Académique Documents
Professionnel Documents
Culture Documents
Technical Description
Issue Date Draft A 2011-01-31
Copyright Huawei Technologies Co., Ltd. 2011. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS" without warranties, guarantees or representations of any kind, either express or implied. The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute the warranty of any kind, express or implied.
Website: Email:
Product Version
The following table lists the product version related to the document. Product Name BSC6900 Product Version V900R013C00
Intended Audience
This document is intended for: l l l Network planners System engineers Field engineers
Organization
1 Changes in the BSC6900 GU Technical Description This document describes the changes in the BSC6900 GU Technical Description. 2 Hardware Configuration Modes The BSC6900 supports flexible hardware configuration mode, which varies according to the scenario. 3 Overall Structure This chapter describes the interactions between the modules in the BSC6900.
Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. iii
4 Working Principles This chapter describes the working principles of the BSC6900 in the following ways: power supply, environment monitoring, clock synchronization, and OM. 5 Signal Flow The BSC6900 signal flow consists of the user-plane signal flow, control-plane signal flow, and OM signal flow. 6 Transmission and Networking The transmission and networking between the BSC6900 and other NEs can be classified into the following types: transmission and networking on the A/Gb interface, on the Abis interface, on the Ater interface, on the Pb interface, on the Iub interface, and on the Iu/Iur interface. 7 Parts Reliability The BSC6900 guarantees its operation reliability by means of board redundancy and port redundancy.
Conventions
Symbol Conventions The symbols that may be found in this document are defined as follows. Symbol Description Indicates a hazard with a high level of risk, which if not avoided, will result in death or serious injury. Indicates a hazard with a medium or low level of risk, which if not avoided, could result in minor or moderate injury. Indicates a potentially hazardous situation, which if not avoided, could result in equipment damage, data loss, performance degradation, or unexpected results. Indicates a tip that may help you solve a problem or save time. Provides additional information to emphasize or supplement important points of the main text.
General Conventions The general conventions that may be found in this document are defined as follows. Convention Times New Roman Description Normal paragraphs are in Times New Roman.
iv
Description Names of files, directories, folders, and users are in boldface. For example, log in as user root. Book titles are in italics. Examples of information displayed on the screen are in Courier New.
Command Conventions The command conventions that may be found in this document are defined as follows. Convention Boldface Italic [] { x | y | ... } [ x | y | ... ] { x | y | ... }* Description The keywords of a command line are in boldface. Command arguments are in italics. Items (keywords or arguments) in brackets [ ] are optional. Optional items are grouped in braces and separated by vertical bars. One item is selected. Optional items are grouped in brackets and separated by vertical bars. One item is selected or no item is selected. Optional items are grouped in braces and separated by vertical bars. A minimum of one item or a maximum of all items can be selected. Optional items are grouped in brackets and separated by vertical bars. Several items or no item can be selected.
[ x | y | ... ]*
GUI Conventions The GUI conventions that may be found in this document are defined as follows. Convention Boldface > Description Buttons, menus, parameters, tabs, window, and dialog titles are in boldface. For example, click OK. Multi-level menus are in boldface and separated by the ">" signs. For example, choose File > Create > Folder.
Keyboard Operations The keyboard operations that may be found in this document are defined as follows.
Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. v
Description Press the key. For example, press Enter and press Tab. Press the keys concurrently. For example, pressing Ctrl+Alt +A means the three keys should be pressed concurrently. Press the keys in turn. For example, pressing Alt, A means the two keys should be pressed in turn.
Mouse Operations The mouse operations that may be found in this document are defined as follows. Action Click Double-click Drag Description Select and release the primary mouse button without moving the pointer. Press the primary mouse button twice continuously and quickly without moving the pointer. Press and hold the primary mouse button and move the pointer to a certain position.
vi
Contents
Contents
About This Document...................................................................................................................iii 1 Changes in the BSC6900 GU Technical Description...........................................................1-1 2 Hardware Configuration Modes.............................................................................................2-1 3 Overall Structure........................................................................................................................3-1
3.1 Switching Subsystem......................................................................................................................................3-5 3.2 Service Processing Subsystem......................................................................................................................3-10 3.3 Interface Processing Subsystem....................................................................................................................3-12 3.4 Clock Synchronization Subsystem................................................................................................................3-13 3.5 OM Subsystem..............................................................................................................................................3-14
4 Working Principles....................................................................................................................4-1
4.1 Power Supply Principle...................................................................................................................................4-2 4.2 Environment Monitoring Principle.................................................................................................................4-3 4.3 Clock Synchronization Principle.....................................................................................................................4-6 4.3.1 Clock Sources.........................................................................................................................................4-6 4.3.2 Structure of the clock synchronization subsystem.................................................................................4-7 4.3.3 Clock Synchronization Process..............................................................................................................4-9 4.3.4 RFN Generation and Reception...........................................................................................................4-11 4.4 OM Principle.................................................................................................................................................4-12 4.4.1 Dual OM Plane.....................................................................................................................................4-13 4.4.2 OM Network........................................................................................................................................4-14 4.4.3 Active/Standby Workspaces................................................................................................................4-16 4.4.4 Data Configuration Management.........................................................................................................4-18 4.4.5 Security Management...........................................................................................................................4-21 4.4.6 Performance Management....................................................................................................................4-25 4.4.7 Alarm Management..............................................................................................................................4-26 4.4.8 Loading Management...........................................................................................................................4-28 4.4.9 Upgrade Management..........................................................................................................................4-32 4.4.10 BTS Loading Management................................................................................................................4-34 4.4.11 BTS Upgrade Management................................................................................................................4-35
5 Signal Flow..................................................................................................................................5-1
5.1 User-Plane Signal Flow...................................................................................................................................5-2 Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. vii
Contents
BSC6900 GU Technical Description 5.1.1 GSM CS Signal Flow.............................................................................................................................5-2 5.1.2 GSM PS Signal Flow.............................................................................................................................5-7 5.1.3 UMTS Signal Flow Between Iub and Iu-CS/Iu-PS...............................................................................5-9 5.1.4 CBC Signal Flow.................................................................................................................................5-11
5.2 Control-Plane Signal Flow............................................................................................................................5-13 5.2.1 Signaling Flow on the A Interface.......................................................................................................5-13 5.2.2 Signaling Flow on the Abis Interface...................................................................................................5-15 5.2.3 Signaling Flow on the Gb Interface.....................................................................................................5-17 5.2.4 Signaling Flow on the Pb Interface......................................................................................................5-17 5.2.5 Signaling Flow on the Uu Interface.....................................................................................................5-18 5.2.6 Signaling Flow on the Iub Interface ....................................................................................................5-20 5.2.7 Signaling Flow on the Iu/Iur Interface ................................................................................................5-21 5.3 OM Signal Flow............................................................................................................................................5-22
7 Parts Reliability..........................................................................................................................7-1
7.1 Concepts Related to Parts Reliability..............................................................................................................7-2 7.1.1 Backup....................................................................................................................................................7-2 7.1.2 Resource Pool.........................................................................................................................................7-3 7.1.3 Port Trunking.........................................................................................................................................7-3 7.1.4 Port Load Sharing...................................................................................................................................7-4 7.2 Board Redundancy..........................................................................................................................................7-4 7.2.1 Backup of AEUa Boards........................................................................................................................7-5 7.2.2 Backup of EIUa Boards..........................................................................................................................7-6 7.2.3 Backup of OIUa Boards.........................................................................................................................7-6 7.2.4 Backup of PEUa Boards.........................................................................................................................7-7 viii Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
Contents
7.2.5 Backup of SCUa/SCUb Boards..............................................................................................................7-8 7.2.6 Backup of TNUa Boards........................................................................................................................7-8 7.2.7 Backup of AOUa/AOUc Boards............................................................................................................7-9 7.2.8 Backup of FG2a/FG2c Boards.............................................................................................................7-10 7.2.9 Backup of GCUa/GCGa Boards..........................................................................................................7-11 7.2.10 Backup of GOUa/GOUc Boards........................................................................................................7-12 7.2.11 Backup of OMUa/OMUb/OMUc Boards..........................................................................................7-13 7.2.12 Backup of POUa/POUc Boards.........................................................................................................7-14 7.2.13 Backup of UOIa/UOIc Boards...........................................................................................................7-14 7.2.14 Backup of XPUa/XPUb/SPUa/SPUb Boards....................................................................................7-15 7.2.15 Resource Pool of DPUa/DPUb/DPUc/DPUd/DPUe/DPUf/DPUg Boards........................................7-16 7.3 Port Redundancy...........................................................................................................................................7-17 7.3.1 Optical Port Backup.............................................................................................................................7-17 7.3.2 FE/GE Port Backup..............................................................................................................................7-18 7.3.3 Port Load Sharing.................................................................................................................................7-18 7.3.4 Port Trunking.......................................................................................................................................7-19
ix
Figures
Figures
Figure 3-1 Structure of the host software.............................................................................................................3-2 Figure 3-2 Structure of the OMU software..........................................................................................................3-2 Figure 3-3 Logical structure of MPS/EPS............................................................................................................3-3 Figure 3-4 Logical structure of TCS.................................................................................................................... 3-3 Figure 3-5 Position of the switching subsystem in the BSC6900 system............................................................3-5 Figure 3-6 Position of the switching subsystem in the TCS................................................................................ 3-6 Figure 3-7 Network topologies between subracks...............................................................................................3-7 Figure 3-8 Interconnections between subracks through the crossover cables between the SCUa boards (MPS/EPS) ...............................................................................................................................................................................3-7 Figure 3-9 Interconnections between subracks through the crossover cables between the SCUa boards (TCS) ...............................................................................................................................................................................3-8 Figure 3-10 Interconnections between subracks through the crossover cables between the SCUb boards (MPS/ EPS).......................................................................................................................................................................3-8 Figure 3-11 Interconnections between subracks through the crossover cables between the SCUb boards (TCS) ...............................................................................................................................................................................3-9 Figure 3-12 Interconnections between subracks through the inter-TNUa cables (MPS/EPS).............................3-9 Figure 3-13 Interconnections between subracks through the inter-TNUa cables (TCS)...................................3-10 Figure 3-14 Service processing subsystem........................................................................................................3-11 Figure 3-15 Position of the interface processing subsystem in the MPS/EPS...................................................3-12 Figure 3-16 Position of the interface processing subsystem in the TCS............................................................3-13 Figure 3-17 Position of the clock synchronization subsystem in the BSC6900 system....................................3-14 Figure 3-18 Position of the OM subsystem in the BSC6900 system.................................................................3-15 Figure 4-1 Power input part of the BSC6900.......................................................................................................4-2 Figure 4-2 Working principle of power monitoring.............................................................................................4-3 Figure 4-3 Working principle of fan monitoring..................................................................................................4-4 Figure 4-4 Working principle of environment monitoring...................................................................................4-5 Figure 4-5 Structure of the clock synchronization subsystem..............................................................................4-8 Figure 4-6 Structure of the clock synchronization subsystem..............................................................................4-9 Figure 4-7 Process of clock synchronization in the MPS/EPS (1).....................................................................4-10 Figure 4-8 Process of clock synchronization in the MPS/EPS (2).....................................................................4-10 Figure 4-9 Process of clock synchronization in the TCS...................................................................................4-11 Figure 4-10 Process of RFN generation and reception......................................................................................4-12 Figure 4-11 Dual OM plane...............................................................................................................................4-14 Figure 4-12 Structure of the OM network..........................................................................................................4-15 Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. xi
Figures
Figure 4-14 Principle of ineffective mode configuration...................................................................................4-19 Figure 4-15 Check of the data consistency between the OMU and the host boards..........................................4-21 Figure 4-16 Process of collecting performance measurement data periodically................................................4-25 Figure 4-17 Alarm management process............................................................................................................4-27 Figure 4-18 Working principle of the alarm box................................................................................................4-27 Figure 4-19 Loading process (1)........................................................................................................................4-29 Figure 4-20 Loading process (2)........................................................................................................................4-30 Figure 4-21 Loading process (3)........................................................................................................................4-31 Figure 4-22 Upgrade through the OM network..................................................................................................4-32 Figure 4-23 Upgrade process.............................................................................................................................4-33 Figure 5-1 GSM CS signal flow (1).....................................................................................................................5-2 Figure 5-2 GSM CS signal flow (2).....................................................................................................................5-3 Figure 5-3 GSM CS signal flow (3).....................................................................................................................5-4 Figure 5-4 GSM CS signal flow (4).....................................................................................................................5-4 Figure 5-5 GSM CS signal flow (5).....................................................................................................................5-5 Figure 5-6 GSM CS signal flow (6).....................................................................................................................5-6 Figure 5-7 GSM CS signal flow (7).....................................................................................................................5-6 Figure 5-8 GSM CS signal flow (8).....................................................................................................................5-7 Figure 5-9 GSM PS signal flow (1)......................................................................................................................5-8 Figure 5-10 GSM PS signal flow (2)....................................................................................................................5-9 Figure 5-11 Intra-BSC6900 data flow between Iub and Iu-CS/Iu-PS................................................................5-10 Figure 5-12 Inter-BSC6900 data flow between Iub and Iu-CS/Iu-PS................................................................5-11 Figure 5-13 Signal flow from Iu-BC/CBC-BSC to Iub/Abis.............................................................................5-12 Figure 5-14 Signaling flow on the A interface in A over TDM mode (BM/TC separated)...............................5-14 Figure 5-15 Signaling flow on the A interface in A over TDM mode (BM/TC combined)..............................5-14 Figure 5-16 Signaling flow on the A interface in A over IP mode....................................................................5-15 Figure 5-17 Signaling flow on the Abis interface in Abis over TDM mode......................................................5-16 Figure 5-18 Signaling flow on the Abis interface in Abis over IP mode...........................................................5-16 Figure 5-19 Signaling flow on the Gb interface.................................................................................................5-17 Figure 5-20 Signaling flow on the Pb interface.................................................................................................5-18 Figure 5-21 Intra-BSC6900 signaling flow on the Uu interface........................................................................5-19 Figure 5-22 Inter-BSC6900 signaling flow on the Uu interface........................................................................5-20 Figure 5-23 Signaling flow on the Iub interface................................................................................................5-21 Figure 5-24 Signaling flow on the Iu/Iur interface.............................................................................................5-22 Figure 5-25 OM signal flow (BM/TC separated)...............................................................................................5-23 Figure 5-26 OM signal flow (BM/TC combined)..............................................................................................5-24 Figure 6-1 TDM-based networking on the A interface in local TCS mode.........................................................6-2 Figure 6-2 TDM-based networking on the A interface in remote TCS mode......................................................6-2 Figure 6-3 TDM-based networking on the Gb interface......................................................................................6-3 Figure 6-4 IP over E1 networking on the A interface..........................................................................................6-3 Figure 6-5 IP over Ethernet networking on the A/Gb interface...........................................................................6-4 xii Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
Figures
Figure 6-6 TDM-based networking on the Abis interface...................................................................................6-5 Figure 6-7 IP over E1 Networking.......................................................................................................................6-5 Figure 6-8 IP over Ethernet networking (layer 2)................................................................................................6-6 Figure 6-9 IP over Ethernet networking (layer 3)................................................................................................6-6 Figure 6-10 TDM-based networking on the Ater interface..................................................................................6-7 Figure 6-11 IP-based networking on the Ater interface.......................................................................................6-8 Figure 6-12 TDM-based networking on the Pb interface.....................................................................................6-8 Figure 6-13 SDH-based networking with MSP backup between optical ports..................................................6-10 Figure 6-14 SDH-based networking with load sharing between optical ports...................................................6-11 Figure 6-15 SDH-based networking with STM-1 shared between Iu and Iur...................................................6-12 Figure 6-16 ATM-based networking..................................................................................................................6-13 Figure 6-17 Single-homing layer 3 networking.................................................................................................6-15 Figure 6-18 Dual-homing layer 3 networking....................................................................................................6-16 Figure 6-19 Direct connection with load sharing...............................................................................................6-17 Figure 6-20 SDH-based networking with MSP backup between optical ports..................................................6-17 Figure 6-21 SDH-based networking with load sharing between optical ports...................................................6-18 Figure 6-22 SDH-based networking with STM-1 shared between Iu and Iur...................................................6-19 Figure 6-23 ATM over E1/STM-1 networking (transparent TDM transmission).............................................6-21 Figure 6-24 ATM over E1 networking (ATM transmission convergence)........................................................6-21 Figure 6-25 ATM over STM-1 networking (ATM transmission convergence).................................................6-22 Figure 6-26 IP over E1 networking....................................................................................................................6-23 Figure 6-27 IP over Ethernet networking (layer 2)............................................................................................6-23 Figure 6-28 IP over Ethernet networking (layer 3)............................................................................................6-24 Figure 6-29 IP networking based on hybrid transport........................................................................................6-24 Figure 6-30 ATM/IP-based networking on the Iub interface.............................................................................6-25
xiii
Tables
Tables
Table 3-1 Components of the BSC6900 cabinet..................................................................................................3-1 Table 4-1 Definitions of the user rights..............................................................................................................4-22 Table 4-2 Types of logs......................................................................................................................................4-24
xv
Draft A (2011-01-31)
This is the Draft A release of V900R013C00. Compared with issue 03 (2010-09-20) of V900R012C01, this issue does not include any new topics. Compared with issue 03 (2010-09-20) of V900R012C01, this issue incorporates the following changes. Content 3.1 Switching Subsystem Description The description of the inter-subrack switching principle when the SCUb is configured is added. The description of the SCUb board is added. The description of the OMUc board is added. The description of the DPUf/DPUg board is added.
7.2.5 Backup of SCUa/SCUb Boards 7.2.11 Backup of OMUa/OMUb/OMUc Boards 7.2.15 Resource Pool of DPUa/DPUb/ DPUc/DPUd/DPUe/DPUf/DPUg Boards
Compared with issue 03 (2010-09-20) of V900R012C01, this issue does not exclude any topics.
1-1
2
Configuration of Subracks
The BSC6900 supports flexible hardware configuration mode, which varies according to the scenario.
The subracks of the BSC6900 are classified into the main processing subrack (MPS) and the extended processing subrack (EPS). If the BSC6900 is deployed in the GSM network, the transcoder subrack (TCS) may exist. In this case, the MPS and EPS are collectively known as basic module (BM) subrack, and the TCS is known as TC subrack.
When the BSC6900 is deployed in the UMTS network, the subrack configuration modes mentioned earlier are no longer applicable.
When the BSC6900 is deployed in the GSM network, three subrack configuration modes are supported: l BM/TC separated In BM/TC separated mode, the BSC6900 is configured with the MPS, EPS, and TCS (local or remote). Characteristics: In this mode, the installation location of the TCS is flexible. The TCS can be installed in the transcoder rack (TCR) and be placed on the CN side, thus saving the transmission resources between the BSC6900 and the CN. Alternatively, the TCS can be installed in the same cabinet as the MPS or EPS and be placed on the BSC6900 side. l BM/TC combined In BM/TC combined mode, the boards of the TCS are installed in the MPS or in the EPS, with the subrack names unchanged. Characteristics: The BSC6900 in this mode has higher hardware integration, and fewer cabinets and subracks when the capacity is the same, than in the BM/TC separated mode. l A over IP In A over IP mode, layer 3 (network layer) of the protocol stack on the A interface adopts the IP protocol. In this case, the BSC6900 is configured with the MPS and EPS but not with the TCS. The TC function is performed by the Media Gateway (MGW).
Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 2-1
Characteristics: In this mode, the BSC6900 has fewer cabinets and subracks. It must be interconnected with a specific MGW. One BSC6900 uses only one configuration mode.
2-2
3 Overall Structure
3
About This Chapter
Physical Structure
Table 3-1 Components of the BSC6900 cabinet Component MPS EPS TCS Independent fan subrack Power distribution box Configuration
Overall Structure
This chapter describes the interactions between the modules in the BSC6900.
The BSC6900 cabinet consists of power distribution boxes and subracks, as listed in Table 3-1.
One MPS must be configured. Zero to five EPSs can be configured. Zero to four TCSs can be configured. Each cabinet must be configured with one independent fan subrack. Each cabinet must be configured with one power distribution box.
NOTE
If the customer purchase the Nastar product of Huawei, the customer needs to install the SAU board in the MPS or EPS of the BSC6900 cabinet (the SAU board occupies two slots that work in active/standby mode). For details on how to install the SAU board, how to install the software on the SAU board, and how to maintain the SAU board, see the SAU User Guide of Nastar documents.
Software Structure
The software of the BSC6900 has a distributed architecture. It is classified into the host software and OMU software.
Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 3-1
3 Overall Structure
Host software The host software is distributed on the service boards. It consists of the operating system, middleware, and application software. See Figure 3-1. Figure 3-1 Structure of the host software
Operating system The VxWorks real-time embedded operating system runs on each service board. Middleware The Versatile Protocol Platform (VPP) and the Virtual Operating System (VOS) function as the middleware. The middleware enables the upper-layer application software to be independent from the lower-layer operating system so that software functions can be transplanted between different platforms. Application software Boards of different types can be installed with different application software. The application software is classified into radio resource processing software, resource control-plane processing software, base station management software, and configuration maintenance management software. l OMU software The Operation and Maintenance Unit (OMU) software runs on the OMUa board, OMUb board, OMUc board, and GBAM. The OMU is responsible for the operation and maintenance of the BSC6900. The OMU software consists of the operating system and the OMU application software. See Figure 3-2. Figure 3-2 Structure of the OMU software
Operating system The Dopra Linux, Suse Linux, or Windows Server 2003 operating system is used. OMU application software The OMU application software runs on the lower-level operating system and provides various service processes, including the LMT process, fault diagnosis process, and authentication process.
3-2 Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
3 Overall Structure
Logical Structure
Figure 3-3 and Figure 3-4 show the logical structure of the BSC6900. Figure 3-3 Logical structure of MPS/EPS
3-3
3 Overall Structure
Subsystems
Logically, the BSC6900 consists of the following five subsystems: 3.1 Switching Subsystem The switching subsystem performs switching of traffic data, signaling, and OM signals. 3.2 Service Processing Subsystem The BSC6900 service processing subsystem performs the control functions defined in the 3GPP protocols and processes services of the BSC6900. 3.3 Interface Processing Subsystem The interface processing subsystem provides transmission ports and resources, processes transport network messages, and enables interaction between the BSC6900 internal data and external data. 3.4 Clock Synchronization Subsystem The clock synchronization subsystem provides clock signals for the BSC6900, generates the RNC Frame Number (RFN), and provides reference clock signals for base stations. 3.5 OM Subsystem The OM subsystem enables the management and maintenance of the BSC6900 in the following scenarios: routine maintenance, emergency maintenance, upgrade, and capacity expansion.
3-4
3 Overall Structure
3-5
3 Overall Structure
Functions
l l l l Provides intra-subrack Medium Access Control (MAC) switching Provides intra-subrack Time Division Multiplexing (TDM) switching Provides inter-subrack MAC switching and TDM switching Distributes clock signals and RFN signals to the service processing boards
Hardware Involved
The switching subsystem consists of the SCUa/SCUb boards, TNUa boards, high-speed backplane channels in each subrack, crossover cables between SCUa/SCUb boards, and interTNUa cables.
Chain topology
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
3 Overall Structure
There is a connection between every two adjacent nodes. If an intermediate node is out of service, the communications between other nodes are affected. The bandwidth utilization in this topology is high. Figure 3-7 Network topologies between subracks
In the switching subsystem of the BSC6900, the star or chain topology is established among the MAC switching logical modules, and the mesh topology is established among the TDM switching logical modules.
Inter-Subrack Connection
The MAC switching logical modules switch the ATM/IP traffic data, OM signals, and signaling. Switching is performed by the SCUa boards and the Ethernet cables between the SCUa boards. The inter-subrack connections related to MAC switching can be classified into the following types: l Interconnections between the MPS and the EPSs The MPS functions as the main subrack, and a maximum of five EPSsfunction as extension subracks. The star interconnections between the MPS and the EPSs are established through the Ethernet cables between the SCUa boards, as shown in Figure 3-8. l Interconnections between the TCSs One TCS functions as the main subrack, and a maximum of three TCSs function as extension subracks. The star interconnections between the TCSs are established through the Ethernet cables between the SCUa boards, as shown in Figure 3-9. Figure 3-8 Interconnections between subracks through the crossover cables between the SCUa boards (MPS/EPS)
3-7
3 Overall Structure
Figure 3-9 Interconnections between subracks through the crossover cables between the SCUa boards (TCS)
Switching is performed by the SCUb boards and the Ethernet cables between the SCUb boards. The inter-subrack connections related to MAC switching can be classified into the following types: l Interconnections between the MPS and the EPSs The MPS functions as the main subrack. Star interconnections are established between the MPS and the EPSs in the MPR through the Ethernet cables between the SCUb boards. Chain interconnections are established between the EPSs in the MPR and other EPSs through the Ethernet cables between the SCUb boards, as shown in Figure 3-10. l Interconnections between the TCSs Any TCS functions as the main subrack. Star interconnections are established between the center TCS and the other TCSs in center TCR through the Ethernet cables between the SCUb boards. Chain interconnections are established between the two TCSs in the center TCR and other TCSs through the Ethernet cables between the SCUb boards, as shown in Figure 3-11. Figure 3-10 Interconnections between subracks through the crossover cables between the SCUb boards (MPS/EPS)
3-8
3 Overall Structure
Figure 3-11 Interconnections between subracks through the crossover cables between the SCUb boards (TCS)
As shown in Figure 3-10 and Figure 3-11, subracks 0, 1, and 2 are in the same cabinet and star interconnections are established between them through the Ethernet cables between the SCUb boards. Chain interconnections are established between subracks 2 and 3 through the Ethernet cables between the SCUb boards. Data is exchanged between subrack 0 and subrack 3 through subrack 2. The TDM switching logical modules switch the TDM-based traffic data. Switching is performed by the TNUa boards and the inter-TNUa cables. The inter-subrack connections related to TDM switching can be classified into the following types: l Interconnections between the MPS and the EPSs The mesh interconnections between the MPS and the EPSs are established through the inter-TNUa cables, as shown in Figure 3-12. l Interconnections between the TCSs The mesh interconnections between the TCSs are established through the inter-TNUa cables, as shown in Figure 3-13. Figure 3-12 Interconnections between subracks through the inter-TNUa cables (MPS/EPS)
3-9
3 Overall Structure
Figure 3-13 Interconnections between subracks through the inter-TNUa cables (TCS)
For details about the definitions of CP and UP, see 5 Signal Flow.
3-10
3 Overall Structure
Functions
The service processing subsystem performs the following functions: l l l l l l l l l l l l User data transfer System admission control Radio channel ciphering and deciphering Data integrity protection Mobility management Radio resource management and control Cell broadcast service control System information and user message tracing Data volume reporting Radio access management CS service processing PS service processing
Service processing subsystems communicate with each other through the switching subsystem to form a resource pool and perform tasks cooperatively. They can be increased as required, according to the linear superposition principle, thereby improving the service processing capability of the BSC6900.
3-11
3 Overall Structure
Hardware Involved
The service processing subsystem consists of the SPUa, SPUb, XPUa, XPUb, DPUb, DPUc, DPUd, DPUe, DPUf and DPUg boards. The SPUa, SPUb, XPUa, and XPUb boards process signaling. The DPUb, DPUc, DPUd, DPUe, DPUf and DPUg boards process services.
3-12
3 Overall Structure
Functions
l The interface processing subsystem provides the following types of ATM, IP, and TDM interfaces. E1/T1 electrical ports Channelized STM-1/OC-3 optical ports Unchannelized STM-1/OC-3 optical ports FE/GE electrical ports GE optical ports l l The interface processing subsystem processes transport network messages and, also hides differences between them within the BSC6900. On the uplink, the interface processing subsystem terminates transport network messages at the interface boards. It also transmits the user plane, control plane, and management plane datagrams to the corresponding service processing boards. The processing of the signal flow on the downlink is the reverse of the processing of the signal flow on the uplink.
Hardware Involved
The interface processing subsystem consists of the Iu, Iur, Iub, Abis, A, Ater, Gb, and Pb interface boards.
3 Overall Structure
Functions
The clock synchronization subsystem provides the following clock sources for the BSC6900 and ensures the reliability of the clock signals: l l l l Building Integrated Timing Supply System (BITS) clock Global Positioning System (GPS) clock External 8 kHz clock LINE clock
The BSC6900 provides reference clock sources for base stations. Clock signals are transmitted from the BSC6900 to base stations over the Abis/Iub interface.
Hardware Involved
The clock synchronization subsystem consists of the GCUa/GCGa board.
3.5 OM Subsystem
The OM subsystem enables the management and maintenance of the BSC6900 in the following scenarios: routine maintenance, emergency maintenance, upgrade, and capacity expansion.
3-14 Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
3 Overall Structure
Functions
The OM subsystem provides: l l l l l l l l 4.4.4 Data Configuration Management 4.4.5 Security Management 4.4.6 Performance Management 4.4.7 Alarm Management 4.4.8 Loading Management 4.4.9 Upgrade Management 4.4.10 BTS Loading Management 4.4.11 BTS Upgrade Management
Hardware Involved
The OM subsystem consists of the OMUa board, OMUb board, OMUc board, or GBAM.
3-15
4 Working Principles
4
About This Chapter
Working Principles
This chapter describes the working principles of the BSC6900 in the following ways: power supply, environment monitoring, clock synchronization, and OM. 4.1 Power Supply Principle The power supply subsystem of the BSC6900 adopts the dual-circuit design and point-by-point monitoring solution. It consists of the power input part and the power distribution part. 4.2 Environment Monitoring Principle The environment monitoring subsystem of the BSC6900 comprises the power distribution box and the environment monitoring parts in each subrack. This subsystem monitors and controls the power supply, fans, and operating environment. 4.3 Clock Synchronization Principle The clock synchronization subsystem of the BSC6900 consists of the GCUa/GCGa board and the clock processing units of each subrack. It provides clock signals for the BSC6900 and reference clocks for base stations. 4.4 OM Principle OM is performed in the following scenarios: routine maintenance, emergency maintenance, troubleshooting, device upgrade, and capacity expansion. In addition, OM can be performed to rapidly adjust device status.
4-1
4 Working Principles
NOTE
The DC PDF and the DC power distribution panel are not regarded as the components of the BSC6900.
The working principle of the power input part is as follows: l l The DC PDF provides each cabinet with dual two-route -48 V DC inputs and one route for PGND connection. Typically, the two power inputs work concurrently. If one power input is faulty, the other power input continues to supply power to the system to ensure stable operation. You can rectify the faulty power input without interrupting the services, thereby ensuring the optimum reliability and availability of the power supply subsystem.
4 Working Principles
The working principle of the power distribution part is as follows: l l The PDB performs lightning protection and overcurrent protection on the dual two-route -48 V DC inputs. Then, it supplies power to all the components in the cabinet. The PDB monitors each input in real time. After the PDB detects abnormal power supply, it reports the relevant alarms to the OMU. The OMU, then, forwards the alarms to the LMT or M2000. The power distribution varies according to the type of cabinet. For details, see Connections of Power Cables and PGND Cables in the Cabinet.
The physical entity of the OMU can be the OMUa board, OMUb board, or GBAM. The following takes the OMUa board as an example to describe environment monitoring.
Power Monitoring
Power monitoring involves monitoring the power subsystem in real time, reporting the operating status of the power supply, and generating alarms when faults occur. Figure 4-2 shows the working principle of power monitoring. Figure 4-2 Working principle of power monitoring
The power monitoring process is as follows: 1. The PAMU in the power distribution box monitors the operating status of the power distribution box and sends the monitoring signals to the signal transfer board through the serial port. The signal transfer board transmits the power monitoring signals to the independent fan subrack at the bottom of the cabinet through the monitoring signal cable of the power
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 4-3
2.
4 Working Principles
distribution box. Then, the fan subrack forwards the power monitoring signals to the active SCUa board in the power monitoring subrack. 3. The SCUa board processes the monitoring signals. If faults occur, the SCUa board generates alarms and reports the alarms to the OMUa board. The OMUa board then forwards the alarms to the LMT or M2000.
Fan Monitoring
Fan monitoring involves monitoring the operating status of the fans in real time and adjusting the speed of the fans based on the temperature in the subrack. Each subrack is configured with a built-in fan box. The temperature sensor next to the air outlet can detect the temperature in the subrack. Besides the built-in fan box in the subrack, there is an independent fan subrack at the bottom of the cabinet. This improves the heat dissipation capability of the cabinet. Figure 4-3 shows the working principle of fan monitoring. Figure 4-3 Working principle of fan monitoring
The fan monitoring process is as follows: 1. The built-in fan box in the subrack and the fan monitoring unit PFCU in the independent fan subrack monitor the operating status of the fans in real time and reports the monitoring signals to the signal transfer board through the serial port. The signal transfer board transmits the monitoring signals to the active SCUa board. l In the case of built-in fan box in the subrack, the signal transfer board transmits the monitoring signals to the active SCUa board through the backplane of the subrack. l In the case of independent fan subrack, the signal transfer board transmits the monitoring signals to the active SCUa board in the fan monitoring subrack through the monitoring signal cable. 3. The SCUa board processes the monitoring signals. If faults occur, the SCUa board generates alarms and reports them to the OMUa board. The OMUa board then forwards the alarms to the LMT or M2000.
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
2.
4-4
4 Working Principles
Environment Monitoring
Environment monitoring involves monitoring the temperature, humidity, operating voltage, door status, water damage, smoke, and infrared. The environment monitoring function is performed by the Environment Monitor Units (EMUs). Figure 4-4 shows the working principle of environment monitoring. Figure 4-4 Working principle of environment monitoring
If the power distribution box can transfer signals, the environment monitoring process is as follows: 1. 2. 3. The sensors monitor the environment in real time and send the monitoring signals to the EMU. The EMU sends the monitoring signals to the power distribution box through the serial cable. The signal transfer board in the power distribution box transmits the monitoring signals to the active SCUa board in the power monitoring subrack through the monitoring signal cable of the power distribution box. The active SCUa board in the power monitoring subrack transmits the monitoring signals to the SCUa board in the MPS through the Ethernet cables between the SCUa boards. The SCUa board in the MPS processes the monitoring signals. If faults occur, the SCUa board generates alarms and reports the alarms to the OMUa board. The OMUa board then forwards the alarms to the LMT or M2000.
4. 5.
If the power distribution box cannot transfer signals, the environment monitoring process is as follows: 1. The sensors monitor the environment in real time and send the monitoring signals to the EMU.
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 4-5
4 Working Principles
2. 3. 4.
The EMU sends the monitoring signals to the active SCUa board in the lowest subrack through the serial cable. The active SCUa board in the lowest subrack transmits the monitoring signals to the SCUa board in the MPS through the Ethernet cables between the SCUa boards. The SCUa board in the MPS processes the monitoring signals. If faults occur, the SCUa board generates alarms and reports the alarms to the OMUa board. The OMUa board then forwards the alarms to the LMT or M2000.
External Clocks
The external clocks of the BSC6900 are of two types: l BITS Clock The BITS clock signals are of three types: 2 MHz, 2 Mbit/s, and 1.5 Mbit/s. The 2 MHz and 2 Mbit/s clock signals are E1 clock signals, and the 1.5 Mbit/s clock signals are T1 clock signals. The BITS clock has two input modes: BITS0 and BITS1. BITS0 and BITS1 correspond to the CLKIN0 and CLKIN1 ports on the GCUa/GCGa board respectively. The BSC6900 obtains the BITS clock signals through the CLKIN0 or CLKIN1 port. l External 8 kHz Clock Through the COM1 port on the GCUa/GCGa board, the BSC6900 obtains 8 kHz standard clock signals from an external device.
4-6
4 Working Principles
LINE Clock
The LINE clock is an 8 kHz clock that is transmitted from an interface board in the MPS to the GCUa/GCGa board through the backplane channel. The LINE clock has two input modes: LINE0 and LINE1.
NOTE
LINE0 and LINE1 correspond to backplane channel 1 and backplane channel 2 respectively.
GPS Clock
The GPS clock provides 1 Pulse Per Second (PPS) clock signals. The BSC6900 obtains the GPS clock signals from the GPS system. The GCGa board is configured with a GPS card, and the BSC6900 receives the GPS signals at the ANT port on the GCGa board.
NOTE
The GCUa board is not configured with a GPS card. Therefore, when the BSC6900 is configured with the GCUa board instead of the GCGa board, the GPS clock is unavailable to the BSC6900.
Local Oscillator
If the BSC6900 fails to obtain any external clock, the BSC6900 can obtain its working clock signals from the local oscillator.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
4-7
4 Working Principles
The structure of the BSC6900 clock synchronization subsystem is described as follows: l The clock board of the BSC6900 can be the GCUa or GCGa board. The BSC6900 cannot be configured with both the GCUa and GCGa boards simultaneously. Depending on the clock type, it can have either the GCUa board or the GCGa board. If the MPS extracts the clock signals, the clock signals enter the MPS in any of the following ways: The clock signals enter the port on the panel of the GCUa/GCGa board. The clock signals enter the port on the panel of an interface board that can extract line clock signals, include AEUa/AOUa/EIUa/OIUa/PEUa/POUa/UOIa board. The clock signals are then switched to the GCUa/GCGa board through the backplane. The GCUa/GCGa board generates oscillator clock signals. l l If the EPS extracts the clock signals, the interface board that extracts clock signals must be the AEUa/AOUa/EIUa/OIUa/PEUa/POUa/UOIa board. If the BSC6900 is configured with the Gb interface board, the Gb interface board extracts clock signals either from the backplane or from the CN. The Gb interface board, however, cannot extract clock signals from them simultaneously. If the PS services and CS services use different clock sources and the clock signals are extracted from the CN, the Gb interface board serves only the Gb interface.
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
4-8
4 Working Principles
Figure 4-6 shows the connections of the clock cables between the clock boards in the MPS and the SCUa boards in the EPS when the BSC6900 is configured with active and standby clock boards and SCUa boards. Figure 4-6 Structure of the clock synchronization subsystem
The active and standby clock boards in the MPS are connected to the active and standby SCUa boards in the EPS through the Y-shaped clock signal cables. This connection mode ensures that the system clock of the BSC6900 works properly in the case of a single-point failure of the clock board, Y-shaped clock signal cable, or SCUa board. In addition, the Y-shaped clock signal cable ensures the proper working of the SCUa boards during the switchover of the active and standby clock boards.
NOTE
In the MPS, the clock board sends clock signals to the SCUa board in the same subrack through the backplane channel. Therefore, a Y-shaped clock signal cable is not required.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
4 Working Principles
l l
Figure 4-7 shows the process of clock synchronization in the MPS/EPS when the clock board extracts clock signals from an external device or from the GPS. Figure 4-8 shows the process of clock synchronization in the MPS/EPS when the clock board extracts LINE clock signals from the Iu-CS/A interface.
As shown in Figure 4-7 and Figure 4-8, the process of clock synchronization in the MPS/EPS is as follows: 1. If an external clock is used, external clock signals travel to the clock board through the port on the panel of the clock board. If the GPS clock is used, clock signals travel to the clock board through the GPS antenna port. If the LINE clock is used, clock signals travel to the clock board through the backplane.
4-10
4 Working Principles
2.
The clock source is phase-locked in the clock board to generate clock signals. The clock signals, then, are sent to the SCUa board in the MPS through the backplane and to the SCUa board in each EPS through the clock signal output ports. The SCUa board in the MPS/EPS transmits the clock signals to the other boards in the same subrack through the backplane.
NOTE
3.
The Iub/Abis interface boards transmit the clock signals to the base stations.
1. 2.
The TCS extracts LINE clock signals from the A interface. Then, the LINE clock signals are processed by the A interface board to obtain the required clock signals. In the TCS, the A interface board transmits the clock signals to the SCUa board through the backplane. Then, the SCUa board transmits the clock signals to the other boards in the TCS.
NOTE
l In A over IP over Ethernet mode, the BSC6900 can extract only external clock signals. l In A over IP over E1/T1 mode, the BSC6900 can extract only LINE clock signals.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
Figure 4-10 shows the process of RFN generation and reception. This figure takes the GCUa board as an example.
Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 4-11
4 Working Principles
The GCUa/GCGa board in the MPS sends the 1 PPS signals and synchronization time packets to the SCUa board in each subrack. The SCUa board in each subrack then sends the 1 PPS signals and synchronization time packets to the other boards in the same subrack. The boards generate the required RFN signals according to the received 1 PPS signals and synchronization time packets.
NOTE
l The 1 PPS signals can be generated by the GCUa/GCGa board. l When the BSC6900 is configured with the GCGa board, it can obtain the GPS synchronization signals through the GPS card to generate the 1 PPS signals that are synchronized with the satellite signals.
4.4 OM Principle
OM is performed in the following scenarios: routine maintenance, emergency maintenance, troubleshooting, device upgrade, and capacity expansion. In addition, OM can be performed to rapidly adjust device status.
4-12
4 Working Principles
4.4.1 Dual OM Plane The BSC6900 has a dual OM plane to prevent single-point failure from affecting the normal operation and maintenance. 4.4.2 OM Network The OM network of the BSC6900 consists of the M2000, LMT, OMU, SCUa/SCUb boards, and OM modules in other boards. 4.4.3 Active/Standby Workspaces This section describes the active/standby workspaces of the OMU and those of the host boards. 4.4.4 Data Configuration Management The data configuration management involves managing the data configuration process of the BSC6900 so that configuration data is properly sent to the related boards in a secure manner. 4.4.5 Security Management The security management ensures the security of user login and helps to identify equipment faults. It involves rights management, log management, and inventory management. 4.4.6 Performance Management The BSC6900 performance management involves collecting, analyzing, and querying performance data. 4.4.7 Alarm Management The alarm management helps to monitor the running status of the BSC6900 and informs you of faults in real time so that you can take proper measures in time. 4.4.8 Loading Management The BSC6900 loading management involves managing the process of loading program and data files onto boards after the boards (or subracks) are started or restarted. 4.4.9 Upgrade Management The upgrade management involves managing the procedures for upgrading the OMU software and patch. 4.4.10 BTS Loading Management The BTS loading management involves managing the process of loading software to the boards in the BTS. 4.4.11 BTS Upgrade Management The BTS upgrade management refers to upgrading the BTS to a later version. You can locally or remotely upgrade multiple BTSs through the OM network.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
4-13
4 Working Principles
If the internal network and external network are on different network segments, ensure that the two networks are isolated. The dual OM plane design is implemented by the hardware that works in active/standby mode. When an active component is faulty but the standby component works properly, a switchover is automatically performed between the active and standby components, to ensure that the OM channel works properly. The active/standby OMUa boards use the same external virtual IP address to communicate with the LMT or M2000 and use the same internal virtual IP address to communicate with the SCUa board. l When the active OMUa board is faulty, an active/standby switchover is performed automatically, and the standby OMUa board takes over the OM task. In this case, the internal and external virtual IP addresses remain unchanged. Thus, the proper communication between the internal and external networks of the BSC6900 is ensured. When a single-point failure occurs on the switching network, the active/standby SCUa boards in each subrack are switched over automatically to ensure that the OM channel works properly.
4.4.2 OM Network
The OM network of the BSC6900 consists of the M2000, LMT, OMU, SCUa/SCUb boards, and OM modules in other boards.
4-14
4 Working Principles
Either the OMUa, OMUb, or OMUc board, or GBAM can serve as an OMU. This chapter uses the OMUa board as an example for your reference. Either the SCUa or SCUb board can serve as an SCU. This chapter takes the SCUa board as an example for your reference.
Figure 4-12 shows the structure of the BSC6900 OM network. Figure 4-12 Structure of the OM network
NOTE
Figure 4-12 shows some of the boards in the OM network. The SCUa boards in the EPS/TCS are connected to the SCUa boards in the MPS through crossover cables. The crossover cables transmit OM signals from the MPS to the EPS/TCS. In remote TCS mode, the SCUa boards in the TCS are connected to the SCUa boards in the MPS through the Ater interface boards. The Ater interface boards transmit OM signals from the MPS to the TCS.
M2000
The M2000 is a centralized network management system. The M2000 is connected to the BSC6900 through Ethernet cables. One M2000 can remotely manage multiple BSC6900s.
LMT
The LMT is connected to the OMUa board of the BSC6900 and works on the Windows XP Professional or Windows Vista operating system. One or more LMTs can be connected to the OMUa board directly or through networks. The maintenance of the BSC6900 can be performed locally or remotely through the LMT. The LMT is connected to an alarm box through a serial cable.
Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 4-15
4 Working Principles
OMUa Board
The OMUa board is the back administration module of the BSC6900. It is connected to an external device through the Ethernet cable. The BSC6900 can be configured with one OMUa board in independent mode or with two OMUa boards in active/standby mode. The OMUa board functions as a bridge between the BSC6900 and the LMT/M2000. The OM network of the BSC6900 is classified into the following networks: l l Internal network: implements the communication between the OMUa board and the host boards of the BSC6900. External network: implements the communication between the OMUa board and external devices, such as the LMT or M2000.
SCUa Board
The SCUa board is the switching and control board of the BSC6900. It is responsible for the OM of the subrack where it is located. If a subrack is configured with two SCUa boards, then the two boards work in active/standby mode. The SCUa board performs OM on other boards in the same subrack through the backplane channels. The SCUa boards in different subracks are connected through crossover cables.
4.
4-16
4 Working Principles
5. 6.
A switchover is performed between the active and standby workspaces of the standby OMU to ensure that the versions of the workspaces are consistent with those of the active OMU. The OMU version upgrade is complete.
After the OMU version upgrade, the standby workspaces of the active and standby OMUs store the files of the old version. In this case, version rollback can be performed as required. The working principles of the OMU active/standby workspaces in the case of version rollback are as follows: 1. 2. 3. 4. A switchover is performed between the active and standby workspaces of the active OMU. The running version of the active OMU is rolled back to the pre-upgrade version. The active OMU runs the pre-upgrade version. A switchover is performed between the active and standby workspaces of the standby OMU to ensure that the versions of the workspaces are consistent with those of the active OMU. The OMU version rollback is complete.
Relation Between the Active/Standby Workspaces of Host Boards and the Active/ Standby Workspaces of the OMU
On the active workspaces of the host boards, files can be loaded only from the active workspace of the OMU. On the standby workspaces of the host boards, files can be loaded only from the standby workspace of the OMU.
4 Working Principles
Relation Between the Active/Standby Workspaces of Host Boards and the Active/ Standby Workspaces of the OMU
On the active workspaces of the host boards, files can be loaded only from the active workspace of the OMU. On the standby workspaces of the host boards, files can be loaded only from the standby workspace of the OMU.
4-18
4 Working Principles
The process of effective mode configuration is as follows: 1. 2. 3. The BSC6900 is switched to effective mode. The configuration console (LMT or M2000) sends MML commands to the configuration management module of the OMU. The configuration management module of the OMU sends the configuration data to the database of the related host board and writes the data to the OMU database.
The process of ineffective mode configuration is as follows: 1. 2. 3. 4. The BSC6900 is switched to ineffective mode. The configuration console (LMT or M2000) sends MML commands to the configuration management module of the OMU. The configuration management module sends only the configuration data to the OMU database. When a subrack or the BSC6900 is reset, the OMU formats the configuration data in the database into a .dat file, loads the file onto the related host boards, and then activates the configuration data.
4-19
4 Working Principles
WARNING
Data configuration rollback cannot be performed when the CM control enable switch is set to ON, when the fast configuration mode is selected, or when batch configuration is performed. Data configuration rollback consists of the following types of operation: l Undoing a single configuration command After you undo the latest ten commands one by one, the system rolls back to the configuration before each command is executed. l Redoing a single configuration command After you redo the latest ten commands one by one, the system rolls back to the configuration after each command is executed. l Undoing configuration commands in batches This operation is performed to undo all the configuration commands that were executed after a specified rollback savepoint. After this operation, the system rolls back to the configuration at the specified rollback savepoint. l Redoing configuration commands in batches This operation is performed to redo the configurations that were rolled back in batches. After this operation, the system returns to the configuration at the specified rollback savepoint or the configuration after the commands were executed.
With the data configuration rights management, users cannot configure data for the BSC6900 at the same time.
4 Working Principles
The procedure for checking the data consistency between the OMU and the host boards is as follows: 1. 2. 3. On the LMT, a data consistency check command is sent to the OMU automatically on a regular basis or manually. The OMU analyzes the parameters of the command and checks whether the data in the board databases is the same as that in the OMU database. The OMU generates a result file and sends it to the LMT.
Rights Management
The rights management is performed to identify a user and define the rights of the user.
Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 4-21
4 Working Principles
The BSC6900 supports multi-user operations. It performs hierarchical rights management for users to ensure security. The BSC6900 authorizes users at multiple levels and assigns certain rights to the users at each level. To log in to the LMT of the BSC6900, a user must enter the registered user name and password, through which the BSC6900 identifies the user. l User types Local users: refer to the accounts (including the default local account admin) managed by only the BSC6900 LMT. This type of LMT users can log in to the LMT during the BSC6900 installation and during the disconnection from the M2000. Domain users: refer to the accounts that are created, changed, authenticated, and authorized on the M2000. Domain users can manage the BSC6900 after logging in to the LMT or after logging in to the M2000 server through the M2000 client. l User rights Table 4-1 Definitions of the user rights Class Rights Com mand Grou p G_0 Description
Guest
The objects in this command group are used to query system information, such as users, command groups, logs, NTP, EMS, and time zones. The objects in this command group are used to query data configurations and consist of the MML commands of the LST type. The objects in this command group are used to query alarm information. The objects in this command group are used to query performance data, for example, a result file or a task file. The objects in this command group are used to query device information such as device status and consist of the MML commands of the DSP type. The objects in this command group are used to query the information about base stations, for example, the attributes and boards of base stations. The objects in this command group are used to perform performance management, for example, to activate a performance task file or to upload a performance result file.
G_2
G_4 G_6
G_8
G_13
User
In addition to the rights granted to the Guest, User can perform system OM.
G_7
4-22
4 Working Principles
Class
Rights
Description
The objects in this command group are used to perform device management, for example, to reset, block, unblock, or switch over a board. The objects in this command group are used to trace and monitor the signal flow on the control plane and on the user plane, for example, to query a tracing task or to create/delete/start a tracing task. The objects in this command group are used to modify device panels. The objects in this command group are used to perform software management, for example, patch management. The objects in this command group are used to perform base station management, for example, to manage base station software or to reset a base station. The objects in this command group are used to configure data, for example, the data for a new cell. The objects in this command group are used to perform alarm management, for example, to clear an alarm or to set the alarm level.
G_10
G_11 G_12
G_14
Operator
In addition to the rights granted to the User, the Operator can perform data configuration on the equipment. Administrator has the highest operation rights. It can manage all the other users.
G_3
G_5
Adminis trator
G_1
The objects in this command group are used to manage system information, for example, to manage a user, to set the time zone, to set the daylight saving time, or to perform batch configuration.
Custom
Log Management
Log management records the operation history and saves the related logs about the BSC6900. Thus, it helps analyze and identify faults. Table 4-2 lists the types of logs that are recorded when the BSC6900 is running.
4-23
4 Working Principles
Table 4-2 Types of logs Type Running log Operation log Security log Description Records the information on the operating status of the system. The information is used to analyze and locate faults. Records the information on operation and maintenance performed by users. Records the information on the operations that may affect the system security, for example, the information on the change of user password.
The log management provides the following functions: l l Saving log files You can save the log information to the OMU by setting the log record parameters. Uploading log files You can upload the log files in the OMU to a specified FTP server by setting the uploading parameters. l l Querying log files You can view the specified log information in the OMU by setting the querying conditions. Extracting the up-to-date logs from the buffer You can obtain the latest log information by saving the logs stored in the buffer to the log file.
NOTE
The OMU saves the log information in the buffer. When the log information reaches the specified limit or the current time reaches the log record period, the OMU records the log file.
Inventory Management
The inventory management refers to the efficient and centralized management of the primary configuration information about the equipment in the network. By exporting and uploading the inventory information files on the M2000, you can learn the physical and logical configurations of NEs. The inventory management system is deployed on the M2000. It obtains the required inventory information from NEs through the related interfaces. NEs report inventory information to the M2000 in the form of files, which contain the information on the following aspects: l l l l l l l
4-24
4 Working Principles
l l l l l
Subracks Boards and the Flash electronic labels of the boards Slots Ports Antennas
The process of collecting performance measurement data periodically is as follows: 1. 2. The user registers a performance measurement task and specifies the object, time, and item attributes of the task on the M2000 client. Based on the performance measurement task, the M2000 server modifies the measurement task file, sends it to the OMU, and issues a command to activate the modified measurement task file. Based on the modified measurement task file, the OMU requests host boards to collect data according to the new requirements. The OMU receives the measurement results from the host boards and saves them as files. The OMU notifies the M2000 server of the measurement results and uploads the files into the M2000 server. The M2000 server processes the files and saves them into the database. Based on the performance measurement task registered by the M2000 client, the M2000 server obtains the relevant results from the database, performs certain calculation on them, and then sends the result to the M2000 client.
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 4-25
3.
4. 5.
4 Working Principles
Measurement Types
Performance measurement objects are of three types: default measurement objects, optional measurement objects, and real-time measurement objects. l Default measurement objects The BSC6900 automatically measures all objects of this type. The default measurement task file supports three periods: Normal measurement period with a default duration of 30 minutes or 60 minutes. A proper measurement period can be selected on the M2000. Short measurement period with a default duration of 5 minutes or 15 minutes. A proper measurement period can be selected on the M2000. Long measurement period with a default duration of 24 hours. You cannot add objects to or remove objects from the list of default measurement objects on the M2000. l Optional measurement objects By default, the BSC6900 does not measure the optional measurement objects. The purpose of defining optional measurement objects is to avoid measuring these objects every time because they are of a large quantity. You can add objects to or remove objects from the list of optional measurement objects on the M2000. l Real-time measurement objects The BSC6900 measures real-time measurement objects in a short measurement period of one minute. The purpose is to monitor the changes in target KPIs in real time. The M2000 can start or stop real-time measurement tasks. Real-time measurement data is reported to the M2000 through messages.
4 Working Principles
Each board detects alarms and reports them to the OMU automatically. The OMU then classifies these alarms into different severity levels and sends them to the LMT or the M2000 server. You can view and manage alarm information on the LMT or M2000 client. The alarm management module of the OMU provides the following functions: l l Alarm storage The alarm management module stores the alarms in the database of the OMU. Alarm processing The alarm management module processes the operation commands from the LMT or M2000 client and then returns the operation results to the LMT or M2000 client. These commands include querying active alarms, querying alarm logs, and modifying alarm configuration items. l Alarm triggering If the generation of an alarm triggers another alarm, the alarm management module reports the two alarms to the LMT or M2000 client. l Alarm recovery After an alarm is handled, the system automatically clears the alarm. At the same time, the alarm management module clears the alarm information from the LMT or M2000.
Alarm Box
The alarm box generates audible and visual alarms. The red, orange, yellow, and green alarm indicators on the alarm box indicate the critical, major, minor, and warning alarms respectively. Different alarm severity levels have different alarm sounds. Figure 4-18 shows the working principle of the alarm box. Figure 4-18 Working principle of the alarm box
4-27
4 Working Principles
The alarm box is connected to the LMT through a serial cable. When an alarm is reported, the LMT forwards it to the alarm box. The alarm box then generates an audible and visual alarm. You can stop alarm sounds, turn off alarm indicators, and reset the alarm box through the LMT.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
Principle of Loading
The OMUa board and the active SCUa board in each subrack play important roles during the BSC6900 loading process. l The OMUa board functions as the first-level center of the entire BSC6900 loading management process. The loading and power-on of the OMUa board are independent of other boards. The OMUa board processes the loading control requests of other boards. The active SCUa board functions as the second-level center of the loading management process. If the OMUa board is not in position, the active SCUa board in a subrack processes the loading control requests from the other boards in the same subrack. If the SCUa boards in an extension subrack are not started, the active SCUa board in the main subrack processes the loading control requests from the boards in the extension subrack. The SCUa board in the main TCS functions as the file transfer server during the TCS loading process. If a board in a TCS needs to load files from the OMUa board, the SCUa board in the main TCS downloads the files from the OMUa board and then processes the file download request from the board.
Loading Process
The BSC6900 loading process varies according to the configuration mode of subracks and the location of TCS. l Scenario 1: BM/TC separated and local TCS Figure 4-19 shows the loading process.
4-28
4 Working Principles
If the OMUa board is in effective mode, the loading process is as follows: 1. 2. After a board is started, it sends a BOOTP request. After receiving the BOOTP request message from the board, the OMUa board generates a BOOTP response message and sends it to the board. The response message contains the loading control parameter, IP address, and version information. After receiving the response message, the board loads the program files and data files according to the loading control parameter. The loading is complete.
3. 4.
If the OMUa board is not started or is in ineffective mode, the loading process is as follows: 1. 2. 3. After a board is started, the board sends a BOOTP request. If the board does not receive any response 30 seconds after the request is sent, the SCUa board loads the program files and data files from its flash memory. After the SCUa board in the MPS loads the program files and data files, it processes the BOOTP requests from the other boards in the MPS and from the SCUa boards in the EPS and TCS. After the SCUa board in the EPS or TCS loads the program files and data files, it processes the BOOTP requests from the other boards in the same subrack. After receiving the response messages, the other boards in each subrack load program files and data files from their flash memories. The loading is complete.
4. 5. 6. l
4 Working Principles
In this scenario, the Ater interface functions as the loading path between the BM and the TC. Figure 4-20 shows the loading process. Figure 4-20 Loading process (2)
If the OMUa board is in effective mode, the loading process is as follows: 1. 2. After a board is started, the board sends a BOOTP request. After receiving the BOOTP request message from the board, the OMUa board generates a BOOTP response message and sends it to the board. The response message contains the loading control parameter, IP address, and version information. After receiving the BOOTP response message, the board in the MPS or EPS loads the program files and data files according to the loading control parameter. After the Ater interface board in the MPS loads the program files and data files, it functions as the loading proxy of the Ater interface board in the main TCS and forwards the BOOTP request and response messages. After the Ater interface board in the main TCS loads the program files and data files, it functions as the loading proxy of the other boards in the TCS and forwards the BOOTP request and response messages. After receiving the response messages, the other boards in the TCS load program files and data files according to the loading control parameter.
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
3. 4.
5.
6.
4-30
4 Working Principles
7.
If the OMUa board is not started or is in ineffective mode, the loading process is as follows: 1. 2. 3. After a board is started, the board sends a BOOTP request. If the board does not receive any response 30 seconds after the request is sent, the SCUa board loads the program files and data files from its flash memory. After the SCUa board in the MPS loads the program files and data files, it processes the BOOTP requests from the other boards in the MPS and from the SCUa board in the EPS. After the SCUa board in the EPS loads the program files and data files, it processes the BOOTP requests from the other boards in the same subrack. After receiving the response messages, the other boards in the EPS load program files and data files according to the loading control parameter. After the Ater interface board in the MPS loads the program files and data files, it functions as the loading proxy of the Ater interface board in the main TCS and forwards the BOOTP request and response messages. After the Ater interface board in the main TCS loads the program files and data files, it functions as the loading proxy of the other boards in the TCS and forwards the BOOTP request and response messages. After receiving the response messages, the other boards in the TCS load program files and data files from their flash memories. The loading is complete.
4. 5. 6.
7.
8. 9. l
Scenario 3: BM/TC combined or A over IP Figure 4-21 shows the loading process. Figure 4-21 Loading process (3)
If the OMUa board is in effective mode, the loading process is as follows: 1. 2. After a board is started, it broadcasts a BOOTP request. After receiving the BOOTP request message from the board, the OMUa board generates a BOOTP response message and sends it to the board. The response
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 4-31
4 Working Principles
message contains the loading control parameter, IP address, and version information. 3. 4. After receiving the response message, the board loads the program files and data files according to the loading control parameter. The loading is complete.
If the OMUa board is not started or is in ineffective mode, the loading process is as follows: 1. 2. 3. After a board is started, the board sends a BOOTP request. If the board does not receive any response 30 seconds after the request is sent, the SCUa board loads the program files and data files from its flash memory. After the SCUa board in the MPS loads the program files and data files, it processes the BOOTP requests from the other boards in the MPS and from the SCUa board in the EPS. After the SCUa board in the EPS loads the program files and data files, it processes the BOOTP requests from the other boards in the same subrack. After receiving the response messages, the other boards in the MPS/EPS load program files and data files from their flash memories. The loading is complete.
4. 5. 6.
Upgrade Scenarios
The BSC6900 needs to be upgraded to rectify the existing defects and to support new functions, higher specifications, and later protocol standards. The upgraded version can provide better QoS.
Upgrade Mode
You can use the dedicated upgrade tool to upgrade the BSC6900 through the OM network of the BSC6900. See Figure 4-22. Figure 4-22 Upgrade through the OM network
NOTE
4-32
4 Working Principles
Upgrade Process
The BSC6900 is upgraded remotely by using the dedicated upgrade tool, which consists of the upgrade client and the upgrade server. Figure 4-23 shows the upgrade process. Figure 4-23 Upgrade process
NOTE
1. 2.
The user sends the upgrade version files and the upgrade server program to the specified directories of the active OMU through the network. The user connects the client PC to the active OMU and then starts the upgrade client on the client PC and the upgrade server on the active OMU to set up the connection between the upgrade client and the upgrade server. The upgrade server synchronizes the version files of the standby OMU with those of the active OMU. The user starts the upgrade server on the standby OMU and sets up the connection between the upgrade server on the standby OMU and the upgrade server on the active OMU. The upgrade server on the active OMU performs health check on the data and files in the active workspace of the active OMU and then backs them up before the upgrade. The upgrade server of the active OMU upgrades the software in the standby workspace of the active OMU. At the same time, the upgrade server of the standby OMU upgrades the software in the standby workspace of the standby OMU. The upgrade server of the active OMU upgrades the data in the standby workspace of the active OMU. The upgrade server of the active OMU issues a command to load the host program, DSP, BOOTROM, and data files in the standby workspace of the active OMU onto the standby workspaces of the host boards so that the standby workspaces of the boards are synchronized with the standby workspace of the active OMU.
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 4-33
3. 4. 5. 6.
7. 8.
4 Working Principles
9.
The upgrade server of the active OMU issues a command to switch over the active and standby workspaces of the active OMU to upgrade the active OMU.
10. The upgrade server of the active OMU issues a command to reset all the standby boards of the BSC6900. 11. After the reset, all the standby boards of the BSC6900 automatically load the program files and data files from the standby workspaces of their flash memories to upgrade the boards. 12. After the upgrade server of the active OMU detects that all the standby boards are started, it issues a command to reset all the active boards of the BSC6900. 13. When the active boards are being reset, the original standby boards become active. Similarly, after the reset, all the original active boards automatically load the program files and data files from the standby workspaces of their flash memories to upgrade themselves. 14. After the service verification is successful, the upgrade server of the active OMU issues a command to switch over the active and standby workspaces of the standby OMU so as to upgrade the standby OMU. After the switchover, the standby OMU automatically synchronizes with the active OMU. The upgrade is complete.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
For the BTS connected to an IP Abis interface board, the loading management process is as follows: 1. 2. After the BTS is started, it attempts to establish the OML and then broadcasts a DHCP request over the OML. After receiving the DHCP request, the SCUa board in the subrack, in which the Abis interface board connected to the BTS is located, processes the request and sends a DHCP response to the BTS. Through this response, the SCUa board notifies the BTS of the IP address of the BTS board and the IP address of the OMUa board. Based on the version number of the BTS, the BSC6900 reads the version configuration file from the corresponding BTS version directory on the hard disk of the OMUa board, obtains the information about the software version numbers of all the BTS boards, and then sends the information to the BTS. After obtaining the software version numbers, the BTS automatically checks whether the number of the version running on each board is the same as the obtained number. If there is any inconsistency, the BTS requests the BSC6900 to load and activate the version software. After running the version software, the BTS requests the BSC6900 for configuration data. The OMUa board obtains the BTS configuration data from its database and sends it to the BTS through messages. Then, the BTS is initialized.
3.
4.
5. 6. l
For the BTS connected to a non-IP Abis interface board, the loading management process is as follows: 1. After the BTS is started, it attempts to establish the OML.
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
4-34
4 Working Principles
2. 3.
The BSC6900 sends a version check request to the BTS. Then, the BTS reports its version information to the BSC6900. The BSC6900 checks the BTS version number. If the BTS version does not match the BSC6900 version, the BSC6900 sends a version loading request to the BTS, instructing the BTS boards to obtain and load program files from the OMUa board. After receiving a loading completion indication message from the BTS, the BSC6900 sends a version activation request to the BTS, instructing the BTS boards to run the new version. After running the version software, the BTS requests the BSC6900 for configuration data. The OMUa board obtains the BTS configuration data from its database and sends it to the BTS through messages. Then, the BTS is initialized.
4.
5. 6.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
The BTS upgrade process is as follows: 1. Downloading BTS software (1) The LMT or M2000 sends a download request to the OMUa board. (2) The OMUa board responds to the request. The LMT or M2000 downloads the BTS software to the specified directory on the OMUa board through FTP. 2. Loading BTS software (1) The LMT or M2000 sends a loading command to the OMUa board. The OMUa board then sends the loading command to the BTS. (2) The BTS responds to the command. The OMUa board and the SCUa board perform the BTS loading management and load the software from the OMUa board to the BTS. 3. Activating BTS software (1) The LMT or M2000 sends an activation command to the OMUa board. (2) The OMUa board checks the activation command and then forwards it to the BTS. (3) The BTS activates the software. Then, the BTS is reset. 4. Verifying upgrade result You should verify services to ensure that the BTS is successfully upgraded.
4-35
5 Signal Flow
5
About This Chapter
Definitions
l User plane
Signal Flow
The BSC6900 signal flow consists of the user-plane signal flow, control-plane signal flow, and OM signal flow.
User plane refers to the set of logical functions of the BSC6900 that process the service data, including the speech data and packet data. l Control plane Control plane refers to the set of logical functions of the BSC6900 that process the control signaling, including the call control signaling and the connection control signaling. 5.1 User-Plane Signal Flow The user plane of the BSC6900 processes the user-plane messages on each interface. 5.2 Control-Plane Signal Flow The control plane of the BSC6900 processes the control-plane messages on each interface. 5.3 OM Signal Flow OM signal flow refers to the messages transmitted between the BSC6900 and the LMT/M2000. The LMT or M2000 maintains and monitors the BSC6900 in real time through the OM signal flow.
5-1
5 Signal Flow
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
l The Abis, Ater, and A interface boards can be the EIUa/OIUa/POUc board. The boards shown in Figure 5-1, Figure 5-2, and Figure 5-3 are only examples. l The INT in the figure stands for the interface board. You can use different interface boards as required.
5-2
5 Signal Flow
As shown in Figure 5-1, the CS signal flow on the uplink is as follows: 1. 2. 3. The uplink CS signals are sent from the BTS to the Abis interface board in the MPS/EPS. The CS signals are demultiplexed in the Abis interface board. Each CS signal uses a 64 kbit/s timeslot and is transmitted to the Ater interface board through the TNUa board. The CS signals are multiplexed in the Ater interface board. Each full-rate CS signal uses a 16 kbit/s sub-timeslot, and each half-rate CS signal uses an 8 kbit/s sub-timeslot. The CS signals are then transmitted to the Ater interface board in the TCS over the Ater interface. The CS signals are demultiplexed in the Ater interface board of the TCS. Each CS signal uses a 64 kbit/s timeslot and is transmitted to the DPUc board through the TNUa board. The DPUc board performs speech codec and rate adaptation on the CS signals, which are converted into 64 kbit/s PCM signals. The 64 kbit/s PCM signals are transmitted to the A interface board through the TNUa board and then to the MSC over the A interface.
4. 5.
The downlink flow is the reverse of the uplink flow. Figure 5-2 shows the CS signal flow in Abis over TDM, Ater over IP, A over TDM, and BM/ TC separated mode. Figure 5-2 GSM CS signal flow (2)
As shown in Figure 5-2, the CS signal flow on the uplink is as follows: 1. 2. The uplink CS signals are sent from the BTS to the Abis interface board in the MPS/EPS. The CS signals are demultiplexed in the Abis interface board. Each CS signal uses a 64 kbit/s timeslot and is transmitted to the Ater interface board through the TNUa board, DPUc board, and SCUa board in sequence. The CS signals are multiplexed in the Ater interface board. Each full-rate CS signal uses a 16 kbit/s sub-timeslot, and each half-rate CS signal uses an 8 kbit/s sub-timeslot. The CS signals are then transmitted to the Ater interface board in the TCS over the Ater interface. The CS signals are demultiplexed in the Ater interface board of the TCS. Each CS signal uses a 64 kbit/s timeslot and is transmitted to the DPUc board through the TNUa board. The DPUc board performs speech codec and rate adaptation on the CS signals, which are converted into 64 kbit/s PCM signals. The 64 kbit/s PCM signals are transmitted to the A interface board through the TNUa board and then to the MSC over the A interface.
3.
4. 5.
The downlink flow is the reverse of the uplink flow. In the case of BM/TC combined mode, the Ater interface does not exist. Figure 5-3 shows the CS signal flow in Abis over TDM and A over TDM mode.
Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 5-3
5 Signal Flow
As shown in Figure 5-3, the CS signal flow on the uplink is as follows: 1. 2. 3. The uplink CS signals are sent from the BTS to the Abis interface board in the MPS/EPS. The CS signals are demultiplexed in the Abis interface board. Each CS signal uses a 64 kbit/s timeslot and is transmitted to the DPUc board through the TNUa board. The DPUc board performs speech codec and rate adaptation on the CS signals, which are converted into 64 kbit/s PCM signals. The 64 kbit/s PCM signals are transmitted to the A interface board through the TNUa board and then to the MSC over the A interface.
l The Abis interface board can be the PEUa/FG2a/GOUa/POUc/FG2c/GOUc board, and the Ater and A interface boards can be the EIUa/OIUa/POUc board. The boards shown in Figure 5-4, Figure 5-5, and Figure 5-6 are only examples. l The INT in the figure stands for the interface board. You can use different interface boards as required.
5 Signal Flow
1. 2. 3.
The uplink CS signals are sent from the BTS to the Abis interface board in the MPS/EPS. The CS signals are transmitted from the Abis interface board to the DPUc board through the SCUa board. The DPUc board reorders PTRAU frames, eliminates jitter, and converts PTRAU frames into TRAU frames. Then, the TRAU frames are transmitted to the Ater interface board through the TNUa board. The CS signals are multiplexed in the Ater interface board in the MPS/EPS, and then are transmitted to the Ater interface board in the TCS. The CS signals are demultiplexed in the Ater interface board of the TCS. Each CS signal uses a 64 kbit/s timeslot and is transmitted to the DPUc board through the TNUa board. The DPUc board performs speech codec and rate adaptation on the CS signals, which are converted into 64 kbit/s PCM signals. The 64 kbit/s PCM signals are transmitted to the A interface board through the TNUa board and then to the MSC over the A interface.
4. 5. 6.
The downlink flow is the reverse of the uplink flow. Figure 5-5 shows the CS signal flow in Abis over IP, Ater over IP, A over TDM, and BM/TC separated mode. Figure 5-5 GSM CS signal flow (5)
As shown in Figure 5-5, the CS signal flow on the uplink is as follows: 1. 2. 3. The uplink CS signals are sent from the BTS to the Abis interface board in the MPS/EPS. The CS signals are demultiplexed in the Abis interface board. Each CS signal uses a 64 kbit/s timeslot and is transmitted to the Ater interface board through the SCUa board. The CS signals are multiplexed in the Ater interface board. Each full-rate CS signal uses a 16 kbit/s sub-timeslot, and each half-rate CS signal uses an 8 kbit/s sub-timeslot. The CS signals are then transmitted to the Ater interface board in the TCS over the Ater interface. The CS signals are demultiplexed in the Ater interface board of the TCS. Each CS signal uses a 64 kbit/s timeslot and is transmitted to the DPUc board through the SCUa board. The DPUc board performs speech codec and rate adaptation on the CS signals, which are converted into 64 kbit/s PCM signals. The 64 kbit/s PCM signals are transmitted to the A interface board through the TNUa board and then to the MSC over the A interface.
4. 5.
The downlink flow is the reverse of the uplink flow. In the case of BM/TC combined mode, the Ater interface does not exist. Figure 5-6 shows the CS signal flow in Abis over IP and A over TDM mode.
Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 5-5
5 Signal Flow
As shown in Figure 5-6, the CS signal flow on the uplink is as follows: 1. 2. 3. 4. The uplink CS signals are sent from the BTS to the Abis interface board in the MPS/EPS. The CS signals are transmitted to the DPUc board through the SCUa board. The DPUc board reorders PTRAU frames, eliminates jitter, and performs speech codec and rate adaptation on the PTRAU frames, which are converted into 64 kbit/s PCM frames. The PCM frames are transmitted to the A interface board through the TNUa board, and then are transmitted to the MSC over the A interface.
l The Abis interface board can be the EIUa/OIUa/POUc board, and the A interface board can be the FG2a/ GOUa/FG2c/GOUc/POUc board. The boards shown in Figure 5-7 are only examples. l The INT in the figure stands for the interface board. You can use different interface boards as required.
5 Signal Flow
1. 2. 3. 4.
The uplink CS signals are sent from the BTS to the Abis interface board in the MPS/EPS. The CS signals are demultiplexed in the Abis interface board. Each CS signal uses a 64 kbit/s timeslot and is transmitted to the DPUc board through the TNUa board. The DPUc board converts PTRAU frames into RTP frames, reorders RTP frames, and eliminates jitter. The SCUa board transmits the CS signals to the A interface board, which then transmits the signals to the MGW over the A interface.
l The Abis interface board can be the PEUa/FG2a/GOUa/POUc/FG2c/GOUc board, and the A interface board can be the FG2a/GOUa/PEUa/FG2c/GOUc/POUc board. The boards shown in Figure 5-8 are only examples. l The INT in the figure stands for the interface board. You can use different interface boards as required.
As shown in Figure 5-8, the CS signal flow on the uplink is as follows: 1. 2. 3. 4. The uplink CS signals are sent from the BTS to the Abis interface board in the MPS/EPS. The Abis interface board encapsulates the CS signals in PTRAU frames, which are then transmitted to the DPUc board through the SCUa board. The DPUc board converts PTRAU frames into RTP frames, reorders RTP frames, and eliminates jitter. The SCUa board transmits the CS signals to the A interface board, and then the A interface board transmits the signals to the MGW over the A interface.
5 Signal Flow
NOTE
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
l The Abis interface board can be the EIUa/OIUa/POUc board, and the Gb interface board can be the PEUa/ FG2a/POUc/FG2c/GOUc board. The boards shown in Figure 5-9 are only examples. l The INT in the figure stands for the interface board. You can use different interface boards as required.
As shown in Figure 5-9, the PS signal flow on the uplink is as follows: 1. The packet data is sent from the BTS to the Abis interface board in the MPS/EPS. The data uses one to four 16 kbit/s sub-timeslots on the Abis interface, depending on the modulation and coding scheme, for example, CS1-CS4 or MCS1-MCS9. The Abis interface board transmits the packet data to the TNUa board, which then transmits the data to the DPUd board. The DPUd board converts the frame format and then transmits the data to the Gb interface board through the SCUa board. The Gb interface board processes the packet data according to the IP or FR protocol and then transmits it to the SGSN over the Gb interface.
2. 3. 4.
Abis over IP
Figure 5-10 shows the PS signal flow in Abis over IP transmission mode.
NOTE
l The Abis interface board can be the PEUa/FG2a/GOUa/POUc/FG2c/GOUc board, and the Gb interface board can be the PEUa/FG2a/POUc/FG2c/GOUc board. The boards shown in Figure 5-10 are only examples. l The INT in the figure stands for the interface board. You can use different interface boards as required.
5-8
5 Signal Flow
As shown in Figure 5-10, the PS signal flow on the uplink is as follows: 1. 2. 3. 4. The packet data is sent from the BTS to the Abis interface board in the MPS/EPS. The SCUa board transmits the packet data to the DPUd board. The DPUd board converts the frame format and then transmits the data to the Gb interface board through the SCUa board. The Gb interface board processes the packet data according to the IP or FR protocol and then transmits it to the SGSN over the Gb interface.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
5-9
5 Signal Flow
NOTE
l The INT in the figure stands for the interface board. You can use different interface boards as required. l All the communications between the boards are switched by the SCUa boards. l The boards shown in the figure are only examples.
The signal flow on the uplink is as follows: 1. 2. The NodeB processes the data and then sends it to the Iub interface board of BSC6900 over the Iub interface. The Iub interface board processes the data and sends it to the DPUb board in the same subrack. See signal flow 1 in Figure 5-11. If the DPUb board that processes the data and the Iub interface board that receives the data are located in different subracks, the data is switched by the MPS. The MPS then sends the data to the target DPUb board. See signal flow 2 in Figure 5-11. 3. The DPUb board processes the data according to the FP, MDC, MAC, RLC, and Iu UP or PDCP/GTP-U protocols, separates the CS/PS user-plane data from other data, and then sends the data to the Iu-CS/Iu-PS interface board. The Iu-CS/Iu-PS interface board processes the data and then sends it to the MSC/SGSN.
4.
5-10
5 Signal Flow
NOTE
l The INT in the figure stands for the interface board. You can use different interface boards as required. l All the communications between the boards are switched by the SCUa boards.
The signal flow on the uplink is as follows: 1. 2. The NodeB processes the data and then sends it to the Iub interface board of BSC6900-1 over the Iub interface. The Iub interface board and DPUb board of BSC6900-1 process the data and then send it to the Iur interface board of BSC6900-1.
NOTE
The DPUb board of BSC6900-1 processes the data according to only the FP and MDC protocols.
3. 4. 5. 6.
The Iur interface board of BSC6900-1 processes the data and then sends it to the Iur interface board of BSC6900-2 over the Iur interface between BSC6900-1 and BSC6900-2. The Iur interface board of BSC6900-2 processes the data and then sends it to the DPUb board. The DPUb board processes the data, separates the CS/PS user-plane data from other data, and then sends the data to the Iu-CS/Iu-PS interface board. The Iu-CS/Iu-PS interface board processes the data and then sends it to the MSC/SGSN.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
Figure 5-13 shows the signal flow from the Iu-BC/CBC-BSC interface to the Iub/Abis interface. See signal flows 1 and 2 in the figure.
5-11
5 Signal Flow
NOTE
l The INT in the figure stands for the interface board. You can use different interface boards as required. l The boards shown in Figure 5-13 are only examples.
Signal flow 1 in Figure 5-13 shows the CBC signal flow when the CBC service processing subrack is a UMTS service processing subrack. 1. 2. 3. The CBC sends the broadcast data to the Iu-BC interface board of the BSC6900 over the Iu-BC interface. The Iu-BC interface board processes the data and then sends it to the SPUa board. The SPUa board processes the data according to the Service Area Broadcast Protocol (SABP) and then sends the data to the target DPUb board.
NOTE
If the SPUa board cannot process the data, the data is switched by the MPS. The MPS then sends the data to the target SPUa board, which processes the data according to the SABP. Then, the SPUa board sends the data to the DPUb board.
4. 5. 6.
The DPUb board performs the BMC, RLC, and MAC processing on the data and then sends the data to the Iub interface board. The Iub interface board processes the data and then sends it to the base station. The base station broadcasts the data to the UEs in the cells served by the base station.
Signal flow 2 in Figure 5-13 shows the CBC signal flow when the CBC service processing subrack is a GSM service processing subrack. 1. The CBC sends the broadcast data to the XPUa board of the BSC6900 over the CBC-BSC interface. The XPUa board processes the data according to the related protocols and then sends it to the Abis interface board.
NOTE
If the XPUa board in a subrack cannot process the data, the data is switched by the MPS to the XPUa board in another subrack.
2. 3.
5-12
The Abis interface board processes the data and then sends it to the base station. The base station broadcasts the data to the MSs in the cells served by the base station.
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
5 Signal Flow
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
A over TDM
In A over TDM mode, the signaling flow on the A interface varies according to the configuration mode of BSC6900 subracks.
Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 5-13
5 Signal Flow
l l
Figure 5-14 shows the signaling flow on the A interface in BM/TC separated mode. Figure 5-15 shows the signaling flow on the A interface in BM/TC combined mode.
NOTE
l The A interface board can be the EIUa/OIUa/POUc board, and the XPUa/XPUb/SPUa/SPUb board processes signaling. The boards shown in Figure 5-14 and Figure 5-15 are only examples. l The INT in the figure stands for the interface board. You can use different interface boards as required.
Figure 5-14 Signaling flow on the A interface in A over TDM mode (BM/TC separated)
As shown in Figure 5-14, the uplink signaling flow on the A interface is as follows: 1. In the MPS/EPS, the XPUa board processes the signaling according to the MTP3, SCCP, and BSSAP protocols. Then, the signaling is transmitted to the Ater interface board through the SCUa board. The Ater interface board processes the signaling according to the MTP2 protocol. Then, the signaling is transmitted to the Ater interface board in the TCS. In the TCS, the Ater interface board transparently transmits the signaling to the TNUa board and then to the A interface board. Then, the signaling is transmitted to the MSC over the A interface.
2. 3.
The downlink flow is the reverse of the uplink flow. Figure 5-15 Signaling flow on the A interface in A over TDM mode (BM/TC combined)
As shown in Figure 5-15, the uplink signaling flow on the A interface is as follows:
5-14 Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
5 Signal Flow
1.
In the MPS/EPS, the XPUa board processes the signaling according to the MTP3, SCCP, and BSSAP protocols. Then, the signaling is transmitted to the A interface board through the SCUa board. The A interface board processes the signaling according to the MTP2 protocol. Then, the signaling is transmitted to the MSC over the A interface.
2.
A over IP
Figure 5-16 shows the signaling flow on the A interface in A over IP mode.
NOTE
l The A interface board can be the FG2a/GOUa/FG2c/GOUc/POUc board, and the XPUa/XPUb/SPUa/ SPUb board processes signaling. The boards shown in Figure 5-16 are only examples. l The INT in the figure stands for the interface board. You can use different interface boards as required.
As shown in Figure 5-16, the uplink signaling flow on the A interface is as follows: 1. In the MPS/EPS, the XPUa board processes the signaling according to the BSSAP, SCCP, SCTP, and M3UA protocols. Then, the signaling is transmitted to the A interface board through the SCUa board. The A interface board processes the signaling according to the IP protocol. Then, the signaling is transmitted to the MSC server through the MGW.
2.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
5 Signal Flow
NOTE
l The Abis interface board can be the EIUa/OIUa/POUc board, and the XPUa/XPUb/SPUa/SPUb board performs signaling processing. The boards shown in Figure 5-17 are only examples. l The INT in the figure stands for the interface board. You can use different interface boards as required.
Figure 5-17 Signaling flow on the Abis interface in Abis over TDM mode
As shown in Figure 5-17, the uplink signaling flow on the Abis interface is as follows: 1. 2. The signaling from the BTS is transmitted to the Abis interface board in the MPS/EPS over the Abis interface and is then transmitted to the SCUa board. The SCUa board transmits the signaling to the signaling processing board.
Abis over IP
Figure 5-18 shows the signaling flow on the Abis interface in Abis over IP mode.
NOTE
l The Abis interface board can be the FG2a/GOUa/PEUa/FG2c/GOUc/POUc board, and the XPUa/XPUb/ SPUa/SPUb board performs signaling processing. The boards shown in Figure 5-18 are only examples. l The INT in the figure stands for the interface board. You can use different interface boards as required.
Figure 5-18 Signaling flow on the Abis interface in Abis over IP mode
As shown in Figure 5-18, the uplink signaling flow on the Abis interface is as follows:
5-16 Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
5 Signal Flow
1. 2.
The signaling from the BTS is transmitted to the Abis interface board in the MPS/EPS over the Abis interface. The Abis interface board processes the signaling according to the MAC, IP, and UDP protocols. Then, the signaling is transmitted to the signaling processing board through the SCUa board.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
l The Gb interface board can be the PEUa/FG2a/POUc/FG2c board, and the XPUa/XPUb/SPUa/SPUb board performs signaling processing. The boards shown in Figure 5-19 are only examples. l The INT in the figure stands for the interface board. You can use different interface boards as required.
As shown in Figure 5-19, the uplink signaling flow on the Gb interface is as follows: 1. In the MPS/EPS, the signaling processing board processes the signaling according to the NS and BSSGP protocols. Then, the signaling is transmitted to the Gb interface board through the SCUa board. The Gb interface board processes the signaling according to the IP or FR protocol. Then, the signaling is transmitted to the SGSN over the Gb interface.
2.
5 Signal Flow
NOTE
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
l The Pb interface board can be the EIUa/OIUa/POUc board, and the XPUa board performs signaling processing. The boards shown in Figure 5-20 are only examples. l The INT in the figure stands for the interface board. You can use different interface boards as required.
As shown in Figure 5-20, the uplink signaling flow on the Pb interface is as follows: 1. In the MPS/EPS, the signaling processing board processes the signaling according to the IP and RR protocols. Then, the signaling is transmitted to the Pb interface board through the SCUa board. The Pb interface board processes the signaling according to the LAPD protocol. Then, the signaling is transmitted to the PCU over the Pb interface.
2.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
5 Signal Flow
NOTE
l The INT in the figure stands for the interface board. You can use different interface boards as required. l All the communications between the boards are switched by the SCUa boards. l As shown in the figure, the cross symbol in the MPS indicates the switching unit in the MPS.
The signaling flow on the uplink is as follows: 1. 2. The RRC messages from the UE are processed at the physical layer of the NodeB and then are sent to the Iub interface board of the BSC6900 over the Iub interface. The Iub interface board processes the messages and then sends them to the DPUb board. See signal flow 1 in Figure 5-21. If the SPUa board that processes the RRC messages and the Iub interface board that receives the RRC messages are located in different subracks, the messages travel to the MPS for switching. The MPS then sends the messages to the target DPUb board. See signal flow 2 in Figure 5-21. 3. The DPUb board processes the messages according to the FP, MDC, MAC, and RLC protocols and then sends the messages to the target SPUa board where the messages are terminated.
5-19
5 Signal Flow
NOTE
l The INT in the figure stands for the interface board. You can use different interface boards as required. l All the communications between the boards are switched by the SCUa boards.
The signaling flow on the uplink is as follows: 1. 2. The RRC messages sent from the UE are processed at the physical layer of the NodeB and then are sent to the Iub interface board of BSC6900-1 over the Iub interface. The Iub interface board and the DPUb board of BSC6900-1 process the messages and then send them to the Iur interface board of BSC6900-1.
NOTE
When the UE performs a cell update across the Iur interface, the RRC messages travel to the Iur interface board of BSC6900-1 through the SPUa board of BSC6900-1. In any other case, the RRC messages need not pass through the SPUa board of BSC6900-1.
3.
The Iur interface board of BSC6900-1 processes the RRC messages and then sends them to the Iur interface board of BSC6900-2 over the Iur interface between BSC6900-1 and BSC6900-2. The Iur interface board of BSC6900-2 processes the messages and then sends them to the DPUb board. The DPUb board processes the messages according to the FP, MDC, MAC, and RLC protocols and then sends the messages to the target SPUa board where the messages are terminated.
4. 5.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
5-20
5 Signal Flow
NOTE
l The INT in the figure stands for the interface board. You can use different interface boards as required. l All the communications between the boards are switched by the SCUa boards. l As shown in the figure, the cross symbol in the MPS indicates the switching unit in the MPS.
The signaling flow on the uplink is as follows: 1. 2. The NodeB transmits the control-plane messages to the Iub interface board of the BSC6900 over the Iub interface. The Iub interface board processes the messages and then sends them to the SPUa board where the messages are terminated. See signal flow 1 in Figure 5-23. If the SPUa board that processes the messages and the Iub interface board that receives the messages are located in different subracks, the messages travel to the MPS for switching. The MPS then sends the messages to the target SPUa board. See signal flow 2 in Figure 5-23. The downlink flow is the reverse of the uplink flow.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
Figure 5-24 shows the signaling flow on the Iu/Iur interface. See signal flows 1, 2, and 3.
5-21
5 Signal Flow
NOTE
l The INT in the figure stands for the interface board. You can use different interface boards as required. l All the communications between the boards are switched by the SCUa boards. l As shown in the figure, the cross symbol in the MPS indicates the switching unit in the MPS.
The signaling flow on the downlink is as follows: 1. The MSC or SGSN sends the control-plane messages to the Iu interface board of the BSC6900 over the Iu interface, or another BSC6900 sends the control-plane messages to the Iur interface board of the local BSC6900 over the Iur interface. The Iu/Iur interface board processes the messages and then sends them to the SPUa board in the same subrack for processing. See signal flow 1 in Figure 5-24. If the SPUa board in the same subrack as the Iu/Iur interface board cannot process the messages, the messages are switched by the MPS to the SPUa board in another subrack. See signal flow 2 in Figure 5-24. After being processed by the Iu/Iur interface board, the messages are directly switched by the MPS to the SPUa board in another subrack. See signal flow 3 in Figure 5-24. The uplink flow is the reverse of the downlink flow.
2.
Select a board according to the board function. For more information, see Boards. All the boards listed in this chapter are used as examples for your reference.
5 Signal Flow
As shown in Figure 5-25, the OM signal flow in the BSC6900 is as follows: l OM signal flow in the MPS 1. 2. 3. l 1. 2. 3. 4. l The OM signal is transmitted from the LMT or M2000 to the OMUa board in the MPS. After the OM signal is processed by the OMUa board, it is transmitted to the SCUa board through the backplane of the MPS. The SCUa board then transmits the OM signal to the service boards to be maintained. The OM signal is transmitted from the LMT or M2000 to the OMUa board in the MPS. After the OM signal is processed by the OMUa board, it is transmitted to the SCUa board through the backplane of the MPS. The SCUa board in the MPS transmits the OM signal to the SCUa board in the EPS through the Ethernet cable between the SCUa boards. In the EPS, the SCUa board transmits the OM signal to the service boards to be maintained. The OM signal is transmitted from the LMT or M2000 to the OMUa board in the MPS. After being processed by the OMUa board, the OM signal is transmitted to the SCUa and Ater interface boards through the backplane of the MPS. The OM signal is transmitted from the Ater interface board in the MPS to the Ater interface board in the main TCS through the E1/T1 or optical cable between the Ater interface boards. In the main TCS, the OM signal is transmitted from the Ater interface board to the SCUa board through the backplane.
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 5-23
5 Signal Flow
4.
In the main TCS, the backplane switches the signal from the SCUa board to the service boards to be maintained. The OM signal is transmitted from the SCUa board in the main TCS to the SCUa board in the extension TCS through the Ethernet cable between the SCUa boards. In the extension TCS, the backplane switches the signal from the SCUa board to the service boards to be maintained.
As shown in Figure 5-26, the OM signal flow in the BSC6900 is as follows: l OM signal flow in the MPS 1. 2. 3. l The OM signal is transmitted from the LMT or M2000 to the OMUa board in the MPS. After the OM signal is processed by the OMUa board, it is transmitted to the SCUa board in the MPS through the backplane of the MPS. The SCUa board then transmits the OM signal to the service boards to be maintained.
OM signal flow in the EPS 1. 2. 3. 4. The OM signal is transmitted from the LMT or M2000 to the OMUa board in the MPS. After the OM signal is processed by the OMUa board, it is transmitted to the SCUa board in the MPS through the backplane of the MPS. The SCUa board in the MPS transmits the OM signal to the SCUa board in the EPS through the Ethernet cable between the SCUa boards. In the EPS, the SCUa board transmits the OM signal to the service boards to be maintained.
Scenario 3: A over IP
In BM/TC combined mode, no TCS is configured, and the TC function is performed by the media gateway (MGW). The OM signal flow in A over IP mode is the same as that in BM/TC combined mode.
5-24 Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
6
About This Chapter
The transmission and networking between the BSC6900 and other NEs can be classified into the following types: transmission and networking on the A/Gb interface, on the Abis interface, on the Ater interface, on the Pb interface, on the Iub interface, and on the Iu/Iur interface. 6.1 Transmission and Networking on the A/Gb Interface Multiple transmission and networking modes, including TDM-based networking on the A/Gb interface and IP-based networking on the A/Gb interface, can be adopted between the BSC6900 and the core network (CN). 6.2 Transmission and Networking on the Abis Interface Multiple transmission and networking modes, including TDM-based networking on the Abis interface, and IP-based networking on the Abis interface, can be adopted between the BSC6900 and the base station. 6.3 Transmission and Networking on the Ater Interface When the BSC6900 adopts the BM/TC separated mode, the Ater interface exists. Multiple transmission and networking modes, including TDM-based networking on the Ater interface and IP-based networking on the Ater interface, can be adopted between the BM subrack and the TC subrack. 6.4 Transmission and Networking on the Pb Interface In external PCU configuration mode, TDM transmission can be applied to the Pb interface between the BSC6900 and the PCU. 6.5 Transmission and Networking on the Iu/Iur Interface Multiple transmission and networking modes, including ATM-based networking on the Iu/Iur interface and IP-based networking on the Iu/Iur interface, can be adopted between the BSC6900 and the CN or another BSC6900. 6.6 Transmission and Networking on the Iub Interface Multiple transmission and networking modes, including ATM-based networking on the Iub interface and IP-based networking on the Iub interface, can be adopted between the BSC6900 and the base station.
6-1
6-2
IP over E1 Networking
In this networking mode, the PEUa/POUc board of the BSC6900 functions as the A interface board. The PEUa board provides E1/T1 ports, and the POUc board provides channelized STM-1 ports and OC-3 ports. Figure 6-4 shows the IP over E1 networking on the A interface. The Gb interface does not support the IP over E1 networking mode. Figure 6-4 IP over E1 networking on the A interface
6-3
TDM-Based Networking
In this networking mode, the EIUa/OIUa/POUc board of the BSC6900 functions as the Abis interface board. The EIUa board provides E1/T1 ports, the OIUa board provides channelized
6-4 Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
STM-1 ports, and the POUc board provides channelized STM-1 ports and OC-3 ports. Figure 6-6 shows the TDM-based networking on the Abis interface. Figure 6-6 TDM-based networking on the Abis interface
IP over E1 Networking
In this networking mode, the BSC6900 and the base station communicate with each other through the SDH/PDH network. The PEUa/POUc board functions as the Abis interface board. The PEUa board provides E1/T1 ports, and the POUc board provides STM-1 ports and OC-3 ports. See Figure 6-7. Figure 6-7 IP over E1 Networking
IP over E1 Networking
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
This networking mode does not meet the requirements of the evolution from the telecom network to the IP network. l IP over Ethernet Networking The QoS of the network cannot be guaranteed easily. Therefore, the end-to-end QoS mechanism must be adopted.
TDM-Based Networking
In this networking mode, the EIUa/OIUa/POUc board of the BSC6900 functions as the Ater interface board. The EIUa board provides E1/T1 ports, the OIUa board provides channelized STM-1 ports, and the POUc board provides channelized STM-1 ports and OC-3 ports. Figure 6-10 shows the TDM-based networking on the Ater interface. Figure 6-10 TDM-based networking on the Ater interface
IP-Based Networking
In this networking mode, the POUc board of the BSC6900 functions as the Ater interface board and provides channelized STM-1 ports and OC-3 ports. Figure 6-11 shows the IP-based networking on the Ater interface. Figure 6-11 IP-based networking on the Ater interface
TDM-Based Networking
In this networking mode, the EIUa/OIUa/POUc board of the BSC6900 functions as the Pb interface board. The EIUa board provides E1/T1 ports, the OIUa board provides channelized STM-1 ports, and the POUc board provides channelized STM-1 ports and OC-3 ports. Figure 6-12 shows the TDM-based networking on the Pb interface. Figure 6-12 TDM-based networking on the Pb interface
6-8
6-9
Figure 6-13 SDH-based networking with MSP backup between optical ports
In this networking mode, each Iu or Iur interface requires a pair of STM-1 optical cables for MSP 1+1 (single-end or both-end) or MSP 1:1 backup. In some cases rather than direct connection between the BSC6900 and the MSC or SGSN, the section-specific MSP backup at the BSC6900 protects only the optical channels between the BSC6900 and the ADM, instead of all the optical channels between the BSC6900 and the MSC or SGSN.
6-10
Figure 6-14 SDH-based networking with load sharing between optical ports
In this networking mode, the two UOIa/UOIc boards for the Iu or Iur interface are not configured for backup. The Iu/Iur control plane PVCs are shared between two optical ports on different UOIa/UOIc boards. The same is applicable to the Iu/Iur user plane PVCs. Thus, the two optical ports share the load. If one of the optical ports is faulty, it is isolated and the services carried on it are disrupted. Then the traffic on the Iu or Iur interface reduces by half.
6-11
Figure 6-15 SDH-based networking with STM-1 shared between Iu and Iur
Generally, the traffic on the Iur interface is light. Therefore, when the BSC6900 has a number of Iur interfaces where the traffic is light, the Iu and Iur interfaces can share an STM-1 transmission resource, and then the MGW separates the Iu PVC from the Iur PVC by using VC or VP switching.
ATM-Based Networking
In this networking mode, the UOIa/UOIc board of the BSC6900 functions as the Iu/Iur interface board and provides unchannelized STM-1 optical ports, as shown in Figure 6-16.
6-12
In this networking mode, each Iu or Iur interface requires a pair of STM-1 optical cables for MSP 1+1 (single-end or both-end) or MSP 1:1 backup. In some cases rather than direct connection between the BSC6900 and the MSC or SGSN, the section-specific MSP backup at the BSC6900 protects only the optical channels between the BSC6900 and the ATM switch instead of all the optical channels between the BSC6900 and the MSC or SGSN.
NOTE
l STM-1 sharing between the Iu and Iur interfaces is applicable to the ATM-based networking. In this case, the Iu and Iur interfaces share a pair of STM-1 optical cables to transmit data before the ATM switch separates the Iu PVC from the Iur PVC by using VC or VP switching. l Load sharing is also applicable to the ATM-based networking. This networking mode is similar to the SDH-based networking with load sharing between optical ports.
6-13
In the case of a large number of Iur interfaces, the demand for transmission resources is high and the resource usage is low if each Iur interface occupies one STM-1 port. The SDHbased networking with STM-1 shared between Iu and Iur is resource-effective. l ATM-based networking The Iu and Iur interfaces can share a port or board for data transmission, thus saving the transmission resources and improving the resource usage. Disadvantages: l SDH-based networking with MSP backup between optical ports For transmission backup, this networking mode requires double optical ports and cable resources. l SDH-based networking with load sharing between optical ports This networking mode does not provide transmission backup, thus reducing the transmission reliability. If an optical port or optical cable is faulty, the services carried on the faulty part are disrupted. l SDH-based networking with STM-1 shared between Iu and Iur This networking mode requires VC/VP switching at the MGW, thus increasing the load of the MGW. l ATM-based networking The market share of ATM networks decreases as the ATM equipment is expensive. Building additional ATM networks for Iu and Iur transmission is not recommended.
6-14
In this networking mode, the FE/GE ports of the BSC6900 work in active/standby mode. The active and standby FE/GE ports of the BSC6900 connect to the Provider Edge (PE), which then connects to the data network. The active and standby FE/GE ports of the BSC6900 share one IP address, that is, IP1-1. On the PE side, the active and standby ports of the BSC6900 are in one VLAN and share one port IP address of the VLAN, that is, IP1-0.
NOTE
The GE optical ports on the GOUa/GOUc board are used when the distance between the BSC6900 and the PE is greater than 100 meters. The FE/GE electrical ports on the FG2a/FG2c board are used when the distance between the BSC6900 and the PE is equal to or less than 100 meters.
6-15
In this networking mode, the FE/GE ports of the BSC6900 are configured for backup. The active and standby FE/GE ports of the BSC6900 connect to two PEs, which then connect to the data network. Complying with the Virtual Router Redundancy Protocol (VRRP), the two PEs provide redundancy-based protection for the data received from the BSC6900. One PE connects to the other PE through two GE ports. Link Aggregation (LAG) is applied to the interconnection links between the PEs to increase the bandwidth and reliability of the links. The active and standby FE/GE ports of the BSC6900 share one IP address, that is, IP1-1. On the PE side, the active and standby ports of the BSC6900 are in one VLAN and share one virtual VRRP IP address, that is, IP1-0.
NOTE
The GE optical ports on the GOUa/GOUc board are used when the distance between the BSC6900 and the PE is greater than 100 meters. The FE/GE electrical ports on the FG2a/FG2c board are used when the distance between the BSC6900 and the PE is equal to or less than 100 meters.
6-16
When the BSC6900 and the MGW, SGSN, or another BSC6900 are located in the same equipment room, direct connection through FE/GE ports is applicable to the Iu or Iur interface. This networking mode does not require additional transport network or equipment. The FG2a/ GOUa/FG2c/GOUc boards can work in board backup mode, and the FE/GE ports work in load sharing mode to carry services.
6-17
In this networking mode, each Iu or Iur interface requires a pair of STM-1 optical cables for MSP 1+1 (single-end or both-end) or MSP 1:1 backup. In cases rather than direct connection between the BSC6900 and the MSC or SGSN, the section-specific MSP backup at the BSC6900 protects only the optical channels between the BSC6900 and the ADM, instead of all the optical channels between the BSC6900 and the MSC or SGSN.
In this networking mode, the two UOIa/UOIc boards for the Iu/Iur interface are not configured for backup, and the two optical ports work in load sharing mode to carry services. If one of the optical ports is faulty, it is isolated and the services carried on it are disrupted. Then the traffic on the Iu or Iur interface reduces by half.
Figure 6-22 SDH-based networking with STM-1 shared between Iu and Iur
Generally, the traffic on the Iur interface is light. Therefore, when the BSC6900 has a large number of Iur interfaces where the traffic is light, the Iu and Iur interfaces can share an STM-1 transmission resource.
SDH-based networking with load sharing between optical ports This networking mode saves the optical ports and optical cables between the BSC6900 and the ADM, thus improving the optical resource usage.
SDH-based networking with STM-1 shared between Iu and Iur In the case of a large number of Iur interfaces, the demand for transmission resources is high and the resource usage is low if each Iur interface occupies one STM-1 port. The SDHbased networking with STM-1 shared between Iu and Iur is resource-effective.
Disadvantages: l l l Single-homing layer 3 networking The single PE cannot provide PE-level protection. Dual-homing layer 3 networking The dual PEs require a high networking cost. Direct connection with load sharing This networking mode does not provide backup for data transmission. A port failure will lead to the decrease of transmission capacity. l SDH-based networking with MSP backup between optical ports For transmission backup, this networking mode requires double optical ports and cable resources. l SDH-based networking with load sharing between optical ports This networking mode does not provide transmission backup, thus reducing the transmission reliability. If an optical port or optical cable is faulty, the services carried on the faulty part are disrupted. l SDH-based networking with STM-1 shared between Iu and Iur The load of the MGW is increased.
6-20
The E1/T1 signals from multiple base stations are converged at the ATM switch and then are transmitted to the BSC6900 through the SDH/PDH network.
Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 6-21
The E1/T1 signals from multiple base stations are converged onto one STM-1 channel at the ATM switch and then are transmitted to the ATM switch in the BSC6900 equipment room through the SDH/PDH network. Then, the E1 links are converged by the ATM switch and transmitted to the BSC6900.
IP over E1 Networking
In this networking mode, the BSC6900 and the base station communicate with each other through the SDH/PDH transmission network. The PEUa/POUa/POUc board of the BSC6900 functions as the Iub interface board. The PEUa board provides E1/T1 ports, and the POUa/POUc board provides channelized STM-1 ports and OC-3 ports. The optical ports of the POUa/POUc board work in MSP 1+1 (single-end), MSP 1+1 (both-end), or MSP 1:1 backup mode. Figure 6-26 shows the IP over E1 networking. Figure 6-26 IP over E1 networking
In this networking mode, the BSC6900 and the base station communicate with each other through the SDH/PDH network and the IP packets are transmitted through the PPP protocol. In IP over E1 networking mode, E1 signals are transparently transmitted through the SDH/PDH network, thus ensuring the reliability and security of data transmission and meeting the QoS requirements of data transmission.
Both the BSC6900 and the base station access the IP network through switches.
Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 6-23
In IP over Ethernet (layer 2) networking mode, the Virtual LAN (VLAN) technology is adopted to divide the BSC6900 and the base station into different subnets. In this case, the BSC6900 and the base station are part of IP private networks, thus ensuring the security of data transmission.
6-24
The BSC6900 and the base station in this networking mode communicate with each other through different transmission networks, which carry different types of data. The networks are described as follows: l The SDH/PDH network applies to the data services with high QoS requirements, such as the real-time data service. The base station obtains clock signals through the SDH or PDH network. The data network applies to the data services with low QoS requirements.
The base station is connected to the ATM and IP networks through its ATM and IP interface boards respectively. Figure 6-30 ATM/IP-based networking on the Iub interface
6-25
Disadvantages: The ATM/IP-based networking requires maintenance of both ATM and IP networks. This increases the difficulty in and the cost for network maintenance to a certain extent.
6-26
7 Parts Reliability
7
About This Chapter
Parts Reliability
The BSC6900 guarantees its operation reliability by means of board redundancy and port redundancy. 7.1 Concepts Related to Parts Reliability The concepts related to parts reliability are board backup, port backup, resource pool, port trunking, and port load sharing. 7.2 Board Redundancy Board redundancy of the BSC6900 is of two types: board backup and resource pool. 7.3 Port Redundancy Port redundancy is of three types: optical port backup, FE/GE port backup, port load sharing, and port trunking.
7-1
7 Parts Reliability
7.1.1 Backup
Backup is a process of synchronization between the active and standby units. In backup mode, two units of the same type work in active/standby mode, with one working as the active unit and the other working as the standby unit. When the active unit is faulty, the active and standby units are switched over, and the standby unit takes over the tasks from the active unit. In this manner, the impact of unit failure on services is minimized.
Backup Types
l Board Backup In board backup mode, two boards work in active/standby mode, with one working as the active board and the other working as the standby board. Services can be processed by either the active board only or both the active and standby boards. If the active board is faulty, the BSC6900 automatically switches over the active and standby boards. l Port Backup In port backup mode, two ports work in active/standby mode, with one working as the active port and the other working as the standby port. Data is transmitted through either the active port only or both the active and standby ports. If the active port is faulty, the BSC6900 automatically switches over the active and standby ports.
7 Parts Reliability
1+1 Hot Backup The active and standby units work simultaneously and process the same services, but the standby unit does not output the processing result. When the active unit is faulty, the standby unit takes over the tasks from the active unit.
1+1 Warm Backup The active and standby units work simultaneously, and the standby unit backs up the necessary signaling and service data of the active unit. When the active and standby units are switched over, services are slightly affected. When the active unit is faulty, the standby unit takes over the tasks from the active unit.
NOTE
When the active and standby units working in 1+1 warm backup mode are switched over, the established services may or may not be disrupted. If the established services are not disrupted and the impact on the services is acceptable, the impact on the services in 1+1 warm backup mode is equivalent to that in hot backup mode.
1+1 Cold Backup The active and standby units work simultaneously, but the standby unit does not back up the necessary signaling and service data of the active unit. When the active and standby units are switched over, the established services are disrupted. When the active unit is faulty, the standby unit takes over the tasks from the active unit.
N+1 Warm Backup The active and standby N+1 units work simultaneously, with N units being active and one unit being standby. The standby unit backs up the necessary signaling and service data of the active N units. When the active and standby units are switched over, services may be slightly affected. When any active unit is faulty, the standby unit takes over the tasks from this active unit.
N+1 Cold Backup The active and standby N+1 units work simultaneously, with N units being active and one unit being standby. The standby unit does not back up the signaling and service data of the active N units. When the active and standby units are switched over , the established services are disrupted. When any active unit is faulty, the standby unit takes over the tasks from this active unit.
NOTE
l The active and standby XPUa/XPUb/SPUa/SPUb boards of the BSC6900 work in 1:1 backup or 1+1 warm backup mode. l The DPUa/DPUb/DPUc/DPUd/DPUe/DPUf/DPUg boards of the BSC6900 work in resource pool mode. l Other active and standby boards of the BSC6900 work in 1+1 warm backup mode.
7 Parts Reliability
Port trunking works in trunk groups. Multiple physical links form a trunk group. If a physical link in the trunk group becomes faulty, the data carried on the faulty link is transferred to other links in the trunk group. Thus, the link failure does not disrupt the communication between both ends of the trunk group. The traffic of the trunk group at the most can reach the total traffic on all the physical links in the trunk group. Port trunking helps enhance transmission reliability and increase transmission bandwidth.
7 Parts Reliability
7.2.9 Backup of GCUa/GCGa Boards The BSC6900 is configured with two GCUa/GCGa boards in the MPS. The two boards work in backup mode. 7.2.10 Backup of GOUa/GOUc Boards When two GOUa/GOUc boards are configured in adjacent active and standby slots in a subrack of the BSC6900, the two boards can be configured to work in one of the following two modes: board backup with no port backup and board backup with port backup. 7.2.11 Backup of OMUa/OMUb/OMUc Boards When the BSC6900 is configured with two OMUa/OMUb/OMUc boards in the MPS, the two boards work in backup mode. 7.2.12 Backup of POUa/POUc Boards When two POUa/POUc boards are configured in adjacent active and standby slots in a subrack of the BSC6900, the two boards can be configured to work in board backup mode or port backup mode. 7.2.13 Backup of UOIa/UOIc Boards When two UOIa/UOIc boards are configured in adjacent active and standby slots in a subrack of the BSC6900, the two boards can be configured to work in board backup mode or port backup mode. 7.2.14 Backup of XPUa/XPUb/SPUa/SPUb Boards When two XPUa/XPUb/SPUa/SPUb boards are configured in adjacent active and standby slots in a subrack of the BSC6900, the two boards can be configured to work in backup mode. 7.2.15 Resource Pool of DPUa/DPUb/DPUc/DPUd/DPUe/DPUf/DPUg Boards The DPUa/DPUb/DPUc/DPUd/DPUe/DPUf/DPUg boards of the BSC6900 and the Digital Signal Processors (DSPs) in all the DPUa/DPUb/DPUc/DPUd/DPUe/DPUf/DPUg boards work in resource pool mode.
Switchover Modes
The SWP BRD command can be used to switch over the active and standby AEUa boards.
7 Parts Reliability
Switchover Process
When the active and standby AEUa boards are switched over, the active AEUa board becomes standby after being reset, and the other AEUa board becomes active.
Switchover Modes
The SWP BRD command can be used to switch over the active and standby EIUa boards.
Switchover Process
When the active and standby EIUa boards are switched over, the active EIUa board becomes standby after being reset, and the other EIUa board becomes active.
7 Parts Reliability
Switchover Modes
The SWP BRD command can be used to switch over the active and standby OIUa boards.
Switchover Process
When the active and standby OIUa boards are switched over, the active OIUa board becomes standby after being reset, and the other OIUa board becomes active.
Switchover Modes
The SWP BRD command can be used to switch over the active and standby PEUa boards.
Switchover Process
When the active and standby PEUa boards are switched over, the active PEUa board becomes standby after being reset, and the other PEUa board becomes active.
Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 7-7
7 Parts Reliability
Switchover Modes
l l Automatic switchover: The active and standby SCUa/SCUb boards perform a switchover automatically. Manual switchover: The SWP BRD command can be used to switch over the active and standby SCUa/SCUb boards.
Switchover Process
When the active and standby SCUa/SCUb boards are switched over, the active SCUa/SCUb board becomes standby after being reset, and the other SCUa/SCUb board becomes active.
7 Parts Reliability
Switchover Modes
l l Automatic switchover: The active and standby TNUa boards perform a switchover automatically. Manual switchover: The SWP BRD command can be used to switch over the active and standby TNUa boards.
Switchover Process
When the active and standby TNUa boards are switched over, the active TNUa board becomes standby after being reset, and the other TNUa board becomes active.
Switchover Modes
l l Automatic switchover: The active and standby AOUa/AOUc boards perform a switchover automatically. Manual switchover: The SWP BRD command can be used to switch over the active and standby AOUa/AOUc boards.
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 7-9
7 Parts Reliability
Switchover Process
When the active and standby AOUa/AOUc boards are switched over, the active AOUa/AOUc board becomes standby after being reset, and the other AOUa/AOUc board becomes active.
NOTE
After an active/standby switchover, the BSC6900 determines the active and standby ports according to the MSP protocol strategy.
Switchover Modes
l l Automatic switchover: The active and standby FG2a/FG2c boards perform a switchover automatically. Manual switchover: The SWP BRD command can be used to switch over the active and standby FG2a/FG2c boards.
The active FG2a/FG2c board is reset, but the standby FG2a/FG2c board works properly.
Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. Issue Draft A (2011-01-31)
7 Parts Reliability
The active FG2a/FG2c board is faulty, but the standby FG2a/FG2c board works properly.
Switchover Process
When the active and standby FG2a/FG2c boards are switched over, the active FG2a/FG2c board becomes standby after being reset, and the other FG2a/FG2c board becomes active.
NOTE
If the FG2a/FG2c boards work in board backup with port backup mode, after an active/standby switchover, the BSC6900 determines the active and standby ports and defines the port load sharing strategy.
Switchover Modes
l l Automatic switchover: The active and standby GCUa/GCGa boards perform a switchover automatically. Manual switchover: The SWP BRD command can be used to switch over the active and standby GCUa/GCGa boards.
The GCGa board supports the GPS clock. If the satellite card in the active GCGa board is faulty but that in the standby GCGa board works properly, the active and standby GCGa boards are switched over.
Switchover Process
When the active and standby GCUa/GCGa boards are switched over, the active GCUa/GCGa board becomes standby after being reset, and the other GCUa/GCGa board becomes active.
Issue Draft A (2011-01-31) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 7-11
7 Parts Reliability
Switchover Modes
l l Automatic switchover: The active and standby GOUa/GOUc boards perform a switchover automatically. Manual switchover: The SWP BRD command can be used to switch over the active and standby GOUa/GOUc boards.
Switchover Process
When the active and standby GOUa/GOUc boards are switched over, the active GOUa/GOUc board becomes standby after being reset, and the other GOUa/GOUc board becomes active.
NOTE
If the GOUa/GOUc boards work in board backup with port backup mode, the BSC6900 determines the active and standby ports and defines the port load sharing strategy after an active/standby switchover.
7-12
7 Parts Reliability
Switchover Modes
l l Automatic switchover: The active and standby OMUa/OMUb/OMUc boards perform a switchover automatically. Manual switchover: The SWP OMU command can be used to switch over the active and standby OMUa/OMUb/OMUc boards.
By default, the period for automatic switchover between the active and standby OMUa/OMUb/ OMUc boards is 90 days. You can also use the SET ASWPARA command to set the period for automatic switchover.
Manual switchover can be performed only when the standby OMUa/OMUb/OMUc board works properly and the state of data synchronization between the active and standby OMUa/ OMUb/OMUc boards is Data synchronization is successful.
NOTE
You can use the DSP OMU command to query the state of data synchronization between the active and standby OMUa/OMUb/OMUc boards.
Switchover Process
When the active and standby OMUa/OMUb/OMUc boards are switched over, the active OMUa/ OMUb/OMUc board becomes standby, and the other OMUa/OMUb/OMUc board becomes active.
7 Parts Reliability
Switchover Modes
l l Automatic switchover: The active and standby POUa/POUc boards perform a switchover automatically. Manual switchover: The SWP BRD command can be used to switch over the active and standby POUa/POUc boards.
Switchover Process
When the active and standby POUa/POUc boards are switched over, the active POUa/POUc board becomes standby after being reset, and the other POUa/POUc board becomes active.
NOTE
After an active/standby switchover, the BSC6900 determines the active and standby ports according to the MSP protocol strategy.
7 Parts Reliability
When two UOIa/UOIc boards are configured to work in board backup mode, one UOIa/UOIc board is active and the other is standby. The standby board synchronizes its data with that on the active board in real time. Port backup adopts the MSP 1:1 or MSP 1+1 backup mode. Services are processed by the board where the active port is located. Active ports may be located on both the active and standby boards because the switchover between the optical ports on the active and standby boards does not affect the active/standby relation between the boards. In that case, both the active and standby boards can process services. For details about the backup of UOIa/ UOIc optical ports, see 7.3.1 Optical Port Backup. When the ADD BRD command is executed to add a UOIa/UOIc board, the backup mode of the UOIa/UOIc board is configurable. If Backup is set to YES, both the UOIa/UOIc boards and their optical ports work in backup mode. Therefore, the backup mode of the optical ports does not need to be configured again.
Switchover Modes
l l Automatic switchover: The active and standby UOIa/UOIc boards perform a switchover automatically. Manual switchover: The SWP BRD command can be used to switch over the active and standby UOIa/UOIc boards.
Switchover Process
When the active and standby UOIa/UOIc boards are switched over, the active UOIa/UOIc board becomes standby after being reset, and the other UOIa/UOIc board becomes active.
NOTE
After an active/standby switchover, the BSC6900 determines the active and standby ports according to the MSP protocol strategy.
7-15
7 Parts Reliability
Switchover Modes
l l Automatic switchover: The active and standby XPUa/XPUb/SPUa/SPUb boards perform a switchover automatically. Manual switchover: The SWP BRD command can be used to switch over the active and standby XPUa/XPUb/SPUa/SPUb boards.
Switchover Process
When the active and standby XPUa/XPUb/SPUa/SPUb boards are switched over, the active XPUa/XPUb/SPUa/SPUb board becomes standby after being reset, and the other XPUa/XPUb/ SPUa/SPUb board becomes active.
7 Parts Reliability
The priorities of DSPs to be allocated in descending order are DSPs in the same board, DSPs in the same subrack, and DSPs in different subracks.
Switchover Modes
l l Automatic switchover: The active and standby optical ports perform a switchover automatically. Manual switchover: The SET MSPCMD command can be used to switch over the active and standby optical ports.
7 Parts Reliability
Switchover Process
When the active and standby optical ports are switched over, the active optical port stops receiving data and becomes standby, and the original standby optical port starts to receive data and becomes active.
Switchover Modes
l l Automatic switchover: The active and standby ports on the active and standby FG2a/GOUa/ FG2c/GOUc boards perform a switchover automatically. Manual switchover: The SWP ETHPORT command can be used to switch over the active and standby ports on the FG2a/GOUa/FG2c/GOUc boards.
Switchover Process
When the active and standby ports are switched over, the active port stops receiving and sending data and becomes standby, and the original standby port starts to receive and send data and becomes active.
7 Parts Reliability
Prerequisites
The BSC6900 supports load sharing between FE/GE ports that are located either on the same board or on active and standby boards.
NOTE
l l
The BSC6900 does not support load sharing between the FE/GE ports on non-active/standby boards. The BSC6900 does not support load sharing between active and standby ports.
Working Principles
Load sharing between FE/GE ports is based on the user type. That is the data of a type of user is carried on one FE/GE port, and that of another type of user is carried on another FE/GE port.
NOTE
The data of one user is transmitted through only one FE/GE port.
Application Scenario
When the FE/GE ports of the BSC6900 work in load sharing mode, the data towards the same IP address may be transmitted through different ports, and thus different IP routes must be configured. For example, load sharing between two FE/GE ports requires two IP routes. The IP routes must have the same destination IP address, subnet mask, and priority, but different nexthop IP addresses.
NOTE
l The ADD IPRT command can be used to add an IP route. l The BSC6900 supports load sharing between a maximum of three FE/GE ports.
Benefits
l l Data traffic is shared by the ports to avoid the condition where some ports are busy whereas others are idle. Load sharing enhances the reliability of data transmission.
7 Parts Reliability
Benefits
l l l In a trunk group, the bandwidth is evenly allocated to the GE/FE ports, thus fulfilling load balancing. If a GE/FE link in a trunk group is faulty, the data stream on the link is automatically switched to other GE/FE links. If an SCUa/SCUb or another service board is faulty, no associated switchover occurs.
7-20