BASIC DATA

For category- III : Cement / Steel / Pipes / RCC poles / AC & GI sheets / Packed materials For category- IV : PCC slabs / Shahabad slabs / BS slabs / CC & Laterite blocks / Wood For lead beyond 30 km for every km Sl No. 1 2 Description Truck hire charges Fuel charges Crew charges Add for small Tools & Plants @ Add for Contractor's Profit on Fuel & Crew charges @ Add for Hidden cost on Crew @ Add for Contractor's Overheads @ Total for machinery under category III for Total for machinery under category IV for For category III : For category IV : Unit Hour Hour Hour Unit : Unit : Quanty 0.0555 0.0555 0.0555 1% 10% 15% 5% 8.00 tonne 3.40 cum 8.00 tonne 3.40 cum Rate Amount in Rs. in Rs. 269.00 14.93 208.00 11.54 56.70 3.15 Total Rs: 29.62 Rs: 0.30 Rs: 1.47 Rs: 0.47 Rs: 1.48 Rs: 33.34 Rs: 33.34

For category-V : Water For total lead upto 1 km Description Water tanker hire charges Fuel charges Crew charges Add for small Tools & Plants @ Add for Contractor's Profit on Fuel & Crew charges @ Add for Hidden cost on Crew @ Add for Contractor's Overheads @ Total for machinery under category V for For category-V : Water For total lead more than 1 km upto 2 km Description Water tanker hire charges Fuel charges Crew charges Add for small Tools & Plants @ Add for Contractor's Profit on Fuel & Crew charges @ Add for Hidden cost on Crew @ Add for Contractor's Overheads @ Total for machinery under category V for Unit : Quanty 0.215 0.215 0.215 8000.00 Litres Rate Amount in Rs. in Rs. 268.00 57.62 208.00 44.72 56.70 12.19 Total Rs: 114.53 Rs: 1.15 Rs: 5.69 Rs: 1.83 Rs: 5.73 Rs: 128.92 Unit : Quanty 0.148 0.148 0.148 8000.00 Litres Rate Amount in Rs. in Rs. 268.00 39.75 208.00 30.85 56.70 8.41 Total Rs: 79.02 Rs: 0.79 Rs: 3.93 Rs: 1.26 Rs: 3.95 Rs: 88.95

Sl No. 1 2

Unit Hour Hour Hour

1% 10% 15% 5% 8000.00 Litres

Sl No. 1 2

Unit Hour Hour Hour

1% 10% 15% 5% 8000.00 Litres

70

BASIC DATA

For category-V : Water For total lead more than 2 km upto 3 km Description Water tanker hire charges Fuel charges Crew charges Add for small Tools & Plants @ Add for Contractor's Profit on Fuel & Crew charges @ Add for Hidden cost on Crew @ Add for Contractor's Overheads @ Total for machinery under category V for Unit : Quanty 0.280 0.280 0.280 8000.00 Litres Rate Amount in Rs. in Rs. 268.00 75.04 208.00 58.24 56.70 15.88 Total Rs: 149.16 Rs: 1.49 Rs: 7.41 Rs: 2.38 Rs: 7.46 Rs: 167.90

Sl No. 1 2

Unit Hour Hour Hour

1% 10% 15% 5% 8000.00 Litres

For category-V : Water For total lead more than 3 km upto 4 km Description Water tanker hire charges Fuel charges Crew charges Add for small Tools & Plants @ Add for Contractor's Profit on Fuel & Crew charges @ Add for Hidden cost on Crew @ Add for Contractor's Overheads @ Total for machinery under category V for Unit : Quanty 0.342 0.342 0.342 8000.00 Litres Rate Amount in Rs. in Rs. 268.00 91.57 208.00 71.07 56.70 19.37 Total Rs: 182.01 Rs: 1.82 Rs: 9.04 Rs: 2.91 Rs: 9.10 Rs: 204.88

Sl No. 1 2

Unit Hour Hour Hour

1% 10% 15% 5% 8000.00 Litres

For category-V : Water For total lead more than 4 km upto 5 km Description Water tanker hire charges Fuel charges Crew charges Add for small Tools & Plants @ Add for Contractor's Profit on Fuel & Crew charges @ Add for Hidden cost on Crew @ Add for Contractor's Overheads @ Total for machinery under category V for Unit : Quanty 0.402 0.402 0.402 8000.00 Litres Rate Amount in Rs. in Rs. 268.00 107.83 208.00 83.69 56.70 22.81 Total Rs: 214.32 Rs: 2.14 Rs: 10.65 Rs: 3.42 Rs: 10.72 Rs: 241.25

Sl No. 1 2

Unit Hour Hour Hour

1% 10% 15% 5% 8000.00 Litres

71

BASIC DATA

For category-V : Water For lead beyond 5 km upto 30 km for every km: Description Water tanker hire charges Fuel charges Crew charges Add for small Tools & Plants @ Add for Contractor's Profit on Fuel & Crew charges @ Add for Hidden cost on Crew @ Add for Contractor's Overheads @ Total for machinery under category V for Unit : Quanty 0.0588 0.0588 0.0588 8000.00 Litres Rate Amount in Rs. in Rs. 268.00 15.77 208.00 12.24 56.70 3.34 Total Rs: 31.34 Rs: 0.31 Rs: 1.56 Rs: 0.50 Rs: 1.57 Rs: 35.28

Sl No. 1 2

Unit Hour Hour Hour

1% 10% 15% 5% 8000.00 Litres

For category-V : Water For lead beyond 30 km for every km: Description Water tanker hire charges Fuel charges Crew charges Add for small Tools & Plants @ Add for Contractor's Profit on Fuel & Crew charges @ Add for Hidden cost on Crew @ Add for Contractor's Overheads @ Total for machinery under category V for g. LEAD CHARGES BY ANY MODE : FOR CATEGORY- I : Earth / Sand / Gravel / Murum / Lime / Surki For lead upto 1 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 1 km upto 2 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 2 km upto 3 km: Waiting time idle hire charges Running time hire charges Total for Unit : Quanty 0.0555 0.0555 0.0555 8000.00 Litres Rate Amount in Rs. in Rs. 268.00 14.87 208.00 11.54 56.70 3.15 Total Rs: 29.56 Rs: 0.30 Rs: 1.47 Rs: 0.47 Rs: 1.48 Rs: 33.28

Sl No. 1 2

Unit Hour Hour Hour

1% 10% 15% 5% 8000.00 Litres

5.00 cum Rate per cum

Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs:

85.84 89.42 175.25 35.10 85.84 129.61 215.44 43.10 85.84 168.79 254.62 50.90

5.00 cum Rate per cum

5.00 cum Rate per cum

72

BASIC DATA

For lead more than 3 km upto 4 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 4 km upto 5 km: Waiting time idle hire charges Running time hire charges Total for For lead beyond 5 km upto 30 km: Waiting time idle hire charges Running time hire charges Total for For lead beyond 30 km: Waiting time idle hire charges Running time hire charges Total for

5.00 cum Rate per cum

Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs:

85.84 205.96 291.80 58.40 85.84 242.53 328.37 65.70 0.00 35.47 35.47 7.10 0.00 33.46 33.46 6.70

5.00 cum Rate per cum

5.00 cum Rate per cum / km

5.00 cum Rate per cum / km

FOR CATEGORY- II : Rubble / Size stone / Cut stone / Coarse aggregate For lead upto 1 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 1 km upto 2 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 2 km upto 3 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 3 km upto 4 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 4 km upto 5 km: Waiting time idle hire charges Running time hire charges Total for

5.00 cum Rate per cum

Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs:

154.19 89.10 243.29 48.70 154.19 129.15 283.34 56.70 154.19 168.20 322.38 64.50 154.19 205.24 359.42 71.90 154.19 241.68 395.87 79.20

5.00 cum Rate per cum

5.00 cum Rate per cum

5.00 cum Rate per cum

5.00 cum Rate per cum

73

BASIC DATA

For lead beyond 5 km upto 30 km: Waiting time idle hire charges Running time hire charges Total for For lead beyond 30 km: Waiting time idle hire charges Running time hire charges Total for

5.00 cum Rate per cum / km

Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs:

0.00 35.34 35.34 7.10 0.00 33.34 33.34 6.70

5.00 cum Rate per cum / km

FOR CATEGORY- III : Cement / Steel / Pipes / AC & GI sheet / RCC pole / Packed materials For lead upto 1 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 1 km upto 2 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 2 km upto 3 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 3 km upto 4 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 4 km upto 5 km: Waiting time idle hire charges Running time hire charges Total for For lead beyond 5 km upto 30 km: Waiting time idle hire charges Running time hire charges Total for For lead beyond 30 km: Waiting time idle hire charges Running time hire charges Total for

8.00 tonne Rate per tonne

Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs:

214.28 89.10 303.39 37.90 214.28 129.15 343.43 42.90 214.28 168.20 382.48 47.80 214.28 205.24 419.52 52.40 214.28 241.68 455.96 57.00 0.00 35.34 35.34 4.40 0.00 33.34 33.34 4.20

8.00 tonne Rate per tonne

8.00 tonne Rate per tonne

8.00 tonne Rate per tonne

8.00 tonne Rate per tonne

8.00 tonne Rate per tonne/ km

8.00 tonne Rate per tonne/ km

74

BASIC DATA

FOR CATEGORY- IV : PCC slab / Shahabad slab / BS slab / CC & Laterite block / Wood For lead upto 1 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 1 km upto 2 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 2 km upto 3 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 3 km upto 4 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 4 km upto 5 km: Waiting time idle hire charges Running time hire charges Total for For lead beyond 5 km upto 30 km: Waiting time idle hire charges Running time hire charges Total for For lead beyond 30 km: Waiting time idle hire charges Running time hire charges Total for

3.40 cum Rate per cum

Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs:

232.99 89.10 322.10 94.70 232.99 129.15 362.14 106.50 232.99 168.20 401.19 118.00 232.99 205.24 438.23 128.90 232.99 241.68 474.67 139.60 0.00 35.34 35.34 10.40 0.00 33.34 33.34 9.80

3.40 cum Rate per cum

3.40 cum Rate per cum

3.40 cum Rate per cum

3.40 cum Rate per cum

3.40 cum Rate per cum / km

3.40 cum Rate per cum / km

FOR CATEGORY- V : Water For lead upto 1 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 1 km upto 2 km: Waiting time idle hire charges Running time hire charges Total for

8000.00 litres Rate per 1000 ltr

Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs:

145.47 88.95 234.42 29.30 145.47 128.92 274.39 34.30

8000.00 litres Rate per 1000 ltr

75

BASIC DATA

For lead more than 2 km upto 3 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 3 km upto 4 km: Waiting time idle hire charges Running time hire charges Total for For lead more than 4 km upto 5 km: Waiting time idle hire charges Running time hire charges Total for For lead beyond 5 km upto 30 km: Waiting time idle hire charges Running time hire charges Total for For lead beyond 30 km: Waiting time idle hire charges Running time hire charges Total for

8000.00 litres Rate per 1000 ltr

Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs: Rs:

145.47 167.90 313.37 39.2 145.47 204.88 350.35 43.80 145.47 241.25 386.72 48.30 0.00 35.28 35.28 4.40 0.00 33.28 33.28 4.20

8000.00 litres Rate per 1000 ltr

8000.00 litres Rate per 1000 ltr

8000.00 litres Rate per 1000 ltr / km

8000.00 litres Rate per 1000 ltr / km

IV. LOADING AND UNLOADING CHARGES : For loading or unloading materials are grouped into 5 categories as in case of lead charges. FOR CATEGORY- I : Earth / Sand / Gravel / Murum / Lime / Surki Quantity of material per load : 5.0 cum Number of loads per day ( refer lead charges for details ) : 10 Deploy 7 heavy and 5 light mazdoors for loading. Deploy tipper 25 minutes ( 10 trips ) for mechanical tipping and 1 heavy mazdoor at unloading spot. LOADING : Sl Description No. 1 Heavy mazdoor 2 Light mazdoor Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for Loading Unit : Quanty 7.00 5.00 1% 10% 15% 5% 50.00 cum Rate per cum 50.00 cum Rate Amount in Rs. in Rs. 132.00 924.00 130.50 652.50 Total Rs: 1576.50 Rs: 15.77 Rs: 157.65 Rs: 236.48 Rs: 78.83 Rs: 2065.22 Rs: 41.30

Unit Day Day

76

BASIC DATA

UNLOADING : ( for 10 trips @ 2.5 min / trip ) Sl Description No. 1 Tipper 5 cum capacity Fuel / Energy charges Crew charges 2 Heavy mazdoor

Unit Hour Hour Hour Day

Unit : Quanty 0.417 0.417 0.417 1.000 1% 10% 15% 5%

Add for small Tools & Plants @ Add for Contractor's Profit on Fuel / Crew / Labour charges @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for 50.00 cum Unloading Rate per cum

50.00 cum Rate Amount in Rs. in Rs. 271.00 112.92 208.00 86.67 56.70 23.63 132.00 132.00 Total Rs: 355.21 Rs: 3.55 Rs: 24.23 Rs: 23.34 Rs: 17.76 Rs: 424.09 Rs: 8.50

FOR CATEGORY- II : Rubble / Size stone / Cut stone / Coarse aggregate Quantity of material per load Number of loads per day ( refer lead charges for details ) Deploy 7 heavy and 5 light mazdoors for loading. Deploy 5 heavy mazdoors for unloading. Total cost is apportioned at 2 / 3 for loading and 1 / 3 for unloading. Unit : Quanty 12.00 5.00 1% 10% 15% 5% 40.00 cum Rate per cum Rate per cum

: 5.0 cum :8

Sl No. 1 2

Description Heavy mazdoor Light mazdoor Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for Loading @ 2/3 of total Unloading @ 50 % of loading

Unit Day Day

40.00 cum Rate Amount in Rs. in Rs. 132.00 1584.00 130.50 652.50 Total Rs: 2236.50 Rs: 22.37 Rs: 223.65 Rs: 335.48 Rs: 111.83 Rs: 2929.82 Rs: 48.80 Rs: 24.40

FOR CATEGORY- III : Cement / Steel / Pipes / AC & GI sheet / RCC pole / Packed materials Quantity of material per load : 8.0 t Number of loads per day ( refer lead charges for details ) :8 Deploy 16 heavy mazdoors for loading. Deploy16 heavy mazdoors for unloading and stacking. Total cost is apportioned at 1/ 2 for loading and 1/ 2 for unloading including stacking. Unit : Quanty 64.00 tonne Rate Amount in Rs. in Rs. 32.00 134.00 4288.00 0.00 0.00 0.00 Total Rs: 4288.00 Contd

Sl No. 1

Description Cement / Steel handling mazdoor

Unit Day

77

BASIC DATA

Sl No.

Description

Unit

Quanty

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for additional Hidden cost on Labour @ Add for Contractor's Overheads @ Total for Loading @ 50 % apportioning Unloading & stacking same rate as loading

1% 10% 15% 5% 5% 64.00 tonne Rate per tonne Rate per tonne

Rate in Rs. Contd Rs: Rs: Rs: Rs: Rs: Rs: Rs:

Amount in Rs. 42.88 428.80 643.20 214.40 214.40 5831.68 45.60 45.60

FOR CATEGORY- IV : PCC slab / Shahabad slab / BS slab / CC block / Laterite / Wood Quantity of material per load : 3.4 cum Number of loads per day ( refer lead charges for details ) :7 Deploy 6 heavy mazdoors for loading. Deploy 6 heavy mazdoors for unloading and stacking. Total cost is apportioned at 1/ 2 for loading and 1/ 2 for unloading including stacking. Unit : Quanty 12.00 0.00 1% 10% 15% 5% 24.00 cum Rate per cum Rate per cum 24.00 cum Rate Amount in Rs. in Rs. 132.00 1584.00 0.00 0.00 Total Rs: 1584.00 Rs: 15.84 Rs: 158.40 Rs: 237.60 Rs: 79.20 Rs: 2075.04 Rs: 43.20 Rs: 43.20

Sl No. 1

Description Heavy mazdoor

Unit Day

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for Loading @ 50 % apportioning Unloading & stacking same rate as loading

FOR CATEGORY-V : Water Quantity of material per load Deploy 5 hp diesel pump for filling and unloading by gravity flow. Time required for filling at 250 ltr per minute Crew for filling time and idle time ( 32 + 53 ) Unit : Quanty 0.533 0.533 1.500 1% 10%

: 8000 ltrs : 32 min say : 90 min 8000.00 ltrs Rate Amount in Rs. in Rs. 7.00 3.73 55.00 29.33 35.80 53.70 Total Rs: 86.77 Rs: 0.87 Rs: 8.30 Contd

Sl No. 1 2

Description Dewatering pump 5 hp ( Diesel ) Fuel charges Crew charges including idle time Add for small Tools & Plants @ Add for Contractor's Profit on Fuel & Crew charges @

Unit Hour Hour Hour

78

BASIC DATA

Sl No.

Description

Unit

Quanty

Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for Loading Rate per Unloading

15% 5% 8000 ltrs 1000 ltrs By gravity flow

Rate in Rs. Contd Rs: Rs: Rs: Rs: Rs:

Amount in Rs. 8.06 4.34 108.33 13.50 ---

V. ADDITIONAL LIFT CHARGES : For the purpose of working out lift charges by head load the category of materials as classified in ( I ) above are grouped together as under : CATEGORY I & II : Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate / Rubble stone / Size stone / Cut stone In this group the materials which are comperatively lighter and generally conveyed by head load by light / heavy mazdoor are included. Method of conveyance, apprximate weight per load and the time required to cover specified additional distance will be generally same whether the material belongs to Category-I or Category-II of the classification. Therefore, common data is considered for lift charges by head load for materials under these two categories. CATEGORY III : Cement bag / Reinforcement steel / Structural steel sections In this group materials in packed / rolled / fabricated condition which are heavier per load compared to the materials under Category -I and II and which can not be split into small quantities for the purpose of lift charges are included. CATEGORY IV : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood In this group the materials in moulded condition / cut to standard size which are heavier per load compared to materials under Category-I and II are included. FOR CATEGORY I & II : Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate / Rubble stone / Size stone / Cut stone Lift : Upto 1.50 m This is the initial lift and forms integral part of the activities in the basic rate of work item. Lift charges are admissible only for lifting effort beyond initial lift specified in the work item. Lift : Upto 3.00 m For lift upto 3 m average additional lift beyond initial lift 1 m lift is reckoned as equivalent to 6 m lead. Equivalent distance for 0.75 m lift ( 0.75 x 6 ) Average speed of conveyance by head load per minute Round trip cycle time for 4.5 m considering 50 min/ hr working ( 2 x 4.5 x 60 / 50 / 60 ) No. of trips per day for lift 1.5 m to 3 m ( 8 x 60 / 0.18 ) Quantity of material by head load Quantity of material by head load per day ( 2667 x 0.015 ) Deploy 1 mazdoor for every additional lift of 1.5 m beyond initial lift.

: 0.75 m : 4.5 m : 60 m : : : : 0.18 min 2667 0.015cum 40 cum

79

BASIC DATA

Lift : Upto 3.00 m for materials under Category I & II. Sl Description No. 1 Light mazdoor

Unit Day

Unit : Quanty 1.00 0.00 1% 10% 15% 5%

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for

40.00 cum Rate per cum

40.00 cum Rate Amount in Rs. in Rs. 130.50 130.50 0.00 0.00 Total Rs: 130.50 Rs: 1.31 Rs: 13.05 Rs: 19.58 Rs: 6.53 Rs: 170.96 Rs: 4.30

Lift : Upto 4.50 m For lift upto 4.5 m additional lift of upto 3 m is involved. Deploy 2 mazdoors. Lift : Upto 4.50 m for materials under Category I & II. Sl Description No. 1 Light mazdoor Unit : Quanty 2.00 0.00 1% 10% 15% 5% 40.00 cum Rate per cum 40.00 cum Rate Amount in Rs. in Rs. 130.50 261.00 0.00 0.00 Total Rs: 261.00 Rs: 2.61 Rs: 26.10 Rs: 39.15 Rs: 13.05 Rs: 341.91 Rs: 8.50

Unit Day

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for

Lift : Upto 6.00 m For lift upto 6 m additional lift of upto 4.5 m is involved. Deploy 3 mazdoors. Lift : Upto 6.00 m for materials under Category I & II. Sl Description No. 1 Light mazdoor Unit : Quanty 3.00 0.00 1% 10% 15% 5% 40.00 cum Rate per cum 40.00 cum Rate Amount in Rs. in Rs. 130.50 391.50 0.00 0.00 Total Rs: 391.50 Rs: 3.92 Rs: 39.15 Rs: 58.73 Rs: 19.58 Rs: 512.87 Rs: 12.80

Unit Day

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for

Lift : Upto 7.50 m For lift upto 7.5 m additional lift of upto 6 m is involved. Deploy 4 mazdoors.

80

BASIC DATA

Lift : Upto 7.50 m for materials under Category I & II. Sl Description No. 1 Light mazdoor

Unit Day

Unit : Quanty 4.00 0.00 1% 10% 15% 5%

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for

40.00 cum Rate per cum

40.00 cum Rate Amount in Rs. in Rs. 130.50 522.00 0.00 0.00 Total Rs: 522.00 Rs: 5.22 Rs: 52.20 Rs: 78.30 Rs: 26.10 Rs: 683.82 Rs: 17.10

FOR CATEGORY III : Cement bag / Reinforcement steel / Structural steel sections Lift : Upto 1.50 m This is the initial lift and forms integral part of the activities in the basic rate of work item. Lift charges are admissible only for lifting effort beyond initial lift specified in the work item. Lift : Upto 3.00 m For lift upto 3 m average additional lift beyond initial lift 1 m lift is reckoned as equivalent to 6 m lead. Equivalent distance for 0.75 m lift ( 0.75 x 6 ) Average speed of conveyance by head load per minute Round trip cycle time for 4.5 m considering 50 min/ hr working ( 2 x 4.5 x 60 / 50 / 25 ) No. of trips per day for lift upto 3 m ( 8 x 60 / 0.43 ) Quantity of material by head load Quantity of material by head load per day ( 1116 x 50 / 1000 ) Deploy 1 mazdoor for every additional lift of 1.5 m beyond initial lift. Lift : Upto 3.00 m for materials under Category I & II. Sl Description No. 1 Cement / Steel handling mazdoor Unit : Quanty 1.00 0.00 1% 10% 15% 5% 56.00 tonne Rate per tonne

: 0.75 m : 4.5 m : 25 m : : : : 0.43 min 1116 50 kg 56 t

Unit Day

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for

56.00 tonne Rate Amount in Rs. in Rs. 134.00 134.00 0.00 0.00 Total Rs: 134.00 Rs: 1.34 Rs: 13.40 Rs: 20.10 Rs: 6.70 Rs: 175.54 Rs: 3.10

Lift : Upto 4.50 m For lift upto 4.5 m additional lift of upto 3 m is involved. Deploy 2 mazdoors.

81

BASIC DATA

Lift : Upto 4.50 m for materials under Category III. Sl Description No. 1 Cement / Steel handling mazdoor

Unit Day

Unit : Quanty 2.00 0.00 1% 10% 15% 5%

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for

56.00 tonne Rate per tonne

56.00 tonne Rate Amount in Rs. in Rs. 134.00 268.00 0.00 0.00 Total Rs: 268.00 Rs: 2.68 Rs: 26.80 Rs: 40.20 Rs: 13.40 Rs: 351.08 Rs: 6.30

Lift : Upto 6.00 m For lift upto 6 m additional lift of upto 4.5 m is involved. Deploy 3 mazdoors. Lift : Upto 6.00 m for materials under Category III. Sl Description No. 1 Cement / Steel handling mazdoor Unit : Quanty 3.00 0.00 1% 10% 15% 5% 56.00 tonne Rate per tonne 56.00 tonne Rate Amount in Rs. in Rs. 134.00 402.00 0.00 0.00 Total Rs: 402.00 Rs: 4.02 Rs: 40.20 Rs: 60.30 Rs: 20.10 Rs: 526.62 Rs: 9.40

Unit Day

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for

Lift : Upto 7.50 m For lift upto 7.5 m additional lift of upto 6 m is involved. Deploy 4 mazdoors. Lift : Upto 7.50 m for materials under Category III. Sl Description No. 1 Cement / Steel handling mazdoor Unit : Quanty 4.00 0.00 1% 10% 15% 5% 56.00 tonne Rate per tonne 56.00 tonne Rate Amount in Rs. in Rs. 134.00 536.00 0.00 0.00 Total Rs: 536.00 Rs: 5.36 Rs: 53.60 Rs: 80.40 Rs: 26.80 Rs: 702.16 Rs: 12.50

Unit Day

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for

82

BASIC DATA

FOR CATEGORY IV : PCC slab / Shahabad slab / CC block / Laterite / BS slab / Wood Lift : Upto 1.50 m This is the initial lift and forms integral part of the activities in the basic rate of work item. Lift charges are admissible only for lifting effort beyond initial lift specified in the work item. Lift : Upto 3.00 m For lift upto 3 m average additional lift beyond initial lift 1 m lift is reckoned as equivalent to 6 m lead. Equivalent distance for 0.75 m lift ( 0.75 x 6 ) Average speed of conveyance by head load per minute Round trip cycle time for 4.5 m considering 50 min/ hr working ( 2 x 4.5 x 60 / 50 / 40 ) No. of trips per day for lift upto 3 m ( 8 x 60 / 0.27 ) Quantity of material by head load Quantity of material by head load per day ( 1778 x 0.017 ) Deploy 1 mazdoor for every additional lift of 1.5 m beyond initial lift. Lift : Upto 3.00 m for materials under Category IV. Sl Description No. 1 Heavy mazdoor Unit : Quanty 1.00 0.00 1% 10% 15% 5% 30.00 cum Rate per cum

: 0.75 m : 4.5 m : 40 m : : : : 0.27 min 1778 0.017cum 30 cum

Unit Day

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for

30.00 cum Rate Amount in Rs. in Rs. 132.00 132.00 0.00 0.00 Total Rs: 132.00 Rs: 1.32 Rs: 13.20 Rs: 19.80 Rs: 6.60 Rs: 172.92 Rs: 5.80

Lift : Upto 4.50 m For lift upto 4.5 m additional lift of upto 3 m is involved. Deploy 2 mazdoors. Lift : Upto 4.50 m for materials under Category IV. Sl Description No. 1 Heavy mazdoor Unit : Quanty 2.00 0.00 1% 10% 15% 5% 30.00 cum Rate per cum 30.00 cum Rate Amount in Rs. in Rs. 132.00 264.00 0.00 0.00 Total Rs: 264.00 Rs: 2.64 Rs: 26.40 Rs: 39.60 Rs: 13.20 Rs: 345.84 Rs: 11.50

Unit Day

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for

83

BASIC DATA

Lift : Upto 6.00 m For lift upto 6.00 m additional lift of upto 4.50 m is involved. Deploy 3 mazdoors. Lift : Upto 6.00 m for materials under Category IV. Sl Description No. 1 Heavy mazdoor Unit : Quanty 3.00 0.00 1% 10% 15% 5% 30.00 cum Rate per cum 30.00 cum Rate Amount in Rs. in Rs. 132.00 396.00 0.00 0.00 Total Rs: 396.00 Rs: 3.96 Rs: 39.60 Rs: 59.40 Rs: 19.80 Rs: 518.76 Rs: 17.30

Unit Day

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for

Lift : Upto 7.50 m For lift upto 7.50 m additional lift of upto 6.00 m is involved. Deploy 4 mazdoors. Lift : Upto 7.50 m for materials under Category IV. Sl Description No. 1 Heavy mazdoor Unit : Quanty 4.00 0.00 1% 10% 15% 5% 30.00 cum Rate per cum 30.00 cum Rate Amount in Rs. in Rs. 132.00 528.00 0.00 0.00 Total Rs: 528.00 Rs: 5.28 Rs: 52.80 Rs: 79.20 Rs: 26.40 Rs: 691.68 Rs: 23.10

Unit Day

Add for small Tools & Plants @ Add for Contractor's Profit @ Add for Hidden cost on Labour @ Add for Contractor's Overheads @ Total for

84