Daily Work Sheet (Painting)

Date:Management Inspection Supervision

5/23/2013
C/Hands Utility Men Comments

Operatives

Job Location

Operatives Names

Expected Daily Task

Area/Fire Zone. Job Location Operatives Names

Job Card No. Expected daily task

Area/Fire Zone. Job Location Operatives Names

Job Card No. Expected Daily Task

Area/Fire Zone. Job Location Operatives Names

Job Card No. Expected Daily Task

Area/Fire Zone. Job Location Operatives Names

Job Card No. Expected Daily Task

Area/Fire Zone.

Job Card No.

PROTECTIVE COATINGS INSPECTION REPORT


DAILY INSPECTION REPORT
Client: Total Contractor: CAPE Specification: GEN-W-SP-83202 Rev A01 Inspector: J.Warren/P.Durin Date Time Air Temp. C RH % Installation: Elgin 2013 Painting Campaign Drawing Number: IF APPLICABLE Line Number: IF APPLICABLE Area/Fire Zone: 8LW3 Dew Point Steel Temp. Date C C Time Air Temp. C

Report Number: EL-13-???


Contract Ref: 4300002629

Job Card No: 8LW3-061 Workpack No: 8LW3 Date Work Started: 24th May 2013 RH % Dew Point Steel Temp. C C

12/5 0745 12/5 1100 12/5 1405

RECORD 3 TIMES DAILY (INCLUDE DAY & NIGHTSHIFT ON SAME REPORT. ENSURE UPDATED BEFORE END OF YOUR SHIFT

CREATE NEW WORKSHEET IF YOU RUN OUT OF SPACE BY RIGHT CLICK ON WORKSHEET TAB SELECT MOVE/COPY, SELECT CREATE A COPY BOX, SELECT OK. RENAME I.E. DAILY REPORT 1, 2, 3 ETC BY RIGHT CLICK ON WORKSHEET & SELECT RENAME

Date 5/12/2013 5/13/2013 5/15/2013

Drawing Number

Line Number

Date

Drawing Number

Line Number

PUT IN DRAWING NUMBER & LINE NUMBER IF APPLICABLE

Pre-wash Complete: Yes Surface Preparation Method: Dry Grit Blast Date 5/12/2013 Blast Surface Profile (m) Dust Level Max 85m Max 2 Mill Scale Clear Y/N Yes Soluble Salt Level
MAX 30mg/m

Surface Degreased: IF APPLICABLE Abrasive Used: Garnet or Aquagrit Date Blast Surface Profile (m) Dust Level Cleaning Grade: SA 2 Mill Scale Clear Y/N Soluble Salt Level

Coating Manufacturer: Carboline Stripe Coating Performed: Yes Date Time 12/5 1015 13/5 0850 15/5 0830 Area/Item Coated Structure Structure Structure System Code P01 P01 P01 Coat Number 1 2 3 Coating 18FC 18FC 2000 TC

Coating Used: Carbomastic 18FC & Carboxane 2000TC Paint Application Method: Either Airless Spray or Brush Batch No. Base Batch No. Hardner Colour Grey Grey Yellow DFT (Average) 150m 300m 400m 5 Mpa Minimum Adhesion (Pull off Force)

Total Ave. DFT 400m Protection Fitted to Supports: IF APPLICABLE Comments:-

PUT ANY APPLICABLE COMMENTS IF REQUIRED

Company: Name: Position: Signature: Date:

CAPE Painting Supervisor

CAPE QA/QC Inspector

Total Company Representative

PROTECTIVE COATINGS INSPECTION REPORT


TEST RECORD
ATTACH SURFACE PROFILE TEST RESULTS:
Report Number: EL-13-???

ATTACH TESTEX TAPE HERE

ATTACH TESTEX TAPE HERE

Location:

Put JC Number

Date: Put Date

Location:

Put JC Number

Date: Put Date

ATTACH TESTEX TAPE HERE

ATTACH TESTEX TAPE HERE

Location:

Put JC Number

Date: Put Date

Location:

Put JC Number

Date: Put Date

ATTACH TESTEX TAPE HERE

ATTACH TESTEX TAPE HERE

Location:

Put JC Number

Date: Put Date

Location:

Put JC Number Serial Number:

Date: Put Date Put Serial Number

Inspection Equipment Used: Testex Tape and Micrometer Calibration Date: Put Calibration Due Date

ATTACH SURFACE DUST TEST RESULTS:


5/12/2013

ATTACH SURFACE DUST TAPE HERE

ATTACH SURFACE DUST TAPE HERE

ATTACH SURFACE DUST TAPE HERE


ATTACH SOLUBLE SALT TESTS: (DESCRIBE TEST CARRIED OUT)
Salt test detection kit used was the conductivity meter and brestle patch

PUT DETAILS OF TEST AS ABOVE & READING IN HERE IN MG/M2


Inspection Equipment Used: Brestle Patch & Conductivity Meter Serial Number: Put Serial Number Calibration Date: Put Calibration Due Date & (141 Solution)

DESCRIPTION OF ADHESION TEST RESULTS:

PUT READING IN HERE IN MPA


Inspection Equipment Used: Elcometer 108 Digital Adhesion Gauge Calibration Date: Put Calibration Due Date Serial Number: Put Serial Number

PROTECTIVE COATINGS INSPECTION REPORT


PHOTOGRAPHIC RECORD
EXAMPLE

Photo of Initial condition

Photo of Pre-washing of vessel

Photo of blasted area

Photo of blasted area

Test panel done in-situ Test panel done in-situ

Testex tapes attached

PROTECTIVE COATINGS INSPECTION REPORT


PHOTOGRAPHIC RECORD
EXAMPLE

Salt test result (Final Result after blasting)

Stripecoating performed for 1st coat of 18FC

Stripecoating performed for 1st coat of 18FC

Spray applied 18FC Test panel done in-situ

Stripe coating C750V2

Stripe coating C750V2

PROTECTIVE COATINGS INSPECTION REPORT


PHOTOGRAPHIC RECORD
EXAMPLE

Spray applied C750V2 Test panel done in-situ Photo of completed job as per JC

Adhesion Test - Photo value recorded on adhesion test beside test plate

FABRIC COMPLETION CERTIFICATE


Work Order Number: 8260534 Notification Number: 18187659 Scope of Work: Contractor: CAPE Date:

Statement: All work has been completed to the current Total approved specifications. Work orders have been updated and closed out in SAP Inspection records have recorded the environmental conditions, surface preparation, coating application, trace heating, Insulation and cladding (where applicable), all of which have been measured with inspection equipment traceable to national standards.

Specification Used For Coatings:- GEN-W-SP-83202 Rev 1

Specification Used For Insulation:- GEN-W-SP-83200 Rev A02

Deviations To Specifications:- Y/N

Documentation Package Complete:- Y/N

FINAL ACCEPTANCE
Company: Name: Position: Signature: Date:

CAPE Site Manager

Total Company Representative