Vous êtes sur la page 1sur 3

SHAKEEB AMIR

House # A-1/74, Sector 38-A, Al-Muslim Housing Society, Scheme 33, Main University Road Karachi. +92-0301-25 98 227, +92 0312-33 866 15 shakebamir@yahoo.com

Career Objective:
To explore my knowledge and skills in various fields of Telecommunication and want to attain a challenging position in the field of BTS and BSS, TXN Implementation projects with my full devotion and dedication.

Education:
B-Tech (Hon, s): in telecom engineering. D.A.E: in Telecom Engineering. New Port Institute Of Communication and Economics (2012) Jinnah Polytechnic Institute Karachi (2007)

Job Profile: Symbia information communication (Pvt) Ltd. Projects Coordinator:


MAY 2006 to Present

Responsible for all projects initiation, implementation unto closure phases. Communication, coordinate with different department & internally both, Prepared maintain TE department project plan and activities, handle recruitment hiring process plans, prepared maintain every department employee record & their plans accordingly date wise. Assist the Project & Implementation in executing the Network rollout, Swap, Expansion Access link Backbone link, sending reports. Expertise in End to End projects & its deliverable. Coordination with site technical teams for installation & quality assurance of equipments Conducting PreATP/ and snag removal activities. Prepare regular updates and Send same to customer on regular intervals. Escalate problematic and knotty issues. Technical, financial and legal to concerned stakeholders. Arrange and co-ordinate for the various hold point inspections with PM Prepare the Completion of certificate documentation for sign off by customer Interface with the client through regular reports and briefs. Prepare weekly and monthly reports of all activities including project milestone completion reports. Manage day-to-day issues through regular interaction with the PM. Ensure quality of all site-build activities. Ensure safety standards are met. Ensure compliance with the processes and standards identified by the project quality plan. Planning and implementation of Performance Improvement in Transport Network. Warehouse/Logistics Management Responsible for Warehouse and Material Management. Material movement planning and controlling the warehouse. Tracking of the equipments/ materials to the delivery of material at sites.

BSS /Transmission Engineer.


Responsible of 3900BTSsites, BBU 3900, DBS, IBBS, RRU APM 30H, TP48200 Cabinet Installation. Roll Out, Swap,(CM PAK Project) To perform the PAT according to the customer requirement and removes all the snags of sites. Supervising BTS cell site installation activity for HUAWEI PAKISTAN for their project with WARIDTELECOM. Supervise, hardware installation, Huawei BTS, 3012, 312 Indoor. Measuring of VSWR, RL & DTF through Anritsu & spectrum analyzer, and Sweep Testing of Antenna / feeder and power tests of BTS. Installations of outdoor Kathrein RF antenna, Feeder cable, antenna orientation, and azimuth. Electrical

and mechanical tilt. Conducting Acceptance test Using Power meter & Site Masters, BTS Alarm cable Patching. Working on Huawei RTN 950, 980 microwave equipment. Commissioning and configuration of the Microwave Links RTN. Responsible for installation, commissioning and alignment of NEC microwave antenna (0.3, 0.6, 0.9, 1.2 &1.8m)Paso link ,Neo,(1+0,1+1 HS/SD,F/D ) (8E1,16E1,48E1,96E1,STM-1) PDH & SDH. Responsible for up gradation of PDH links of existing sites for increased E1 capacity. Upgrade Radio links from 1+0 to 1+1 Hot / Standby. Microwave commissioning through PNMT Software of NEC. Monitoring QUALITY CONTROL during site installation. Performed PAT activity.

MW LOS Team Lead:


Conduct 2500 Microwave PTP Links survey & TSSR for Ufone Pakistan, Warid telecom, NEC, Huawei, WITribe. QUBEE Broadband, Telenor, and Ericsson Pakistan.(South Region) TSSR,LOS Survey, Planning, USF MOUZAS Project with Telenor Pakistan (Thar Parker region Sindh) 3G RAN TSSR, MW LOS TSSR, (ZTE Swap with Telenor Vega project) Karachi, Quetta, Sukkur Region. Manage Transmission Engineers of LOS Team LOS Survey for new site (Access and Backbone) proposed optimal Antenna Heights. Repeater Planned for Critical Survey. Checking for obstacle details that may obstruct the transmission path of MW link as planned. On field obstacle heights collection of transmission path of PTP MW link. Path Profile generation and verification for the PTP Microwave links using Path loss 4.0. Proposing the optimum height of antenna keeping in view the height of obstacles and clearance. Proposed of Antenna heights and Orientation according to clutter. Generation and Submission of LOS survey reports. Provide solutions for service affected links.

Professional Training:
04days training on structure & installation of ZTE BTS ZXSDR, held by ZTE. 04 days training on installation, testing & commissioning of NEC MW radio system, held by ZTE, UET LAHORE, Pakistan. 2 day training on HSSE, supervisory management, human resource, Human Safety. 01 Day 3G, BTS3900 WCDMA , QA Training, Network Safety Training, held by HUAWEI Technologies at Karachi .

Personal Data:
Father Name: D.O.B NIC No. Religion : : : Riaz Ahmad. 18 Nov 1982 42101-3643836-1 ISLAM
th

Vous aimerez peut-être aussi