La Arena - Proyecciones
Primera barra de oro Mayo 6, 2011 a 10 meses de aprobado el EIA Proyeccin actual: 190 210,000 ozs en 2012 Produccin de oro de xidos: 6 years Produccin de xidos @ 20,000 tpd ampliacin @ 36,000 tpd hacia fines de 2012/2013 7 Perforadoras diamantinas probando Cu/Au Fase 2 (sulfuros) para estudio de factibilidad interno Produccin de concentrados de Cu & Au en Fase 2 estimado para 2016
5
55,973 ozs
58,081 ozs
190,000 a 210,000 ozs Peru Cash Cost* US$ 479 / oz US$ 500 to US$ 550 / oz
* Cash cost and total cash cost per ounce sold are non-GAAP (non-IFRS) measures used by management to evaluate operating performance and used by some investors as an indicator of a companys future cash generating capability. Cash cost and total cost per ounce sold should not be considered as a substitute for GAAP performance measures nor should they be considered in isolation.
Actualizacin de Recursos
Aprobacin de EIA
Testigos de Sulfuros
8
Recursos Mineral de Oxidos Alto Cobre (Cu 300ppm 1000ppm ; Au>=0.1 g/t)
Clasificacin de Recursos Medidos Indicados Medidos+Indicados Inferidos Mt 0.5 13.5 14.0 1.4 Au (g/t) 0.66 0.29 0.31 0.18 Cu (%) 0.06 0.06 0.06 0.06 Ag (ppm) 0.7 0.6 0.6 0.6 Mo (ppm) 36.0 41.4 41.2 55.7 Au ('000 Oz) 11 127 138 8
10
PAD Lixiviacin
Planta ADR
Poza PLS
12
La Arena - Flota
3 Palas Bucyrus RH90C. 17 Volquetes 777F & 4 x 777G 2 x CAT 365 Excavadoras 8 x Actros 8 x 4 volquetes 2 x Bulldozers D8T Motoniveladoras 14M & 16M 1 x 834H Torito 2 x Perforadoras D245S DTH 6 - 1/8 7 x Perforadoras Diamantinas (Exploracin) 3 x Perforadoras RC (Exploracin)