Vous êtes sur la page 1sur 4

Doosan Heavy Industries & Construction

Power & Water For Tomorrow


Supercritical Steam Turbine & Generator 660MW / 800MW

Copyright, Doosan Heavy Industries & Construction Co,, Ltd. Used with Permission. All right reserved

Layout and Steam Conditions


800MW Main Steam Pressure Main Steam Temperature Reheat Steam Temperature 242 bar 566 C 593 C 660MW 242 bar 566 C 593 C

660MW

HP

IP

LP

GEN

800MW

HP

IP

LP

LP

GEN

For a supercritical power plant, we recommend 3 casings steam turbine generator for 660MW and 4 casings steam turbine generator for 800MW each. 660MW steam turbine is consisted of a single flow HP section, a double flow IP section, and a double flow LP section. Thanks to relatively high back pressure (In india), we can use one double flow LP section with 48 LSB. For 800MW, we provide one more double flow LP section.

HP Part - Configuration and Key Technologies


Continuous Coupled Blade HP Valves CV**

MSV*

OLV*** Inlet OLV*** Assembled diaphragm

Honeycomb seal

3D blade Design Technology

*MSV: Main Stop Valve **CV: Control Valve ***OLV: Over Load Valve

To provide a steam turbine with high efficiency and high quality, we apply several key technologies for each section like continuous coupled blade, honeycomb seal, assembled diaphragm, 3D blade design technology etc.

IP Part - Configuration and Key technologies


Continuous Coupled Blade

IP Valves

IP ICV** IP SV* Honeycomb seal Assembled diaphragm 3D blade Design Technology

*SV: Stop Valve **ICV: Intercept Control Valve

Most of the technologies are applied both HP and IP section. We can design high efficient 3D blades witn Doosans own in-house analysis program tuned by various test data.

LP Part - Configuration and Key Technologies

LP 1 to LP 3 Shroud

LP 4 Shroud

33.5 LSB

48 LSB

Hollow Diaphragm

In LP section, hollow type welded diaphragm allow moisture removing among the last LP stages for water erosion protection. . Hollow stationary blade provided by groove for water separation on suction and pressure side..

48inch LSB for 660MW Design Basic


0 rpm 3000 rpm CFD Verification Fatigue test (full scale) Dynamic Testing

Tie-boss

Shroud Wind Tunnel Test Fir tree dovetail Vacuum Spin pin Test

3D full aero design/Integral blade tip cover High structural reliability and stability Verify structural reliability with full scale dynamic test Curved axial entry dovetail

Major Steam Turbine & Generator Experiences

Doosan Heavy Industries & Construction


Korea
Coal Younghung #1/2 (800MW x 2) Hadong #7/8 (500MW x 2) Tangjin #5~8 (500MW x 4) Poryong #7/8 (550MW x 2) Taean #7/8 (550MW x 2) Samchunpo #1~6 (500MW x 6) Nuclear Wolsong #2~4 (700MW x 3) Yonggwang #3~6 (1050MW x 4) Ulchin #3~6 (1050MW x 4) Shinkori #1/2 (1050MW x 2) Shinwolsong #1/2 (1050MW x 2) Shinkori #3/4 (1450MW x 2) Shinulchin #1/2 (1450MW x 2) CCPP/CHP Yeongwol(848MW x 1) Pocheon (800MW(x 2 ) Yangju (540MW x 1) Haengbok(540MW 1x )

Czech Republic
Ledvice (660MW x 1)

UAE
BNPP #1~4 (1390MW x 4)

India
Raipur (685MW x 2)

Indonesia
Cirebon (698MW x 1)

Saudi Arabia
Rabigh #7~10 (700MW x 2) Marafiq #5/6 (275MW x 2) Yanbu #2 (276MW x 3)

Thailand
GHECO-one (700MW x 1)

Vietnam
Mong Duong I (540MW x 2) Mong Duong II (600MW x 2)

Eraring #1~4 (750MW x 4unit)

Australia

Total Unit (MW)


Subcritical Supercritical Total Fossil Fired 73Unit (46,277 MW) 16Unit ( 9,496 MW) 90Unit (55,773 MW)

Copyright, Doosan Heavy Industries & Construction Co,, Ltd. Used with Permission. All right reserved

Vous aimerez peut-être aussi