RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT


(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Mechanical Engineer a. TOTAL b. WITH CURRENT FIRM

Natalie Alavi, P.E. 20 10


15. FIRM NAME AND LOCATION (City and State)
NBA Engineering Inc. San Francisco, California
16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Degree: Master of Science State: California
Specialization: Mechanical Engineering Discipline: Mechanical Engineering
University: Michigan State License: # M2348
Expires: 9/30/05

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)


LEED Accredited; C-20 Licensed Contractor; Underground Storage Tank Install Certificate;
NFPA Automatic Sprinkler Workshop Certificate; Value Engineering Certificate; Recent
member of Mayor's San Francisco Public Utilities Infrastructure Task Force.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Department of Parking and Traffic PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Red Light Photo Enforcement S.F. CA 2002 2004
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
X Check if project performed with current firm
a.
Managed the design drawings for the installation of a photo enforcement
camera.Completed field construction inspections of 21 intersections to verify as-built
conditions. Determined the most cost effective method for connecting the cameras and
loop detectors.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Airport Boarding Area G PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
San Francisco, California 2002 2003
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
X Check if project performed with current firm
b.
Responsible for inspection. Provided construction cost estimates for mechanical
disciplines. Provided constructibility review /quality control. Provided value
engineering.Confirmed installations adhered to specs and codes. $190 million. 368,000 sf

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Power Inn Road Separation PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Sacramento, CA 2002 2004
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
X Check if project performed with current firm
c.
Managed the team of inspectors providing construction and inspection services for
grade separation in Sacramento. Inspected fire water system due to relocated pipe.
Oversaw storm and sewer inspections. 2.4 miles. $25 million.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Port of Oakland T2 Mechanical Room PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Oakland, California 2004 2008
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
X Check if project performed with current firm
d.
New central utility plant at Oakland Airport's two-level terminal complex. Hired and
managed architect, civil and other consultants. Implemented green/sustainable design
features. Inspected and commissioned all equipment for design intent.
Size: 15,000 sf. Cost: $ 12,500,000 Role: Principal in Charge.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Santa Clara Valley Transportation PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Agency Santa Clara California 2003 2004
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
X Check if project performed with current firm
e.
Provided pre and post construction engineering consulting serives for a variety of
county roadway projects. Most we widening projects with one new road built. Value
Engineering saved the agency $1.5 million. Size and Cost n/a