INTERNSHIP REPORT ON

STRENGTHNING OF KING EDWARD MEDICAL UNIVERSITY, LAHORE.


A practical training report on STRENGTHNING OF KING EDWARD MEDICAL UNIVERSITY, LAHORE from 29 July 2013 to 14 September 2013

Submitted by Zohaid Ali BSCE-01103123

Department of Civil Engineering

THE UNIVERSITY OF LAHORE


1|Page

Table of Contents
Introduction of Project............................................................................................................................ 5 INTRODUCTION ................................................................................................................................... 5 GENERAL INFORMATION ........................................................................................................................ 6 Company Profile.................................................................................................................................. 7 Some Major Projects of the company ............................................................................................ 7 Current Project................................................................................................................................ 7 Competency Profile......................................................................................................................... 7 Scope of Project ...................................................................................................................................... 8 Physical Progress of the Project .......................................................................................................... 8 MATERIALS ............................................................................................................................................ 10 Steel bars........................................................................................................................................... 10 Sand................................................................................................................................................... 10 Binder materials ................................................................................................................................ 10 Water ................................................................................................................................................ 10 Equipments ........................................................................................................................................... 11 vibrator................................................................................................. Error! Bookmark not defined. Cylinders and cubes .......................................................................................................................... 11 Concrete mixer.................................................................................................................................. 12 Concrete lifter ................................................................................................................................... 12 Instruments to install the steel cabins .............................................................................................. 12 Wheel barrows .................................................................................................................................. 13 Shuttering and Frame work .............................................................................................................. 13 Water Tanks ...................................................................................................................................... 13 Construction Management ................................................................................................................... 13 Basic Concept .................................................................................................................................... 13 Selection usage of technology & method ......................................................................................... 14 Work task .......................................................................................................................................... 14 Relationship among different work activities ................................................................................... 14 Estimation of duration of work activities.......................................................................................... 14 Requirements of resources ............................................................................................................... 14 Safety ................................................................................................................................................ 15 Dome ..................................................................................................................................................... 16 Conclusions ........................................................................................................................................... 18 2|Page

ABSTRACT
This report is submitted for the requirements of the degree of Bachelor of Science in civil engineering. This report is a summer internship report submitted in partial fulfillment of the requirements for the degree of Bachelor of Science in civil engineering as per norms of the University of Lahore. I visited the site for construction of King Edward medical university, Lahore in my training period and attained technical knowledge during the project. And after that i was able to compile this report. The report consists of brief study and description of material, equipments and procedures used at site for construction of King Edward medical university. I have put my best to elaborate the actual site conditions, the problems faced there and the tactics used to tackle those problems. The main objective of this report is to tell about the execution for construction of King Edward medical university. The report also covers the basic aspects of safety, planning, feasibility and economy at the construction site.

3|Page

ACKNOWLEDGMENT
I would like to thank prof. Zulfiqar Ali Khan HOD of civil engineering department for permitting me to carry out this training. I would also like to thank Mr. Basit sultan (Site engineer at the project) for providing me the guidance and teaching me the methodologies to carry out construction in the most efficient manner. Finally but importantly, I would like to express my heartiest thanks to my parents for their blessings, my friends/classmates for their help and wishes for the successful completion of this training.

4|Page

Introduction of Project
INTRODUCTION
Tender Documents prepared by the Consultants were issued to pre-qualified contractors. These were received and opened by the Committee in office of the Project Director (KEMU), Lahore on 22.06.2010. After detail scrutiny and recommendation by the Consultants the work was awarded to lowest bidder i.e. M/s. Progressive International, Lahore on 26.06.2010.

5|Page

GENERAL INFORMATION
Project Strengthening of King Edward Medical University, Lahore Patiala Block, Lahore 7 Kanal 89,511 Sft. 1st June, 2011 Two years June 2013 Rs. 228,621,989/King Edward Medical University, Lahore. Pakistan Environmental Planning & Architectural Consultants (Private) Limited, Islamabad (PEPAC) Project Director, King Edward Medical University, Lahore. M/s. Progressive International, Lahore.

Location Plot Area Covered Area Date of Start Date of Completion Contract Value Owner Consultants

Top Supervision

Contractor

6|Page

Company Profile This construction firm named as Hafiz Akhter was established in august 1997, and it is the construction firms of Pakistan. Name of the owner of the company is Mr. Hafiz Akhtar running this company. Some Major Projects of the company Construction of GILLANI LAW COLLEGE MULTAN. Construction of Highway. Current Project Construction of new block in King Edward medical university. Competency Profile This construction firm is categorized as A class contractors in the PEC rankings. Company has more than 170 dumpers in working condition. Company has hired permanent skilled labor. Maintenance of the machineries is very good. Company has covered many mega projects all across PAKISTAN. Company plays a major role in providing job opportunities all over PAKISTAN. And that is a very positive sign for PAKISTAN. Company has a very vast experience in the construction of roads. Company is having very experienced skilled staff which is a good asset for the company, and it has increased its reputation a lot.

7|Page

Scope of Project
Construction of new block in King Edward medical university. Construction Auditorium. Class rooms. Construction of Office Rooms and Canteen. Construction of basement for car parking. Provision of Street Lights. Provision of Tuff Tiles in Parking and Shopping Areas. Total Cost Rs. 228,621,989/ Time for Completion of work of completion in 2 years. Executing Agency: Works & Services Dept. king Edward medical university. Physical Progress of the Project Up to 4th floor of building completed. Basement and auditorium completed. Temporary offices completed. 4th slab and 5th floor were in progress. Finishing of auditorium completed. Steels are laded by workers. Concrete pouring to be made. Dome were in progress

8|Page

Figure showing pouring of concrete and steel in 4th slab.

9|Page

MATERIALS
Steel bars Steel bars are laded in 8in thick slab Sand Sand was used to make cement paste which was used for construction. Binder materials These materials were used as a binder material such as cement and concrete. Water Water is used to make a paste of cement and sand. And it is also used to make concrete. It is very necessary to maintain the required strength of concrete and to control the hydration of concrete. It is a major component to improve workability.

10 | P a g e

Equipments
Vibrator Vibrator were used for removing of air from concrete.

Cylinders and cubes These are used for compression test of concrete before pouring infield.

11 | P a g e

Concrete mixer Mixing of concrete were done by concrete mixer.

Concrete lifter After mixing of concrete lifter were used to lift the concrete up to top

Instruments to install the steel cabins These instruments were used to install and fix the steel cabins at site.

12 | P a g e

Wheel barrows

Shuttering and Frame work Shuttering and frame work was used to construct the buildings of beams, columns and slab.

Water Tanks Water tanks were there to store and use water.

Construction Management
Basic Concept

Construction planning is a fundamental and challenging activity in the management and execution of construction projects. It involves the choice of technology, the definition of work tasks and many other things. An effective construction plan is the base for the development

13 | P a g e

of the budget and the schedule of the work. A good construction plan is very critical part of a project.
Selection usage of technology & method

Sometimes it is very necessary to formulate a number of construction plans and techniques based on alternative methods and then select alternative methods and techniques. And then select a most suitable technique for the application in the actual field.
Work task

A project may involve thousands of work tasks, its important to make a schedule for those tasks. That can be time taking and lengthy but that is mighty effective in the context of the planning of a project and ultimately it saves time in the field as u can perform many tasks parallel to each other.
Relationship among different work activities

When the work activities have been defined then make relationships between those activities. By this way we can signify that activities must take place and completed in a particular way. And by developing relationships between different work activities we can save our time because we can know that which activity is following the ongoing activity and we can make arrangements accordingly.
Estimation of duration of work activities.

Each work activity has some time duration. And by using these durations we can prepare our schedule. We can assume that certain activities will take certain time but in actual work those activities may take longer time and we should keep in mind to do effective scheduling.
Requirements of resources

Resource requirements are usually estimated for each activity. The total sources required for the project are the sum of the resources required for the various activities. By making resource requirement estimates for each activity, the requirements for the particular resources during the course of the project can be identified.

14 | P a g e

Safety

Following safety measures should be carried out on the construction site. There should be hard hats on site. There should be eye protection on site. There should be hearing protection near loud equipment. There should be safety shoes for workers. There should be proper first aid at the site.

15 | P a g e

Dome
At that time construction of dome was in progress. All the details of dome are given

16 | P a g e

17 | P a g e

Conclusions
I worked there and I felt that my working abilities and my skill level has improved and groomed a lot and that is a very positive sign for me. I gained the experience to study keeping in mind the actual field so that I can implement my knowledge in a very effective way in the field. Main deficiency in the project was proper planning and planning lacks in almost all the projects all over the PAKISTAN. And that causes major delays in the duration of the projects. And safety measurements very also not taken very effectively, and that can cause a permanent disability or a life of any person, and that can be very shameful. This experience was very helpful for me and I gained much more knowledge through it. I understood the working process in the actual field and I came to know the actual relationship between contractor, client and consultant. I felt that actual working in the field was a bit different from studies. I observed proper application of knowledge which I gained during studies in the field and I was very happy after seeing that. I also got experience in slabs and beams designing. Many of the slab and beam were design by engineer. I saw different section of beams in which steel bars were laid at both sides. Stirrups were provided. 8 inch thick slab were designed. The most I got experience is about domes. At that time dome construction were in process. Which was placed on the beam. All load of dome was transferred to beams. No such load was placed on slab of dome. I personally think that there should be a full semester in which student can get exposure of the field. And there should be proper grading for that so that each and every student can pay full attention in the field work. I gained so much experience in just one moth thats why I think that a full semester would be very helpful for that purpose. I obtained very much experience of public dealing. I learnt that how to deal with a labor and a higher authority person. I learnt so many thing s which would be very helpful in my future and my career. Major change in me that my understanding was improved a lot. And my coordination was also groomed to another level.

18 | P a g e