Académique Documents
Professionnel Documents
Culture Documents
Mining
Transportation
Energy
Healthcare
Lighting
GEs portfolio
Founded by Thomas Edison in 1878 Only company from the original 1896 Dow Jones index still listed today 4 businesses operating in more than 100 countries 125+ years Over 300,000 employees worldwide Revenue $160B (2010) Assets $ 750 billion
Energy Infrastructure
Technology Infrastructure
NBC Universal
Capital Finance
1. Mongolias mining sector driving economic growth 2. Rapid urbanization driving greater infrastructure needs 3. Substantial infrastructure needs 4. Economic diversification & value-added, local mfg & svcs will be encouraged 5. Renewable Energy policies supported
Supporting Facts Mining sector accounts 30% of GDP, 91% of exports and 40% of Government revenues GDP expected to grow 5-6 x in next 10 years US $6bn investment signed with Rio Tinto for OT ~45% of total population live in capital Investments of US$ 9 billion needed to meet urban housing and infrastructure needs by 2030 Installed MW to double in 10 years to 2000 MW Construction of 1,100 km out of total 5,684 km of railways
Sainshand industrial park project Mongolian Railway policy encourages domestic manufacturing & processing, job creation Renewable energy up 10% by 2020 to 200 MW Renewable Energy Law of 2007 provides preferential rates for power from renewable energy Mongolian Stock Exchange to adopt LSE platform Mongolia is to adopt European Union (EU) standards for its goods and services Mongolian companies successfully launched overseas IPOs Mongolias coal, mineral resources, renewable energy resources to address Chinas energy needs Developing Mongolia as a significant energy exporter will create synergies of scale
Mining
Energy (PG)
Rail
Other
80mm tons of mining commodities to be transported in 5-10 years Substantial Mining Vertical Sales Opp. OHV, motors, electrics Assess opportunity to establish mining service JV Mining leasing opportunity
Current installed capacity to be doubled in 5 years (from 800MW to 2200MW in 5 years; no reserve capacity) Potential for largescale power generation for export (>10GW) Opportunities for gas turbine, Jenbacher, I/S, wind, crude oil and digital energy Smart energy for residential and telecom Country demand for 200-300 locomotives in next 5-10 years Interest from the Government of Mongolia to establish locomotive assembly/ maintenance JV to supply next 15 years locomotive needs
Several immediate hospital equipment supply opportunities Lighting infrastructure opportunities under discussion Future airplane leasing opportunity
GE mining
Dust Control
4 3
Motors
Grinding Excavating Crushers Hoisting Fans & Pumps Generators Genuine GE Parts Conveyors Services
Reverse Osmosis Hollow Fiber EDR/EDI/ED Thermal Evaporative Systems Mobile Water Systems Spiral-Wound Membranes Chemical Program Solutions
DusTreat Wetting Agents DusTreat Foaming Agents DusTreat Binders DusTreat Foam Binders DusTreat Crusting Agents
POWER GENERATIONGE ENERGY Steam Turbines Aero derivative Gas Turbines Heavy Duty Gas Turbines Jenbacher Services DISTRIBUTION Power Equipment Power Protection Multilin Power Quality Motors Lighting Power Houses
Project engineering, design and & Measurement implementation On site Installation and Project Flow Management Pressure Services Temperature Machinery Diagnostic Service Gas and Moisture Technical Training Validation & On site & Remote Monitoring Service Contracts Ultrasonic Continuous Inspection Protection and Monitoring System Remote Visual Inspection Distributed and Scanning Systems Radiography Wireless & Portable Eddy Current Condition Services Monitoring Testing System 1r Machines Condition Monitoring Sensors and Transducer Systems Asset Condition
Inspection
Condition Monitoring
9 8
Automation
Process solution Controller and I/O HMI/SCAD A Intelligent Manufacturi ng Service Lean Six Sigma
Environmental Technologies
10
Financing
ThermoPleat Filter Elements BHA-TEX ePTFE Membrane Horizontal Dust Controller Baghouse Engineered Services SQ-300i Precipitator Voltage Control Precipitator Engineered Systems
Equipment Finance Commercial Real Estate Financing Working capital Fleet financing, insurance, maintenance and management Technology financing, management and control
6/ GE Update 2/10/2012
GE rail
GE rail
Mongolia operates one EVO, 2 Dash-7, and 14 GE Modernized TE10 locomotives today; Country demand for 200300 locomotives in next 510 years; Interest from the Government of Mongolia to establish locomotive assembly/maintenance JV to supply locomotive demand.
2ZAGAL
locos
2005 (M62M)
2-006,007, 2.7 .
Modernized 210
2008 (TE10)
PowerHaul Lt-Wt