Vous êtes sur la page 1sur 6

Utility Right of Way Management Program

Notification and Work Approval Application, V6.2


Effective: 1-1-11

Color Legend:

Check out the "What's New" tab below for changes. Blue blocks MUST be completed on ALL projects Yellow blocks required for projects with street cuts White blocks contain project-specific data TITLE Project Name Description of Work Street Seg. #1 Data

Note: This spreadsheet is for a single Project, possibly having multiple streets, or multiple cuts on a single street. Call (704) 432-ROW1 for information (Opttion 1) or to request Patching from Street Maintenance Division (Option 2).

Save your work to a known location, then click this link to e-mail to: ROWUSE@ci.charlotte.nc.us (You will have to attach the spreadsheet)
Enter each street's data separately for proper entry into CDOT's database. Street Seg. #2 Data Street Seg. #3 Data Street Seg. #4 Data Street Seg. #5 Data

CATEGORY General Information BASIC DATA

Sample Data Install 12" ductile iron water pipe along N. Sharon Amity Rd. Install 8" Schedule 40 PVC water pipe along Sudbury Rd. NOTE: Drag a selection box around all of the sample data in the spreadsheet and press the DELETE key to remove the sample data.

Request Type

3
Worksite Locating Info. LOCATION DATA http://VC.CharMeck.org

Estimated Start Date Estimated Stop Date Street Name Between Street #1

01/01/2011 03/01/2011 N. Sharon Amity Rd. Central Ave. Sudbury Rd.

02/01/2011 04/01/2011 Sudbury Rd N.Sharon Amity Rd Firethorne Rd

CDOT can not issue Permits for And Street #2 streets that are maintained by NCDOT. Use our web-based Location GIS program to ID NCDOT roads. Expand the Transportation layers and click on State Maintained Streets.

Northbound right-hand lane and sidewalk of N.Sharon Amity Rd. Eastbound right-hand lane of Sudbury Rd.

Utility Company Util. Company Contact APPLICANT INFORMATION

Contractor Company #1

Contractor Company #2

Certified Excavator #1

Certified Excavator #2

Basic Information

Utility Company Name Utility's Contact Name Util. Contact's current phone # Util. Contact's current mobile # Company #1 Name Company #1 current phone # Company #1 current mobile # Company #2 Name Company #2 current phone # Company #2 current mobile # Cert, Excav. #1 Name Cert, Excav. #1 current phone # Cert, Excav. #1 current mobile # Cert. Excav. #2 Name Cert. Excav. #2 current phone # Cert. Excav. #2 current mobile # Project ID / Work Order # New Installation?

Charlotte Mecklenburg Utilities Bill Deal (800) 555-1212 (704) 555-1212 Dellinger, Inc. (800) 555-1212 none Dallas 1 (800) 555-1212 none Ralph Emory (704) 555-1212 (847) 555-1212 Junior Samples BR-549 none WP4321-1 WP4321-2 Yes Yes

Names of the currently registered companies, employees, and Certified Excavators can be found at this website:

Utility R/W Management Program web page


If the Company / Person that you plan to use is not listed, please submit their data beginning on line 84.

v6.0 - R/W Permit Application - 12/01/10

Page 1 of 6

CATEGORY BASIC DATA

TITLE Plans Submitted for Review? (Submit in PDF format)

Street Seg. #1 Data Yes Yes No No No No No No 6 14A 19 Yes Yes Yes Yes Yes Yes No 3759.00 4.00 3.00 Steel Pipe 4 2 6 0 0 No 0 Yes Yes Yes Yes No Yes Yes 6:00 19:00 3759.00 5.00 3.00

Street Seg. #2 Data Yes Yes No No No No No No 6 14B 18 Yes Yes Yes Yes No No No 3616.00 4.00 3.00 Plastic Pipe 0 0 25 0 0 No 0 Yes Yes Yes No No No No

Street Seg. #3 Data

Street Seg. #4 Data

Street Seg. #5 Data

Traffic Control Info

Thoroughfare Lane Closure?

(see http://vc.charmeck.org )
Aerial Work Only? Entire street closure? In Central Business District? Traffic Signal Affected? Near Hospital? Near Bobcats Arena? Diagram Used1 Diagram Used2 Diagram Used3 Cutting Street Pavement? (Enter data in rows 73-83) Cutting Sidewalk? Cutting Curb? Trenching Involved? Plowing (direct bury)? Boring Involved? Blasting required? Utility Installation Length (ft) Utility Installation Width (ft) Utility Installation Depth (ft) Material Type Number of Bore Pits Number of new Handholes No. Sidewalk Panels affected No. of Planting Strips affected No. of Mid-Block Crossings Parking Meters in work area? - How many parking meters? Trees 2" & larger in work area? Prune & Trench spec. on file? Standard Hours? (9am-4pm) Special Hours? Peak? (6-9am or 4-6pm) Night? (after 6pm) Weekend? Start Time End Time Length (ft) Width (ft) Depth (ft)

WATCH Handbook PROJECT & TRAFFIC CONTROL INFORMATION

Construction Methods

Utility Installation Information

Boring Pit Info

Park-It! Tree Ordinance Construction Work Hours

ATION FOR SMD

Street Cut Information

3616.00 5.00 3.00

v6.0 - R/W Permit Application - 12/01/10

Page 2 of 6

BASIC DATA FOR SMD INFORMATION

CATEGORY

TITLE Curb replacement (L.F.) Sidewalk Panels Replaced SMD Patch? Contractor Patch? Temp. Patch Needed? Street to be paved? Patch Item(s) Patch Material Contact Name Contact Company Contact Address #1 Contact Address #2 Contact Office Phone# Contact FAX # Contact Mobile # Contact Excav. Cert. No. Contact E-mail address Website URL

Street Seg. #1 Data 25.00 6.00 No Yes Yes Yes ST+SW+CU Asphalt+Concrete

Street Seg. #2 Data 219.00 0.00 No Yes No No ST+CU Asphalt+Concrete

Street Seg. #3 Data

Street Seg. #4 Data

Street Seg. #5 Data

New Contacts NEW CONTACT DATA

v6.0 - R/W Permit Application - 12/01/10

Page 3 of 6

YesNo Yes No

RequestType 1 2 3

UtilMatl Cabinet Comm. Cable Copper Cable Fiber Cable Fiber & Copper Cable Plastic Pipe Pipe & Fiber Pipe & Copper Steel Pipe Wood Pole Steel Pole Wood Pole

PatchItem Street (ST) Sidewalk (SW) Curb (CU) Driveway (DW) Conc. Median ST+SW+CU ST+CU ST+CU+DW ST+CU+SW+DW

PatchMatl Asphalt Concrete Asphalt+Concrete 4" Conc. Driveway 6" Conc. Driveway Steel Plate Temporary

WHAT'S NEW IN VERSION 6.x


It has been almost three years since the Utility Right-of-Way Management Permit program was implemented. We have identified several items in our spreadsheet application that were consistently being used incorrectly, and new requirements needed to be added. We have tweaked the spreadsheet (attached) to eliminate some of the confusion and make it easier to fill in. The changes include: The embedded comments have been updated, and in some cases, re-written to be more clear. Cells with comments have a small red triangle in the upper right corner, and the comment will popup when the mouse Elimination of ID numbers. The requested information now requires names. Reduced the number of pre-formatted columns for street information from ten to five. We seldom received projects with more than three street segments. All of the hyperlinks have been updated and two new of links have been added. tool. The suggested use for o New links (lines 13 and 36) will open the public version the Virtual Charlotte this tool is twofold: 1.) to determine whether or not a street is City-maintained or NCDOT-maintained and 2.) to determine if the projects streets are thoroughfares. To use this tool, click on the provided link, then expand the Transportation layers by clicking the plus-box. Select City-maintained streets (shown in green) and Statemaintained streets (shown in red). Private streets will not have a color assigned to them. CDOT cannot issue work permits for NCDOT or private streets. Then move the slider in the top right-hand corner to the left so it is sitting at a point less than halfway. Clicking on any street segment centerline will open a small window that displays information including the classification. ExMinTh is a page Minor Thoroughfare, ExMajTh is a Major o The link to the Utility Right-Of-Way Management Program on line 18 has been updated since the Citys website was redesigned this summer. o The new link on line 42 will open the online page for the WATCH (Work Area Traffic Control Handbook). If you want to see the Traffic Control Diagrams, just open the PDF link at the top of the page, or you can download drop-down lists for a Material Type (line 54), Patch Items (line 80), and Patch Materials (line 81) have The Most cells now require Yes or No response instead of a Yes/blank. We want you to respond Yes or No to all applicable items. Two NEW items have been added to assist other agencies. o Park-It! (lines 60-61) addresses projects that are in the CBD along streets with Parking meters. During construction when meters are blocked, the City loses revenue. These types of projects will be coordinated with Park-It! to recoup some of those monies. o Tree Ordinance (lines 62-63) addresses projects that have trees 2 in diameter and larger that could be in the way of construction. The Citys arborist will be consulted on those projects and a tree survey will need to be A New Contacts section has been added to the bottom of the spreadsheet so you dont have to use the separate Utility Contact Registration spreadsheet to add new folks to our database. Please review the new sheet and advise me of errors, and/or suggestions for additional items that would make using this spreadsheet easier for you to use. You may begin using this new spreadsheet Immediately, if you wish, however, after January 1, 2011, we will no longer process submissions that use the old version of the spreadsheet application. A quick visual way to determine if youre using the new application is the City of Bug Fix #1 - 11/22/10 1. The spreadsheet is converted to Excel 2003 because some folks couldnt load the Excel 2007 file. 2. The Effective date is changed to 1-1-11. 3. Aerial Work Only? was missing and has been restored (line 37) 4. Near Hospital? was missing and has been restored (line 41) 5. Data Type for How many Parking Meters? (line 63) has been changed from List to Whole-number Data 6. The spreadsheet has been posted to the Citys web site for downloading. 7. A Whats New tab has been added that incorporates the e-mail message from 11/18/10, and subsequent Bug Fixes.

Bug Fix #2 - 11/29/10 1. Data Type for Name Entry (lines 16, 17, 20, 23, 26, & 29) has been changed to "Mixed Text" (40 Characters) from "Numbers". 2. Request Type (line 11) change to a dropdown list. 3. Added hyperlink to the "What's New" tab. 4. Version number changed to 6.2

Vous aimerez peut-être aussi