(C)DR.A.M.

SURENDRA KUMAR

VAPOUR COMPRESSION REFRIGERATION SYSTEM

(C)DR.A.M.SURENDRA KUMAR

(C)DR.A.M.SURENDRA KUMAR 3

(C)DR.A.M.SURENDRA KUMAR

RESULTS OF FIRST AND SECOND LAW ANALYSIS FOR STEADY-FLOW

COMPONENT

PROCESS s = Const.

FIRST LAW RESULT

1 2 3 4

Compressor

m (h2 h1 ) W in

0 W net Condenser P = Const Expansion Valve s > 0


Evaporator P = Const

m (h2 h3 ) Q H

h4 h3
m (h1 h4 ) Q L

COPR COPHP

Q h h L 1 4 W h2 h1 net , in Q h h H 2 3 Wnet ,in h2 h1


(C)DR.A.M.SURENDRA KUMAR 6

(C)DR.A.M.SURENDRA KUMAR

P-H CHART

(C)DR.A.M.SURENDRA KUMAR

MERITS & DEMERITS OF VAPOUR SYSTEM OVER AIR REFRIGERATION SYSTEM

MERITS:
1. C.O.P. is quite high as the working of the cycle is very near to
that of reversed Carnot cycle.

2. When used on ground level the running cost of vapour


compression refrigeration system is only 1/5 of air refrigeration system. 3. For the same refrigeration effect the size of the evaporator is

smaller.
4. The required temperature of the evaporator can be achieved simply by adjusting the throttle valve of the same unit.

DEMERITS
1. Initial cost is high. 2. the major disadvantages are

a) Inflammability
b) Leakage of vapours c) Toxity.

(C)DR.A.M.SURENDRA KUMAR

11

VAPOUR COMPRESSION REFRIGERATION SYSTEM ON T-S.DIAGRAM

EFFECT OF SUCTION & DELIVERY PRESSURE

EFFECT OF SUPERHEATING & SUBCOOLING OF LIQUID

LIQUID- VAPOUR HEAT EXCHANGER

EFFECT OF CONDENSING & EVAPORATING TEMPERATURE ON C.OP & REFRIGERATING EFFECT

(C)DR.A.M.SURENDRA KUMAR

17

EFFECT OF CONDENSER WATER TEMPERATURE ON POWER

(C)DR.A.M.SURENDRA KUMAR

18

PULL DOWN CHARACTRISTCS

PURPOSE OF THE TEST COMPARE THE VALUES FOR DIFFERENT REFRIGERATORS FOR DIFFERENT REFRIGERENTS TESTING OF REFRIGERATORS ACCORDING TO ISI SPECIFICATIONS ENVIORNMENT TEMPERATURE MAINTAINED AT 430C. NO-LOAD TEST ADJUST THERMOSTAT CABNET TEMP. 70C. PURPOSE: FIND PULL DOWN PERIOD NO LOAD POWER CONSUMPTION % RUNNING TIME PULL DOWN PERIOD : TIME REQUIRED TO REACH THE SPECIFIED TEMP. INSIDE THE CABNET AFTER SWITCHING ON THE UNIT.

Ice making time test


For this test: Stable operating conditions after Pull-down test Quantity of 0.5 kg of water at 30 10C in std tray kept in the freezer Time for each ON and OFF is noted. After specified time of 3 hrs., ice tray is examined for the formation of ice. Running time of the unit during 3 hrs of operation is obtained from DAS DAS to monitor N-OFF cycle. This running time of the unit is the ice making time. For Freon -12 refrigerator: pull-down period 90 min for 160L capacity ice making time 125 min.
(C)DR.A.M.SURENDRA KUMAR 20