Duration
Start
S
Bungalow Design
Geotechnical Design Planning and proposal of site investigation Proposal of number and locations of boreholes Proposal of tests on disturbed and undisturbed samples Cost estimation for boring based on JKR schedule of rates Analysis of site investigation results Description of the type of soil encountered at site; determination of Location of groundwater table
24 days
Mon 7/1/13
Mon 7/1/13 Mon 7/1/13 Mon 7/1/13 Mon 7/1/13 Sat 7/6/13 Mon 7/8/13 Mon 7/8/13 Tue 7/9/13 Fri 7/12/13 Mon 7/15/13 Mon 7/15/13 Mon 7/15/13 Tue 7/16/13 Wed 7/17/13 Fri 7/5/13 Fri 7/5/13 Fri 7/5/13 Sat 7/6/13 Tue 7/9/13 Tue 7/9/13 Sat 7/13/13 Sat 7/13/13 Mon 7/1/13
External Tasks External Milestone Deadline Progress Manual Progress
19 days 7 days 5 days 3 days 2 days 7 days 4 days 1 day Anticipation of construction problems; 3 days suggestion of possible solutions Proposal of suitable type of foundation 5 days Justification for shallow or deep 2 days foundation Ultimate limit state and serviceability limit 2 days state Reccomendation for foundation 1 day? construction method Design for swimming pool foundation 3 days Structural Design 12 days Column and Beam Location 4 days Identify column and beam location from 1 day architecture drawing for checking column 3 days Use esteem software and beam location Load Distribution 4 days Use esteem software to determine load 4 days distribution for the whole structures (roof 4 days Framing System Identify and propose type of framing 4 days system that will be applied Water Resources Design 19 days
Task Split Manual Task Duration-only
Dr
Ir. Faz
Ir.
Inactive Summary
Page 1
ID 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
Duration
Start
S
Information Gathering Volume of water discharged/used Point of water discharge Types of water are discharged Cost consideration Type of Drainage System Identification of Drainage System Comparison method to identify the best and most suitabletype system Propose of suitable of drainage system Propose system chosen and justification Include calculation to support the design Draw the drainage and show water flow in the drain Project Management Project Planning Collecting project timeline and description from structural, geotechnical and water Produce Gantt chart
6 days 3 days 1 day 1 day 1 day 6 days 2 days 4 days 11 days 2 days 3 days 4 days 14 days 6 days 3 days 3 days Design standards and codes 4 days Collecting design codes used in structural, 2 days geotechnical and water resources Learn Uniform Building-By Law design 2 days Authority submission 4 days Collecting the forms related to authority 3 days submission Submission to authority 1 day
Mon 7/1/13 Mon 7/1/13 Thu 7/4/13 Fri 7/5/13 Sat 7/6/13 Sun 7/7/13 Sun 7/7/13 Tue 7/9/13 Tue 7/9/13 Tue 7/9/13 Mon 7/15/13 Tue 7/16/13 Thu 7/11/13 Fri 7/19/13 Fri 7/19/13 Mon 7/22/13 Thu 7/11/13 Thu 7/11/13 Sat 7/13/13 Mon 7/15/13 Mon 7/15/13 Thu 7/18/13
Ir. Hafiz
Dr
Task Split
Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only
Page 2
Jul 7, '13 S
Dr. Odu
Dr. Odu
Task Split
Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only
Page 3
Jul 7, '13 S
iz
Ir. Hafiz Ir. Hafiz Ir. Hafiz Ir. Hafiz Ir. Hafiz
Task Split
Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only
Page 4