Technical drawings

Project: Parcel: Feasibility study for crossing the Sognefjord Submerged floating tunnel Lavik - Oppedal

Kvinnherad Municipality

Technical data
Sognefjorden

From - to profile Sizing class: Speed limit

: : :

0 - 4083

E 39

Lavik
S4 80 km/t 4000 year 2032

Traffic basis (ADT) :

Oppedal

2000m 0

2000m

4000m

Statens vegvesen

Scale

1:200000

Region West 1. Draft November 2012

Drawing list
Project: Feasibility study for crossing the Sognejord Concept development of submerged floating tunnel SFT Lavik - Oppedal
Tegn.nr. Title
Drawing date
28.11.2012 28.11.2012 28.11.2012 B101 B102 F101 F102 K101 K102 K111 K112 K113 K121 K131 K132 K133 K141 K142 K143 K201 K202 K203 K211 Y101 Y102 Y103 Y104 Y105 Sognefjord SFT crossing - Overview Sognefjord SFT crossing - Navigation channel 28.11.2012 Normal profiles - Submerged floating tunnel - Typical sections Normal profiles - Landfalls - Typical sections 28.11.2012 Submerged floating tunnnel - General plan and elevation Submerged floating tunnnel - Typical sections Submerged floating tunnnel - Mid span Submerged floating tunnnel - Landfall Lavik Submerged floating tunnnel - Landfall Lavik - Elevation and sections Concrete tubes - Form - Typical sections Concrete tubes - Reinforcement layout - Typical sections Concrete tubes - Reinforcement layout - Landfall section Concrete tubes - Reinforcement layout - Bracings and cross tunnels Concrete tubes - Post tensioning - Typical sections Concrete tubes - Post tensioning - Landfall section Concrete tubes - Element joints Submerged floating tunnel - Element key plan Submerged floating tunnel - Landfall element Lavik - Isometric view Submerged floating tunnel - Tunnel element n 1 - Isometric view Submerged floating tunnel - Floating sequences Construction sequence - Jointing of elements - Jetty and outrigger support Construction sequences - Jointing of elements 1 Construction sequences - Jointing of elements 2 Construction sequences - Towing of tunnel Construction sequences - Pontoon installation 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 28.11.2012 A A A A A A A A A A A A A A A A A A 28.11.2012 28.11.2012 28.11.2012 A A A A 28.11.2012 A A 28.11.2012

Page 1 of 2

List no. Revision

1 28.11.2012

Statens vegvesen

Revision Index
A A A A

Date

Remarks

A101 A102

Frontpage Drawing list

Sognefjorden

Lavik

Oppedal

250m

500m

1000m 1:25000
ARP SAH SAH

Horizontal Scale
A
Rev.

Issued for client approval


Description

Drawn by Checked Approved File no.

Feasibilitystudy for crossing the Sognefjord

2011145371 -

N
2012-11-28
Rev. date

Drawing date Client rep.

Lidvard Skorpa Region vest

Statens vegvesen

Produced for Originator:

Concept development of Submerged Floating Tunnel Lavik - Oppedal

Sognefjord SFT crossing Overview

Project number PROF number File number Building code Scale A1

As shown

Sea bed equidistance: 200m


Drawn by Checked by Approved by Project no.

Drawing number / Revision index

ARP

SAH

SAH

11744

B101 K001

Sognefjorden

(20)

Lavik

2 4 0 0m

Oppedal

R = 3 0 0 0

m
3 0

3 1 8 3 . 2 4

250m

500m

1000m 1:25000
ARP SAH SAH

Horizontal Scale
A
Rev.

Issued for client approval


Description

Drawn by Checked Approved File no.

Feasibilitystudy for crossing the Sognefjord

2011145371 -

N
2012-11-28
Rev. date

Drawing date Client rep.

Lidvard Skorpa Region vest

Statens vegvesen

Produced for Originator:

Concept development of Submerged Floating Tunnel Lavik - Oppedal

Sognefjord SFT crossing Navigation channel Suggested main ship routing based on Norvegian Coastal Directorates fairlead recommendations.

Project number PROF number File number Building code Scale A1

As shown

Sea bed equidistance: 200m


Drawn by Checked by Approved by Project no.

Drawing number / Revision index

ARP

SAH

SAH

11744

B102 K001

10

11

12

1 5 5 0

0 0 2

0 0 3 R6

0 0 5 R5

0 0 6 4

5 6 5

6 3 000 2
D

% 0 . 3
D

30 0 0

8 0 0
300 3000 300

5 1 7

=8m 3800 5000 3800

12600

Cross tunnel 1:100

Tunnel section 1 1:100

REMARKS: 1. 2. 3. 4. 5. 6.
2

REFERENCES:

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011 Prosesskode 2, Hndbok 26 2007

Drawn by Checked Approved File no.

Net cross - sectional area Ac = 37,4 m

K101 K111

Submerged floating tunnel - General plan and elevation


Execution class:

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

K110.

Wearing layer (75 mm) Solid ballast compartment Water ballast compartment

Submerged floating tunnel - Mid span

EXC 3
Statens vegvesen
Concrete:

Lidvard Skorpa Region vest

Produced for Originator:

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

Reinforcement:

Normal profiles Submerged floating tunnel Typical sections


Drawn by Checked by Approved by Project no.

Project number PROF number File number Building code Scale A3 Drawing number / Revision index

As shown

B500NC (NS 3576-3)

Post - cladding fire protection


Post-tensioning:

Bridge railing (strength class H2)

Y-1860-S7 (EN 10138-3)

ARP

SAH

SAH

11744

F101 K001
12

10

11

10

11

12

Grouted

0 0 0 7 R

0 5 5 1

0 0 0 6 R
C

0 5 7 1

0 0 5 3

0 0 5 3

0 5 7 1
C

0 0 6 4

5 6 5

60 0 0

% 0 . 3
D

3 0 0

45 3 0

300 500 4 5 582 1126 1000 2 000 3

300

2 000

1000

1210

5 582

1 0 0 0

3 000

4500

4 6 2

5000

4500

14000
F F

End section 1:100

Tunnel section 2 1:100

REMARKS: 1. 2. 3. 4. 5. 6.
2

REFERENCES:

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011 Prosesskode 2, Hndbok 26 2007

Drawn by Checked Approved File no.

Net cross - sectional area Ac = 37,4 m

K101 K112

Submerged floating tunnel - General plan and elevation


Execution class:

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

K110.

Wearing layer (75 mm) Solid ballast compartment Water ballast compartment

Submerged floating tunnel - Landfall Lavik

EXC 3
Statens vegvesen
Concrete:

Lidvard Skorpa Region vest

Produced for Originator:

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

Reinforcement:

Normal profiles Landfalls Typical sections


Drawn by Checked by Approved by Project no.

Project number PROF number File number Building code Scale A3 Drawing number / Revision index

As shown

B500NC (NS 3576-3)

Post - cladding fire protection


Post-tensioning:

Bridge railing (strength class H2)

Y-1860-S7 (EN 10138-3)

ARP

SAH

SAH

11744

F102 K001
12

10

11

10

11

12

Elevation 1:10000

Lavik
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Oppedal 18

-12 m

-20 m

MSL

Plan 1:10000

B
D

5 0 2

0 5 1

430

1 5 0

2 0 5

5 0 2

2 0 5

5 0 2
5 0 2
R= 2 6 8 2m

2 0 5
2 0 5

B
5 0 2
E

A
2 0 5
1 5 0
E

0 5 1

Steel pontoon 7 4 0

Concrete tube

0 0 5

Horizontal bracing

5 0 0

C
F F

Closure joints

Closure joints

3700

200m

200m

400m 1: 10000

Horizontal scale
G

REMARKS:

REFERENCES:
K111 K112 Submerged floating tunnel - Mid span

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011 Prosesskode 2, Hndbok 26 2007

Drawn by Checked Approved File no.

Feasibilitystudy for crossing the Sognefjord


Execution class:

2011145371 -

Drawing date Client rep.

Submerged floating tunnel - Landfall Lavik

EXC 3
Statens vegvesen
Concrete:

Lidvard Skorpa Region vest

Produced for Originator:

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

Project number

As shown

Reinforcement:

B500NC (NS 3576-3)

Submerged floating tunnel General plan and elevation

PROF number File number Building code Scale A3

Post-tensioning:

Y-1860-S7 (EN 10138-3)


Drawn by Checked by Approved by Project no.

Drawing number / Revision index

ARP

SAH

SAH

11744

K101 K001
12

10

11

10

11

12

Sections 1 : 750

MSL
B

MSL

MSL
B

Section A - A

Section B - B

Section C - C

Plans 1 : 750
D D

Plan A

Plan B

Plan C

REMARKS:

REFERENCES:

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011 Prosesskode 2, Hndbok 26 2007

Drawn by Checked Approved File no.

K101

Submerged floating tunnel - General plan and elevation


Execution class:

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

EXC 3
Statens vegvesen
Concrete:

Lidvard Skorpa Region vest

Produced for Originator:

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 6 : 2 3 : 5 4 Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K102 - Submerged floating tunnel - Typical sections.dgn

Project number Reinforcement:

As shown

B500NC (NS 3576-3)

Submerged floating tunnel Typical sections

PROF number File number Building code Scale A3

Post-tensioning:

Y-1860-S7 (EN 10138-3)


Drawn by Checked by Approved by Project no.

Drawing number / Revision index

ARP

SAH

SAH

11744

K102 K001
12

10

11

10

11

12

8
B

10

11
B

26

400 (min)

26

Ship channel

Steel pontoon Steel shaft

MSL

Min -20 m
C C

Concrete tube

Elevation 1:2000

430

0 5 1
E

1 5 0
1 2 . 6
E

Concrete bracing 4 0 Plan 1:2000


G G

8 0

REMARKS:

REFERENCES:

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011 Prosesskode 2, Hndbok 26 2007

Drawn by Checked Approved File no.

Feasibilitystudy for crossing the Sognefjord


Execution class:

2011145371 -

Drawing date Client rep.

EXC 3
Statens vegvesen
Concrete:

Lidvard Skorpa Region vest

Produced for Originator:

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

Reinforcement:

Submerged floating tunnel Mid span Plan and elevation


Drawn by Checked by Approved by Project no.

Project number PROF number File number Building code Scale A3 Drawing number / Revision index

As shown

B500NC (NS 3576-3)

Post-tensioning:

Y-1860-S7 (EN 10138-3)

ARP

SAH

SAH

11744

K111 K001
12

10

11

10

11

12

Closure joint

0 2
3
H

7
1 2 , 6 0,5
B

1 4

6 , 2 1

2 4 1

2
C

Temp. support

1 Detail H 1:250

4 1

D E F
E E

D
G

E F

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Drawn by Checked Approved File no.

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

Lidvard Skorpa Region vest

Statens vegvesen

Produced for Originator:

Concept development of Submerged Floating Tunnel Lavik - Oppedal

P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 6 : 0 8 : 5 0 Filnavn:

Submerged floating tunnel

Project number PROF number

As shown

Plan 1:1000

Landfall Lavik Plan


Drawn by Checked by Approved by Project no.

File number Building code Scale A3 Drawing number / Revision index

L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K112 - Submerged floating tunnel - Landfall Lavik - Plan.dgn

ARP

SAH

SAH

11744

K112 K001
12

10

11

10

11

12

Monolitic end joint

M.S.L.

D Rock cut Grouted

C tunnel L

Prefab. landfall element 1


C

1
C

Temporary bulkhead

Longitudinal section 1:500

Section G - G

Section F - F

Section E - E

Section D -D

Detail Different cross sections


G

1:50

1:500

REMARKS:
1. Temporary jacking point for positioning and locking during grouting

REFERENCES:
F102 K101 K112 Normal profiles - Landfalls - Typical sections Submerged floating tunnel - General plan and elevation Submerged floating tunnel - Landfall Lavik - Plan

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011 Prosesskode 2, Hndbok 26 2007

Drawn by Checked Approved File no.

Feasibilitystudy for crossing the Sognefjord


Execution class:

2011145371 -

Drawing date Client rep.

EXC 3
Statens vegvesen
Concrete:

Lidvard Skorpa Region vest

Produced for Originator:

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

Reinforcement:

Submerged floating tunnel Landfall Lavik Elevation and sections


Drawn by Checked by Approved by Project no.

Project number PROF number File number Building code Scale A3 Drawing number / Revision index

As shown

B500NC (NS 3576-3)

Post-tensioning:

Y-1860-S7 (EN 10138-3)

ARP

SAH

SAH

11744

K113 K001
12

10

11

10

11

12

CL t u n n e l

d a o CL r

0 0 3

CL t u n n e l

d a o CL r

0 0 5

R
R

0 0 0 0 0 0 6

6 2 9

5 2 0

800 COG 8 3 6 0 1

1 000 COG
D

9 6 6 1 1 . R A V 0 0 0 5 0 3 . R A V

0 0 3

3 0 0

3 0 0

47 4 1

( v a r . )

50 6 0

( v a r . )

300 500 2 000

300

36 9 5

300

300

31 3 4

11 0 4

5 1 7

2 0 0

12 5 8

5 000

5 1 7

5 000
F F

General tube section Axis 1+150 m to 18-150 m 1:100


G

Landfall section Axis 1 to 1+150 m / 17 to 18-150 m 1:100


G

2 0 0

0 0 2

0 0 2

1 000

1 000

0 0 5
0 0 8

1 000

1 000

1 0 0 0

500 500

2 000

500 500

500

REMARKS:

REFERENCES:

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011 Prosesskode 2, Hndbok 26 2007

Drawn by Checked Approved File no.

K101 K102 K131 K141

Submerged floating tunnel - General plan and elevation Submerged floating tunnel - Typical sections Concrete tubes - Reinforcement layout - Typical sections
Concrete: Execution class:

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

K110.

EXC 3
Statens vegvesen

Lidvard Skorpa Region vest

Produced for Originator:

Concrete tubes - Post-tensioning - Typical sections

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

Reinforcement:

Concrete tubes Form Typical sections


Drawn by Checked by Approved by Project no.

Project number PROF number File number Building code Scale A3 Drawing number / Revision index

As shown

B500NC (NS 3576-3)

Post-tensioning:

Y-1860-S7 (EN 10138-3)

ARP

SAH

SAH

11744

K121 K001
12

10

11

10

11

12

25c200

25c200

16c400c400

16c400c400

232c200

232c200

32c200

32c200

16c200
D

16c200 16c200

16c200

16c200 16c200

16c200 16c200

16c200

16c200
D

16c200 16c200 16c200 BS 20c200 20c200 16c200 T-head 25c200

16c200 16c200 16c200 T-head

16c200 16c200 16c200 BS 20c200 20c200 16c200 T-head 25c200

16c200 16c200 16c200 T-head

716c65

716c65

20c200

16c400c400

16c200c200 Headed stirrups

20c200

16c400c400

16c200c200 Headed stirrups

Reinforcement layout - Type 1 Axis 1+150 m to 3 / 7 to 12 / 16 to 18 -150 m 1:100

Reinforcement layout - Type 2 Axis 3 to 7 / 12 to 16 1:100

REMARKS:

REFERENCES:

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011 Prosesskode 2, Hndbok 26 2007

Drawn by Checked Approved File no.

1. Concrete cover: - Outer face - Inner face main compartment) : 70 mm : 45 mm

3. Average reinforcement intensity: - Type 1 - Type 2 : 245 kg/m3 : 175 kg/m3

K101 K102 K121 K141

Submerged floating tunnel - General plan and elevation Submerged floating tunnel - Typical sections Concrete tubes - Form - Typical sections
Concrete: Execution class:

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

K110.

EXC 3
Statens vegvesen

Lidvard Skorpa Region vest

Produced for Originator:

- Inner face ballast compartments : 80 mm


H

Concrete tubes - Post-tensioning - Typical sections

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

2. Min. lap length for longitudinal reinforcement 32 is 1 200 mm. Lap splices to be fully staggered.

Reinforcement:

Concrete tubes Reinforcement layout Typical sections


Drawn by Checked by Approved by Project no.

Project number PROF number File number Building code Scale A3 Drawing number / Revision index

As shown

B500NC (NS 3576-3)

Post-tensioning:

Y-1860-S7 (EN 10138-3)

ARP

SAH

SAH

11744

K131 K001
12

10

11

10

11

12

25c200

16c400c400 25c200
C C

232c200 232c200

16c200

16c200

16c200

16c200

16c200

16c200 16c200 16c200 BS

16c200 16c200 16c200 T-head 20c200


E

20c200

16c200 T-head 25c200

716c65

20c200

16c400c400

16c200c200 Headed stirrups

Reinforcement layout - Landfall elements

1:100
G G

REMARKS:

REFERENCES:

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011 Prosesskode 2, Hndbok 26 2007

Drawn by Checked Approved File no.

1. Concrete cover: - Outer face - Inner face main compartment) : 70 mm : 45 mm

3. Average reinforcement intensity: - Landfall elements :215 kg/m3

K101 K102 K121 K142

Submerged floating tunnel - General plan and elevation Submerged floating tunnel - Typical sections Concrete tubes - Form - Typical sections
Concrete: Execution class:

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

K110.

EXC 3
Statens vegvesen

Lidvard Skorpa Region vest

Produced for Originator:

- Inner face ballast compartments : 80 mm


H

Concrete tubes - Post-tensioning - Landfall section

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

2. Min. lap length for longitudinal reinforcement 32 is 1 200 mm. Lap splices to be fully staggered.

Reinforcement:

Concrete tubes Reinforcement layout Landfall section


Drawn by Checked by Approved by Project no.

Project number PROF number File number Building code Scale A3 Drawing number / Revision index

As shown

B500NC (NS 3576-3)

Post-tensioning:

Y-1860-S7 (EN 10138-3)

ARP

SAH

SAH

11744

K132 K001
12

10

11

10

11

12

Segment / casting joint


A A

Segment i Outer face 2 8 8

Segment i+1 6-19 hoop tendons

8 0 0

4 0 0

1 1 2

6-31 tendon

Fixed multiplane coupler

Detail coupling of longitudinal PT 1:50

PT 6-19 c 1000
2 1 7

PT 6-19 c 1000

7 5 1 1

PT 6-31 PT 6-31

5 0 R 60

R 60 0 5

R 60 0 5

5 0 R 60

R6 80 4 0

R6 80 4 0

R6 80 4 0

Active 6-19 multiplane anchor

Active 6-19 multiplane anchor

Active 6-19 multiplane anchor

R6 80 4 0

Active 6-19 multiplane anchor

Post-tensioning layout - Type 1 Axis 1+150 m to 3 / 7 to 12 / 16 to 18-150 m


G

Post-tensioning layout - Type 2 Axis 3 to 7 / 12 to 16


G

1:100

1:100

REMARKS:

REFERENCES:

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011 Prosesskode 2, Hndbok 26 2007

Drawn by Checked Approved File no.

1. Metal sheats complying with EN 523 shall be used. Sheat inner diameter ID: - 6-19 tendons - 6-31 tendons
H

3. Hoop cables are stressed from both ends. 4. Maximum stressing force during stressing shall not exceed 0.95 x Fp0,1k: - 6-19 tendons : 6 860 kN : 4 210 kN - 6-31 tendons

K101 K102

Submerged floating tunnel - General plan and elevation Submerged floating tunnel - Typical sections Concrete tubes - Form - Typical sections
Concrete: Execution class:

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

K110.

EXC 3
Statens vegvesen

Lidvard Skorpa Region vest

90

mm mm

K121 K131

Produced for Originator:

: 110

Concrete tubes - Reinforcement layout - Typical sections

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

2. Longituinal cables are contiuous and stressed from one end using fixed multiplane coulpers. The couplers are staggered over 3 segment joints, average cable length is 90 m.

Reinforcement:

Concrete tubes Post-tensioning layout Typical sections


Drawn by Checked by Approved by Project no.

Project number PROF number File number Building code Scale A3 Drawing number / Revision index

As shown

B500NC (NS 3576-3)

Post-tensioning:

Y-1860-S7 (EN 10138-3)

ARP

SAH

SAH

11744

K141 K001
12

10

11

10

11

12

PT 6-19 c 1000

7 6 5
PT 6-31
C C

R1 90 7 2

R 66 0 5

5 0 R 66

Active 6-19 multiplane anchor


F

R1 90 7 2

Active 6-19 multiplane anchor


F

Post-tensioning layout - Landfall elements

1:100
G G

REMARKS:

REFERENCES:

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011 Prosesskode 2, Hndbok 26 2007

Drawn by Checked Approved File no.

1. Metal sheats complying with EN 523 shall be used. Sheat inner diameter ID: - 6-19 tendons - 6-31 tendons
H

3. Hoop cables are stressed from both ends. 4. Maximum stressing force during stressing shall not exceed 0.95 x Fp0,1k: - 6-19 tendons : 6 860 kN : 4 210 kN - 6-31 tendons

K101 K102

Submerged floating tunnel - General plan and elevation Submerged floating tunnel - Typical sections Concrete tubes - Form - Typical sections
Concrete: Execution class:

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

K110.

EXC 3
Statens vegvesen

Lidvard Skorpa Region vest

90

mm mm

K121 K132

Produced for Originator:

: 110

Concrete tubes - Reinforcement layout - Landfall section

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

2. Longituinal cables are contiuous and stressed from one end using fixed multiplane coulpers. The couplers are staggered over 3 segment joints, average cable length is 90 m.

Reinforcement:

Concrete tubes Post-tensioning Landfall section


Drawn by Checked by Approved by Project no.

Project number PROF number File number Building code Scale A3 Drawing number / Revision index

As shown

B500NC (NS 3576-3)

Post-tensioning:

Y-1860-S7 (EN 10138-3)

ARP

SAH

SAH

11744

K142 K001
12

10

11

10

11

12

Element i

Element i+1

Longitundinal section - Element joint 1:50

Section - Element joint 1:100

REMARKS:

REFERENCES:

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011 Prosesskode 2, Hndbok 26 2007

Drawn by Checked Approved File no.

1. Metal sheats complying with EN 523 shall be used. Sheat inner diameter ID: - 6-19 tendons - 6-31 tendons
H

3. Hoop cables are stressed from both ends. 4. Maximum stressing force during stressing shall not exceed 0.95 x Fp0,1k: - 6-19 tendons : 6 860 kN : 4 210 kN - 6-31 tendons

K101 K102

Submerged floating tunnel - General plan and elevation Submerged floating tunnel -Typical sections Concrete tubes - Form - Typical sections
Concrete: Execution class:

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

K110.

EXC 3
Statens vegvesen

Lidvard Skorpa Region vest

90

mm mm

K121 K131 K141

Produced for Originator:

: 110

Concrete tubes - Reinforcement layout - Typical sections Concrete tubes - Post-tensioning - Typical sections

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

2. Longituinal cables are contiuous and stressed from one end using fixed multiplane coulpers. The couplers are staggered over 3 segment joints, average cable length is 90 m.

Reinforcement:

Concrete tubes Post-tensioning Element joints


Drawn by Checked by Approved by Project no.

Project number PROF number File number Building code Scale A3 Drawing number / Revision index

As shown

B500NC (NS 3576-3)

Post-tensioning:

Y-1860-S7 (EN 10138-3)

ARP

SAH

SAH

11744

K143 K001
12

10

11

10

11

12

5 n t n e m e l e l e n n m u T 3 7 , 8 0 =3 L

6 n t n e m e l e l e n n u T m 3 7 , 8 0 =3 L
P P T

7 n t n e m e l e l e n n u T
m 4 7 , 4 6 2 = L

4 tn n e m e l e l e 6m n 6 , n 4 u 6 T 2 = P L
3 n t n e m m e l 3 e 7 l , e 8 n 0 n 3 u = T L
P

P T P P P T
B

P T P T

P T
2 n t n e m m 3 e 7 l , e 8 l 0 e 3 n n = u L T

P
D

P
n t n e m m 7 e 1 l , e 8 l 6 e 2 n n = u L T 1

T P

T
E

t n e m e m l e 5 l l 4 , a f 8 d 2 n 2 a = L L P

Element key plan


1: 5000 T

P Permanent shaft T Temporary shaft


G G

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Drawn by Checked Approved File no.

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

K110.

Lidvard Skorpa Region vest

Statens vegvesen

Produced for Originator:

1
H

Start rotation q = 0.5

Approaching q = 0.2

Final position q= 0

Continuity cast

Concept development of Submerged Floating Tunnel Lavik - Oppedal

Submerged floating tunnel

Project number PROF number

As shown

Pivot launching sequence


1: 2000

Tunnel section 1

File number Building code Scale A3

Drawn by

Checked by

Approved by

Project no.

Drawing number / Revision index

ARP

SAH

SAH

11744

F101 K001
12

10

11

10

11

12

1 1

2 3

REMARKS:

REFERENCES:

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011

Drawn by Checked Approved File no.

1. 2. 3.
P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 3 : 4 1 : 4 3 Filnavn:

Temporary shaft OD 8000mm Temporary bulkhead Sliding support beam (pivot launching)

Prosesskode 2, Hndbok 26 2007

Feasibilitystudy for crossing the Sognefjord


Execution class:

2011145371 -

Drawing date Client rep.

EXC 3
Statens vegvesen
Concrete:

Lidvard Skorpa Region vest

Produced for Originator:

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

Reinforcement:

Submerged floating tunnel Landfall element Lavik Isometric view


Drawn by Checked by Approved by Project no.

Project number PROF number File number Building code Scale A3 Drawing number / Revision index

As shown

B500NC (NS 3576-3)

Post-tensioning:

Y-1860-S7 (EN 10138-3)

L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K202 Submerged floating tunnel - Landfall element Lavik - Isometric view.dgn

ARP

SAH

SAH

11744

K202 K001
12

10

11

10

11

12

1
E E

2
F F

REMARKS:

REFERENCES:

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011

Drawn by Checked Approved File no.

1. 2. 3.
P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 3 : 4 3 : 3 3 Filnavn:

Temporary shaft OD 8000mm Temporary bulkhead Sliding support beam (pivot launching) Access / escape tunnel

Prosesskode 2, Hndbok 26 2007

Feasibilitystudy for crossing the Sognefjord


Execution class:

2011145371 -

Drawing date Client rep.

EXC 3
Statens vegvesen
Concrete:

Lidvard Skorpa Region vest

Produced for Originator:

Concrete grade B55 Durability class MF40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

4.

Mix specification SV-40

Reinforcement:

Submerged floating tunnel Tunnel element N 1 Isometric view


Drawn by Checked by Approved by Project no.

Project number PROF number File number Building code Scale A3 Drawing number / Revision index

As shown

B500NC (NS 3576-3)

Post-tensioning:

Y-1860-S7 (EN 10138-3)

L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K203 - Submerged floating tunnel - Tunnel element no 1 - Isometric view.dgn

ARP

SAH

SAH

11744

K203 K001
12

10

11

10

11

12

Cross sections 1:750


A A

MSL
B

MSL

MSL
B

1.

Test submergence

2.

Tow to site

3.

Element assembly

Displacement
D

: 76000 tonnes : : : 35 meters 2.1 meters


2 2

Displacement Draft G.M Solid ballast Water ballast

: 71000 tonnes : : : 2 meters 0.8 meters


2 2

Displacement Draft G.M Solid ballast Water ballast

: : : :

341000 tonnes 12.6 meters 1.0 meters


2 2

Draft G.M Solid ballast Water ballast

: 30 - 35 m 7m

: 30 - 35 m 7m

: 30 - 35 m 7m

MSL

MSL

MSL

4.

Tunnel assembly

5.

In place installation

6.

Test submergence

Displacement Draft
G

: 353000 tonnes : : : 32 meters 1.7 meters


2 2

Displacement Draft G.M Solid ballast Water ballast

: 1050000 tonnes : : : 32 meters > 30 meters


2 2

Displacement Draft G.M Solid ballast Water ballast

: 1050000 tonnes : : : 32 meters > 30 meters


2 2

G.M Solid ballast Water ballast

: 30 - 35 m 7m

: 30 - 35 m 7m

: 30 - 35 m 7m

REMARKS:

REFERENCES:

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011 Prosesskode 2, Hndbok 26 2007

Drawn by Checked Approved File no.

K101

Submerged floating tunnel - General plan and elevation


Execution class:

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

EXC 3
Statens vegvesen
Concrete:

Lidvard Skorpa Region vest

Produced for Originator:

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 6 : 1 2 : 4 5 Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Floating phases.dgn

Project number Reinforcement:

As shown

B500NC (NS 3576-3)

Submerged floating tunnel Floating sequences

PROF number File number Building code Scale A3

Post-tensioning:

Y-1860-S7 (EN 10138-3)


Drawn by Checked by Approved by Project no.

Drawing number / Revision index

ARP

SAH

SAH

11744

K211 K001
12

10

11

10

11

12

Plan 1:2000

A
B

B
B

Jetty
C

Access road Section A - A : Jetty 1:1000


D

Barge

Wire bracing
D

MSL

Access road

Section B - B : Outrigger support 1:1000

MSL

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Drawn by Checked Approved File no.

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

Lidvard Skorpa Region vest

Statens vegvesen

Produced for Originator:

Concept development of Submerged Floating Tunnel Lavik - Oppedal

P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 3 : 5 0 : 0 4 Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y101 Construction sequences - Jointing of elements - Jety and outrigger support.dgn

Construction sequences Jointing of elements Jetty and outrigger support


Drawn by Checked by Approved by Project no.

Project number PROF number File number Building code Scale A3 Drawing number / Revision index

As shown

11744

Y101
12

10

11

10

11

12

Remarks Step 1
A B 1 2
B

Tunnel, length = 1200m Tunnel, length = 1200m Quay, see drawing Y101 Barge, see drawing Y101
B

Sea
C

Land
C

Step 2
D D

A
E E

Sea

Land

Step 3 A

250m

500m

1000m 1:25000

Horizontal Scale

B
A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Drawn by Checked Approved File no.

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

Lidvard Skorpa Region vest

Sea
P l o t t e d a t o :2 9 . 1 1 . 2 0 1 2 0 6 : 3 6 : 2 1 Filnavn:

Land

Statens vegvesen

Produced for Originator:

Concept development of Submerged Floating Tunnel Lavik - Oppedal

Project number

As shown

Construction sequences Jointing of elements 1

PROF number File number Building code Scale A3

Drawn by
L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y102 Construction sequences - Jointing of elements 1.dgn

Checked by

Approved by

Project no.

Drawing number / Revision index

11744

Y102
12

10

11

10

11

12

Step 4 B
B

A
B

Sea

Land

Step 5

Tow to site

Sea

Land

Remarks
A B C 1 Tunnel, length = 1200m Tunnel, length = 1200m Tunnel, length = 1200m

250m

500m

1000m 1:25000

Horizontal Scale

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Drawn by Checked Approved File no.

Feasibilitystudy for crossing the Sognefjord

2011145371 -

Drawing date Client rep.

Lidvard Skorpa Region vest

Statens vegvesen

Produced for Originator:

Quay, see drawing Y101 Barge, see drawing Y101

Concept development of Submerged Floating Tunnel Lavik - Oppedal

Project number

As shown

Construction sequences Jointing of elements 2

PROF number File number Building code Scale A3

Drawn by

Checked by

Approved by

Project no.

Drawing number / Revision index

11744

Y103
12

10

11

10

11

12

Lavik

3 B
C

4 Joint 5 2

1 Joint
E

Oppedal

500m
G

1000m

2000m 1:50000

N
G

Horizontal Scale

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011 Prosesskode 2, Hndbok 26 2007

Drawn by Checked Approved File no.

Feasibilitystudy for crossing the Sognefjord


Execution class:

2011145371 -

Drawing date Client rep.

EXC 3
Statens vegvesen
Concrete:

Lidvard Skorpa Region vest

Produced for Originator:

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 4 : 2 8 : 3 8 Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y106 Construction - Installation.dgn

Project number Reinforcement:

As shown

B500NC (NS 3576-3)

Construction sequences Towing of tunnel

PROF number File number Building code Scale A3

Post-tensioning:

Y-1860-S7 (EN 10138-3)


Drawn by Checked by Approved by Project no.

Drawing number / Revision index

ARP

SAH

SAH

11744

Y104
12

10

11

10

11

12

MSL

MSL

Pontoon installation 1:1000

Final position 1:1000

REMARKS:

REFERENCES:

Standards / provisions:

A
Rev.

Issued for client approval


Description

ARP

SAH

SAH

2012-11-28
Rev. date

Hndbok 185 Eurocode ed. 2011

Drawn by Checked Approved File no.

1. 2.

Pontoons are installed after the tunnel has been installed Total weight of pontoon : tonnes

Prosesskode 2, Hndbok 26 2007

Feasibilitystudy for crossing the Sognefjord


Execution class:

2011145371 -

Drawing date Client rep.

EXC 3
Statens vegvesen
Concrete:

Lidvard Skorpa Region vest

Produced for Originator:

Concrete grade B55 Durability class MF40 Mix specification SV-40

Concept development of Submerged Floating Tunnel Lavik - Oppedal

P l o t t e d a t 2 o 9 : . 1 1 . 2 0 1 2 0 6 : 0 0 : 2 6 Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y107 Pontoon installation.dgn

Project number Reinforcement:

As shown

B500NC (NS 3576-3)

Construction sequences

PROF number File number Building code Scale A3

Pontoon Installation
Post-tensioning:

Y-1860-S7 (EN 10138-3)


Drawn by Checked by Approved by Project no.

Drawing number / Revision index

ARP

SAH

SAH

11744

Y105
12