Vous êtes sur la page 1sur 26

CALCULO DE INTERESES POR MORA EN PAGO DE VALORIZACIONES

OBRA
LPN
CONTRATISTA

:
:
:

MEJORAMIENTO DE INFRAESTRUCTURA DE LA I.E. "MARIA PARADO DE BELLIDO"


EXONERACION DE PROCESO N0021 -2009 ED/UE 108
COSAPI SA

INTERES=((TILE FINAL/TILE INICIAL)-1)*MONTO

VAL N

1
2
3
4
5
6
7

MES

MONTO
S/.

FECHA RECEPCION
FACTURA

DOCUMENTO DE
INGRESO

FECHA LEGAL
DE PAGO

FECHA REAL
DE PAGO

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10

122,431.23
302,503.19
553,637.58
678,273.12
793,468.39
631,428.22
414,780.34

13/10/09
09/11/09
09/12/09
23/12/09
10/02/10
04/03/10
08/04/10

28883-MINEDU-040-09
28883-MINEDU-045-09
28883-MINEDU-049-09
28883-MINEDU-051-09
28883-MINEDU-005-10
Entrega directa
28883-MINEDU-020-10

10/31/2009
11/30/2009
12/31/2009
1/31/2010
2/28/2010
3/31/2010
4/30/2010

10/28/2009
11/23/2009
12/21/2009
1/4/2010
2/11/2010
3/17/2010
4/22/2010

TILE FINAL

TILE INICIAL

INTERES
S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL

S/. 0.00

DOCUMENTO MUY URGENTE


PLAZOS DE LIQUIDACION
Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"

EXONERACION DEL PROCESO N 007-2009-ED/U.E.108

FECHA DE RECEPCION DE OBRA

2-Jun-10

PLAZO PARA PRESENTAR LA LIQUIDACION

60 d.n.

PRESENTE LA LIQUIDACION

1-Aug-10

FECHA DE PRESENTACION DE LA LIQUIDACION

26-Jul-10

26-Jul-10

60 d.n.

LIQUIDACION

24-Sep-10

FECHA LIMITE PARA PARA NOTIFICACION

24-Sep-10

FECHA MAXIMA PARA QUE EL CONTRATISTA

FECHA DE INGRESO A LA UNIDAD DE


LIQUIDACIONES
PLAZO PARA NOTIFICAR RESOLUCION DE
APROBACION DE LIQUIDACION
FECHA DE EMISION DEL INFORME DE LA

INFORME N 168-2010-ME/VMGI-OINFE-OBRAS-OMH
A

: ARQ. JORGE LUIS VERGEL POLO


Obras (e) - OINFE

ASUNTO

: LIQUIDACIN FINAL DEL CONTRATO DE ELABORACION DE EXP. TECNICO Y EJECUCION DE OBRA


Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"
EXON N 007-2009-ED/U.E.108
COSAPI S.A.

REF

: EXP 063052 / Carta N 28883-MINEDU-033-10 de COSAPI ( 26-Jul-2010)

FECHA
: Lima, 27 - AGO-2010

Me dirijo a usted, para informarle que el suscrito ha elaborado la Liquidacin Final del Contrato suscrito,
para la Elaboracin del Expediente Tcnico y Ejecucin de la obra citada en el asunto, cuyos clculos han
sido elaborados en concordancia con los dispositivos legales vigentes.
ANTECEDENTES
Del Expediente
- N
-Monto
De la Convocatoria :
-Modalidad
Del Contrato :
-N
-Fecha
-Monto

: Resolucion Jefatural N 1422-2009-ED


: S/. 10,390,326.49 C/I.G.V.
: CONCURSO OFERTA
: 042-2009 - ME /SG-OGA-UA-APP
: 18-Feb-09
: S/. 10,598,133.02 C/I.G.V.

De la Obra :
Centro Educativo
Ubicacin
Plazo de Ejecucin
Adelantos

Fecha de inicio
Fecha de trmino
Fecha Const. Fsica
Fecha de Recepcin
Adicionales

:
:
:
:

Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"


Lima - Lima - Rimac
Contractual:
240 d.n.
Real :
Directo
S/. 1,746,273.36
S/I.G.V.
S/. 2,078,065.30 C/I.G.V.
Materiales
: S/. 3,483,067.93
S/I.G.V.
S/. 4,144,850.84 C/I.G.V.

:
:
:
:
:
:
Deductivos
:
Deductivo 01 :
Recupero
Ampliacin de Plazo
:
Amp de Plazo 01
Coordinador
:
Supervision
:

Contractual
Contractual
21-Apr-10
02-Jun-10

25-Aug-09
21-Apr-10

S/. 0.00

S/IGV

S/. -93,289.49
S/. -569,956.00

S/IGV

Real
Real

S/. -111,014.49
S/. -678,247.64

0 d.n.
Ing. Ing. Adolfo Alvarez Osco
Schmidt Chavez - Tafur Ingenieros S.R.L.
O. Miranda H.

25-Aug-09
21-Mar-10

C/IGV

MINISTERIO DE EDUCACION

PRONIED
OINFE

Obras
EXON N

: N007 -2009 ED/UE 108

Obra

: Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"

Contratista

: COSAPI S.A.

Ubicacin

:
Distrito :
Provincia :
Departamento:

Rimac
Lima
Lima

LIQUIDACIN FINAL DEL CONTRATO DE OBRA


Contiene:
01
02
03
04
05
06
07
08
09
10

Ficha Tcnica de Obra


Clculo de Reintegro Autorizado
Clculo de los Coeficientes "K" de Reajuste
Calendario Valorizado de Avance de Obra
Clculo de Reintegro que no corresponde por Adelanto en Efectivo
Clculo de Reintegro que no corresponde por Adelanto para Materiales
Anexo N 01 de Liquidacin
Cuadro del Monto Vigente de Inversin
Clculo de Multas
Valorizaciones Pagadas (Conformidad de Contabilidad)

FICHA TECNICA DE LA OBRA


1
2

Local
Ubicacin : Departamento
Provincia
Distrito
Area Geogrfica segn I.N.E.I.
Obra

:
:
:
:
:
:

Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"


Lima
Lima
Rimac
2
CONSTRUCCION:
INICIAL
- Mdulo de Inicial (2AU+SSHH) (02 mdulos)
- Mdulo Administrativo de Inicial
PRIMARIA
- Mdulo Administrativo (Sub-direccin, sshh, cocina/ biblioteca- depsito)
- 04 aulas en segundo piso del Pabelln 8
- Escalera de 2 tramos
- 01 aula de Computo en un primer piso
SECUNDARIA
- Escalera de 02 tramos (5 unidades en pabellones existentes)
- Auditorio para 400 personas (incluye sshh, vestuarios, estrado, gradas, panel de proyeccin)
OTROS
- Vivienda del guardin
REFORZAMIENTO Y REHABILITACION:
-Pabelln 1 administrativo, dos niveles con 01 escalera: 1er piso: Administracin, 2do piso: Laboratorio de fsica, Lab. De Qumica,
escalera.
-Pabelln 2A administrativo, dos niveles con 01 escalera: 1er piso: Administracin, 2do piso: Audiovisuales, escalera, biblioteca,
Laboratorio de Biologa, sshh, Aulas de Innovacin tecnolgica.
-Pabelln 3A dos niveles con 01 escalera: 1er piso: 05 aulas +sshh, escaleras, 2do piso: 05 aulas + sshh, escalera
-Pabelln 3B, dos niveles con 01 escalera: 1er piso: Escaleras, Taller de industria del vestido, Taller de Industria alimentaria, 2do
piso: Centro cmputo CEBA, Aula banda de msicos.
-Pabelln 4 dos niveles con 01 escalera: 1er piso: 05 aulas +sshh, escaleras, 2do piso: 05 aulas + sshh, escalera
-Pabelln 5A dos niveles con 01 escalera: 1er piso: 05 aulas +sshh, escaleras, 2do piso: 05 aulas + sshh, escalera
-Pabelln 6A dos niveles con 01 escalera: 1er piso: 05 aulas +sshh, escaleras, 2do piso: 05 aulas + sshh, pasadizos.
-Pabelln 7A dos niveles con 01 escalera: 1er piso: 05 aulas +sshh, escaleras, 2do piso: 03 aulas + sshh, Aulas de usos mltiples
-Pabelln 7B dos niveles con 01 escalera: 1er piso: 02 aulas +sub-direccin de primaria, 2do piso: 02 aulas + depsito
-Pabelln 8A de 01 nivel: 1er piso: 04 aulas
-Pabelln 5B y 6B un nivel: 1er piso: Depsito de alimentos, cocina, comedor
-Pabelln 9 en dos niveles: Consta de 06 aulas + escaleras
-Pabelln 10: Consta de servicios higinicos de primaria
-Tramo de prgola de concreto existente
OBRAS EXTERIORES:

- Ingreso principal especifco con Prticos


- Ingreso de secundaria especifico con prticos
- Ingreso de Inicial especfico con prticos
- Ingreso a estacionamiento de 3.00m con columnas de concreto y puerta de reja
- Cerco transparente tipo UNI con sobrecimiento armado
- Cerco existente: Reforzamiento con columnas, viga superior y rehabilitacin
- Kit de juegos infantiles (1 columpio, 1 tobogn, 1 sube y baja, 1 pasamanos; incluye posa de arena con sardinel de borde)
- Cerco tipo malla inc. Puertas, parte interna de la educacin Inicial
- Patio y veredas con juntas cada 3 m. (incluye patio de educ. Inicial), veredas perimetrales, veredas exteriores.
- Piso de proscenio primaria, de concreto con sardineles de borde
- Gradera de 3 niveles frente a la losa deportiva
- 04 losas deportivas multiusos demarcadas y equipadas primaria y secundaria.
- 01 area de estacionamiento.
- rampas, jardineras, banca, 01 puente de circulacion peatonal.
- escalera de acceso a 2 piso de talleres.
- Caseta de control Ingreso con cocineta y sshh, de concreto armado en el ingreso principal
- Cisterna y tanque elevado secundaria Rehabilitacin
- Cisterna y tanque elevado primaria - Rehabilitacin
- Redes exteriores Sanitarias, con salida para riego de jardines
- Redes exteriores elctricas
- Movimiento de Tierras
DEMOLICION Y ELIMINACION:
Demolicin de Pabelln 2B vivienda del guardin, sshh, Pabelln 11, 12, y 13, construccin de ladrillo con techo liviano, tramo de
prgola de concreto existente, depsito de alimentos, modulo de duchas (depsito).
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

Contratista
Financiamiento
Exoneracin del Proceso N
Modalidad
N de Contrato, y Fecha.
Monto del Contrato, con IGV
Monto del Contrato, sin IGV
Costo de Elaboracin del Expediente Tcnico
Costo de Expediente Tcnico, sin IGV
Costo de Ejecucin de Obra, con IGV
Costo de Ejecucin de Obra, sin IGV
Costo de Obra segn Expediente, con IGV
Costo de Obra segn Expediente, sin IGV
Plazo de Elaboracin del Expediente Tcnico
Plazo de Ejecucin de Obra
Ampliacin de Plazo N 01
Presupuesto Adicional
Presupuesto por Aceleramiento
Presupuesto Deductivo 1
Presupuesto por Recuperar
Mayores Gastos Generales
Intereses
Monto de la Inversin, con IGV
Monto de la Inversin, sin IGV
Solicitud del Adelanto Directo
Adelanto Directo, Monto y fecha de pago, S/IGV
Adelanto para Materiales, Monto y Fecha, S/IGV
Entrega de Terreno
Inicio Oficial del Plazo para el Expediente
Trmino del Plazo para el Expediente
Trmino Real del Expediente
Aprobacin del Expediente Tcnico
Inicio Oficial del Plazo para la Obra
Inicio Real de la Obra
Trmino original programado de obra
Trmino vigente programado de obra
Trmino real de obra, segn Supervisor
Acta de Observaciones
Fecha de culminacin de subsanacin
Acta de Recepcin de Obra
Multa por atraso en la entrega del expediente
Multa por atraso en la entrega de la obra

:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:

COSAPI S.A.
RECURSOS ORDINARIOS
N007 -2009 ED/UE 108
CONCURSO OFERTA
042-2009 - ME /SG-OGA-UA-APP
18-Feb-09
S/. 10,598,133.02
S/. 8,905,994.13
S/. 207,806.53
S/. 174,627.34
S/. 10,390,326.49
S/. 8,731,366.80
S/. 10,390,326.49
Resolucion Jefatural N 1422-2009-ED
S/. 8,731,366.80
75
240
0 d.c.
S/. 0.00
S/. 569,956.00
S/IGV
(S/. 93,289.49)
S/IGV
Resolucion Jefatural N 1628-2010-ED
(S/. 569,956.00)
S/IGV
Memorandum N 291-2010-ME/SG
S/. 0.00
S/. 0.00
S/. 10,560,061.08
S/. 8,874,000.91
14-Aug-09
S/. 1,746,273.36
21-Aug-09
S/. 3,483,067.93
2-Sep-09
25-Feb-09
Acta de entrega de terreno
25-Feb-09
Con la suscripcion del Contrato
11-May-09
10-Aug-09
13-Aug-09
RJ N 1422-2009-ED
25-Aug-09
OFICIO N 3175-2009-ME/VMGI-OINFE
25-Aug-09
Asiento N 01 del C.O.
21-Apr-10
21-Apr-10
21-Apr-10
21-Mar-10
Asiento N 219/228 del C.O.
21-Apr-10
16-May-10
2-Jun-10
S/. 20,780.65
S/. 0.00

CLCULO DEL REINTEGRO AUTORIZADO


(Con los K del mes posterior a la valorizacin)

Contrato Principal
OBRA
Ubicacin
Contratista

:
:
:

Val.
No.

Fecha

Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"


RIMAC - LIMA - LIMA
COSAPI S.A.

Estructuras
1
2
3
4
5
6
7
8
9

Aug-09
Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

Valorizacin
Programada
C

Valorizacin
Real

K-1

Reajuste
Program.

Reajuste
Real

F=C*E

G=D*E

4,145,325.59

4,145,325.59

43,045.09
150,208.30
605,218.18
715,599.76
544,795.63
795,981.38
688,665.89
444,874.67
156,936.69

0.00
280,915.51
546,899.20
831,065.10
931,019.03
998,420.75
460,933.75
96,072.25
0.00

3,423,303.24

3,423,303.24

0.006
0.003
0.004
0.003
0.004
0.009
0.008
0.014
0.023

Subtotal Estructuras

Arquitectura

EXON: N007 -2009 ED/UE 108

258.27
450.62
2,420.87
2,146.80
2,179.18
7,163.83
5,509.33
6,228.25
3,609.54

0.00
842.75
2,187.60
2,493.20
3,724.08
8,985.79
3,687.47
1,345.01
0.00

29,708.43

23,265.90
0.00

Aug-09

0.00

0.00

0.013

0.00

Sep-09

0.00

0.00

0.010

0.00

0.00

Oct-09

275,232.62

171,728.84

0.012

3,302.79

2,060.75

Nov-09

877,730.82

419,567.57

0.013

11,410.50

5,454.38

Dec-09

548,887.16

441,985.73

0.014

7,684.42

6,187.80

Jan-10

216,492.01

503,245.28

0.015

3,247.38

7,548.68

Feb-10

673,341.20

868,716.00

0.016

10,773.46

13,899.46

Mar-10

691,245.36

865,257.74

0.017

11,751.17

14,709.38

Apr-10

140,374.07

152,802.08

0.021

2,947.86

3,208.84

48,169.72

49,860.45
0.00

Subtotal Arquitectura

Inst. Sanitarias

345,914.12

345,914.12

Aug-09

0.00

0.00

0.016

0.00

Sep-09

0.00

0.00

0.013

0.00

0.00

Oct-09

12,133.09

23,168.24

0.014

169.86

324.36

Nov-09

93,798.50

66,514.41

0.016

1,500.78

1,064.23

Dec-09

55,491.52

89,316.72

0.017

943.36

1,518.38

Jan-10

3,111.62

166,914.75

0.017

52.90

2,837.55

Feb-10

69,158.77

0.00

0.015

1,037.38

0.00

Mar-10

76,413.95

0.00

0.017

1,299.04

0.00

Mar-10

35,806.67

0.00

0.020

716.13

0.00

5,719.44

5,744.52

0.00

Subtotal Inst. Sanitarias

Inst. Elctricas

816,823.85

816,823.85

Aug-09

0.00

0.00

0.014

0.00

Sep-09

0.00

0.00

0.017

0.00

0.00

Oct-09

29,570.81

12,281.44

0.022

650.56

270.19

Nov-09

207,341.22

88,610.80

0.029

6,012.90

2,569.71

Dec-09

155,617.14

99,303.00

0.036

5,602.22

3,574.91

Jan-10

28,055.22

69,008.13

0.038

1,066.10

2,622.31

Feb-10

149,477.11

92,053.39

0.040

5,979.08

3,682.14

Mar-10

183,600.90

85,572.40

0.058

10,648.85

4,963.20

Mar-10

63,161.45

369,994.69

0.067

4,231.82

24,789.64

34,191.52

42,472.10

Subtotal Inst. Elctricas

8,731,366.80
Total de Reintegro del Contrato Principal
TOTAL

Reintegro
Autorizado
Bruto
H

Deducciones por Adelantos


En Efectivo Para Materi.
I

Reintegro
Autorizado
Neto
L =H-I-J

23,265.90

931.55

3,661.29

18,673.06

48,169.72

1,725.19

8,203.95

38,240.59

5,719.44

50.44

488.22

5,180.79

34,191.52

6,121.61

28,868.08

-798.17

8,731,366.80
61,296.26

MINISTERIO DE EDUCACION
Viceministerio de Gestin Institucional

COEFICIENTE DE REAJUSTE

L.P.N
O B R A
CONTRATISTA
SUPERVISOR
FECHA
FORMULA 01

EXONERACION DE PROCESO N007 -2009 ED/UE 108


MEJORAMIENTO DE INFRAESTRUCTURA DE LA I.E. "MARIA PARADO DE BELLIDO"
COSAPI S.A.
SCHMIDT & CHAVEZ TAFUR INGENIEROS SRL.
31 DE MARZO 2,010

:
:
:
:
:
:

ESTRUCTURAS

K= 0.333*(Jr / Jo) + 0.123*(MQr / MQo) + 0.091*(Cr / Co) + 0.060*(MTr / MTo) + 0.088*(ACr / ACo) + 0.062*(AGr / AGo) + 0.079*(Vr / Vo) + 0.167*(GGUr / GGUo)
AREA GEOGRAFICA 2
12
COEF.
%
Io
SIMBOLO
ELEMENTO REPRESENTATIVO
CODIGO
I. BASE
AGOSTO 09
SEPTIEMBRE 09
INCID.
INCID.
Mayo '09
Ir
K
Ir
K

13

OCTUBRE 09

14

NOVIEMBRE 09

15

DICIEMBRE 09

16

ENERO 10

17

FEBRERO 10

18

19

MARZO 10

20

ABRIL 10

MAYO 10

Ir

Ir

Ir

Ir

Ir

Ir

Ir

Ir

MANO DE OBRA (INC. LEYES SOC.)

47

0.330

100%

397.23

413.41

0.343

413.41

0.343

413.41

0.343

413.41

0.343

413.41

0.343

415.58

0.345

415.58

0.345

415.58

0.345

415.58

0.345

415.58

0.345

MQ

MAQUINARIA Y EQUIPO NACIONAL

48

0.123

100%

338.98

334.78

0.120

331.98

0.120

330.43

0.120

330.19

0.120

329.98

0.120

329.61

0.120

334.95

0.122

334.22

0.121

334.24

0.121

334.68

0.121

CEMENTO PORTLAND TIPO I

21

0.091

100%

323.41

323.41

0.091

323.41

0.091

323.41

0.091

323.41

0.091

323.41

0.091

327.42

0.092

329.31

0.093

329.31

0.093

329.31

0.093

329.31

0.093

MT

MADERA TERCIADA PARA ENCOFRADO

45

0.060

100%

327.07

316.59

0.058

316.97

0.058

317.71

0.058

314.88

0.058

314.7

0.058

314.69

0.058

314.34

0.058

314.71

0.058

315.99

0.058

317.54

0.058

AC

ACERO DE CONSTRUCCION CORRUGADO

0.088

100%

453.81

455.85

0.089

457.29

0.089

451.47

0.088

452.34

0.088

443.96

0.086

439.58

0.085

439.27

0.085

446.16

0.087

476.18

0.092

513.35

0.1

AG

AGREGADO GRUESO

0.062

100%

212.99

210.23

0.061

208.71

0.061

207.07

0.06

207.94

0.061

207.94

0.061

207.94

0.061

207.94

0.061

206.82

0.06

206.82

0.06

206.82

0.06

BLOQUE Y LADRILLO

17
30

0.079

0.37%
99.63%
100.00%

672.61
371.94
373.06

665.27
370.23
366.99

0.078

659.4
365.9
366.99

0.078

648.56
361.48
362.55

0.077

643.8
363.47
364.52

0.077

640.05
362.71
363.74

0.077

641.92
359.43
360.48

0.076

649.68
360.41
361.49

0.077

649
358.6
359.68

0.076

649.89
360.2
361.28

0.077

654.32
361.46
362.55

0.077

100%

347.88

346.62

0.166

346.32

0.166

346.74

0.166

346.35

0.166

347.45

0.167

348.48

0.167

349.61

0.168

350.59

0.168

350.68

0.168

351.51

0.169

DLAR (GENERAL PONDERADO)

GU

IND. GRAL. PRECIOS AL CONSUMIDOR

COEFICIENTE DE REAJUSTE:

K=

39

0.167

1.000

1.006

1.006

1.003

1.004

1.003

1.004

1.009

1.008

1.014

1.023

MINISTERIO DE EDUCACION
Viceministerio de Gestin Institucional

COEFICIENTE DE REAJUSTE

L.P.N

EXONERACION DE PROCESO N007 -2009 ED/UE 108


MEJORAMIENTO DE INFRAESTRUCTURA DE LA I.E. "MARIA PARADO DE BELLIDO"
COSAPI S.A.
SCHMIDT & CHAVEZ TAFUR INGENIEROS SRL.
31 DE MARZO 2,010

:
:
:
:
:
:

O B R A
CONTRATISTA
SUPERVISOR
FECHA
FORMULA 02

ARQUITECTURA

K = 0.321*(Jr / Jo) + 0.166*(Lr / Lo) + 0.163*(PBr / PBo) + 0.079*(MPr / MPo) + 0.104*(Vr / Vo) + 0.167*(GGUr / GGUo)
AREA GEOGRAFICA 2
12
SIMBOLO

ELEMENTO REPRESENTATIVO

12

13

14

15

16

17

18

19

20

COEF.

INCID.

INCID.

Io
I. BASE
Mayo '09

Ir

Ir

Ir

Ir

Ir

Ir

Ir

Ir

Ir

Ir

CODIGO

AGOSTO 09

SEPTIEMBRE 09

OCTUBRE 09

NOVIEMBRE 09

DICIEMBRE 09

ENERO 10

FEBRERO 10

MARZO 10

ABRIL 10

MAYO 10

MANO DE OBRA (INC. LEYES SOC.)

47

0.321

100%

397.23

413.41

0.334

413.41

0.334

413.41

0.334

413.41

0.334

413.41

0.334

415.58

0.336

415.58

0.336

415.58

0.336

415.58

0.336

415.58

0.336

LOSETA

40
30

0.166

55.40%
44.60%
100.00%

310.12
371.94
337.69

310.12
370.23
335

0.165

310.12
365.9
335

0.165

310.32
361.48
333.14

0.164

313.38
363.47
335.72

0.165

313.38
362.71
335.38

0.165

310.09
359.43
332.1

0.163

306.32
360.41
330.44

0.162

306.32
358.6
329.64

0.162

306.32
360.2
330.35

0.162

306.32
361.46
330.91

0.163

0.166

659.4
305.36
358.32

0.166

648.56
303.3
354.95

0.164

643.8
305.9
356.45

0.165

640.05
305.51
355.56

0.165

641.92
307.1
357.19

0.165

649.68
306.98
358.25

0.166

649
312.39
362.75

0.168

649.89
309.33
360.28

0.167

654.32
311.35
362.66

0.168

0.08

DLAR (GENERAL PONDERADO)

PB

17
52

0.163

14.96%
85.04%
100.00%

672.61
295.5
351.92

665.27
301.61
358.32

43
54

0.079

48.05%
51.95%
100.00%

498.87
330.13
411.21

498.11
329.59
411.57

0.079

500.18
329.61
411.57

0.079

499.54
329.47
411.19

0.079

499.13
329.73
411.13

0.079

499.21
329.6
411.1

0.079

501.72
329.41
412.2

0.079

502.65
329.49
412.69

0.079

502.93
329.53
412.85

0.079

506.25
329.39
414.37

0.08

508.6
329.21
415.41

0.104

FLETE TERRESTRE

37
21
32

37.85%
25.26%
36.89%
100.00%

259.12
323.41
425.75
336.83

258.27
323.41
419.22
333.38

0.103

257.17
323.41
418.41
333.38

0.103

256.9
323.41
418.41
333.28

0.103

260.48
323.41
418.41
334.64

0.103

259.32
323.41
418.25
334.14

0.103

260.18
327.42
418.25
335.48

0.104

260.43
329.31
418.25
336.05

0.104

260.48
329.31
414.72
334.77

0.103

270
329.31
414.72
338.37

0.104

275.36
329.31
414.72
340.4

0.105

IND. GRAL. PRECIOS AL CONSUMIDOR

39

0.167

100%

347.88

346.62

0.166

346.32

0.166

346.74

0.166

346.35

0.166

347.45

0.167

348.48

0.167

349.61

0.168

350.59

0.168

350.68

0.168

351.51

0.169

BLOQUE DE LADRILLO
PERFIL DE ALUMINIO

MP

MADERA NACIONAL PARA ENCOFRADO


PINTURA LATEX

HERRAMIENTA MANUAL
CEMENTO PORTLAND TIPO I

GU

COEFICIENTE DE REAJUSTE:

K=

1.000

1.013

1.013

1.010

1.012

1.013

1.014

1.015

1.016

1.017

1.021

MINISTERIO DE EDUCACION
Viceministerio de Gestin Institucional
PRONIED

COEFICIENTE DE REAJUSTE

L.P.N
O B R A
CONTRATISTA
SUPERVISOR
FECHA
FORMULA 03

:
:
:
:
:
:

EXONERACION DE PROCESO N007 -2009 ED/UE 108


MEJORAMIENTO DE INFRAESTRUCTURA DE LA I.E. "MARIA PARADO DE BELLIDO"
COSAPI S.A.
SCHMIDT & CHAVEZ TAFUR INGENIEROS SRL.
31 DE MARZO 2,010
INSTALACIONES ELECTRICAS

K = 0.198*(Jr / Jo) + 0.228*(ALr / ALo) + 0.292*(ARTr / ARTo) + 0.115*(MDTr / MDTo) + 0.167*(GGUr / GGUo)
AREA GEOGRAFICA 2
12
SIMBOLO

AL

ELEMENTO REPRESENTATIVO

MANO DE OBRA (INC. LEYES SOC.)

ALAMBRE Y CABLE TIPO LOSH

12

17

18

19

20

Ir

Ir

Ir

Ir

Ir

Ir

Ir

Ir

Ir

Ir

47

0.198

100%

397.23

413.41

0.206

413.41

0.206

413.41

0.206

413.41

0.206

413.41

0.206

415.58

0.207

415.58

0.207

415.58

0.207

415.58

0.207

415.58

0.207

0.228

100.00%

472.62

492.42

0.245

508.79

0.245

519.51

0.251

528.24

0.255

543.27

0.262

561.09

0.271

561.39

0.271

567.88

0.274

586.3

0.283

587.53

0.283

0.283

273.28

0.283

270.6

0.281

271.54

0.282

270.97

0.281

269.44

0.279

269.3

0.279

268.21

0.278

276.48

0.287

283.59

0.294

0.114

359.96
330.43
339.37
338.77

0.113

359.80
330.19
340.04
338.88

0.113

358.76
329.98
339.61
338.45

0.113

358.57
329.61
333.83
336.11

0.112

358.18
334.95
331.63
337.68

0.113

359.94
334.22
328.49
336.49

0.113

362.49
334.24
332.85
338.54

0.113

362.63
334.68
334.65
339.43

0.114

0.166

346.74

0.166

346.35

0.166

347.45

0.167

348.48

0.167

349.61

0.168

350.59

0.168

350.68

0.168

351.51

0.169

AGOSTO 09

SEPTIEMBRE 09

0.292

100.00%

281.54

276.24

MDT

DUCTO DE CONCRETO

31
48
72

0.115

TUBERIA DE PVC PARA AGUA

17.05%
45.96%
36.99%
100.00%

367.52
338.98
338.58
343.7

364.70
334.78
337.25
340.4

0.114

361.64
331.98
341.07
340.4

IND. GRAL. PRECIOS AL CONSUMIDOR

39

0.167

100%

347.88

346.62

0.166

346.32

K=

16

Io
I. BASE
Mayo '09

12

COEFICIENTE DE REAJUSTE:

15

INCID.

ARTEFACTO DE ALUMBRADO INTERIOR

GU

14

INCID.

ART

MAQUINARIA Y EQUIPO NACIONAL

13

COEF.
CODIGO

1.000

1.014

1.014

OCTUBRE 09

1.017

NOVIEMBRE 09

1.022

DICIEMBRE 09

1.029

ENERO 10

1.036

FEBRERO 10

1.038

MARZO 10

1.040

ABRIL 10

MAYO 10

1.058

1.067

MINISTERIO DE EDUCACION
Viceministerio de Gestin Institucional

COEFICIENTE DE REAJUSTE

L.P.N
O B R A
CONTRATISTA
SUPERVISOR
FECHA
FORMULA 04

:
:
:
:
:
:

EXONERACION DE PROCESO N007 -2009 ED/UE 108


MEJORAMIENTO DE INFRAESTRUCTURA DE LA I.E. "MARIA PARADO DE BELLIDO"
COSAPI S.A.
SCHMIDT & CHAVEZ TAFUR INGENIEROS SRL.
31 DE MARZO 2,010
INSTALACIONES SANITARIAS

K = 0.428*(Jr / Jo) + 0.099*(Er / Eo) + 0.107*(TUBr / TUBo) + 0.081*(VALr / VALo) + 0.118*(Dr / Do) + 0.167*(GGUr / GGUo)
AREA GEOGRAFICA 2
12
SIMBOLO

ELEMENTO REPRESENTATIVO

12

13

14

15

16

17

18

19

20

COEF.

INCID.

INCID.

Io
I. BASE
Mayo '09

Ir

Ir

Ir

Ir

Ir

Ir

Ir

Ir

Ir

Ir

CODIGO

AGOSTO 09

SEPTIEMBRE 09

OCTUBRE 09

NOVIEMBRE 09

DICIEMBRE 09

ENERO 10

FEBRERO 10

MARZO 10

ABRIL 10

MAYO 10

MANO DE OBRA (INC. LEYES SOC.)

47

0.428

100%

397.23

413.41

0.445

413.41

0.445

413.41

0.445

413.41

0.445

413.41

0.445

415.58

0.448

415.58

0.448

415.58

0.448

415.58

0.448

415.58

0.448

MAQUINARIA Y EQUIPO IMPORTADO

49
48

0.099

43.24%
56.76%
100.00%

257.18
338.98
303.61

253.68
334.78
296.6

0.097

250.16
331.98
296.6

0.097

246.98
330.43
294.35

0.096

247.72
330.19
294.53

0.096

247.22
329.98
294.2

0.096

245.6
329.61
293.29

0.096

245.24
334.95
296.16

0.097

243.77
334.22
295.11

0.096

244.23
334.24
295.32

0.096

244.28
334.68
295.59

0.096

MAQUINARIA Y EQUIPO NACIONAL

TUB

TUBERIA DE PVC PARA AGUA

72

0.107

100.00%

338.58

337.25

0.108

341.07

0.108

339.37

0.107

340.04

0.107

339.61

0.107

333.83

0.105

331.63

0.105

328.49

0.104

332.85

0.105

334.65

0.106

VAL

VALVULA BRONCE NACIONAL

77

0.081

100.00%

287.51

283.34

0.079

279.72

0.079

281.89

0.079

281.98

0.079

281.58

0.079

280.98

0.079

274.36

0.077

273.78

0.077

274.33

0.077

274.44

0.077

DLAR (GENERAL PONDERADO)

30

0.118

53.48%
10.20%
36.32%
100.00%

371.94
328.4
583.16
444.2

370.23
342.41
621.00
456.54

0.121

365.9
346.28
621.00
456.54

0.121

361.48
344.69
613.88
451.43

0.12

363.47
339.74
628.59
457.33

0.121

362.71
338.64
632.72
458.31

0.122

359.43
335.09
638.88
458.43

0.122

360.41
334.87
638.88
458.94

0.122

358.6
335.53
638.88
458.03

0.122

360.2
335.69
654.07
464.42

0.123

361.46
341.05
654.07
465.64

0.124

0.167

100%

347.88

346.62

0.166

346.32

0.166

346.74

0.166

346.35

0.166

347.45

0.167

348.48

0.167

349.61

0.168

350.59

0.168

350.68

0.168

351.51

0.169

TUBERIA DE ACERO NEGRO Y/O GALVANIZADO


65

AGREGADO FINO

GU

IND. GRAL. PRECIOS AL CONSUMIDOR

COEFICIENTE DE REAJUSTE:

K=

39

1.000

1.016

1.016

1.013

1.014

1.016

1.017

1.017

1.015

1.017

1.020

CALENDARIO VALORIZADO DE OBRA (ADECUADO A LA FECHA DE INICIO)


OBRA
EXON
CONTRATISTA
PRESUP.CONTRAT.
F.R.

Cd.
01
02
03
04

:
:
:
:
:

Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"


N007 -2009 ED/UE 108
COSAPI S.A.
S/. 8,731,366.80
1.00000

CALENDARIO DE AVANCE DE OBRA FECHADO DEL CONTRATO PRINCIPAL


Descripcin
25/08/09 al 31/08
01/09 al 30/09
06 d.n.
30 d.n.

01/10 al 31/10
31 d.n.

Fecha de Inicio
Plazo de Ejecucin
Fecha Trmino Prog.
Ampliac. de Plazo
Fecha Trmino Vigente

01/11 al 30/11
30 d.n.

:
:
:
:
:

25-Aug-09
240
21-Apr-10
0 d.n.
21-Apr-10

01/12 al 31/1201/01/10 al 31/0101/02 al 28/02 01/03 al 31/03


31 d.n.
31 d.n.
28 d.n.
31 d.n.

01/04 al 22/04
22 d.n.

Presupuesto
Contratado

ESTRUCTURAS
ARQUITECTURA
INST. SANITARIAS
INST. ELECTRICAS

43,045.09
0.00
0.00
0.00

150,208.30
0.00
0.00
0.00

605,218.18
275,232.62
12,133.09
29,570.81

715,599.76
877,730.82
93,798.50
207,341.22

544,795.63
548,887.16
55,491.52
155,617.14

795,981.38
216,492.01
3,111.62
28,055.22

688,665.89
673,341.20
69,158.77
149,477.11

444,874.67
691,245.36
76,413.95
183,600.90

156,936.69
140,374.06
35,806.67
63,161.45

4,145,325.59
3,423,303.24
345,914.12
816,823.85

COSTO DIRECTO CON F.R. Y G.G.U.


I.G.V.
19%
TOTAL
Porcentaje de Avance:
% mensual =
% acumulado =

43,045.09
8,178.57
51,223.66
0.49%
0.49%

150,208.30
28,539.58
178,747.87
1.72%
2.21%

922,154.70
175,209.39
1,097,364.09
10.56%
12.77%

1,894,470.30
359,949.36
2,254,419.66
21.70%
34.47%

1,304,791.45
247,910.38
1,552,701.83
14.94%
49.42%

1,043,640.24
198,291.65
1,241,931.89
11.95%
61.37%

1,580,642.98
300,322.17
1,880,965.14
18.10%
79.47%

1,396,134.88
265,265.63
1,661,400.50
15.99%
95.46%

396,278.87
75,292.99
471,571.86
4.54%
100.00%

8,731,366.80
1,658,959.69
10,390,326.49

REINTEGRO QUE NO CORRESPONDE


POR EL ADELANTO DIRECTO (EN NUEVOS SOLES)
(Con los K del mes siguiente al de la valorizacin)
Obra :
EXON:
Contratista :

Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"


N007 -2009 ED/UE 108
COSAPI S.A.

Adelanto en Efectivo, sin IGV =


Monto del Contrato, sin IGV =

Frmulas Polinmicas
Estructuras
Arquitectura
Instalaciones Sanitarias
Instalaciones Elctricas
Total

No.

Valorizacin
Mes
Monto
V

Estructuras
1
Aug-09
2
Sep-09
3
Oct-09
4
Nov-09
5
Dec-09
6
Jan-10
7
Feb-10
8
Mar-10
9
Apr-10
SUB TOTAL
Arquitectura
1
Aug-09
2
Sep-09
3
Oct-09
4
Nov-09
5
Dec-09
6
Jan-10
7
Feb-10
8
Mar-10
9
Apr-10
SUB TOTAL
Inst. Sanitarias
1
Aug-09
2
Sep-09
3
Oct-09
4
Nov-09
5
Dec-09
6
Jan-10
7
Feb-10
8
Mar-10
9
Apr-10
SUB TOTAL
Inst. Elctricas
1
Aug-09
2
Sep-09
3
Oct-09
4
Nov-09
5
Dec-09
6
Jan-10
7
Feb-10
8
Mar-10
9
Apr-10
SUB TOTAL
TOTAL

1,746,273.36
8,731,366.80

21-Aug-09

Montos sin IGV


Adel. Efectivo
Del Contrato
A
C
829,065.12
4,145,325.59
684,660.65
3,423,303.24
69,182.82
345,914.12
163,364.77
816,823.85
1,746,273.36
8,731,366.80
Coeficientes del mes del
Reajuste
Pago del Adel.
en Efectivo
K
Ka

Ka
Aug-09
1.006
1.013
1.016
1.014

Reintegro
que NO
Corresponde
D = V*A/C (K/Ka - 1)

0.00
280,915.51
546,899.20
831,065.10
931,019.03
998,420.75
460,933.75
96,072.23
0.00
4,145,325.57

1.006
1.003
1.004
1.003
1.004
1.009
1.008
1.014
1.023

1.006
1.006
1.006
1.006
1.006
1.006
1.006
1.006
1.006

0.00
0.00
0.00
0.00
0.00
595.48
183.27
152.80
0.00
931.55

0.00
0.00
171,728.84
419,567.57
441,985.73
503,245.28
868,716.00
865,257.74
152,802.09
3,423,303.25

1.013
1.010
1.012
1.013
1.014
1.015
1.016
1.017
1.021

1.013
1.013
1.013
1.013
1.013
1.013
1.013
1.013
1.013

0.00
0.00
0.00
0.00
87.26
198.71
514.54
683.32
241.35
1,725.19

0.00
0.00
23,168.24
66,514.41
89,316.72
166,914.75
0.00
0.00
0.00
345,914.12

1.016
1.013
1.014
1.016
1.017
1.017
1.015
1.017
1.020

1.016
1.016
1.016
1.016
1.016
1.016
1.016
1.016
1.016

0.00
0.00
0.00
0.00
17.58
32.86
0.00
0.00
0.00
50.44

0.00
0.00
12,281.44
88,610.80
99,303.00
69,008.13
92,053.39
85,572.40
369,994.70
816,823.86
8,731,366.80

1.014
1.017
1.022
1.029
1.036
1.038
1.040
1.058
1.067

1.014
1.014
1.014
1.014
1.014
1.014
1.014
1.014
1.014

0.00
0.00
19.38
262.16
430.90
326.67
472.07
742.64
3,867.79
6,121.61
8,828.79

MINISTERIO DE EDUCACION
Viceministerio de Gestin Institucional

DEDUCCION POR ADELANTO DE MATERIALES


C.P.N
O B R A
CONTRATISTA
SUPERVISOR
FECHA
MONTO CONT. (s/IGV)
ADEL.MAT. (s/IGV):

:
:
:
:
:
:
:

EXONERACION DE PROCESO N0021 -2009 ED/UE 108


MEJORAMIENTO DE INFRAESTRUCTURA DE LA I.E. "MARIA PARADO DE BELLIDO"
COSAPI S.A.
SCHMIDT & CHAVEZ TAFUR INGENIEROS SRL.
31 DE MARZO 2,010
8,731,366.80
3,483,067.93

FORMULA 01

ESTRUCTURAS

VALORIZACION
No.

MES

MONTO
V

ADELANTO PAGADO
FECHA

MONTO
A

D = Coef.*V*(Ir-Ia)/Io

COEFICIENTE
COEF.INCID.
C

INDICES

INCID.
%

MAYO
Io

SET
Ia

453.810
453.810
453.810
453.810
453.810
453.810
453.810

457.290
457.290
457.290
457.290
457.290
457.290
457.290

Ir

ADELANTO

ADELANTO

DEDUCCION

DEFLAC.
AD=A*Io/Ia

UTILIZADO
AU=C*%*V

ACERO DE CONSTRUCCION CORRUGADO (03)


1
2
3
4
5
6
7

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10

280,915.51
546,899.20
831,065.10
931,019.03
998,420.75
460,933.75
96,072.25

3/9/09

363,088.29
363,088.29
363,088.29
363,088.29
363,088.29
363,088.29
363,088.29

0.088
0.088
0.088
0.088
0.088
0.088
0.088

100%
100%
100%
100%
100%
100%
200%

451.470
452.340
443.960
439.580
439.270
446.160
446.160

360,325.170
360,325.170
360,325.170
360,325.170
360,325.170
360,325.170
360,325.170

24,720.56
48,127.13
73,133.73
81,929.67
87,861.03
44,553.05
-

360,325.17
AGREGADO GRUESO (05)
1
2
3
4
5
6
7

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10

280,915.51
546,899.20
831,065.10
931,019.03
998,420.75
460,933.75
96,072.25

3/9/09

251,845.61
251,845.61
251,845.61
251,845.61
251,845.61
251,845.61
251,845.61

0.062
0.062
0.062
0.062
0.062
0.062
0.062

100%
100%
100%
100%
100%
100%
100%

212.990
212.990
212.990
212.990
212.990
212.990
212.990

208.710
208.710
208.710
208.710
208.710
208.710
208.710

207.070
207.940
207.940
207.940
207.940
206.820
206.820

257,010.190
257,010.190
257,010.190
257,010.190
257,010.190
257,010.190
257,010.190

17,416.76
33,907.75
51,526.04
57,723.18
61,902.09
28,577.89
5,956.48

257,010.19
BLOQUE Y LADRILLO (17)
1
2
3
4
5
6
7

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10

280,915.51
546,899.20
831,065.10
931,019.03
998,420.75
460,933.75
96,072.25

3/9/09

1,187.88
1,187.88
1,187.88
1,187.88
1,187.88
1,187.88
1,187.88

0.079
0.079
0.079
0.079
0.079
0.079
0.079

0.37%
0.37%
0.37%
0.37%
0.37%
0.37%
0.37%

672.610
672.610
672.610
672.610
672.610
672.610
672.610

659.400
659.400
659.400
659.400
659.400
659.400
659.400

648.560
643.800
640.050
641.920
649.680
649.000
649.890

1,211.680
1,211.680
1,211.680
1,211.680
1,211.680
1,211.680
1,211.680

82.78
161.15
244.89
274.34
294.20
135.82
18.50

1,211.68
CEMENTO PORTLAND TIPO I (21)
1
2
3
4
5
6
7

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10

280,915.51
546,899.20
831,065.10
931,019.03
998,420.75
460,933.75
96,072.25

3/9/09

376,702.13
376,702.13
376,702.13
376,702.13
376,702.13
376,702.13
376,702.13

0.091
0.091
0.091
0.091
0.091
0.091
0.091

100%
100%
100%
100%
100%
100%
100%

323.410
323.410
323.410
323.410
323.410
323.410
323.410

323.410
323.410
323.410
323.410
323.410
323.410
323.410

323.410
323.410
323.410
327.420
329.310
329.310
329.310

376,702.130
376,702.130
376,702.130
376,702.130
376,702.130
376,702.130
376,702.130

25,563.31
49,767.83
75,626.92
84,722.73
90,856.29
41,944.97
8,220.08

1,050.49
1,657.50
765.21
149.96

376,702.13
DLAR (GENERAL PONDERADO) (30)
1
2
3
4
5
6
7

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10

280,915.51
546,899.20
831,065.10
931,019.03
998,420.75
460,933.75
96,072.25

3/9/09

168,393.02
168,393.02
168,393.02
168,393.02
168,393.02
168,393.02
168,393.02

0.079
99.63%
0.079
99.63%
0.079
99.63%
0.079
99.63%
1.079 199.63%
2.079 299.63%
3.079 399.63%

371.940
371.940
371.940
371.940
371.940
371.940
371.940

365.900
365.900
365.900
365.900
365.900
365.900
365.900

361.480
363.470
362.710
359.430
360.410
358.600
360.200

171,172.720
171,172.720
171,172.720
171,172.720
171,172.720
171,172.720
171,172.720

22,109.55
43,043.88
65,409.25
40,610.04
-

171,172.72
MADERA NACIONAL PARA ENCOFRADO Y CARP (45)
1
2
3
4
5
6
7

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10

280,915.51
546,899.20
831,065.10
931,019.03
998,420.75
460,933.75
96,072.25

3/9/09

199,901.90
199,901.90
199,901.90
199,901.90
199,901.90
199,901.90
199,901.90

0.060
0.060
0.060
0.060
0.060
0.060
0.060

100%
100%
100%
100%
100%
100%
100%

327.070
327.070
327.070
327.070
327.070
327.070
327.070

316.970
316.970
316.970
316.970
316.970
316.970
316.970

317.710
314.880
314.700
314.690
314.340
314.710
315.99

206,271.620
206,271.620
206,271.620
206,271.620
206,271.620
206,271.620
206,271.620

16,854.93
32,813.95
49,863.91
55,861.14
50,877.69
-

38.13
-

206,271.62
TOTAL
1,361,118.83
TOTAL REINTEGRO QUE NO CORRESPONDE EN ESTRUCTURAS

3,661.29

MINISTERIO DE EDUCACION
Viceministerio de Gestin Institucional

DEDUCCION POR ADELANTO DE MATERIALES


C.P.N
O B R A
CONTRATISTA
SUPERVISOR
FECHA
MONTO CONT. (s/IGV)
ADEL.MAT. (s/IGV):

:
:
:
:
:
:
:

EXONERACION DE PROCESO N0021 -2009 ED/UE 108


MEJORAMIENTO DE INFRAESTRUCTURA DE LA I.E. "MARIA PARADO DE BELLIDO"
COSAPI S.A.
SCHMIDT & CHAVEZ TAFUR INGENIEROS SRL.
31 DE MARZO 2,010
8,731,366.80
3,483,067.93

FORMULA 02

ARQUITECTURA

VALORIZACION

ADELANTO PAGADO

MONTO
No.

MES

D = Coef.*V*(Ir-Ia)/Io

FECHA

INDICES

ADELANTO

ADELANTO

MONTO

COEF.INCID.

COEFICIENTE
INCID.

MAYO

SET

DEFLAC.

UTILIZADO

Io

Ia

AD=A*Io/Ia

AU=C*%*V

Ir

DEDUCCION
D

BLOQUE Y LADRILLO (17)


1
2
3
4
5
6
7
8

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

0.00
171,728.84
419,567.57
441,985.73
503,245.28
868,716.00
865,257.74
152,802.08

Sep-09

81,837.09
81,837.09
81,837.09
81,837.09
81,837.09
81,837.09
81,837.09
81,837.09

0.163
0.163
0.163
0.163
0.163
0.163
0.163
0.163

14.96%
14.96%
14.96%
14.96%
14.96%
14.96%
14.96%
14.96%

672.610
672.610
672.610
672.610
672.610
672.610
672.610
672.610

659.400
659.400
659.400
659.400
659.400
659.400
659.400
659.400

648.560
643.800
640.050
641.920
649.680
649.000
649.890
654.320

83,476.560
83,476.560
83,476.560
83,476.560
83,476.560
83,476.560
83,476.560
83,476.560

4,187.57
10,231.07
10,777.73
12,271.54
21,183.47
21,099.14
3,726.04

83,476.56
CEMENTO PORTLAND TIPO I (21)
1
2
3
4
5
6
7
8

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

0.00
171,728.84
419,567.57
441,985.73
503,245.28
868,716.00
865,257.74
152,802.00

Sep-09

89,931.55
89,931.55
89,931.55
89,931.55
89,931.55
89,931.55
89,931.55
89,931.55

0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104

25.26%
25.26%
25.26%
25.26%
25.26%
25.26%
25.26%
25.26%

323.410
323.410
323.410
323.410
323.410
323.410
323.410
323.410

323.410
323.410
323.410
323.410
323.410
323.410
323.410
323.410

323.410
323.410
323.410
327.420
329.310
329.310
329.310
329.310

89,931.550
89,931.550
89,931.550
89,931.550
89,931.550
89,931.550
89,931.550
89,931.550

4,511.39
11,022.21
11,611.14
13,220.45
22,821.52
22,730.67
4,014.17

143.97
241.18
416.34
414.68
73.23

85,917.38
DLAR (GENERAL PONDERADO) (30)
1
2
3
4
5
6
7
8

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

Sep-09
171,728.84
419,567.57
441,985.73
503,245.28
868,716.00
865,257.74
152,802.00

177,229.88
177,229.88
177,229.88
177,229.88
177,229.88
177,229.88
177,229.88
177,229.88

0.166
0.166
0.166
0.166
0.166
0.166
0.166
0.166

44.60%
44.60%
44.60%
44.60%
44.60%
44.60%
44.60%
44.60%

371.940
371.940
371.940
371.940
371.940
371.940
371.940
371.940

365.900
365.900
365.900
365.900
365.900
365.900
365.900
365.900

361.480
363.470
362.710
359.430
360.410
358.600
360.200
361.460

180,155.460
180,155.460
180,155.460
180,155.460
180,155.460
180,155.460
180,155.460
180,155.460

12,714.12
31,063.10
32,722.86
37,258.27
66,397.11
-

180,155.46
LOSETA (40)
1
2
3
4
5
6
7
8

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

Sep-09
171,728.84
419,567.57
441,985.73
503,245.28
868,716.00
865,257.74
152,802.00

312,025.71
312,025.71
312,025.71
312,025.71
312,025.71
312,025.71
312,025.71
312,025.71

0.166
0.166
0.166
0.166
0.166
0.166
0.166
0.166

55.40%
55.40%
55.40%
55.40%
55.40%
55.40%
55.40%
55.40%

310.120
310.120
310.120
310.120
310.120
310.120
310.120
310.120

310.120
310.120
310.120
310.120
310.120
310.120
310.120
310.120

310.320
313.380
313.380
310.090
306.320
306.320
306.320
306.320

312,025.710
312,025.710
312,025.710
312,025.710
312,025.710
312,025.710
312,025.710
312,025.710

15,792.87
38,585.11
40,646.78
46,280.45
79,890.60
90,829.90
-

166.02
405.61
-

312,025.71
FLETE TERRESTRE (32)
1
2
3
4
5
6
7
8

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

Sep-09
171,728.84
419,567.57
441,985.73
503,245.28
868,716.00
865,257.74
152,802.00

125,652.62
125,652.62
125,652.62
125,652.62
125,652.62
125,652.62
125,652.62
125,652.62

0.104
0.104
0.104
0.104
0.104
0.104
0.104
0.104

36.89%
36.89%
36.89%
36.89%
36.89%
36.89%
36.89%
36.89%

425.750
425.750
425.750
425.750
425.750
425.750
425.750
425.750

418.410
418.410
418.410
418.410
418.410
418.410
418.410
418.410

418.410
418.410
418.250
418.250
418.250
414.720
414.720
414.720

127,856.890
127,856.890
127,856.890
127,856.890
127,856.890
127,856.890
127,856.890
127,856.890

6,588.48
16,096.96
16,957.05
19,307.31
33,328.81
33,196.13
2,382.15

127,856.89
MADERA NACIONAL PARA ENCOF. Y CARPINT. (43)
1
2
3
4
5
6
7
8

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

Sep-09
171,728.84
419,567.57
441,985.73
503,245.28
868,716.00
865,257.74
152,802.00

130,288.11
130,288.11
130,288.11
130,288.11
130,288.11
130,288.11
130,288.11
130,288.11

0.079
0.079
0.079
0.079
0.079
0.079
0.079
0.079

48.05%
48.05%
48.05%
48.05%
48.05%
48.05%
48.05%
148.05%

498.870
498.870
498.870
498.870
498.870
498.870
498.870
498.870

500.180
500.180
500.180
500.180
500.180
500.180
500.180
500.180

499.540
499.130
499.210
501.720
502.650
502.930
506.250
508.600

129,946.880
129,946.880
129,946.880
129,946.880
129,946.880
129,946.880
129,946.880
129,946.880

6,518.74
15,926.58
16,777.56
19,102.94
32,976.03
32,844.75
5,800.28
129,946.88

51.79
94.58
181.78
399.64
97.90

PERFIL DE ALUMINIO (52)


1
2
3
4
5
6
7
8

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

Sep-09
171,728.84
419,567.57
441,985.73
503,245.28
868,716.00
865,257.74
152,802.00

485,572.29
485,572.29
485,572.29
485,572.29
485,572.29
485,572.29
485,572.29
485,572.29

0.163
0.163
0.163
0.163
0.163
0.163
0.163
0.163

85.04%
85.04%
85.04%
85.04%
85.04%
85.04%
85.04%
85.04%

295.500
295.500
295.500
295.500
295.500
295.500
295.500
295.500

305.360
305.360
305.360
305.360
305.360
305.360
305.360
305.360

303.300
305.900
305.510
307.100
306.980
312.390
309.330
311.350

469,893.280
469,893.280
469,893.280
469,893.280
469,893.280
469,893.280
469,893.280
469,893.280

23,804.23
58,158.44
61,265.94
69,757.45
120,417.24
136,489.98
-

43.50
29.52
360.75
382.43
2,864.75
1,833.72
-

469,893.28
PINTURA LATEX (54)
1
2
3
4
5
6
7
8

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

Sep-09
171,728.84
419,567.57
441,985.73
503,245.28
868,716.00
865,257.74
152,802.00

140,828.07
140,828.07
140,828.07
140,828.07
140,828.07
140,828.07
140,828.07
140,828.07

0.079
0.079
0.079
0.079
0.079
0.079
0.079
0.079

TOTAL
1,543,365.32
TOTAL REINTEGRO QUE NO CORRESPONDE EN ARQUITECTURA

51.95%
51.95%
51.95%
51.95%
51.95%
51.95%
51.95%
51.95%

330.130
330.130
330.130
330.130
330.130
330.130
330.130
330.130

329.610
329.610
329.610
329.610
329.610
329.610
329.610
329.610

329.470
329.730
329.600
329.410
329.490
329.530
329.390
329.210

141,050.240
141,050.240
141,050.240
141,050.240
141,050.240
141,050.240
141,050.240
141,050.240

7,047.84
17,219.26
18,139.32
20,653.44
35,652.54
35,510.61
6,827.23

2.56
-

141,050.24
8,203.95

MINISTERIO DE EDUCACION
Viceministerio de Gestin Institucional

DEDUCCION POR ADELANTO DE MATERIALES


C.P.N
O B R A
CONTRATISTA
SUPERVISOR
FECHA
MONTO CONT. (s/IGV)
ADEL.MAT. (s/IGV):

:
:
:
:
:
:
:

EXONERACION DE PROCESO N0021 -2009 ED/UE 108


MEJORAMIENTO DE INFRAESTRUCTURA DE LA I.E. "MARIA PARADO DE BELLIDO"
COSAPI S.A.
SCHMIDT & CHAVEZ TAFUR INGENIEROS SRL.
31 DE MARZO 2,010
8,731,366.80
3,483,067.93

FORMULA 03

INST.ELECTRICAS

VALORIZACION
No.

MES

MONTO
V

ADELANTO PAGADO
FECHA

MONTO
A

D = Coef.*V*(Ir-Ia)/Io

COEFICIENTE
COEF.INCID.
C

INCID.
%

MAYO
Io

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

472.620
472.620
472.620
472.620
472.620
472.620
472.620
472.620

INDICES

ADELANTO

ADELANTO

DEDUCCION

SET
Ia

DEFLAC.
AD=A*Io/Ia

UTILIZADO
AU=C*%*V

Ir

ALAMBRE Y CABLE TIPO TW Y THW (07)


1
2
3
4
5
6
7
8

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

12,281.44
88,610.80
99,303.00
69,008.13
92,053.39
85,572.40
369,994.69

Sep-09

186,373.23
186,373.23
186,373.23
186,373.23
186,373.23
186,373.23
186,373.23
186,373.23

0.228
0.228
0.228
0.228
0.228
0.228
0.228
0.228

508.790
508.790
508.790
508.790
508.790
508.790
508.790
508.790

519.510
528.240
543.270
561.090
561.390
567.880
586.300
587.530

196,373.230
196,373.230
196,373.230
196,373.230
196,373.230
196,373.230
196,373.230
196,373.230

2,800.17
20,203.26
22,641.08
15,733.85
20,988.17
19,510.51
94,496.19

115.24
1,473.93
2,505.46
1,751.09
2,624.08
3,199.74
15,743.37

196,373.23
ARTEFACTO DE ALUMBRADO INTERIOR (12)
1
2
3
4
5
6
7
8

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

12,281.44
88,610.80
99,303.00
69,008.13
92,053.39
85,572.40
369,994.69

Sep-09

234,397.05
234,397.05
234,397.05
234,397.05
234,397.05
234,397.05
234,397.05
234,397.05

0.292
0.292
0.292
0.292
0.292
0.292
0.292
0.292

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

281.540
281.540
281.540
281.540
281.540
281.540
281.540

273.280
273.280
273.280
273.280
273.280
273.280
273.280

270.600
271.540
270.970
269.440
269.300
268.210
276.480

231,514.930
231,514.930
231,514.930
231,514.930
231,514.930
231,514.930
231,514.930

3,586.18
25,874.35
28,996.48
20,150.37
26,879.59
126,027.96

1,432.44

231,514.93
DUCTO DE CONCRETO (31)
1
2
3
4
5
6
7
8

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

12,281.44
88,610.80
99,303.00
69,008.13
92,053.39
85,572.40
369,994.69

Sep-09

15,928.17
15,928.17
15,928.17
15,928.17
15,928.17
15,928.17
15,928.17
15,928.17

0.115
0.115
0.115
0.115
0.115
0.115
0.115
0.115

17.05%
17.05%
17.05%
17.05%
17.05%
17.05%
17.05%
17.05%

367.520
367.520
367.520
367.520
367.520
367.520
367.520
367.520

361.640
361.640
361.640
361.640
361.640
361.640
361.640
361.640

359.960
359.800
358.760
358.570
358.180
359.940
362.490
362.630

15,759.630
15,759.630
15,759.630
15,759.630
15,759.630
15,759.630
15,759.630
15,759.630

240.81
1,737.44
1,947.08
1,353.08
1,804.94
1,677.86
6,998.42

3.88
18.85

15,759.63
TUBERIA PVC AGUA (72)
1
2
3
4
5
6
7
8

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10

12,281.44
88,610.80
99,303.00
69,008.13
92,053.39
85,572.40
369,994.69

Sep-09

34,411.53
34,411.53
34,411.53
34,411.53
34,411.53
34,411.53
34,411.53
34,411.53

0.115
0.115
0.115
0.115
0.115
0.115
0.115
1.115

36.99%
36.99%
36.99%
36.99%
36.99%
36.99%
36.99%
36.99%

338.580
338.580
338.580
338.580
338.580
338.580
338.580
338.580

341.070
341.070
341.070
341.070
341.070
341.070
341.070
341.070

339.370
340.040
339.610
333.830
331.630
328.490
332.850
334.650

34,411.530
34,411.530
34,411.530
34,411.530
34,411.530
34,411.530
34,411.530
34,411.530

522.43
3,769.37
4,224.20
2,935.50
3,915.81
3,640.12
15,404.10

34,411.53
TOTAL
471,109.98
TOTAL REINTEGRO QUE NO CORRESPONDE EN ELECTRICAS

28,868.08

MINISTERIO DE EDUCACION
Viceministerio de Gestin Institucional

DEDUCCION POR ADELANTO DE MATERIALES

ADEL.MAT. (s/IGV):

:
:
:
:
:
:
:

EXONERACION DE PROCESO N0021 -2009 ED/UE 108


MEJORAMIENTO DE INFRAESTRUCTURA DE LA I.E. "MARIA PARADO DE BELLIDO"
COSAPI S.A.
SCHMIDT & CHAVEZ TAFUR INGENIEROS SRL.
31 DE MARZO 2,010
8,731,366.80
3,483,067.93

FORMULA 04

INST. SANITARIAS

C.P.N
O B R A
CONTRATISTA
SUPERVISOR
FECHA
MONTO CONT. (s/IGV)

VALORIZACION

ADELANTO PAGADO

INDICES

ADELANTO

ADELANTO

MONTO

COEF.INCID.

INCID.

MAYO

SET

DEFLAC.

UTILIZADO

FECHA

Io

Ia

AD=A*Io/Ia

AU=C*%*V

Sep-09

14,633.79
14,633.79
14,633.79
14,633.79
14,633.79
14,633.79
14,633.79

MONTO
No.

MES

D = Coef.*V*(Ir-Ia)/Io

COEFICIENTE

Ir

DEDUCCION

AGREGADO FINO (04)


1
2
3
4
5
6
7

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10

23,168.24
66,514.41
89,316.72
166,914.75
-

0.118
0.118
0.118
0.118
0.118
0.118
0.118

36.32%
36.32%
36.32%
36.32%
36.32%
36.32%
36.32%

583.160
583.160
583.160
583.160
583.160
583.160
583.160

621.000
621.000
621.000
621.000
621.000
621.000
621.000

613.880
628.590
632.720
638.880
638.880
638.880
654.070

13,742.090
13,742.090
13,742.090
13,742.090
13,742.090
13,742.090
13,742.090

992.94
2,850.65
3,827.90
7,153.57
-

13,742.09

13,742.09

19,978.510
19,978.510
19,978.510
19,978.510
19,978.510
19,978.510
19,978.510

1,462.06
4,197.48
5,636.46
10,533.39
-

16,928.99

16,928.99

3,866.280
3,866.280
3,866.280
3,866.280
3,866.280
3,866.280
3,866.280

278.83
800.49
1,074.91
2,008.79
-

3,866.28

3,866.28

34,800.710
34,800.710
34,800.710
34,800.710
34,800.710
34,800.710
34,800.710

2,479.00
7,117.04
9,556.89
17,859.88
-

34,800.71

34,800.71

27,549.620
27,549.620
27,549.620
27,549.620
27,549.620
27,549.620
27,549.620

1,876.63
5,387.67
7,234.65
13,520.09
-

27,546.41

27,546.41

12.92
57.29
117.37
219.33
-

DOLAR (GENERAL PONDERADO) 30


1
2
3
4
5
6
7

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10

23,168.24
66,514.41
89,316.72
166,914.75
-

Sep-09

19,654.08
19,654.08
19,654.08
19,654.08
19,654.08
19,654.08
19,654.08

0.118
0.118
0.118
0.118
0.118
0.118
0.118

53.48%
53.48%
53.48%
53.48%
53.48%
53.48%
53.48%

371.940
371.940
371.940
371.940
371.940
371.940
371.940

365.900
365.900
365.900
365.900
365.900
365.900
365.900

361.480
363.470
362.710
359.430
360.410
358.600
360.200

TUBERIA DE ACERO NEGRO Y/O GALVANIZADO (65)


1
2
3
4
5
6
7

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10

23,168.24
66,514.41
89,316.72
166,914.75
-

Sep-09

4,076.78
4,076.78
4,076.78
4,076.78
4,076.78
4,076.78
4,076.78

0.118
0.118
0.118
0.118
0.118
0.118
0.118

10.20%
10.20%
10.20%
10.20%
10.20%
10.20%
10.20%

328.400
328.400
328.400
328.400
328.400
328.400
328.400

346.280
346.280
346.280
346.280
346.280
346.280
346.280

344.690
339.740
338.640
335.090
334.870
335.530
335.690

TUBERIA PVC AGUA (72)


1
2
3
4
5
6
7

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10

23,168.24
66,514.41
89,316.72
166,914.75
-

Sep-09

35,056.64
35,056.64
35,056.64
35,056.64
35,056.64
35,056.64
35,056.64

0.107
0.107
0.107
0.107
0.107
0.107
0.107

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

338.580
338.580
338.580
338.580
338.580
338.580
338.580

341.070
341.070
341.070
341.070
341.070
341.070
341.070

339.370
340.040
339.610
333.830
331.630
328.490
332.850

VALVULA DE BRONCE NACIONAL (77)


1
2
3
4
5
6
7

Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10

23,168.24
66,514.41
89,316.72
166,914.75
-

Sep-09

26,803.17
26,803.17
26,803.17
26,803.17
26,803.17
26,803.17
26,803.17

0.081
0.081
0.081
0.081
0.081
0.081
0.081

TOTAL
100,224.46
TOTAL REINTEGRO QUE NO CORRESPONDE EN SANITARIAS

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

287.510
287.510
287.510
287.510
287.510
287.510
287.510

279.720
279.720
279.720
279.720
279.720
279.720
279.720

281.890
281.980
281.580
280.980
274.360
273.780
274.330

14.75
34.85
31.71
-

488.22

ANEXO N 01
RESUMEN DE SALDOS DE LA LIQUIDACION DEL CONTRATO
Obra:
Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"
Exoneracin del Proceso: N007 -2009 ED/UE 108
Contratista :

COSAPI S.A.
A Cargo del

Item

Concepto
Efectivo

II

III

ELABORACION DEL EXPEDIENTE TECNICO


- En efectivo
- I.G.V.
EJECUCION DE LA OBRA
- En efectivo
- I.G.V.

A favor del
Contratista
Efectivo

IGV

#REF!

0.00

0.00
0.00

S/.

SALDO A FAVOR DEL CONTRATISTA

IGV

0.00
#REF!

0.00

MULTAS
- Elaboracion de Exp. Tecnico
- Ejecucion de Obras
TOTAL

A Favor del

A cargo del
Contratista

0.00
0.00
0.00

0.00
0.00
#REF!

S/.

0.00

- En Efectivo
- En I.G.V.

S/.
S/.

0.00
0.00

SALDO A CARGO

S/.

0.00

0.00

0.00
0.00

0.00
0.00

0.00

0.00

ANEXO N 01
LIQUIDACION FINAL DEL CONTRATO DE OBRA
Obra:
Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"
Exoneracin del Proceso
N007 -2009 ED/UE 108
Contratista :
I.

COSAPI S.A.

AUTORIZADO Y PAGADO
1.1.0
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.1.6
1.1.7

AUTORIZADO
Contrato Principal
Deductivo N 01
Adicional N01
Elab de Exp. Tec.
Aceleramiento
Recupero
Reajuste Autorizado
Contrato Principal

S/. 8,731,366.80 Resolucion Jefatural N 1422-2009-ED


(93,289.49) Resolucion Jefatural N 1628-2010-ED
0.00
174,627.34
569,956.00
(569,956.00) Memorandum N 291-2010-ME/SG
61,296.26
S/. 8,874,000.91
S/. 1,686,060.17
S/. 10,560,061.08

1.1.8 I.G.V. (19%)

1.2.0
1.2.1
1.1.2
1.1.3
1.1.4
1.1.5
1.2.3

PAGADO
Contrato Principal
Deductivo N 01
Adicional N01
Elab de Exp. Tec.
Aceleramiento
Reajustes
Contrato Principal
1.2.4 I.G.V.

S/. 8,622,606.99

S/. 174,627.34
S/. 569,956.00
103,256.37

9,470,446.70
S/. 1,799,384.86
S/. 11,269,831.56

SALDO A CARGO DEL CONTRATISTA


- En efectivo
- I.G.V.
II

III

IV

S/. 596,445.79
S/. 113,324.69

ADELANTOS (sin IGV)


2.1.0 CONCEDIDOS
2.1.1 Efectivo
S/. 1,781,198.83
2.1.2 Materiales
S/. 3,483,067.93
2.2.0 AMORTIZADOS
2.2.1 Efectivo
S/. 1,781,198.83
2.2.2 Materiales
S/. 3,483,067.93
SALDO A CARGO DEL CONTRATISTA

S/. 5,264,266.76

S/. 5,264,266.76
S/. 0.00

COSTO DE LA ELABORACION DE LA LIQUIDACION


3.1.0 AUTORIZADO
3.2.0 DESCONTADO
SALDO A FAVOR DEL CONTRATISTA
MULTA POR ATRASO DE OBRA
4.1.0 Autorizado por Ejec de Obra
4.1.1 Autorizado por Exp Tecnico
4.2.0 Descontada por Ejec de Obra
4.2.1 Descontada por Exp. Tecnico
SALDO A FAVOR DEL CONTRATISTA

S/. 0.00
S/. 0.00
S/. 0.00

S/. 0.00
S/. 20,780.65
S/. 0.00
S/. 20,780.65
S/. 0.00

RESUMEN DE SALDOS
Obra:
LP :

Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"


N007 -2009 ED/UE 108

Contratista :

COSAPI S.A.
A Cargo del

Item

Concepto
Efectivo

AUTORIZADO Y PAGADO

II

ADELANTOS

A Favor del

A cargo del
Contratista

A favor del
Contratista
Efectivo

IGV

596,445.79
0.00

113,324.69
0.00

III

COSTO DE LA ELABORACION
DE LA LIQUIDACION

0.00

0.00

IV

MULTA ATRASO DE OBRA

0.00

0.00

TOTAL

S/.

0.00

SALDO A CARGO DEL CONTRATISTA


- En Efectivo
- En I.G.V.

0.00

709,770.48
S/.
S/.

IGV

596,445.79
113,324.69

0.00

0.00

ANEXO N 01

LIQUIDACION POR ELABORACION DEL EXPEDIENTE TECNICO


Obra
: Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"
Ubicacin : RIMAC - LIMA - LIMA
EXON N
: N007 -2009 ED/UE 108
Contratista : COSAPI S.A.

A.I.

LIQUIDACION DE CUENTAS

( Expresado en nuevos soles )

AUTORIZADO Y PAGADO
1.1.0
1.1.1
1.1.2
1.1.3

AUTORIZADO
Elaboracin de Expediente Tcnico
Reintegro Autorizado
IGV (19%)
TOTAL DE LA INVERSION

1.2.0
1.2.1
1.2.2
1.2.3

PAGADO
Elaboracin de Expediente Tcnico
Reintegro de Obra Contratada
I.G.V. (Expediente Tcnico)
TOTAL PAGADO

174,627.34
0.00

174,627.34
33,179.19
207,806.53

174,627.34
0.00

174,627.34
33,179.19
207,806.53

SALDO A FAVOR DEL CONTRATISTA


- En efectivo
- En IGV
II

III

0.00
0.00

ADELANTOS (sin IGV)


2.1.0 CONCEDIDOS
2.1.1 Directo
2.1.2 Para Materiales
2.2.0 AMORTIZADOS
2.2.1 Efectivo
2.2.2 Materiales
SALDO A CARGO DEL CONTRATISTA

34,925.47
0.00

34,925.47

34,925.47
0.00

34,925.47
0.00

MULTA POR ATRASO EN LA ELABORACION DEL EXPEDIENTE TECNICO


3.1.0 CALCULADA
3.2.0 DESCONTADA
SALDO A CARGO DEL CONTRATISTA

B.-

RESUMEN DE SALDOS

Item

( Expresado en nuevos soles )


A cargo del
Contratista

Concepto
Efectivo

AUTORIZADO Y PAGADO

II

ADELANTOS

III

MULTA

TOTAL

S/.

#REF!
#REF!
#REF!

A favor del
Contratista
Efectivo
IGV

IGV

0.00

0.00

#REF!

#REF!

#REF!

#REF!

SALDO A FAVOR DEL CONTRATISTA


En Efectivo
S/. 0.00
En IGV
S/. 0.00

SALDO A CARGO DEL CONTRATISTA


En Efectivo
S/. #REF!
En IGV
S/. #REF!

0.00

0.00

0.00

0.00

MONTO DEL CONTRATO VIGENTE


(EXPRESADO EN NUEVOS SOLES)
Obra
Ubicacin
Exoneracin del Proceso N
Contratista
Descripcin
Contrato Principal de Obra
Elaboracin de Expediente Tcnico
Reintegro del Contrato Principal
Presupuesto Adicional
Presupuesto Deductivo N 01
Presupuesto por Aceleramiento
Presupuesto Deductivo N 01
Mayores Gastos Generales
Intereses
Contrato Vigente

Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"


RIMAC - LIMA - LIMA
N007 -2009 ED/UE 108
COSAPI S.A.
Monto sin IGV
8,731,366.80
174,627.34
61,296.26
0.00
(93,289.49)
569,956.00
(569,956.00)
0.00
0.00
8,874,000.91

IGV (19%)
1,658,959.69
33,179.19
11,646.29
0.00
(17,725.00)
108,291.64
(108,291.64)
0.00
0.00
1,686,060.17

Total con IGV


10,390,326.49
207,806.53
72,942.55
0.00
(111,014.49)
678,247.64
(678,247.64)
0.00
0.00
10,560,061.08

CLCULO DE LA MULTA
Obra :
Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"
L.P. N :
N007 -2009 ED/UE 108
Contratista: COSAPI S.A.
Monto del Expediente Aprobado C/IGV:
10,390,326.49
MULTA POR RETRASO EN LA ENTREGA DE LA OBRA
(Esta multa no sera de aplicacin en los casos de rescisin del contrato)
A Determinacin del retraso en la terminacin de la obra
1
2
3
4
5
6
7
8

Fecha de Inicio del plazo


Plazo contractual, en dias calendario
Fecha de trmino de plazo contractual original
Ampliacin de Plazo
Reduccion de plazo por Aceleramiento
Plazo Vigente (plazo original + ampliaciones) : PV
Fecha de vencimiento del plazo vigente
Fecha de trmino de la obra, segn inspector

25-Aug-09
240
21-Apr-10
0
0
240
21-Apr-10
21-Mar-10

9 Dias de Retraso :

-31 dias calendarios

D Determinacin del retraso en la subsanacin de observaciones


1
2
3
4
5

Fecha del acta de observaciones


Se cuenta a apartir del quinto da de suscrita el acta
1/10 del plazo vigente : C5 / 10
Fecha Mxima para subsanar observaciones : D1+D2+D3
Fecha de Trmino de subsanacin observaciones

6 Dias de atraso en subsanar observaciones ( D4 - D3 )


E Atraso Total: C8 + D6 =

21-Apr-10
25-Apr-10
24 dias calendarios
16-May-10
16-May-10
0 dias calendarios
0 dias calendarios

F Multa por retraso en la entrega de la obra


Tope Multa = 10% del Contrato Vigente
=
1,056,006.11
Penalidad diaria =

Total de las Multas (E X F)

0.10 x Monto
0.15 x Plazo en das

S/.
=

28,862.02

diaria

CLCULO DE LA MULTA
Obra
Ubicacin
EXON
Contratista

:
:
:
:

Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"


Rimac - Lima - Lima
N007 -2009 ED/UE 108
COSAPI S.A.

MULTA POR ATRASO EN LA ELABORACION DEL EXPEDIENTE TECNICO


A Determinacin del atraso en la elaboracin del expediente
1 Fecha de Inicio del plazo
2 Plazo contractual, en das naturales
3 Fecha de trmino del plazo contractual original
4 Ampliaciones de plazo
5 Plazo Vigente (plazo original + ampliaciones) : PV
6 Fecha de vencimiento del plazo vigente
7 Fecha de conformidad del expediente tcnico
8 Atraso :

25-Feb-09
75.00 das naturales
11-May-09
0.00
75.00
11-May-09
13-Aug-09
94 das naturales

B Multa por atraso en la elaboracin del expediente tcnico


Tope de Multa
= 10% del Total del Contrato Vigente
=
S/. 20,780.65
Multa
= (0.10xMonto del Contrato/0.25xPlazo)xAtraso
MultaDiaria
=
S/. 1,108.30
MultaTotal
104,180.34
Multa a Considerar
=
S/. 20,780.65
Total de la Multa
=
S/. 20,780.65

VALORIZACIONES
Obra:
LP No.:
Contratista:
Valorizacin
Monto S/.
A

PAGADAS

Mejoramiento de Infraestructura dela I.E. "MARIA PARADO DE BELLIDO"


N007 -2009 ED/UE 108
COSAPI S.A.
Reajuste
Concedido

TOTAL
REAJUSTADO

C=A+B

Amortizaciones de
Adelantos ( D )
En Efectivo
Para Mater.
D1
D2

VALORIZAC.
NETA
( VN )
VN = C - D

Localidad:
Distrito :
Rimac
Provincia:
Lima
Departamento Lima
Fondo de
Garanta
FG

Otras Deducciones ( E )
Elab.
Multa
de Liq.

NETO PAGADO S/.


Efectivo
VN - FG - E

IGV

1
2
3
4
5
6
7

280,915.51
754,077.72
1,405,757.88
1,561,624.48
1,818,443.77
1,449,150.20
1,352,637.43

1,966.41
2,473.35
16,848.18
13,506.95
19,999.94
18,569.03
29,892.51

282,881.92
756,551.07
1,422,606.06
1,575,131.43
1,838,443.71
1,467,719.23
1,382,529.94

56,183.10
150,815.54
281,151.58
312,324.90
363,688.75
289,830.04
292,279.45

104,267.59
303,232.34
587,816.90
584,533.41
681,286.57
546,460.97
675,470.15

122,431.23
302,503.19
553,637.58
678,273.12
793,468.39
631,428.22
414,780.34

122,431.23
302,503.19
553,637.58
678,273.12
793,468.39
631,428.22
414,780.34

23,261.93
57,475.61
105,191.14
128,871.89
150,758.99
119,971.36
78,808.26

TOTAL

8,622,606.99

103,256.37

8,725,863.36

1,746,273.36

3,483,067.93

3,496,522.07

3,496,522.07

664,339.18

ACELERAMIENTO
Monto S/.

1
TOTAL

A
569,956.00
569,956.00

EXPEDIENTE TECNICO
Monto S/.

1
TOTAL

A
174,627.34
174,627.34

Reajuste
Concedido
B
Reajuste
Concedido
B
-

TOTAL
REAJUSTADO
C=A+B
569,956.00
569,956.00
TOTAL
REAJUSTADO
C=A+B
174,627.34
174,627.34

Amortizaciones de
Adelantos ( D )
En Efectivo
Para Mater.
D1
D2
-

VALORIZAC.
NETA
( VN )
VN = C - D
569,956.00
569,956.00

Fondo de
Garanta
FG
-

Amortizaciones de
Adelantos ( D )
En Efectivo
Para Mater.
D1
D2
34,925.47
34,925.47
-

VALORIZAC.
NETA
( VN )
VN = C - D
139,701.87
139,701.87

Fondo de
Garanta
FG
-

No.
1
2
1

Otras Deducciones ( E )
Elab.
Multa
de Liq.
-

NETO PAGADO S/.

Otras Deducciones ( E )
Elab.
Multa
de Liq.
-

2,119,626.61

Materiales

4,144,850.84
4,144,850.84

Total =

IGV
108,291.64
108,291.64

NETO PAGADO S/.

20,780.65
20,780.65

Adelantos
En Efectivo
41,561.31
2,078,065.30

Efectivo
VN - FG - E
569,956.00
569,956.00

S/.

Efectivo
VN - FG - E
118,921.22
118,921.22

IGV
26,543.35
26,543.35

NETO PAGADO S/.


Efectivo
IGV
34,925.47
6,635.84
1,746,273.36
331,791.94
3,483,067.93
661,782.91
5,264,266.76 1,000,210.69

9,449,666.05

1,799,384.86

Comprob. de Pago
Fecha de
No
Cobranza

28551
28683
28734
28804
28913
29010
29150

10/28/2009
11/23/2009
12/21/2009
1/4/2010
2/11/2010
3/17/2010
4/22/2010

Comprob. de Pago
Fecha de
No
Cobranza
28551

6/25/2010

Comprob. de Pago
Fecha de
No
Cobranza
28551

6/25/2010

Comprob. Pago
No.
Fecha Cob
3/20/2009
28365
8/21/2009
28421
9/2/2009

MINISTERIO DE EDUCACION
Viceministerio de Gestin Institucional

ADELANTO DE MATERIALES - MONTOS MAXIMOS A SOLICTAR


816823.848

IU

DESCRIPCION

3
5
17
21
30
45

Acero Corrugado
Agregado Grueso
Bloque y Ladrillo
Cemento Portland tipo I
Dlar
Madera terciada Encofrado

IU

DESCRIPCION

17
21
30
32
40
43
52
54

Bloque y Ladrillo
Cemento Portland tipo I
Dlar
Flete Terrestre
Loseta
Madera Nacional Encofrado
Perfil de Aluninio
Pintura Latex

IU

DESCRIPCION

7
12
31
72

Alambre y Cable tipo LSOH


Artefacto de Alumbrado Int
Ducto de Concreto
Tuberia de PVC

IU

DESCRIPCION

MONTO

COEF.INCID.

INCID.

MAYO

SET

MONTO

MONTO

MONTO

Io

Ia

A SOLICTAR

SOLICTADO

APROBADO

ESTRUCTURAS

4,145,325.59
4,145,325.59
4,145,325.59
4,145,325.59
4,145,325.59
4,145,325.59

0.088
0.062
0.079
0.091
0.079
0.060

100%
100%
0.37%
100%
99.63%
100%

453.810
212.990
612.610
323.410
371.940
327.070

457.290
208.710
659.400
323.410
365.900
316.970

367,586.000
251,845.608
1,304.224
377,224.628
320,970.701
241,039.016

351,088.290
254,075.780
121,041.930
371,702.130
138,693.020
184,901.900

351,088.29
254,075.78
1,300.00
371,702.13
138,693.02
184,901.90

MONTO

COEF.INCID.

INCID.

MAYO

SET

MONTO

MONTO

MONTO

Io

Ia

A SOLICTAR

SOLICTADO

APROBADO

ARQUITECTURA

3,423,303.24
3,423,303.24
3,423,303.24
3,423,303.24
3,423,303.24
3,423,303.24
3,423,303.24
3,423,303.24

0.163
0.104
0.166
0.104
0.166
0.079
0.163
0.079

14.96%
25.26%
44.60%
36.89%
55.40%
48.05%
85.04%
51.95%

672.610
323.410
371.940
425.750
310.120
498.870
295.500
330.130

659.400
323.410
365.900
418.410
310.120
500.180
305.360
329.610

81,837.093
89,931.545
249,331.897
129,072.810
314,820.659
130,288.111
490,355.317
140,272.779

131,236.060
118,643.980
144,309.880
125,652.620
269,025.710
131,964.950
431,572.290
140,828.070

89,500.000
162,372.105
144,309.880
125,652.62
269,025.710
129,500.000
431,572.290
140,828.070

MONTO

COEF.INCID.

INCID.

MAYO

SET

MONTO

MONTO

MONTO

Io

Ia

A SOLICTAR

SOLICTADO

APROBADO

INSTALACIONES ELECTRICAS

816,823.85
816,823.85
816,823.85
816,823.85

0.228
0.292
0.115
0.115

100%
100%
17.05%
37%

472.620
281.540
367.520
338.580

508.790
273.280
361.640
341.070

200,488.621
231,514.931
15,759.634
35,001.995

186,373.230
234,397.000
15,928.170
34,411.530

187,050.538
234,397.000
15,928.170
34,411.530

MONTO

COEF.INCID.

INCID.

MAYO

SET

MONTO

MONTO

MONTO

Io

Ia

A SOLICTAR

SOLICTADO

APROBADO

INTALACIONES SANITARIAS

4
30
65
72
77

Agregado Fino
Dlar
Tuberia de Acero Negro
Tuberia de PVC
Valvula de Bronce Nacional

345,914.12
345,914.12
345,914.12
345,914.12
345,914.12

0.118
36.32%
0.118
53.48%
0.118
10.20%
0.107
100%
0.081 100.00%

583.160
371.940
328.400
338.580
287.510

621.000
365.900
346.280
341.070
279.720

15,787.015
21,474.903
4,390.103
37,285.012
27,259.876

14,633.790
16,654.080
4,076.780
35,056.640
27,238.500

14,633.790
16,654.080
4,076.780
35,056.640
27,238.500

3,363,968.82