Project: Parcel: Feasibility study for crossing the Sognefjord Submerged floating tunnel Lavik - Oppedal
Kvinnherad Municipality
Technical data
Sognefjorden
: : :
0 - 4083
E 39
Lavik
S4 80 km/t 4000 year 2032
Oppedal
2000m 0
2000m
4000m
Statens vegvesen
Scale
1:200000
Drawing list
Project: Feasibility study for crossing the Sognejord Concept development of submerged floating tunnel SFT Lavik - Oppedal
Tegn.nr. Title
Drawing date
28.11.2012 28.11.2012 28.11.2012 B101 B102 F101 F102 K101 K102 K111 K112 K113 K121 K131 K132 K133 K141 K142 K143 K201 K202 K203 K211 Y101 Y102 Y103 Y104 Y105 Sognefjord SFT crossing - Overview Sognefjord SFT crossing - Navigation channel 28.11.2012 Normal profiles - Submerged floating tunnel - Typical sections Normal profiles - Landfalls - Typical sections 28.11.2012 Submerged floating tunnnel - General plan and elevation Submerged floating tunnnel - Typical sections Submerged floating tunnnel - Mid span Submerged floating tunnnel - Landfall Lavik Submerged floating tunnnel - Landfall Lavik - Elevation and sections Concrete tubes - Form - Typical sections Concrete tubes - Reinforcement layout - Typical sections Concrete tubes - Reinforcement layout - Landfall section Concrete tubes - Reinforcement layout - Bracings and cross tunnels Concrete tubes - Post tensioning - Typical sections Concrete tubes - Post tensioning - Landfall section Concrete tubes - Element joints Submerged floating tunnel - Element key plan Submerged floating tunnel - Landfall element Lavik - Isometric view Submerged floating tunnel - Tunnel element n 1 - Isometric view Submerged floating tunnel - Floating sequences Construction sequence - Jointing of elements - Jetty and outrigger support Construction sequences - Jointing of elements 1 Construction sequences - Jointing of elements 2 Construction sequences - Towing of tunnel Construction sequences - Pontoon installation 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 A A A A A A A A A A A A A A A A A A 28.11.2012 28.11.2012 28.11.2012 A A A A 28.11.2012 A A 28.11.2012
Page 1 of 2
1 28.11.2012
Statens vegvesen
Revision Index
A A A A
Date
Remarks
A101 A102
Sognefjorden
Lavik
Oppedal
250m
500m
1000m 1:25000
ARP SAH SAH
Horizontal Scale
A
Rev.
2011145371 -
N
2012-11-28
Rev. date
Statens vegvesen
As shown
ARP
SAH
SAH
11744
B101 K001
Sognefjorden
(20)
Lavik
2 4 0 0m
Oppedal
R = 3 0 0 0
m
3 0
3 1 8 3 . 2 4
250m
500m
1000m 1:25000
ARP SAH SAH
Horizontal Scale
A
Rev.
2011145371 -
N
2012-11-28
Rev. date
Statens vegvesen
Sognefjord SFT crossing Navigation channel Suggested main ship routing based on Norvegian Coastal Directorates fairlead recommendations.
As shown
ARP
SAH
SAH
11744
B102 K001
10
11
12
1 5 5 0
0 0 2
0 0 3 R6
0 0 5 R5
0 0 6 4
5 6 5
6 3 000 2
D
% 0 . 3
D
30 0 0
8 0 0
300 3000 300
5 1 7
12600
REMARKS: 1. 2. 3. 4. 5. 6.
2
REFERENCES:
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
K101 K111
2011145371 -
K110.
Wearing layer (75 mm) Solid ballast compartment Water ballast compartment
EXC 3
Statens vegvesen
Concrete:
Reinforcement:
Project number PROF number File number Building code Scale A3 Drawing number / Revision index
As shown
ARP
SAH
SAH
11744
F101 K001
12
10
11
10
11
12
Grouted
0 0 0 7 R
0 5 5 1
0 0 0 6 R
C
0 5 7 1
0 0 5 3
0 0 5 3
0 5 7 1
C
0 0 6 4
5 6 5
60 0 0
% 0 . 3
D
3 0 0
45 3 0
300
2 000
1000
1210
5 582
1 0 0 0
3 000
4500
4 6 2
5000
4500
14000
F F
REMARKS: 1. 2. 3. 4. 5. 6.
2
REFERENCES:
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
K101 K112
2011145371 -
K110.
Wearing layer (75 mm) Solid ballast compartment Water ballast compartment
EXC 3
Statens vegvesen
Concrete:
Reinforcement:
Project number PROF number File number Building code Scale A3 Drawing number / Revision index
As shown
ARP
SAH
SAH
11744
F102 K001
12
10
11
10
11
12
Elevation 1:10000
Lavik
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Oppedal 18
-12 m
-20 m
MSL
Plan 1:10000
B
D
5 0 2
0 5 1
430
1 5 0
2 0 5
5 0 2
2 0 5
5 0 2
5 0 2
R= 2 6 8 2m
2 0 5
2 0 5
B
5 0 2
E
A
2 0 5
1 5 0
E
0 5 1
Steel pontoon 7 4 0
Concrete tube
0 0 5
Horizontal bracing
5 0 0
C
F F
Closure joints
Closure joints
3700
200m
200m
400m 1: 10000
Horizontal scale
G
REMARKS:
REFERENCES:
K111 K112 Submerged floating tunnel - Mid span
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
2011145371 -
EXC 3
Statens vegvesen
Concrete:
Project number
As shown
Reinforcement:
Post-tensioning:
ARP
SAH
SAH
11744
K101 K001
12
10
11
10
11
12
Sections 1 : 750
MSL
B
MSL
MSL
B
Section A - A
Section B - B
Section C - C
Plans 1 : 750
D D
Plan A
Plan B
Plan C
REMARKS:
REFERENCES:
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
K101
2011145371 -
EXC 3
Statens vegvesen
Concrete:
P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 6 : 2 3 : 5 4 Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K102 - Submerged floating tunnel - Typical sections.dgn
As shown
Post-tensioning:
ARP
SAH
SAH
11744
K102 K001
12
10
11
10
11
12
8
B
10
11
B
26
400 (min)
26
Ship channel
MSL
Min -20 m
C C
Concrete tube
Elevation 1:2000
430
0 5 1
E
1 5 0
1 2 . 6
E
8 0
REMARKS:
REFERENCES:
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
2011145371 -
EXC 3
Statens vegvesen
Concrete:
Reinforcement:
Project number PROF number File number Building code Scale A3 Drawing number / Revision index
As shown
Post-tensioning:
ARP
SAH
SAH
11744
K111 K001
12
10
11
10
11
12
Closure joint
0 2
3
H
7
1 2 , 6 0,5
B
1 4
6 , 2 1
2 4 1
2
C
Temp. support
1 Detail H 1:250
4 1
D E F
E E
D
G
E F
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
2011145371 -
Statens vegvesen
P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 6 : 0 8 : 5 0 Filnavn:
As shown
Plan 1:1000
L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K112 - Submerged floating tunnel - Landfall Lavik - Plan.dgn
ARP
SAH
SAH
11744
K112 K001
12
10
11
10
11
12
M.S.L.
C tunnel L
1
C
Temporary bulkhead
Section G - G
Section F - F
Section E - E
Section D -D
1:50
1:500
REMARKS:
1. Temporary jacking point for positioning and locking during grouting
REFERENCES:
F102 K101 K112 Normal profiles - Landfalls - Typical sections Submerged floating tunnel - General plan and elevation Submerged floating tunnel - Landfall Lavik - Plan
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
2011145371 -
EXC 3
Statens vegvesen
Concrete:
Reinforcement:
Project number PROF number File number Building code Scale A3 Drawing number / Revision index
As shown
Post-tensioning:
ARP
SAH
SAH
11744
K113 K001
12
10
11
10
11
12
CL t u n n e l
d a o CL r
0 0 3
CL t u n n e l
d a o CL r
0 0 5
R
R
0 0 0 0 0 0 6
6 2 9
5 2 0
800 COG 8 3 6 0 1
1 000 COG
D
9 6 6 1 1 . R A V 0 0 0 5 0 3 . R A V
0 0 3
3 0 0
3 0 0
47 4 1
( v a r . )
50 6 0
( v a r . )
300
36 9 5
300
300
31 3 4
11 0 4
5 1 7
2 0 0
12 5 8
5 000
5 1 7
5 000
F F
2 0 0
0 0 2
0 0 2
1 000
1 000
0 0 5
0 0 8
1 000
1 000
1 0 0 0
500 500
2 000
500 500
500
REMARKS:
REFERENCES:
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
Submerged floating tunnel - General plan and elevation Submerged floating tunnel - Typical sections Concrete tubes - Reinforcement layout - Typical sections
Concrete: Execution class:
2011145371 -
K110.
EXC 3
Statens vegvesen
Reinforcement:
Project number PROF number File number Building code Scale A3 Drawing number / Revision index
As shown
Post-tensioning:
ARP
SAH
SAH
11744
K121 K001
12
10
11
10
11
12
25c200
25c200
16c400c400
16c400c400
232c200
232c200
32c200
32c200
16c200
D
16c200 16c200
16c200
16c200 16c200
16c200 16c200
16c200
16c200
D
716c65
716c65
20c200
16c400c400
20c200
16c400c400
REMARKS:
REFERENCES:
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
Submerged floating tunnel - General plan and elevation Submerged floating tunnel - Typical sections Concrete tubes - Form - Typical sections
Concrete: Execution class:
2011145371 -
K110.
EXC 3
Statens vegvesen
2. Min. lap length for longitudinal reinforcement 32 is 1 200 mm. Lap splices to be fully staggered.
Reinforcement:
Project number PROF number File number Building code Scale A3 Drawing number / Revision index
As shown
Post-tensioning:
ARP
SAH
SAH
11744
K131 K001
12
10
11
10
11
12
25c200
16c400c400 25c200
C C
232c200 232c200
16c200
16c200
16c200
16c200
16c200
20c200
716c65
20c200
16c400c400
1:100
G G
REMARKS:
REFERENCES:
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
Submerged floating tunnel - General plan and elevation Submerged floating tunnel - Typical sections Concrete tubes - Form - Typical sections
Concrete: Execution class:
2011145371 -
K110.
EXC 3
Statens vegvesen
2. Min. lap length for longitudinal reinforcement 32 is 1 200 mm. Lap splices to be fully staggered.
Reinforcement:
Project number PROF number File number Building code Scale A3 Drawing number / Revision index
As shown
Post-tensioning:
ARP
SAH
SAH
11744
K132 K001
12
10
11
10
11
12
8 0 0
4 0 0
1 1 2
6-31 tendon
PT 6-19 c 1000
2 1 7
PT 6-19 c 1000
7 5 1 1
PT 6-31 PT 6-31
5 0 R 60
R 60 0 5
R 60 0 5
5 0 R 60
R6 80 4 0
R6 80 4 0
R6 80 4 0
R6 80 4 0
1:100
1:100
REMARKS:
REFERENCES:
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
1. Metal sheats complying with EN 523 shall be used. Sheat inner diameter ID: - 6-19 tendons - 6-31 tendons
H
3. Hoop cables are stressed from both ends. 4. Maximum stressing force during stressing shall not exceed 0.95 x Fp0,1k: - 6-19 tendons : 6 860 kN : 4 210 kN - 6-31 tendons
K101 K102
Submerged floating tunnel - General plan and elevation Submerged floating tunnel - Typical sections Concrete tubes - Form - Typical sections
Concrete: Execution class:
2011145371 -
K110.
EXC 3
Statens vegvesen
90
mm mm
K121 K131
: 110
2. Longituinal cables are contiuous and stressed from one end using fixed multiplane coulpers. The couplers are staggered over 3 segment joints, average cable length is 90 m.
Reinforcement:
Project number PROF number File number Building code Scale A3 Drawing number / Revision index
As shown
Post-tensioning:
ARP
SAH
SAH
11744
K141 K001
12
10
11
10
11
12
PT 6-19 c 1000
7 6 5
PT 6-31
C C
R1 90 7 2
R 66 0 5
5 0 R 66
R1 90 7 2
1:100
G G
REMARKS:
REFERENCES:
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
1. Metal sheats complying with EN 523 shall be used. Sheat inner diameter ID: - 6-19 tendons - 6-31 tendons
H
3. Hoop cables are stressed from both ends. 4. Maximum stressing force during stressing shall not exceed 0.95 x Fp0,1k: - 6-19 tendons : 6 860 kN : 4 210 kN - 6-31 tendons
K101 K102
Submerged floating tunnel - General plan and elevation Submerged floating tunnel - Typical sections Concrete tubes - Form - Typical sections
Concrete: Execution class:
2011145371 -
K110.
EXC 3
Statens vegvesen
90
mm mm
K121 K132
: 110
2. Longituinal cables are contiuous and stressed from one end using fixed multiplane coulpers. The couplers are staggered over 3 segment joints, average cable length is 90 m.
Reinforcement:
Project number PROF number File number Building code Scale A3 Drawing number / Revision index
As shown
Post-tensioning:
ARP
SAH
SAH
11744
K142 K001
12
10
11
10
11
12
Element i
Element i+1
REMARKS:
REFERENCES:
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
1. Metal sheats complying with EN 523 shall be used. Sheat inner diameter ID: - 6-19 tendons - 6-31 tendons
H
3. Hoop cables are stressed from both ends. 4. Maximum stressing force during stressing shall not exceed 0.95 x Fp0,1k: - 6-19 tendons : 6 860 kN : 4 210 kN - 6-31 tendons
K101 K102
Submerged floating tunnel - General plan and elevation Submerged floating tunnel -Typical sections Concrete tubes - Form - Typical sections
Concrete: Execution class:
2011145371 -
K110.
EXC 3
Statens vegvesen
90
mm mm
: 110
Concrete tubes - Reinforcement layout - Typical sections Concrete tubes - Post-tensioning - Typical sections
2. Longituinal cables are contiuous and stressed from one end using fixed multiplane coulpers. The couplers are staggered over 3 segment joints, average cable length is 90 m.
Reinforcement:
Project number PROF number File number Building code Scale A3 Drawing number / Revision index
As shown
Post-tensioning:
ARP
SAH
SAH
11744
K143 K001
12
10
11
10
11
12
5 n t n e m e l e l e n n m u T 3 7 , 8 0 =3 L
6 n t n e m e l e l e n n u T m 3 7 , 8 0 =3 L
P P T
7 n t n e m e l e l e n n u T
m 4 7 , 4 6 2 = L
4 tn n e m e l e l e 6m n 6 , n 4 u 6 T 2 = P L
3 n t n e m m e l 3 e 7 l , e 8 n 0 n 3 u = T L
P
P T P P P T
B
P T P T
P T
2 n t n e m m 3 e 7 l , e 8 l 0 e 3 n n = u L T
P
D
P
n t n e m m 7 e 1 l , e 8 l 6 e 2 n n = u L T 1
T P
T
E
t n e m e m l e 5 l l 4 , a f 8 d 2 n 2 a = L L P
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
2011145371 -
K110.
Statens vegvesen
1
H
Approaching q = 0.2
Final position q= 0
Continuity cast
As shown
Tunnel section 1
Drawn by
Checked by
Approved by
Project no.
ARP
SAH
SAH
11744
F101 K001
12
10
11
10
11
12
1 1
2 3
REMARKS:
REFERENCES:
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
1. 2. 3.
P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 3 : 4 1 : 4 3 Filnavn:
Temporary shaft OD 8000mm Temporary bulkhead Sliding support beam (pivot launching)
2011145371 -
EXC 3
Statens vegvesen
Concrete:
Reinforcement:
Project number PROF number File number Building code Scale A3 Drawing number / Revision index
As shown
Post-tensioning:
L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K202 Submerged floating tunnel - Landfall element Lavik - Isometric view.dgn
ARP
SAH
SAH
11744
K202 K001
12
10
11
10
11
12
1
E E
2
F F
REMARKS:
REFERENCES:
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
1. 2. 3.
P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 3 : 4 3 : 3 3 Filnavn:
Temporary shaft OD 8000mm Temporary bulkhead Sliding support beam (pivot launching) Access / escape tunnel
2011145371 -
EXC 3
Statens vegvesen
Concrete:
4.
Reinforcement:
Project number PROF number File number Building code Scale A3 Drawing number / Revision index
As shown
Post-tensioning:
L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K203 - Submerged floating tunnel - Tunnel element no 1 - Isometric view.dgn
ARP
SAH
SAH
11744
K203 K001
12
10
11
10
11
12
MSL
B
MSL
MSL
B
1.
Test submergence
2.
Tow to site
3.
Element assembly
Displacement
D
: : : :
: 30 - 35 m 7m
: 30 - 35 m 7m
: 30 - 35 m 7m
MSL
MSL
MSL
4.
Tunnel assembly
5.
In place installation
6.
Test submergence
Displacement Draft
G
: 30 - 35 m 7m
: 30 - 35 m 7m
: 30 - 35 m 7m
REMARKS:
REFERENCES:
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
K101
2011145371 -
EXC 3
Statens vegvesen
Concrete:
P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 6 : 1 2 : 4 5 Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Floating phases.dgn
As shown
Post-tensioning:
ARP
SAH
SAH
11744
K211 K001
12
10
11
10
11
12
Plan 1:2000
A
B
B
B
Jetty
C
Barge
Wire bracing
D
MSL
Access road
MSL
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
2011145371 -
Statens vegvesen
P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 3 : 5 0 : 0 4 Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y101 Construction sequences - Jointing of elements - Jety and outrigger support.dgn
Project number PROF number File number Building code Scale A3 Drawing number / Revision index
As shown
11744
Y101
12
10
11
10
11
12
Remarks Step 1
A B 1 2
B
Tunnel, length = 1200m Tunnel, length = 1200m Quay, see drawing Y101 Barge, see drawing Y101
B
Sea
C
Land
C
Step 2
D D
A
E E
Sea
Land
Step 3 A
250m
500m
1000m 1:25000
Horizontal Scale
B
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
2011145371 -
Sea
P l o t t e d a t o :2 9 . 1 1 . 2 0 1 2 0 6 : 3 6 : 2 1 Filnavn:
Land
Statens vegvesen
Project number
As shown
Drawn by
L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y102 Construction sequences - Jointing of elements 1.dgn
Checked by
Approved by
Project no.
11744
Y102
12
10
11
10
11
12
Step 4 B
B
A
B
Sea
Land
Step 5
Tow to site
Sea
Land
Remarks
A B C 1 Tunnel, length = 1200m Tunnel, length = 1200m Tunnel, length = 1200m
250m
500m
1000m 1:25000
Horizontal Scale
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
2011145371 -
Statens vegvesen
Project number
As shown
Drawn by
Checked by
Approved by
Project no.
11744
Y103
12
10
11
10
11
12
Lavik
3 B
C
4 Joint 5 2
1 Joint
E
Oppedal
500m
G
1000m
2000m 1:50000
N
G
Horizontal Scale
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
2011145371 -
EXC 3
Statens vegvesen
Concrete:
P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 4 : 2 8 : 3 8 Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y106 Construction - Installation.dgn
As shown
Post-tensioning:
ARP
SAH
SAH
11744
Y104
12
10
11
10
11
12
MSL
MSL
REMARKS:
REFERENCES:
Standards / provisions:
A
Rev.
ARP
SAH
SAH
2012-11-28
Rev. date
1. 2.
Pontoons are installed after the tunnel has been installed Total weight of pontoon : tonnes
2011145371 -
EXC 3
Statens vegvesen
Concrete:
P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 6 : 0 0 : 2 6 Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y107 Pontoon installation.dgn
As shown
Construction sequences
Pontoon Installation
Post-tensioning:
ARP
SAH
SAH
11744
Y105
12
10
11