Refining Division
Oil Refineries upgrading Program For the production of clean fuels In Algeria
CONTENTS
1. Crude refining activity in Algeria Existing facilities for each refinery. Present scheme for production of gasoline and Diesel Present status of motor fuels in Algeria Rehabilitation and adaptation program Principles and objectives . History of actions . Program for each refinery. Future Lay outs.
2. 3.
4. 5.
In Algeria
Skikda
Arzew
2,7 MMT 1964 15 MMT 1980
Hassi Messaoud
1,2 MMT 1979
In Amnas
0,3 MMT 1980
Motor fuels
Lub-oil
Bitumen
Aromatics
Existing Refineries
Algiers Refinery
Location: 10 Km South of Algiers (on 200 Ha) Final Products: Motor Fuels and LPG (For Local Market) Naphtha et fuel oil (For Export)
Shipment:
sea vessels
STABILISATION
Gas - Plant
LPG
PROPANE
BUTANE
Crude. 2700.000
REFORMING
Heavy Naphtha
Topping Unit
REFORMATE
Gasoline Blending
DIESEL
Existing Refineries
Arzew Refinery
Location: Industrial Area in Arzew (150 Ha) Final Products: Motor Fuels + LPG + Bitumen (For Local Market) Lubricants (For Local Market and Export ) Naphtha and Fuel-oil (For Export)
Shipment:
by trucks
pipelines
sea vessels
rail way
LPG
STABILISATION ESSENCES Light Naphta REFORMING CATALYTIQUE Gas Plant PROPANE
LPG
TOPPING UNIT
2,5 M
Crude
EXPORT Lubes
Lub 2
Vacuum Distillation Blowins Unit
Grease
Wax Fuel - oil (HS) Oxydised Bitumen
Road Bitumen
and Export)
Fuel-oil (For Local Market
Shipment:
by trucks (for Bitumen & Toluene)) pipelines (Motor Fuels, LPG) sea vessels
OAPEC Symposium - Bahrain - Oct 25 TH to 27 th - 2010
PROPANE
BUTANE
NAPHTHA
15.000.000
Crude
Unleaded Gasoline
PX Cristallisatio n Kerosene Sweetening Imported Reduced Crude MELANGE-XYLENES PARA-XYLENE JET A1 Gas - oil Blending Blowing Unit DIESEL Fuel - oil (LS) Fuel - oil (HS)
277.100
Vacuuum Distillation
Oxydised Bitumen
Road Bitumen OAPEC Symposium - Bahrain - Oct 25 TH to 27 th - 2010
Existing Refineries
Shipment:
trucks
1. HASSI-MESSAOUD 1
LPG
Crude
T O P P I N G
LPG Unit
FUEL.GAS. BUTANE
STABILIS.
2. HASSI-MESSAOUD 2
GPL
NAPHTHA UNIT LPG/RHM1 SLOPS
Crude
100.000
T O P P I N G
R E F O R M I N G
REFORMATE
Regular gasoline
Gasoline Blending
Premium Gasoline
Existing Refineries
In-Amenas Refinery
Location: Industrial Area of In- Amenas (SH-DP))
FuelGaz
T O P P I N G
Naphtha
Gasoline Blending
Vers Slop
Regular Gasoline Premium Gasoline JET
Kerosen e Diesel
sweetening
Diesel
Fuel-Oil
OAPEC Symposium - Bahrain - Oct 25 TH to 27 th - 2010
Slops
Gasoline
At the present time the local market consumption is about 2,3 million Tons/Year of gasoline including 3 types:
Limits Premium 95 Specs RON MON Benz ene Specific gravity Sulphur Distillation ASTM 86 70C 100C 180C 210C Final Poi nt Reid Vapor Pressure Winter / Summer Units Min 95 85 % Vol Kg/m3 ppm 725 5 780 100 Max
% Vol
15 40 85 90
47 70
215
Kpa
80 / 65
Comments:
The specification of unleaded gasoline in Algeria doesnt
mention any limit for aromatics, olefins and oxygen ( the unleaded gasoline RON 95, is similar to leaded premium
gasoline RON 96, with a quite wide gravity gap). The benzene content is limited to 5 % vol. (means in the limit of the skikda refinery production quality)
Gasoline Status in Algeria (cntd) Gasoline Average Qualities for the Local Market lead content was reduced by the Regulation from 0.65 to 0.40 g/l. max, from the year 2000 According to the regional demand of gasoline and the available basestocks in each refinery for gasoline
Gasoline Average Qualities / Local Market (cntd.) Sulphur average content : less than 30 ppm (due to good crude quality and good quality of basestocks), Aromatics content : 50 to 60 % vol. (due to use of
Butane Isopentane Light Naphta Reformate Raw Toluene Heavy aromatics Leaded Regular RON 89
Gasoline blending
rafinate
X X X X
X X X
X X X X X
X X X X
X
Diesel fuel :
The Algerian market consumes currently up to 7 millions Tons / year of Diesel
Specification Specific density Cetane number Flash point Pour point /winter. Pour point /summer. Distillation ASTM D86
Gasoil 810 860 48 min 55 min -12 max -7 max 250C min 350C max 390C max 1 500 max
Sulphur content
Nota: Before Year 2005, Skikda refinery has produced Diesel for export (in the limit of 350 ppm max sulphur content ) from SR
SR Kerosene
SR Light Gas-oil
Gas-oil blending
SR Heavy Gas-oil
Diesel
Vacuum Gas-oil
RA1K SR Kerosene
RA1G
RA1Z
RHM2
SR Light Gas-oil
SR Heavy Gas-oil Vacuum Gas-oil
X X
X X X
X
Modernize the instrumentation for a better optimization of the various Units, Produce clean fuels for the local market and for export, for a better environment
From October 2001 to March 2003, we worked after an open tender for
each subject: For Skikda Refinery: with Foster Wheeler France (for the process and
1.
Evaluation of the various reports and options proposed by the consultancy companies
Selection of the options to be implemented in each refinery Identification of all the small projects which do not need deep engineering work, in order to implement them immediately Agglomerate all the other subjects in one, two, or three major EPC projects, including capacity increase Minimize the shutdown duration for construction and tie-ins
The rehabilitation program will be implemented simultaneously in the three coastal refineries, Shutdowns of existing rehabilitation work, units will be minimized for the
The normal investment program for maintenance purposes will be continued in parallel at each refinery,
Skikda Refinery
Rehabilitation Program
Reconfiguration of aromatics chain (revamp of the Benzene /Toluene recovery unit Addition of a cristallization unit and a mixed xylene isomerisation unit
CLEAN FUELS 02 New NHT/ light naphta isom Units 02 New DHDS Units
OAPEC Symposium - Bahrain - Oct 25 TH to 27 th - 2010
Achievement of two Units for light naphta isomerisation, Rehabilitation of electrical equipments, upgrading of electrical network , Achievement of two Hot Oil systems,
Instrumentation modernization (implementation of DCS with a centralized control room), Upgrading of the Quality control laboratory,
Arzew Refinery
Revamping
Existing CDU/ Gas Plants for 50% higher crude oil processing capacity Add / Modify existing utilities / offsite facilities.
MODERNISATION
Rehabilitation Programme
ADAPTATION FUELS 01 New Unit for Isomerization Gasoline to improve the LSRN characteristics 01 New Unit for Diesel Hydrodesulphurized
Project 1: Instrumentation modernisation (implementation of DCS + APC + optimisation with a centralized control room),
Project 2: Rehabilitation of electrical equipments, upgrading of electrical network Project 3: Main EPCC Capacity increase for Topping and Gas plant, Adaptation for utilities and storage units,
Algiers Refinery
Revamping
Existing CDU/ Gas Plants for 35% higher crude oil processing capacity Add / Modify existing utilities / offsite facilities.
MODERNISATION Of the Instrumentation with DCS / APC/Optimisation type .Main oprating Central Room. Of the Electrical network with ECS type.
Rehabilitation Programm
RECONFIGURATION
New Reforming Unit (CCR mode). New RFCC Unit for the gasoline
and Diesel production.
ADAPTATION FUELS 01 New Unit for Isomerization Gasoline to improve the LSRN characteristics 01 New Unit for clean Diesel
OAPEC Symposium - Bahrain - Oct 25 TH to 27 th - 2010
Oprations included in one large EPC project: Rehabilitation of existing facilities (Topping Unit and Reforming Unit with a new catalyst). Rehabilitation of the Utility production facilities and distribution network, Rehabilitation of electrical equipments, upgrade of electrical network.
Instrumentation modernization ( DCS with a blast resistant control room), Rehabilitation of underground piping
GP I
GP II
PROPANE BUTANE FG
H2 RICH GAS
PSA
ISO PENTANE
C6 CUT
CDU - I
LNHT-I/ LNISOM-I
TOLU. CUT
C5 CUT
KERO
LGO+HGO
C6 CUT
LNHT-II/ LNISOM-II
RCO
BENZENE ARU
EXCESS KERO
CRUDE
LPG
TO NAPHTHA POOL
DHDS-I
C6 CUT NAP A
TO DIESEL POOL NHDS/ REFORM-II KTU-II PX REC. HY. AROM. UNIT DHDS-II PARAXYLENE HY ARO. TO GASOLINE CR KERO TO DIESEL POOL EXCESS C8+ TO GASOLINE
CDU - II
PROPANE
GP III
RCO
BUTANE
XYL-ISOM UNIT LOW SULPHUR FO GAS OIL OXIDISED BITUMEN ROAD BITUMEN
BBU
EXISTING
C6 CUT
HGO
REVAMP
NEW
PAGE 50
Arzew Refinery
REHABILITATION FUTUR ET ADAPTATION
STAB.1
18 982 BPSD
LSRN 1 HSRN 1 LSRN 2
Gas Plant
6 289 BPSD
Isomerisation
7500 BPSD Ess.Super Ess.Normale
STAB.2
14 346 BPSD
KERO HSRN 2
Unibon Platformer
8500 BPSD
CDU
Krosne
DIESEL
BHM
90 000 BPSD
LGO HGO
VGO LUB
HDS
36500 BPSD
Gasoil
Fuel BTS
Project 2: Rehabilitation and capacity increase of fire fighting network. Contractor: ETTERKIB (Algeria) started on February 23rd 2008 Physical progress: 77%
Project3: Rehabilitation and adaptation of production facilities. Contractor: SAMSUNG Engineering (South Korea) started on August 13th 2009 Physical progress: 28%
Project 3: Rehabilitation and adaptation of production facilities. Contractor: Groupement HYUNDAI Eng & Co Ltd / HANWHA / DAEWOO started on February 23rd, 2009. Physical progress: 39%.
Present status of the rehabilitation program at both Algiers & Hassi-Messaoud refineries .
For RA1G: Contractor : TECHNIP France. Physical Progress: to be launched soon.
For RHM2: The adaptation and rehabilitation program will be conducted according to the following planning: Consultation for PMC: 6 months: April 2011. FEED studies: 15 months : June 2012. Consultation for EPC: 12 months : July 2013. Realisation EPC: 48 months :August 2017.