Vous êtes sur la page 1sur 8

PERSPECTIVE VIEW

A-1
A-2
S-1
E-1 ELECTRICAL LAYOUT PLAN, RISER
DIAGRAM, LOAD SCHEDULE, GEN.
NOTES
PERSPECTIVE VIEW, TABLE OF
CONTENTS
FOUNDATION PLAN, ROOF FRAMING
PLAN FOOTING DETAIL, COLUMN
DETAIL, WF-1, RAMP DETAIL, ELEV.
TYP. CONNECTION DETAIL
FLOOR PLAN, ELEVATIONS, ROOF
PLAN SECTIONS, REFLECTED
CEILING PLAN, DOOR&WINDOWS
SCHEDULE, MISC. DETAILS
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE CITY/MUNICIPAL
ENGINEER/BUILDING OFFICIAL
DISTRICT/CITY/MUNICIPALITY
LAND USE & ZONING
TABLE
OF
CONTENTS
LINE & GRADE
ARCHITECTURAL
STRUCTURAL
SANITARY
ELECTRICAL
MECHANICAL
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
SANITARY

~
DETAIL OF TIE BEAM. RAMP DETAIL
TYPICAL BEAM ELEVATION, BEAM
SCHEDULE, TYPICAL TRUSS
CONNECTION DETAIL
S-2
DETAIL OF STAIR S-3
REFLECTED CEILING AND ROOF
PLANS, CROSS & LONGITUDINAL
SECTIONS, SCHEDULE OF DOORS AND
WINDOWS, CONCRETE SUNBREAKER
DET. & LOUVER DETAILS
A-3
EAVES DETAIL, EAVES & INT.
CEILING DET., SPOT DETAILS,
RAMP DETAIL, BAY SECTION,
VENT. DET. PLAN, DET. SECTION
OF CLASSROOM, STAIR DETAIL
A-4
TWO STOREY
TWO CLASSROOM
G.I. ROOF SCHOOL BUILDING






A-1
4












DEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITY
PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


















ED p e D
NOISIVIDGNIR E E N I G N E S L O O H C S D N A S E I T I L I C AFLACISYHP









B
C









GROUND FLOOR PLAN

1 2 3




C
B






1 2 3















SECOND FLOOR PLAN



1


2 3












C


B



A

1


2 3












C


B



A

FRONT ELEVATION


RIGHT SIDE ELEVATION


REAR ELEVATION


LEFT SIDE ELEVATION

























TWO STOREY
TWO CLASSROOM
G.I. ROOF SCHOOL BUILDING






A-2
4












DEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITY
PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


















ED p e D
NOISIVIDGNIR E E N I G N E S L O O H C S D N A S E I T I L I C AFLACISYHP















1 2 3
A
C
B









A C B







CROSS SECTION

1

3 2






LONGITUDINAL SECTION


ROOF PLAN

c
b
A
















SECOND FLOOR REFLECTED CEILING PLAN




1 3 2





















SEE TRUSS DET.




















ROOF
BEAM



























SPOT DETAIL (CORNER CLG.)




SPOT DETAIL (EAVES)




SECTION DETAIL (EAVES)




12x12x2mm FLAT BAR
STRAP @600mm O.C.
2x25x25mm ANGULAR
BAR NOSING @STEP


SECOND FLOOR LEVEL
150mm THK CHB RAILING
PLASTER AND PAINT FIN.
50mm G.I.PIPE SCH. 40
HANDRAIL w/25mm SQ.
BRACKECT @600mm O.C.
PAINT FIN.

ELEV.
SCALE: 1:50m

SCALE: 1:20m
DETAIL

TREAD
50mm G.I. PIPE
SCHEDULE 40
(PAINT FINISH)


NOSING DETAIL




BALCONY RAILING DET.




SPOT DETAIL













A B C

DETAIL SECTION OF CLASSROOM




TYPICAL

LANDING

SECOND F.F.L.

STAIR DETAIL



1
6
T
R
E
A
D
S
@
2
9
2
m
m
E
A
C
H
=
4
6
7
2
m
m
A-5
7
DN
5
4
9
7
6
10
11
8
3



A-4

24



B
A

A-5
8
12
13
14
15
16
17
18
19
2
1
1

1
6
T
R
E
A
D
S
@
2
9
2
m
m
E
A
C
H
=
4
6
7
2
m
m
UP
5
4
9
7
6
10
11
8
3



A-4

24



B
A

12
13
14
15
16
17
18
19
2
1
1
DETAILED PLAN OF STAIR




(GRD FLOOR TO SECOND FLOOR)
DETAILED PLAN OF STAIR




(SECOND FLOOR TO GROUND FLOOR)
TWO STOREY
TWO CLASSROOM
G.I. ROOF SCHOOL BUILDING






A-4
4











DEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITY
PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


















ED p e D
NOISIVIDGNIR E E N I G N E S L O O H C S D N A S E I T I L I C AFLACISYHP
TREAD



C

2ND FLOOR FRAMING PLAN












A
1





2 3






B
C

FOUNDATION PLAN

2 3






S
E
C
O
N
D
L
E
V
E
L











B
C



S C H E D U L E OF S L A B S
TYPICAL SLAB ELEVATION










1 2


ROOF FRAMING PLAN



S C H E D U L E O F F O O T I N G






































TYP. FOOTING DETAIL



3
5
0





350




3
5
0







350






3
5
0





350




C O L U M N S C H E D U L E
350
3
5
0

350
3
5
0

350
3
5
0




TWO STOREY
TWO CLASSROOM
G.I. ROOF SCHOOL BUILDING






S-1
3












DEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITY
PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


















ED p e D
NOISIVIDGNIR E E N I G N E S L O O H C S D N A S E I T I L I C AFLACISYHP
DETAIL OF RAMP

L2/5

TYPICAL BEAM ELEVATION








































LAP SPLICES ARE ALLOWED
ONLY IN THIS PORTION

L2/5

L1
2D
L2/3
2D
2-12mm SIDE BARS
L2/5
L2/3
L2
2D








L3/6
LAP SPLICES ARE ALLOWED
ONLY IN THIS PORTION
2D
L3/3
L3


L3/3
2D



8




DETAIL OF TIE BEAM






HALF TRUSS
TYPICAL TRUSS
CONNECTION DETAIL


ANCHORAGE DETAIL
1
5
0


SAG ROD CONNECTION DETAIL PURLIN CONNECTION DETAIL



SCHEDULE OF TRUSS MEMBERS



CONNECTION DETAIL






















CONNECTION DETAIL


1
5
0

DETAIL OF T-1



CONNECTION DETAIL



TWO STOREY
TWO CLASSROOM
G.I. ROOF SCHOOL BUILDING






S-2
3

































DEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITY
PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


















ED p e D
NOISIVIDGNIR E E N I G N E S L O O H C S D N A S E I T I L I C AFLACISYHP



LANDING

SECOND F.F.L.
STAIR DETAIL

1
6
T
R
E
A
D
S
@
2
9
2
m
m
E
A
C
H
=
4
6
7
2
m
m

B
A






STAIR FRAMING PLAN (TYP.)


(SECOND FLOOR TO GROUND FLOOR)


SECOND F.F.L.

SECTION OF CS-1


TWO STOREY
TWO CLASSROOM
G.I. ROOF SCHOOL BUILDING






S-3
3











B C























SPOT DETAIL





SPOT DETAIL





SECTION OF STAIR SLAB




SPOT DETAIL






DEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITY
PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


















ED p e D
NOISIVIDGNIR E E N I G N E S L O O H C S D N A S E I T I L I C AFLACISYHP
GENERAL NOTES
3. WIRING METHOD SHALL BE AS FOLLOWS :
a. FEEDERS AND RISERS - RIGID METALLIC CONDUIT
- CEILING LIGHT OUTLET
- CEILING FAN OUTLET
- TWO GANG DEVICE SWITCH
- ONE GANG DEVICE SWITCH
- 2 x 40 WATTS FLUORESCENT LAMP
DESCRIPTION
S/Sa
Sab
SYMBOL
2
F
LEGEND
- THREE WAY DEVICE SWITCH
- THREE GANG DEVICE SWITCH
- SAFETY SWITCH
- FAN CONTROL SWITCH
- ELECTRIC SERVICE METER
- SERVICE ENTRANCE
S3W
Scde
Sf
M
- RACEWAY CONDUIT CONCEALED UNDER FLOOR
- RACEWAY CONDUIT CONCEALED IN CEILING
8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS :
1. ALL ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH THESE PLANS
AND SPECIFICATIONS. THE APPLICABLE PROVISIONS OF THE LATEST EDITION
OF THE PHILIPPINE ELECTRICAL CODE (PEC). THE RULES AND REGULATION OF
THE LOCAL ENFORCING AUTHORITY AND THE REQUIREMENTS OF THE LOCAL
POWER COMPANY. ALL ELECTRICAL WORKS SHALL BE UNDER THE IMMEDIATE
SUPERVISION OF A DULY REGISTERED ELECTRICAL ENGINEER.
2. THE ELECTRICAL SERVICE POWER IS 1-PHASE, 2-WIRE, 230 V AC, 60 Hz.
b. LIGHTING, POWER
RECEPTACLE BRANCH CKT., &
AUXILIARY
- POLYVINYL CHLORIDE CONDUIT
SCH. 40
4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE
"THW" UNLESS OTHERWISE INDICATED IN THE PLAN. THE MINIMUM
SIZE OF WIRE FOR POWER AND LIGHTING CIRCUIT HOMERUN SHALL BE
3.5mm AND INSULATED FOR 600 VOLTS. SMALLEST RACEWAY SHALL BE
15mm TRADE/NOMINAL SIZE.
5. ALL OUTLET BOXES SHALL BE GALVANIZED GAGE NO. 16 DEEP
TYPE WITH FACTORY KNOCKOUTS.
6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED
TYPE FOR THE PARTICULAR LOCATION AND PURPOSE.
7. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND
POWER CIRCUIT AS PER PHILIPPINE ELECTRICAL CODE
REQUIREMENT.
a. LIGHT SWITCH - 1.20 M ABOVE FINISH FLOOR
b. CONVENIENCE OUTLET - 0.30 M ABOVE FINISH FLOOR.
c. SAFETY SWITCH - 1.80 M ABOVE FINISH FLOOR
- DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE
10 AMPS, 250 VOLT WITH MODERN PLATE COVER
A
B
C

GRND. FLR. LIGHTING LAYOUT

1 2 3
A
C
B
1 2 3

2ND FLR. LIGHTING LAYOUT



2
F
f
2
2
LP
3
Sf
2
f
i
2
Si
e
Sef
e
2
F
f
2
2
LP
4
Sf
2
f
i
2
Si
e
Sef
e





ELECTRICAL RISER DIAGRAM

A
B
C

GRND. FLR. POWER LAYOUT

1 2 3
A
C
B
1 2 3

2ND FLR. POWER LAYOUT

LP
M
FA
REFER TO RISER DIAGRAM
OVERHEAD SERVICE ENTRANCE
TO LINE SIDE OF LP
RATING: 220 V, 2P, 20AT, 50AF
ENCLOSED AIR CIRCUIT BREAKER
LP
1
LP
2
40AT, 100AF, 2P, 240V
CONVENIENCE OUTLET
LIGHTS & FAN
IL = 3420 = 15 A
DESCRIPTION
PANELBOARD: LP
LOAD SCHEDULE
2
SPARE 3
TOTAL
CKT.
1
NO.
FEEDER:
CIRCUIT BREAKER
AT
PROTECTION: 40 AT, 50 AF, 2P, 240 V
20 2 230 1200
3420
1500
230 V
20 2 230
VA
720
LOAD
20
POLE
2
VOLT
230
50 3-3.5mm THW IN 15mm C
2-5.5mm THW IN 20mm RSC
2
50
WIRE & CONDUIT SIZE
3-3.5mm THW IN 15mm C
MAIN :
AF
50
2
2
IN 20mmORSC
2-5.5mm THW
1
8
0
0
m
m
~
METERING CONDUIT
BUILDING WALL
KWHR METER
~
~
2 WIRE, 60 Hz FITTED WITH
CONNECTED TO 220V AC, 1O,
OVERHEAD SERVICE ENTRANCE
20mm O TYPE "F" CONDULET
1
8
0
0
m
m
2
IN 15mmO C
1-5.5mm THW COPPER WIRE
GROUNDING ROD COPPERWELD
16MMO x 2400mm LENGTH
~
~ FIN. GRADE LINE
GROUND FLOOR LINE
2
3
5
0
0
m
m
~ CEILING LINE
TWO STOREY
TWO CLASSROOM
G.I. ROOF SCHOOL BUILDING






E-1
1












DEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITY
PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


















ED p e D
NOISIVIDGNIR E E N I G N E S L O O H C S D N A S E I T I L I C AFLACISYHP

Vous aimerez peut-être aussi