavista y Sub-estaciones
ECP-0034-10
VERSION A
52
Cortocircuito para la
Bellavista y Sub-estaciones
K
T =Mx
E
I
1
Ipu
Donde:
T
M
I
Ipu
K, E
:
:
:
:
:
CURVA IEC
0.140
0.020
Very Inverse
13.500
1.000
Extremely Inverse
80.000
2.000
120.000
1.000
Normal Inverse
7.3
ECP-0034-10
VERSION A
53
Cortocircuito para la
Bellavista y Sub-estaciones
ECP-0034-10
VERSION A
54
Cortocircuito para la
Bellavista y Sub-estaciones
:
1.15 1.2 pu
1 30 segundos.
ECP-0034-10
VERSION A
55
U>>
tU>>
:
:
Cortocircuito para la
1.2 1.3 pu
0.1 10 segundos.
S.E TOCACHE
8.1.1
Estos ajustes fueron determinados por REP en el estudio PEAMP5-GT-112-2009-TIN-94-115, del cual se extrae:
Operation Dir
X1
R1
X0
R0
RFPP
RFPE
t PP
t PE
b.
Zona 1
Forward
64.90
17.15
202.86
50.39
60
70
0.00
0.00
AJUSTES PRIMARIOS
Zona 2
Zona 3
Zona 5
Forward
Forward
Reverse
91.62
141.07
54.96
24.21
37.27
14.52
286.39
440.97
171.80
71.14
109.54
42.68
60
60
60
70
80
80
0.40
1.00
1.50
0.40
1.00
1.50
Unid
---Ohm
Ohm
Ohm
Ohm
Ohm
Ohm
seg
seg
S.E BELLAVISTA
8.2.1
Estos ajustes fueron determinados por REP en el estudio PEAMP5-GT-112-2009-TIN-94-115, del cual se extrae:
Operation Dir
X1
R1
X0
ECP-0034-10
VERSION A
Zona 1
Forward
64.90
17.15
202.86
AJUSTES PRIMARIOS
Zona 2
Zona 3
Zona 5
Forward
Forward
Reverse
91.62
157.57
41.21
24.21
41.63
10.89
286.39
492.54
128.82
Unid
---Ohm
Ohm
Ohm
56
Cortocircuito para la
Bellavista y Sub-estaciones
R0
RFPP
RFPE
t PP
t PE
50.39
60
70
0.00
0.00
8.2.2
71.14
60
70
0.40
0.40
122.35
60
80
1.00
1.00
32.00
60
80
1.50
1.50
Ohm
Ohm
Ohm
seg
seg
PT
Kz
ABB
:
REL 511
200/5A
132 0.10
/
kV
3
3
33
tiene los
siguientes parmetros:
L
R1
X1
Z1
=
=
=
=
80.8km
11.50 -prim
40.34 -prim
41.95 < 74
R0
X0
Z0
= 25.81 -prim
= 133.08 -prim
= 135.56 < 79
ECP-0034-10
VERSION A
Z
Lnea
Z Lnea
Adyace
nte
Z Trafo
Remoto
(S.E.
Tarapoto)
41.95
50.0
89.13
Z
Lnea
Rever
sa
77.72
Z Trafo
Local
124.42
57
Cortocircuito para la
Bellavista y Sub-estaciones
Impedancia de carga
X0- X1
;
3x1
KN
0.776
B. Proteccin de Distancia
Impedancia Zona 1
58
Cortocircuito para la
Bellavista y Sub-estaciones
=
=
0.0 s.
0.0 s.
Impedancia Zona 2
ECP-0034-10
VERSION A
59
Cortocircuito para la
Bellavista y Sub-estaciones
ECP-0034-10
VERSION A
60
Cortocircuito para la
Bellavista y Sub-estaciones
Impedancia Zona 3
61
Cortocircuito para la
Bellavista y Sub-estaciones
62
Cortocircuito para la
Bellavista y Sub-estaciones
POTT
(Disparo
Permisivo
D. Recierre
Solo se debe activar un recierre monofsica (1ph). El tiempo
de reclamo se ajustar en 180s
TReclaim= 180.0s
El tiempo muerto se ajustara en 500 mseg
T1S= 500 mseg
E. Sincronismo
Se propone ajustar esta funcin con los siguientes valores:
ECP-0034-10
VERSION A
63
Cortocircuito para la
Bellavista y Sub-estaciones
UDiff
= 10%
Phase Diff
= 20.0 Deg
Freq Diff
= 0.10 Hz.
A continuacin se muestra una tabla resumen de ajustes
para el rel de distancia.
Zona 1
Operacin
On
AJUSTES SECUNDARIOS
Zona
Zona
Zona
2
3
4
On
On
On
0.91
0.92
0.26
10.61
2.99
2.06
0.58
3.03
2.73
4.24
3.94
On
On
On
0.25
Forwa
rd
0.85
Forwa
rd
1.50
Rever
se
Seg.
0.98
1.81
R1
0.28
0.51
X0
3.23
5.96
R0
0.63
1.15
RFPP
1.82
3.03
RFPE
2.42
4.24
Timer
On
0.00
Operarion Dir
Forward
I>
IN>
X1GFCF
w
X0GFCF
w
ECP-0034-10
VERSION A
REFER.
SECUNDARIO
150%Ir
20%Ir
X1GFCRv
1.36
X0GFCRv
4.48
RFGFC
7.58
RFNGFC
6.36
ohm/Loop
Rld
4.77
ohm/Loop
45
Angulo
3.54
11.67
A
A
ohm/phas
e
ohm/phas
e
ohm/phas
e
ohm/phas
e
ohm/Loop
ARGLd
--ohm/pha
se
ohm/pha
se
ohm/pha
se
ohm/pha
se
ohm/loo
p
ohm/loo
p
3.22
X1
Unid
64
Cortocircuito para la
Bellavista y Sub-estaciones
c.
S.E TARAPOTO
8.3.1
PT
Kz
ABB
:
REL511
200/5A
132 0.10
/
kV
3
3
33
=
=
=
=
80.8 km
11.50 -prim
40.34 -prim
41.95 < 74
R0
X0
Z0
= 25.81 -prim
= 133.08 -prim
= 135.56 < 79
Z
Lnea
Z Lnea
Adyace
nte
Z Trafo
Remoto
(S.E.
Bellavista)
41.95
77.72
124.42
Z
Lnea
Rever
sa
50.0
Z Trafo
Local
89.13
Impedancia de carga
ECP-0034-10
VERSION A
65
Cortocircuito para la
Bellavista y Sub-estaciones
X0- X1
;
3X1
KN
0.776
B. Proteccin de Distancia
Impedancia Zona 1
El alcance reactivo propuesto para fases y tierra de esta
zona cubre hasta el 80% de la reactancia de la L.T
Tarapoto-Bellavista
X1 = 0.80 x (40.34) = 32.27 -prim.
R1 = 9.20 -prim.
X0 = 106.46 -prim.
X0 = 20.65 -prim.
El alcance resistivo fase fase lo ajustamos para cubrir
fallas bifsicas de 15 Ohm en la lnea hasta el 50% de la
lnea.
RFPP = 90.00 -prim. (Ajuste en Ohm/loop)
El alcance resistivo fase tierra, lo ajustamos para
detectar fallas monofsicas hasta 40 Ohm al 50% de la
lnea y 90 Ohm al 1% de la lnea; esto se debe a que el
flujo potencia en la lnea tiene sentido importador.
RFPE = 140.00 -prim. (Ajuste en Ohm/loop)
ECP-0034-10
VERSION A
66
Cortocircuito para la
Bellavista y Sub-estaciones
=
=
0.0 s.
0.0 s.
Impedancia Zona 2
El alcance reactivo propuesto para fases y tierra de esta
zona cubre hasta el 40% de la impedancia de la lnea L.T
Bellavista-Tocache (Lnea adyacente).
X1 = 40.34 + 0.4 x (74.75) = 70.24 -prim.
R1 = 20.02 -prim.
X0 = 231.70 -prim.
R0 = 44.93 -prim.
ECP-0034-10
VERSION A
67
Cortocircuito para la
Bellavista y Sub-estaciones
ECP-0034-10
VERSION A
=
=
0.30 s.
0.30 s.
68
Cortocircuito para la
Bellavista y Sub-estaciones
Impedancia Zona 3
El alcance reactivo de la Zona 3 lo ajustamos al 110% de
la suma de la reactancias de las Lneas L.T TarapotoBellavista y L.T Bellavista-Tocache.
X1 = 1.10 x (40.34+74.75) = 126.60 -prim.
R1 = 36.08 -prim.
ECP-0034-10
VERSION A
69
Cortocircuito para la
Bellavista y Sub-estaciones
X0 = 417.60 -prim.
R0 = 80.98 -prim
El alcance resistivo fase fase lo ajustamos en:
RFPP = 90.00 -prim. (Ajuste en Ohm/loop)
El alcance resistivo fase tierra lo ajustamos en:
RFPP = 140.00 -prim. (Ajuste en Ohm/loop)
La temporizacin de esta zona la ajustamos:
tPP
tPE
=
=
0.85 ms.
0.85 ms.
Impedancia Zona 4
1.50s.
70
tPE
Cortocircuito para la
1.50s.
prim.
X1GFCRw
= 1.5 x X1 (Z4)
28.84-
X0GFCRw
= 1.5 x X0 (Z4)
95.16-
RFGFC
= 2.5 x X1 (Z3)
= 225.00-
RFNGFC
= 1.5 x X1 (Z3)
= 210.00-
prim.
prim.
prim. (Ohm/loop)
prim. (Ohm/loop)
La zona de carga se ajustar como la Resistencia mnima
de carga
RLd
= 157.25-prim.
ARGLd = 45
Oscilacin de Potencia
El alcance reactivo interno se ajustar por encima del
alcance de la Zona 3.
X1PSB = 2.0 x X1 (Z3) = 253.20 -prim.
El alcance resistivo interno se ajustar por encima del
alcance de la Zona 3.
R1PSB = 2.0 x RFPE (Z3) = 280.00 -prim.(Ohm/loop)
ECP-0034-10
VERSION A
71
Cortocircuito para la
Bellavista y Sub-estaciones
D. Esquema de Teleproteccin
El esquema a utilizar ser el POTT (Disparo Permisivo
Transferido en Sobrealcance)
E. Recierre
Solo se debe activar un recierre monofsico (1ph)
El tiempo de reclamo se ajustar en 180 mseg.
tReclaim = 180.0 mseg.
El tiempo muerto se ajustar en 500 mseg.
t1S= 500 mseg.
F. Sincronismo
Se propone ajustar esta funcin con los siguientes valores:
UDiff Synch
= 10% Ur
Phase Diff
Freq Diff
= 0.10 Hz
20.0 Deg
Operacin
X1
R1
X0
R0
RFPP
RFPE
Timer
Timer
Operarion
Dir
ECP-0034-10
VERSION A
Zona 1
On
0.98
0.28
3.23
0.63
2.73
4.24
On
0.00
AJUSTES SECUNDARIOS
Zona 2
Zona 3
Zona 4
On
On
On
2.13
3.84
0.58
0.61
1.09
0.17
7.02
12.65
1.92
1.36
2.45
0.37
2.73
2.73
1.82
4.24
4.24
2.73
On
On
On
0.25
0.85
1.50
Forward
Forward
Forward
Unid
ohm/phase
ohm/phase
ohm/phase
ohm/phase
ohm/loop
ohm/loop
s
Reverse
72
Cortocircuito para la
Bellavista y Sub-estaciones
Refer.
Secunda
rio
150%Ir
I>
IN>
X1GFCF
w
X0GFCF
w
8.3.2
20%Ir
Unid
A
X1GFCRv
0.87
X0GFCRv
2.88
RFGFC
6.82
A
ohm/phas
e
ohm/phas
e
ohm/phas
e
ohm/phas
e
ohm/Loop
RFNGFC
6.36
ohm/Loop
Rld
4.77
ohm/Loop
4.22
13.92
L.T. TARAPOTO-MOYOBAMBA
138 kV
ARGLd
45
Angulo
Esta lnea cuenta con un (01) rels de distancia una principal y
otro de respaldo; ambos con la siguiente caracterstica:
Marca
Modelo
CT
PT
Kz
ALSTOM
:
EPAC3112
100/5A
138
3
0.1
3
kV
69
ECP-0034-10
VERSION A
=
=
=
=
96.30 km
13.70-prim
48.08 -prim
50.00 < 74
R0
X0
Z0
= 30.76 -prim
= 158.61 -prim
= 161.56 < 79
73
Cortocircuito para la
Bellavista y Sub-estaciones
Z
Lnea
Z Lnea
Adyace
nte
Z Trafo
Remoto
(S.E.Moyoba
mba)
50.00
N/A
127.09
Z
Lnea
Rever
sa
41.95
Z Trafo
Local
89.13
Impedancia de carga
K0
K0
= 7
B. Proteccin de Distancia
Impedancia Zona 1
El alcance de impedancia propuesto para fases y tierra
de esta zona cubre hasta el 90% de la reactancia de la
L.T Tarapoto-Moyobamba.
ECP-0034-10
VERSION A
74
Cortocircuito para la
Bellavista y Sub-estaciones
ECP-0034-10
VERSION A
0.0 s.
Impedancia Zona 2
75
Cortocircuito para la
Bellavista y Sub-estaciones
0.20 s.
Impedancia Zona 3
0.65 ms.
Impedancia Zona 4
El alcance de impedancia propuesto para fases y tierra
de esta zona cubre hasta 80% de la impedancia de la
impedancia del transformador de Moyobamba.
ECP-0034-10
VERSION A
76
Cortocircuito para la
Bellavista y Sub-estaciones
1.0s.
1.50s.
C. Esquema de Teleproteccin
El esquema a utilizar ser el POTT (Disparo Permisivo
Transferido en Sobre Alcance).
D. Recierre
Solo se debe ajustar un recierre monofsico.
El tiempo de reclamo se ajustar en 180s
El tiempo muerto se ajustar en 500mSEG
E. Sincronismo
ECP-0034-10
VERSION A
77
Cortocircuito para la
Bellavista y Sub-estaciones
U
f
= 10% UN
=
= 0.10 Hz
20.0
ECP-0034-10
VERSION A
78
Cortocircuito para la
Bellavista y Sub-estaciones
Z1
Z2
Z3
Z4
Z5
DiZ3
SECUNDA
RIO
0.652
0.87
1.449
2.198
0.304
Forward
R1m
R1b
R2
R3
R lim
0.725
1.449
1.884
2.609
2.609
Unid
ohm LV
ohm LV
ohm LV
ohm LV
ohm LV
ohm LV
ohm
ohm
ohm
ohm
ohm
LV
LV
LV
LV
LV
0.00
T1
s
0.20
T2
s
0.65
T3
s
1.00
T4
s
1.50
T1
ECP-0034-10
VERSION A
79
Cortocircuito para la
Bellavista y Sub-estaciones
8.4
S.E MOYOBAMBA
8.4.1
PT
Kz
ALSTOM
:
EPAC3112
100/5A
138
3
0.1
3
kV
69
=
=
=
=
96.30 -prim.
13.70 -prim
48.08 -prim
50.00 < 74
R0
X0
Z0
= 30.76 -prim
= 158.61 -prim
= 161.56 < 79
Z
Lnea
Z Lnea
Adyace
nte
Z Trafo
Remoto
(S.E.
Tarapoto)
50.00
41.95
89.13
Z
Lnea
Rever
sa
N/A
Z Trafo
Local
127.09
Impedancia de carga
ECP-0034-10
VERSION A
80
Cortocircuito para la
Bellavista y Sub-estaciones
Z0- Z1
=
3Z1
0.746;
KN =
B. Proteccin de Distancia
Impedancia Zona 1
0.0 s.
81
Cortocircuito para la
Bellavista y Sub-estaciones
Impedancia Zona 2
ECP-0034-10
VERSION A
0.20 s.
82
Cortocircuito para la
Bellavista y Sub-estaciones
Impedancia Zona 3
ECP-0034-10
VERSION A
0.65s.
Impedancia Zona 4
83
Cortocircuito para la
Bellavista y Sub-estaciones
1.0s.
1.50s.
C. Esquema de Teleproteccin
El esquema a utilizar ser el POTT (Disparo Permisivo
Transferido en Sobre Alcance).
D. Recierre
Solo se debe ajustar un recierre monofsico.
ECP-0034-10
VERSION A
84
Cortocircuito para la
Bellavista y Sub-estaciones
E. Sincronismo
Se propone ajustar esta funcin con los siguientes valores:
U
f
= 10% UN
=
= 0.10 Hz
20.0
ECP-0034-10
VERSION A
85
Cortocircuito para la
Bellavista y Sub-estaciones
Z1
Z2
Z3
Z4
Z5
DiZ3
R1m
R1b
R2
R3
R lim
SECUNDAR
IO
0.616
0.968
1.302
1.599
0.553
Forward
0.725
1.449
1.884
2.609
2.609
T1
T2
T3
T4
Unid
ohm LV
ohm LV
ohm LV
ohm LV
ohm LV
ohm LV
ohm LV
ohm LV
ohm LV
ohm LV
ohm LV
0.00
0.20
0.65
1.00
1.50
T1
ECP-0034-10
VERSION A
86
Cortocircuito para la
Bellavista y Sub-estaciones
9.
CALCULO
DE
LOS
AJUSTES
PARA
LA
SOBRECORRIENTE (50/51, 50N/SIN, 67/67N)
FUNCIN
DE
ECP-0034-10
VERSION A
87
Cortocircuito para la
Bellavista y Sub-estaciones
ECP-0034-10
VERSION A
88
Cortocircuito para la
Bellavista y Sub-estaciones
ECP-0034-10
VERSION A
80
Amp
(Por
89
Cortocircuito para la
Bellavista y Sub-estaciones
ECP-0034-10
VERSION A
90
Cortocircuito para la
Bellavista y Sub-estaciones
ECP-0034-10
VERSION A
91
Cortocircuito para la
Bellavista y Sub-estaciones
S.E. Bellavista
El transformador de potencia de esta subestacin est
protegido por un rel diferencial marca SIEMENS, modelo
7UT613.
Datos del Transformador de Potencia
Potencia
:
Niveles de tensin :
Grupo de conexin :
ECP-0034-10
VERSION A
15 MVA (ONAN)
1382x2.5%/10kV
YNd5.
92
T.C. (138kV)
T.C. (10kV)
:
:
Cortocircuito para la
50-100/1 A.
500-1000/1 A
50%
E. Diferencial instantnea
ECP-0034-10
VERSION A
93
Cortocircuito para la
Bellavista y Sub-estaciones
:
:
7.5I/In0
0.00 segundos.
F. Restriccin de armnicos
La energizacin del transformador de potencia puede
originar corrientes altas (Inrush) con frecuencia de 120Hz
(2da armnica), as como tambin la sobre-excitacin
intencional del sistema puede originar corrientes altas con
frecuencia de 300Hz (5ta armnica).
El 7UT613 posee un ajuste de restriccin por segunda
armnica, en el cual se indica al rel el porcentaje de 2da
armnica por debajo del cual este ltimo debe considerarlo
como una falla interna, arriba de este porcentaje el rel
considera que la corriente diferencial es ocasionada por la
corriente Inrush, bloqueando su operacin. Algo similar
ocurre con las corrientes diferenciales que se presentan
durante la sobreexcitacin de una maquina, tambin es
muy cierto que el fenmeno de sobreexcitacin viene
acompaado de una cantidad considerable de armnicas de
5ta armnica, el 7UT613 tambin posee una restriccin por
armnicas de 5ta armnica.
El rel dispone de filtros que inhiben estas corrientes. Los
ajustes recomendados para estos filtros son:
ECP-0034-10
VERSION A
INRUSH.2. HARM
RESTR.n. HARM
5th Harmonic
2. HARMONIC
20%
ON
94
Cortocircuito para la
Bellavista y Sub-estaciones
n. HARMONIC
30%
=
144.9kV
131.5kV
2Umax.Umin
(144.9)(131.5)
=2
= 137.00kv
Umax + Umin
(144.9 + 131.5)
SN
15000KVA
=
=62.81
3xU N1
3X137.88kv
I
N1(secund) =
I N1
CT1
62.81
100
=0.63A I Nobj
SN
15000KVA
=
= 866A
3xU N2
3x10kv
I
N2(secund)=
ECP-0034-10
VERSION A
I N2 866
=
=0.87A I Nobj
CT2 1000
95
Cortocircuito para la
Bellavista y Sub-estaciones
N1(+5%)=
IN
15000KVA
=
= 59.8A
3xU max
3x144.9kV
I
N1(secund) (+5%)=
I N1
CT1
59.8
100
La corriente diferencial
I Dif
= I N1(secund) (+5%)
I N2 =
0.95I
La corriente de restriccin
I Rest =
I N1(secund)
(+5%) +
I N2 =
0.95I Nobj +
I
N1( -5%)=
SN
3xU min
I
N1(secund)
(-5%) =
I N1
CT1
15000KVA
65.86
100
3x131.5kV
= 65.86A
La corriente diferencial:
- I
N2
La corriente de restriccin
ECP-0034-10
VERSION A
96
Cortocircuito para la
Bellavista y Sub-estaciones
de
operacin
= m.IRest
= 0.25
= 0.25. IRest
= 0.25
= 0.40
I DIFF >7.5
I Nobj
I DIFF
7.5
I Nobj
= 0.2
= 7.5
I add - on
=8
I Nobj
ECP-0034-10
VERSION A
97
Cortocircuito para la
Bellavista y Sub-estaciones
:
:
I2fn/IfN =20%
I5fn/IfN = 30%
b.
ECP-0034-10
VERSION A
Ajuste Propuesto
0.2 p.u.
7.5 p.u.
8 p.u.
25%
0.0
40%
2.5
20%
30%
S.E. Tarapoto
98
Cortocircuito para la
Bellavista y Sub-estaciones
5 MVAR
138kV
:
50/5 A.
:
50/5 A
Ajuste Propuesto
0.15 p.u.
6 p.u.
8 p.u.
25%
0.0
40%
2
20%
30%
ECP-0034-10
VERSION A
99
Cortocircuito para la
Bellavista y Sub-estaciones
11.
RECOMENDACIONES Y CONCLUSIONES
a)
RECOMENDACIONES
A. No se propone ajustes para los reles de distancia para la
L.T. 138kV Tocache Bellavista, ya que estos fueron
calculados por REP en su documento PE-AMP5-GT-1122009-TIN-94-115, cuyos valores son adecuados y no
proponemos reajustes.
B. Se est proponiendo nuevos ajustes para todos los rels
de distancia en 138kV (Bellavista Tarapoto
Moyobamba). Para el cual se recomienda verificar la
operatividad de cada rel de proteccin y del esquema de
teleproteccin, a travs de las pruebas end to end.
C. Se recomienda con la finalidad de modernizar los equipos
de proteccin, implementar nuevos rels de respaldo para
reemplazar los existentes SPAS120C y KCEG142 de las
siguientes lneas:
L.T. 138kV Bellavista Tarapoto.
L.T. 138kV Tarapoto. Moyobamba
Lo ms recomendable seria comprar nuevos rels de
distancia
los
cuales
se
implementaran
como
rels
100
Cortocircuito para la
Bellavista y Sub-estaciones
101
Cortocircuito para la
Bellavista y Sub-estaciones
CONCLUSIONES
FLUJO DE CARGA Y CORTOCIRCUITO
A. De acuerdo a las corrientes mximas de falla calculadas
en el presente estudio se determina que ningn
transformador de corriente del proyecto Tocache
Bellavista Tarapoto - Moyobamba se satura, con el cual
se verifica que el dimensionamiento de estos equipos es
satisfactorio.
B. De acuerdo al flujo de carga en operacin normal
ninguna lnea de transmisin y/o transformador de
potencia se sobrecarga y las tensiones en barra con
carga (4.16kV, 10kV y 22.9kV) siempre estn dentro del
5% Vn (Vn.: tensin nominal).
C. El sistema elctrico de San Martin actualmente posee
una demanda mxima cercana a los 30MW, demanda
media de 25MW y demanda minima de 15MW. El
requerimiento
de
ELECTROORIENTE
para
la
interconexin es de 33MW, el cual puede ser asumido
sin complicaciones del SEIN y de la CH Gera I (2x2.8MW)
y CH Gera II (1.8MW).
ECP-0034-10
VERSION A
102
Cortocircuito para la
Bellavista y Sub-estaciones
INTERCONEXION
servicio)
SEIN
SAN
MARTIN
(En
L.
TOCA138
T28-162
AUC60
AUC22.9
TOCA10
L.T. Tocache-Bellavista
T-35-121
TOCA22.9
S.E. AUCAYACU
Tocache 10
Aucayacu 22.9
AUC138
S.E. TOCACHE
Aucayacu 60
Tocache 22.9
L.T. Bellavista-Tarapoto
BELLA/B0.0
TAR
S.E. BELLAVISTA
-1
-2
BELLA22.9
RE_5
SA POSOA
BIAVO
PICOTA
SISA
ECP-0034-10
VERSION A
=
=
=
5%
0.1Hz
20
103
TR-EMD(BB)
RE_4
TR-CAT 2(PYGSA)
RE_3
TR-CAT 3(EPLI)
RE_2
TR-CAT 4(EPLI)
TARA22.9
BELLA10
L.T. Bellavista-Juanjui
BELLA10_R
RE_1
TP-1301(Sieme
TP-1311(Siemens)
TR-CAT 1(EPLI)
TR-Bellavista_Reactor
S.E. TARAPOT
Bellavista
0
SAL2 LAMAS
S AL6 J
Cortocircuito para la
Bellavista y Sub-estaciones
COORDINAMIENTO DE PROTECCIONES
F. Con el equipamiento existente se ha logrado obtener un
adecuado coordinamiento de protecciones, pero queda a
disposicin de la concesionaria mejorar aun mas su
sistema con las recomendaciones indicadas en el tem
12.1.
G. Para los rels distancia se recomienda implementar los
siguientes esquemas:
Teleproteccion POTT.
Comparacin Direccional.
Cierre sobre falla (SOTF), el cual debe ser
condicionado:
La lgica debe ser condicionado con la posicin
de los tres polos abiertos o el comando de
cierre manual del interruptor.
Se activara con el arranque de la zona 2 o
funcin de sobrecorriente (Ajustes mayor a la
mxima corriente de carga).
ECP-0034-10
VERSION A
104
Cortocircuito para la
Bellavista y Sub-estaciones
ECP-0034-10
VERSION A
105