Académique Documents
Professionnel Documents
Culture Documents
KSE Board
Key
101
Qty Est
14
Qty Meas
14
#VALUE! Particulars
2013
Unit
No
Rate
24943.52
1781.68
24943.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-1-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18/Jan/2014
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Materials Issued
#VALUE!
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
###
Dec/99
-10
0
0
0
0
0
0
0
0
Materials Taken Back
List of Contractors
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
-1-
-1-
-1-
-1-
24943.52
24943.52
24943.52
24943.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Work Estimate
15%
Remark
page
-10.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4
10
11
12
13
14
15
16
17
18
19
20
21
22
23
-1-
-1-
-1-
-1-
-1-
-1-
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
-1-
-1-
-1-
-1-
-1-
-1-
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
-1-
-1-
-1-
-1-
-1No
-1-
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
-1-
-1-
-1-
-1-
-1101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
-1-
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
156
157
158
159
160
161
162
163
164
165
166
167
168
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
#REF!
#REF!
#REF!
#REF!
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
#REF!
#REF!
#REF!
#REF!
-1301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
401
402
403
404
405
406
407
408
-1409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
#REF!
#REF!
#REF!
#REF!
451
452
453
454
455
456
476
477
478
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
-1566
567
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
651
652
653
654
655
656
657
658
676
677
678
679
680
681
701
702
703
704
705
706
707
708
709
710
711
712
713
714
726
727
728
729
355
356
357
358
359
360
361
362
363
364
365
951
952
-1953
954
955
#REF!
776
777
778
779
780
781
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
0
-11
2
3
4
5
6
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
-156
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
-1118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
-1180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
-1242
243
244
245
246
247
248
249
250
-1-
Uniform Labour Data for Distribution Works in KSEB - Based on PWD Schedule of Rates 2012
Appended to B.O. (FM) (Genl) No.162/2013 (DPCII/AE/Proposal 07/2010/2012) dated 19/01/2013
Key
Particulars
Fabrication of storewel cum cupboard from the old, dismantled and unusable
control and relay panels od old 220 kv substation control room for the use of
various offices.The work includes cutting,Drilling,leveling,filing and
101 fabricating of storewell cum cupboards of aproximate size 50X 60 x 180 cm
and providing 3no of shelves inside the newly fabricated cupboard for
keeping the files and a door with the hand lock facility, the charges includes
welding,grinding sectioning and aligning etc complete
102 Surveying one km 11kV line using Ranging Rod
Loading HT PSC pole to Hand cart from the stacking place and unloading the
103
same at work site.
104 Transporting one HT PSC pole by Hand cart (limited to 4 km).
Loading HT 'A' type pole to Hand cart from the stacking place and unloading
the same at work site.
106 Transporting 'A' type pole by Hand cart (limited to 4 km).
105
Unit
Amount
incl. 10% CP
No
1781.68
km
1761.00
P/km
213.00
P/km
213.00
No
234.00
P/km
264.00
No
316.00
Loading HT 4 legged pole to Hand cart from the stacking place and unloading
the same at work site.
108 Transporting 4 legged pole by Hand cart (limited to 4 km).
P/km
371.00
109 Transporting one HT PSC pole by Head load (limited to 0.3 km)
P/km
1177.00
110 Transporting 'A' type pole by Head load (limited to 0.3 km)
P/km
1384.00
P/km
1918.00
No
1493.00
No
1908.00
No
2758.00
No
65.00
No
3961.00
107
112
113
114
115
116
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm,
digging & back filling pit, drawing earth leads.
Fitting and erecting one HT 'A' type Pole in position incl. fitting cross arm,
digging & back filling pit, drawing earth leads.
Fitting and erecting one HT 4 legged pole in position incl. fitting cross arm,
digging & back filling pit, drawing earth leads.
Additional rate for providing one disc set on any type of HT pole for making
cut point
Fitting and erecting one HT DP using PSC pole in position incl.fitting 2
channel cross arms, digging & back filling pit, drawing earth leads.
117
Fitting and erecting one HT DP using 'A' type pole in position incl. fitting 2
channel cross arms, digging & back filling pit, drawing earth leads.
No
4791.00
118
Fitting and erecting one HT DP using 4 legged pole in position incl. fitting 2
channel cross arms, digging & back filling pit, drawing earth leads.
No
6491.00
No
636.00
No
1390.00
No
1804.00
No
2194.00
Fitting and providing one HT Stay for 11 kV pole incl. digging & back filling
pit.
Fitting and providing one Strut using HT PSC pole incl. digging & back
120
filling pit.
Fitting and providing one Strut using 'A' type pole incl. digging & back filling
121
pit.
Fitting and providing one HT Fly stay for 11 kV pole using HT PSC pole incl.
122
digging & back filling pits.
119
Fitting and providing one HT Fly stay for 11 kV pole using 'A' type pole incl.
digging & back filling pits.
Insertion of one HT PSC pole in existing line incl. digging & backfilling pit,
124
fitting cross arm, insulators, binding etc.
Insertion of one HT 'A' type pole in existing line incl. digging & backfilling
125
pit, fitting cross arm, insulators, binding etc.
Insertion of one HT 4 legged pole in existing line incl. digging & backfilling
126
pit, fitting cross arm, insulators, binding etc.
123
No
2609.00
No
1559.00
No
1973.00
No
2960.00
127 Additional rate for excavation of one Pit for HT Pole/ HT Stay in Laterite.
No
207.00
Additional rate for excavation of one Pit for HT Pole/ HT Stay in Hard
128
Laterite.
No
415.00
129 Additional rate for excavation of one Pit for HT Pole/ HT Stay in Soft Rock.
No
622.00
130 Additional rate for excavation of one Pit for HT Pole/ HT Stay in Rock.
No
1244.00
131 Additional rate for excavation of Pit for 'A' type pole in Laterite.
No
311.00
132 Additional rate for excavation of Pit for 'A' type pole in Hard Laterite.
No
622.00
133 Additional rate for excavation of Pit for 'A' type pole in Soft Rock.
No
933.00
134 Additional rate for excavation of Pit for 'A' type pole in Rock.
Stringing of one km 11 kV line with ACSR Raccoon (3 conductors) incl.
135
cutting and removing tree branches wherever necessary.
Stringing of one km 11 kV line with ACSR Rabbit (3 conductors) incl.
136
cutting and removing tree branches wherever necessary.
No
1866.00
km
15997.00
km
13420.00
No
18957.00
No
8222.00
No
7953.00
No
7414.00
No
2336.00
No
2224.00
No
2336.00
No
3306.00
No
3418.00
No
2857.00
No
2969.00
No
3823.00
Fitting and erecting one HT PSC DP, fitting all accessories ( 2 Stays, 8 cross
137 arms, AB, DO, LA etc.), mounting of 100 KVA Transformer, providing 5
earthing, fixing DB, DTR box and giving all HT & LT connections.
138
139
140
141
142
143
144
145
146
147
148
149
Erecting one 315 kVA Transformer to existing Plinth and giving connections,
incl. loading & unloading, excluding transportion.
Erecting one 500 kVA Transformer to existing Plinth and giving connections,
incl. loading & unloading, excluding transportion.
Installing one DTR Meter with box on existing poles and giving the complete
connections incl. conveyance of materials.
Installing one Border Meter with box on existing poles and giving the
complete connections incl. conveyance of materials.
Erection of LT 2 way distribution box on existing cross arm giving
connection incl. cable and earth connection (excluding earthing).
Erection of LT 3 way distribution box on existing cross arm giving
connection incl. cable and earth connection (excluding earthing).
Erection of LT 4 way distribution box on existing cross arm giving
connection incl. cable and earth connection (excluding earthing).
Fitting one additional Fuse unit and giving connection from Transformer to
fuse and DB to LT OH line.
Providing one Earth using earth pipe incl. digging separate pit at standard
distance away from the pole/structure & backfilling.
Providing one Driven Earth using GI earth pipe at standard distance away
from the pole/structure in loose Soil.
Providing one Driven Earth using Steel earth rod at standard distance away
from the pole/structure in loose Soil.
No
3935.00
No
4047.00
No
1690.00
No
1690.00
No
1690.00
No
1799.00
No
1908.00
No
150.00
No
633.00
No
273.00
No
273.00
160 Additional rate for excavation of one Earth Pit (2.5 m depth) in Laterite.
No
415.00
161 Additional rate for excavation of one Earth Pit (2.5 m depth) in Hard Laterite
No
829.00
162 Additional rate for excavation of one Earth Pit (2.5 m depth) in Soft Rock
No
1244.00
Providing one Coil Earth using GI earth wire, digging separate pit at standard
distance away from the pole/structure & backfilling.
No
415.00
164 Fitting One set (3 No.) 11 kV LA and giving connections excluding earthing.
No
213.00
No
213.00
No
1690.00
No
1890.00
km
829.00
No
213.00
No
213.00
No
270.00
No
259.00
No
253.00
No
63.00
150
151
152
153
154
155
156
157
158
159
163
166
167
168
169
170
171
172
173
174
Fitting one set AB switch, DO fuse, LA, giving connections and drawing
earth leads for earthing excluding provision of earth.
Fitting one set AB Switch, giving connection and earthing the same using one
earth pipe incl. digging & back filling pit.
Conveyance of one km 11kV line materials from section store/ stacking place
to the work site (excluding poles).
Fitting one Additional V cross arm in existing single pole incl. conveyance of
materials.
Fitting one Additional 75x40, 1.8 m Channel cross arm in existing single pole
incl. conveyance of materials.
Fitting one Additional 3 m Channel cross arm (100x50x6 mm), in existing 11
kV DP incl. conveyance of materials
Fitting one Additional 3 m Channel cross arm (75x40x6 mm), in existing 11
kV DP incl. conveyance of materials.
Fitting one Additional 3 m Channel cross arm (35x35x5 mm), in existing 11
kV DP incl. conveyance of materials.
Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting
insulators and binding the same with LT Line.
No
95.00
No
7048.00
No
108.00
No
63.00
No
176.00
P/km
176.00
P/km
643.00
No
944.00
205 Providing Stay for LT poles incl. digging & back filling pit.
No
428.00
206 Providing Strut using LT PSC pole incl. digging & back filling pit.
No
881.00
No
1416.00
No
944.00
No
207.00
210 Additional rate for excavation of one Pit for LT Pole/ LT Stay in Soft Rock.
No
311.00
211 Additional rate for excavation of one Pit for LT Pole/ LT Stay in Rock.
Stringing one km LT S ph 2 wire line (Rabbit) incl. fitting cross arm
212
etc.removing touchings and conveyance of materials.
No
622.00
km
7817.00
177 Providing barbed wire protection (2.5 1m height) for one 11kV pole.
178
201
202
203
204
Providing special type anti-climbing protection 2.5 m height for one 11kV
pole.
Loading LT PSC pole to Hand cart from the stacking place and unloading the
same at work site.
Transporting one LT PSC pole by Hand cart - limited to 4 km (Excluding
loading and unloading).
Transporting one LT PSC pole by Head load for an average distance of one
km (limited to 0.3 km).
Erecting one LT PSC Pole in position incl. digging & back filling pit.
Providing Fly stay for LT pole using LT PSC pole incl. digging & back filling
207
pit.
Erecting one LT PSC/RCC Pole in position including digging & back filling
208
pit.
Additional rate for excavation of one Pit for LT Pole/ LT Stay in Hard
209
Laterite.
213
Stringing one km LT S ph 3 wire line (Rabbit for Ph&N, Weasel for St.main)
incl. fitting cross arm etc.removing touchings and conveyance of materials.
km
11006.00
214
Stringing one km LT 3 ph 4 wire line (Rabbit for Ph, Weasel for N) incl.
fitting cross arm etc.removing touchings and conveyance of materials
km
14194.00
km
17383.00
km
3189.00
km
3127.00
km
2152.00
km
1572.00
km
16400.00
No
106.00
No
3614.00
Stringing one km LT 3 ph 5 wire line (Rabbit for Ph and weasel for N&
215 St.main) incl. fitting cross arm etc.removing touchings and conveyance of
materials.
216
217
218
219
220
221
222
Stringing one km LT Addl conductor (Rabbit) incl. fitting cross arm, insulator
etc. removing touchings and conveyance of materials.
Stringing one km LT Addl conductor (Weasel) incl. fitting cross arm,
insulator etc. removing touchings and conveyance of materials.
Stringing one km LT Addl conductor (Rabbit) incl. fitting insulators,
removing touchings and conveyance of materials.
Stringing one km LT Addl conductor (Weasel) incl. fitting insulators,
removing touchings and conveyance of materials
Conversion of one km LT S ph to 3 ph line incl. dismantling existing 2
conductors, stringing 3 Rabbit & 1 Weasel and conveyance.
Fitting one No Section fuse on LT line with dropping cables, crimping
sockets, connecting with bolt&nut etc.
Providing Guarding LT line one span for road crossing incl.earthing both
ends.
223
No
37.00
251
No
829.00
No
1244.00
No
1286.00
No
1659.00
No
1659.00
No
1451.00
No
1685.00
No
2138.00
No
1256.00
No
1940.00
No
2393.00
No
1511.00
No
656.00
No
1029.00
No
1104.00
No
913.00
No
43.00
No
55.00
No
2051.00
252
253
254
255
256
257
258
259
260
261
262
263
Giving one three phase WP service connection (up to 10kW) as per standards,
incl. conveyance of materials.
Giving one three phase WP service connection (above10kW to 25 kW) as per
standards, incl. conveyance of materials.
Giving one three phase WP Service Connection with CT connections as per
standards, incl. conveyance of materials.
Converting Single phase WP Service connection to three phase Service
Connection, incl. conveyance of materials.
Converting three phase WP Service connection to single phase Service
Connection, incl. conveyance of materials.
Constructing One span S ph OH line for giving S/C using PSC pole with one
stay incl. digging& back filling 2 pits, cutting tree branches .
Constructing One span S ph OH line for giving S/C using PSC pole with PSC
strut incl. digging& back filling 2 pits, cutting tree branches.
Constructing One span S ph OH line for giving S/C using PSC pole without
stay/strut incl. digging& back filling pit, cutting tree branches.
Constructing One span 3 Ph OH line for giving S/C using PSC pole with one
stay incl. digging& back filling 2 pits, cutting tree branches.
Constructing One span 3 Ph OH line for giving S/C using PSC pole with PSC
strut incl. digging& back filling 2 pits, cutting tree branches..
Constructing One span 3 Ph OH line for giving S/C using PSC pole without
stay/strut incl. digging& back filling pit, cutting tree branches.
Conversion of one span S ph OH line to 3 ph incl. dismantling existing line,
stringing new Rabbit for phase and Weasel for neutral & conveyance.
Installing one pole top service connection box Sph 6 way and giving
connections.
Installing one pole top service connection box 3 ph 6 way and giving
268
connections.
267
No
2516.00
303
No
3774.00
No
2373.00
No
2838.00
306
Renewal of existing damaged/old 11 kV 'A' type pole with new A' type pole
in place and refitting of all items incl conveyance (except pole).
Renewal of existing damaged/old 11 kV 4 legged pole with new 4 legged pole
308
in place and refitting of all items incl conveyance (except pole).
Renewal of existing damaged/old 11 kV TW/RSJ/Rail DP with new PSC DP
309
in place and refitting of all items incl conveyance (except poles).
Renewal of existing damaged/old 11 kV PSC DP with new PSC DP in place
310
and refitting of all items incl conveyance (except poles).
307
No
4256.00
No
2891.00
No
4337.00
No
5347.00
No
5990.00
311
No
6176.00
312
No
9264.00
313
No
6819.00
314
No
10228.00
315
No
7026.00
316
No
10539.00
No
15026.00
No
15441.00
No
16818.00
No
15669.00
No
16084.00
No
17782.00
No
128.00
No
321.00
No
321.00
326
No
850.00
327 Renewal of existing damaged/ broken old 11kV Stay to the existing stay rod.
No
270.00
No
270.00
No
2084.00
No
2292.00
Renewal of existing damaged/old 11 kV Fly Stay with new Fly stay incl.
331 renewal of HT PSC pole and refitting of all items and conveyance (except
pole).
No
3292.00
Renewal of existing damaged/old 11 kV Fly Stay with new Fly stay incl.
332 renewal of 'A' type pole and refitting of all items and conveyance (except
pole).
No
3499.00
No
325.00
No
753.00
No
316.00
No
1898.00
No
106.00
No
106.00
No
321.00
No
195.00
No
133.00
No
353.00
No
353.00
No
337.00
No
316.00
No
643.00
No
524.00
No
850.00
No
3712.00
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
Dismantling 25 kVA Tr., erecting new 25 kVA Tr. in place incl. loading &
unloading at site.
Dismantling 63 kVA Tr., erecting new 63 kVA Tr. in place incl.loading &
unloading at site.
Dismantling 100 kVA Transformer, erecting new 100 kVA Transformer,
giving connections incl. loading & unloading at site.
Dismantling 160 kVA Transformer, erecting new 160 kVA Transformer,
giving connections incl. loading & unloading at site.
Dismantling 250 kVA Transformer, erecting new 250 kVA Transformer,
giving connections incl. loading & unloading at site.
No
3544.00
No
3712.00
No
5383.00
No
5552.00
No
6159.00
401
No
1412.00
402
No
1619.00
No
1584.00
No
1791.00
No
170.00
No
539.00
No
207.00
No
207.00
No
1218.00
No
2020.00
No
121.00
No
223.00
No
51.00
No
301.00
No
65.00
No
44.00
No
38.00
No
47.00
No
409.00
No
791.00
Additional rate for refitting/ redoing one Shackle set while renewing any type
of pole.
Renewal of existing damaged/old LT stay with new stay in place and refitting
406
of all items and conveyance of all materials.
407 Renewal of existing damaged/ broken old LT stay with existing stay rod.
405
421
422
423
424
425
451
452
453
454
455
456
476
477
478
501
502
503
504
505
506
507
508
509
510
Straightening one Slanted LT pole after unbinding the line and rebinding the
line after work.
Straightening one Slanted LT Cut pole after unbinding the line and rebinding
the line after work.
Reconductoring one km LT S ph 2 wire OH old line with new ACSR Rabbit
conductor incl. conveyance of materials.
Reconductoring one km LT 3 Ph 4 wire OH old line with new 3 ACSR
Rabbit one Weasel conductor incl. conveyance of materials.
Reconductoring one km LT OH one old conductor with New ACSR Rabbit
conductor incl. conveyance of materials.
Dismantling and reconnecting S ph service connection from the OH line incl.
lower down the WP portion.
Dismantling and reconnecting 3 ph service connection from the OH line incl.
lower down the WP portion.
Redoing S ph WP S/C complete incl. changing WP, E/Meter, cut-out, neutral
link etc, and conveyance of material.
Redoing 3 ph WP S/C complete incl. changing WP, E/Meter, cut-out, neutral
link etc, and conveyance of material.
Shifting One S ph metering equipment with all fittings at new location and
redoing the WP service wire.
Shifting One 3 ph metering equipment with all fittings at new location and
redoing the WP service wire.
Changing Faulty S ph Energy meter with new meter, giving connection incl.
conveyance of meter to the site and back to store.
Changing Faulty 3 ph Energy meter with new meter, giving connection incl.
conveyance of meter to the site and back to store.
Changing Faulty 3 ph CT meter with new meter & CT, giving connection
incl. conveyance of meter to the site and back to store.
Dismantling one damaged 11 kV TW/RSJ/Rail pole after disconnecting stays,
strut etc. and stacking the same.
Dismantling (with out damage) one No. 11 kV TW/RSJ/Rail pole after
disconnecting stays, strut etc. and stacking the same.
Dismantling one damaged 11 kV PSC/RCC pole after disconnecting stays,
strut etc. and stacking the same.
Dismantling (with out damage) one 11 kV PSC/RCC pole after disconnecting
stays, strut etc. and stacking the same.
Dismantling one damaged 11 kV 'A' type pole after disconnecting stays, strut
etc. and stacking the same.
Dismantling (with out damage) one 11 kV 'A' type pole after disconnecting
stays, strut etc. and stacking the same.
Dismantling one damaged 11 kV 4 legged pole after disconnecting stays, strut
etc. and stacking the same.
Dismantling (with out damage) one 11 kV 4 legged pole after disconnecting
stays, strut etc. and stacking the same.
Dismantling one damaged HT TW/RSJ/Rail Strut pole incl. removal of
clamps and stacking.
Dismantling (with out damage) one HT TW/RSJ/Rail Strut pole incl. removal
of clamps and stacking.
No
480.00
No
650.00
km
7848.00
km
16229.00
km
4190.00
No
43.00
No
64.00
No
415.00
No
523.00
No
394.00
No
518.00
No
49.00
No
90.00
No
529.00
No
490.00
No
811.00
No
812.00
No
1413.00
No
1019.00
No
1427.00
No
1529.00
No
2140.00
No
373.00
No
695.00
511
No
695.00
No
1294.00
km
6383.00
No
422.00
No
85.00
No
135.00
No
747.00
No
264.00
No
477.00
No
472.00
No
897.00
No
214.00
No
233.00
No
430.00
No
441.00
No
739.00
No
32.00
No
47.00
No
415.00
No
622.00
No
1071.00
km
2958.00
km
5382.00
km
1370.00
No
106.00
No
106.00
512
513
514
515
516
517
551
552
553
554
555
556
557
558
559
562
563
564
565
566
567
601
602
Dismantling single phase WP service connection with meter & all accessories
and bringing back to section store
Dismantling three phase WP service connection with meter & all accessories
and bringing back to section store .
Dismantling (with out damage) one span of HT or LT cradling and stacking
the same neatly and in good condition for re-use.
Dismantling (with out damage) one km LT S Ph 2 wire OH line, cross arms,
insulators and stacking the conductors in rolls.
Dismantling (with out damage) one km LT 3 Ph 4 wire OH line, cross arms,
insulators and stacking the conductors in rolls.
Dismantling (with out damage) one km LT additional conductor line, cross
arms, insulators and stacking the conductors in rolls.
Wiring and installing one new ordinary street light fitting on existing pole and
giving connections.
Wiring and installing one new CFL street light fitting on existing pole and
giving connections.
603
604
605
606
607
608
Wiring and installing one new LED street light fitting on existing pole and
giving connections
Dismantling (with out damage) one ordinary street light/ CFL/ LED fitting
from the pole and stacking.
Dismantling one ordinary street light/ CFL/ LED fitting from pole, repairing
and refitting the same in position and giving connection.
Wiring and installing new set 2 x 40 W fluorescent tube fitting on existing
poles incl. giving connection.
Dismantling one set 2x40 W fluorescent tube fitting from pole, repairing and
refitting the same in position and giving connection.
Replacing bulb on existing street light.
No
106.00
No
63.00
No
159.00
No
177.00
No
266.00
No
31.10
No
31.10
No
169.00
No
291.00
No
664.00
No
664.00
No
664.00
No
332.00
No
332.00
No
332.00
No
1061.00
No
415.00
No
1062.00
621
Dismantling SV/MV/Metal halide lamp fitting from the existing pole and
refitting the same on newly erected pole and reconnecting (using aerial lift).
No
531.00
622
No
62.00
651
km
833.00
km
1042.00
km
959.00
km
1217.00
km
1250.00
656
km
1563.00
657
km
783.00
km
916.00
No
215.00
No
369.00
No
561.00
No
324.00
No
587.00
No
822.00
Loading HT TW/RSJ/Rail pole from the stacking place and unloading the
same at work site (transport by vehicle).
No
161.00
No
358.00
No
423.00
No
593.00
No
117.00
No
224.00
No
633.00
No
1058.00
No
840.00
No
1265.00
No
861.00
No
1073.00
No
1073.00
No
1286.00
701
702
703
704
705
706
707
708
709
710
711
712
713
714
Loading HT PSC pole from the stacking place and unloading the same at
work site (transport by vehicle).
Loading HT 'A' type pole from the stacking place and unloading the same at
work site (transport by vehicle).
Loading HT 4 legged pole from the stacking place and unloading the same at
work site (transport by vehicle).
Loading LT TW/RSJ/Rail pole from the stacking place and unloading the
same at work site (transport by vehicle).
Loading LT PSC pole from the stacking place and unloading the same at work
site (transport by vehicle).
Unloading one Transformer (up to and incl. 160 kVA) from vehicle to ground
incl. conveyance up to 25 m.
Unloading one Transformer (above 160 kVA) from vehicle to ground incl.
conveyance up to 25 m.
Loading one Transformer (up to and incl. 160 kVA) from ground to vehicle
incl. conveyance up to 25 m.
Loading one Transformer (above 160 kVA) from ground to vehicle incl.
conveyance up to 25 m.
Dismantling one Transformer up to 160 kVA from structure and loading to
vehicle incl. disconnecting HT/LT/Earth connections.
Dismantling one Transformer above 160 kVA from plinth and loading to
vehicle incl. disconnecting HT/LT/Earth connections.
Dismantling one Transformer (up to and incl. 160 kVA) from existing
structure to ground.
Dismantling one Transformer (above 160 kVA) from existing plinth to
ground.
726
Trip
792.00
km
33.00
Trip
792.00
km
33.00
No
6327.00
No
6496.00
No
4692.00
No
5070.00
No
5307.00
No
5846.00
No
6014.00
km
19826.00
No
7.00
No
17.00
No
32.00
No
22762.00
No
2593.00
Sq M
1224.00
Sq M
216.00
No
1623.00
No
35.00
No
3.60
No
169.00
727
355
356
357
358
359
360
361
362
Providing one Earth using earth pipe incl. digging & backfilling pit and
supply of charcoal, salt, sand etc.
Painting the surface of pole with anti algal yellow paint and painting Letters
776
with black paint as specified incl. cost of paint.
Preparing index register (book & soft copy) showing name of Transformer,
777
post numbers, consumer numbers as specified.
Traffic signal painting of pole 1.5 m height using black and white paints in
778
alternate rings of 25 cm width incl. cost of paint as specified
955
No
13.40
No
946.00
No
7.00
Materials
Rate
PSC Pole 7m
1111.00
PSC Pole 8m
1353.00
PSC Pole 9m
2189.00
A Pole 10m
12500.00
A Pole 11m
13700.00
A Pole 12m
15000.00
A Pole 13m
16300.00
A Pole 14m
34000.00
53.81
10
47.00
11
Packing clamp - LT
26.00
12
101.16
13
454.71
14
Disc insulator 11 kV
254.71
15
217.88
16
200.00
17
MS Cleat
54.44
18
GI Cleat
19
105.00
20
41.99
21
Shackle insulator - LT
46.00
22
31.00
23
21.00
24
35.00
25
981.53
26
877.33
27
Stay insulator - 11 kV
30.00
28
Stay insulator - LT
10.00
29
Stay rod - HT
345.00
30
Stay rod - LT
239.00
31
Stay Tightner - HT
427.00
32
Stay Tightner - LT
360.00
33
RCC stayblock
64.00
34
8499.67
35
244.00
36
130.00
37
438.68
38
581.40
39
468.00
40
638.60
41
125.00
42
304.44
43
570.83
44
748.71
45
60.00
46
Fuse wire
kg
535.00
47
951.00
48
256.00
49
262.00
50
498.00
51
472.00
52
67.00
53
1063.20
54
1176.00
55
1364.50
56
1464.00
57
2063.50
58
59
153.00
60
V Cross arm - 11 kV
975.00
61
164.00
62
kg
65.20
63
PG clamp (Raccoon)
145.00
64
ACSR Raccoon
km
50820.00
65
ACSR Rabbit
km
37110.00
66
ACSR Weasel
km
20400.00
67
ACSR Squirrel
km
13770.00
68
mtr
545.00
69
Coil
293.00
70
Coil
700.00
71
Coil
1260.00
72
24.00
73
40.00
74
55.00
75
64.00
76
82.00
77
85.00
78
79
80
27.85
81
54.00
82
65.90
83
79.90
84
92.00
85
109.00
86
1583.28
87
3500.00
88
End termination kit (Heat shrinkable type) 300 sq.mm XLPE cable
2600.00
89
Straight joint kit (Heat shrinkable type) 300 sq.mm XLPE cable
6600.00
90
5083.00
91
5.50
92
6.25
93
9.25
94
13.00
95
17.00
96
21.00
97
540.00
98
HT Stay wire
56.02
99
kg
43.43
58350.00
90676.49
152316.00
207789.00
395944.00
118044.00
172087.00
kg
86.00
656.50
2477.63
3198.00
3777.75
115 CT - 100/5
430.00
116 CT - 150/5
600.00
117 CT - 200/5
320.62
32820.00
2953.00
40.00
121 Double tube flourescent street light fitting with bracket, clamp, B&N
1080.00
122 Pipe fittings for flourescent tube with clamp,bolt & nut
300.00
kg
225.00
kg
212.50
7.00
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
HT LINE WORKS
LT LINE WORKS
SERVICE
CONNECTION
HT MAINTENANCE
WORK
LT MAINTENANCE
WORK
MAINTENANCE OF
SERVICE
CONNECTION
METER CHANGING
DISMANTLING HT
DISMANTLING LT
STREET LIGHT
CLEARING
TOUCHINGS (HT)
CLEARING
TOUCHINGS (LT)
Tree Cutting
LOADING AND
UNLOADING
Transportation of
Transformer/pole by
lorry
HT MAINTENANCE
WORK
FABRICATING WORKS
CIVIL WORKS
EARTHING
Painting
POLES
LINE MATERIALS
METERING EQUIPMENTS
OTHERS
S AND CABLES
QUIPMENTS
GHT FITTINGS
Name of work : Fabrication of old dismantled control panels to convert them as storewels for office use under 220kV
Substation Sub Division Poovanthuruthu, .
Ele.SubDivision :
Particulars
101 Fabrication of storewel cum cupboard from the old, dismantled and
unusable control and relay panels od old 220 kv substation control room
for the use of various offices.The work includes
cutting,Drilling,leveling,filing and fabricating of storewell cum cupboards
of aproximate size 50X 60 x 180 cm and providing 3no of shelves inside
the newly fabricated cupboard for keeping the files and a door with the
hand lock facility, the charges includes welding,grinding sectioning and
aligning etc complete
SNo Key
Unit
No
Rate
1781.68
Add
Qty
14
TOTAL
Amount
24943.52
24943.52
Asst.
Assistant Engineer,
Ele.Section,
Engineer
SNo Key
Particulars
Unit
Rate
Add
Qty
Amount
SNo Key
Particulars
Unit
Rate
Add
Qty
Amount
SNo Key
Particulars
Unit
Rate
Add
Qty
Amount
Estimate sanction - Fabrication of old dismantled control panels to convert them as storewels for office
useunder 220kV Substation Sub Division Poovanthuruthu, - reg.
ORDER No. DB / WE / 58 / 2013-14 / dt. 23-12-2013
Ref :
ORDER
Sanction is hereby accorded to the working estimate amounting to Rs.24944/-( Rupees TwentyFour
Thousand Nine Hundred and FortyFour Only ) towards the labour and transporting portion of the subject
work.Funds to the extent may be met from :1- Current years budget provision of Substation Sub Division, under Operation & Maintenance Service and
charged to A/c No. 0
2- Amount remitted by the party/ local body/ department/ others, towards the execution of subject work and
charged to A/c No. .............................
Assistant Engineer,
Ele.Section,
Acc:-Copy of the sanctioned estimate.
Copy submitted to:1- Asst.Executive Engineer,
Ele.Sub Division,
2Copy to:1- Assistant Engineer,220kV Substation section
2-
Estimate
Amount
(Rs)
Name of work
EMD
(Rs)
Cost of
Tender form
24944/-
ORDER
1- Quotations should be addressed to the undersigned and should be received at Office of the
...... ........... ...... ..... ..... ...... .... .... ..... ..... (Name of office) on or before ..AM/PM on ...........(Date).
2- Quotations shall be opened at ........AM/PM on the same day or any day fixed by the undersigned.
3- Quotations from Contractors/suppliers/Agencies within the state of Kerala will be preferred.
4- If ordered, an agreement in stamp paper worth Rs.100/- will have to be executed if necessary after furnishing the
required security deposit.
5- All other conditions prevalent in the KSE Board for the contract work shall be binding for the contractors as per
this quotation.
.......................................
QUOTATION
Name of work : Fabrication of old dismantled control panels to convert them as storewels for office use under 220kV
Substation Sub Division Poovanthuruthu, .
220kv Sub Station.SubDivision :
Particulars
101 Fabrication of storewel cum cupboard from the old, dismantled and
unusable control and relay panels od old 220 kv substation control room
for the use of various offices.The work includes
cutting,Drilling,leveling,filing and fabricating of storewell cum cupboards
of aproximate size 50X 60 x 180 cm and providing 3no of shelves inside
the newly fabricated cupboard for keeping the files and a door with the
hand lock facility, the charges includes welding,grinding sectioning and
aligning etc complete
SNo Key
Unit
No
TOTAL
I agree to carry out the work at .............% Above/ Below Estimate rate
Rate
1781.68
Add
Qty
14
Amount
24943.52
24943.52
SNo Key
Particulars
Unit
Rate
Add
Qty
Amount
SNo Key
Particulars
Unit
Rate
Add
Qty
Amount
SNo Key
Particulars
Unit
Rate
Add
Qty
Amount
Fabrication of old dismantled control panels to convert them as storewels for office useunder 220kV
Substation Sub Division Poovanthuruthu, - Orders issued - reg.
Work Order No. DB / WO / .......... / 20...--... / dt. ..............................
Ref :
1 - Work Estimate sanction No. DB / WE / 58 / 2013-14 / dt. 23-12-2013 of Assistant Engineer,
Ele.Section,
2 - Your Quotation / Tender No. ..................... Dated. ...............................
ORDER
Your offer to carryout the subject work at the quoted rate of at 'Estimate Rate' is hereby accepted and the work is
awarded in your favour subject to the following conditions.
1- You are requested to execute the contract agreement in non judicial stamp paper worth Rs.100/- for the full fillment of the
contract within .................. days.
2- You are requested to remit an amount of Rs...................../- either by DD/Cash in this office towards the security deposit .The
EMD remitted by you for this work will be released for the part of security deposit.
3- The work may be started in consultation with the undersigned and should be completed within ............. days.
4- The safety of the workmen engaged by You is at your risk and cost. No compensation will be paid by the KSE Board
5- You are responsible for the safe custody of the KSE Board's materials/equipments issued to you for this work till the
completion of work.
6- All terms and conditions in force pertaining to contract work in KSE Board will be applicable to this work also.
7- The Key and description in the Work Estimate/ Schedule of work represents the detail description of work given in the Labour
Data approved vide.
Yours faithfully,
12Copy to:-
1-
.............................................
2-
AGREEMENT
No. ............/ 20....--..../ Dated. .................
ARTCLES OF AGREEMENT made this ................ day of ........................ between the ............................. acting for and on
behalf of the KERALA STATE ELECTRICITY BOARD (hereinafter reffered to as the 'KSE Board' which expression shall,where
the context so admits or implies be deemed to include their successors in office and assignees) of the one part AND
Sri/Smt (hereinafter called the 'contractor') which expression shall where the context so admits or implies be deemed to include
his/her successors interest,legal representatives and assignees as well) of the other part.
WHERE AS the contractor has agreed with the KSE Board for the performance of the work set forth in the quotation/ tender
and accompaniments here unto annexed and marked as 'Schedule A' up on the conditions herein mentioned.
AND WHERE AS the performance of the said work is an act in which the public are interested and is entered into under the
orders of the KSE Board.
AND WHERE AS the Contractor has deposited in cash/DD amounting to Rs.................... (Rupees.................... ..........................
.......................... .....................) at this office vide Receipt No............... Dated.................... as Security Deposit for the due
performance of this contract.
NOW THESE PRESENTS WITNESS that in consideration of the payment to be made by the KSE Board herein after
mentioned, the contractor will duly perform the said works in the said schedule set forth and will complete the same
in accordance with plans and specifications thereon to annexed on or before the day(date) ..................
and will observe fulfill and keep all the conditions therein mentioned ( which shall be deemed and taken to be a part of this contract
as if the same had been fully set out therein ) and the KSE Board both hereby agree that if the contractor shall duly perform the said
work in the manner aforesaid and observe and keep the said terms and conditions,
the KSE Board will pay or cause to be paid to the contractor at the times and in the manner in the said conditions set forth the sum
of Rs.24944/- ( Rupees TwentyFour Thousand Nine Hundred and FortyFour Only ) as payment for the said work.
It is also agree that the KSE Board will in no way be liable to pay compensation as per workmen's compensation act, to the workmen
engaged by the contractor should they met with accidents, if any during the execution of the contracts work.
The Key and description in the Work Estimate/ Schedule of work represents the detail description of work given in the Labour Data
approved vide.
Signature of (1)
.................................................
Signature of (2)
.................................................
(Contractor )
Unit
No
Rate
1781.68
Add
Qty
14
TOTAL
Amount
24943.52
24943.52
Engineer
SNo Key
Particulars
Unit
Rate
Add
Qty
Amount
SNo Key
Particulars
Unit
Rate
Add
Qty
Amount
SNo Key
Particulars
Unit
Rate
Add
Qty
Amount
Particulars
Unit
Rate
Add
Qty
Asst.Engineer
Ele.Section,
Assistant Engineer,
Ele.Section,
Amount
Name of work : Fabrication of old dismantled control panels to convert them as storewels for office use under Ele.section,
Consumer / Pole No
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Location wise details of work : Fabrication of old dismantled control panels to convert them as storewels for office useunder 220kV Substation Sub Division Poovanthurut
Bring Total to - Rs. 24944.00
Ele.SubDivision :
Sl
No
Key
Qty
Total : 0.00
Km
Particulars
Amount
TOTAL
Key
Qty
Materials
Sl
No
Key
Qty
Km
Particulars
Amount
Key
Qty
Materials
Sl
No
Key
Qty
Km
Particulars
Amount
Key
Qty
Materials
Sl
No
Key
Qty
Km
Particulars
Amount
Key
Qty
Materials
Sl
No
Key
Qty
Km
Particulars
Amount
Key
Qty
Materials
Sl
No
Key
Qty
Km
Particulars
Amount
Key
Qty
Materials
Sl
No
Key
Qty
Km
Particulars
Amount
Key
Qty
Materials
-1-
Bill Register No
220kvsumbstaion Section
1188 ME
2013 AD
Budget Provision
Rs. 24944/ -
Sub-head:
.....................
Agreement No:
Name of Contractor :
Amount of contract
Rs. 24944/-
Entered in
Adjusted receipts and issues as per part IV(Materials account) of this bill in
the MAS.Account for the month of
...
ACCOUNTANT
No:..
DIVISIONAL ACCOUNTANT
DIVISIONAL OFFICER
NOTES
[ 1 ].This contract certificate will be in four parts.
Part I comprising the body of the bill will show the quantities
and value of work done: Part II embodies certificates and
signatures of various officers
responsible for measuring,checking and payment.
Part III comprises the detailed memorandum of payment. Part
IV gives the account of materials received and issued for the
work billed for.
1
1
2
101
Ref. to
M Book
As per Agreement
Number/
Quantity/
Weight
Number/
Quantity/
Weight
Rate
Rs Ps
Per
Unit
3
14
4
14
5
1781.68
No
Book
No
Page
No
Value at
Quantities
Agreement rate
of work
of work done
done
Rs Ps
10
14
11
24943.52
24943.52
Remarks
12
-31
B/F Rs:
24943.52
24943.52
12
- 4 (a)Estimate
Item
Key
No
Ref. to
M Book
As per Agreement
Number/
Quantity/
Weight
Number/
Quantity/
Weight
Rate
Rs Ps
Per
Unit
Value at
Quantities Agreement
Pag of work rate of work
Book
e
done
done
No
Rs Ps
No
B/F
24943.52
24943.52
Remarks
12
- 4 (b) 1
B/F Rs.
24943.52
24943.52
12
- 4 (c)Estimate
Item
Key
No
Ref. to
M Book
As per Agreement
Number/
Quantity/
Weight
Number/
Quantity/
Weight
Rate
Rs Ps
Per
Unit
Value at
Quantities Agreement
Pag of work rate of work
Book
done
done
e
No
Rs Ps
No
B/F
24943.52
24943.52
0.00
24943.52
Remarks
12
-5-
10
11
:
:
:
Rs.
0.00
0.00
0.00
24943.52
12
Asst. Accountant
. Senior Accountant
Officer
preparing the bill
Dated signature ..
Rank
Division Officer
C .Audit Section
Checked again the calculation and verified the rates against the contract schedule, quantities against Estimate provisions and
receipts and issues against sanctioned date
Vide I Sub Division Audit Slip No
attached
Accountant
...Head Clerk
* This column need be filled in only when the contractor submits the bill
-7-
Figures for
works abstract
Rs.
Rs
Ps
(a)
Rs
Ps
TOTAL 2 ( b ) and ( c )
The Total value of work is admitted and passed for Rupees (in words)..
..
Officer authorising
payment
Dated signature
Rank
pay in cheque.
Paid in cash
paid in cheque
Paid by me ....
Received Rupees (in words).
.
as per above memorandum in settlement of all my claims and liabilities.
( amount in vernacular )
Left hand thumb impression
Dated of ..
Rs (in figures)
Left hand thumb impression
Witness
Stamp
Ps
-8-
Sl No
Description
MCS No:
Remarks
6
TAKEN BACK
Officer
Verified
Accountant
Audit Section
measuring
the work and
preparing the Bill
Signature
Rank ..
Signature of Contractor
(at the time of payment)
Date :..
: 0
: NA
: 0
: 0
: 12/30/1899
: 12/30/1899
: 12/30/1899
11- Bill No
: 1
: 0
14- In the Certificate, the MCS No. And MASA No. In which
the materials booked to be mentioned.
Yes
No
NA
2- Whether a deviation statement has been prepared and attached , showing the
reason for deviation.
Yes
No
NA
3- Whether there is sanction for excess over estimate and proper explanation
furnished for the deficiency (In case where there is deficiency).
Yes
No
NA
4- Whether measurement has been done as required in para 316 & 317 of K.P.W.A
code.
Yes
No
NA
Yes
No
NA
Yes
No
NA
7- Whether NLC of the contractor has been furnished in the M Book and bill.
Yes
No
NA
8- Whether prescribed certificated have been furnished in the M Book and Bills.
Yes
No
NA
9- Whether first page of the bill has been properly filled up with required details.
Yes
No
NA
10- Whether material account have been properly written up in part IV and reconciled :
with MRCI/Debit slips/Devolution Notes etc. and whether copies of MRCI
enclosed for verification.
Yes
No
NA
Yes
No
NA
:
12- Whether penal recovery for materials not returned have been effected from the
bill.
13- Whether income tax at 2% and surcharge at 5% of income tax have been deducted :
from the bill.
Yes
No
NA
Yes
No
NA
Yes
No
NA
Yes
No
NA
Yes
No
NA
Yes
No
NA
18- Whether two copies of Estimate sanction (of AS, Working estimate etc.), work
order, agreement etc attached.
Yes
No
NA
Yes
No
NA
20- Whether security deposit @ 5% of total amount is collected and copy of receipt is :
attached.
Yes
No
NA
Yes
No
NA
Yes
No
NA