Genentech Site Security Phone Number for Reporting Emergencies or Requesting Aid:
_________________________________________
TAbLE Of CONTENTs
Page
Biological Hazards. ...................................................................... 18 Warning Signs and Barricades....................................................... 19 Unattended Work......................................................................... 19 Contractors Property. .................................................................... 19 Genentech Property...................................................................... 19
SECTION VII. INDEX. ............................................................. 34-36 USEFUL NAMES AND CONTACT NUMBERS. ................................. 37 ACCEPTANCE OF RULES............................................................. 39
All employees of a Category 1 Contractor, as dened in Section 6.03, must certify in writing on the acknowledgement form at the end of the handbook that they have read, understand, and will comply with the contents of this handbook before beginning work on Genentech premises. The Category 1 Contractor must ensure that this certication is completed and provide such records to Genentech upon request.
INTRODUCTION
This Contractor Safety Handbook (Handbook) denes the rules and requirements for all Contractors and sub-contractors working on Genentech projects. Contractors performing construction, facilities maintenance, hazardousmaterials handling, and related work are defined by Genentech as Category I Contractors. If you have questions concerning matters addressed in this handbook please speak with your Genentech contact, the Site EHS staff, or the Corporate EHS Contractor Safety Program Manager.
Informing Genentech and other contractors and subcontractors in the Managing subcontractors and ensuring their compliance with all
same work area or adjacent areas of any hazards applicable laws and regulations and Genentechs requirements
have been adequately briefed about and are aware of any unique or unseen hazards that they may encounter at the job site, and are trained, fully qualied, and competent in the work they will be performing
Ensuring that all Contractor and subcontractor employees complete the Providing a copy of this handbook to Contractor employees and to
subcontractors Genentech EHS Contractor Safety Orientation prior to beginning work
Paying all incurred fees, nes, and costs, including those incurred by
Genentech reserves the right to: during the project
Review Contractors safety programs and procedures prior to and Inspect the project site at any time Shut down the project if Contractor is operating in a manner deemed
unsafe by an Area Owner or an EHS staff member, or does not comply with the law or the requirements in this Handbook. Such shutdowns will occur at no cost to Genentech for any delays that may result.
Nothing contained herein changes the requirement that Contractor is solely responsible for all EHS aspects of the work performed for Genentech.
The speed limit is 15 miles per hour on Genentech property, and as posted Obey all posted traffic signs. Only those Contractor vehicles required for delivery of equipment and Unsafe drivers will be barred from driving on Genentech sites.
1.03 PARKING
Genentech Security will designate how Contractors personnel, vehicles, vendors, and visitors must enter and leave the site. Genentech provides parking placards that must be placed on the dashboard of each vehicle required to be parked on site. Contractors personal vehicles must have a Genentech parking sticker and must park in the designated Contractor parking lot. Vehicles must never obstruct emergency equipment, safety showers, eyewash stations, fire extinguishers, fire hydrants, fire lanes, exits, roadways, aisles or other safety equipment.
materials or for the performance of necessary operations by Contractor will be admitted to the site.
Loading docks may be used only for active loading or unloading, after which vehicles must immediately be moved away from the dock area. Violators of any of these rules may be towed away at the vehicle owners expense.
Genentech-hosted events), or other controlled substances while on Genentech property (including company parking lots), is prohibited. Such actions are grounds for immediate dismissal. Genentech reserves the right, without prior notice, to inspect all property brought onto Genentech property to determine whether prohibited materials are present.
Cleanup on Completion of the Project Contractor must remove from the premises all rubbish, tools, scaffolding, equipment, and materials not the property of Genentech and leave the work and premises in a clean, orderly manner.
Callers name and the telephone extension theyre on Location of the emergency: building, floor, room, and area name Type of emergency (injury, re, spill, leak, etc.) For spills or leaks: the substance and quantity involved (if known) For injuries or medical emergencies: the number of people injured, type of
injury or medical emergency, whether the person has a breathing problem, and whether an ambulance is needed Stay on the line as long as it is safe to do so while the Security ofcer contacts emergency services, in case more information is needed. Assign someone aware of the emergency to stand outside the building to direct emergency personnel to the site of the emergency. Contractor must cooperate with personnel providing emergency services, as requested.
10
2.02
Genentech provides wall-mounted fire extinguishers throughout its facilities. If Contractors employees have been properly trained, they may use these extinguishers to fight incipient-stage (i.e., newly started, relatively small) fires. If a Contractor employee is untrained or if the re is deemed to be too large to ght effectively, evacuate the area and report the emergency to the Site Security Office immediately. Contractor must report any used or out-of-date fire extinguishers to the Area Owner.
2.03 EARTHQUAKE
In the event of an earthquake, Contractor employees must take cover facing away from windows. They must not attempt to leave the building until all shaking has stopped. They must then follow the directions of the emergency coordinator.
Chemical spills Release of any wastes to storm-drain sewers Release of any hazardous material or hazardous waste to the air, soil,
water, storm drains or sanitary sewer
Any adverse chemical reaction or injury Use of the deluge showers or eye wash stations by a Contractors
employees Contractors must cooperate with Genentech to help minimize the consequences resulting from a Contractor-caused chemical release. Contractor employees should only assist with spill response if appropriately trained, equipped, and authorized for such work. Wastes generated as a result of the containment and cleanup of Contractorcaused chemical releases will be managed by Genentech after they have been appropriately identied and placed in appropriate waste containers.
11
Contractor is responsible for investigating releases of hazardous chemicals in which its employee was involved. Contractor must provide a copy of the written investigation report and information about corrective-and-preventive measures taken to the Site EHS staff.
2.06 EVACUATION
During any evacuation, Contractor employees must leave the area or building through the nearest exit, if it is safe to do so, and must report to the designated Genentech emergency assembly area. Contractor employees may not leave the assembly area until released by a Genentech emergency coordinator. Contractor must immediately report any missing Contractor employee or other individual to a Genentech Safety Coordinator.
injuries requiring more than minor rst aid vehicle accidents occurring on Genentech property incidents of criminal or suspected criminal activity damage to Genentech facilities or equipment spills or releases of hazardous materials potential exposure to human or animal blood or other body fluids non-storm water discharges to storm drain res
Contractor must report incidents including near-miss or close call events in which signicant losses or injuries could have resulted under slightly different circumstances using STARI within 24 hours. If the Contractor cannot report within 24 hours, the Area Owner shall enter the incident into STARI. A further report including any mitigation measures must be submitted by Contractor upon request.
12
2.08
Contractor must provide rst-aid equipment and training for its employees.
Sections 3.04 and 3.05 immediately below, Section 2.04 above concerning accidents or emergencies involving
exposures and/or releases of hazardous chemicals and chemicals.
Contractor must ensure that all of its employees are trained and competent to handle the chemicals they use. This training must be designed to:
Prevent the exposure of anyone to hazardous chemicals in the work area Prevent accidental or unauthorized release of any chemicals to the
environment
14
Contractor must store its daily-use chemicals and compressed-gas cylinders as follows:
Flammable substances must not be placed near potential sources of Bonding and grounding straps must be used whenever flammable liquids Chemicals must be located within an appropriate storage area based
on the characteristics of the chemical and manufacturers storage recommendations provide secondary containment
When required by applicable codes or regulations, Contractors must Compressed-gas cylinders must be secured in an upright position using
two non-combustible straps or chains located at 1/3 and 2/3 of the height of the cylinder not in use
Valve-protection caps must be in place when compressed-gas cylinders are Cylinder valves must be closed when cylinders are empty or are moved Only gas-specific regulators approved by the supplier for use that are in
proper working order may be used
15
Hazardous wastes must be kept within a fence or under the control of the Site Security Office, and must be located or staged in such a way that allows safe and easy access for removal. It is prohibited to dispose of hazardous wastes on Genentech property. Drains, sewers, sinks, rest rooms, trenches, trash containers and the ground may not be used for the disposal of hazardous chemicals or hazardous wastes.
3.07 CONTROLLING CONTAMINATION Demolition, Laboratory Equipment Decontamination, Contractor Tools In Manufacturing and GMP Areas Discovery Of Mold During Contractor Activities Contractors Contamination Control Checklist
Demolition Prior to the demolition of all or a portion of a building, Contractor must identify, obtain, and complete any regulatory permits required for demolition In addition, Contractor shall identify and remove any hazardous materials in the demolition area, including but not limited to: asbestos-containing materials, lead-based paints, fluorescent bulbs, and/or light ballasts containing PCB (polychlorinated biphenyl). 16 CONTRACTOR SAFETY HANDBOOK
Contractor must coordinate demolition activities to minimize disruption to occupants and operations in any locations that could be impacted by the work. Demolition work must be conducted in a manner that minimizes impacts on indoor air quality in the building or adjacent buildings. Decontamination of Laboratory Equipment Prior to removing any equipment from laboratories, Contractor must ensure that the equipment has been certified as clean by an attached clean or decontaminated certification form. Contractors Tools in Manufacturing and GMP Areas Contractor may be required to clean its tools before entering GMP manufacturing areas. Check with the Area Owner to determine which GMP procedures may apply. Discovery of Mold during Contractors Activities Contractor must immediately suspend work and notify the Area Owner and Site EHS staff upon discovery of any contamination by mold. Contractors Cross-Contamination Checklist Contractor employees must not enter any manufacturing buildings for 24 hours after holding or touching a rodent, (including pet rodents) and must have showered and changed into clean clothes within that period. Contractor employees shall complete and sign a Cross-Contamination Checklist Form during badging. The purpose of the checklist is to identify any prior contact with:
rodents (rats, mice, guinea pigs), reptiles, or their feces pets that may have come in contact with rodents or reptiles pet stores or labs where rodents or reptiles are present
Access to GMP buildings will be denied for 24 hours after entry into Genentech research buildings where research animals are housed or involved in experimentation. During that period, Contractor employees must shower and change into clean clothes prior to admittance to a GMP building. Under certain circumstances where Contractors activities in Genentech research buildings do not bring them into contact with rodents or lab areas, such as entry into a loading dock, reactivation of badge access to GMP areas may be granted by contacting the Site Security Office. To receive access prior to the 24-hour hold period, Contractor must go to the Site Security Office and complete a Biocontainment Access Form.
17
3.11
BIOLOGICAL HAZARDS
Genentech utilizes mammalian cells and bacterial cells for commercial production of protein and antibody drug substances using recombinant DNA technology. Cell lines in use are generally recognized as safe and are processed in closed systems with little potential for human exposure. During certain processing steps involving bacterial cells, aerosols containing bacterial endotoxins from cell wall debris can be generated, potentially causing flu-like symptoms. Research facilities may have laboratories where pathogenic organisms are used for research. Such laboratories use standard industry biosafety equipment and practices to contain the organisms and prevent human exposure.
18
Other research laboratories may have human and animal tissue and blood samples. These laboratories also employ standard biosafety equipment and practices to prevent human exposure. The Area Owner with assistance from the Site EHS staff will provide appropriate warnings, evaluate the need for decontamination before work commences, specify any PPE requirements, and give other necessary safety instructions to Contractors who conduct work in areas with potential biological exposure hazards.
3.12
Contractor must provide appropriate warning signs, barriers, and/or barricades wherever such protection is necessary. Where signs and barricades do not provide adequate protection, particularly along a road or walkway, Contractor must use a flag person. If Contractor must isolate sections of Genentechs parking lots, it must request assistance from the Site Security Office two weeks in advance, except in an emergency situation. When properly notified, Security will set up barricades the night before work begins.
19
Under no circumstances may exposed voltages greater than 30V be left unattended.
21
All work on energized systems must be done behind safety-barrier tape or barricades posted with appropriate warning signs. Lone workers must not perform work on energized systems. For work on pressurized systems that cannot be depressurized and blocked out, the Site EHS staff must be contacted prior to initiating work to review and approve the planned safe work controls, practices and specic procedures associated with the work.
4.06
Work within six feet of an unprotected roof edge, platform edge, or scaffold
edge and are exposed to a fall in excess of six feet
Are roofers working above 20 feet Are iron workers connecting steel above 30 feet Are iron workers working above 15 feet and performing duties other than
connecting steel A personal fall-arrest system must consist of an anchor, lanyard, and harness, and the system must be secured to a properly rated anchor point dened by Contractors designated competent person. All fall-arrest systems must be rigged such that individuals can neither free-fall more than 4 feet nor contact any lower level. Contractor employees may not wear waist belts in place of harnesses for fall arrest. Contractor may not use sprinkler systems, hoists, or utility piping for anchorage points. Contractors designated competent person must inspect all personal fall-arrest equipment at least every 6 months, and this inspection must be documented.
4.07
Prior to connecting to any re hydrants, Contractor must obtain permission from the Site Facilities or Maintenance Department and the Site Security Office. When practical, all hydrants, alarm boxes, and standpipe connections must be kept visible and readily accessible. If visibility cannot be maintained, then Contractor must provide clearly visible signs showing the location of the re hydrant, fire alarm box, or standpipe connection. Contractor work that requires the impairment of smoke or heat detectors, re suppression system components or water supply, re alarms, etc shall not be undertaken without issuance of a Fire Prevention Systems Impairment Permit.
22
4.08
Gasoline-, propane-, or diesel-powered forklifts and other similarly powered industrial vehicles must not be operated inside buildings. Propane-fueling operations must be done outdoors. Only those drivers authorized by Contractor and trained in the safe operation of the same type of forklifts utilized by Contractor may operate such Contractorprovided vehicles. No Contractor employee may operate a Genentech forklift unless the driver has been tested and licensed by Contractor to operate the same type of vehicle and proof of this training has been provided to the site/functional groups forklift program administrator for their approval. Prior to using the vehicle, a forklift driver must ensure that all operational controls, lights, and warning systems are working. Every forklift, except those guided by a walking operator, must be equipped with a warning device (horn, gong, or other audible device) and a back-up alarm that can be heard clearly above the normal industrial noise in the workplace.
4.10 LASERS
Contractor must use only trained, qualied employees to install, adjust, or operate Class 3 or Class 4 laser equipment. Contractor must inform the Site EHS staff of any plans to use such lasers, and must post standard laser-warning signs in areas where such lasers are used and in adjacent areas where occupants could be harmed by possible exposure to the laser light source.
23
Genentech equipment-specific LOTO procedures shall be provided to the Contractor(s) prior to working on designated machines, equipment or processes. Genentechs general rule concerning LOTO by a Contractor is that a Genentech Authorized Persons (for LOTO) will place their lock on first and remove it last upon completion of the task by the Contractor. However, in some situations where a Category I Contractor has a long-term ongoing responsibility to routinely perform work requiring LOTO for Genentech, the Area Owner, with written approval from the Site or Corporate EHS staff may designate that appropriately trained and experienced Category I Contractor as their authorized representative to place the lock on rst during work involving LOTO by another Category I Contractor. If a Contractor employee is working on equipment or a system that is to be locked out, he or she must attach his or her lock to the lockout device. That Contractor employee must retain the lock key, and only this person is authorized to unlock the lock and remove the tag upon completion of the job. If more than one person is working on the system, then each must place his/her own lock on the switch and retain his/her own key. Master keys are prohibited.
24
Contractor must notify EHS if the task pertains to any of the below:
Are anticipated to release regulated air pollutants or water pollutants in Will require a special permit Will generate hazardous wastes requiring disposal by Genentech
amounts that might exceed regulatory limits including those specified in existing permit conditions at the site
Prior to any drilling or cutting operation on any lines or equipment containing flammable or combustible materials, Contractor must purge them with nitrogen. Contractor must evaluate other potential fire and explosion hazards in the area before seeking a Hot Work Permit or before work begins that could ignite a fire or initiate an explosion. If Contractor purges any piping, tanks, or vessels with an inert gas such as nitrogen or carbon dioxide, then they must also assess potential asphyxiation hazards. Contractor must take precautions to prevent the venting of unsafe quantities of such purge gases into an enclosed work space.
4.13
MANLIFTS
Contractor employees must not operate any Genentech manlift unless the employee has been tested and licensed to operate that specic equipment by Contractor or by Genentech. Contractor-provided manlifts may be used only by Contractor employees who have been properly trained in their operation. When manlifts do not have standard guardrails, or when it is necessary to lean out over existing guardrails to work, Contractor employees must use personal fall-arrest systems. Where boom-lifts are used, Contractor shall use a personal fall arrest system at all times.
25
4.15
Contractor must provide all necessary personal protective equipment and equipment training for its employees. Contractors may not take personal protective equipment from Genentech dispensers for their own use unless authorized to do so by the Area Owner. Contractor must inform the Area Owner and Site EHS staff whenever a Contractor employee plans to use a respirator in an area occupied by, or adjacent to, Genentech work activities. When working indoors where safety glasses are required, Contractor employees must wear impact-resistant safety glasses with solid side shields. Additional safety equipment, such as approved, steel-toed boots or shoes, may also required by department protocols, standard operating procedures, or other written directives that are identified on the Safe Work Authorization Form.
4.16
PORTABLE LADDERS
In situations that require the use of portable ladders, Contractor must provide ladders appropriate to the tasks involved (usually berglass ladders). Contractor may not use wooden ladders in GMP areas, nor use Genentech portable ladders at any time. Any portable ladder that is not a free-standing step ladder must be tied, blocked, or otherwise secured to prevent its being displaced. If the placement of ladders may block access to passageways, entries, or exits (including emergency exits) Contractor must obtain prior approval from the Area Owner.
4.17
The use of pneumatically driven nailers / staplers (operating at more than 50 psi pressure at the tool), and/or (gun) powder-actuated tools on Genentech property requires the immediate work area to be effectively barricaded against unauthorized entry with clear warning signs posted on the barricades. Such tools may only be operated by individuals who have been properly trained and certied on the specic tool being used. These tools shall have a safety device on the muzzle to prevent the tool from operating unless the muzzle is in contact with the surface as the trigger is pulled. Taping down the trigger of these devices to speed up the work will result in an immediate shut-down of the work and ejection of the contractor. When not in use, or unattended, all pneumatically driven nailers and staplers shall be disconnected from the air supply at the tool.
26
Powder-actuated tools shall be locked in their required storage containers. Violation of these rules will result in an immediate shut-down of the work and ejection of the contractor.
4.19
Contractor must not discharge rinse-water, wash-water, or industrial water of any type to the storm-drainage system or natural drainage channels on or adjacent to Genentech facilities. Discharge of fire-hydrant water, sprinkler water, or potable water may be allowed, but Contractor must obtain prior approval from the Site EHS staff. Contractor must prevent construction debris from their work activities from entering the storm-drain system and must protect areas subject to soil erosion against such erosion. Contractors performing construction work must comply with applicable Construction Stormwater regulatory requirements which may include ling a Notice of Intent, preparing a Construction Storm-Water Pollution-Prevention Plan (SWPPP), conducting periodic BMP inspections, and/or filing a Notice of Termination. If a Construction SWPPP is required, Contractor must submit a copy to Site EHS staff prior to commencing work, and is responsible for implementing the plan including training its workforce. Contractor must not discharge wastewater into the process wastewater or sanitary-sewer system without pre-approval by the Site EHS staff. Wastewater not acceptable for discharge to the process wastewater or sanitary sewer must be collected by Contractor for offsite disposal. If the collected wastewater is characterized as hazardous waste, then conditions for disposal described in Section 3.05 apply.
27
Excavation, Trenching, Ground Breaking, or Tunneling Floor or Wall Penetration Soil Movement Use of a Concrete Saw
No work shall be done until the existence and location of unseen gas lines, pipes, electrical conductors, contaminated soils, etc., has been determined. Contractors shall make daily inspections of each excavation. If at any time there is evidence of possible cave-in or slides, all work in the excavation shall immediately cease until the necessary safeguards have been taken. All excavations shall be backfilled as soon as practical after work is completed and all associated equipment removed. NOTE: Hand digging within the first 12 inches and wall penetrations that do not go beyond the first two inches, do not require an excavation permit.
5.05
Work that involves one or more of the following requires a Hot Work Permit:
Welding, Brazing, or Torch Soldering Portable Space Heaters Open Flames Heated Tar Pots Other Ignition Sources
Contractors must provide a trained re watch and appropriate type of fire extinguisher on all jobs involving hot work. Contractors must not use Genentech fire extinguishers to meet this requirement. The person performing hot work cannot also act as a re watch. An additional person is required. After hot work is completed, the contractor must inspect the area and remain in the area until (a) it is determined that no smoldering or previously unnoticed fires exist or (b) an additional 30 minutes has elapsed, whichever is longer. The contractor must provide and use non-combustible or flame proof shields or screens to protect all individuals from welding flash or arc flash. When hot work involves working on flammable or combustible chemical lines or vessels, they must be depressurized, drained, purged of residual chemical, and inerted and tested to ensure a safe atmosphere. Adjacent flammable and combustible chemical lines must also be depressurized and effectively protected by blanketing or shielding to protect them from damage. CONTRACTOR SAFETY HANDBOOK 29
Hot work on chemical systems must be coordinated with a process engineer from the affected area. Portable Propane Space Heaters (Salamanders) A portable space heater is generally heated by propane fuel. As such, it presents risks of both open flame and carbon monoxide generation in poorly ventilated areas. Due to these potential dangers, the following rules shall apply. A Genentech Hot Work Permit must be obtained before a propane-powered space heater may be used. (Note: a re watch is not required after the heater has been turned off). Heaters shall not be left unattended while in use. Heaters must be Factory Mutual or Underwriters Laboratory (UL) approved and shall not be used inside buildings, except in high-bay manufacturing/ warehouse areas or large construction areas with good ventilation that have access restricted to contractors. Heaters shall be positioned away from all combustible material to reduce the possibility of uncontrolled re and away from trafc to prevent them from being overturned.
5.06
Work that will involve helicopter or mobile crane lifts over Genentech property such as the installation of HVAC equipment on roofs requires a Mobile Crane or Helicopter Lift Permit. Mobile cranes including portable crane derricks, power shovels, helicopters, and other heavy lifting equipment shall not be operated within ten feet of overhead electrical power lines and shall never be operated above any occupied building or area. Helicopter lifts are restricted to 9:00 a.m.-5:00 p.m. and require notication of the Site Security Office ten working days before the lift, so that Genentech Security can inform the local authorities.
5.07
SCAFFOLDING WORK
Contractor must erect, use, and dismantle scaffolds in compliance with Genentechs scaffolding permit as well as all applicable laws, regulations and local permitting requirements. The work must be performed under the direct supervision of a qualied person.
5.08 RADIOGRAPHY
Contractors using radiation producing equipment to x-ray equipment, inspect welds, etc. require a Radiography Permit approved by the Radiation Safety Officer.
30
5.09
Work that impairs the function of the following, requires completion of a Fire Protection Systems Impairment Permit. Such equipment is not to be moved, relocated, or blocked even temporarily without the required permit.
Emergency Exit Routes and Doors, Deluge Showers, or Eyewash Fountains, Fire Doors and Lanes, Fire Service Control Valves, Pull Stations, Smoke Detectors, Fire Suppression Systems (ex. FM200, CO2,Halon), Annunciators, Company Fire Hydrants, Fire Water System (ex. Standpipes, Sprinkler Riser Valves), Fire Pumps,
31
6.04 CONTRACTOR
Non-Genentech workers under contract to work on Genentech projects under the direct supervision of a third party (non-GNE) employer.
6.07 EMERGENCY
Any of the following:
A serious-injury accident; A life-threatening incident; Personal medical emergencies; Serious occupational injuries or illnesses; Spills or Leaks; Environmental releases; Fires; Explosions; Exposure to toxic or hazardous chemicals; and Exposure to suspicious, unknown odors.
6.08
FDA
6.09 GFCI
Ground Fault Circuit Interrupter
32
6.10 GMP
Good Manufacturing Practices, which are FDA state-of the-art manufacturing practices for pharmaceutical manufacturers.
6.11
HAZARDOUS WASTE
Any waste classied as a hazardous waste under federal, state, or local laws and regulations.
6.12 INCIDENT
An event that includes, but is not limited to, (a) accidents that require rst aid or medical attention, (b) spills, leaks, or releases of materials or wastes on a job site, in a building, or to the environment, (c) fires and explosions, (d) extensive property damage, and /or (e) close calls or near misses of any such events.
6.13 RSO
Radiation Safety Officer, the Genentech employee who manages the radiation safety program, or his/her designee. The RSO resides in South San Francisco. No work involving radioactive materials or ionizing radiation sources may be undertaken without the notication, involvement, review, and approval of the RSO.
6.14
A form the Area Owner uses to notify Contractor of EHS concerns relating to the work area and Contractor uses to notify the Area Owner of EHS concerns relating to the work to be performed. The form must be signed by the Area Owner and Work Crew Leader before Contractor may perform any work in the area.
6.15
SUBCONTRACTOR
Any company or person hired by a Contractor to perform work at Genentech facilities. On Genentech premises, all subcontractor employees are deemed to be employees of Contractor, and Contractor is responsible for ensuring their safety and safe performance.
6.16 UL
Underwriters Laboratories
6.17
An employee or Contractor responsible for a work crew performing project work or maintenance. In a work crew of one, that individual serves as the Work Crew Leader. Work crew leaders or their designee are responsible for completing the Safe Work Authorization Form and any applicable permits or forms. CONTRACTOR SAFETY HANDBOOK 33
Live Electrical Work..........................................................See section 4.05 Live Electrical Work..........................................................See section 5.03 Lockout/Tagout of Chemical Equipment..............................See section 4.12 Lockout/Tagout of Equipment............................................See section 4.11 Management of On Site Chemical Waste.............................See section 3.05 Manlifts. ..........................................................................See section 4.13 Medical Emergencies........................................................See section 2.08 Medical Emergencies........................................................See section 2.01 Mobile Cranes..................................................................See section 5.06 Mold...............................................................................See section 5.01 MSDSs............................................................................See section 3.01 Nail Guns........................................................................See section 4.17 Non-Harassment Policy.....................................................See section 1.15 Overhead Work.................................................................See section 4.14 Parking. ...........................................................................See section 1.03 Personal Protective Clothing and Equipment.......................See section 4.15 Photography. ....................................................................See section 1.13 Pneumatic Nailers or Staplers . .........................................See section 4.17 Portable Space Heaters.....................................................See section 5.05 Powder-Actuated Tools......................................................See section 4.17 Powered Industrial Vehicles (Forklifts etc.)..........................See section 4.08 Prohibited Materials. ........................................................See section 1.12 Radiography Equipment....................................................See section 5.08 Reporting Emergencies.....................................................See section 2.01 Roof Access.....................................................................See section 4.18 Roof or Floor Penetration. .................................................See section 5.04 Safe Work Authorization Form............................................See section 3.01 Salamanders....................................................................See section 5.05 Sanitary Sewer Lines. ........................................................See section 4.19 Scaffolding......................................................................See section 5.07 Site and Building Access. .................................................See section 1.05 Smoking and Open Flames................................................See section 1.10 Speed Limits. ...................................................................See section 1.02 Sports And Shower Facilities.............................................See section 1.07 Sprinkler Systems. ............................................................See section 5.09 Storm Drains . ..................................................................See section 4.19 Tools and Equipment (Contractor supplied).........................See section 3.14 CONTRACTOR SAFETY HANDBOOK 35
Tools and Equipment (Genentech supplied). ........................See section 3.15 Trash and Construction Debris...........................................See section 1.17 Trenching. ........................................................................See section 5.04 Unattended Work. ............................................................See section 3.13 Warning Signs and Barricades. ..........................................See section 3.12 Welding...........................................................................See section 5.05 Work On Energized - Pressurized Systems...........................See section 4.05 Work Using Lead-Containing Materials................................See section 5.01
36
SECURITY
24/7 EMERGENCY LINE _____________________________________________ NON-EMERGENCY CALLS ____________________________________________ ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________
PERMIT APPROVERS
____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________ ____________________________________________________________________
37
38
ACCEPTANCE OF RULES
Please remove this form, sign it, and return it to your trainer or designee. All contractor employees are required to read through and understand all of the rules and procedures set forth in the Genentech Contractor Safety Handbook (2/01/2009 Edition). Reading and understanding the Handbook is a requirement for work at Genentech and must be completed BEFORE working at Genentech. Genentech has the right, but not the obligation to verify that all contractor employees have read and understand all of the rules and procedures set forth in the Genentech Contractor Safety Handbook (2/01/2009 Edition). Contractors representative, in accepting Genentechs contract for work, has agreed that only Contractor employees who are familiar with the routine and specic hazards of their job and who have been prepared to deal with the hazards they may encounter while on the job at Genentech will be sent to work at Genentech. This policy is an important protection for both Genentech and Contractor against accidents.
TRAINERs ACkNOwLEDGmENT:
The above-named Contractors employee was trained to understand, and abide by the rules and procedures set forth in the Genentech Contractor Safety Handbook (2/01/2009 Edition). Name (please print):__________________________________________________ Signature:___________________________________________________________ Name of Contractors Company:______________ Date of training: ___________ Handbook last updated: February 1, 2009
39
regulations, policy, standards, rules and procedures is everyones responsibility. All employees are expected to help manage EHS risks and to act responsibly to protect themselves, co-workers, the environment, and our facilities. Management Leadership, Participation and Accountability: Our leaders, from top management to front-line supervisors, are responsible and accountable for EHS compliance and for managing EHS risks of their organizations. Their active participation includes collaborating across organizational lines to integrate EHS risk management practices into our routine business processes.