Business Department
PROJECT GHANNOUCH Shaft line erection 450 MW KIRENE CENTRALE Erection of the thermal power plant 35 MW (MAN motors 4 x 8.75 MW each) Supply, transport and erection of 12 storage tanks from 100 cum till 2000 cum TAN TAN Dismantling of fuel tanks with sludge treatment. Erection of the new power plant 126 MW (7 motors of 18 MW each)
YEAR
COUNTRY
MAIN CONTRACTOR
CLIENT
2010 currently
TUNISIA
ALSTOM
STEG
2008-2009
SENEGAL
TSK/INGEMAS
CIMENTS DU SAHEL
2008-2009
MOROCCO
WARTSILA
NSDONE MOROCCO
KAHONE II Erection of mechanical equipment of the power plant : 4 motors 18 MW each PORT II Erection of the gas turbine, alternator and auxiliaries 40 MW. Electrical installation
2008
SENEGAL
WARTSILA NSD
SENELEC
2008
GEEPE
EDF
LUCCIANA Erection of the gas turbine, alternator and auxiliaries 40 MW. Electrical installation MOHAMMEDIA Supply of steel structure, ducts of Jorf Lasfar thermal power plant (2x150 MW) equipment unit 3-4. Dismantling and equipment erection piping under pression parts insulation
2008
FRANCE CORSE
GEEPE
EDF
2007-2010
MOROCCO
ANSALDO
ONE MOROCCO
PROJECT BEL AIR Supply and erection of oil storage tanks. Piping and auxiliaries erection of Bel Air power plant 72 MW ( 4x18 MW each) Insulation Painting Instrumentation OWENDO Erection of oil storage tanks. Supply and installation of piping and equipment. Erection of 2 motors diesel-gas (18 MW each)
YEAR
COUNTRY
MAIN CONTRACTOR
CLIENT
2005-2007
SENEGAL
WARTSILA NSD
SENELEC
2006-2007
GABON
WARTSILA NSD
SEEG GABON
2006-2007
GABON
SEEG
SEEG
BERROUAGHIA Erection of the gas power plant 480 MW, 2 gas turbine, 2 generators, storage, piping (BOP), electrical instrumentation, insulation, painting.
2005-2006
ALGERIA
SAIPEM
SONELGAS
CPCU Erection of 2 boilers and auxiliaries, Supply of steel structure and piping
2005
FRANCE
CCT
CPCU
2004
FRANCE GUADELOUPE
GEEPE
EDF
2003-2004
ALGERIA
ALSTOM POWER
SONELGAZ
PROJECT TAHADDART Erection of boiler and stack of the power plant DUNKERQUE Erection of 2 gas turbines and 2 steam turbine and auxiliaries of the power plant 2X400 MW CAP DES BICHES Erection of mechanical equipment and piping of the diesel power plant 2 motors 15 MW each
YEAR 2003-2004
COUNTRY MOROCCO
CLIENT SIEMENS
2003-2004
FRANCE
ALSTOM POWER
2002
SENEGAL
WARTSILA NSD
SENELEC
2001
GEEPE
EDF
GUELB Erection of mechanical equipment of the diesel motor 14 MW piping, duct, instrumentation, insulation, painting NOUADHIBOU Erection of mechanical equipment of 2 diesel motors 8 MW each DAKHLA Erection of mechanical equipment of 3 diesel motors - 7.8MW each
2001-2002
MAURITANIA
WARTSILA NSD
SNIM
2001-2002
MAURITANIA
WARTSILA NSD
SNIM
2001-2002
MOROCCO
WARTSILA NSD
ONE
KENITRA Prefabrication and erection of piping of 2 diesel motors 3.5 MW each, supplied by Wartsila, insulation
2000
MOROCCO
CMCP
CMCP
PROJECT UIOM Erection of a garbage incineration plant 2 x 7 tons/hour RADES II Erection of mechanical equipment of the combined cycle power plant 2 x 171 MW prefabrication and erection of piping Erection of steam turbine, insulation painting ST OUEN Erection of a gas turbine and mechanical auxiliaries OWENDO Erection of mechanical equipment of a diesel power plant 3 x 10 MW piping, instrumentation, painting DARSALAM Erection of mechanical equipment of a gas turbine and auxiliaries 20 MW, insulation, painting JARRY Design and supply of steel structures, piping and storage. Erection of mechanical equipment of the combined cycle power plant 4 x 5 MW, insulation, painting
YEAR 2000-2001
CLIENT SICEM
2000-2001
TUNISIA
ALSTOM POWER
1999-2001
FRANCE
GEEPE
1999-2000
GABON
WARTSILA NSD
SEEG VIVENDI
1999
MALI
A.G.T ALSTOM
EDM
1998
FRANCE
SEMT PIELSTICK
1998
PORTUGAL
CNIM
LIPOR HIDROPROJECTO
1997-1998
CZECH REPUBLIC
CNIM
PROJECT NPC IN RAYONG Complete erection of HRSG of the thermal power plant in Rayong
YEAR
COUNTRY
MAIN CONTRACTOR
CLIENT
1995-1996
THAILAND
NPC THAILAND
NPC THAILAND
I.M.G. Erection of mechanical equipment for 2 diesel motors 45 MW SOUSSE Erection of mechanical equipment of the combined cycle power plant 2 x 100 MW, piping, generator, steam turbine CORDEMAIS Erection of platens super heater SOUTH BANGKOK Erection of HRSG, steam turbine, auxiliaries, supply and erection of piping 1 x 300MW JORF LASFAR Erection of steel structures, turbines, boilers and auxiliaries of the power plant 2 x 300 MW
1995-1996
EDF CIG
EDF CIG
1994-1995
GEC ALSTOM
STEG
1993
FRANCE
EDF
BABCOCK
1993-1994
THAILAND
E.G.A.T.
E.G.A.T.
1992-1994
MOROCCO
GEC ALSTHOM/STEIN/BABCOCK
ONE
1991-1992
FRANCE
CNIM
VILLE DE GRENOBLE
RAYONG Erection of mechanical equipment of the power plant 4 x 300 MW, boilers, steam turbines, generators, auxiliaries, piping, painting
1990-1993
THAILAND
E.G.A.T.
E.G.A.T.
PROJECT ABU QIR Erection of a boiler , steel structure, piping, mechanical equipment 1 x 300 MW JARRY NORD BELLEFONTAINE Erection of 18 boilers of the power plant, piping, insulation SAINT OUEN Erection of 3 boilers LAAYOUNE. Design supply and erection of connecting pipe, 3 storage tanks of the power plant 3 x 7 MW insulation, painting JARRY AND BELLEFONTAINE 5-6-7-8 Supply and erection of piping and supports, Erection of mechanical auxiliaries, insulation LE PORT Supply and erection of piping Erection of mechanical equipment, insulation EGBIN Erection of mechanical equipment of the power plant 1200 MW Painting, insulation
YEAR
COUNTRY
MAIN CONTRACTOR
CLIENT
1989-1990
EGYPT
ALSTOM-STEIN-INDUSTRIE
E.E.A.
1988-1990
FRANCE
CNIM
EDF
1988-1989
FRANCE
STEIN INDUSTRIE
SYCTOM
1987-1988
MOROCCO
SEMT PIELSTICK
ONE
1986-1988
FRANCE GUADELOUPE
ALSTHOM
EDF
1985-1988
ALSTHOM
EDF
1984-1985
NIGERIA
BOUYGUES
NEPA