Submission of MHP Resolution by the Community uTechnical and Social Feasibility Survey by Field /District Engineers
uPreparation of Project digest based on survey u Scheme Proposal Rejected uApproval of the Project by head office Engineer
uEstablishment of Project, Audit and Operation & Maintenance Committees uSRSP & CommunityBased Monitoring. Establishment of Operation & Maintenance company uOn -Job Training to the Committees uHanding over of MHP to Community
uScheme Completion
The challenge is to electrification rural area to achieve basic development objectives such as combating poverty and climate changes, while promoting gender equality, economic growth, environment protection and private sector development. Off-grid systems should be considered when grid extension is not feasible.
To develop micro power projects within shortest possible time. To reduce the burden on national grid. To generate employment opportunities.
Sites
50 26 39 20 35 9 13 45 25 11 44 39
35.5
356
What do Mini & Micro hydro systems provide? Electricity for Isolated-grids Remote power supplies but also Reliability Very low operating costs Reduced exposure to energy price volatility
1 2 3 4 5 6 7 8 9 10 11 12 13
5 to 15 kW 20kW 30 kW 40 kW 50 kW 75kW 100 kW 150 kW 200 kW 250 kW 300 kW 400 kW 500 kW Total
80 35 35 25 40 30 20 25 15 15 10 08 18 356
1.08 MW 0.60 MW 0.90 MW 0.60 MW 1.75 MW 1.87 MW 1.50 MW 2.70 MW 3.00 MW 3.75 MW 3.00 MW 3.20 MW 3.00 MW 35.5 MW
Tim elines for Distributed/ Off-grid M icro and M ini Hydro P ow er P rojects
Meeting with PCRET Dialogue with SRSP uCompleted uCompleted
Identification of Sites
uAll by 31 Dec
PDWP APPROVAL
uJuly 2014
Installation of Turbine and generators etc
Commissioning
uAug 2014
P roposals im plem entation and operation of M icro and M ini Hydro P ow er P rojects
PHYDO may be allowed to award/execute the mini /micro Hydel through NGOs( like SRSP/ AKRSP etc.) as a special case; Funds be considered as grant and the revenue generated be spent on O&M of respective projects PHYDO may disburse the funds to concerned NGO as per following schedule
10% on mobilization. 20% on completion of 25% of work. 20% on completion of 50% of work. 30% on completion of 75% of work. 20% on completion of 100% of work.
Payment to NGO after verification of work by Management Consultant The hydel stations after its completion will be handed over to the concerned NGO and Community for O&M through concern district administration
Employment generation:
Direct: A total of 300 personnel will be provided with jobs on contractual basis. Indirect: (a) A total of 1,800 local inhabitants will be imparted training on post installation O&M of MHP plants. Thus 1,800 local people will be provided jobs on these plants. A total of 30,000 labor jobs during construction period. (b) About 3,500 local inhabitants is envisaged to get jobs in small scale industrial/commercial units running on MHP plants.